Bringing new life to historic church - L ike so many beautiful old buildings in - Higgs Construction
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
6 | St Peter’s Anglican Church COMMUNITY Bringing new life to historic church Richard Loader “It’s absolutely amazing to walk in and see how the old While Wellington practice Tennent Brown Architects were engaged as lead architects and the new have been brought together. L ike so many beautiful old buildings in for the project, Christchurch practice Chaplin Christchurch, St Peter’s Anglican Church For many people they will not notice any differences Crooks Architects handled all contract admin- istration and the day-to-day work. suffered extensive damage during the and all the strengthening work has been hidden away.” series of Canterbury earthquakes. Christchurch commercial builders Higgs With its origins dating back to 1858, the Construction was engaged as lead contractor stone church is a sacred space, a place of and Suzanne says the success of the project peace and prayer on Christchurch’s Church Following two years of extensive earth- the integration of the new elements of the was in no small part due to the company’s site Corner. quake repairs, seismic strengthening and church with the heritage elements have been manager who presented practical solutions to modernisation the official re-opening and re- hugely successful. the numerous issues encountered. Initially built in timber from Akaroa, the dedication of the church was held on February “It’s absolutely amazing to walk in and see “You had extensive earthquake damage to church has undergone many additions and 28, attended by Archbishop Philip Richardson how the old and the new have been brought a structure that had been built in stages over extensions over time, notably in 1874 when along with Bishop Peter Carrell. together. the years.” Benjamin Mountfort was engaged as archi- tect and made an addition in stone. His great Suzanne Price, Church Property Trustees “For many people they will not notice any great-great nephew, the Venerable Nick (CPT) Recovery Programme Manager, says differences and all the strengthening work has to page 9 Mountfort, is the church’s current Vicar. while the $5 million project has been complex, been hidden away.” ST PETER’S ANGLICAN CHURCH, UPPER RICCARTON PROUD TO BE REBUILDING CANTERBURY’S HERITAGE “Your Canterbury-owned Construction Partner” www.higgsconstruction.co.nz www.hi w ggsconstruction.co.nz w.hi
COMMUNITY St Peter’s Anglican Church | 7 The repair has provided the opportunity to modernise the church to meet the 21st century requirements of a growing parish. The Pumphouse Demolition Yard Buyers & sellers of: • recycled bricks • recycled joinery • building materials • architectural antiques Visit us in our restored buildings 544 Tuam St Phillipstown, CHCH Phone 03 389 6638 • www.thepumphouse.co.nz Pleased to support St Peters Church Riccarton tennentbrown.co.nz A long journey for the Parish, expertly stewarded by Suzanne Price -CPT, well supported by all consultants, and beautifully built by Higgs and their subcontractors. Special mention to Ray MacFarlane, the ideal site foreman for this special project. St Peters can now continue to serve the people of Christchurch.
8 | St Peter’s Anglican Church COMMUNITY The addition of a beautifully designed timber screen between Chancel and Nave provides a small chapel, named The Nurse Maud Chapel of Compassion, for smaller services. Providing protection For over twenty years Masterguard has “They like the fact that it’s cost effective established itself as a trusted provider of and that they can call one person for all security and fire protection system services their needs.” throughout the Canterbury region, Mac- kenzie Basin and beyond. Shane says Masterguard provides a ‘one company – one solution’ total care pack- With Head Office based in Ashburton, age. “We’re generally with the client from Masterguard has branches in Christchurch design of their building and systems all and Timaru ensuring agility when respond- the way through to handover and beyond. ing to its core customer base. As the site is handed over to the client we will go back to them for servicing of those systems and building compliance manage- Sales Manager Shane Walton says the ment, as well as alterations/expansion over company offers fire, security, and safety time.” solutions for almost every aspect of the industry. With a particular interest in custom designs and heritage buildings, Master- “If you require fire or security protection, guard’s strength lies in developing bespoke we can take care of it from design, instal- solutions for challenging situations. lation to long term maintenance of those systems. We also provide fire and security monitoring services either via our own A recent project involved the installation • SECURITY ALARM INSTALLATION • ACCESS CONTROL SYSTEMS monitoring centre or direct to FENZ (Fire and Emergency New Zealand).” of a fire alarm system in the refurbished St Peters Church in Riccarton that involved AND MAINTENANCE • ALARM RESPONSE the use of infrared beams to detect smoke, • SECURITY ALARM MONITORING • TECHNICIANS AVAILABLE 24/7 so that the fire detection was unobtrusive. Providing Building Warrant of Fitness and IQP (Independent Qualified Person) • FIRE ALARM INSTALLATION • GUARDS AVAILABLE 24/7 Services is another specialty offered by Another project was for the Dark Sky AND MAINTENANCE Masterguard. Project and involved the clever use of linear • BUILDING WOF AND heat detection cabling, wireless relays and • FIRE ALARM MONITORING IQP SERVICES special LED indicators in the large observa- Within the Ashburton District, Master- PH 0800 308 854 (24 HOUR) tory dome that covers the antique Brashear guard offers locksmithing services along Telescope in Tekapo. with restricted key system design and installation. “Weaved throughout the ridges of the dome 12 metres from the viewing plat- “Customers who choose us tend to be small to medium size enterprises. We’re form is a 4mm white cable which is very hard to see and does not detract from the Christchurch | Ashburton | Timaru often dealing with clients with multiple viewing experience. A wireless solution sites who require solutions, including com- was essential here as the dome rotates info@mgfiresecurity.co.nz pliance, across all of those sites. near 360 degrees.” www.mgfiresecurity.co.nz
COMMUNITY St Peter’s Anglican Church | 9 Restoration successfully combines old and new from page 6 “The church has had a myriad “The church has had a myriad of additions of additions and those and those additions all performed differently additions all performed because the structural elements varied. So we had to get in and rebuild walls that were differently because the beyond repair, retaining as much as possible.” structural elements varied. The shape of the church formed a cross So we had to get in and with the transepts running north and south behind the chancel that sits at the front rebuild walls that were housing the altar, and the nave which is the beyond repair, retaining as church’s main body stretching from the main entrance to the transepts. much as possible.” While the chancel, the oldest part of the The transepts were extended providing church, suffered the least amount of earth- space for new kitchen and vestibule that will quake damage, the transept walls collapsed be a community hub for pastoral, musical, through the earthquake shocks. social and educational activities. “Although the stone church looks robust “We also moved the restored Rieger organ on the outside, internally it’s lined with brick, to the southern transept. There’s also space which is not as robust as stone. for the choir there too. Relocating the organ “The nave suffered extensive damage to the was a major project and allows everyone to southern and northern walls and when we got see it and the choir, rather than be hidden into the repair there was a lot more damage away.” than was obvious to the eye. The addition of a beautifully designed “So the stonemasons completely rebuilt the timber screen between Chancel and Nave pro- northern wall of the Nave.” vides a small chapel, named The Nurse Maud As well as the church’s significant heritage Chapel of Compassion, for smaller services. value, a key driver for undertaking the repair “The project has been funded by a combi- and strengthening project was that a complete nation of grants from individuals, organisa- rebuild was not an economic option. tions, the parish itself and from earthquake The repair also provided the parish the proceeds.” opportunity to modernise the church to meet Suzanne says funding applications were the 21st century requirements of a growing submitted to different organisations for differ- parish, for no additional cost. ent elements of the church. GOLDFIELD STONE LTD STONE AND BRICK BUILDING RESTORATION SPECIALISTS TIMBER FLOOR SANDING & COATING • TIMBER REPAIRS • INSTALLATION goldfieldstone.co.nz Phone: 03 384 9673 027 433 4550 www.sutherlandfloorsanding.co.nz sutherlandfloors@gmail.com Graham Stewart NZCCM - 027 443 4961 | 03 310 3036 e: stewartstainedglass@hotmail.com | 948 Loburn Whiterock Rd, RD 2 Rangiora CONTECH SPECIALIST CONTRACTING Your preferred partner in developing innovative, quality and engineered solutions in the building and civil engineering construction industry BBR Contech is pleased to have supplied and installed Macalloy Stainless Post-tensioning Systems and Sika FRP Strengthening System for Higgs Construction on the St Peter’s Church Restoration Project. Auckland Wellington Christchurch Tel (09) 274 9259 Tel (04) 569 1167 Tel (03) 339 0426 www.contech.co.nz
You can also read