Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC

 
CONTINUE READING
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
Publication Mail Agreement #43029513. Return postage guaranteed Marked Business Media Inc. 67 Simcoe Street North, Oshawa, Ontario, Canada L1G 4S8

                                                                                                                                                     Commissioning
                                                                                                                                                     hydronic systems
                                                                                                                                                     The devil’s in the details
                                                                                                                                                                                              INSIDE
                                                                                                                                                                                              Q Alberta waives onerous hydronic slab
                                                                                                                                                      OCTOBER 2018   WWW.PLUMBINGANDHVAC.CA
                                                                                                                                                                                                 insulation rules
                                                                                                                                                                                              Q Dual flush flow rates too high, says Vancouver

                                                                                                                                                                                              Q U.S. rolling back HFC refrigerant restrictions

                                                                                                                                                                                              Q Mechanical contractors meet in Whistler
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
at
 Visit us
       West
CIPHEX 614
 BOOTH #
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
Q Contents

                                                              CIPHEX West Show Issue
Departments
Hot Seat .........................................4
A deal at last

Industry News ..............................7
Dual flush water savings questioned

Today’s Distribution ....................14
Entering the digital age

People & Places ...........................57
Wholesaler raises $28,000 to fight cancer

Shop Management .....................59
Buy or lease new trade vehicles

Coming Events ............................62
Ottawa hydronics conference announced

Products &
Technologies
Hot Water Heating ......................20            Mechanical contractors meet in Whistler Marijuana legalization creates concern
Heating ........................................29
Tools & Instruments ....................41
Refrigeration ...............................43
                                                      Features
Plumbing......................................49

                                                                                                       The changing face of wholesale              14
                                                                                                       Adapting to the digital age

Cover: A careful commissioning process will
result in an a hydronic system that provides                                                           An ounce of prevention                      30
maximum efficiency and comfort. Please see            Dwindling resources                         37   Reducing the likelihood of heat exchanger
our article on page 20. (Photo by Roy Collver)        Nova Scotia’s natural gas reserves running dry   failures

www.plumbingandhvac.ca                                                                                      October 2018 – Plumbing & HVAC         3
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
Q Hot Seat
                       October 2018
                   Volume 28, Number 7
                      ISSN 1919-0395
                          Publisher
                   Mark Vreugdenhil
                   (289) 638-2133 ext.1
                   Cell: (416) 996-1031
                 mark@plumbingandhvac.ca
                            Editor
                       Simon Blake
                    (289) 638-2133 ext.2
                    Cell: (416) 574-5867
                 simon@plumbingandhvac.ca
                        Assistant Editor
                      Leah Den Hartogh
                     (289) 638-2133 ext. 4
                      Cell: (289) 830-1217
                  leah@plumbingandhvac.ca
                                                                                A deal at last
               Contributing Writers
                                                                                On Sept. 28 Canada and the U.S. finally          would be reached or what it would look
          Roy Collver, Ron Coleman,
      Mark P. Evans, Bill Hooper, Art Irwin,                                    agreed on terms for a new North American         like along with the threat of further tariffs,
       Michael McCartney, Glenn Mellors                                         free trade agreement. The U.S.-Mexico-           on automobiles, put considerable stress
          Bruce Nagy, Greg Scrivener                                            Canada Agreement (USMCA) replaces the            on Canada’s business community and on
                  National Sales Manager                                        previous NAFTA agreement. Commentators           everyday Canadians who wondered if they
                       Mark Tomlin                                              report that about 90 percent of NAFTA – a        would still have jobs. While we may not
                    (289) 638-2133 ext.3                                        trade agreement that U.S. President Donald       entirely agree with the path going forward,
                    Cell: (289) 927-6393
                 markT@plumbingandhvac.ca
                                                                                Trump labelled a “disaster” – remains intact.    at least there is a path.
                                                                                   But there are some significant issues.            In the HVAC/R and plumbing/
                 Design and Production
              Tim Norton/Janet Popadiuk
                                                                                One would have hoped that tariffs on steel       mechanical industries, the uncertainty
             production@plumbingandhvac.ca                                      and aluminum imposed by the U.S., along          pushed prices up in some cases. Higher
                      Circulation Manager
                                                                                with the Canadian counter-tariffs, would         prices will likely stay in effect until tariffs
                          Dorothy Lai                                           have been removed immediately after the          come off. This period of turmoil created real
  All articles and photos by Plumbing & HVAC staff unless noted.
                                                                                agreement was reached – as a goodwill            pricing challenges, but some manufacturers
                                                                                gesture, if nothing else. However, apparently    and wholesalers managed to avoid increases
PLUMBING & HVAC Magazine is published eight times annually by
Marked Business Media Inc. and is written for individuals who purchase/
                                                                                the U.S. – and the ball is solidly in the U.S.   by absorbing prices to some extent and/
specify/approve the selection of plumbing, piping, hot water heating,           court on this – won’t look at that until         or having enough stock on hand to get
fire protection, warm air heating, air conditioning, ventilation, refrigera-
tion, controls and related systems and products throughout Canada.              the agreement is actually ratified by each       through.
Marked Business Media Inc.                                                      country’s elected officials.                         And maybe it’s just me, but I find the
167 Simcoe Street North, Oshawa, Ontario, Canada L1G 4S8                           Secondly, I think most Canadians were         name of the new agreement curious. USMC
Tel: (289) 638-2133
                                                                                taken aback when the U.S. implemented            is the acronym for the U.S. Marine Corps
Postmaster: Send all address changes and circulation inquiries to:
Plumbing & HVAC Magazine, 167 Simcoe Street North, Oshawa, Ontario,             the tariffs on so-called security grounds.       and is as common in the U.S. as RCMP –
Canada L1G 4S8. Canadian Publications Mail Sales Product Agreement
No. 43029513. Postage paid at Toronto, ON.
                                                                                As two countries that have long been close       the Royal Canadian Mounted Police – is
Annual Subscription Canada: $40.00 plus applicable taxes, single copy           friends and allies, where our economies          in Canada. While this may not be a “brand
$5.00 plus applicable taxes. Annual Subscription United States: $60.00
U.S. Annual Subscription foreign: $90.00 U.S.
                                                                                and militaries are extensively intertwined,      new deal” as Trump promised, he certainly
Copyright 2018. The contents of this magazine may not be reproduced in          what possible security issue could the U.S.      got his wish in putting a U.S.-first spin on it.
any manner without the prior written permission of the Publisher.               have with Canada? We’re still not sure, but          For C anada, it’s not really an
A member of:
• Canadian Institute of Plumbing & Heating
                                                                                the new agreement does nothing to prevent        improvement over NAFTA, but thankfully
• Mechanical Contractors Association of Canada                                  the U.S. from citing security concerns to        it’s not much worse either. And a long-time
• Ontario Plumbing Inspectors Association
• American Society of Heating Refrigerating & Air Conditioning Engineers
                                                                                implement tariffs in the future.                 friendship is strained.
• Heating Refrigeration and Air Conditioning Institute of Canada                   However, in the end, I think most
• Refrigeration Service Engineers Society of Canada
                                                                                Canadians and Canadian manufacturers
                                                                                are happy that there is finally an agreement
                                                                                and they can get back to business. When
                                                                                the tariffs come off, it will be business as
                                                                                usual. The uncertainly over whether a deal
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
CIPHEX WEST
                                                        November 7 & 8, 2018
                                                                                             BOOTH
                                                        BMO Centre, Stampede Park, Calgary     443

Comfort made easy

With a 96% AFUE, our SL 10-85 G3 is one of the most
efficient boilers in the market.

Our intuitive touchscreen controller makes the boiler
easy to set up and monitor, so that Canadians can
enjoy their winter worry-free.

Learn more at ibcboiler.com

                                                                                         IBC SL 10-85 G3

                                                          Proudly Canadian
                                                    ibcboiler.com | 1-844-HEAT-IBC
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
THE RIGHT PARTS.
                                                   THE RIGHT PRODUCT.
                                                    THE RIGHT CHOICE.

    FLUIDMASTER ® PRO SERIES PRODUCTS

       “We have never had a failure with h
   Fluidmaster products.
                 products Check out thiss line
and you too will switch to Fluidmaster – which
are safer to install, saving money and time, and
   you will have a better overall experience.“

     “I really believe in these products…
                  always have.”

       David Or tiz, Owner of Or tiz Plumbing

                  See us at
             CIPHEX West
                Booth #652

        F LUI DMA S T ER P R O . CO M
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
Q Industry News

Dual-flush toilets flush
too much, says Vancouver
Bylaw amendment could                                  The Canadian Institute of Plumbing and
                                                    Heating (CIPH) and the U.S.-based Plumbing
make many models obsolete                           Manufacturers International (PMI) dispute
By Leah Den Hartogh                                 the fact that dual-flush tank-type toilets don’t
                                                    meet performance expectations.
                                                       A Canada Mortgage and Housing
The City of Vancouver plans to change the           Corporation study reports that the overall         Vancouver officials say they aren’t
bylaws for dual-flush tank-type toilets because     ratio was around 1.56 short flushes to every       seeing the water savings they had hoped
they are not saving enough water.                   long flush. Akshay Sharma, program manager         for with dual flush toilets. Perhaps users
   The expectation for these toilets is that        for CIPH, reports that this conclusion shows       are confused over which button to push?
for every three flushes, one is a large flush       that there is water saving value with dual-
and two are small flushes. But this just isn’t      flush tank-type toilets.                           said. Not enough time has passed for the city
happening, reports Chris Radziminski, water                                                            to receive proper statistics on how the initial
design branch for Vancouver, in an email. The       Reduced flush volumes                              bylaw went, adds Sigler
Vancouver building bylaw currently allows           The most recent Vancouver water use bylaw               “It takes time to get those results of
a maximum flush rate of 4.8 litres per flush        changes, reducing the maximum flow rate            those reduced flow rate on water and energy
(LPF) for all toilet types.                         of several plumbing products including             consumption. You can’t expect it over night,
   However, in 2014 an exception was made           residential lavatory faucets to 5.7 litres per     it all depends on how many new structures
for dual-flush tank-type toilets, permitting        minute (LPM) and showerheads to 7.6 LPM,           are built in the city of Vancouver. It takes
a full flush of 6 LPF and a small flush of 4.1      came into effect in January 2018.                  time.” Sigler suggests that at least three
LPF. The new proposal to limit all toilets to 4.8      The new lower volume for dual-flush             years would be needed to calculate the total
LPF would eliminate 90 per cent of the dual-        toilets, along with several other changes, is      impact.
flush tank-type toilets that are currently on       scheduled to take effect in January 2019.             PMI supports the use of non-potable water
                                                                                                       for toilet flushing. However, they believe there
                                                                                                       should be provisions to account for maximum
          The new proposal would eliminate 90 per cent of                                              chlorine levels when used with onsite non-
                                                                                                       potable water systems. They recommend
          the dual-flush tank-type toilets that are                                                    that a maximum residual chlorine level of
currently on the market from using city water.                                                         2.5 milligrams per litre. If chlorine levels are
                                                                                                       too high, some plumbing products can fail.
                                                                                                       CIPH would also like to see a set level of 2.5
the market from using city water, say industry         “They really haven’t allowed the changes        milligrams per litre.
officials. Most toilets – including over 2,000      made in the 2017 bylaw amendments time to             However, said Radziminski, “The proposed
single-flush tank-type toilet models – are          make an impact on their total per-capita water     requirement for non-potable water systems
entirely unaffected. The city’s proposal will       consumption,” noted Matt Sigler, technical         were developed in collaboration with the local
allow the installation of 6 LPF dual-flush tank-    director for PMI. Existing products that           health authority and are performance based.
type toilets in new construction projects, but      wouldn’t meet requirements would become            No specific type of disinfection is prescribed.
only with treated rainwater or clear water waste    obsolete as they could no longer be installed      This is the decision of the registered
(i.e. cooling water and condensate drainage         in new construction.                               professional engineer who must design the
from refrigeration and air-conditioning                “Retailers again are going to have to restock   system, and it is his/her responsibility to
equipment) systems for flushing.                    shelves and account for these changes,” he         consider the local context.”

www.plumbingandhvac.ca                                                                                      October 2018 – Plumbing & HVAC          7
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
Q Industry News

Mechanical contractors                                                                          laughing and giving knowing looks to their
                                                                                                spouses.

group meets in Whistler                                                                         Pot legislation in Canada
                                                                                                B.C. lawyer Chris Munroe spoke about
                                                                                                marijuana in the workplace, explaining what
Marijuana legalization causing                  guns, threw axes, and shot hockey pucks.        rights employers have over their employees
concern among members                           Members from MCA Saskatchewan took              when it is legalized in Canada Oct. 17.
                                                home the trophy for this year’s competition.    Munroe began by informing the crowd that
By Leah Den Hartogh                                The conference kicked off with the opening   the “sky isn’t falling.” Employees who were
                                                backyard barbeque outside the Westin            already smoking before legalization will
                                                Resort where members dressed in their best      continue with the practice, he expects.
Around 235 delegates and companions             lumberjack clothing as the new “voice of           That didn’t leave the members in attendance
attended the Mechanical Contractors of          God,” Dan Milroy (Bradford-White Canada),       more hopeful about what to do to stop their
Canada’s 77th annual national conference at     commenced the conference.                       employees from going to a jobsite “stoned.”
the Westin Resort and Spa in Whistler, B.C.        Over the next few days, members              Many were concerned about the connection
Sept. 19-22.                                    participated in panel discussions, wine         of smoking marijuana and addiction, and
   Typical B.C. weather at this time of year    tastings, general meetings, business            what they would be able to do in terms of
meant it was a cold and rainy event, but        sessions, and general sessions. Right           terminating someone claiming to have an
that didn’t stop participants from trekking     after the opening breakfast Mark Gungor         addiction.
to the Olympic Park to participate in the       presented his “Laugh your way to a Better          Munroe suggested that employers set
infamous MCAC Games. At this year’s games       Marriage” seminar which, as promised,           up a policy for all drugs similar to that is in
participants sawed logs, raced on skis, fired   had everyone in the filled conference room      place for alcohol. Elements would include:

                       d
               %    te
            0 0 te
                   s

     fa
       ct
          1
          o ry
                                           ferocious
                                           bite.
                                            Model 818 - 1 HP: 115/200/230 Volt, 1 Phase
                                                                                                shark® series
                                                                                                818-819-820

                                            Model 819 - 1.5 HP: 200/230 Volt, 1 Phase
                                            Model 820 - 2.0 HP: 200/230 Volt, 1 Phase
                                            Redesigned to handle the most challenging sewage applications, the new 1 HP
                                            and 1.5 HP Shark® models join our 2.0 HP Shark® Model 820. A new cutter design
                                            destroys tough materials including disposable wipes.
                                            More torque per cutter blade | Lowered amp spikes | Solids ground to less than 1/8"

                                                      1-877-710-7867
                                                      www.zoellerpumps.com

8    Plumbing & HVAC – October 2018                                                                              www.plumbingandhvac.ca
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
Best practices                                                       Pierre Boucher after former CEO Richard
                                                     One panel that drew a larger crowd concerned                         McKeagan retired in June.
                                                     best practices in mechanical contracting.                               Members elected Jack Bavis, G.J. Cahill,
                                                     A few issues were brought forward by the                             Mount Pearl, Nfld., as president, replacing
                                                     panel members. One that stuck out was the                            Dave Flamand, Peak Mechanical Partnership,
                                                     issue that installers don’t know exactly what                        Saskatoon, Sask., who has completed his one-
                                                     they are installing “for instance, they know                         year term.
                                                     it’s a copper pipe, but they don’t know if it’s                         Three different categories of awards were
Everyone dressed the part during                     not a water designated pipe,” remarked Tim                           presented. The Doug Crawford Memorial
Lumberjack Night at the MCAC annual                  Padfield, Alberta director of MCA and owner                          Award went to Milroy. Lifetime Awards were
conference.                                          of Pad-Car Mechanical, Medicine Hat, Alta.                           presented to Robert Hoare, Adelt Mechanical
                                                         The industry skills shortage also came up.                       Works Ltd, Tom Vincent, president of
purpose, applications to both recreational and       This brought about a discussion on whether                           Atlantica Mechanical Contractors Inc.,
prescription drugs, differentiations between         or not it is best just to simply get more                            Dartmouth, N.S., and James Derksen,
safety sensitive and non-safety sensitive roles,     people in the trades. Rod Yeoh, principal at                         Derksen Plumbing & Heating, Winnipeg,
prohibiting impairment, setting out roles and        Dialog, Vancouver, B,C., said the industry                           Manitoba. Gaetan Beaulieu, Beaulieu
responsibilities of managers and employees,          needs more intelligent people who go into                            Plumbing & Mechanical Inc., Edmundston,
requirement to self-disclose an addiction            the trades because they are passionate about                         N.B., received the Lloyd MacLean Memorial
and/or prescription, and consequences for            it, rather than seeing it as a last resort option.                   Award for his contributions to the
breaching policy. The audience heard court                                                                                organization.
case examples as to how to make sure that they       Changes to MCAC                                                         The next MCAC national conference will
aren’t put into a bad situation because of the       This year, MCAC saw several changes. It                              take place on Oct. 2-5, 2019 in Nashville,
new legislation.                                     was the first event for MCAC under CEO                               Tennessee at the Hilton Nashville Downtown.

                                                   HEATMASTER
                                                   TC SERIES
                                                   HIGH EFFICIENCY CONDENSING
                                                   BOILER & DOMESTIC WATER HEATER

                                                                1. Universal Vent & Air Connections

                                                                2. Proven Modulating Premix Burner Assembly

                                                                3. Combustion Chamber

                                                                4. Stainless Steel Fire Tubes

                                                                5. Exclusive “Tank-in-Tank” Heat Exchanger

                                                                6. Low Temperature Total Condensing Tank

                                                                7. Polypropylene Flue & Condensate Pan

                                                                8. Internal Circulator to Equalize Internal Temperature

                                                                9. Easy Access Wire Terminal Strip
                                                                10.   ACVMax Control
                                                                11.   ACVMax Display
                                                                12.   Polyurethane Foam Insulation

                                                    Learn more at www.triangletube.com

www.plumbingandhvac.ca                                                                                                         October 2018 – Plumbing & HVAC      9
Commissioning hydronic systems - The devil's in the details - Plumbing & HVAC
Q Industry News

Alberta lifts onerous slab                                                                                       published a Standata (14-BCV-019) that
                                                                                                                 provides a variance to National Building
                                                                                                                 Code Regulation 9.36 that increased
insulation requirements                                                                                          underslab insulation requirements for
                                                                                                                 radiant floor heating systems from the
                                                                                                                 one inch or R-5 required by the CSA B214
Extra insulation provides                             Alberta has waived onerous underslab                       hydronic installation code to R-16 or about
                                                      insulation requirements that brought the                   four inches.
little benefit in hydronic                            hydronic heating industry to a virtual                        The variance requires a minimum RSI
heating applications,                                 standstill when they came into effect in                   0.88 (R-5) for a radiant floor heating slab
                                                      November 2016.                                             in contact with the ground where the
says Standata                                            On Oct. 4, Alberta Municipal Affairs                    floor is fully below the frost line and RSI
                                                                                                                 1.32 (R-7.5) where the floor is above the
                                                                                                                 frost line. Standard industry practice has

                                                                                              4& )&
                                                                                              $*
                                                                                                 1
                                                                                                 & 98
                                                                                                                 been to install 1.5-inch (38 mm) R-7.5

                                                                                                   " &
                                                                                                     % 4
                                                                                                      &. 5
                                                                                                                 insulation.

                                                                                                        0 
                                                                                                         " 
                                                                                                                    “ There is sufficient evidence that

                                                                                                           5 
                                                                                                                 indicates that the current underslab
                                                                                                                 insulation code provisions are excessive
                                                                                                                 and jeopardize the availability of hydronic
                                                                                                                 heating as an option for Albertans,” the
                                                                                                                 Standata states.
                                                                                                                    “ This type of system has become
                                                                                                                 increasingly popular in Alberta for
     INTRODUCING THE MOST EFFICIENT AND ECONOMICAL WAY                                                           homeowners who want added comfort
     TO JOIN ½" THROUGH 2" PIPING IN HVAC SYSTEMS                                                                and control in their heating zones, savings
                                                                                                                 through lower heating bills, and a decrease
                                                                                                                 in their environmental impact by making
                                                                                                                 smart green building choices.”
                                                                                                                    The additional insulation provides little
                                                                                                                 increase in energy efficiency. Going from R-5
                                                                                                                 to R-16 reduces heat loss through the slab by
                                                                                                                 only 1.27 percent but makes the insulation
                                                                                                                 cost about 50 percent of the installed cost for
                                                                                                                 the radiant floor slab, reports the Standata.
                                                                                                                 As well, the thick insulation can result in
                                                                                                                 structural issues that can only be dealt with
                                                                                                                 through costly modifications to building
                                                                                                                 design.
                                                                                                                    The variance does not remove the
                                                      •   Available in sizes ½ – 2" | DN15 – DN50
                                                                                                                 insulation requirement from Section 9.36 of
                                                      •   For use on Schedules 10 – 80 carbon steel pipe
                                                                                                                 the Alberta Building Code, but it allows, as
                                                      •   Up to 300 psi | 2068 kPa | 21 bar
                                                                                                                 an alternative, the reduced insulation. The
                                                                                                                 variance covers the entire province.
                                                      •   Up to +250°F | +120°C with EPDM gasket
                                                                                                                    Alberta Municipal Affairs officials are
                                                                                                                 also encouraging the federal National
                                                                                                                 Research Council (NRCan) to change
     victaulic.com | quickvicsd.com
                                                                                                                 the underslab insulation requirements in
                                                                                                                 the National Building Code to “allow for
                                                                                                                 hydronic heating installations while also
     © 2018 VICTAULIC COMPANY. ALL RIGHTS RESERVED.                                                              supporting Alberta’s energy efficiency
                                                                                                                 goals.”

10     Plumbing & HVAC – October 2018                                                                                             www.plumbingandhvac.ca
Navien...the condensing
leader brings you
the future of fire tube
boiler technology

New NFB high efficiency
condensing fire tube boilers
Out of this world quality — built from top to bottom with in-house designed and manufactured Navien parts.
Also, our state-of-the-art robotic laser welding and automated assembly systems assure the highest level of quality.

              Patented stainless                    Advanced user interface         Built-in hardware
              steel heat exchanger                  controls with intuitive text    to connect a
              with a one-piece                      display and innovative click    boiler pump,
              combustion chamber                    wheel simplifies boiler setup.   3 zone pumps
              eliminates high stress                                                or 3 zone valves
              point welds that are          Optional add-on NaviLink                integrated into the
              prone to corrosion.           Wi-Fi remote control system.            unit. No need to add extra zone panels.
                                            Cascading up to 16 units and            10:1 Turn Down Ratio reduces excessive
              AFUE 95.0%                    common venting up to 8 units.           boiler cycling, saves money and energy.
              Energy Star 2018
              most efficient rating.         Field gas convertible, NG or LP.        To learn more visit NavienInc.com

                                            Always a step ahead
Top quality and
attractive price…
The newest version of our most popular
boiler series ever!

                               Lasting performance
                               Quality workmanship you can trust
                               with new Viessmann-made SA240 S43932 stainless
                               steel Inox-Radial self-cleaning heat exchanger and
                               new factory-calibrated, fully-modulating stainless
                               steel MatriX cylinder gas burner.

                               User-friendly control
                               New backlit LCD touchscreen control with
                               enhanced programming interfaces with a
                               variety of external control devices to provide
                               comfortable and reliable energy-saving space and
VITODENS 100-W, B1HA           DHW heating.
gas condensing boiler
Heating input: 21 to 125 MBH   Outstanding versatility
                               NG or LP fuel compatible “out-of-the-box”
                               with bottom pipe connections and front access
                               to all serviceable components plus multiple
                               venting options for easy installation service and
                               maintenance - all in a compact wall-mount design.

                               On-demand DHW (combi model only)
                               Built-in DHW unit includes stainless steel plate
                               heat exchanger, 3-speed pump, diverting, pressure
                               bypass and pressure relief valves, water hammer
                               arrester & sensors - conforms to NSF/ANSI 372 for
                               “lead free” plumbing products.

VITODENS 100-W, B1KA
gas condensing Combi boiler
Heating input: 21 to 125 MBH
DHW max. input: 149 MBH
9LVLWXVDW&,3+(;:HVWERRWK
Q Industry News

EPA proposal would relax
HFC refrigerant restrictions
The U.S. Environmental Protection Agency             • repair an appliance that leaks above a
has announced that it plans to roll back                threshold leak rate,
restriction on the use of HFC replacement            • conduct verification tests on repairs,
refrigerants that took effect in 2016.               • conduct periodic leak inspections on
   Issued Sept. 18, the proposed rule,                  appliances that exceed the threshold leak
Protection of Stratospheric Ozone: Revisions            rate,
to the Refrigerant Management Program’s              • report to EPA on chronically leaking
Extension to Substitutes, will revisit the              appliances,
Agency’s recent approach to regulating               • retrofit or retire appliances that are not
appliances containing substitute refrigerants           repaired, and
such as hydrofluorocarbons (HFCs) by                 • maintain related records.
proposing to rescind the November 18, 2016               The use of HFCs were restricted because
extension of the leak repair provisions to           they are an ozone depleting substance. The
appliances using substitute refrigerants.            EPA says the rule would save industry about
   If finalized as proposed, the new rule would      $39 million annually in regulatory costs. But
rescind the leak repair and maintenance              the rule also would have the climate impact
requirements at 40 CFR 82.157 for substitute         of an additional 642,000 cars on the road.
refrigerants. Therefore, appliances with 50 or       HFCs have a warming potential thousands
more pounds of substitute refrigerants would         of times more potent than carbon dioxide,
not be subject to the following requirements:        reported Greg Zimmerman, executive editor
• conduct leak rate calculations when                of Building Operating Management magazine
  refrigerant is added to an appliance,              (www.facilitiesnet.com).

Q Letters

Green technology                                        Then there’s the variable speed evaporator
                                                     fan motor that costs three to four times the
unreliable, expensive                                amount of a regular PSC motor when it burns
                                                     out. And they do burn out regularly. Add to this
to repair, says reader                               the variable speed compressor that never lasts
                                                     and you have one unreliable, untrustworthy,
Dear Editor:                                         expensive piece of junk in your home. The first
I’m sorry, but I just can’t “tow the line” when it   time the system burps, all your energy savings
comes to manufacturers making these ultra-           go down the toilet while you pay two to four
efficient residential heat pump systems and          times for a new compressor, evaporator motor,
air conditioning units.                              evaporator or control board.
   Manufacturers have been making paper                 I have a Red Seal journeyman ticket in
thin evaporator coils for several years now          HVAC and know what I am talking about.
with disastrous results. They simply don’t last.     I am registered with the Ontario College
They leak like a garden sprinkler after a couple     of Trades. The entire industry must clean
of short years and they blame the installer          itself up and make reliable units and charge
or chemicals in your household carpet that           much less for replacement parts to win back
corrode the coils. Wow! The all-aluminum             customers who are constantly being screwed
evaporator coils are next to impossible to           by “green technology”.
repair, but the HVAC rep. will tell you its          Mike Mineau
possible to repair them.                             Schreiber, Ontario

www.plumbingandhvac.ca                                                                                  October 2018 – Plumbing & HVAC   13
Q Today's Distribution

                             Emco’s Aquavato
                          showroom in Toronto
                              stocks premium
                            brands for interior
                                    designers.

                  The
             changing
               face of
DISTRIBUTION
                                                                                                         Founder Jeff Bezos has a net worth of
                                                                                                      about $156 billion, a testament the deep
                                                                                                      understanding his team has developed in the
                                                                                                      field of E-commerce.
                                                                                                         Amazon specialist and HVAC consultant
Canada’s wholesalers gear up                        plumbing and HVAC/R business. They’re             Bruce Merrifield calls the Amazon
                                                    facing new threats from E-commerce giants         construction portfolio “a highly customer-
for the digital/online age                          like Amazon, while continuing to battle bricks    centric value channel.” It includes product
                                                    and mortar performers like Home Depot and         reviews, easy to find advice from industry
By Bruce Nagy                                       Lowes/Rona. They’re planning to weather the       experts, multimedia resources, chat and
                                                    storm, reinvent their business model, and add     telephone support, and a Prime member
                                                    sophisticated online and offline capabilities.    loyalty program offering bonus points for

O
                 ne-time body-builder               And they expect to emerge stronger and better.    watching product videos.
                 Arnold Schwarzenegger beat
                 formidable competitors to          The Millennial effect                             Big web investment
                 win numerous body-building         It won’t be easy. Millennials are moving into     Each year Amazon invests another $40 million
                 crowns and achieve fame. But       procurement positions and they’re online savvy.   to improve its web properties, with an army of
he wanted more and moved to the United              The internet comes naturally to them. Amazon      top E-commerce analysts testing and refining
States to re-invent himself as a movie actor, but   is building numerous B2B web properties and       its models and algorithms. They identify
it wouldn’t be the last career change. He went      pursuing transaction dominance in high ticket,    the most profitable top sellers, then develop
on to become governor of California in 2003.        high margin categories. They’re focusing on       Amazon brand knock-offs, delivered to the
   A similar rejuvenation is currently              items such as furnaces, that are purchased in     contractor for a few hundred dollars less.
underway among leading wholesalers in the           large volumes every day.                             The Amazon brand is already ranking among

14      Plumbing & HVAC – October 2018                                                                                 www.plumbingandhvac.ca
Wolseley Oshawa, Ont. branch manager Paul Duncan, left, serves a customer.

                                                     kinds of information found online. You need              “The relationship between manufacturers,
                                                     to combine some electronic skills with some           wholesalers and contractors is strengthening
                                                     industry experience to determine what is              because it needs to be stronger. We’re sharing
                                                     going to work for your application.”                  data with manufacturers which benefits both
                                                                                                           of us, and we’re discovering a lot of great
                                                     Time and service                                      product information and learning tools on
                                                     “On the other hand, at the end of the day,            manufacturers sites that can be mined to better
                                                     the Amazon customer might become mainly               serve and educate our contractor customers.”
                                                     price-driven,” added Kelly. “So, we’ll continue
the “most trusted” in several categories. Some       to think of ourselves as a partner that can save      Online lacking in expertise
say Amazon brand product receives preferential       contractors time.”                                    “It’s still a service business. If we hire the best
treatment on its sites and the company’s legions        Online companies can provide product,              talent and they’re knowledgeable enough to
of lawyers fight unfair competition accusations.     but the role of the traditional wholesaler is         serve contractors better than anyone else,
    Once a Millennial purchasing agent places        much more than that and the service aspects           we’re providing the most important part of
an order for 175 faucets, the order is efficiently   are not easy to duplicate.                            the value equation,” said Joe Senese, vice
picked by robots and shipped to the desired             “We can provide project management                 president, operations, Groupe Deschenes,
end point. Delivery progress is, of course, easy     support. For example, we can supply plans             Etobicoke, Ont.
to track online.                                     and layouts with hydronics products, and then             “Building relationships is still an important
    “There is a lot of talk about what Amazon        package them in the order in which they will be       part of this market. It’s not just about
is doing in our industry. Some might say it’s        used.” said Kelly. “If a buyer ships enough toilets   products. In fact, installers are inundated
overhyped, but I think a little paranoia could       and faucets for a whole building, they may find       with products. They have projects to plan
be a good thing. We’re behind on digital             there’s no storage on the site for that product.      and they need help. Oftentimes we know the
processes,” remarked Sean Kelly, division vice       Our truck can arrive when the crane is ready to       right product solution. We have sales reps in
president, Western Canada Plumbing, for              move skids to the floors where they’re needed.”       certain segments plus generalists. You need
Emco Corporation, London, Ont.                          “Delivery is going to be more important            some specialists. The one size fits all approach
    “I think the proliferation of new                than ever and understanding who the                   has never really applied in our industry.”
technologies and energy efficient products           customer is and our cost to serve them will               “And expertise is becoming even more
gives us an advantage,” says Kevin Fullan,           be too,” says Fullan “I think we’re beginning         important with numerous retirements and
general manager – plumbing & HVAC/R,                 to work more closely with contractors and             a skilled labour shortage. We need to hire
Ontario & Atlantic, for Wolseley Canada,             manufacturers and in some cases, we can               bright new people in the right demographics,
Burlington, Ont. “Not everyone can assess            have products shipped directly from the
these new entries by sorting through different       manufacturer to the job site.                         Please see ‘Millennial’ on page 17

www.plumbingandhvac.ca                                                                                        October 2018 – Plumbing & HVAC            15
OUR TEAM
 IS BUILT
 FOR THE PROS
 You can’t beat our line for delivering top
 performance and exceeding goals. At the
 centre, we’ve got proven tough Bradford White
 products distributed through our Canadian
 Independent Sales Agencies. On the two wings
 we have Laar’s high efficiency residential and
 commercial hydronic boilers, volume water
 heaters, and commercial pool heaters as well
 as the solid delivery of storage tanks and
 specialty items from Niles Steel Tank.

 Offering exceptional customer service is a
 point of pride for our team. The recent move
 to a larger, more efficiently-spaced location
 means additional room for a state-of-the-art                                         Visit us at
 training center, more product, warranty, and                                       CIPHEX West
 technical support, and a fully stocked parts                                    Stop by booth 536
 service desk with next day parts delivery                                  for a chance to win an ATV!
 capability. With our group of talented team
 players and a solid game plan for your success,
 Bradford White Canada is a formidable force in
 the Canadian market.

     BRADFORD WHITE CANADA
     9 Brigden Gate
     Halton Hills, Ontario, CAN L7G 0A3
     Telephone: 905.203.0600
     Toll Free: 866.690.0961
     Facsimile: 905.636.0666
     www.bradfordwhite.com

                  Bradford White Water Heaters            Laars Heating Systems                     Niles Steel Tank
                  Q More than 8,000 models                Q 20+ products including                  Q Shop-built ASME
                  for nearly every residential,           high-efficiency residential               Code pressure vessels
                  commercial, and industrial              and commercial hydronic                   and steel tanks for all
                  application                             boilers, volume water                     industries
                                                          heaters, and commercial
                                                          pool heaters
BWPLHV1018
© 2018 Bradford White Corporation. All rights reserved.
Q Today's Distribution

Millennial contractors bring new expectations
                        Continued from page 15                              with purchases. Other online interactions, not controlled by sellers,
                                                                            include discussion forums, and blogs with reader comments. This
                        and then manage the transfer of knowledge           ‘more democratic’ tradition is accepted Internet culture. Modern
                        from retiring veterans,” he added.                  players must learn to turn it to their advantage.
                           “There are two kinds of expertise that are          Wholesalers acknowledge that their traditional business is changing
                        becoming important,” says Fullan. “Technical        significantly. “Whether through online order entry or E-commerce, the
                        knowledge and online skills. We are trying          prediction is that 30 percent of the business will go online,” noted Kelly.
                        to recruit and retain people who have both of       “Some of this will be retained through our own sites and some of it will
                        these.”                                             go to players like Amazon. We will continue to work at providing the very
                           “For a while we developed some online            best service to the other 70 percent of the market. We’re social beings.
                        training tools for people to do some self-          We’re not wired to stay home. I have faith in the human condition.”
                        training, but it doesn’t work for everybody. To        “There is a slow changing of the guard taking place in our industry
                        build productive relationships I think we have      as some of the older people retire and are replaced by younger
With specialized        to master both the electronic and in-person         generations,” says Fullan. “The older guys might come in with a coffee
products like           challenges. It’s hard to build a relationship       in one hand and their order scrawled on a piece of cardboard in the
this Kohler Numi        via the computer, but on the other hand the         other and shoot the breeze for an hour in the morning. Those days may
toilet, it helps to     online world offers some obvious strengths in       be coming to an end. Younger people send the order electronically the
see the product to communication and supply chain efficiency.”              night before and contractor owners want the crews to pick it up and go.
learn its features         Although it’s difficult to argue the
and installation        importance of expert solutions, relationship        Please see ‘Keeping’ on page 18
procedure.              building, and high-level service, these may
                        not be the exclusive domain of in-person
interactions. What the customer needs is one thing. How it is
obtained could be moving online, in the form of comparison guides,
expert primers, chat services staffed by semi-retired specialists, well-
produced installation videos, webinars, taped classroom seminars, and
manufacturer animations.

New markets
While touting service-based strength in the face of the online threat,
wholesalers are also hedging against future disruption by expanding
into completely new, albeit related, businesses.
   Wolseley has established Kitchen & Bath, Taps and other branded
plumbing showrooms. For Groupe Deschenes it’s Mondeau, and
for Emco it’s Aquavato and Ensuite. These are high-end kitchen and
bathroom showrooms located in larger urban centres. They’re aimed
primarily at interior designers, but also at anyone interested in premium
brands and unique plumbing products. They’re staffed by design experts
who can provide full interior design consultation and support.
   For Emco these showrooms are supplied by a dedicated warehouse
with national distribution.

Online education
Still, the bulk of the business is likely to remain with contractors –
Millennial-age contractors. Ben Landers, a digital marketing expert,
wrote recently in Sales and Marketing Magazine that: “Mobile buyers
prefer to self-educate…81 percent of them do research online before
they have much…commercial intent.”
   According to Landers, genuine online reviews correlate very highly

www.plumbingandhvac.ca                                                                                   October 2018 – Plumbing & HVAC           17
Q Today's Distribution

Keeping the business as it goes online
Continued from page 17                              The local advantage                                   competency. After two terms in state politics
                                                     “If we think about the essential capabilities of     he returned to the movies and enjoyed success
We’re trying to serve both kinds of customers       a distributor in the digital age, we recognize        almost immediately, despite being in his 70s.
and it really is a challenge to get it right… We    that community…is local,” remarked Mark               In 2018 he underwent emergency open heart
must continue evolving and changing. We             Dancer, a Fellow with the Institute for               surgery. Frightening for a while, but again he
may even need to accelerate our evolution.”         Distribution Excellence of the National               survived. So too will Canada’s plumbing and
    “Those who don’t adapt will find that           Association of Wholesaler-Distributors                HVAC/R wholesalers. According to reports,
their market is getting smaller,” said Senese.      (NAW), Washington, DC. Distributors can               after he stabilized, his eyes fluttered open and
“We’ve been slow to create the omnichannel          offer “a physical space where products can be         he said to his family: “I’m back.” 
we’ll need, but we’ve invested in technology        explored, experienced…They can help with
in the back end at the warehouse. We know           installation, training and troubleshooting.”
it’s critical to be as efficient as possible with       Desco hosts ‘lunch ’n learn’ seminars on
modern warehouse management, GPS,                   new standards and codes, local requirements,                            Bruce Nagy is a Toronto
logistics technology, loading mechanisms...”        new kinds of wall hung instantaneous water                              writer, author of more than
    He describes the company as sharing             heaters, and product choices that impact space                          150 articles on clean energy.
and analyzing big data with selected                planning. They’re doing online marketing and                            His new book, ‘The Clean
                                                                                                                            Energy Age’ will be released
manufacturing partners, and it is well              posting how-to videos. It’s a different way of
                                                                                                                            on Amazon by Rowman &
entrenched in preparations for full online          operating, but it still comes back to creating        Littlefield in 2018. He can be reached at
ordering, job site deliveries and emphasizing       value for customers.                                  bruce.nagy@rogers.com.
its local area advantages.                              Schwarzenegger also reverted to his core

                                                                     Glow Brand C95 and C140 instantaneous combination ASME boilers
            Models C95 & C140                                        for heating and on-demand hot water supply. The ultra-efficient
            Condensing                                               compact design combination boiler has an AFUE rating of 94%. These
                                                                     units are fully modulating at 10 to 1 and 2 inch PVC venting up to 100 feet.
            Combination Boiler
                                                                     Canadian Made

18      Plumbing & HVAC – October 2018                                                                                        www.plumbingandhvac.ca
YEAR
                                                                          LIMITED

                                                                       WARRANTY

                                    SOLAR SUSTAINABILITY.
                                                 ®
                                    DELTA PERFORMANCE.
                                    Introducing a bright new solution from Delta –
                                    solar electronic faucets and flush valves.
                                    Our products efficiently harvest power from
                                    natural, artificial, ambient and even occupancy
                                    lighting, which makes them perfect for any
                                    number of applications. We’ve combined the
                                    sustainability of solar power and the reliability
                                    of batteries into thoughtfully designed products
                                    that are backed by Delta Faucet quality.

                                    deltacommercialfaucets.ca

                                    COME VISIT US AT THE CIPHEX WEST SHOW AT BOOTH #449.

Solar Lavatory Faucet: DEMD-320LF
Solar Flush Valve: 81T201SP-MMO
                                    COMMERCIAL
QHot Water Heating

Commissioning
hydronic                                             Good start-up procedures
                                                     will keep customers happy

systems                                              and minimize callbacks
                                                     By Roy Collver

I
      t’s the start-up time of year again         A proper start-up
      with new projects completed and             This article deals with HVAC&R equipment
      existing systems to get ready for the       and more modest system start-up and
      heating season. A proper start-up and       documentation. A start-up may be part of a
commissioning process is a great opportunity      formal commissioning process, or a stand-
for the contractor to show their customers        alone procedure. The reasons for doing a
that they hired the right people.                 proper startup are as follows:
   There are many levels one can offer a client      Contractual obligation – some customers
depending on their needs and budget, from         demand nothing less than a certified factory
starting-up, testing and documenting the          technician in the direct employ of the
performance of a single piece of equipment,       manufacturer to perform and document a
to a methodical and complicated full system       start-up, while others just require a detailed
commissioning and proving process,                checklist be completed by a licensed trades
overseen by a commissioning authority –                                                            prove equipment is performing safely and
usually an engineering firm. ASHRAE has                                                            to specifications is simply part of the job,
two documents available (for a fee, of course)              If they still balk,                    and it’s not over ‘till the paperwork is done.
that provide a painful but necessary amount                                                        This not only means equipment proving, but
of detail and instruction on the procedural
                                                            then you should                        also includes compilation and turn-over of
and technical details of commissioning. One       politely decline the work                        equipment literature.
can make a whole career out of this process.                                                       Cover your butt – Being able to provide
   ASHRAE Guideline 0 is a 54-page                as they are asking                               a paper trail that shows how the equipment
document titled “The Commissioning                                                                 was tested, and that it was turned-over to the
Process”, and their Guideline 1.1 is a 150-
                                                  you to take                                      owner in a proper and safe working order,
page document titled “HVAC&R Technical            unacceptable risks.                              can stop future disputes. Take lots of pictures
Requirements for The Commissioning                                                                 and file them as well. We are living in an
Process”. This article will not be dealing with   person. These details should be formally         increasingly litigious society.
this full-blown process for obvious reasons,      spelled out in tender documents prior to         Show off your skills and market your
but if you have trouble sleeping, they are        bidding on a contract, or simply referred        expertise – Many trades people show up,
a great read and help you understand how          to verbally when a customer engages your         perform some task, charge the big bucks, but
things like hospitals and aircraft carriers get   services.                                        are unable or unwilling to explain exactly what
built and handed over to their owners.            Best practice – Developing a routine to          they did. Don’t be one of them. Unless the

20      Plumbing & HVAC – October 2018                                                                              www.plumbingandhvac.ca
Some building owners require the
                                                                                                   manufacturer to be present at or
                                                                                                   conduct commissioning. Ian Bowles
                                                                                                   of IBC Technologies tests new boilers
                                                                                                   at Springwood Elementary School,
                                                                                                   Parksville, B.C.

                                                                                                   A digital manometer is connected to the
                                                                                                   boiler gas valve inlet pressure tap.

customer really doesn’t care, take the time to   are things that you can offer the customer        • Read and understand installation and
at explain what you did for them. Go further,    as optional. When you price out a job, you          operation manuals for each piece of
and provide them with documentation.             should automatically include the cost of the        equipment and look for anything that may
Set a good example and raise the bar – If        “always do” stuff and explain to the customer       be unique.
comprehensive start-up and documentation         what they will be getting.                        • Ensure that the installation complies with
practices become more of an industry norm,          If the customer doesn’t want the “always         the requirements. Pay close attention
it will make it that much harder for fly-by-     do” stuff, explain to them that these are code      to venting details, piping and wiring
night operations to thrive.                      and safety requirements and are not optional.       schematics, clearances, etc.
Don’t make mistakes, be sure of yourself         If they still balk, then you should politely      • Perform the start-up exactly as required,
and sleep soundly – “Did I check that            decline the work as they are asking you to take     ensuring all equipment performs to
high limit? Am I sure the vent was working       unacceptable risks.                                 specifications. Make up a checklist if the
properly? What was the CO reading?” Prevent                                                          manufacturer hasn’t provided one. (It is
these and many other questions from popping      Critical steps                                      useful to come up with a generic checklist
into your head at night by developing a          Those things that constitute a “proper”             of your own design with company logos.
routine, and always doing things by-the-book.    start-up, will always include:                      You may want to mark each item as “code
   Step one is to understand exactly how         • Get the necessary permits and inform              requirement”, “manufacturer requirement”
much detail the customer expects. There are         code officials when you will be ready for
things you should always do and then there          inspection.                                    Please see ‘Optional’ on page 23

www.plumbingandhvac.ca                                                                                October 2018 – Plumbing & HVAC      21
HELPING CONTRACTORS
              ACHIEVE MORE.
Wolseley is your leading local
source for all your plumbing
and HVAC/R supplies.
• Convenient ONE stop shop
• Order 24/7 on Wolseley Express
• Large selection of industry        COAST TO COAST.
  leading plumbing and HVAC/R
  brands and products                Branches from Victoria, BC
• Associates with proven industry    to Mount Pearl, Newfoundland
  expertise and knowledge            and everywhere in between.
• Supplies for all jobs from the
  smallest renovation or new
  home construction to the largest
  commercial projects
• Delivery – where you need it,
  when you need it

Visit wolseleyinc.ca/locations.html
to find your nearest dealer.
QHot Water Heating

                                                                                                                                With today’s
                                                                                                                                test equipment,
                                                                                                                                the contractor’s
                                                                                                                                smart phone
                                                                                                                                communicates with
                                                                                                                                the combustion
                                                                                                                                analyzer and the
                                                                                                                                phone mirrors the
                                                                                                                                display, making it
                                                                                                                                easy to download.

                                                                                                        Step 3 – provide documentation for
                                                                                                        everything – the internet is a great resource as
                                                                                                        you can often locate old I&O and maintenance
                                                                                                        manuals and download them for free.
                                                                                                        Step 4 – put together “as-built” drawings of
                                                                                                        their system.
                                                                                                        Step 5 – put together a maintenance
                                                                                                        manual for their whole system – filter change
There is a considerable amount of instrumentation needed for commissioning. Note                        schedule, lubrication, cleaning, service checks
the combustion analyzer on the floor.                                                                   – the whole meal-deal.
                                                                                                        Enhanced documentation packages:
Optional commissioning                                                                                  With company computer expertise, you can
                                                                                                        offer to transpose everything to a digital

and maintenance programs                                                                                format and provide electronic files or hard
                                                                                                        copy print-outs as a bound manual.
                                                                                                        Planned maintenance programs: Discuss
Continued from page 21                            Additional paid work                                  options for planned maintenance. You should
                                                  Here are some options you can offer your              provide a hand-out from your company of
  or “company requirement” to show your           customer:                                             various programs detailing what is included,
  customer how you go above and beyond.)          Complete system review and re-                        frequency and cost.
• Ensure that your test instruments are           commission – you may be replacing just the            Insurance possibilities: Larger HVAC&R
  working properly and are calibrated. Some       boiler, but what about the rest of the system?        companies may self-finance equipment
  of the newest equipment can upload test         This is an escalating process – bill for your         insurance plans, points programs, customer
  data directly to a smart phone or a laptop,     time accordingly.                                     membership programs and the like. Smaller
  so you can provide files to the customer.       Step 1 is a complete system assessment                firms can work with third party underwriters
• Write everything down during set-up,            where you climb all over the place looking            or manufacturer insurance programs.
  start-up and testing – follow the checklist     into nooks and crannies and note what is                 These programs can help you retain your
  and fill it out as you go so you don’t forget   there and check to see if there are any obvious       customer base in long-term relationships and
  anything.                                       problems. This first step is billable, but you        can enhance the value of your company when
• Gather the manuals together along with          should be gentle if you are only giving them          the time comes to sell. 
  copies of your checklists and any print-        a verbal report where you advise regarding
  outs (combustion tests and such). You           further detailed examination, and how much
  may have to do some component labeling          each option might cost.                                               Roy Collver is an author
                                                                                                                        and consultant on hydronic
  and “as-built” drawings as well. Present        Step 2, a detailed examination, requires
                                                                                                                        heating based in Qualicum
  them to the owner and review how the            testing everything, not only to see if it is simply                   Beach, B.C. He can be
  equipment works, differences from               working, but also to prove how it is performing                       reached at
  previous equipment, and maintenance             and how everything is working together or not                         hoth2o@shaw.ca
  requirements.                                   (don’t forget exhaust fans, HRV’s and such).

www.plumbingandhvac.ca                                                                                     October 2018 – Plumbing & HVAC          23
QHot Water Heating

  A PROPER
                      STARTUP                                                                        An error code on the boiler
                                                                                                     control can be a good
                                                                                                     thing. (Roy Collver photos)

                                                                                                     • Do a visual inspection (and push-pull-wiggle
                                                                                                       tests of sketchy looking components) to
                                                                                                       make sure the installation conforms to the
                                                                                                       manufacturer’s installation instructions and
                                                                                                       all code requirements. Pay special attention
                                                                                                       to the venting system. If you did the
                                                                                                       installation and are confident in your work,
                                                                                                       you may choose to skip some of these checks.
                                                                                                     • Turn the water feed on to the hydronic
                                                                                                       system and check the water pressure gauge
                                                                                                       to ensure the system is pressured to at
                                                                                                       least the minimum required by the boiler.
                                                                                                       Adjust fill pressure as required. If pressure
                                                                                                       continues to creep up, the pressure reducing
                                                                                                       valve may need to be serviced or replaced.

                                                                                                               If you did the
Commissioning today’s                            make sure you or the person doing the work                    installation and are
                                                 has the right training and licenses to do the
modulating condensing                            job safely. Following is the typical procedure:     confident in your work, you
                                                     Like many things, the job starts with a
boilers                                          look at the installation and operation (I&O)
                                                                                                     may choose to skip some
By Roy Collver
                                                 manuals. You are looking for any unusual or         of these checks.
                                                 special procedures required for the particular
                                                 boiler that you are working on. As well,
                                                 you are looking for a start-up section and a
In the past few pages we looked at the reasons   start-up checklist.                                 • Make sure the condensate trap has been
for creating a commissioning procedure           • If no checklist is in the manual, make one up       filled.
for space heating boilers and how that              yourself – the list should include check boxes   • Turn the thermostat down, or otherwise
could benefit both your business and your           or comment lines for the items listed below.       make sure there is no call for heat.
customers. So, what exactly do we do to start       I would strongly suggest you provide this list   • Make sure the gas is turned off at the
and commission a new gas fired modulating-          to the boiler manufacturer for comment and         appliance shutoff valve.
condensing (mod-con) boiler?                        get them to help you make up a checklist,
   Of course, it almost goes without saying,        they may disagree with some things.              Please see ‘Focus’ on page 27

www.plumbingandhvac.ca                                                                                  October 2018 – Plumbing & HVAC         25
A high-efficiency water heater
for any high-volume job.
A. O. Smith offers a range of high-efficiency commercial water heaters that can help
save on energy costs and still deliver the reliable, powerful performance needed to
serve any commercial application—even when
the odds might seem stacked against it.

To find out more visit
hotwatercanada.ca
QHot Water Heating

Focus on the combustion                                                                                    40°F you need to check the flow rates
                                                                                                           through the boiler and if both the supply

analyzer readings
                                                                                                           and return temperatures climb rapidly. you
                                                                                                           need to provide a bigger load for the boiler
                                                                                                           in order to continue testing. Otherwise, the
Continued from page 25                                  first time.                                        boiler will trip off on high limit.
                                                      • Monitor the boiler outlet temperature to         • Check flame current readings to ensure
• Turn on the power to the boiler – displays            make sure it doesn’t shoot up quickly, if          they are within specifications. Turn the gas
  or lights should come on.                             it does, you either have a flow problem or         supply off and ensure the boiler shuts down
• Go through the boiler control settings                there is insufficient load on the system and       on flame failure.
  and make sure they are set to appropriate             you need to resolve this before proceeding.      • Physically test all safeties to ensure shut-
  values for the application -- you will need         • Monitor the manometer reading to make              down of the boiler when they are tripped.
  to refer to the manual at this point if you are       sure the pressure remains steady and within      • Check the venting system to make sure
  unfamiliar with this particular boiler.               the acceptable pressure range specified.           there is no leakage of flue gasses – a soap
• Make sure any mechanical aquastats, high-           • Shut down again and connect a combustion           bubble test usually works for this.
  limits or other safety devices have been set          analyzer to the venting system after making      • Block the exhaust vent and make sure the
  properly and any safety reset buttons have            sure it is “zeroed” and functioning properly.      boiler shuts down with a blocked vent error
  been pushed.                                                                                             – repeat with the air intake.
• Turn up the thermostat or otherwise give                                                               • Check all zones to make sure heat is being
  the boiler a call for heat.                                                                              delivered and there are no blockages, air
• Check that the boiler pump comes on and                                                                  locks or component failures restricting flow
  turn on any other pumps in the system and                                                                and heat delivery.
  leave them running.                                                                                    • Check the condensate drainage system
• Do the same with any zone valves, making                                                                 and make sure the trap is still full and the
  sure they are in the open position – you                                                                 condensate is free flowing to drain.
  want to make sure the boiler has a load to                                                             • Remove the call(s) for heat and make sure the
  dump its heat into once it starts up.                                                                    boiler shuts down in an orderly fashion, the
• Turn off the water supply to the hydronic                                                                pumps, valves and fans shut down in good
  system and watch the pressure gauge to                                                                   order, and the system drops into stand-by
  make sure there is no drop in pressure                                                                   mode ready for the next call for heat.
  (which would indicate a leak). If all is well,      This is where quality equipment like this             Of course, you have been checking this all
  turn the water feed back on again.                  combustion analyzer pays for itself.               off and documenting values as you go and
• While you have been doing the last three steps,                                                        now have a completed checklist – signed
  you should have heard the boiler’s combustion       • Re-start the boiler and focus on the             and dated – a copy of which you will leave
  fan start up and the boiler should have tried         combustion analyzer readings while               the customer along with the system manuals
  to fire. It will now likely be locked out due to      simultaneously monitoring the gas                and documentation. The whole procedure
  successive failures on trial for ignition – there     pressure, water pressure and boiler supply       should normally take about one to two hours
  will normally be an error code displayed (this        and return temperatures. 1) Test the             depending on the complexity of the system.
  is a good thing). Check the manual to see             combustion chemistry and flue temperature        This is a simplified start-up with no balancing
  how to reset the boiler to try again, usually by      at low fire, medium fire and high fire. If the   performed and minimal control system
  turning the power off briefly.                        combustion test results are outside of the       proving or adjusting.
• While the power is off, ensure that the gas           range specified by the boiler manufacturer          To take it one step further, you should allow
  lines have been properly purged and then              in the I&O manual – you will need to adjust      the system to cycle on its own a few times and
  connect a manometer securely to the inlet             the gas/air mix as detailed in the manual. 2)    check Delta T readings zone by zone to make
  test port on the gas valve.                           If the water pressure climbs up more than        sure controls are set properly and there are no
• Slowly turn on the gas and check to make              25 percent as the water temperature climbs,      conflicts. This may all seem like too much to
  sure there are no leaks and monitor the               you need to check the expansion tank to          do, but if you have been starting up new mod-
  manometer reading to ensure the gas                   ensure it has been properly charged. 3) If       con boilers and missing any of these steps
  pressure is within the min/max pressure               the gas pressure drops more than 25 percent      – you have likely been getting call-backs. As
  requirement at regulator “lock-up”.                   at high fire you need to check the gas supply    you gain experience with a particular boiler
• Turn on the power again and watch closely             regulator or piping capacity. 4) If the Delta    model or class of boiler, you will be able to do
  to observe the boiler as it fires up for the          T across the boiler increases to more than       this much faster and with more assurance. 

www.plumbingandhvac.ca                                                                                      October 2018 – Plumbing & HVAC          27
You can also read