Atlas-Fiori guidelines for suppliers - January 2021 - Siemens ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Index Language Main menu Clarification of Intro Page First login Steps ECC agreement FIORI Setting Setting Overview ECC instruction Notification Notification Mandatory Adding files Completed Task Overview Task Creation Overview Creation documents Task Reply Step Email overview Annexes
Use this Link to This is Siemens Business access the FIORI Portal. Portal Connect to Siemens Portal using this link: https://cportal.siemens.com
IMPORTANT to Remember when using Fiori always use Google Chrome or Mozilla Firefox Do not use internet explorer or Microsoft edge Connect to Siemens Portal using this link: https://cportal.siemens.com
To Reset your Password. It you need to Reset you password, Click on the link Don't remember the password ? And
Click here
Click here to change language
Languages available to choose from If desired, User must change language on this page for the complete session. Only English, French and Deutsch are available.
Adjust User settings
To Sign out
IMPORTANT 1 2 when using Fiori always use Google Chrome or Mozilla Firefox Do not use internet explorer or Microsoft edge QM Notification QM Task tab tab This is Home Page of FIORI Platform. Clicking on User Profile Icon or the tabs will take you to respective slides.
Please Note This Message will appear only once After every first session login
Some Example of ECC Classification
Legacy information
Legacy Drawing or Specification What should you do if you are unsure ? Please contact your SQA or use eMail address below adgtconcessions.energy@siemens.com
This symbol Left Pane lists all shows Open currently open Action against Notifications this Notification This is QM Notification window. It shows all currently open Notifications. Clicking on a QM Notif. Detail Notification Number will window tabs show it’s details. An exclamation mark “!” against a Notification number shows pending action against that particular Notification. For more details on the QM notification Window. Refer to Slide 33 Click here to Notification an be printed from here create a new Notification
QM Notification Detail window tabs
QM Notification Detail window tabs You Can Upload ECC compliant Document from here also You Can Upload ECC compliant Document from here also
Click here to create a new Notification
For greyed out fields, data shall be automatically extracted from SAP This is Create Notification popup window. Use this window to provide details on new Notification. It is recommended to complete fields in sequential manner. All fields with Asterisk (*) are mandatory.
Example: Concession – TRN101737 – RRSCAMGB70008 or MBO Concession – TRN101737 - RRSCAMGB70008 Title field follows a defined Space convention. It has 3 parts. All three limitation are separated by dash (-). 1st part: Write Concession, Prod. Permit, MBO Concession, Delta Concession, TAD or MDA depending upon the nature of request. 2nd part: Write Part Number of the affected part. 3rd part (if applicable): Write serial number of the affected part.
Supplier to enter their internal NCR number against this non-conformance report (if applicable) Space limitation
Supplier to enter a Problem Code for this non-conformance report
Click here for complete list. This is Problem Annex 1 Code Selection popup window. Choose one from the list. A problem code can directly be entered into search box.
Click here to show all PO or SA currently open. If the P.O or SA is not in the list just type the complete numb This is Create Notification popup window. Ensure that correct PO number is entered. For Schedule Agreement if the number does not appear in the list, please continue to enter you full SA number and then press enter if the number is accepted, just continue to the next field
This is Create Notification popup Change Item# as window. required. Once correct PO number is entered, it Change quantity automatically extracts as required. information from SAP for following 4 fields. Exact number of affected parts must be put in Quantity field.
Insert a code directly if known Click here for complete list. This is Cause Annex 2 Selection popup window. Choose one from the list. A problem code can directly be entered into search box. Refer to Annex 2 for complete list.
For MBO concessions please add a line on top “PPQ Lead name:”
This is Create Notification popup window. Provide clear & precise information for each element. Write N/A if not applicable. Don’t forget to provide Cause and Corrective action. Provision of Corrective Action Report is mandatory with every request. Annex 3
Mandatory documents to be attached Click here to 1. Spread Sheet open Mandatory: For all deviations (dimensional and others) the attach excel template needs to be completed Don’t attach drawings or Data cards, if unsure please contact your SQA or a. Supplier_Template_Concessions.xlsx use adgtconcessions.energy@siemens.com to ask your question 2. For all other report use Word or PDF file, to consolidate all information in 1 single file: Click here to open the PIR document a. PIR. b. Pictures, sketches, Figures, Spline/Gear Graphs, … (If needed) c. Repair Scheme/Plan. (If needed) d. Other document that might clarify any deviations ambiguity 3. CMM Data. (when needed only provide report in Excel format)
Please do not upload any documents for Controlled Click here to Technology through this attache files portal. If you are not sure about the documents that you are uploading please contact your Siemens procurement / Drop filrs here to attach to OR Quality contact to get Notification instructions.
Please do not upload any documents for Controlled Technology through this portal. Please select all the mandatory files to complete the notification
Click here to submit.
Notification number Click here to go will appear once a to Home Page. submission is made. This is QM Notification window. It shows all currently open Notifications. Clicking on a Notification Number Files can be attached will show it’s details. here also
Click on Icon to Filter Left Pane Concession list
Use this field to Filter Notification list by Coordinator Use this field to Filter Notification list by Material Use this field to Filter Notification list by Purchase Order Modify date Reported on and To in order to Filter further the Notification list IMPORTANT keep this field checked to see Closed Notifications
This is QM Notification window. It shows all currently open Notifications. Clicking on a Notification Number will show it’s details.
QM Task Detail This is QM TASK Window window. It shows all Left Pane lists all currently open tasks. tasks currently in WIP. Clicking on a task will show it’s details. Duration (in days) if in red means that a task is pending to be processed. Task Description Window Please do not click Supplier to re-assign a here even if the task is task back to Siemens. completed Click here if Supplier Click here to add text wants to re-assign a task / response to internally. Description Window. Click here to create a new task.
Click here to go to Home Page. Click here to see the tasks against this Notification. A small number with circle This is QM shows total number of tasks. Notification window. It shows all currently open Notifications. Clicking on a Notification Number will show it’s details. Click here to see the details of this task. With in QM notification window, a new task can also be created by clicking here.
Choose the correct Notification number from the list against which this task is being raised. This is QM Create New Task popup window. Click here to add Task Title. Use this window to provide details about new task. It is recommended to Click here to open complete fields in Task Type Selection sequential manner. popup window. All fields with Asterisk (*) are mandatory.
This is QN Number Selection popup window. Choose the right reference number from the list.
Provide a Task Title Click here to save and submit.
Provide details in Description Window.
Click here to go to Home Page. This is QM TASK window. It shows all currently open tasks. Clicking on the recently created task (left pane) will show it’s details in main window. Click here to see the details of the Notification New task with ID 0003 is created.
If this window appears, when you click Siemens on save, it means that user ID. there is another user currently working on this task. Please try again later.
Concession and PP disposition • The disposition will be send by a task to the supplier. • Supplier must reassign to Siemens as a confirmation response. • Add long text to acknowledge Click here to add text / response to Description Window. • For more information about Concession, CAT disposition and requirement Please consult the file below: Click here to open Definitions, requirements
Add any relevant comment relating the question, comment or request in the task
Supplier to re-assign a task back to Siemens.
Task title could be : Disposition use as is, Disposition rework Disposition Reject This is an example of E- mail that you will receive from Coordinators, if there is a task assigned to you
ANNEX 1 : Problem Selection Code Click here to open Problem Selection Code Click here to go back Back
ANNEX 2 : Cause Code Selection Click here to open Cause Code Selection Click here to go back Back
ANNEX 3 : Mandatory Excel format for deviations Click here to open Concession details Click here to go back Back
You can also read