DIRECT FACTORY OUTLET EXTENSION DRAFT MAJOR DEVELOPMENT PLAN For more information visit www.bne.com.au
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION TABLE OF CONTENTS 1.0 INTRODUCTION ....................................................................................................................................... 5 1.1 Background ................................................................................................................................................ 5 1.2 Report Structure ......................................................................................................................................... 5 1.3 Project Proponent ...................................................................................................................................... 5 2.0 PROJECT DESCRIPTION ......................................................................................................................... 6 2.1 Project Summary ....................................................................................................................................... 6 2.1.1 Extension to DFO .............................................................................................................................. 6 2.1.2 Retail Plaza & Pedestrian Walkways ................................................................................................. 6 2.1.3 Multi-Level Car park .......................................................................................................................... 6 2.1.4 Access Arrangements ....................................................................................................................... 7 2.2 Project Justification and Objectives ........................................................................................................... 7 2.3 Location of Proposed Development ........................................................................................................... 7 2.4 Proposed Design ....................................................................................................................................... 8 2.4.1 Building Materials .............................................................................................................................. 8 2.4.2 Occupational Health and Safety ........................................................................................................ 9 2.4.3 Equity of Access ................................................................................................................................ 9 2.4.4 Energy Efficiency Considerations ...................................................................................................... 9 2.5 Project Development Phases ..................................................................................................................... 9 2.5.1 Roads and Services .......................................................................................................................... 9 2.5.2 Building Works and Site Works ......................................................................................................... 9 2.5.3 Indicative Timing of Proposal ............................................................................................................ 9 3.0 LEGISLATIVE CONTEXT ........................................................................................................................ 10 3.1 Consistency with Commonwealth Legislation .......................................................................................... 10 3.1.1 Airports Act 1996 ............................................................................................................................. 10 3.1.2 Environmental Protection and Biodiversity Conservation Act 1999 ................................................. 11 3.2 Pre-existing Airport Land.......................................................................................................................... 12 3.3 Consistency with Airport Lease ................................................................................................................ 12 3.4 Consistency with the Brisbane Airport Master Plan ................................................................................. 12 3.5 Consistency with Brisbane Airport Environmental Strategy ..................................................................... 22 3.6 Consistency with State and Local Government Planning ......................................................................... 22 3.6.1 State Planning Policies .................................................................................................................... 22 3.6.2 Brisbane City Plan 2000 .................................................................................................................. 23 3.7 Airport Development and Building Approvals ........................................................................................... 24 4.0 ASSESSMENT METHODOLOGY ........................................................................................................... 25 4.1 Assessment Scope .................................................................................................................................. 25 4.2 Document Review .................................................................................................................................... 25 4.2.1 Literature ......................................................................................................................................... 25 Brisbane Airport Corporation Pty Ltd 2
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION 4.2.2 Assessment Technique ................................................................................................................... 25 5.0 ENVIRONMENTAL ASSESSMENT ......................................................................................................... 27 5.1 Geology, Soils and Topography ............................................................................................................... 27 5.1.1 Baseline Conditions......................................................................................................................... 27 5.1.2 Assessment of Impacts ................................................................................................................... 28 5.1.3 Mitigation Measures ........................................................................................................................ 29 5.2 Ecology .................................................................................................................................................... 30 5.2.1 Baseline Conditions......................................................................................................................... 30 5.2.2 Assessment of Impacts ................................................................................................................... 30 5.2.3 Mitigation Measures ........................................................................................................................ 30 5.3 Hydrology and Water Quality ................................................................................................................... 30 5.3.1 Baseline Controls ............................................................................................................................ 30 5.3.2 Assessment of Impacts ................................................................................................................... 31 5.3.3 Mitigation Measures ........................................................................................................................ 31 5.4 Air Quality and Odour............................................................................................................................... 31 5.4.1 Baseline Conditions......................................................................................................................... 31 5.4.2 Assessment of Impacts ................................................................................................................... 32 5.4.3 CASA Plume Rise Assessment ....................................................................................................... 32 5.4.4 Mitigation Measures ........................................................................................................................ 32 5.5 Noise ........................................................................................................................................................ 32 5.5.1 Baseline Conditions......................................................................................................................... 32 5.5.2 Assessment of Impacts ................................................................................................................... 33 5.5.3 Mitigation Measures ........................................................................................................................ 34 5.6 Land Use.................................................................................................................................................. 34 5.6.1 Baseline Conditions......................................................................................................................... 34 5.6.2 Assessment of Impacts ................................................................................................................... 35 5.6.3 Mitigation Measures ........................................................................................................................ 35 5.7 Economic Impacts .................................................................................................................................... 35 5.7.1 Baseline Conditions......................................................................................................................... 35 5.7.2 Assessment of Impacts ................................................................................................................... 37 5.7.3 Mitigation Measures ........................................................................................................................ 39 5.8 Landscape ............................................................................................................................................... 39 5.8.1 Baseline Conditions......................................................................................................................... 39 5.8.2 Assessment of Impacts ................................................................................................................... 39 5.8.3 Mitigation Measures ........................................................................................................................ 39 5.9 Cultural Heritage ...................................................................................................................................... 40 5.9.1 Baseline Conditions......................................................................................................................... 40 5.9.2 Assessment of Impacts ................................................................................................................... 40 Brisbane Airport Corporation Pty Ltd 3
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION 5.9.3 Mitigation Measures ........................................................................................................................ 40 5.10 Waste .................................................................................................................................................. 40 5.10.1 Baseline Conditions......................................................................................................................... 40 5.10.2 Assessment of Impacts ................................................................................................................... 40 5.10.3 Mitigation Measures ........................................................................................................................ 40 5.11 Traffic and Parking............................................................................................................................... 41 5.11.1 Baseline Conditions......................................................................................................................... 41 5.11.2 Assessment of Impacts ................................................................................................................... 42 5.11.3 Mitigation Measures ........................................................................................................................ 43 5.12 Hazardous Goods ................................................................................................................................ 44 5.13 Aviation Safety..................................................................................................................................... 44 5.13.1 Prescribed Airspace ........................................................................................................................ 44 5.13.2 Airport Navigation and Radar Systems ........................................................................................... 44 5.13.3 Flight Paths ..................................................................................................................................... 44 5.13.4 Lighting and Reflection .................................................................................................................... 44 6.0 BUILDING SUSTAINABILITY .................................................................................................................. 45 6.1 Water Efficiency ....................................................................................................................................... 45 6.2 Energy Efficiency ..................................................................................................................................... 45 7.0 SUMMARY OF IMPACTS ........................................................................................................................ 46 8.0 REFERENCES ........................................................................................................................................ 47 APPENDIX A: EXISTING SITE PLAN ............................................................................................................... 48 APPENDIX B: PROPOSAL PLANS ................................................................................................................... 49 APPENDIX C: AIRPORTS ACT REQUIREMENTS FOR DRAFT MAJOR DEVELOPMENT PLAN ................. 52 LIST OF FIGURES Figure 1: Location of Proposed Development ......................................................................................................... 8 Figure 2: MDP Approval Process .......................................................................................................................... 11 Figure 3: Retail Centres within 5 km of Airport Village .......................................................................................... 37 LIST OF TABLES Table 1: Consistency of proposed development to Brisbane Airport Master Plan Objectives ............................... 14 Table 2: Environmental and Social-Economic Significance Criteria ...................................................................... 26 Table 3: Growth in Employment at Brisbane Airport 2007 - 2013 ......................................................................... 38 Table 4: Projected population by SAL 2, Brisbane Airport Locality, 2011 to 2031 ................................................ 38 Table 5: Trip Generation of DFO Extension .......................................................................................................... 43 Table 6: Summary of Environmental and Social Impact ........................................................................................ 46 Brisbane Airport Corporation Pty Ltd 4
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION 1.0 INTRODUCTION 1.1 Background The proposal described in this Draft Major Development Plan (MDP) concerns Stage 4 (extension) of the Direct Factory Outlet (DFO) centre located within the Airport Village Precinct. The proposed development footprint and layout is provided in Appendix B. The existing DFO was subject to an approved MDP issued in 2004. The centre was constructed in 3 stages between 2004 and 2008 with Stage 1 opening to the public in 2005. The DFO has a Net Lettable Area (NLA) of 2 21,307m which is accommodated in two single storey buildings, currently containing approximately 135 tenancies. The existing DFO Site Plan is provided as Appendix A. The existing and proposed DFO is to be supported by associated facilities including new car parking spaces in a new multi-story car park; truck manoeuvring, service areas and loading docks; taxi ranks and bus stop facilities. The site is landscaped, with on-site provision for management of stormwater drainage and water quality treatment. Current access is via The Circuit and The Boulevard (roundabouts) which connect onto Airport Drive, a priority road link to the city’s principal arterial road network. The DFO retail concept which offers leading Australian and International brands or surplus goods that are out of season, seconds or samples for sale at consistently below normal retail price has proved highly successful. The centre attracts visitors and shoppers from a wide catchment area across metropolitan Brisbane and neighbouring Local Government Areas such as the Moreton Bay Regional Council and Redland City. The centre offers a different marketing model to other shopping centres with trading hours of 10am - 6pm, 7 days a week. The extension is consistent with the Brisbane Airport Corporation’s Master Plan which supports continuous improvement to the amenities, services and overall shopping experience being offered to the Brisbane Airport, Airport Village and DFO centre visitors. 1.2 Report Structure Section 2 of this report describes the project that is the subject of this draft MDP. Section 3 outlines the legislative context within which the project is being developed, having regard to relevant federal, state and local legislation and policy. Section 4 defines the scope of the assessment and the methodology used in the assessment of environmental impacts associated with the proposal. Section 5 details the environmental assessment and measures proposed to manage or mitigate any potential impacts. Sections 6 and 7 provide a summary of the sustainability elements and environmental effects of the proposal. 1.3 Project Proponent All works associated with the proposed facility are on land within the existing boundary of the Brisbane Airport. Brisbane Airport Corporation (BAC) is an “airport-lessee company” under the Airports Act 1996. The proponent for this proposed “major airport development” as defined under the Airports Act 1996 is: Brisbane Airport Corporation Limited 11 The Circuit Brisbane Airport QLD 4008 The contact in connection with this proposal is Terry Rossitto, Infrastructure Development Manager, BAC, telephone (07) 3406 3000. Brisbane Airport Corporation Pty Ltd 5
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION 2.0 PROJECT DESCRIPTION 2.1 Project Summary The proposed development is the extension of the existing DFO Centre. Physically, this includes: an eastern extension to the existing southern DFO building to accommodate additional retail tenancies; a new multi-level car park located adjacent to the northern part of the DFO building; retail plaza area which is likely to accommodate alfresco dining and a mixed-use commercial building (with offices at first floor level); and a redeveloped pedestrian walkway connecting the DFO, plaza and Village Market components of the Airport Village precinct and children’s play area. Detailed Plans of the proposed development are provided in Appendix B. These components of the development are discussed in further detail below. 2.1.1 Extension to DFO DFO extension is a functional addition of the existing centre and will create a greater level of connectivity and integration with the surrounding Airport Village Precinct. The extension is located on the eastern side of the southern DFO building and will be constructed with consistent design, materials and height to the current centre. As with the current DFO, the extension will be an air conditioned, single level building, with an open plan layout, high ceilings and wide walkways allowing ease of pedestrian movements along the shopping mall. A high degree of internal flexibility is provided to enable tenancies to be sized and constructed to meet the specific needs of future lessees. 2 The proposed development will provide approximately 4,700m of additional Net Lettable Area (NLA), representing an approximate 22% increase to the current DFO centre. 2.1.2 Retail Plaza & Pedestrian Walkways 2 The proposed development includes a retail plaza with possible alfresco dining plaza (of approximately 600m NLA) located between the proposed DFO extension and the new multi-level car park. This area will be developed with a high level of public amenity and landscaping to soften the built form and create a highly attractive entrance to the DFO. The plaza will function as a ‘high street’ pedestrian link between the DFO and uses within the Airport Village Precinct including the Village Markets and Brisbane Airport Corporation offices. “Shop-Top” commercial offices 2 (of approximately 600m NLA) will be developed at a first floor above the new retail/dining outlets. These st tenancies will have a connection to the 1 floor of the multi-level car park. The plaza will also incorporate a children’s play area. A proposed vertical transport zone located at the eastern end of the retail plaza will provide an attractive, convenient and highly visual pedestrian connection (including potential travelators) linking the new multi-level car park, to the commercial offices, the plaza, DFO entrance and the broader pedestrian network across the Airport Village Precinct. 2.1.3 Multi-Level Car park The new multi-level car park is located to the north of the proposed retail plaza area and the east of the DFO Centre. The proposed car park will provide approximately 1,160 parking spaces across up to 4 levels. There are currently a total of 1,856 parking spaces provided on the site, equating to a parking rate of 2 2 approximately 1 space per 10m NLA for the existing 21,307m NLA. This equates to approximately 1 space per 2 2 11m GFA for existing 23,440m GFA. Brisbane Airport Corporation Pty Ltd 6
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION The proposal includes plans to replace the existing north-eastern car park of about 560 spaces with up to 4 levels in a multi-storey parking station with approximately 1,160 parking spaces. Thus the DFO and office area will have a total combined parking provision of approximately 2,459 spaces. This equates to approximately 1 space per 2 9.6m NLA. The maximum building height of the car park will be approximately 14m above ground level. 2.1.4 Access Arrangements Current road access arrangements are maintained from both The Circuit and The Boulevard (roundabouts) with connection onto Airport Drive. 9th Avenue will be reconfigured to maintain local access into the car parking areas and provide passenger and bus bay facilities in a low speed traffic environment. 2.2 Project Justification and Objectives The planning context (justification) for the proposed development is provided in the Brisbane Airport - 2009 Master Plan. The vision for the Brisbane Airport is “to transform Brisbane Airport from a city airport to an Airport City” by: positioning Brisbane Airport as a premier airport and major business centre with a multi-modal transport hub; growing Brisbane Airport as a leading economic engine and gateway to the east coast of Australia; creating a business environment that values partnerships ,people ,quality of life and community engagement; and adopting a proactive and sustainable approach to sustainable management. The vision is delivered through the Brisbane Airport’s land use strategy which has been prepared to increase the airport’s contribution to the regional economy and respond to market demand with opportunities identified to provide for a mix of business, retail, industrial and tourism activities. DFO extension addresses the vision by: Meeting the demand for increased NLA in the existing DFO centre; Improving the existing centre’s amenities and attractiveness to visitors through planned upgrades and improvements; Enhancing the range of services and facilities available in the Airport Village precinct to both the on-airport workforce and visitors to the Brisbane Airport; Satisfying car parking demands within a multi-level building that provides highly accessible, convenient and all weather protected parking spaces; Extending a pedestrian spine through the Airport Village; Improving the amenity of the public realm with the development of a pedestrian walkway flanked by restaurants, hotels, green space and urban art; Increasing investment in infrastructure and generating employment opportunities during construction and operational phases; and Providing a development that achieves BAC’s overall vision for Airport Village and the development objectives for the Brisbane Airport. 2.3 Location of Proposed Development The proposed development is an extension of the existing DFO centre and adjoining land uses at Airport Village. It is a north-easterly extension of the existing building predominately facing Ninth Avenue, the Village Markets and the BAC Headquarters building. It forms part of the Airport Village precinct. Brisbane Airport Corporation Pty Ltd 7
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Airport Drive DEVELOPMENT SITE Lakeside Drive Airport Village FIGURE 1: LOCATION OF PROPOSED DEVELOPMENT 2.4 Proposed Design The DFO extension includes an eastern extension to the existing southern DFO building to accommodate additional retail tenancies, retail plaza area which is likely to accommodate alfresco dining and a mixed-use commercial building and a new multi-level car park. 2.4.1 Building Materials DFO extension will be primarily constructed in a manner consistent with the existing centre. In particular, the DFO extension will be a steel frame construction, with pre-cast concrete walls, concrete floors and colorbond metal roof. External finish and façade treatments will be generally consistent with the existing DFO. The proposed multi-level car park will be a primarily concrete construction with external façade treatments to provide visual interest and reduce building bulk. The retail plaza with mixed uses including first floor offices will be developed with a high level of visual interest and include glass windows at both the retail and office level and a range of light weight timber and aluminium elements to create the desired streetscape. This area will be enhanced by soft and hard landscape elements to improve way findings and overall visitor experience. The development will minimise the use of materials that are non-renewable or create toxic pollution in their manufacturing or disposal. Life cycle cost will be taken into consideration when selecting construction materials. Brisbane Airport Corporation Pty Ltd 8
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION 2.4.2 Occupational Health and Safety Occupational health and safety requirements within and adjacent to the proposed development site will be in accordance with relevant BAC, Commonwealth Federal Government Agency Requirements and all applicable statutory requirements including the Queensland work health and safety legislation; the Work Health and Safety Act 2011, and Work Health and Safety Regulation 2011 and the 11 new national codes of practices that have been adopted within Queensland as part of the harmonisation process. 2.4.3 Equity of Access Provisions for mobility-impaired people within the building will comply with the applicable codes, including the Premises Standards and Disability Access provisions of the BCA. 2.4.4 Energy Efficiency Considerations The building will be designed having regard to the mandatory performance requirements and applicable optional deemed to satisfy provisions of the BCA. During the design process BAC will investigate means of adopting energy efficiency techniques in the building design. 2.5 Project Development Phases 2.5.1 Roads and Services The proposed development involves the construction over existing car parking areas and use of building foundations that meet industry standards. As such, Bulk Earthworks have been completed for the majority of the Airport Village Site. Construction for the proposed development will involve installation of services, construction of building foundations and structure, construction of the plaza, some road works in 9th Avenue and The Circuit including pavements, kerbs, footpaths, landscaping and lighting works. Earthworks will be generally restricted to minor adjustment of existing ground levels as required to develop level building platforms and to generate the surface grades required for drainage. 2.5.2 Building Works and Site Works Foundations for building structures will be typical for this type of construction and may likely require piled solutions. Superstructure again will consist of typical elements such as precast and in situ reinforced concrete, steel work, and typical roofing and wall claddings. Building services will be installed as the structure is progressed. Services including sewer, water, power and communication will be extended from current services connections on site. These services will be installed in trenches and will extend into and under the proposed structures. Works will include installation of conduits, cables, pipes, and fittings and the construction of manhole and substation structures as required. Stormwater drainage infrastructure will be constructed to service the building and to collect roof water from the structure. Infrastructure includes pipe work, manholes, gully pits, and water sensitive design measures. Finishing works will include planting and landscaping, the commissioning of services and the installation of any architectural features. The landscaping design and the timing of the installation of landscaping will consider water sensitive urban design principles. 2.5.3 Indicative Timing of Proposal The construction program will occur over 12-14 months commencing in early to mid 2014. It will include temporary car parking, access and pedestrian movement arrangements to mitigate the impacts on the continuing operation of the DFO and other facilities in this part of the Airport Village precinct. These arrangements will be documented at the time of preparing the detail design drawings for building approval and be subject of extensive consultation with key stakeholders. Brisbane Airport Corporation Pty Ltd 9
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION 3.0 LEGISLATIVE CONTEXT The following sections provide an overview of relevant legislation and policy for the development of a proposed extension to the existing DFO centre and car park. The following key statutes were considered during the preparation of this draft MDP: Airports Act 1996 (Cth); Airports Regulations 1997 (Cth); Airports (Environment Protection) Regulations 1997 (Cth); Airports (Building Control) Regulations 1996 (Cth); Airports (Control of On-Airport Activities) Regulations 1997 (Cth); Environment Protection and Biodiversity Conservation Act 1999 (Cth); Work Health and Safety Act 2011 (Qld); Civil Aviation Safety Authority Manual of Standards – Part 139 Aerodromes; Environmental Protection Act 1994 (Qld); and Airport (Protection of Airspace) Regulations 1996 3.1 Consistency with Commonwealth Legislation 3.1.1 Airports Act 1996 The Airports Act 1996 requires an MDP for each major development at a regulated airport. Section 89 of the Act prescribes those activities that are included as a ‘major airport development.’ The proposed development outlined in this draft MDP is defined as a ‘major development’ by virtue of Section 89(1): e) constructing a new building, where: (i) the building is not wholly or principally for use as a passenger terminal; and (ii) the cost of construction exceeds $20 million or such higher amount as is prescribed;” Section 90 of the Airports Act 1996 provides that major airport developments must not be carried out except in accordance with an approved MDP. This draft MDP has been prepared in accordance with and in order to meet the requirements of the Airports Act 1996 as outlined above, in particular the requirements as listed in Section 91. The key steps in the approval process for an MDP under the Airports Act 1996 are presented in Figure 2. An important implication of this process is the requirement that the MDP be made available for public comment for 60 days. An MDP checklist is provided in Appendix C to demonstrate the compliance of this proposed development with Section 91 of the Airports Act 1996. Brisbane Airport Corporation Pty Ltd 10
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION FIGURE 2: MDP APPROVAL PROCESS Note: The MDP approval protocols subject to provisions contained under the Commonwealth Airports Act 1996. The Minister is responsible for deciding whether to grant approval or refuse the MDP. 3.1.2 Environmental Protection and Biodiversity Conservation Act 1999 The Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act) provides protection to matters of National Environmental Significance (NES) which include: World Heritage properties; National Heritage properties; Wetlands of international importance; Brisbane Airport Corporation Pty Ltd 11
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Nationally threatened species and communities; Migratory species; Nuclear actions; Commonwealth marine environment; and Any additional matters specified by the regulations. The EPBC Act protects the environment on Commonwealth land and regulates those actions of Commonwealth departments and agencies that may have a significant impact on the environment. As Brisbane Airport is located on Commonwealth land it is subject to the provisions of the EPBC Act. It is determined that matters of NES are considered unlikely to be affected by this proposed development. (Section 5 of this draft MDP provides an assessment of environmental impacts). 3.2 Pre-existing Airport Land When BAC became the airport-lessee company for Brisbane Airport in July 1997, it assumed certain pre-existing lessor obligations under various leases. BAC also became the head-lessee under the airport lease subject to a number of other interests in the airport land (such as easements). Some of those contractual and other rights remain in existence. Others have expired. However, there are no such contractual or other rights affecting the site where the development works specified in the draft MDP will be undertaken. 3.3 Consistency with Airport Lease The proposed facility is consistent with the airport lease between BAC and the Commonwealth of Australia for Brisbane Airport by providing an extension to the existing retail offering and providing new parking facilities which will benefit the Airport Village precinct. The quality and standard of the development will be consistent with the existing high quality facility and will attribute to regional economic growth. Further details of these points are included in Table 1. 3.4 Consistency with the Brisbane Airport Master Plan The planning context for the development is provided by the Brisbane Airport 2009 Master Plan, which was approved by the Federal Minister on 16 September 2009. The Master Plan provides a framework for development of the airport site to 2029 and beyond. It provides the basis for planning of aviation activity, landside development, environmental management and transport access in an integrated way. It also provides Commonwealth, State and Local government agencies, potential investors and the community with a statement of the way in which the airport intends to grow and develop. The DFO extension is considered to achieve the intent of the Brisbane Airport Master Plan by: Meeting the demand for increased NLA in the existing DFO centre; Improving the existing centre’s amenities and attractiveness to visitors through planned upgrades and improvements; Enhancing the range of services and facilities available in the Airport Village precinct to both the on-airport workforce and visitors to the Brisbane Airport; Satisfying car parking demands within a multi-level building that provides highly accessible, convenient and all weather protected parking spaces; Extending a pedestrian spine through the Airport Village; Improving the amenity of the public realm with the development of a pedestrian walkway flanked by restaurants, hotels, green space and urban art; Investing and creating jobs for Queensland; and Providing a development that achieves BAC’s overall vision for Airport Village and the development objectives for the Brisbane Airport. It is concluded that the proposed development achieves satisfactory compliance with the land use intent for the Major Centre zone and the zoning outcomes. Brisbane Airport Corporation Pty Ltd 12
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION The proposed development will add additional retail and much needed food and dining amenity. Workers will have the capacity to use this precinct as their principal location for both shopping and lunch time activities. The development will provide a greater variety of retail and food services to accommodate the ongoing growth of the Brisbane Airport working population. The proposed development will also provide additional services and facilities to cater for the forecast growth in airport based employment and passenger numbers. The Airport Village is a diverse and vibrant business centre, which includes commercial offices, retail premises, a high quality airport hotel, child care facilities, tourist outlets, health and well being facilities, a direct factory outlet, food and drink premises, and supermarket. The proposed development will further cement the existing reputation, and desired overall outcomes for the Airport Village. Brisbane Airport Corporation Pty Ltd 13
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION TABLE 1: CONSISTENCY OF PROPOSED DEVELOPMENT TO BRISBANE AIRPORT MASTER PLAN OBJECTIVES Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP Economic Achieve sound BAC is committed to responsible corporate governance and 1.1 Concept for the proposed Sustainability corporate governance, compliance, innovative and informed planning and sound 2.2 development has been developed planning and business management and systems. 3.4 through a process that management demonstrates informed planning and reflects sound business management and systems. Shareholders, customers, financiers and credit rating 3.1.1 The MDP approval process will agencies, Governments and the community will be provided include consultation with DIT, with an informed analysis of sustainability issues on-airport CASA, ASA, State and Local and an overview of BAC’s strategies to manage those Governments. issues. Ensure selective, While BAC is economically robust, global changes in the 3.4 Proposed development is an profitable and timely economy, the outlook for aviation and commercial property 3.5 extension of an existing retail and aviation and commercial and the impacts of climate change must all be factored into 3.6 commercial development that has development long term planning. 5.6 been identified as part of the 5.7 Airport Village precinct in the Brisbane Airport Master Plan and is suitably aligned with the long term vision and planning for the Brisbane Airport site. World-class retail environments will complement the travel 2.1 The main component of the experience, providing a further boost to the airport’s retail 5.6 proposed development is an business and consumption figures in the region. A 5.7 extension to existing retail responsible strategy to ensure adequate transport options business, with the construction of and commercial car parking for visitors to the airport is a ancillary multi-level car park. necessary adjunct to these developments. Brisbane Airport Corporation Pty Ltd 14
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP Complementing BAC’s pursuit of aviation and aviation 3.4 The proposed development will related development opportunities and its continued 3.5 increase retail business within the exploration of commercial opportunities. As a private sector 5.6 Airport Village precinct of the airport operator, BAC must capitalise on new commercial 5.7 Brisbane Airport Master Plan, opportunities and achieve the selective and timely helping to further establish a fully development of the airport’s extensive land bank over the integrated airport business, retail period of its lease. BAC is progressively designing and and leisure community as desired marketing nine quality precincts targeting specific industry under the Brisbane Airport Master segments. Plan. This strategy remains a high priority to achieve sustained 2.1 The proposed development is an growth in shareholder value and a buoyant regional 2.2 extension to an established tenant economy. However, BAC will maintain its preference for 3.4 and industry (retail) that already tenants and partners that demonstrate clear synergies with 5.6 demonstrates clear synergies with the Airport City vision. 5.7 the Airport City Vision. Contribute to regional While national and state economic contributions accrue from 5.7 The proposed development is an economic wealth and a busy, metropolitan airport linked to national and extension to an already employment generation international hubs, Brisbane Airport’s most direct impacts established and highly successful will continue to be felt in the Brisbane-Moreton regional retail development that provides economy. Locally, sustained growth in real output, real not only the Brisbane Airport, but consumption and employment will occur as a direct result of the greater Brisbane-Moreton implementing the 2009 Master Plan. community with specialised and unique retail opportunities. New and expanded industries and diverse employment 5.7 The proposed development opportunities will emerge as a by-product of Brisbane reinforces the mixed use character Airport’s progression towards an Airport City. In particular, of the Airport Village and as jobs in tourism are set to grow as the airport increases its business and retail hub for the connectivity within the global aviation network; gains access Airport site. It will further provide Brisbane Airport Corporation Pty Ltd 15
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP to more destinations; and secures more frequent flights. an opportunity to increase the diversity of employment opportunities at Brisbane Airport. Job opportunities in aviation and logistics industries will also 5.7 The proposed development grow as clusters of excellence emerge at Brisbane Airport in reinforces the mixed use character air freight export and import, aviation maintenance, repair of the Airport Village and as and overhaul, aviation education and related service business and retail hub for the industries. Airport site. It will further provide an opportunity to increase the diversity of employment opportunities at Brisbane Airport. Operational Facilitate the safe and Brisbane Airport strives for and achieves a high level of N/A Sustainability secure movement of compliance in safety and security. However, even greater people, freight and vigilance will be required in the future as airports face aircraft potential new or heightened risks, and Brisbane Airport’s facilities, flights, employment and freight continue to expand. To address this challenge, BAC is engaged in research that will ensure it remains at the cutting edge of new security technologies. BAC will also work with its industry and Government partners to maintain airside safety standards and to explore flexible, risk-based security measures. Ensure the timely This development objective aligns closely with BAC’s 3.4 The proposed development is an delivery of new and previously stated objective of ‘meeting future capacity 3.5 extension to an existing retail improved airport needs’. The intent in this 2009 Master Plan is to continue to 5.6 centre complex that is considered capacity increase airport capacity by investing in an integrated and 5.13 to be a supporting facility of carefully staged program of development for airfields Brisbane Airport operations and (runways, taxiways and aprons), terminals, buildings and will result in an increase in retail Brisbane Airport Corporation Pty Ltd 16
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP supporting facilities and infrastructure. space for a highly successful retail destination. Availability of critical assets to operate the airport and meet 3.4 The proposed development is an the demands of aviation and regional growth is essential. 3.5 extension to an existing retail For BAC, achieving sustainable and responsible growth on- 5.6 complex that is considered to be a airport means ensuring that new and improved operating 5.7 supporting facility of Brisbane capacity is available to maintain business continuity and Airport operations and will result in satisfy demand. However, identifying ways to maximise the an increase in retail space for a airport’s current capacity is also important. highly successful retail destination. The proposed development has been designed to make the best use of space available at the existing retail facility and ancillary car park. Deliver innovative, This objective builds upon that stated in the 2009 Master 2.1 The proposed development efficient and continuous Plan to ‘improve the quality of services’. Quality, efficiency 2.4 includes a new multi-level car park airport services and innovation jointly impact on how the airport will perform 5.7 to compliment the proposed as a service provider. Here, the experience and perception extension to the existing retail of airport customers continue to be important indicators. A facility. This will provide convenient, safe and enjoyable journey for passengers and convenient travel options for users, the efficient transit of freight through Brisbane Airport are and increase the trip generation key outcomes of smooth facilitation processes in the capacity of the facility. terminals. The benefits of these innovations at Brisbane Airport are 2.1 The proposed development will twofold: airline and logistics partners achieve greater increase the overall positive process and cost efficiencies, and passengers enjoy more shopping experience within the ‘dwell’ time for shopping and relaxation in the terminals and Airport Village precinct. Brisbane Airport Corporation Pty Ltd 17
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP precincts. Supplementing the services offered inside the terminals is a range of new facilities in emerging precincts across the airport. Facilities to cater for medical and childcare needs, banking, leisure and recreation, are all adding to the overall service experience of those who visit or work on airport. Environmenta Develop a proactive At Brisbane Airport, BAC aims to reduce those emissions for N/A l response to climate which it is directly responsible, and to work towards reducing Sustainability change the indirect effects of its activities, while working with other parties to explore ways of reducing emissions that are beyond BAC’s control. Minimise adverse The 2009 Master Plan highlights an ongoing program for the 5.1 The proposed development environmental impacts management of energy, water, waste, noise and 5.2 commits to the achievement of the biodiversity. 5.3 sustainable design principles and 5.4 minimising environmental impacts 5.5 including waste generation. 5.8 5.9 5.10 6 6.1 6.2 Ultimately, it is the level of success in reducing the use of N/A non-renewable resources, identifying alternative sources, recycling, noise and biodiversity management, that will have the greatest effect on BAC’s environmental footprint. Brisbane Airport Corporation Pty Ltd 18
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP To minimise adverse environmental impacts, but allow for 5.1 The proposed development is not responsible and considered growth, a wide range of 5.2 expected to create any initiatives feature in the 2009 AES. 5.3 environmental impacts on the 5.4 surrounding environment and 5.5 reflects a carefully considered and 5.8 environmentally responsible 5.9 design. 5.10 6 6.1 6.2 Achieve a balance of Awareness of the overall balance of built and natural 5 The proposed development is built environment and environments is paramount in ensuring that on-airport 6 located in an existing built up area. biodiversity values precincts achieve positive environmental and aesthetic 7 No biodiversity impacts are outcomes, but also fulfil commercial and operational goals. expected as a result of the proposed development. Consideration of the most appropriate locations and 5.6 The proposed development is densities for development and an urban open space strategy 5.7 located in an existing built up area, are high priorities for Brisbane Airport to achieve this goal. 3.4 in a Brisbane Airport Master Plan While balancing built and natural environments is a new zone that intends retails uses, and objective in the 2009 Master Plan, it is in line with BAC’s is an extension to existing retail 2003 objective of ‘balancing economic benefit and uses on site. environmental impact’. Social Build stakeholder For BAC, social responsibility refers to public accountability 3.1 The MDP approval process will Sustainability engagement and and an ongoing dialogue with shareholders, Government 3.6 include consultation with DIT, partnerships employees, business partners, customers and the CASA, ASA, State and Local community. It also embraces sponsorships and philanthropic Government. Brisbane Airport Corporation Pty Ltd 19
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP activities. In developing and implementing the Master Plan, the engagement of all interested and affected stakeholders remains a high priority. On-airport, BAC’s long-term goal is to create a sense of 2.1 Proposed development will community and quality of life by fostering close linkages 2.2 increase sense of community and between those who work in different precincts. Valuable 3.4 quality of life, already established social connections can be promoted by smart precinct 3.5 by the existing retail facility that is design, friendly amenities and open space, as highlighted in 5.6 to be extended. this Master Plan. 5.7 Off-airport, a meaningful dialogue with neighbours is just as 3.1 The MDP approval process will important, and community forums are regularly held include consultation with DIT, throughout Brisbane. BAC also strives to build inclusive CASA, ASA, as well as State and relationships with neighbouring communities about aviation Local Government. and property developments on-airport. Consultation with the community will occur through representative forums such as Brisbane Airport Community Area Consultative Group (BACACG). Grow and share At BAC, priority is given to building knowledge and ideas N/A knowledge with about airport development, creating professional stakeholders development opportunities for staff and the airport business community, and exploring the airport’s interface with surrounding communities. Maximise airport Ease of access to Brisbane Airport and a high level of 2.3 Proposed development does not accessibility and connectivity within the airport are essential to its success as 5.6 impact on the ease of access to a regional economic engine and to fulfil its social 5.7 the Brisbane Airport, or the high Brisbane Airport Corporation Pty Ltd 20
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION Proposed Development Theme Objective Specific Guidance Relevant Achieves Section Comments MDP connectivity responsibilities. This is a new and important Development 5.11 level of connectivity within the Objective within the 2009 Master Plan. airport. BAC values teamwork with Government, business partners N/A and the community to maximise airport accessibility. An integrated public transport system, an improved road network (including the interface of airport roads with adjacent suburbs), adequate car park capacity, cycle paths, courtesy buses and pedestrian facilities, jointly shape the vision for the airport’s surface transport. Safe and convenient walkways and appropriate public car 2.4 Proposed development includes a parking in close proximity to terminals and buildings are vital 5.11 new multi level car park to enable inclusions in this Master Plan. the provision of appropriate levels of public car parking ancillary to the existing and proposed extension of retail facility. BAC’s long-term goal is to achieve more balanced use of N/A public and vehicular transport and ease of access to all airport precincts. The 2009 Master Plan articulates BAC’s strategy towards that goal. Brisbane Airport Corporation Pty Ltd 21
DRAFT MAJOR DEVELOPM ENT PLAN DIRECT FACTORY OUTLET EXTENSION 3.5 Consistency with Brisbane Airport Environmental Strategy The 2009 Brisbane Airport Environment Strategy (2009 AES), approved on 19 August 2009, provides a framework for environmental management at Brisbane Airport. The 2009 AES was prepared in accordance with Part 6 Division 2 of the Airports Act 1996. It addresses issues such as environmentally significant areas, sources of environmental impact and environmental management. The proposed development is consistent with the 2009 AES and does not affect any areas identified as ‘environmentally significant sites’. 3.6 Consistency with State and Local Government Planning For the purpose of this draft MDP, Brisbane Airport is not subject to planning and development controls under Queensland legislation administered by the State and Local governments. As airport land is Commonwealth- owned, it is subject to Commonwealth legislation including the Airports Act 1996. Notwithstanding the use of some terminology consistent with State and Local Government planning laws in this draft MDP, BAC is not bound by any planning jurisdiction other than as prescribed by the Airports Act 1996 and Regulations. Under Section 91(4) of the Airports Act 1996, a Draft Major Development Plan must address the extent (if any) of consistency with planning schemes in force under a law of a State or Territory in which the airport is located. This requirement is addressed below. 3.6.1 State Planning Policies In preparing this draft MDP, consideration has been given to relevant State Planning Policies (SPP) operating in Queensland and effective at the time of publishing this draft MDP including: State Planning Policy 1/02: Development in the Vicinity of Certain Airports and Aviation Facilities (SPP1/02); State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulphate Soils (SPP2/02); State Planning Policy 1/03: Mitigating the Adverse Impacts of Flood, Bushfire and Landslide (SPP1/03); and State Planning Policy 4/10: Healthy Waters (SPP4/10). The Queensland Government is currently reviewing all SPP’s and consolidating them all into a single SPP, the “Draft SPP”. The Draft SPP sets out policies about matters of state interests in relation to planning and development, and how these interests are dealt with in planning instruments, council development assessment processes and in designating land for community infrastructure. For the purposes of this draft MDP, reference is made to existing SPP’s as consultation on the draft SPP has recently closed, with the Final SPP not expected to be released until late 2013. 3.6.1.1 State Planning Policy 1/02: Development in the Vicinity of Certain Airports and Aviation Facilities This SPP sets out the State’s interest concerning development in the vicinity of those airports and aviation facilities considered essential for the State’s transport infrastructure. The SPP applies to development that could: Adversely affect the safety and operational efficiency of operational airspace or the functioning of aviation facilities; Increase the number of people that could, amongst other things, work or live within a noise contour of 20-25 ANEF; and Increase the number of people or the use/storage of hazardous material within public safety areas. Compliance of the Draft MDP with SPP1/02 is demonstrated below: The proposed development is located in an area identified in the Brisbane Airport 2009 Master Plan as acceptable for commercial building purposes (retail and other like activity) due partly to the fact that the safety, operational efficiency, and function of airspace and aviation facilities are not affected or impacted at this location; Brisbane Airport Corporation Pty Ltd 22