BOUNDARY REVIEW OF THE EAST BOSTON DESIGNATED PORT AREA LA REVISIÓN DEL LÍMITE DEL ÁREA PORTUARIA DESIGNADA DE EAST BOSTON - Public Information ...

Page created by Jessica Douglas
 
CONTINUE READING
BOUNDARY REVIEW OF THE EAST BOSTON DESIGNATED PORT AREA LA REVISIÓN DEL LÍMITE DEL ÁREA PORTUARIA DESIGNADA DE EAST BOSTON - Public Information ...
BOUNDARY REVIEW OF THE
EAST BOSTON DESIGNATED PORT AREA

 LA REVISIÓN DEL LÍMITE DEL ÁREA
  PORTUARIA DESIGNADA DE EAST
             BOSTON

          Public Information Meeting
              February 23, 2021
BOUNDARY REVIEW OF THE EAST BOSTON DESIGNATED PORT AREA LA REVISIÓN DEL LÍMITE DEL ÁREA PORTUARIA DESIGNADA DE EAST BOSTON - Public Information ...
FOR INTERPRETATION

Spanish interpretation is available for this meeting. Please
select your preferred language option at the bottom of the
screen by clicking on the globe symbol        and the language
you would like to hear. (Mobile users: Tap the ellipses icon
        and then “Language Interpretation.”)

Optional: To hear only the interpreted language, click Mute
Original Audio.
BOUNDARY REVIEW OF THE EAST BOSTON DESIGNATED PORT AREA LA REVISIÓN DEL LÍMITE DEL ÁREA PORTUARIA DESIGNADA DE EAST BOSTON - Public Information ...
PARA LA INTERPRETACIÓN

Hay interpretación al español disponible para esta reunion.
Seleccione la opción de idioma que preferiera en la parte
inferior de la pantalla haciendo clic en el símbolo del globo
y el idoma en el que desea escuchar la audiencia.
Opcional: Para escuchar únicamente el idioma interpretado,
haga clic en Mute Original Audio (Silenciar Audio Original).
BOUNDARY REVIEW OF THE EAST BOSTON DESIGNATED PORT AREA LA REVISIÓN DEL LÍMITE DEL ÁREA PORTUARIA DESIGNADA DE EAST BOSTON - Public Information ...
ZOOM TIPS
                    CONSEJOS PARA ZOOM

Your controls should be available at   Los controles están disponibles en
the bottom of the screen. Clicking     la parte inferior de la pantalla. Al
on these symbols activates different   hacer clic en estos símbolos se
features:                              activin diferentes funciones:
        Mute/unmute
                                               Silenciar/hablar
        Turn video on/off
                                               Encender/apagar el video
        To select language/mute
        original                               Para cambiar el canal de
                                               audio entre español e inglés
BOUNDARY REVIEW OF THE EAST BOSTON DESIGNATED PORT AREA LA REVISIÓN DEL LÍMITE DEL ÁREA PORTUARIA DESIGNADA DE EAST BOSTON - Public Information ...
ZOOM TIPS
CONSEJOS PARA ZOOM

Please sign into the meeting with
your name and affiliation in the
Chat.
AGENDA

• Introductions
• DPA background
• DPA boundary review process
• Standards of designation
• Example review
• Questions and comments
PLAN: East Boston
PLAN: East Boston offers the opportunity to imagine the future of an entire neighborhood, and respond boldly to the
challenges it faces today. Guided by Imagine Boston 2030 and several city-wide strategic plans, PLAN: East Boston
will produce a framework to predictably shape the future of East Boston, and identify opportunities to preserve,
enhance, and grow.

 ESTABLISHING EXISTING CONDITIONS         IDENTIFYING CHALLENGES &                     IMAGINING THE FUTURE
                                          OPPORTUNITIES

   ●   Open House / Establish IPOD          ●   Character Area Overview                WE’RE HERE! - Advertisement for a
   ●   Preserve / Enhance / Grow            ●   Neighborhood Residential               community workshop in April forthcoming!
   ●   Open Space                           ●   Squares and Corridors
   ●   Transportation                       ●   Waterfront & Economic Development
   ●   Housing                                  Areas
   ●   Small Business                       ●   Transportation Networks

For more information about the initiative, and to register for event updates, please visit bit.ly/PlanEastBoston

                                                                       Para escuchar la sesión en español, por favor utilice el canal en español
PLAN: East Boston
PLAN: East Boston es una iniciativa de planificación comunitaria en todo el vecindario de East Boston. Toma como
punto de partida Imagine Boston 2030 y varios planes estratégicos de la ciudad, PLAN: East Boston generará una
estructura para moldear de forma previsible el futuro de East Boston, e identificar oportunidades para preservar,
mejorar, y crecer.

ESTABLECER CONDICIONES EXISTENTES       IDENTIFICAR DESAFÍOS Y                         IMAGINAR EL FUTURO
                                        OPORTUNIDADES

 ●   Casa abierta/establecer IPOD        ●    Áreas características                    ¡ESTAMOS AQUÍ! – Aviso publicitario de un
 ●   Preservar/mejorar/crecer            ●    Vecindario residencial                   taller comunitario que se realizará el
 ●   Espacio abierto                     ●    Plazas y corredores                      próximo mes de abril.
 ●   Transporte                          ●    Zonas de desarrollo económico y frente
 ●   Vivienda                                 costero
 ●   Empresas pequeñas                   ●    Conexiones regionales

Si desea obtener más información sobre la iniciativa y registrarse para recibir novedades de los eventos, visite
bit.ly/PlanEastBoston

                                                                         Para escuchar la sesión en español, por favor utilice el canal en español
DPA POLICY BACKGROUND

• DPAs established in 1978 to identify coastal geographic areas that
  provide primary characteristics that are essential for water-dependent
  industrial (WDI) uses
• DPA rules to protect WDI uses on water-side areas incorporated into
  Waterways Regulations (310 CMR 9.00) in 1979
• Jurisdiction of Waterways regulations (including DPA rules) expanded
  to include filled tidelands in 1984
• DPA regulations (301 CMR 25.00) setting forth procedure for
  establishing and reviewing DPA boundaries promulgated in 1994
DESIGNATED PORT AREAS
  IN MASSACHUSETTS
PARA LA INTERPRETACIÓN

Hay interpretación al español disponible para esta reunion.
Seleccione la opción de idioma que preferiera en la parte
inferior de la pantalla haciendo clic en el símbolo  del
globo y el idoma en el que desea escuchar la audiencia.
Opcional: Para escuchar únicamente el idioma interpretado,
haga clic en Mute Original Audio (Silenciar Audio Original).
DPA BOUNDARY REVIEW

• The purpose of the DPA boundary review process is to
  determine:
  • if a DPA boundary should remain as it is currently
    established or
  • whether it should be modified to more appropriately
    protect water-dependent industrial uses and promote
    the goals of the DPA policy and overall state growth and
    environmental policy
EAST BOSTON DPA

• East Boston DPA established in
  1978
• East Boston DPA boundary
  reviewed in 2002 (decision issued
  in 2003)
• Boundary at Boston East site
  modified in 2008
INITIATION OF BOUNDARY REVIEW

• At discretion of CZM Director or at the request of:
  • A municipal body with authority to enact zoning (e.g., municipal
    official, planning board, City Council)
  • Any state/regional planning agency with authority over the area
    proposed for review
  • Owner(s) of area proposed for review
  • Any ten citizens of the Commonwealth
• On January 30, 2020 BPDA requested review of East Boston DPA
  boundary
• On March 16, 2020 CZM accepted request and expanded scope of
  review to include entire DPA
PUBLIC NOTICE OF BOUNDARY REVIEW

• Notice of request for boundary review (February 10, 2020 edition of
  Environmental Monitor)
• Notice of response to boundary review published in Environmental
  Monitor (February 10, 2021) and local paper (February 8, 2021 in the
  Boston Globe and February 11, 2021 in El Mundo)
• CZM accepts public comments for 30 days (until March 12, 2021),
  which may be extended with public notice
• Public information meeting within 30-day comment period (February
  23, 2021)
CONSULTATION PERIOD

• Consultation period begins at close of public comment period
• Establish a work plan as a group, including:
  • Planning representative(s)
  • MassDEP
  • Operators of WDI facilities
  • Others as appropriate
• Lasts six months unless otherwise agreed by participants
DESIGNATION REPORT

• Designation report issued by CZM within 30 days of close of
  consultation period
• Report includes:
  • Areas to be included/excluded
  • Maps of proposed changes
  • Data and analyses on which the proposed changes are based
PUBLIC COMMENT ON
                DESIGNATION REPORT

• Notice of the designation report and public hearing published in
  Environmental Monitor and local paper(s)
• CZM accepts public comment for 30 days (may be extended upon
  request and with notice)
• CZM holds a public hearing during 30-day comment period
ISSUANCE OF DESIGNATION DECISION
        AND MAP AMENDMENT

• Final Designation Decision issued by CZM within 60 days of end of
  comment period
• Decision is effective immediately
• Notice published in Environmental Monitor and sent to relevant parties
PROCESS

           Boundary Review                  CZM meets with                     CZM issues
          is initiated by CZM                  agency and        30 days   written designation
               or city/town                     town/city                        report
                                           representatives to
                                            scope work plan
                                              and schedule
          City/town submits
             information
             necessary to                                                   Public comment
               proceed                                                     period; Monitor and
                                                                                                30 days
                                                                           local notice; Public
                                              Local public                       hearing
                                              meetings and
                                              information
           Public comment                       gathering
30 days   period; Monitor and                                              60 days
              local notice

                                                                            CZM issues final
            CZM arranges                                                        written
                                6 months        Close of                      designation
             consultation
                                           consultation period                 decision
               session
PARA LA INTERPRETACIÓN

Hay interpretación al español disponible para esta reunion.
Seleccione la opción de idioma que preferiera en la parte
inferior de la pantalla haciendo clic en el símbolo del
globo y el idoma en el que desea escuchar la audiencia.
Opcional: Para escuchar únicamente el idioma interpretado,
haga clic en Mute Original Audio (Silenciar Audio Original).
DESIGNATION STANDARDS

• Areas not eligible for review
• Standards for designation of waters
• Standards for designation of lands
AREAS NOT ELIGIBLE FOR REVIEW

• Subject of decision within previous 5 years
• WDI use has occurred within previous 5 years, unless that use did not
  take place on a continuous basis for a substantial period
• Recommended for exclusion from review by city council or other
  zoning body
• Land area is entirely bounded by existing DPA lands and/or waters
PLANNING UNITS

• CZM applies the following eligibility criteria to
  groups of parcels (planning units) rather than
  individual properties
• DPA-related attributes vary across different
  parcels such that the combined characteristics
  are not accurately reflected in the
  characteristics of any single property
• Geographic areas reviewed are sized and
  configured in a manner that allows
  consideration of all relevant factors affecting
  eligibility to accommodate water-dependent
  industrial uses
STANDARDS FOR DESIGNATION

• An area of water/land reviewed shall be included in a DPA if CZM finds that the area is
  in substantial conformance with the following criteria governing suitability to
  accommodate water-dependent industrial use:
• Designation of waters
  • The water includes or is contiguous with other DPA waters that include
     • A navigable entrance or main channel with a design depth of at least 20 feet AND
     • Substantially developed shoreline with piers, wharves, bulkheads, or other structures that
       establish a functional connection with land meeting the criteria for DPA lands

  • Configuration, size, and location of water area is conducive to DPA uses; and
  • DPA water area includes, at a minimum:
     • All channels, mooring areas, and turnaround areas serving as access channels to DPA
       lands/waters
     • Water lying between entrance/main channel and DPA land/waters
STANDARDS FOR DESIGNATION

• Designation of lands
  • Land area includes or is contiguous with other DPA lands that
    include a substantially developed shoreline with a functional
    connection to DPA waters
  • Reasonable proximity to rail/road links to major routes and
    water/sewer facilities capable of supporting industrial use;
  • Topography that is conducive to or easily adapted to industrial use;
    and
  • Use character is predominately industrial or reasonably capable of
    becoming predominately industrial
C ASE STUDY

• South Boston DPA Boundary
  Review
• Report and decision issued in
  2018
• Boundary removed one
  planning unit from DPA and
  added another
PARA LA INTERPRETACIÓN

Hay interpretación al español disponible para esta reunion.
Seleccione la opción de idioma que preferiera en la parte
inferior de la pantalla haciendo clic en el símbolo del
globo y el idoma en el que desea escuchar la audiencia.
Opcional: Para escuchar únicamente el idioma interpretado,
haga clic en Mute Original Audio (Silenciar Audio Original).
QUESTIONS AND COMMENTS

           QUESTIONS                                 COMMENTS
• Tyler Soleau, Assistant Director        • Due by 5 PM on March 12, 2021
  • 617-626-1243                          • Email: erikk.hokenson@mass.gov
  • tyler.soleau@mass.gov                                  OR
• Erikk Hokenson, Boston Harbor           • Mail: Office of Coastal Zone Management
  Regional Coordinator
                                                 Attn: Erikk Hokenson
  • 617-626-1234                                 251 Causeway Street, Suite 800
  • erikk.hokenson@mass.gov                      Boston, MA 02114

A translated version of this presentation is also available in Spanish upon request.
QUESTIONS

          QUESTIONS
• Use the “Chat” function to type your
  name and affiliation to be called on
QUESTIONS AND COMMENTS

           QUESTIONS                                 COMMENTS
• Tyler Soleau, Assistant Director        • Due by 5 PM on March 12, 2021
  • 617-626-1243                          • Email: erikk.hokenson@mass.gov
  • tyler.soleau@mass.gov                                  OR
• Erikk Hokenson, Boston Harbor           • Mail: Office of Coastal Zone Management
  Regional Coordinator
                                                 Attn: Erikk Hokenson
  • 617-626-1234                                 251 Causeway Street, Suite 800
  • erikk.hokenson@mass.gov                      Boston, MA 02114

A translated version of this presentation is also available in Spanish upon request.
THANK YOU
You can also read