BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA

Page created by Cody Richards
 
CONTINUE READING
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
Building &
other structures

References 2018
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
Specialist in
the design,
manufacturing
and installation
of steel structures
Maeg is an international player in the construction sector. With more than 40 years of
experience, Maeg is able to adapt to each project characteristics, so to devise tailor-made
and innovative engineering solutions, concretely transforming design into substance.
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
Ideas   Innovative thinking is the engine to dream a different world,
        to imagine what could happen further.

        Building transforms these ideas into reality: by shaping the space around us,

shape
        we are given the possibility to leave a mark and actively contribute to the
        social and economic development of countries, communities and people.

the
world
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
3

References
Hotels, malls, residential, airports, hospitals, stadiums, parking lots, offices, skyscrapers, production factories, warehouses, power plants;
noise-absorbing coverages, gantry and overhead travelling cranes for both industrial and nautical use, domes and temporary pavilions.
The following is a summary of the most notable projects listed by completion date.

Project (civil)                         Location                        Period         Client                                    Contractor                                                Page
COSO Stadium                            Yaoundé, Cameroon               2017-ongoing   Fédération Camerounaise de Football       Gruppo Piccini S.p.A.                                     5
Al Wakrah Stadium & Precinct            Doha, Qatar                     2016-ongoing   Supreme Committee for Delivery & Legacy   Midmac-Purr-Six Construct Joint-Venture (MPS-JV)          7
Termini's station parking lot           Rome, Italy                     2013-ongoing   Grandi Lavori S.p.A.                      Società Appalti Lavori e Costruzioni SpA (SALC)           9
Moving Walkway VCE Airport              Venice, Italy                   2015-2016      SAVE S.p.A.                               E.MA.PRI.CE. S.p.A.                                       11
Mall of Qatar                           Doha, Qatar                     2015           UrbaCon Trading & Contracting (UCC)       -                                                         13
Centre Guido                            Libreville, Gabon               2013-2014      Groupement Santullo Sericom Gabon S.A.    -                                                         15
Garibaldi Complex                       Milan, Italy                    2012           Beni Stabili S.p.A.                       Impresa Costruzioni Giuseppe Maltauro S.p.A.              17
Center International Conference (CIC)   Algeri, Algeria                 2010-2012      Government of Algiers                     China State Construction Engineering Corp. Ltd. (CSCEC)   19
Corinthia Hotel Khartoum                Khartoum, Sudan                 2005-2006      L.A.F.I.C.O.                              Cooperativa Muratori And Cementisti (C.M.C.)              21

Project (industrial)
NatGasoline methanol plant              Beaumont, USA                   2016           Natgasoline LLC                           Orascom E&C USA, INC                                      23
New Capital power plant                 Cairo, Egypt                    2016           Army of Egypt                             Orascom Construction                                      25
ADD airport new cargo terminals         Addis Ababa, Ethiopia           2015           Ethiopian Airlines                        Safet SpA                                                 27
Cameri military airport                 Cameri, Italy                   2011-2013      Alenia Aeronautica                        Impresa Costruzioni Giuseppe Maltauro S.p.A.              29
Termal power plant                      Monfalcone, Italy               2006-2007      Endesa Italia S.p.A.                      Duro Felguera S.A.                                        31

Project (other)
Zoo de Beauval tropical dome            Saint-Aignan-Sur-Cher, France   2017-ongoing   SAS ZooParc de Beauval                    Constructions Metalliques Florentaies (C.M.F.)            33
Place Vendôme domes                     Doha, Qatar                     2017-ongoing   United Development Company (UDC)          Construction & Reconstruction Engineering Company (CRC)
                                                                                                                                                                                           35
The Constellation memorial              Abu Dhabi, UAE                  2017           Private Office of Sheikh Mohamed Bin      Al Fara’a Engineering General Contracting
                                                                                       Zayed Al Nahyan                                                                                     37

Augusta port cranes                     Augusta, Italy                  2017           Autorità Portuale di Augusta              Consorzio Valori S.c.a.r.l.
                                                                                                                                                                                           39
Mexico Pavilion Expo 2015               Milan, Italy                    2014           ProMéxico                                 Nussli Italia S.r.l.
                                                                                                                                                                                           41
Golden Tulip Plaza Caserta              Caserta, Italy                  2004           Hotel Marina di Castello S.p.A.           -
                                                                                                                                                                                           43
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
5         Bridges & viaducts             Civil buildings   Industrial buildings        Other structures

COSO
                               Location                      The “Complexe sportif d'Olembe” or
                               Yaoundé, Cameroon             COSO stadium will host the 2019 the
                                                             Africa Cup of Nations. The steel structu-

stadium
                               Client                        res of the stadium of the roof, composed
                               Fédération Camerounaise       by a compression and a tension ring
                               de Football
                                                             supporting the membrane, have an
                               Contractor                    overall weight of 8.000 tons.
                               Gruppo Piccini S.p.A.
                                                             With 60.000 seats, a hotel, a shopping
                               Scope of work                 mall, gyms and swimming pools, this
                               Design, supply, erection      complex aims to become a new point of
                                                             reference for the Cameroonian capital.
                               Period
                               2017 - ongoing
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
7           Bridges & viaducts              Civil buildings   Industrial buildings         Other structures

Al-Wakrah
                                 Location                      This 40.000 seats stadium will host the
                                 Doha, Qatar                   2022 FIFA World Cup. The design of the
                                                               structure has been conceived by the

stadium
                                 Client                        notorious studio Zaha Hadid Architects,
                                 Supreme Committee for         and it has been inspired by the sails of
                                 Delivery & Legacy
                                                               traditional Dhow boats, used by pearl
                                 Contractor                    divers from the region in the Persian Gulf.
                                 Midmac-Purr-Six Construct
                                 Joint-Venture (MPSJV)         The primary steel structure of the
                                                               stadium, divided in two symmetrical
                                 Scope of work                 halves divided in three shells, has a final
                                 Design, supply, erection      weight of 7.500 tons, supporting
                                                               secondary structures, the cladding and a
                                 Period                        retractable roof ensuring a microclimate
                                 2016 - ongoing
                                                               to balance the elevated temperature of
                                                               the country.
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
9                     Bridges & viaducts                 Civil buildings   Industrial buildings         Other structures

Rome Termini
                                           Location                         This ambitious and vital project for the
                                           Rome, Italy                      city of Rome aimed to solve the traffic
                                                                            and parking situation of the main

station parking lot
                                           Client                           transportation hub of the capital. First of
                                           Grandi Lavori S.p.A.             its kind in Europe, it is a three-floors
                                                                            parking lot built above the railways of
                                           Contractor
                                           Società Appalti Lavori e         Termini train station.
                                           Costruzioni SpA (SALC)
                                                                            The overall surface of 50.000 square
                                           Scope of work                    meters hosts up 1.337 parking spots and
                                           Design, supply, erection         dedicated area for shops and stores. The
                                                                            40.000 tons steel structure has been
                                           Period                           assembled and launched from the top of
                                           2013 - ongoing                   the station, without interfering with the
                                                                            below train traffic.
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
11               Bridges & viaducts                 Civil buildings   Industrial buildings       Other structures

VCE airport
                                      Location                         The moving walkway is a contained and
                                      Venice, Italy                    elevated pedestrian gallery that
                                                                       connects the VCE airport dock with the

moving walkway
                                      Client                           parking garage and the passenger
                                      SAVE S.p.A.
                                                                       terminal.
                                      Contractor
                                      E.MA.PRI.CE. S.p.A.              This 605 tons heavy structure is 365
                                                                       meters long and it is served by five
                                      Scope of work                    moving walkways reducing the travel
                                      Design, supply, erection         distance to only 1s0 minutes. The path,
                                                                       inspired by the High Line in New York,
                                      Period                           offers an extensive view framed by a by a
                                      2015-2016                        “green” wall made of trees and flowers,
                                                                       recreating the feeling of being outdoors.
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
13        Bridges & viaducts              Civil buildings   Industrial buildings         Other structures

Mall of
                               Location                      Realization of a 3.000 seats movie
                               Doha, Qatar                   theatre with the largest IMAX Laser 3D
                                                             projection system in the world, built

Qatar
                               Client                        inside the Mall of Qatar for a total weight
                               UrbaCon Trading &             of the steel structures of 1.600 tons.
                               Contracting (UCC)

                               Contractor                    Designed by the internationally known
                               /                             studio of architects Chapman Taylor, this
                                                             500.000 square meters mall integrates a
                               Scope of work                 shopping, dining and entertainment
                               Design, supply, erection      experience next to the Al Rayyan Sports
                                                             Club and 2022 FIFA World Cup Stadium.
                               Period
                               2015
BUILDING & OTHER STRUCTURES - REFERENCES 2018 - MAEG COSTRUZIONI SPA
15       Bridges & viaducts               Civil buildings   Industrial buildings        Other structures

Centre
                              Location                       L-shaped mixed-use building divided into
                              Libreville, Gabon              three structures with a total surface of
                                                             6.600 square meters: a south residential
                              Client

Guido
                                                             tower 10 floors high, a commercial north
                              Groupement Santullo            tower 12 floors high a horizontal
                              Sericom Gabon S.A.
                                                             connection hosting parking lots.
                              Contractor
                              /                              The steel structure has a weight of 1.769
                                                             tons, supporting the façade characteri-
                              Scope of work                  zed by a regular grid alternating opaque
                              Design, supply, erection       and glazed modules, integrating with the
                                                             surrounding environment near the
                              Period                         prestigious area of Boulevard Triumphal,
                              2012-2014                      main artery of the city hosting several
                                                             ministries and bank offices.
17          Bridges & viaducts                  Civil buildings   Industrial buildings         Other structures

Garibaldi
                                 Location                          Since 1984, the Garibaldi towers
                                 Milan, Italy                      characterize the skyline of the city.

complex
                                 Client                            In 2008 they have undergone a renova-
                                 Beni Stabili S.p.A.               tion including a new body “C” between
                                                                   the two towers, made entirely of steel for
                                 Contractor
                                 Impresa Costruzioni               a total weight of 1.150 tons. This new
                                 Giuseppe Maltauro S.p.A.          element is four floors tall and hosts
                                                                   common spaces and recreational areas.
                                 Scope of work
                                 Design, supply, erection

                                 Period
                                 2012
19                     Bridges & viaducts               Civil buildings      Industrial buildings        Other structures

Centre International
                                            Location                          The project has been conceived and
                                            Algiers, Algeria                  financed by the Algerian Government to
                                                                              step up its position in the international

Conferences (CIC)
                                            Client                            arena.
                                            Government of Algiers
                                                                              With an overall surface of more than
                                            Contractor
                                            China State Construction          110.000 square meters able to host up to
                                            Engineering Corp. Ltd. (CSCEC)    10.000 people, it is the biggest conferen-
                                                                              ce center in North Africa. The 6.613 tons
                                            Scope of work                     heavy steel structure develops around a
                                            Design, supply                    central circular body, called T4, with a
                                                                              diameter of 95 meters realized with
                                            Period                            reticular trusses made of tubular pipes
                                            2010-2014                         with a maximum height of 6 meters.
                                                                              Around it, the main covering T5 develops
                                                                              for 330 meters, extending other 150
                                                                              meters with the coverage T1 and T2.
21                Bridges & viaducts             Civil buildings        Industrial buildings           Other structures

Corinthia Hotel
                                       Location                           One of the first five-star hotels in the
                                       Khartoum, Sudan                    Sudanese capital, located in one of the
                                                                          most alive districts of the city in front of

Khartoum
                                       Client                             the meeting point of the Blue and White
                                       Libyan Arab Foreign Investment     Nile.
                                       Company (L.A.F.I.C.O.)

                                       Contractor                         All the 18 steel floors, 3.700 tons heavy,
                                       Cooperativa Muratori And           are irregularly shaped and lean on a
                                       Cementisti (C.M.C.)                central core made of reinforced concre-
                                                                          te: they compose a majestic oval curved
                                       Scope of work                      façade shaped like a sail with a total
                                       Design, supply, erection           covered surface of 60.000 square
                                                                          meters. The hotel has become a symbol
                                       Period                             of economic and cultural renovation of
                                       2005-2006
                                                                          the city.
23               Bridges & viaducts             Civil buildings   Industrial buildings         Other structures

NatGasoline
                                      Location                     Supply of more than 1.800 tons of steel
                                      Beaumont (TX), USA           for the realization of a methanol plant
                                                                   built in a 514-acre land and integrated to

methanol plant
                                      Client                       an adjacent already existing production
                                      Natgasoline LLC              complex.
                                      Contractor
                                      Orascom E&C USA, INC         The facility will produce 5.000 tons a day
                                                                   of this petrochemical liquid coming from
                                      Scope of work                natural gas, and it is now the biggest
                                      Design, supply               methanol plant in the US, based on the
                                                                   production capacity.
                                      Period
                                      2016
25            Bridges & viaducts              Civil buildings   Industrial buildings       Other structures

New Capital
                                   Location                      Supply of more than 10.400 tons for the
                                   Cairo, Egypt                  construction of a gas-fired combined
                                                                 cycle power plant situated in New Capital

power plant
                                   Client                        City that will supply around 15 million
                                   Army of Egypt                 Egyptians with electricity.
                                   Contractor
                                   Orascom Construction          It sets to become the biggest one in the
                                                                 world, with 4800 MW power capacity,
                                   Scope of work                 supporting the energetic renovation that
                                   Design, supply                the country has undertaken.

                                   Period
                                   2016
27                Bridges & viaducts               Civil buildings   Industrial buildings         Other structures

ADD airport
                                       Location                        New cargo terminals aimed to four-fold
                                       Addis Ababa, Ethiopia           the storing surface at the main airport of
                                                                       Addis Ababa, with a weight of 1.680 tons.

cargo terminals
                                       Client
                                       Ethiopian Airlines              To spur export and consequently the
                                                                       development of the country, the national
                                       Contractor
                                       Safet S.p.A.                    air company Ethiopian Airlines is
                                                                       investing on new areas to host and
                                       Scope of work                   transfer agricultural products destined to
                                       Design, supply, erection        foreign countries. This new enlargement
                                                                       increases the hosting capacity to 1.5
                                       Period                          million tons of goods per year, making of
                                       2014-2015                       it one of the biggest cargo terminals in
                                                                       the world.
29                 Bridges & viaducts               Civil buildings   Industrial buildings         Other structures

Cameri
                                        Location                       Production plant for Final Assembly and
                                        Cameri, Italy                  Checkout (FACO) of F35-JSF aircrafts,
                                                                       located within the military airport of

military airport
                                        Client                         Cameri.
                                        Alenia Aeronautica
                                                                       The overall surface is 500.000m², in
                                        Contractor
                                        Impresa Costruzioni            which there are 20 buildings with a
                                        Giuseppe Maltauro S.p.A.       weight of 10.384 tons used for the
                                                                       construction, maintenance and logistic of
                                        Scope of work                  Joint Strike Fighter aircrafts on a global
                                        Design, supply, erection       level. It had a positive impact on the local
                                                                       economy as well, creating six thousand
                                        Period                         new jobs, increasing the demand of
                                        2010-2014                      members and beginning a technology
                                                                       renovation in the local industry.
31             Bridges & viaducts               Civil buildings   Industrial buildings         Other structures

Termal Power
                                    Location                       Placed along the East side of the
                                    Monfalcone, Italy              Valentinis Canal, it covers an overall area
                                                                   of 30 hectares. The weight of the steel

Plant
                                    Client                         structures reaches 2.300 tons.
                                    Endesa Italia S.p.A.
                                                                   The Thermal Power Station produces
                                    Contractor
                                    Duro Felguera S.A.             electricity and currently has an installed
                                                                   capacity of 976 MW and fueled by coal
                                    Scope of work                  and dense fossil fuel oil, with a very low
                                    Design, supply, erection       Sulphur content.

                                    Period
                                    2006-2007
33                    Bridges & viaducts              Civil buildings      Industrial buildings        Other structures

Zoo de Beauval
                                           Location                         Gigantic dome 32 meters tall realised in
                                           Saint-Aignan-Sur-Cher, France    the Zoo de Beauval, composed of 38
                                                                            semi-arches, with a total weight of 780
                                           Client

tropical greenhouse
                                                                            tons and a diameter of 101 meters.
                                           SAS ZooParc de Beauval
                                                                            Bigger than a soccer field, it recreates
                                           Contractor
                                           Constructions Metalliques        the equatorial habitat ensuring the
                                           Florentaies (C.M.F.)             management of the air and of the
                                                                            temperature hosting up to 3.000 people
                                           Scope of work                    per day visiting up close the animals. The
                                           Design, supply, erection         project will be inaugurated in 2020, for
                                                                            the fortieth anniversary of the zoo.
                                           Period
                                           2017 - ongoing
35              Bridges & viaducts             Civil buildings       Industrial buildings          Other structures

Place Vendôme
                                     Location                          Place Vendôme is a luxurious mixed-use
                                     Doha, Qatar                       development of 1 million square meters.
                                                                       The main mall building consists of 2
                                     Client

domes
                                                                       parking basements, a lower ground floor
                                     United Development                level, an upper ground floor level and 2
                                     Company (UDC)
                                                                       floors hosting shops. Adjacent are
                                     Contractor                        developed three 5-star hotels and 2
                                     Construction & Reconstruction     parking towers.
                                     Engineering Company (CRC)
                                                                       Maeg is contributing by realizing the 12
                                     Scope of work                     iron and glass skylight domes, as
                                     Design, supply, erection          supplier for both steel and glass and
                                                                       proving itself as a competitor in the field
                                     Period                            of installations of architectural envelops.
                                     2017 - ongoing
                                                                       Overall, the weight of the steel structure
                                                                       amount to 7.200 tons, while the glass
                                                                       surface reaches 35.000 square meters.
37                  Bridges & viaducts              Civil buildings         Industrial buildings        Other structures

The Constellation
                                         Location                            The Constellation is a memorial in honor
                                         Abu Dhabi, UAE                      of sheik Zayed bin Sultan Al Nahyan,
                                                                             former Abu Dhabi’s emir and former
                                         Client

memorial
                                                                             president of the UAE.
                                         Private Office of Sheikh Mohamed
                                         Bin Zayed Al Nahyan/ MUSANADA
                                                                             The pavilion is 30 meters tall and has a
                                         Contractor                          triangular structure of steel 250 tons
                                         Al Fara’a Engineering               heavy from which, with a millimetric
                                         General Contracting                 tolerance, depart 1.100 inox cables on
                                                                             which there are 1.327 geometrical
                                         Scope of work                       elements representing the effigy of the
                                         Design, supply, erection            emir, recognizable from any latitude. The
                                                                             project has a high social value for the
                                         Period                              country, indeed it has been kept under
                                         2017
                                                                             secret until the big opening in February
                                                                             2018.
39            Bridges & viaducts               Civil buildings    Industrial buildings        Other structures

Augusta
                                   Location                         Realization of two container cranes,
                                   Augusta, Italy                   1.900 tons heavy, at the Augusta port,
                                                                    province of Syracuse.

port cranes
                                   Client
                                   Autorità Portuale di Augusta     This investment, part of the plan of
                                                                    adjustment of the docks for mooring of
                                   Contractor
                                   Consorzio Valori S.c.a.r.l       the container ships and the mobilisation
                                                                    of containers in the commercial harbor,
                                   Scope of work                    aims to help the port becoming an
                                   Design, supply, erection         important hub in the containerized
                                                                    maritime trade in the Mediterranean Sea.
                                   Period
                                   2016-2017
41                 Bridges & viaducts                  Civil buildings   Industrial buildings         Other structures

Expo 2015
                                        Location                           Temporary pavilion at the Expo 2015 -
                                        Milan, Italy                       Feeding the Planet, Energy for Life.

Mexican pavilion
                                        Client                             The external structure of the pavilion is
                                        ProMéxico                          composed of tubular profiles reaching a
                                                                           height of 14 meters for a weight of 448
                                        Contractor
                                        Nussli Italia S.r.l.               tons, wrapped with a membrane made of
                                                                           canvas, resembling the shape of the
                                        Scope of work                      corn, base ingredient of the Aztec culture
                                        Design, supply, erection           and inspiration of the designer. This
                                                                           combination, filtering natural light and
                                        Period                             reducing energy consumption, has been
                                        2015                               awarded with the Expo sustainability
                                                                           prize.
43             Bridges & viaducts              Civil buildings        Industrial buildings          Other structures

Golden Tulip
                                    Location                           This roofing covers the internal courtyard
                                    Caserta, Italy                     of the luxurious hotel in Caserta.

Plaza Hotel
                                    Client                             It is the biggest ventilated roof of its type
                                    Hotel Marina di Castello S.p.A.    in Italy, and one of the largest in Europe:
                                                                       it has a surface of 3.600 sqm (58.5m x
                                    Contractor
                                    /                                  58.5m). The project had to take into
                                                                       consideration the seismic of the area,
                                    Scope of work                      using a truss ends structure (without
                                    Design, supply, erection           anchors) connecting the perimeter
                                                                       buildings with a total weight of 300 tons.
                                    Period                             The dome, made of shatterproof
                                    2004                               laminated glass, could not be assembled
                                                                       on the ground and has been performed
                                                                       directly at height beginning from
                                                                       perimeter beams.
Maeg Costruzioni S.p.A.
Via Toniolo 40
31028, Vazzola (TV) - Italy
+39 0438 441558
www.maegspa.com
You can also read