Aspiration, Resilience, Opportunity, Excellence - Woodlands School COVID-19 Recovery Plan - July 2021 PDF File

Page created by Eduardo Chapman
 
CONTINUE READING
Aspiration, Resilience, Opportunity, Excellence - Woodlands School COVID-19 Recovery Plan - July 2021 PDF File
Aspiration, Resilience, Opportunity, Excellence

              Woodlands School
            COVID-19 Recovery Plan

            January 2021 to July 2021
Woodlands School                                                                           COVID-19 Recovery Plan – January 2021 to July 2021

Pastoral
Targets:
    To continue to ensure measures are in place to allow for positive wellbeing
    To ensure attendance throughout lockdown remains high with regard to remote learning
    Continue Home/School effective communication to allow positive progress
    Promote and ensure positive behaviour whilst remote learning, both on and off site
    To ensure successful engagement of those onsite and at home

Tasks to achieve Target    Staff          Timescale     Resources       Success criteria        Monitored By      Progress
                           Responsible                  Needed
To continue to ensure      SAm/HOY/GT     Ongoing       Teams           All pupil wellbeing     SAm               TEAMS wellbeing quiz
measures are in place to                                                issues identified and                     each Monday morning -
allow for positive                                                      promptly addressed                        Because this term pupils
wellbeing                                                                                                         are receiving live
                                                                                                                  lessons, it is
                                                                                                                  unnecessary for form
                                                                                                                  tutors to make
                                                                                                                  hundreds of calls each
                                                                                                                  week to all (non-
                                                                                                                  vulnerable) pupils
                                                                                                                  during lock down.
                                                                                                                  However, to cover any
                                                                                                                  safeguarding issues we
                                                                                                                  are using TEAMS quiz
                                                                                                                  facility for form tutors
                                                                                                                  to send out a wellbeing
                                                                                                                  quiz each Monday
                                                                                                                  morning, much in the
                                                                                                                  same way we did when
                                                                                                                  using show my
                                                                                                                  homework. Form tutors

                                                             Page 2 of 50
Woodlands School                                                               COVID-19 Recovery Plan – January 2021 to July 2021

                                                                                                      are using this as a
                                                                                                      register and if any pupil
                                                                                                      doesn’t complete it or
                                                                                                      identifies a concern
                                                                                                      then the form tutor calls
                                                                                                      that pupil and set up
                                                                                                      any follow up actions
                                                                                                      and feeds back to their
                                                                                                      HOY/safeguarding

                   Resilience       Ongoing   School         Increase in pupil      SAm/HTu           147 successful home
                   Team                       mobile         attendance and                           visits have been
                                              secure and     engagement both                          completed by the
                                              remote to      remotely and onsite                      resilience team, to
                                              access to                                               ensure our pupils are
                                              SIMS           All pupils are                           safeguarded
                                                             safeguarded

                   All Pastoral /   Ongoing   Telephone      All pupils offsite     SAm               All HOY Resilience
                   Safeguarding                              safeguarding issues                      Coaches, Progress
                   Teams                      Central        identified and                           Mentors and the
                                              spreadsheet    promptly addressed                       Safeguarding team have
                                              database                                                identified the most
                                              shared on                                               vulnerable pupils whom
                                              the school                                              have been engaging
                                              one cloud                                               with live lessons offsite.
                                                                                                      These pupils have been
                                                                                                      receiving calls every
                                                                                                      week, checking in with
                                                                                                      them ensuring their
                                                                                                      educational needs are

                                                  Page 3 of 50
Woodlands School                                                                COVID-19 Recovery Plan – January 2021 to July 2021

                                                                                                       being met as well as
                                                                                                       ensuring that there are
                                                                                                       no safeguarding
                                                                                                       concerns. The outcomes
                                                                                                       of these calls are being
                                                                                                       collated and monitored
                                                                                                       on a live spread sheet
                                                                                                       by DFU, allowing all
                                                                                                       appropriate staff access
                                                                                                       to review progress and
                                                                                                       concerns raised

                   All HOY/        Ongoing   Teams,          All vulnerable pupils    SAm              Pastoral half termly
                   Attendance/               Microsoft       current provisions are                    action plans – each Hoy
                   Wellbeing/                Office          reviewed as well as                       has been leading a half
                   Safeguarding/                             preparing for their                       term 3 of 6 &
                   Resilience                                successful                                developing a half term 4
                                                             reintegration from                        of 6 pastoral action plan
                                                             school closure and                        supporting the pupil’s
                                                             lockdown                                  pastoral needs whilst
                                                                                                       there is a partial school
                                                                                                       closure and preparing
                                                                                                       for the pupils return to
                                                                                                       school. This has meant
                                                                                                       they are working with
                                                                                                       all specialists within the
                                                                                                       school, as well as
                                                                                                       outside agencies

                   HOY/TG          Ongoing   Teams/          Strong sense of          SAm              These assemblies have
                                             Microsoft       community cohesion                        been designed to
                                             Office/         within year groups                        maintain a sense of

                                                  Page 4 of 50
Woodlands School                                                                   COVID-19 Recovery Plan – January 2021 to July 2021

                                              Twitter         and across the school                       community cohesion,
                                                                                                          see the assembly
                                                                                                          themes:
                                                                                                           18th January
                                                                                                             Holocaust Memorial
                                                                                                             Week
                                                                                                           25th January
                                                                                                             Rewards
                                                                                                           1st February
                                                                                                             Aspire and achieve
                                                                                                           8th February
                                                                                                             Safer Internet Week
                                                                                                           22nd February
                                                                                                             Resilience
                                                                                                           1st March Raising
                                                                                                             Aspirations – Post
                                                                                                             16/Universities
                                                                                                           8th March
                                                                                                             Science week
                                                                                                           15th March
                                                                                                             Spirituality/Morals
                                                                                                           22nd March
                                                                                                             Wellbeing
                   HTu/ SAm/      Spring Term Regular         Improved pupil            HTu/SAm
                   HOY/                       contact with    engagement in
                   Resilience/                external        learning and
                   Counsellors/               agencies,       attendance to live
                   Attendance                 social care     lessons
                                              and
                                              parent/carers

                                                   Page 5 of 50
Woodlands School                                                                   COVID-19 Recovery Plan – January 2021 to July 2021

                   SAm/ HTu/      Spring Term Wellbeing       Improved pupil            HTu/SAm
                   HOY/                       support         engagement in
                   Resilience/                Counselling     learning and
                   Counsellors/               Wellbeing       completion of work
                   Attendance                 referrals       Pupils feel supported
                                              continue
                                              throughout
                                              lockdown
                                              and
                                              counsellors
                                              working with
                                              pupils
                                              throughout
                                              this term

                   HTu/SAm,       Spring Term Tailored care   Improved pupil            HTu/SAm
                   Resilience                 package for     engagement in
                   Team/ HOY/                 pupils          learning, sense of
                   Counsellors/               provided by     community and
                   Attendance                 Safeguarding,   cohesion
                                              Resilience
                                              and HOY

                   HTu            Spring Term E-Safety        Build community
                                              guide issued    cohesion, increased
                                              to parents      value in curriculum
                                                              and lesson
                                              Letters sent    engagement
                                              reminding of
                                              importance
                                              of E-Safety

                                                   Page 6 of 50
Woodlands School                                                                     COVID-19 Recovery Plan – January 2021 to July 2021

                                                  ACL virtual
                                                  free courses
                                                  offered to
                                                  parents
To ensure attendance       Attendance   Ongoing   School           Increase in pupil      SEl               Calls made to
throughout lockdown        Team                   mobile,          attendance and                           parents/carers who
remains high with regard                          secure           engagement both                          indicate their child
to remote learning                                remote           remotely and onsite                      meets the vulnerable
                                                  access to                                                 group criteria and would
                                                  SIMS                                                      like their child to attend
                                                  Access to the                                             school. Discussions held
                                                  school one                                                and recorded re school
                                                  drive                                                     procedures and
                                                  Microsoft                                                 expectations. SIMS and
                                                  Office                                                    Excel register
                                                                                                            spreadsheet amended
                                                  All pupils are                                            to reflect
                                                  safeguarded                                               additions/deletions

                           Attendance   Ongoing   School           Increase in pupil      SEl               Online Teams meetings
                           Team                   mobile,          attendance and                           held to review children
                                                  secure           engagement both                          with medical needs
                                                  remote           remotely and onsite                      support by the local
                                                  access to                                                 authority (Education
                                                  SIMS             All pupils are                           Access)
                                                  Access to the    safeguarded
                                                  school one                                                SIMS updated daily
                                                  drive                                                     using appropriate codes
                                                  Microsoft                                                 as per DfE guidance
                                                  Office                                                    (vulnerable and EHCPs
                                                                                                            when not in school
                                                                                                            should be marked using

                                                       Page 7 of 50
Woodlands School                                                                             COVID-19 Recovery Plan – January 2021 to July 2021

                                                                                                                    the C codes or other
                                                                                                                    appropriate authorised
                                                                                                                    code

                          Attendance      Ongoing      School          Increase in pupil          SEl               Notification of positive
                          Team                         mobile,         attendance and                               COVID cases received
                                                       secure          engagement both                              from parents,
                                                       remote          remotely and onsite                          information shared
                                                       access to                                                    appropriately and SIMS
                                                       SIMS            All pupils are                               updated accordingly.
                                                       Access to the   safeguarded
                                                       school one                                                   Liaising with external
                                                       drive                                                        agencies who are
                                                       Microsoft                                                    supporting our
                                                       Office                                                       vulnerable pupils to
                                                                                                                    ensure they are seen
                          SAm/HTu/        Spring Term Solid          Increased pupil              SAm/HTu           and any concerns raised
                          Attendance/                 communicati engagement                                        are dealt with
                          HOY/                        on between                                                    appropriately as per
                          Safeguarding/               teams and                                                     safeguarding
                          Resilience                  defined                                                       procedures.
                                                      individual
                                                      support plan
                                                      for each pupil
                                                      to determine
                                                      the best level
                                                      of
                                                      intervention

Continue Home/School      SAm/HOY/All     Year 7-      Teams           All parent / carers        SAm               Remote parent
effective communication   staff           14/01/2021                   informed of their                            consultation evenings -

                                                            Page 8 of 50
Woodlands School                                                                        COVID-19 Recovery Plan – January 2021 to July 2021

to allow for positive                              SchoolCloud      child’s progress and                       This term all calendared
progress                              Year 11-     booking          attitude to learning                       parent consultation
                                      28/01/2021   system                                                      evenings are still to go
                                                                                                               ahead, but remotely.
                                      Year 10-                                                                 The school has
                                      8/03/2021                                                                purchased SchoolCloud
                                                                                                               as our remote booking
                                      Year 8-                                                                  system and using teams
                                      11/02/2021                                                               live video call facility to
                                                                                                               complete virtual face to
                                      Year 9-                                                                  face meetings,
                                      6/05/2021                                                                discussing pupil’s
                                                                                                               engagement, attitude to
                                                                                                               learning and academic
                                                                                                               progress

                        Attendance                 School           Increase in pupil        SEl               Attendance Team are
                        Team          Ongoing      mobile,          attendance and                             contacting
                                                   secure           engagement both                            parents/carers of pupils
                                                   remote           remotely and onsite                        who fail to attend
                                                   access to                                                   provision as expected
                                                   SIMS                                                        using school
                                                   Access to the                                               phone/WhatsApp
                                                   school one                                                  messages/emails to
                                                   drive                                                       meet safeguarding
                                                   Microsoft                                                   procedures
                                                   Office

                                                   All pupils are
                                                   safeguarded

                        ERo/TCu/PPG                PPG              Two minute videos        ERo/TCu

                                                         Page 9 of 50
Woodlands School                                                                            COVID-19 Recovery Plan – January 2021 to July 2021

                            Advocates     In weeks       Advocate       created in each
                                          prior to the   “Return to     subject for Year 7 and
                                          school fully   School”        Year 10 pupils, explain
                                          re-opening     videos in      what pupil should
                                          (potentially   each subject   have learnt over
                                          March                         lockdown, what they
                                          2021)                         will be learning upon
                                                                        their return and what
                                                                        parents/carers can do
                                                                        to support
Promote and ensure          SAm           Jan 2021                      All departments are     DWt                Remote learning
positive behaviour whilst                                               clear in the whole                         behaviour policy insert -
remote learning                                                         school expectations                        As lessons are live via
                                                                        on behaviour and are                       teams, this means for
                                                                        empowered to                               each pupil there are
                                                                        consistently address                       increased opportunities
                                                                        any issues regarding                       to interact with their
                                                                        disruptions to                             subject teacher and the
                                                                        learning within in live                    peers within the lesson.
                                                                        lessons                                    This has led to an
                                                                                                                   additional insert to the
                                                                                                                   behaviour policy that
                                                                                                                   provides staff with
                                                                                                                   support and direction
                                                                                                                   when dealing with
                                                                                                                   behaviour concerns

                            Resilience    Ongoing        Teams          Disruptions to             SAm             Behaviour hotspots
                            Coaches/HOF                                 learning within lives                      have been identified
                                                                        lessons are minimised                      and resilience coaches
                                                                                                                   are available to support
                                                                        All barriers to learning                   both pupils and staff

                                                             Page 10 of 50
Woodlands School                                                                    COVID-19 Recovery Plan – January 2021 to July 2021

                                                                 are removed                               within live lessons, using
                                                                                                           the spill out room
                                                                 All pupils are                            function within TEAMS,
                                                                 successfully making                       providing pupils with
                                                                 progress within live                      social emotional needs
                                                                 lessons                                   additional one to one
                                                                                                           support, enabling them
                                                                                                           to promptly reengage
                                                                                                           with the main class
                                                                                                           activities

                       HOY/RLS Team    Ongoing   PAM Central     Increased           SAm                   Remote Learning
                                                 data base       engagement within                         Support (RLS) – The
                                                 share on        remote lessons                            development of the role
                                                 school on       Increase in pupil                         of Remote Learning
                                                 cloud           outcome from remote                       Support (RLS). This new
                                                 Training        learning                                  team of 26 associate
                                                 material                                                  staff work to improve
                                                                 Improvement in                            pupil remote learning
                                                                 communication                             engagement in regard
                                                                 systems between                           to live lessons on
                                                                 pupil/parent/school                       Teams, up loading
                                                                 Reduce anxieties and                      assignments on Teams
                                                                 improved wellbeing                        and the quality of lesson
                                                                                                           outcomes shared on
                                                                                                           Teams
To ensure successful   Resilience      Ongoing   SAm to          Onsite disruptions to    SAm              On site pastoral support
engagement of those    Coaches, Non-             coordinate      learning within in live                   for venerable and key
onsite and at home     Teaching /                weekly rota     lessons are minimised                     worker pupils - Every
                       HOY                       End of day      All barriers to learning                  school day there have
                                                 communicati     are removed                               been a minimum of 2
                                                 on and issues                                             resilience coaches

                                                     Page 11 of 50
Woodlands School                                                       COVID-19 Recovery Plan – January 2021 to July 2021

                                   log to be       All onsite pupils are                      onsite supporting the
                                   written and     successfully making                        pastoral needs of the
                                   shared          progress within live                       onsite venerable and
                                                   lessons                                    key worker pupils. as
                                                                                              well as supporting
                                                                                              progress mentors with
                                                                                              any onsite behaviour
                                                                                              issues
                   SFo   Ongoing   SFo to          All onsite pupils are      SAm             On site progress mentor
                                   coordinate      engaged and making                         support for venerable
                                   weekly rota     progress in their live                     and key worker pupils -
                                                   lessons                                    Weekly rotas with
                                                                                              progress mentors
                                   End of day      All barriers to learning                   supervising and
                                   communicati     are removed                                supporting the learning
                                   on and issues                                              of pupils, throughout
                                   log to be                                                  lockdown the school
                                   written and                                                remained open to all
                                   shared                                                     key worker, hard to
                                                                                              reach and vulnerable
                                                                                              pupils

                                   School          Increase in pupil          SEl             Addendum to
                                   mobile,         attendance and                             Attendance Policy to
                                   secure          engagement both                            reflect current guidance
                                   remote          remotely and onsite                        with regards to
                                   access to                                                  attendance codes
                                   SIMS            All pupils are
                                   Access to the   safeguarded
                                   school one
                                   drive
                                   Microsoft

                                       Page 12 of 50
Woodlands School                                                            COVID-19 Recovery Plan – January 2021 to July 2021

                                          Office

                   Attendance   Ongoing   School          Increase in pupil      SEl               DfE daily return
                   Team                   mobile          attendance and                           completed as required
                                          secure          engagement both
                                          remote          remotely and onsite
                                          access to
                                          SIMS            All pupils are
                                          Access to the   safeguarded
                                          school one
                                          drive
                                          Microsoft
                                          office

                                              Page 13 of 50
Woodlands School                                                                                COVID-19 Recovery Plan – January 2021 to July 2021

Transition support
Targets:
    Ensure current Year 7 pupils who underperformed in English and/or Maths in the internal KS2 SATs receive catch-up intervention and
       achieve a scaled score above 100
    Ensure new intake of Year 7 pupils who underperformed in English and/or Maths in the internal KS2 SATs receive catch-up intervention
       and achieve a scaled score above 100
    Ensure HPA pupils continue to make progress throughout Key Stage Three
    Develop an effective primary-secondary transition network, with a curriculum focus
    Oversee the effective transition of Year 6 pupils into Year 7

Tasks to achieve Target     Staff         Timescale       Resources        Success criteria           Monitored By     Progress
                            Responsible                   Needed
Ensure current Year 7       KSc/Ero/      December        SMID             Identify which current ERo/KSc              The school has transposed
pupils who                  Nwy/ Sfo/     2020                             Year 7 pupils require                       the results of the current
underperformed in           Ase/HHy                                        catch-up in English                         Year 7 data to identify
English and/or Maths in                                                    and Maths.                                  which pupils require
the internal KS2 SATs                                                                                                  catch-up support and who
receive catch-up                                                                                                       are HPAs, MPAs and LPAs:
intervention and achieve
a scaled score above 100.                 January 2020    SMID and      Identify the prior            ERo/KSc          HPA: x > 103.5
                                                          previous SATs attainment groups of                           MPA: 103 ≥ x ≥ 93.5
                                                          data.         current Year 7 pupils,                         LPA: x < 93
                                                                        in light of the internal
                                                                        SATs.                                          HPAs: 189
                                                                                                                       MPAs: 116
                                                                                                                       LPAs: 22

                                          February/       N/A              Distribute the prior       ERo/KSc
                                          March 2020                       attainment groups of
                                                                           all Year 7 pupils to all

                                                                Page 14 of 50
Woodlands School                                                                     COVID-19 Recovery Plan – January 2021 to July 2021

                                                                  staff.
                                       July 2021   KS2 teaching   Use the 2:1 structure    HHy/ASe
                                                   resources      in English and Maths
                                                                  lessons to address
                                                                  gaps in KS2 skills and
                                                                  knowledge.

                                       July 2021   Access to      Ensure catch-up          KSc/SFo/HHy/
                                                   Lexonik,       provision is provided    ASe
                                                   Bedrock,       in English and Maths
                                                   Catch Up       through such
                                                   Numeracy       programmes as
                                                   and Catch Up   Lexonik, Catch Up
                                                   Literacy       Numeracy, Catch Up
                                                                  Literacy and Bedrock
Oversee the effective       KSc/ERo    May/June    Letter used    Send a letter to all     ERo/KSc/NWy
running of the internal     NWy/SFo/   2021        last year      incoming pupils (Year
KS2 SATs for incoming       ASe/HHy                               6), advising that
Year 7 pupils, which will                                         internal KS2 SATs will
provide scaled scores.                                            be sat in Autumn 1 of
                                                                  2021

                                       September   KS2 resources Ensure the new Year       ERo/KSc/HHy/
                                       2021        and SATs past 7 pupils have a           ASe
                                                   papers        programme of SATs
                                                                 preparation in the
                                                                 first few weeks of the
                                                                 Autumn Term, before
                                                                 they sit the internal
                                                                 SATs

                                                       Page 15 of 50
Woodlands School                                                                             COVID-19 Recovery Plan – January 2021 to July 2021

                                        October 2021   KS2 SATs past    Organise and oversee ERo/KSc/HHy/
                                                       papers           the completion of      ASe
                                                                        internal SATs in
                                                                        English and Maths
Ensure new intake of Year   KSc/Ero/    November       SMID             Identify which current ERo/KSc
7 pupils who                Nwy/ SFo/   2021                            Year 7 pupils require
underperformed in           Ase/ HHy                                    catch-up in English
English and/or Maths in                                                 and Maths
the internal KS2 SATs
receive catch-up                        November       SMID and      Identify the prior            ERO/KSC
intervention and achieve                2021           previous SATs attainment groups of
a scaled score above 100.                              data.         current Year 7 pupils,
                                                                     in light of the internal
                                                                     SATs

                                        November       N/A              Distribute the prior       ERO/KSC
                                        2021                            attainment groups of
                                                                        all Year 7 pupils to all
                                                                        staff

                                        July 2022      KS2 teaching     Use the 2:1 structure      KSC/HHY/ASE
                                                       resources        in English and Maths
                                                                        lessons to address
                                                                        gaps in KS2 skills and
                                                                        knowledge

                                        July 2022      Access to        Ensure catch-up            KSC/SFO/HHY/
                                                       Lexonik,         provision is provided      ASE
                                                       Bedrock,         in English and Maths
                                                       Catch Up         through such
                                                       Numeracy         programmes as
                                                       and Catch Up     Lexonik, Catch Up

                                                             Page 16 of 50
Woodlands School                                                                          COVID-19 Recovery Plan – January 2021 to July 2021

                                                        Literacy       Numeracy, Catch Up
                                                                       Literacy and Bedrock
Ensure HPA pupils            KRo/ERo/   Ongoing         HPA            Provide remote HPA      KRo/ERo
continue to make             KSc/HHy/                   Advocate       assemblies to all KS3
progress throughout Key      ASe/HODs                   “Ted Talks”    HPA pupils
Stage Three.
                                        July 2021       HPA            Deliver HPA Maths       HHy/ASe/KSc/
                                                        intervention   and English Morning     KRo/ERo/JFo
                                                        English and    Enhancement in Year
                                                        Maths          8 to HPA pupils who
                                                        resources      have made poor
                                                                       progress in Year 7

                                        July 2021       HPA            Monitor the progress    KRo/ERo/KSc/
                                                        intervention   of HPA pupils in        HHy/CAs/ASe/
                                                        resources      Maths, English,         SPa/KBo
                                                                       Science, History,
                                                                       Geography and MFL
                                                                       throughout KS3

                                        July 2021       Department     Direct HPA Advocates KRo/HPA
                                                        time           to intervene with HPA Advocates
                                                                       pupils making poor
                                                                       progress in the above
                                                                       subjects
Develop an effective         KSc/ERo    February 2021   Contact        Contact local          KSc/ERo
primary-secondary                                       details of     secondary schools to
transition network, with a                              local          garner interest in the
curriculum focus.                                       secondary      primary-secondary
                                                        schools        transition network

                                        March 2021      Microsoft      Arrange initial         KSC/ERO

                                                            Page 17 of 50
Woodlands School                                                     COVID-19 Recovery Plan – January 2021 to July 2021

                                  Teams           meeting with local
                                                  secondaries to
                                                  discuss the core aims
                                                  of the transition
                                                  network: curriculum
                                                  sharing, CPD and KS2-
                                                  3 transition project.

                                  Contact         Contact local primary KSc/ERo
                                  details of      schools to invite them
                                  local primary   to join the network.
                                  schools

                   March 2021     Microsoft       Arrange the first        KSc/ERo
                                  Teams           virtual meeting of the
                                                  network and provide
                                                  the agenda

                   April 2021     KS2 and KS3     Organise subject-        KSc/ERo/HoDs
                                  resources in    specific CPD sessions    /KS3 Leads
                                  each subject;
                                  subjects
                                  specialists
                                  from other
                                  schools

                   By July 2021   KS2 and KS3     Organise curriculum-     KSc/ERo/HoDs
                                  resources in    sharing events           /KS3 Leads
                                  each subject;   (subject-specific).
                                  subjects
                                  specialists
                                  from other

                                      Page 18 of 50
Woodlands School                                                                            COVID-19 Recovery Plan – January 2021 to July 2021

                                                          schools
                                           By July 2021   KS2 and KS3     Organise a Basildon-    KSc/ERo
                                                          resources in    wide KS2-3 transition
                                                          each subject;   project.
                                                          subjects
                                                          specialists
                                                          from other
                                                          schools
Oversee the effective         NWy/LAt/     May onwards    KS2-3           Organise the           ERo/NWy/LAt
transition of Year 6 pupils   ERo/SFo/                    Transition      distribution of KS2-3
into Year 7                   ARo/HTu/                    Information     transition information
                              DMy/HoYs/                   Spreadsheet     spreadsheets to all
                              HoFs/SAm/                                   local primary schools
                              JNe/DWt/
                              SLT/         May onwards    Information  Gathering                  ERo/KSc/LAt
                              Finance/                    sheet;       Information on all
                              Resilience                  appointments pupils
                                                          with all
                                                          schools

                                           July 2021      KS2-3           Tutor group setting     ERo/LAt
                                                          Transition
                                                          Information
                                                          Spreadsheet

                                           May onwards    Information     Pupils requiring       ERo/NWy/LAt/
                                                          from primary    additional support     SFo
                                                          schools         identified and contact
                                                                          initially made with
                                                                          home ie SEND, part
                                                                          timetabled pupils etc

                                                              Page 19 of 50
Woodlands School                                                   COVID-19 Recovery Plan – January 2021 to July 2021

                   July 2021   Referral        Resilience referrals     NWy/LAt/SAm
                               forms           made

                               Information     Extra Transition for     NWy/LAt/SFo
                               from primary    identified pupils
                               schools;
                   July 2021   calendar
                               dates

                               Information     SEND extra Transition    SFo
                               from primary    Days
                               schools;
                   July 2021   calendar
                               dates

                               Action Plan     Action Plan              SAm/NWy
                               template        completed for all
                   July 2021                   identified pupils- ie
                                               SEND, LAC, YC, EAL
                                               Vulnerable,
                                               Safeguarding)

                               Calendar        Taster Days              LAt/NWy/SAm
                               dates; staff
                               timetabling
                   July 2021
                               Presentation Meet the Tutor              NWy/SAm
                               letter/email
                   July 2021   invites/Twitte
                               r message
                               Presentation Parent/ carer               NWy/SAm

                                    Page 20 of 50
Woodlands School                                                  COVID-19 Recovery Plan – January 2021 to July 2021

                               letter/email    information evening
                   July 2021   invites/
                               Twitter
                               message

                               Funding         Summer School            NWy/SAm/
                   July 2021   Letter/ email   (potentially)            DWt
                               invites
                               Twitter
                               message
                               LAC/ YC
                               preference

                   September   Website         Activities over the      KSc/ERo/HoFs
                   2021        resources       summer- Challenges

                   September   Presentation    Staff briefing SDD 1     NWy/SAm
                   2021        to staff

                   September   Presentation    Information Evening      SLT/NWy
                   2021        letter/email    (more in depth- PAM,
                               invites/        show my homework,
                               Twitter         contactless info etc.)
                               message

                   September   Timetables      September start- first   NWy/SAm
                   2021        Tutor group     day
                               information     (Year 7 & Prefects
                               to pupil and    only)
                               parents prior
                               to the day.
                               Letters/

                                   Page 21 of 50
Woodlands School                       COVID-19 Recovery Plan – January 2021 to July 2021

                   emails to
                   parents
                   Presentation
                   Tutor time
                   resources/
                   PPTs

                       Page 22 of 50
Woodlands School                                                                                 COVID-19 Recovery Plan – January 2021 to July 2021

Pupil assessment
Targets:
    Build bank of evidence for Year 11 TAGs (Teacher Assessed Grades), based on guidance and training issued by the exam boards
    Embed assessments required by exam boards into Year 11 curriculum
    TAGs (Teacher Assessed Grades) for Year 11 pupils submitted to the exam boards
    Assess Year 10 progress in order to inform curriculum planning and provide pupils with predicted grades
    Ensure that all Year 8 pupils are allocated the right GCSE courses
    Remotely assess Years 7-9 progress in order to inform curriculum planning
    Assess all pupils on return to school in order to inform curriculum planning
    To launch new KS3 Assessment and reporting system
    Oversee an effective appeals process for Year 11 pupils

Tasks to achieve Target      Staff            Timescale   Resources           Success criteria          Monitored by      Progress
                             Responsible                  Needed
Build bank of evidence for   HODs/HOFs        By 12th     Digital             Yr11s to complete         EJo/ERo
Year 11 TAGs (Teacher        Year 11          March       assessments         remote assessment
Assessed Grades), based on   teachers                                         for all subjects on at
guidance and training                                     OneDrive            least 1 paper/unit.
issued by the exam boards                                 folders for
                                                          each pupil in       Evidence to be
                                                          each subject        banked digitally

                                                                              Further evidence to
                                                                              be collated through
                                                                              the use of Period 6
Embed assessments            HDI/EJo/ERo/     Timescale   Guidance            Discuss Year 11           EJo/ERo
required by exam boards      HODs/HOFs        to be set   from exam           strategies with HoDs
into Year 11 curriculum                       by Ofqual   boards              and HoFs as part of
                                                                              Results Analysis
                                                                              Meetings

                                                              Page 23 of 50
Woodlands School                                                                                COVID-19 Recovery Plan – January 2021 to July 2021

                                                                             When information
                                                                             from exam boards as
                                                                             to how TAGs will be
                                                                             awarded is collated
                                                                             and disseminated and
                                                                             necessary
                                                                             assessments for Yr11
                                                                             are planned for
TAGs for Year 11 pupils       EJo/ERo/HDI/   Timescale    Year 11            When all TAG grades       EJo/ERo
submitted to the exam         HODs/HOFs      to be set    assessments,       have been submitted
boards                                       by Ofqual    PPE data and       by Yr11 teaching staff
                                                          other              and moderated by
                                                          permissible        HODs and HOFs
                                                          evidence
                                                                             When parents/carers
                                                                             have been informed
                                                                             how the TAG process
                                                                             will work.

                                                                             When EJO & ERO have
                                                                             verified TAGs

                                                                             When HDI has
                                                                             entered verified
                                                                             grades

                                                                         When DWT has signed
                                                                         grades off as HOC
Assess Year 10 progress in    HODs/HOFs/     By the end   Year 10 PPEs When all Year 10      EJo/ERo
order to inform curriculum    ERo/EJo/HDI    of the       or alternative pupils have been
planning and provide pupils                  academic     assessment     assessed and
with predicted grades                        year         arrangements predicted grades

                                                             Page 24 of 50
Woodlands School                                                                               COVID-19 Recovery Plan – January 2021 to July 2021

                                                                            awarded
                                                                            When parents
                                                                            evening for Year 10
                                                                            has been held

                                                                            When departments
                                                                            have met to adapt
                                                                            their curriculums in
                                                                            light of the results of
                                                                            Year 10 PPEs and
                                                                            alternative
                                                                            assessments
Ensure that all Yr8 pupils     Some          By end of   Mini, online       When HODs/HOFs             EJo/ERo/JNe/
are allocated the right GCSE   HODs/HOFs/    March       assessments        have marked                RHe/KRo
courses                        EJo/JNe/ERo               for Business,      assessments and
                                                         PE,                made their
subject at HT3 and HT5
                                                         Citizenship,       recommendations
                                                         Sociology,
                                                                            When EJO/ERO have
                                                         Philosophy,
                                                                            cross referenced
                                                         Computer
                                                                            recommendations
                                                         Science,
                                                                            with pupils’ prior
                                                         Psychology
                                                                            attainment data
                                                         PSHRE lesson
                                                         time               When parents/carers
                                                                            of particular pupils
                                                                            have been contacted
                                                                            to discuss their child’s
                                                                            options

                                                                            When all pupils have

                                                            Page 25 of 50
Woodlands School                                                                                 COVID-19 Recovery Plan – January 2021 to July 2021

                                                                               had their option
                                                                               selections confirmed
Remotely assess Years 7-9      HODs/HOFs/       February    Adapted            When all pupils in        Data Team
progress in order to inform    Teaching staff   12th        assessments        Years 7-9 have been       /EJo/ERo
curriculum planning                                                            assessed and data
                                                                               entered

Assess Years 7-9 progress in   HODs/HOFs/       June 18th   Adapted            When all pupils in        Data Team
order to inform curriculum     Teaching staff               assessments        Years 7-9 have been       /EJo/ERo
planning (remotely or on-                                   if needed          assessed and data
site)                                                                          entered

                                                                               When departments
                                                                               have provided whole-
                                                                               class feedback to Year
                                                                               7-9 pupils remotely.

                                                                               When departments
                                                                               have met to adapt
                                                                               their curriculums in
                                                                               light of the results of
                                                                               assessments
Assess all pupils on return    HODs/HOFs/       By July     Interim            When EJO/ERO have         EJo/ERo/SLT
to school in order to inform   Teaching staff   2021        Assessments        provided guidance on
curriculum planning                                                            how to produce
                                                                               interim assessments

                                                                               When SLT have
                                                                               checked interim
                                                                               assessments are in

                                                               Page 26 of 50
Woodlands School                                                                            COVID-19 Recovery Plan – January 2021 to July 2021

                                                                         place for all faculties
                                                                         they line manage

                                                                         When all pupils have
                                                                         completed interim
                                                                         assessments

                                                                         When HODs/HOFs
                                                                         analyse data to
                                                                         identify any trends

                                                                         When necessary
                                                                         curriculum changes
                                                                         are made to address
                                                                         any gaps in learning

                                                                         When SLT have
                                                                         checked adaptations
                                                                         to curriculums to
                                                                         ensure pupils’ needs
                                                                         are being met and
                                                                         gaps are being
                                                                         addressed.

                                                                         When pupils in need
                                                                         of additional
                                                                         intervention are
                                                                         identified
To launch new KS3          EJo/TGr/HODs/ By        KS3                   When new database         EJo/TGr/ERo
Assessment and reporting   HOFS/HDI      September Assessments           has been developed
system                                   2021      in all subjects       allowing staff to
                                                                         report on key

                                                         Page 27 of 50
Woodlands School                                                                            COVID-19 Recovery Plan – January 2021 to July 2021

                                                                          objectives
                                                                          When HODs/HOFs
                                                                          have written
                                                                          assessments for Years
                                                                          7 & Years 8 to reflect
                                                                          the key objectives
                                                                          being reported upon

                                                                          When HODs/HOFs
                                                                          have decided on the
                                                                          boundaries for
                                                                          Working
                                                                          Towards/Expected
                                                                          Standard/Greater
                                                                          Depth and reported
                                                                          these to EJO/TGR/HDI

                                                                          When new reporting
                                                                          system has been
                                                                          shared with parents
Oversee an effective          ERO/EJO/DWT   By        Ofqual and          Evidence of all pupils’
appeals process for Year 11                 September JCQ guidance        grades is collated on
pupils                                      2021                          the shared area of the
                                                                          OneDrive

                                                                          Appeals procedure to
                                                                          be provided to
                                                                          parents/carers on the
                                                                          school website

                                                                          An effective system is
                                                                          set up to oversee the

                                                          Page 28 of 50
Woodlands School                                    COVID-19 Recovery Plan – January 2021 to July 2021

                                   appeals process
                                   effectively and
                                   efficiently.
                                   All appeals have been
                                   processed by the
                                   beginning of the
                                   Autumn Term 2021

                   Page 29 of 50
Woodlands School                                                                              COVID-19 Recovery Plan – January 2021 to July 2021

Supporting great teaching
Targets:
    To ensure that pupils are receiving a quality remote provision through effective monitoring and evaluation procedures and CPD
       opportunities
    To guarantee staff, specifically those new to the profession, feel supported with their pedagogical needs during lockdown
    Consider ways to implement some of the skills learnt during lockdown to our regular teaching provision
    To build the confidence of staff in teaching and ensure the monitoring process for Teaching and Learning is effective in supporting the
       identification of CPD needs
    To plan an effective CPD programme with ‘Planning’ at the heart to ensure all lesson time is geared towards offsetting the detrimental
       impact Lockdown has had on pupil progress
    To ensure personalised learning opportunities are available in all lessons to tackle any gaps in knowledge/understanding caused by
       Lockdown
    To support staff in tacking low level disruption which may be more prevalent following a prolonged period of absence from school with
       the creation of Strategic Behaviour Coach role.
    To adapt lessons and SOL to incorporate exam board guidance on Teacher Assessed Grades
    To adopt a ‘Coaching’ model to support Middle Leaders on their return to school
    To plan a personalised support programme for ITTs/NQTs/RQTs to minimise impact of disruptive induction to profession
    To continue to embed the ‘Thinking School’ model to help support the development of metacognitive skills and to aid the catch up of
       any lost learning
    To launch Retrieval at Woodlands (RAW) to address gaps in learning and encourage memory retrieval through regular subject specific
       opportunities to interleave spaced learning practice
    To continue to promote Literacy across the school and ensure our pupils develop the necessary Oracy skills

Tasks to achieve Target       Staff Responsible   Timescale   Resources Needed      Success criteria   Monitored By     Progress
To ensure that pupils are     NWH/ERO/KVA         Until the   DoE Audit             Increased pupil    SLT
receiving a quality remote                        end of      framework-            engagement
provision through effective                       lockdown    constant review of    Positive
monitoring and evaluation                                     provision             pupil/parent
procedures and CPD                                            Time for the self-    feedback
opportunities                                                 reflection of         Positive staff
                                                              lessons               feedback

                                                                Page 30 of 50
Woodlands School                                                                        COVID-19 Recovery Plan – January 2021 to July 2021

                                                        Engagement            Improved pupil
                                                        spreadsheet           outcomes
                                                        Time for CPD-         Staff successful
                                                        NWH/ERO/KVA-          completion of
                                                        programme based       CPD
                                                        on identified needs   Improved staff
                                                        and drop in           confidence in
                                                        sessions as           delivering
                                                        required              lessons
                                                        Monitoring of         remotely
                                                        feedback              Data from self-
                                                                              reflection audits
                                                                              suggesting
                                                                              improvements
                                                                              Monitoring of
                                                                              any feedback
                                                                              offered
                                                                              suggesting
                                                                              strong provision
To guarantee staff,         NWH/AMA/ADY     Until the   Time to ensure        Positive            NWH/SLT
specifically those new to   and ITTS/NQTS   end of      regular phone calls   feedback from
the profession, feel                        lockdown    are made with all     ITTS/NQTs
supported with their                                    impacted staff        Increased staff
pedagogical needs during                                Audit of needs and    confidence
lockdown                                                CPD programme         Self-reflections
                                                        tailored              (in partnership
                                                        accordingly           with mentors
                                                        Mentor meetings       for NQT) audits
                                                                              which suggest
                                                                              improving
                                                                              practice.
                                                                              Successful

                                                         Page 31 of 50
Woodlands School                                                                                COVID-19 Recovery Plan – January 2021 to July 2021

                                                                                     lesson
                                                                                     observations for
                                                                                     ITTS.
                                                                                     Improved pupil
                                                                                     outcomes
Consider ways to             NWH/KVA              Ongoing    Reflective              Increased          SLT
implement some of the                                        summary of new          independence
skills learnt during                                         skills acquired by      of pupils in
lockdown to our regular                                      staff/pupils during     learning.
teaching provision                                           Lockdown.               Improved
                                                             Review of               quality of
                                                             effectiveness on        teaching
                                                             pupil progress.         provision
                                                             Audit of current
                                                             SOL to identify         Improved
                                                             opportunities to        outcomes
                                                             implement new
                                                             practice
To build the confidence of   NWH/SLT/HOF          Ongoing    Audit of planning       Effective          SLT
staff in teaching and ensure and teaching staff   post       skills for all staff.   monitoring
the monitoring process for                        Lockdoen   Informal Learning       system which is
Teaching and Learning is                          (Summer    Walks with agreed       low stakes but
effective in supporting the                       term)      pro form                high challenges
identification of CPD needs                                                          and allows staff
                                                             QA of monitoring        to engage in
                                                             activities with         feedback.
                                                             Middle Leaders.
                                                             Review of current       Improved staff
                                                             PAM system and          confidence
                                                             suggestions for         identified
                                                             adaptation              through staff
                                                                                     feedback/

                                                               Page 32 of 50
Woodlands School                                                                           COVID-19 Recovery Plan – January 2021 to July 2021

                                                         CPD activities as      monitoring
                                                         required               activities
To plan an effective CPD      NWH and          Autumn    Protected time for     Complete audit      SLT
programme with ‘Planning’     teaching staff   Term      one to one             of the quality of
at the heart to ensure all                     2021-2022 meetings with          short term and
lesson time is geared                          with      every member of        long term
towards offsetting the                         staggered staff to audit short   planning across
detrimental impact                             roll out  term and long term     the school
Lockdown has had on pupil                      from      planning skills
progress                                       Spring 2  Consistent             Effective
                                               2020-21   coaching questions     delivery of CPD
                                                         to support             to target areas
                                                         effective audit        of need.
                                                         CPD activities/time    Improved
                                                         as identified by       quality of SOL
                                                         audit mentioned        Improved staff
                                                         above.                 confidence in
                                                                                ability to plan

                                                                                Improved pupil
                                                                                outcomes
To ensure personalised        NWH/Middle       Ongoing     Audit of pupil       Improved
learning opportunities are    Leaders                      understanding        quality of
available in all lessons to                                through regular      lessons as all
tackle any gaps in                                         AFL opportunities    pupils will be
knowledge/understanding                                                         able to access
caused by Lockdown                                         Effective lesson     learning
                                                           planning audit/CPD
                                                                                Engagement in
                                                           Audit of Teaching    CPD as required
                                                           and Learning to
                                                           ensure               Improved

                                                            Page 33 of 50
Woodlands School                                                                      COVID-19 Recovery Plan – January 2021 to July 2021

                                                       personalised        learning
                                                       learning            outcomes
                                                       opportunities are
                                                       provided

                                                       Support from SEND
                                                       department to
                                                       support with CPD
To support staff in tacking   SAM/ERO/NWH   Appointm   Financial resource Decrease in     SLT
low level disruption which                  ent by                        instances of
may be more prevalent                       Easter.    CPD for appointed low-level
following a prolonged                       Role       individual         disruption as
period of absence from                      ongoing.                      reported via
school with the creation of                            Protected time for radio call
Strategic Behaviour Coach                              appointed          outs/PAM
role.                                                  individual
                                                                          Improved T & L
                                                       Time for           as evidenced by
                                                       discussions with   PAM data
                                                       individual staff
                                                       members/HOD/       Improved
                                                       HOD                progress
                                                                          outcomes
To adapt lessons and SOL      ERO/EJO/NWH   Summer     Collection of data Secure evidence
to incorporate exam board                   Term       to identify gaps   base to award
guidance on Teacher                                                       Teacher
Assessed Grades                                        Audit of SOL       Assessed Grades

                                                       Time to adapt SOL
                                                       as necessary

                                                       Additional

                                                        Page 34 of 50
Woodlands School                                                                          COVID-19 Recovery Plan – January 2021 to July 2021

                                                        resources as
                                                        required
To adopt a ‘Coaching’        NWH/MOC and      Ongoing   Time for One to        Successful initial   SLT
model to support Middle      Middle Leaders             one initial            meetings to
Leaders on their return to                              meetings between       identify the CPD
school                                                  SLT and HOF to         needs of Middle
                                                        establish needs        Leaders.
                                                                               Completion of
                                                        Tool to support        successful
                                                        Middle Leaders in      ‘Coaching Cycle’
                                                        their identification
                                                        of CPD needs        Increased
                                                                            Middle Leader
                                                        Coaches to support confidence
                                                        Middle Leaders
                                                                            Improved
                                                        Training to support Middle Leader
                                                        Coaches             performance
                                                                            (better
                                                        Protected time for communication
                                                        Coaching process    channels etc.)
To plan a personalised       NWH/AMA/ADY/ Ongoing       One to one initial  Engagement in  NWH/HOF/SLT
support programme for        NHO and mentors            meetings on return CPD.
ITTs/NQTs/RQTs to                                       to identify
minimise impact of                                      personalised needs Increased staff
disruptive induction to                                                     confidence
profession                                              Tailored            garnered from
                                                        programme           feedback
                                                        including one to
                                                        one sessions which Improved lesson
                                                        focus on            quality
                                                        planning/other

                                                          Page 35 of 50
Woodlands School                                                                               COVID-19 Recovery Plan – January 2021 to July 2021

                                                             areas of CPD needs     Improved pupil
                                                                                    outcomes

                                                                                    Retention of
                                                                                    staff
To continue to embed the       NWH/STA/KVA/     Ongoing      Monitoring data to     Improved pupil       SLT
‘Thinking School’ model to     RS team and                   ensure that all        outcomes
help support the               teaching staff                lessons begin with
development of                                               a ‘Memory              Improved
metacognitive skills and to                                  Retrieval’ starter     memory
aid the catch up of any lost                                 activity               retention for
learning                                                                            pupil
                                                             RAW Knowledge
                                                                                    All lessons
                                                             Audit of               beginning with a
                                                             assessments to         memory
                                                             ensure they test       retrieval activity
                                                             cumulative             Pupil
                                                             understanding          engagement/
                                                                                    success with
                                                             CPD to parents on      RAW
                                                             metacognitive
                                                             skills/revision        Laser sharp
                                                             strategies             data/ improved
                                                                                    accuracy in
                                                             Practical strategies   predications as
                                                             for pupils to          a result of
                                                             promote                effective
                                                             metacognition          assessments
                                                             skills
To launch Retrieval at         NWH and          Pupils to    CPD for staff on       Effective launch     SLT
Woodlands (RAW) to             teaching staff   be able to   how to make the        of RAW

                                                               Page 36 of 50
Woodlands School                                                                      COVID-19 Recovery Plan – January 2021 to July 2021

address gaps in learning                access      most of Tassomai       Pupil
and encourage memory                    Tassomai    Effective launch       engagement
retrieval through regular               from        with pupils/parents    with RAW
subject specific                        Easter      including              Improved
opportunities to interleave             2021-       information            outcomes
spaced learning practice                Official    sharing activities/
                                        launch      Assemblies/PSHRE
                                        Sept 2021   lessons/form
                                                    activities
                                                    Effective
                                                    reward/sanction
                                                    system
                                                    ICT support
                                                    Support from KHD
                                                    to ensure all pupils
                                                    registered
                                                    Time for pupils to
                                                    trial system
                                                    Time for staff to
                                                    keep question
                                                    banks updated
                                                    Ongoing
                                                    relationship with
                                                    Tassomai
To continue to promote        NWH/LSM   Ongoing     CPD for parents to     Improved           SLT
Literacy across the school                          support with           outcomes
and ensure our pupils                               Literacy
develop the necessary                               development at         Greater
Oracy skills                                        home                   confidence in
                                                    Drop in sessions       public speaking
                                                    for parents re
                                                    Literacy

                                                      Page 37 of 50
Woodlands School                        COVID-19 Recovery Plan – January 2021 to July 2021

                   Literacy resources

                   Opportunities for
                   the development
                   of literacy/oracy
                   across the
                   curriculum
                   including form
                   tutor activities

                    Page 38 of 50
Woodlands School                                                                              COVID-19 Recovery Plan – January 2021 to July 2021

Intervention
Strategic Targets:
       To ensure that a comprehensive package of intervention is in place to support Year 11 pupils
       To continue to provide catch up intervention for Years 7-10
       To plan a programme of intervention for pupils on return in September 2021

Tasks to achieve Target       Staff          Timescale     Resources    Success criteria                     Monitored     Progress
                              Responsible                  Needed                                            By
To ensure that a              EJO/ERO/JLI/   Ongoing       Remote or    When period 6 continues to be        EJO/ERO
comprehensive package of      HODS/HOFs      until July    onsite       offered to all targeted pupils
intervention is in place to                  2021          teaching     remotely
support Year 11 pupils                                     provision
                                                                        When period 6 resumes onsite for
                                                                        targeted pupils on return to
                                                                        school

                                                                        When the remote Holiday
                                                                        Enhancement programme takes
                                                                        place in the upcoming holidays,
                                                                        whether remotely or onsite

                                                                        When Morning Enhancement
                                                                        resumes for all targeted pupils on
                                                                        return to school

                                                                        When targeted pupils complete
                                                                        the MyTutor programme for
                                                                        English, Maths or Science or all
                                                                        180 one to one Mytutor spaces
                                                                        and 30 3:1 (some spaces may be
                                                                        used for Year 10)

                                                                Page 39 of 50
Woodlands School                                                                         COVID-19 Recovery Plan – January 2021 to July 2021

                                                                   English and Maths lessons
                                                                   incorporate 30mins per week
                                                                   focused on KS2 skills

                                                                   PPG, HPA and Boys Advocates to
                                                                   ensure they have met with Y11
                                                                   pupils in those vulnerable groups
                                                                   who are struggling in their
                                                                   subjects and helped to develop
                                                                   an action plan
To continue to provide      DBE/RME/RL   Ongoing      Access on    When staff allocated to support
catch up intervention for   A/GLE/HHY    until July   teams for    underachieving pupils provide
Years 7-10                               2021         interventi   support during lessons
                                                      on staff
                                                      Classroom    When progress gaps for identified
                                                      s on         pupils close
                                                      return to
                                                      school       When Yr10 pupils identified for
                                                                   MyTutor programme can begin
                                                                   intervention and impact on
                                                                   progress can be tracked

                                                                   When Mr Beezy mentoring
                                                                   programme for Yr10 pupils can
                                                                   begin and impact on pupil
                                                                   progress can be measured

                                                                   When the progress gaps have
                                                                   narrowed for targeted pupils
                                                                   identified for the Teach First
                                                                   Academic Intervention
                                                                   Programme

                                                          Page 40 of 50
Woodlands School                                                                         COVID-19 Recovery Plan – January 2021 to July 2021

                                                                   When the progress gaps have
                                                                   narrowed for targeted pupils
                                                                   identified for the Lexonik
                                                                   Intervention Programme

                                                                   When HPA, PPG and Boys
                                                                   Advocates have identified those
                                                                   pupils who have been most
                                                                   disengaged with live learning
                                                                   during the school’s partial
                                                                   closure, and have devised action
                                                                   plans within their departments
To plan a programme of       EJO/ERO/JLI/   By July 2020           When Year 10 data has been used
intervention for pupils on   KRO/ALE/TC                            to identify English and Maths
return in September 2021     U/HDI                                 vulnerables lists

                                                                   When English and maths boost
                                                                   groups have been included in
                                                                   timetable planning

                                                                   When HODs/HOFs have identified
                                                                   priority learners in their subject
                                                                   areas

                                                                   When all PPG Advocates have
                                                                   provided “supporting return to
                                                                   school” videos for their subject
                                                                   for both Year 7 and Year 10 pupils

                                                                   When period 6 timetable has
                                                                   been established for Year 11s
                                                                   starting in September

                                                           Page 41 of 50
Woodlands School                                  COVID-19 Recovery Plan – January 2021 to July 2021

                           When Morning Enhancement
                           groups have been established for
                           Year 11s starting in September

                           When staff under teaching
                           allocation have been identified to
                           support with catch up
                           intervention in English and maths
                           in Years 7-10

                           When HDI has allocated rooms
                           for catch up intervention

                           When DBE and RME have
                           identified pupils for catch up
                           intervention

                   Page 42 of 50
Woodlands School                                                                                   COVID-19 Recovery Plan – January 2021 to July 2021

Access to technology and online learning
Targets:
          Ensure all pupils regularly engage with online learning.
          Ensure all pupils have regular access to a laptop, PC or tablet, sufficient to access five hours of learning per day.
          Ensure all pupils have regular access to reliable broadband or an ample data package.
          Ensure all pupils have the digital literacy and training to access their learning via Microsoft Teams and identify and address any
           technical issues pupils have which prevents them from accessing their online learning.
          Ensure all parents/carers have the digital literacy and training to support their child’s learning via Microsoft Teams.
          Train and develop staff so that all are digitally literate and able to support our pupils’ learning.
          Embed technology within everyday teaching practice upon the return to school.

Tasks to achieve      Staff Responsible              Timescale      Resources          Success criteria Monitored       Progress
Target                                                              Needed                              By
Ensure all pupils     ERO/NWH/SAM/HoFs/HoDs Ongoing                 Microsoft          All pupils to    ERO/SAM/        Engagement as of
regularly engage                            until the               Teams, Remote      have barriers    tutors/RLS      29.01.21:
with online                                 end of the              Learning           to accessing     team
learning                                    school’s                Support Scrips,    online learning                  Y7: 80.90%
                                            partial                 Tutor Time         removed                          Y8: 78.10%
                                            closure                 Meeting scripts,                                    Y9: 76.70%
                                                                    home learning      All teachers to    Teachers/     Y10: 77.20%
                                                                    support FAQs +     record             tutors/RLS    Y11: 81.70%
                                                                    solutions sheet,   engagement of      team/ERO      Overall: 79.00%
                                                                    live lesson        pupils on the
                                                                    engagement         live lesson
                                                                    spreadsheet,       engagement
                                                                    parent/carer       spreadsheet
                                                                    disengagement
                                                                    letters            Letters to be      ERO/LPU
                                                                                       sent home to
                                                                                       the
                                                                                       parents/carers

                                                                    Page 43 of 50
Woodlands School                                                              COVID-19 Recovery Plan – January 2021 to July 2021

                                                                   of pupils who
                                                                   are not
                                                                   engaging, to
                                                                   offer support
                                                                   through Tutors
                                                                   and the RLS
                                                                   team

                                                                   Tutors and        SAM/ERO/
                                                                   Remote            tutors/RLS
                                                                   Learning          team
                                                                   Support Team
                                                                   to address
                                                                   barriers
                                                                   causing
                                                                   disengagement
                                                                   with online
                                                                   learning with
                                                                   their peers and
                                                                   to remain in a
                                                                   continued
                                                                   dialogue with
                                                                   parents and
                                                                   carers
Ensure all pupils     ERO/TCU/NWI   By January     DfE laptops,    Distribute        ERO/TCU/     381 laptops have now been
have regular                        2021           Computeraid     laptops/PCs to    NWI          distributed.
access to a laptop,                 (ongoing       laptops, HP     all pupils who                 252 are from the
PC or tablet,                       for any        laptops and     do not have                    Department for Education.
sufficient to                       pupils later   other donate    regular access                 40 were purchased from
access five hours                   identified     laptops         to their own                   HP.
of learning per                     as                             device                         30 were purchased from
day.                                requiring a    Consent forms                                  Computeraid.

                                                   Page 44 of 50
Woodlands School                                                               COVID-19 Recovery Plan – January 2021 to July 2021

                                   device)                                                         59 were donated from
                                                                                                   Sunrise.

                                                                                                   There are currently no
                                                                                                   pupils on the waiting list
                                                                                                   for a device, but this does
                                                                                                   vary week on week.
Ensure all pupils    ERO/TCU/NWI   By January     DfE routes, O2   Distribute        ERO/TCU/      52 routers have been
have regular                       2021           routers and      routers to all    NWI           distributed to pupils.
access to reliable                 (ongoing       consent forms    pupils who                      40 are from the
broadband or an                    for any                         have no access                  Department for Education.
ample data                         pupils later                    to broadband                    15 have been activated by
package.                           identified                      at home                         the school through O2
                                   as
                                   requiring a                                                     There are currently no
                                   device)                                                         pupils on the waiting list
                                                                                                   for a router, and we have
                                                                                                   more to distribute if more
                                                                                                   pupils come forward

                                                                                                   The school has requested
                                                                                                   10 upgrades to data
                                                                                                   packages for pupils from
                                                                                                   the Department for
                                                                                                   Education; 9 have been
                                                                                                   accepted
Ensure all pupils    ERO/KVA/NWH   September- Microsoft            Provide           ERO/KVA/      2 assemblies, 2 tutor times
have the digital                   January    Teams                training to all   NWH           and 2 PSHRE lessons were
literacy and                       2021                            pupils within                   dedicated to Microsoft
training to access                                                 school during                   Teams training
their learning via                                                 the Autumn
Microsoft Teams                                                    Term

                                                  Page 45 of 50
Woodlands School                                                           COVID-19 Recovery Plan – January 2021 to July 2021

and identify and                                                                               A variety of videos have
address any                                                                                    been provided on the
technical issues                                                                               school website and Twitter
pupils have which
prevents them                     January   School website, Provide               ERO/KVA      SAM and ERO have trained
from accessing                    2021      YouTube, screen training videos                    both tutors and the RLS
their online                                recorder        and guidance                       team, who are now
learning                                                    via the school                     overseeing the remote
                                                            website                            learning support process

                                  January   Live Tutor Time    Set up the live    ERO/SAM
                                  2021      and Remote         Tutor Time
                                            Learning           meetings and
                                            Support scripts,   Remote
                                            PAM.               Learning
                                                               Support Teams
                                                               to support
                                                               pupils
                                                               struggling to
                                                               access their
                                                               work
Ensure all          ERO/KVA/NWH   January   School website,    Provide a letter   ERO/DWT      A letter and video have
parents/carers                    2021      GroupCall          to all                          been sent to all
have the digital                                               parent/carers,                  parent/carers advising
literacy and                                                   outlining the                   them on the school’s
training to support                                            home learning                   online learning process
their child’s                                                  process
learning via
Microsoft Teams                             School website,    Provide video      ERO/KVA      A variety of videos have
                                            GroupCall          training to all                 been provided on the
                                                               screen                          school website and Twitter

                                            Page 46 of 50
Woodlands School                                 COVID-19 Recovery Plan – January 2021 to July 2021

                                      parents/carers
                                      on how to help
                                      their child
                                      access their
                                      online learning

                   School website,    Provide a video   DWT          DWT provided a video to
                   GroupCall,         to all                         all parents/carers
                   screen recorder,   parents/carers                 explaining the monitoring
                   YouTube            explaining                     process for online learning
                                      online learning
                                      and the
                                      monitoring
                                      process

                   School website,    Run a live        ERO/NWH      Q+A session was attended
                   YouTube            parent/carer                   by a variety of
                                      Q+A session on                 parents/carers who posed
                                      live lessons                   questions for an hour

                   Microsoft          Provide a daily   SLT          Ongoing
                   Teams              SLT drop-in for
                                      parents and
                                      carers

                   Remote             Regularly      SAM             RLS Team and Tutors meet
                   Learning           contact                        with their pupils daily to
                   Support scripts,   parents/carers                 ensure pupils stay on track
                   PAM, home          of pupils                      with their online learning
                   learning support   struggling to
                   FAQ                complete work,
                                      via the Remote

                   Page 47 of 50
Woodlands School                                                          COVID-19 Recovery Plan – January 2021 to July 2021

                                                              Learning
                                                              Support Team
Train and develop ERO/NWH/KVA   September- Microsoft          Run CPD            ERO/KVA/     CPD sessions successfully
staff so that all are           December Teams, CPD           sessions for       NWH          delivered
digitally literate              2020       resources          teaching staff
and able to                                                   and Progress
support our                                                   Mentors on
pupils’ learning                                              how to use
                                                              Microsoft
                                                              Teams and run
                                                              live lessons

                                September- Microsoft          Provide            KVA          KVA has run several drop-
                                December Teams, CPD           additional                      in sessions for staff, and all
                                2020       resources          small-group                     are now feeling confident
                                                              drop-in                         on Teams
                                                              sessions for
                                                              staff struggling
                                                              to use
                                                              Microsoft
                                                              Teams

                                January-     Microsoft Sway   Provide weekly     KVA/NWH      Ongoing – the first top tips
                                April 2021                    top tips for                    were provided to all staff
                                                              teachers on                     on Microsoft Sway
                                                              how to
                                                              improve their
                                                              pedagogy via
                                                              Microsoft
                                                              Teams

                                January      Tutor Time       Provide                         RLS team and Tutors meet

                                             Page 48 of 50
Woodlands School                                                          COVID-19 Recovery Plan – January 2021 to July 2021

                               2021          Meeting Script   training to all    ERO/SAM      with their pupils daily to
                                                              tutors on how                   ensure pupils stay on track
                                                              to support                      with their online learning
                                                              pupils who
                                                              have become
                                                              disengaged
                                                              with online
                                                              learning

                               January       Tutor Time       Train the        SAM            RLS team and Tutors meet
                               2021          Meeting Script   Remote                          with their pupils daily to
                                             and Remote       Learning                        ensure pupils stay on track
                                             Learning         Support team                    with their online learning
                                             Support script   on the process
                                                              for supporting
                                                              disengaged
                                                              pupils and their
                                                              parents/carers
Embed technology ERO/KVA/NWH   April 2021    Microsoft        Continue to      Teaching
within everyday                onwards       Teams            provide live     staff + SLT
teaching practice                                             lessons for
upon the return to                                            those pupils
school                                                        self-isolating

                               The return    Microsoft        Provide staff      ERO/KVA/
                               to school     Teams            with CPD on        NWH
                               (possibly                      the lessons to
                               March-                         draw from the
                               April 2021)                    school’s partial
                                                              closure,
                                                              regarding
                                                              technology in

                                             Page 49 of 50
Woodlands School                                           COVID-19 Recovery Plan – January 2021 to July 2021

                                                the classroom

                   March-                       Explore the use   ERO/KVA
                   April 2021                   of the online
                                                learning
                                                process for
                                                cover lessons,
                                                snow days etc

                   March-       Tassomai        Launch the        NWH
                   April 2021                   Retrieval at
                                                Woodlands
                                                programme,
                                                including the
                                                RaW catch-up
                                                sessions in
                                                school

                   Ongoing                      Formulate a       KVA/NWH
                                                voluntary CPD
                                                programme
                                                aimed at
                                                supporting
                                                technology in
                                                the classroom
                                                (teaching staff)
                                                and digital
                                                literacy
                                                (associate staff)

                                Page 50 of 50