ASCENDAS INDIA TRUST Citi-REITAS-SGX C-Suite Singapore REITS and Sponsors Forum 2019 22 August 2019
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Disclaimer This presentation on a-iTrust’s results for the quarter ended 30 June 2019 (“1Q FY2019”) should be read in conjunction with a-iTrust’s quarterly results announcement, a copy of which is available on www.sgx.com or www.a-iTrust.com. This presentation may contain forward-looking statements that involve risks and uncertainties. Actual future performance, outcomes and results may differ materially from those expressed in forward-looking statements as a result of a number of risks, uncertainties and assumptions. Representative examples of these factors include (without limitation) general industry and economic conditions, interest rate trends, cost of capital and capital availability, competition from other developments or companies, shifts in expected levels of property rental income and occupancy rate, changes in operating expenses (including employee wages, benefits and training, property expenses), governmental and public policy changes and the continued availability of financing in the amounts and the terms necessary to support future business. Investors are cautioned not to place undue reliance on these forward-looking statements. All measurements of floor area are defined herein as “Super Built-up Area” or “SBA”, which is the sum of the floor area enclosed within the walls, the area occupied by the walls, and the common areas such as the lobbies, lift shafts, toilets and staircases of that property, and in respect of which rent is payable. The Indian Rupee and Singapore Dollar are defined herein as “INR/₹” and “SGD/S$” respectively. Any discrepancy between individual amounts and total shown in this presentation is due to rounding. 2
Introduction to a-iTrust Mumbai Our presence 13.1 million sq ft 6% Pune of completed 12% Bangalore floor area 34% Mumbai Chennai (Panvel) 22% Pune • Arshiya • aVance, Pune1 Hyderabad warehouses 26% Chennai Bangalore Hyderabad 6% • International Tech • The V Park Bangalore • CyberPearl 6.6 million sq ft Bangalore • aVance, Hyderabad1 of potential floor 41% Chennai area • International Tech Park Chennai • CyberVale Hyderabad 53% 1. aVance, Pune was previously known as BlueRidge 2 and aVance, Hyderabad was previously known as aVance Business Hub. 4
World class IT parks and warehouses Our products Arshiya warehouses Modern IT Parks built to international specifications Modern warehouses with state of the art technology. & standards. Award winning properties Grade-A specifications • ITPC: 2018 CNBC-AWAAZ Real Estate Awards • Up to G+6 racked structure Winner, “Best Commercial Project” • 13 metres ceiling height • ITPC: 2013 FIABCI Prix d’Excellence Award Gold • M35 grade super flat floor Winner, Industrial Category • Advanced fire detection system and security • ITPB: 2012 FIABCI Prix d’Excellence Award Gold services Winner, Industrial Category 5
Awards and accolades Singapore Corporate Awards Securities Investor The Edge Billion Dollar Club The Edge Billion Dollar Club (“SCA”) 2018 Association (Singapore) 2018 Corporate Awards 2017 Corporate Awards Investors’ Choice Awards REITs Category: REITs Category: 2018 REITs & Business Trust “Most Profitable Company” “Fastest Growing Company” Category: Properties Category: “Most Profitable Company” “Most Transparent Company “Gold Award” for Best Award” “Best in Sector” Investor Relations 6
Key safeguarding provisions Our structure a-iTrust is a business trust that has voluntarily adopted the following SREIT restrictions: Permissible investment Adheres to Property Fund Appendix’s definition of allowable investments Investment restriction Invests at least 75% of the Trust property in income-producing real estate Development limit 20% of Trust property Distributable income Minimum 90% to be distributed Tax-exempt distributions Distributions exempt from Singapore tax Gearing limit 45% 7
CapitaLand Limited Our sponsor • CapitaLand is one of Asia’s largest diversified real estate groups, with assets under management of S$129.1 billion as at 30 June 2019. • CapitaLand’s portfolio spans across commercial, retail; business park, industrial and logistics; integrated development, urban development; as well as lodging and residential. • It manages eight listed REITs and business trusts, as well as over 20 private funds. • CapitaLand has presence across more than 200 cities in over 30 countries, including Singapore, China, India, Vietnam, Australia, Europe and the USA. Capital Tower, Singapore 8
1Q FY2019 results 1Q FY2019 1Q FY18/19 Variance SGD/INR FX rate1 51.2 50.2 2.0% • Higher income from aVance, Pune and Anchor building3 at ITPB; and ₹2,523m ₹2,254m 12% • positive rental reversions. Total property income S$49.2m S$44.9m 10% • Increase due to higher income from aVance, Pune and Anchor building; ₹1,935m ₹1,684m 15% • positive rental reversions; and Net property income S$37.8m S$33.6m 13% • partly offset by higher property management fees and taxes mainly ₹1,215m ₹925m 31% from Anchor building. Income available for distribution S$23.7m S$18.4m 29% • Mainly due to net property income growth and interest income from ₹1,094m ₹833m 31% investments in AURUM IT SEZ, aVance 5 Income to be distributed & 6 and aVance A1 & A2. S$21.3m S$16.6m 29% • After retaining 10% of income available ₹1.05 ₹0.80 31% for distribution. Income to be distributed (DPU2) 2.05¢ 1.60¢ 28% Weighted average number of units 1,041,230 1,034,349 1% (‘000) 1. Average exchange rates for the period. 2. Distribution per unit. 3. Anchor building was previously known as MTB 4. 9
Consistent growth Our INR financial performance INR million 9,389 8,943 7,587 6,784 6,108 5,774 Total property income 4,899 5,540 4,007 4,182 3,783 2,801 12% CAGR FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 INR million 6,999 6,089 5,047 Net property income 4,415 3,681 3,450 2,805 3,165 14% CAGR 2,448 2,425 2,117 1,651 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 10
Consistent growth Our SGD financial performance S$ million 188.2 182.0 156.7 144.0 127.5 126.3 128.8 120.9 121.5 120.7 118.1 Total property income 102.7 5% CAGR FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 S$ million 135.7 128.1 104.2 Net property income 93.7 77.6 73.8 70.6 73.0 72.1 72.1 66.2 60.5 8% CAGR FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 11
Quarterly DPU since listing DPU1 (S¢) Change since listing INR/SGD exchange rate2 INR depreciation against SGD: -48% (Indexed) 9.00 SGD DPU3: +42% 130 8.00 120 7.00 110 6.00 100 5.00 90 4.00 80 3.00 70 2.00 60 1.00 50 0.00 40 FY07/08 FY08/09 FY09/10 FY10/11 FY11/12 FY12/13 FY13/14 FY14/15 FY15/16 FY16/17 FY17/18 FY18/19 FY2019 1Q 2Q 3Q 4Q INR/SGD exchange rate 1. DPU (income available for distribution) refers to 100% of distributable income. 10% of distributable income was retained starting from 1Q FY12/13. 2. Average daily spot INR/SGD exchange rate for the period, pegged to 1 August 2007 using data sourced from Bloomberg. 3. Last 12 months DPU compared against FY07/08 DPU. 12
Market review
Global IT powerhouse India’s IT industry Largest global IT Most cost competitive sourcing destination1 IT sourcing destination2 IT engineer’s salary India 55% 2 IT engineers in Singapore The salary of Rest of 1 IT engineer in the world USA is equivalent to 11 IT engineers in India 45% 1. Source: India Brand Equity Foundation. 2. Source: June 2019 median salary from PayScale (provider of global online compensation data), converted into USD from local currencies using exchange rate from Bloomberg (30 June 2019). 14
India office market growth 512 India Grade A office stock (in million sq ft)1 127% growth from 2009 to 2018 444 310 225 2009 2012 2015 2018 1. Source: JLL Report 2018 15
Strong growth in Grade A office supply India Grade A office supply-absorption trend1 70 60 50 40 30 70% 20 10 0 2013 2014 2015 2016 2017 2018 2019E Supply (in million sq ft) Net Absorption (in million sq ft) 1. Source: CBRE Research 16
Office markets healthy Bangalore (Whitefield) Hyderabad (IT Corridor I2) 4.0 4.0 15.5% 12.0% 1 3.0 12.5% 3.0 12.0% 8.9% 2.0 7.2% 2.0 6.2% 5.7% 1.0 1.0 3.0% 2.7% 0.0 0.0 CY 2015 CY 2016 CY 2017 CY 2018 2Q 2019 CY 2015 CY 2016 CY 2017 CY 2018 2Q 2019 Chennai (OMR) Pune (Hinjawadi) 3.0 9.0% 2.0 2.0 7.0% 15.2% 4.8% 3.3% 1.0 9.9% 3.3% 8.6% 1.0 6.4% 6.0% 0.0 CY 2015 CY 2016 CY 2017 CY 2018 2Q 2019 0.0 Supply (in million sq ft) Gross Absorption (in million sq ft) Vacancy (%) CY 2015 CY 2016 CY 2017 CY 2018 2Q 2019 Source: CBRE Research 1. Higher vacancy is due to supply of 3.4m sq ft into the micro-market in 2019. 17 2. Includes HITEC City and Madhapur.
Operational review The V, Hyderabad18
Quality tenants Tenant statistics Top 10 tenants (in alphabetical order) Top 5 sub-tenants of Arshiya (in alphabetical order) 1 Applied Materials 1 DHL Logistics 2 Arshiya1 2 Huawei Telecommunications 3 Bank of America 3 Rolex Logistics (CISCO) 4 Cognizant 4 UPL 5 Mu Sigma 5 ZTE Corporation 6 Renault Nissan 7 Societe Generale 8 Tata Consultancy Services 9 Technicolor 10 The Bank of New York Mellon All information as at 30 June 2019. 1. The Trust is in a master lease agreement with Arshiya Limited (“Vendor”) for the Arshiya warehouses. Rents paid by subtenants of the Vendor are deposited into an escrow account controlled by the Trust. Hence, this allows for the Trust to be paid first before all other expenses. 19
Diversified tenant base Tenant country of origin & company structure by base rental 59% US companies 86% multinational companies UK Others Singapore 2% 3% Japan 2% India Co 2% USA 14% France 59% 8% Country of Company India 24% origin structure MNC 86% All information as at 30 June 2019. 20
Diversified tenant base Tenant statistics Diversified tenant industry Retail F&B Oil & Gas 343 tenants Telco Others 2% 2% 1% 1% IT, Software & Application 3% Development and Service Support Healthcare & Pharma 49% 3% 125,500 park employees Automobile 6% Largest tenant accounts for Electronics, 7% of total base rent Semiconductor & Engineering 7% Top 10 tenants accounts for Design, Gaming 33% of total base rent and Media 7% Logistics 7% Banking & Financial Services 12% All information as at 30 June 2019. 21
Healthy portfolio occupancy Committed portfolio occupancy: 99% 99% 100% 100% 100% 98% 100% 98% 97% 97% 97% 98% 95% 94% 93% 88% ITPB ITPC CyberVale aVance CyberPearl The V aVance Arshiya 1 Hyderabad Pune a-iTrust occupancy Market occupancy of peripheral area2 All information as at 30 June 2019. 1. There are no comparable warehouses in the micro-market that the Arshiya warehouses are located in. 2. CBRE market report as at 30 June 2019. 22
Transacted versus effective rents1 Bangalore Chennai Hyderabad2 Pune 35% 31% 30% 25% 20% 15% 13% 10% 10% 8% 5% 5% 5% 0% ITPB ITPC CyberVale CyberPearl The V aVance, Pune All information as at 30 June 2019. 1. Difference in average transacted rents by a-iTrust over the past 12 months against effective rents at the respective properties. 2. There were no comparable transactions for aVance, Hyderabad in the past 12 months. 23
Spread-out lease expiry profile Weighted average lease term: Weighted average lease expiry: 6.7 years 4.3 years Sq ft expiring 46% 6,000,000 5,000,000 4,000,000 3,000,000 20% 16% 15% 2,000,000 1,000,000 3% - FY2019 FY2020 FY2021 FY2022 FY2023 & beyond All information as at 30 June 2019. 24 Note: Retention rate for the period 1 July 2018 to 30 June 2019 was 73%. This excludes leases in The V which are affected by the redevelopment of Auriga building.
Capital management International Tech Park, Chennai25
Capital management Currency hedging strategy Funding strategy Balance sheet • The Trustee-Manager’s approach to equity raising is predicated on maintaining a strong • Trustee-Manager does not hedge equity. balance sheet by keeping the Trust’s gearing • At least 50% of debt must be denominated in ratio at an appropriate level. INR. • Trustee-Manager does not borrow INR loans onshore in India as it costs less to hedge SGD borrowings to INR-denominated borrowings Income using cross-currency swaps and derivatives. • Income is repatriated semi-annually from India to Singapore. Income distribution policy • Trustee-Manager locks in the income to be • To distribute at least 90% of its income available repatriated by buying forward contracts on a for distribution. monthly basis. • a-iTrust retains 10% of its income available for distribution to provide greater flexibility in growing the Trust. 26
Debt maturity profile Hedging ratio Effective borrowings: S$779 million INR: 67% SGD: 33% S$ Million 243.3 214.8 145.7 165.3 1.0 125.2 171.6 48.2 79.2 96.5 49.9 78.0 46.0 49.9 43.3 FY2019 FY2020 FY2021 FY2022 FY2023 SGD Denominated debt INR Denominated debt Deferred consideration1 Information as at 30 June 2019. 1. Deferred consideration refers to the remaining purchase consideration pertaining to the acquisition of aVance, Pune. 27
Capital structure Indicator As at 30 June 2019 Interest service coverage 3.7 times (EBITDA/Interest expenses) (YTD FY2019) Percentage of fixed rate debt 84% Percentage of unsecured borrowings 100% Gearing: 33% Effective weighted average cost of debt1 6.2% Gearing limit 45% Available debt headroom S$510 million 1. Based on borrowing ratio of 67% in INR and 33% in SGD as at 30 June 2019. 28
Growth strategy International Tech Park Chennai
Steady track record Portfolio growth Total developments: Total acquisitions: 5.0 million sq ft 4.8 million sq ft Floor area (million square feet) 13.1 12.8 12.61 0.5 1.2 11.1 0.4 Floor area 9.0 1.5 0.6 8.1 1.0 7.5 0.6 6.9 6.9 12% CAGR 0.4 0.6 6.0 0.5 12.6 12.6 4.8 4.8 1.2 11.1 4.7 0.1 9.2 3.6 1.1 7.5 8.1 6.9 6.9 6.0 4.7 4.8 4.8 3.6 3.6 IPO Mar-08 Mar-09 Mar-10 Mar-11 Mar-12 Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18 Mar-19 Jun-19 Portfolio Development Acquisition 1. Reduction in floor area due to the demolition of Auriga building (0.2m sq ft) in The V as part of the redevelopment. 30
Clear growth strategy • 2.7m sq ft1 in Bangalore Development pipeline • 3.5m sq ft in Hyderabad • 0.4m sq ft in Chennai • 2.3m sq ft from CapitaLand Sponsor • Ascendas India Growth Programme assets Growth strategy • 3.0m sq ft aVance, Hyderabad 3rd party • 5.2m sq ft aVance Business Hub 2 acquisitions • 2.9m sq ft AURUM IT SEZ • 1.8m sq ft BlueRidge 3 • 2.8m sq ft Arshiya warehouses Logistics • Ascendas-Firstspace platform 1. Includes buildings under construction and additional development potential due to the widening of the road in front of International Tech Park Bangalore. 31 Excludes Anchor building, a 0.5 million sq ft multi-tenanted building, which was completed in May 2019.
Development: ITPB pipeline Future development potential International Tech Park Bangalore • Development potential of 2.7 million sq ft1. • Anchor building (0.5 million sq ft) recently completed in May 2019. • Construction of MTB 5 (0.7 million sq ft) has commenced. Anchor Park Square (New building) (Mall) Taj Vivanta (Hotel) Victor (Multi-tenanted Special Economic Zone2 building) Aviator (Multi-tenanted building) MTB 5 Voyager (Multi-tenanted building) (Under construction) 1. Includes buildings under construction and additional development potential due to the widening of the road in front of International Tech Park Bangalore. 2. Red line marks border of SEZ area. 32
Development: Anchor, Bangalore Artist’s impression Floor area 0.52m sq ft Property International Tech Park Bangalore Construction status Completed in May 2019 Leasing status 100% leased to a leading IT Services company 33
Development: MTB 5, Bangalore Artist’s impression Floor area 0.68m sq ft Property International Tech Park Bangalore • Construction has commenced and excavation is in progress Construction status • Completion expected by 2H 2020 Leasing status 100% pre-leased to a leading IT Services company 34
Development: The V redevelopment Existing Master Plan (1.5m sq ft1) Proposed Master Plan (5.0m sq ft) MLCP BLOCK E Capella Vega BLOCK D Atria Atria Phase I Phase I BLOCK C BLOCK B Orion BLOCK A Auditorium Auriga Mariner Key Highlights Redevelopment to increase the development potential, rejuvenate the existing park, and leverage strong demand in Hyderabad: • Net increase of 3.5m sq ft of leasable area • Development planned in multiple phases over next 7 to 10 years • Construction for Phase I has commenced and excavation is in progress 1. Excludes the leasable area of Auriga building (0.2m sq ft) which has been demolished. 35
Development: The V redevelopment – Phase I Artist’s impression Floor area 1.36m sq ft Property The V redevelopment – Phase I • Construction has commenced and excavation is in progress Development status • Completion expected by 2H 2021 36
Sponsor: Assets in India Sponsor presence1 International Tech Park, Pune • Three phases comprising 1.9 million sq ft completed • Final phase of 0.4 million sq ft under development Gurgaon Pune Chennai Private fund managed by sponsor • Ascendas India Growth Programme 1. Excludes a-iTrust properties. 37
3rd party: Acquisition criteria for commercial space • Target cities: • Bangalore • Chennai • Hyderabad • Pune • Mumbai • Delhi • Gurgaon • Investment criteria: • Location • Tenancy profile • Design • Clean land title and land tenure • Rental and capital growth prospects • Opportunity to add value 38
3rd party: aVance, Hyderabad Acquisition details (5) Property details Investment details Owned by a-iTrust • aVance 1 – 4 with total floor area of 1.5 million sq ft. Construction funding • Total construction funding towards aVance 5 & 6: Up to ₹8.9 bn (S$177m1). (6) • Till date, ₹7.9 bn (S$158m1) already disbursed. • aVance 6 was completed in December 2017. aVance 5 is expected to complete in 1Q 2020. Location HITEC City, Hyderabad Forward purchase agreement Site area 25.7 acres/10.4 ha • Total consideration not expected to exceed ₹13.5 bn2 (S$270m1). Floor area 1.50m sq ft Forward purchase of (5) & (6) 1.80m sq ft ROFR on (7), (8), (9) & (10) 1.16m sq ft 1. Based on exchange rate of S$1 to INR 50.04. 2. Dependent on the leasing commitment at the time of acquisition. 39
3rd party: aVance Business Hub 2, Hyderabad Acquisition details Property details Investment details – aVance A1 & A2 Construction funding • Total construction funding towards aVance A1 & A2: Up to ₹8.0 bn (S$158m1). • Construction completion expected by 2H 2021. • Till date, ₹0.5 bn (S$10m1) already disbursed. Forward purchase agreement • Total consideration not expected to exceed ₹14.0 bn2 (S$278m1). Location HITEC City, Hyderabad Site area 14.4 acres/5.8 ha Forward purchase of (A1) & (A2) 1.85m sq ft Proposed acquisition3 of (A3) to (A5) 3.32m sq ft 1. Based on exchange rate of S$1 to INR 50.44. 2. Dependent on the leasing commitment at the time of acquisition. 3. Master Agreement executed for proposed acquisition of Vendor assets. 40
3rd party: AURUM IT SEZ, Navi Mumbai Acquisition details Property details Investment details Construction funding • ₹5.0 bn (S$100m1). • Till date, ₹4.0 bn (S$79m1) already disbursed. Forward purchase agreement • Total consideration not expected to exceed ₹9.3 bn2 (S$186m1). Buildings 1 & 2 (0.6m & 0.8m sq ft) Artist’s impression • Building 1: Occupancy Certificate received; Building 2: Expected completion 1H 2020. Location AURUM IT SEZ, Navi Mumbai Strategic location Site area 16.06 acres/6.50 ha • Marks entry into Navi Mumbai, an important market for large MNCs. Forward purchase of (1) & (2) 1.40m sq ft • Located next to Thane-Belapur Expressway; close ROFR on (3) & (4) 1.50m sq ft proximity to the Ghansoli train station. 1. Based on exchange rate of S$1 to INR 50.04. 2. Dependent on the leasing commitment at the time of acquisition. 41
3rd party: BlueRidge 3, Pune Acquisition details Property details Investment details – Phase 1 & Phase 2 Loan re-financing and balance land funding • Up to ₹0.6 bn (S$12m1). Construction funding • Total construction funding towards Phase 1 & 2: Up to ₹5.6 bn (S$110m1). Forward purchase agreement • Total consideration not expected to exceed ₹9.8 bn2 (S$194m1). Phase 1 & 2 (1.4m & 0.4m sq ft) Location Hinjawadi Phase 1, Pune • Phase 1: Expected completion 1H 2021; Phase 2: Site area 10.45 acres/4.23 ha Expected completion 2H 2023. Forward purchase of (1) & (2) 1.84m sq ft 1. Based on exchange rate of S$1 to INR 50.48. 2. Dependent on the leasing commitment at the time of acquisition. 42
Logistics: Key demand drivers 1 Rise of • Rapid progress under ‘Make in India’ campaign to raise sector’s share from 13-17% to 25% of GDP manufacturing (e.g FDI increase in defence and railways; new plants announced by MNCs like Apple, Hitachi, sector Foxconn) 2 Retail & • Warehousing requirements of the “E-tail” segment set to double from 14 million in 2016 to 29 E-Commerce million in 2020 boom 3 GST • GST has been introduced since July 1, 2017 and is expected to lead to the simplification of the implementation tax regime, leading to a more efficient supply chain 4 Trend towards • Trend towards modern logistics and manufacturing facilities for speed and efficiency quality • Sectors such as manufacturing, retail and e-commerce demand for modern warehouses Source: Euromonitor, BCG, Goldman Sachs, Various Govt. ministries, Knight Frank and JLL Research 43
Logistics: Growing demand for warehousing space Leased space in 1H2019 up 31% y.o.y Pre - GST Post - GST Million sq ft 16 14 12 10 8 6 4 2 0 1H 2H 1H 2H 1H 2H 1H 2H 1H 2015 2016 2017 2018 2019 Half-year Half-year average : average: ~4.5 million sq ft ~ 190% ~13 million sq ft Source: CBRE 44
Logistics: CapitaLand partnership with Firstspace Realty Sponsor initiative • The Ascendas-Firstspace platform is a joint venture between CapitaLand and Firstspace Realty. • Aims to deliver state-of-the-art logistics and industrial facilities across major warehousing and manufacturing hubs in India. • Targets to develop close to 15 million sq ft of space over the next five to six years. • Provides a-iTrust with a potential pipeline of quality warehouses in the future. 45
Logistics: Arshiya warehouses, Mumbai Acquisition details – 6 operating warehouses Property details Investment details 6 operating warehouses (0.83m sq ft) • Acquired in February 2018. • Upfront payment of ₹4.3 bn (S$91m2) and deferred consideration of up to ₹1.0 bn (S$21m2) to be paid over the next 4 years. • Till date, ₹0.3 bn (S$6m2) deferred consideration already paid • Operating lease arrangement with vendor to lease- back the warehouses for 6 years. Location Panvel, near Mumbai Forward purchase agreement Site area ~143 acres/57.75 ha • Additional future development potential of at least Floor area 0.83m sq ft 2.80m sq ft1. • Right to provide co-financing of construction loan. Forward purchase At least 2.80m sq ft1 • Exclusive right to acquire all future warehouses. 1. Includes a 7th warehouse under construction (0.33 million sq ft). 2. Based on an exchange rate of S$1 to INR 47.50. 46
Logistics: Arshiya warehouses, Mumbai Acquisition details – additional warehouse Property details Investment details Additional warehouse (0.33m sq ft) • In July 2019, a-iTrust has exercised its right under the forward purchase agreement to extend construction funding and finalise the acquisition terms for an additional warehouse. Construction funding • Total construction funding: up to ₹0.7 bn (S$14 m2). Acquisition • Total consideration not expected to exceed ₹2.2 bn Location Panvel, near Mumbai (S$42 m2). Site area ~143 acres/57.75 ha Master lease structure Floor area 0.33m sq ft • Operating lease arrangement with a subsidiary Forward purchase At least 2.80m sq ft1 company of the vendor to lease-back the warehouse for 6 years. 1. Includes a 7th warehouse under construction (0.3 million sq ft). 2. Based on an exchange rate of S$1 to INR 51.0. 47
Outlook International Tech Park Bangalore
Growth based on committed pipeline Floor area (million square feet) 22.3 0.3 1.8 1.9 1.8 1.4 1.4 13.1 0.7 Floor area 71% 13.1 Jun-19 Growth pipeline Portfolio MTB 5 V redevelopment - Phase I AURUM IT SEZ aVance 5 & 6 aVance A1 & A2 BlueRidge 3 - Phase 1 & 2 Arshiya 49
Growth Pipeline ITPB The V aVance, Hyderabad aVance Business Hub 2 AURUM IT SEZ BlueRidge 3 Arshiya TOTAL MTB 5 Phase I aVance 5 aVance 6 aVance A1 aVance A2 Building 1 Building 2 Phase 1 Phase 2 7th warehouse Floor area 0.68 1.36 1.16 0.64 0.86 0.99 0.60 0.80 1.41 0.43 0.33 9.26 (mil sq ft) Time of Completion 2H 2H 1Q Dec 2H 2H OC2 1H 1H 2H 2H N.A. 2020 2021 2020 2017 2021 2021 received 2020 2021 2023 2020 Total consideration1 N.A. N.A. ₹13.5b ₹14.0b ₹9.3b ₹9.8b ₹2.1b3 ₹48.7b (S$270m) (S$278m) (S$186m) (S$194m) (S$42m) (S$970m) Amount disbursed1 N.A. N.A. ₹7.9b ₹0.5b ₹4.0b - - ₹12.4b (S$158m) (S$10m) (S$79m) (S$247m) Remaining N.A. N.A. ₹5.6b ₹13.5b ₹5.3b ₹9.8b ₹2.1b ₹36.3b commitment1 (S$112m) (S$268m) (S$107m) (S$194m) (S$42m) (S$723m) 1. Based on exchange rate at the time of investment/announcement. 2. Refers to occupancy certificate. 3. Net consideration after deduction of security deposit is ₹2.0 billion (S$40 million1). 50
Tan Choon Siang Chief Financial Officer Ascendas Property Fund Trustee Pte Ltd (Trustee-Manager of a-iTrust) Office: +65 6774 1033 Email: choonsiang.tan@a-iTrust.com Website: www.a-iTrust.com
Appendix Glossary Trust properties : Total assets. Derivative financial : Includes cross currency swaps (entered to hedge SGD borrowings into INR), interest rate swaps, options and instruments forward foreign exchange contracts. DPU : Distribution per unit. EBITDA : Earnings before interest expense, tax, depreciation & amortisation (excluding gains/losses from foreign exchange translation and mark-to-market revaluation from settlement of loans). Effective borrowings : Calculated by adding/(deducting) derivative financial instruments liabilities/(assets) to/from gross borrowings, including deferred consideration. Gearing : Ratio of effective borrowings to the value of Trust properties. ITES : Information Technology Enabled Services. INR or ₹ : Indian rupees. SEZ : Special Economic Zone. SGD or S$ : Singapore dollars. Super Built-up Area or SBA : Sum of the floor area enclosed within the walls, the area occupied by the walls, and the common areas such as the lobbies, lift shafts, toilets and staircases of that property, and in respect of which rent is payable. 52
Average currency exchange rate Average exchange rates used to translate a-iTrust’s INR income statement to SGD 1 Singapore Dollar buys Apr May Jun Indian Rupee 2019 51.0 51.0 51.7 2018 49.8 50.5 50.3 SGD appreciation/(depreciation) 2.4% 1.0% 2.8% 1 Singapore Dollar buys 1Q Indian Rupee FY2019 51.2 FY18/19 50.2 SGD appreciation/ 2.0% (depreciation) Note: These rates represent the average exchange rates between Indian Rupee & Singapore Dollar for the respective periods. 53
Balance sheet As at 30 June 2019 INR SGD Total assets ₹120.97 billion S$2,354 million Total borrowings ₹40.42 billion S$787 million Deferred consideration1 ₹0.05 billion S$1 million Derivative financial instruments (₹0.44 billion) (S$9 million) Effective borrowings2 ₹40.03 billion S$779 million Construction funding (AURUM IT SEZ) ₹3.96 billion S$77 million Construction funding (aVance 5 & 6) ₹7.90 billion S$154 million Construction funding (aVance A1 & A2) ₹0.49 billion S$10 million Net asset value ₹50.68 per unit S$0.99 per unit Adjusted net asset value3 ₹65.36 per unit S$1.27 per unit 1. Deferred consideration refers to the remaining purchase consideration on the acquisition of aVance, Pune. 2. Calculated by adding/(deducting) derivative financial instruments liabilities/(assets) to/from gross borrowings, including deferred consideration. 3. Excludes deferred income tax liabilities of ₹15.3 billion (S$298 million) on capital gains due to fair value revaluation of investment properties. 54
World-class IT and logistics parks City Bangalore Chennai Hyderabad Pune Mumbai • Intl Tech Park • Intl Tech Park • The V • aVance, Pune • Arshiya warehouses Property Bangalore Chennai • CyberPearl • CyberVale • aVance, Hyderabad Type IT Park IT Park IT Park IT Park Warehouse 68.5 acres 33.2 acres 51.2 acres1 5.4 acres 143.1 acres1 Site area 27.9 ha 13.5 ha 20.5 ha1 2.2 ha 57.8 ha1 Completed floor 4.5m sq ft2 2.8m sq ft 3.4m sq ft2 1.5m sq ft 0.8m sq ft area Number of 11 6 11 3 6 buildings Park population 48,600 34,700 30,000 12,200 - Land bank (development 2.7m sq ft3 0.4m sq ft 3.5m sq ft4 - - potential) 1. Includes land not held by a-iTrust. 2. Only includes floor area owned by a-iTrust. Excludes the leasable area of Auriga building (0.2m sq ft) in The V, which has been demolished. Includes a 0.5 million sq ft multi-tenanted building in Bangalore which was completed in May 2019. 3. Includes buildings under construction and additional development potential due to the widening of the road in front of International Tech Park Bangalore. Excludes a 0.5 million sq ft multi- tenanted building in Bangalore which was subsequently completed in May 2019. 4. Includes buildings under construction. 55
Lease expiry profile FY2023 City FY2019 FY2020 FY2021 FY2022 Total & Beyond Bangalore 127,600 451,400 1,194,700 634,500 2,030,000 4,438,200 Chennai 109,000 892,000 865,500 554,100 402,000 2,822,600 Hyderabad 186,500 533,100 542,700 753,500 1,285,600 3,301,400 Pune 0 0 0 64,100 1,402,800 1,466,900 Mumbai 0 0 0 0 832,200 832,200 Total 423,100 1,876,500 2,602,900 2,006,200 5,952,600 12,861,300 56
a-iTrust unit price versus major indices (Indexed) Indicator 175 a-iTrust Trading yield FTSE STI Index 6.0%1 (as at 30 Jun 2019) 150 FTSE ST REIT Index Average daily trading 1,165,700 units Bombay SE Realty Index volume (1Q FY2019) 125 INR/SGD FX rate a-iTrust 100 FTSE STI Index FTSE ST REIT Index 75 50 INRSGD FX Rate Bombay 25 SE Realty Index 0 IPO Dec 07 Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 Jun 13 Dec 13 Jun 14 Dec 14 Jun 15 Dec 15 Jun 16 Dec 16 Jun 17 Dec 17 Jun 18 Dec 18 Jun 19 Source: Bloomberg 1. Trading yield based on annualised 1Q FY2019 DPU of 8.20 cents at closing price of S$1.36 per unit as at 30 June 2019. 57
Structure of Ascendas India Trust Unitholders Holding of units Distributions Trustee’s fee & management fees Ascendas Property Fund Trustee Pte. Ltd. a-iTrust (the Trustee-Manager), a wholly owned subsidiary of Acts on behalf of unitholders/ CapitaLand Dividends, principal management services 100% ownership & shareholder’s loan repayment of shareholder’s loan Singapore SPVs 1. Ascendas Property Fund (India) Pte. Ltd. 2. Ascendas Property Fund (FDI) Pte. Ltd. Ownership of ordinary shares; Subscription to Fully & Compulsory Convertible Debentures (“FCCD”) and Dividends on ordinary shares, proceeds from share buyback Non-Convertible Debentures (“NCD”) & interest on FCCD and NCD Singapore The VCUs India • Ascendas Panvel FTWZ • Information Technology Park Limited (92.8% ownership)2 Limited1 (100.0% ownership) • Ascendas Information Technology Park Chennai Ltd. (89.0% ownership)2 • Cyber Pearl Information Technology Park Private Limited (100.0% ownership) • VITP Private Limited (100.0% ownership) • Hyderabad Infratech Private Limited (100.0% ownership) • Avance-Atlas Infratech Private Limited (100.0% ownership) • Deccan Real Ventures Private Limited (100.0% ownership) Ownership Master rental income Ownership Net property income The Properties Provides property • Arshiya warehouses • ITPB • The V management services Ascendas Services • ITPC • aVance, Hyderabad (India) Private Limited • CV • aVance, Pune (the property manager) • CP Property management fees 1. Entered into a master lease agreement with Arshiya Limited (“AL”) to lease back the warehouses to AL for a period of six years. AL will operate and manage the warehouses and pay pre- agreed rentals. 2. Karnataka State Government owns 7.2% of ITPB & Tamil Nadu State Government owns 11.0% of ITPC. 58
You can also read