PR OJECT OVERVIEW: PR OJEC T SU MMARY

   Citywide project to add bike facilities on both sides of multiple area streets

   Funded by a $1.85 million Sound Transit Access grant

   Adds over 6 miles of bike facilities, bringing Citywide total to 17 miles – an increase
   of approximately 50%
   Project corridors:
      • 100th Ave W/9th Ave S:        244th St SW to Walnut St
      • Walnut St/Bowdoin Way:        9th Ave S to 84th Ave W
      • 228th St SW:                  78th Ave W to 80th Ave W
      • 80th Ave W:                   228th St SW to 220th St SW

                                                                                      2
Citywide Bicycle Improvements - City of Edmonds, WA
PROJECT OVERVIEW: MAP

                        3
Citywide Bicycle Improvements - City of Edmonds, WA
PROJECT OVERVIEW: TIMELINE

   Efforts to Date:
     • 2009-2019       Citywide Bike Plan/TIP/Sound Transit Grant Pursuit
     • July 2020       Public Hearing with City Council
     • Aug 2020        City Council approved Accepting Funds
     • Oct/Nov 2020    Blueline selected to assist City with Outreach and Design
     • Nov/Dec 2020    Survey, Parking Study, Traffic Analysis completed
     • Dec 2020        Listening Sessions held with the Community
     • Jan 2021        Preliminary Design Alternatives submitted to City for Review
     • February 2021   Public Outreach – Website, Survey, Zoom Meeting
     • May 2021        Project update to City Council
                                                                               4
Citywide Bicycle Improvements - City of Edmonds, WA
PROJECT OVERVIEW: DESIGN TIMELINE

   Design Timeline:

                                    5
Citywide Bicycle Improvements - City of Edmonds, WA
P R O J E C T O V E R V I E W : D ATA C O L L E C T I O N

     Efforts to Date:
         • Mapping/Field Survey
         • Parking Analysis
         • Traffic Analysis
         • Methodology for Alternatives
         • Preliminary Design
         • Public Involvement
            • Listening sessions
            • Public open house
            • Public survey
         • Alternatives Analysis                            6
Citywide Bicycle Improvements - City of Edmonds, WA
D ATA A N A LY S I S : PA R K I N G

     Data Collection
         • Data was collected over 3 days in
           Nov 2020
             • Wednesday
             • Friday
             • Sunday
         • Number of cars parked was
           recorded every hour from 7:00
           AM to 7:00 PM

                                               7
Citywide Bicycle Improvements - City of Edmonds, WA
D ATA A N A LY S I S : PA R K I N G

     What does the data show?
         • Total of 518 spaces along project
             • 310 on Bowdoin Way/Walnut St
             • 208 on 9th Ave S
         • Average of 7% of stalls are used
           at any time throughout project
             • 481 parking stalls available
         • COVID correction factor
             • Use rate is similar to results
               collected in 2018, pre-COVID
             • No correction factor applied

                                                8
Citywide Bicycle Improvements - City of Edmonds, WA
D ATA A N A LY S I S : T R A F F I C

     Data Collection                           • COVID-19 correction factor applied
                                                  • Based on change in volumes at 238th St
         • Road tube counts were                    SW and Hwy 99 between Aug 2019 and
           collected                                Aug 2020
             • Nov 17th, 2020 – Nov 23rd,         • Morning: 1.7x
               2020 (1 week)                      • Afternoon: 1.3x

         • Turning movement counts
           were collected
             • Wednesday Nov 18th, 2020
             • Turning movements counts
               indicate how traffic volumes
               are split at the intersection

                                                                                             9
Citywide Bicycle Improvements - City of Edmonds, WA
D ATA A N A LY S I S : T R A F F I C

     Dedicated Left Turn Lanes
         • Northbound and southbound left turn lanes will be added at
           9th Ave S and Pine St
             • Data collected in April 2021 during afternoon peak hours meet WSDOT
               Design Manual requirements to add lanes

                                                                                     10
PUBLIC OUTREACH

   Efforts to Date:
     • Listening sessions – 12/10/2020         • Public open house – 2/24/2021
        • 90 residents who previously showed      • 90 residents contacted by email to
          interest in project were contacted        attend
          by email to attend, 21 attended         • 150 door hangers distributed
                                                  • Message board announcing meeting
                                                    placed along project
                                                  • Postings in Edmonds Beacon, My
                                                    Edmonds New and City Facebook page
                                                  • 60 attendees

                                               • Public survey – Closed on 3/1/2021

                                                                                     11
PUBLIC OUTREACH

                                                          100th Ave W/9th Ave S Survey Results
   Public Outreach Results                                              21%
                                                                                                24%

   • Key Issues
                                                                  9%

       • Parking at Yost Park
       • Improved pedestrian crossings
                                                                                        46%
         throughout project areas
                                                  Alternative 1        Alternative 2A    Alternative 2B   Alternative 3
       • Speeding vehicles
                                                         Bowdoin Way/Walnut St Survey Results
   •   Survey results
       • 91 responses                                                                             32%
                                                                  40%
       • 100th Ave W/9th Ave S – Alternative 2A
       • Bowdoin Way/Walnut St – Alternative 3

                                                                                         28%

                                                         Alternative 1          Alternative 2     Alternative 3
                                                                                                                          12
P U B L I C O U T R E A C H : PA R K I N G AT Y O S T ( B O W D O I N WAY & 9 6 T H AV E W )

                                                                                               13
         *for schematic representation only
PUBLIC OUTREACH: PEDESTRIAN IMPROVEMENTS

Bowdoin Way & Pioneer Way/90th Ave W
• Flashing beacons
• Crosswalk markings
• Bulb-out(s)

                                           14
PUBLIC OUTREACH: PEDESTRIAN IMPROVEMENTS

                              9th Ave S & Pine St
                              • Flashing beacons
                                                    15
PUBLIC OUTREACH: PEDESTRIAN IMPROVEMENTS

                             9th Ave S & 224th St SW/14th St SW
                             • Flashing beacons
                             • Crosswalk markings
                             • Bulb-out(s)

                                                                  16
PUBLIC OUTREACH: SPEEDING VEHICLES

   • Bowdoin Way/Walnut St speed study
      • Completed in March 2021
      • 33mph for 85th percentile (current speed limit 30 mph)
   • 9th Ave S/100th Ave W speed study
      • Completed in 2017
      • 36 mph for 85th percentile (current speed limit 30 mph)
   • Vehicle speeds are expected to decrease
      • Pedestrian bulb outs, flashing beacons and marked
        crosswalks at select locations
      • Lane width reduction shown to reduce driving speed

                                                                  17
B O W D O I N WAY / WA L N U T S T ( F R O M F I V E C O R N E R S T O 9 T H AV E S )
                                                   RECOMMENDED ALTERNATIVE
                                                           LOOKING EAST

 •   Geometry should contribute to traffic calming
 •   There is greater usage of parking on the north side of the street
 •   Street width allows dedicated bike lanes in both directions while retaining parking on one side of the street
 •   Sharrows are typically used in downhill sections; Bowdoin has both uphill and downhill sections making
     sharrows less effective                                                                                         18
9 T H AV E S / 1 0 0 T H AV E W ( N O R T H O F S R 1 0 4 )
                                                RECOMMENDED ALTERNATIVE
                                                       LOOKING NORTH

 • Public survey results indicated alternative 2A was most desired
 • Homes on the west side tend to have shorter and steeper driveways, while homes on the east side tend to have more off-
   street parking
 • The current 4-lane configuration at Walnut St will remain as is to maintain PM peak hour Level of Service
 • A greater number of cars park on the west side
                                                                                                                          19
 • There are fewer driveways and streets on the west side, allowing for a greater number of parking stalls to be retained
9 T H AV E S / 1 0 0 T H AV E W a n d 2 2 0 T H S T S W I N T E R S E C T I O N
                                       RECOMMENDED CONFIGURATION

                                                   • This configuration minimizes lane offset that is currently
                                                     present at this intersection
                                                   • The northeast corner of the intersection will be widened in
                                                     order to provide bike lanes through the intersection along
                                                     the curb
                                                   • The northbound right turn lane has been removed; however
                                                     free right turn movements are not currently allowed at the
                                                     intersection
                                                   • Left turn movements on 9th Ave S/100th Ave W will get a
                                                     green arrow followed by a flashing yellow; This will improve
                                                     safety and level of service at this intersection

                                        N
                                                 *green is for visual representation only of proposed bike lanes   20
S R 1 0 4 a n d 1 0 0 T H AV E W I N T E R S E C T I O N
                                       RECOMMENDED CONFIGURATION

                                                   • Provides a single northbound bike lane
                                                   • Addition of bike lane has little effect on wait time at the
                                                     intersection
                                                   • Provides two through lanes with a left turn lane (same as
                                                     existing configuration)
                                                   • Adds sharrows for southbound travel
                                                   • Balances the needs of bicyclists and vehicles

                                              N
                                                  *green is for visual representation only of proposed bike lanes   21
S R 1 0 4 a n d 1 0 0 T H AV E W I N T E R S E C T I O N

               ALTERNATIVE 1                                         ALTERNATIVE 2
                                                                                                                • Provides one bike lane in
                                                                                                                  northbound direction and
                                                                                                                  sharrow lane with bike ramps
                                                                                                                  in southbound direction
                                                                                                                • Provides two through lanes in
                                                                                                                  each direction
                                                                                                                • This configuration narrows
                                                                                                                  the lane width from 13’ to 11’
                                                                                                                  to provide two through lanes
                                                                                                                • This configuration has very
                                                                                                                  little impact on wait time for
                                                                                                                  motorists

                                                                                                        N
                                          N

• Provides bike lane in each direction
• Significantly increases wait time for
  motorists on all 4 legs                     *green is for visual representation only of proposed bike lanes
                                                                                                                                          22
S R 1 0 4 a n d 1 0 0 T H AV E W I N T E R S E C T I O N

                        ALTERNATIVE 3
                                                   • Provides sharrows to the outside lane for bike users who
                                                     are comfortable enough to pass through the intersection
                                                     with vehicle traffic and will add bike on/off ramps to the
                                                     sidewalk for a shared walkway
                                                   • In this configuration, it is expected that curb line
                                                     adjustments will need to be made in order to provide
                                                     enough room on sidewalks to allow pedestrian and bicycles
                                                     to comfortably share
                                                   • Bike users who are using the sidewalks will be asked to
                                                     move through the intersection in the same manner as a
                                                     pedestrian, sharing a narrow sidewalk
                                                   • This configuration has no impact on wait time for motorists

                                              N
                                                                                                              23
1 0 0 T H AV E W ( S O U T H O F S R 1 0 4 )

                                               LOOKING NORTH

 • Provides a bike lane in each direction
 • Provides a center turn lane

                                                               24
1 0 0 T H AV E W a n d W O O D WAY C A M P U S I N T E R S E C T I O N
                                     RECOMMENDED CONFIGURATION

                                                • This configuration has the shortest southbound queue
                                                  length during extreme traffic conditions (school peak
                                                  period)
                                                • This configuration provides a dedicated left turn lane for
                                                  school traffic from the northbound direction
                                                • Relocation of crosswalk to south side of the intersection

                             N
                                                *green is for visual representation only of proposed bike lanes

                                                                                                                  25
F I R D A L E AV E ( 1 0 0 T H AV E W ) a n d 2 3 8 T H S T S W I N T E R S E C T I O N
                                        RECOMMENDED CONFIGURATION

                                                    • This configuration has little to no lane offset and has a
                                                      relatively short queue length in the southbound right
                                                      turn lane
                                                    • This keeps the bike lane along the sidewalk through the
                                                      intersection in the northbound direction and following
                                                      the right turn lane in the southbound direction

                   N

                                                   *green is for visual representation only of proposed bike lanes   26
F I R D A L E AV E ( S O U T H O F S R 1 0 4 )

                                             LOOKING NORTH

 • Provides a bike lane in each direction
 • Provides a center turn lane

                                                             27
2 2 8 T H S T S W ( F R O M 8 0 T H AV E W T O 7 8 T H AV E W )

                                                       LOOKING WEST

 • Roadway will be widened to add a bike lane in each direction
 • Connects into existing bike lanes on 228th St SW near Hwy 99
 • Wider bike lane will be provided on the western end of street where existing widths allow

                                                                                               28
8 0 T H AV E W ( F R O M 2 2 8 T H S T S W T O 2 2 0 T H S T S W )

                                              LOOKING NORTH

 • Sharrows will be added in each direction
 • Work in Snohomish County

                                                                     29
PUBLIC RESOURCES

   Public Contact Information:
      • Email: bikelanes@edmondswa.org
      • Project Contact: Ryan Hague, Capital
        Projects Manager
      • Phone: (425) 771-0220

   Project Website:
      • City Project Website
      • Description, Status, Timeline