REQUEST FOR QUOTES NOTICE

                 Concrete apron and entrance

                     Arrowhead Tra nsit
                     206 Eagle Dr. South
                    Sandstone, MN. 55072

Release Date: August 6,2020
quotes Due: August 31, 2020
Estimated Project Start: September 7, 2020

It is the vendor's responsibility to reod the entire document ond to
comply with oll of the requirements listed herein.
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
1. Introduction
     Arrowhead Economic Opportunity Agency (AEOA) is a private non-profit organization that
     supports programs for low income families. Arrowhead Transit it one of these support
     programs. Arrowhead Transit has an office in Sandstone MN among other areas in 8 counties
     across Northern Minnesota. The Sandstone Office is located at206 Eagle Dr. South which
     has an office and bus storage for Arrowhead Transit. There are numerous people utilizing
     this building daily.

2.   Background
     Arrowhead Transit building in Sandstone, MN has a dirt entrance to the parking lot.
     Arrowhead Transit is looking for qualified contractors to fix low spots at the entrance of the
     parking lot and lay concrete at this area. As well as extending the existing apron at the
     garage.

3.   Scope of Work
     This project will consist of extending the concrete apron and adding concrete to the opening
     of the driveway with 1,231 tons of concrete. As well as adding 940 tons of Class 5 to even
     low spots in these areas.

4.   Requirements
     The contractor bid must include:

               o   A proposed layout of the parking lot with dimensions and materials that will be
                   used.
               o   A plan for improving the drainage and water run     off
               o   A plan to prevent future erosion of parking area.
               o   A payment schedule for the project.
               o   A timeline of the entire project.
               o   Proof of insurance.
               o   Budget

     The contractor must take into consideration that Arrowhead Transit employees will need
     access to the building throughout the project. As employees park behind the building and
     buses move in and out of the garage throughout the day, driving areas must be provided.

5. Compliance
     All quotes submitted will be evaluated using the following criteria:

         1. Compliance with the RFQ
        2. Understanding of the project
        3. Services to be provided
        4. Ability to complete the work within the time specified
        5. Qualifications of the vendor, including but not limited to their experience and
        personnel assigned to the project
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
5- Cost

This Request for Quotes (RFQ) is an invitation by Arrowhead Transit for vendors to submit          a

quote, which may be subject to subsequent discussion. lt is not a request for competitive
bid. Submittal of a quote does not create any right or expectation to a Contract with
ARROWHEAD TRANSIT. ARROWHEAD TRANSIT reserves the right to reject any or all quotes
and the agency further declares that it will incur no financial obligations for any costs by any
company in preparation of their quote.

   A.    Ddto Prdctices - All quotes and any information provided in response to this RFQ
         shall become the property of ARROWHEAD TRANSIT. Pursuant to Minn. Stat. 5
         13.591, subdivision 3(b), once a contract has been awarded as a result of this RFQ
         quotes will be available for viewing and/or reproduction (at requestor's
         expense). As a result, quotes should not include any information the consultant
         might regard as confidential or proprietary. Any statement of confidentiality made
         with regard to a quote cannot be honored.

    B. Addenda to the        - lf it becomes necessary to revise any part of this RFO,
                            RFQ
         addenda will be supplied to all vendors receiving this Request for Quote.

    C.   Presentotions - Any vendor who submits a quote may be required to make an on-
         site presentation of its capability to perform as described in its quote to the Transit
         Manager. Such a presentation will be at the vendor's expense and will provide an
         opportunity for the vendor to clarify its quote to ensure a thorough mutual
         u   nderstanding of its content.

    D.   News Releoses - News releases pertaining to this project shall not be made without
         prior written approval by the Transit Manager.

    E.   Consultants lndependence -f he successful vendorwill beconsideredan
         independent contractor with respect to all services performed.

    F.   Price Changes - All prices shall be firm and not subject to increase

    G. Compliance with Lows -Vendor        shall comply with all federal, state, and local laws,
         ordinances and regulations applicable to the work. Vendor, at its own expense, shall
         secure all occupational and professional licenses and permits from public or private
         sources necessary for the fulfillment of its obligations in the quote.

    H. Modificotion or Withdrawal oI Quotes      - Responses to this Request for Quote (RFQ)
         may be modified or withdrawn by written notice prior to the exact hour as specified
         for receipt of quotes. A quote may be withdrawn in person by the vendor or its
         authorized representative prior to the exact hour and date set for receipt of quote.
         Telephone withdrawals are not permitted.
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
Mistoke in Quote - lf the apparent best qualified vendor discovers a mistake in its
     quote of a serious and significant nature which is unfavorable to it prior to the
     issuance of a purchase order or a Contract, it may request consideration be given to
     modifying or withdrawing the quotes. The mistake must be evident and provable.
     ARROWHEAD TRANSIT reserves the right to reject any and all requests for correction
     or withdrawal of quote received after the hour and date shown in the specifications.
     ln all cases, the decision of the ARROWHEAD TRANSIT Executive Board is final.

J.   Reservotion o/ Rights - ARROWHEAD TRANSIT reserves the right to:

     1.   Accept or reject any and all quotes received in response to this RFQ for any or no
          reason, and to re-advertise for new submittals.

     2.   Waive or modify any irregularities in quotes received after prior notification to
          the consultant.

     3.   Request the submission of quote modifications at any time before the award is
          made, if such request is in the best interest of the agency.

     4.   Consider quotes or modifications received at any time before the award is made,
          if such is in the best interest of the agency.

     5.   Request clarification and/or additional information from the consultant during
          the evaluation process. Said clarification or additional information shall be
          provided within two working days and shall be provided in writing.

     6.   Utilize any and all ideas submitted in the quotes received unless those ideas are
          covered by legal patent or proprietary rights and the patent of those rights is
          indicated by the consultant. Quotes will become the property of ARROWHEAD
          TRANSIT.

K.   Expiration ol the Quote - By submitting a quote the consultant offers to enter into a
     Contract, the form and content of which shall be agreed upon by both parties. The
     consultant's quote shall not be revocable for ninety (90) days following the response
     deadline indicated above. ARROWHEAD TRANSIT reserves the right to waive any
     defects in the offer of any consultant, to reject any or all offers, and to request
     additional information from any or all consultants.

L.   Terminotion Clouse-ARROWHEAD TRANSIT shall have the right to terminate the
     Contract at any time, upon 30 days written notice to the consultant, whenever the
     agency determines that the performance of the vendor is unsatisfactory or for cause
     of the convenience of the agency
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
M. Prevoiling Wages-For purpose of construction or rehabilitation of a facility project
          funded by the Grant Agreement, Recipient agrees to comply with the applicable
           prevailing wage rate requirements in Minnesota Statute, Sections 177.4L and 777.43
           and the rates as set by the Department of Labor and lndustry.

6. Project Deliverables
       Contractors will have the opportunity to meet with the Transit Manager to conduct a
       walk-through of the property and ask questions prior to submitting quotes. Contractors
       may include quotes for several materials that meet project requirements such as
       concrete, crushed rock or asphalt. Once a contractor is selected a meeting will be held
       to finalize plans and the contractual agreement. The AEOA project team and contractor
       will determine the completion of the project during a final walk-through once the
       contractor feels they have met all the requirements.

7.   Project Timeline
       Quote Calendar

       Request for quote issued by August 6,2020
       Due date for quote August 37,2020
       ARROWHEAD TRANSIT accepts selected quote August 37,2020
       Selected vendor notified September 4,2020
       Completion date of entire project (no later than) September 7,2020

8.   Project Budget
       Budget line items will be broken down by project components such as:
          o Add Class 5 to even low spots in driveway before laying concrete.
          o Extending the concrete apron by the garage to 37 feet
          o Adding concrete at the beginning of the driveway from road to pavement in
             parking lot.

Submittal of Request for Quotes forms and any additional documents is to be sent to

                                       Arrowhead Transit
                                      Attn: Melinda Nelson
                                     4995 Miller Trunk Hwy
                                    Melinda.Nelson@aeoa.org
                                    Hermantown, MN 5581I

The deadline for RFQ submittals is by 4:00 PM August3l,2020.
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
REQUEST FOR QUOTATION
                                          THIS RFQ   tr   IS   tr   IS NOT A SMALL BUSINESS SET-ASIDE                               PAGE OF           PAGES
      (THrS rS NOT AN ORDER)
1. REQUEST NO         2. DATE ISSUED                           3.   REQUISITION/PURCHASE REQUEST NO

                      August 6,2020
4a. ISSUED BY: AEOA/Arrowhead Transit                                                                6. DELIVER BY (Date): August 31.,2020
4b. FOR INFORMATION CALL: Melinda Nelson                                                             7.   DELIVERY

                                                            TELEPHONE NUMBER
                                                                                                          f]   FOB DESTINATION
NAME
Arrowhead Transit                                    AREA CODE                       NUMBER               tr OTHER       (See#10)
                                                     218                            735-6851
5.   TO                                                                                              8.   DESTINATION Arrowhead Transit

      a.    NAME                                 b.   COMPANY                                        a. NAME OF CONSIGNEE
      b.    Bidding Manager
                                                                                                     b.   STREET ADDRESS        206 Eagle Drive

c.   STREET ADDRESS                                                                                  c.   CITY Sandstone

d.   CITY                                                       e.    STATE            f   .ZIP      d.   STATE MN                   e.ZlP 55O72

                                                 IMPORTANT: This is a request for information and quotations furnished are not offers. lf you
9.   PLEASE FURNISH QUOTATIONS TO THE
                                                 are unable to quote, please indicate on this form and return it to the address in Block 4a. This
ISSUING OFFICE IN BLOCK 4A ON OR
                                                 request does not constitute a commitment to pay any costs incurred in the preparation of the
BEFORE CLOSE OF BUSINESS ON
                                                 submission of this quotation or to contract for supplies or service. Supplies are of domestic
(Date) :August 31-,2O2O                          origin unless otherwise indicated by quoter. Any representation and/or certifications attached
                                                 to this Request for Quotation must be completed bV ttrcgyqlqt
                                   10. SCHEDULE (lnclude                  a    olicable Federal, State and local taxes)
ITEM NO                 SU PPLI ES/SERVICES                          QUANTITY                 UNIT               UNIT PRICE                       AMOUNT
      (a)                       (b)                                           (c)              (d)                   (e)                            (f)

                                   a. 10 CALENDAR DAYS              b. 20 CALENDAR DAYS (%)               c. 30 CALENDAR DAYS          d. CALENDAR   DAYS
11. DISCOUNT FOR                                                                                          (%l                          NUMBER
                                   t%t
 PROMPT PAYMENT                                                                                                                                                o/
                                                                                                                                                               /o

NOTE: Additional provision sand     representations            E    are               E    are not attached
            12. NAME AND ADDRESS    OF QUOTER                       13.   SIGNATURE OR PERSON AUTHORIZED TO SIGN                     14.   DATE OF QUOTATION
                                                                    QUOTATION
a. NAME OF QUOTER

                                                                                                                   15. SIGNER
b.   STREET ADDRESS
                                                                    a. NAME (Type or Print)                                                  b.   TELEPHONE

c.   COUNTY                                                                                                                          AREA CODE

d. crrY                            e. STATE      f   ,ZIP           c.    TITE (Type or Print)                                       NUMBER
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
AEOA                                                                                                               AEOA
SANDSTONE MN
                                                          ,_   PROPERTY LINE

                                 I
                                          Ir 3gq                                                                     e{rt!ru
                                                                                                                     Mlctt.t   J.   LFc
                                                                                                                     rar45dtu&ld

                                                                                                t)
       br                             \        NEW BITUMINOUS
                                                                                                st
                                                                                        r
                                                                                                                         4l
                                               PAVING
                                                                  \
                         SLOPE
                         Ttr.tn?
                                                                                                                         EE!
        L_
                                                                                                                         ;EI
             "--ffi---
                   o.
                   IP                                                                                                    HEE
                    .t

                                      \        NEW BITUMINOUS
                                               PAVING
                                                                  \
                                                                                                 .+
                                                                                                                         ff!
                                                                                                                       E#3ffid
                                               \*     nppnoxvnrE     EDGE oF EXrsnNG
                                                    ... PARKINS AREA.& NEVY EDGE OF .
                                                                                                                       ffi*
                                                                                                                      --6t-
                                                                                                                       KO.                DATE

                                               'u       BITUMINOUS PAVING

SITE PLAN                            A                                                      NEW BITUMINOUS PAVING:
                                                                                            66,1000 sQ. FT.
                                                                                                                           A4
ffi"                                 sL*
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
AEOA                                                                                                                AEOA
SANDSTONE, MN
                                                                      PROPERTY LINE

                                                     360'__

            t-                                                                                                        Ellw
                                                                                                                      Mlchtt J. lrF.
                                                                                                                      rarostul&ld

       -o                                                                                        b
                                                                                                 s
       st

                                                                                                                             Z
                                                       NEW BITUMINOUS
                                                       PAVING

                                                                                                                             'da
                              SLOPE
                                                                                                                             <
                                                                                                                             rtH3il
                              ila' t Fr.   '                                                                                 o=
                                                                                                                             U3
                                                                                                                             Oq1
            L__
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
MINNESOTA DEPARTMENT OF LABOR AND I}IDUSTRY PREVAILING WAGES FOR STATE FUNDED CONSTRUCTION PROJECTS

                                    \T7
                                     v    rrns    NoTICE MUsr BE posrED oN TIIE JoBSITE IN A coNsPICUous PLACE

Construction Type : Commercial

County Number:    5E

County Name: PINE

Effective: 2Ol9-12-16

This project is covered by Minnesota prevailing wage statutes. Wage rates listed below are the minimum hourly rates to be paid on this project.

All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall   be paid at a rate of one and one half ( 1 1/2) times the basic hourly rate.

Violations should be reported to:

Department of Labor and Industry
Prevailing Wage Section
443 Lafayette Road N
St Paul, MN 55155
(651) 284-509r
DLI.PrevWase @ state.mn.us

* Indicates that adjacent county rates were   used for the labor class listed.

County: PINE (58)

    LABOR CODEAIID CLASS                                                                       EFtr'ECTDATE BASICRATE FRINGERATE TOTALRATE

    LABORERS (101 .1r2) (SPECIAL CRAFTS 701 - 730)

    101                                         LABORER, COMMON (GENERAL                       20t9-t2-16                        26.52                 19.29             45.81
                                                LABORWORK)

    toz                                         LABORER, SKILLED (ASSISTING                    2019-12-t6                        26.52                 t9.29             45.E1
                                                SKILLED CRAFT JOURNEYMAN)

    103*                                        LABORER, LANDSCAPING                           2019-12-t6                        24.OO                 16.96             40.96
                                                (GARDENER, SOD LAYER AND
                                                NT,IRSERY OPERATOR)

    104*                                        FLAG PERSON                                     2019-12-16                       26.52                 19.29             45.E1

    105*                                        WATCH PERSON                                   2019-12-t6                        24.1'7                t9.29             43.46

    lffi                                        BLASTER                                        FOR RATE CALL 65I-284-509I OR EMAIL
                                                                                               DLI.PREVWAGE @ STATE.MN.US

    107                                                                                         2019-12-16                       34.28                20.27              54.55

1
Arrowhead Tra nsit 206 Eagle Dr. South Sandstone, MN. 55072 - Arrowhead Transit
LABOR CODEAND CLASS                                             EFFECTDATE BASICRATE FRtr{GERATE TOTALRATE
                               PIPELAYER (WATER, SEWER AND
                               GAS)

108                            TUNNELMINER                      FOR RATE CALL 65I.284.5091 OR   EMAIL
                                                                DLI.PREVWAGE@ STATE.MN.US

109*                           UNDERGROUND AND OPEN DITCH       2019-12-t6              32.48           20.27   52.7s
                               LABORER (EIGHT FEET BELOW
                               STARTING GRADE LEVEL)

I   l0x                        SURVEY FIELD TECHMCIAN           2019-12-16              24.14           t6.92   41.06
                               (OPERATE TOTAL STATION, GPS
                               RECEIVER, LEVEL, ROD OR RANGE
                               POLES, STEEL TAPE
                               MEASUREMENT; MARK AND
                               DRryE STAKES; HAND OR POWER
                               DIGGINGFORAND
                               IDENTIFICATION OF MARKERS OR
                               MONUMENTS; PERFORM AND
                               CffiCK CALCULATIONS ; REVIEW
                               AND TJNDERSTAND
                               CONSTRUCTION PLANS AND LAND
                               SURVEY MATERIAIS). THIS
                               CLASSIFICATION DOES NOT APPLY
                               TO THE WORK PERFORMED ON A
                               PREVAILING WAGE PROJECT BY A
                               LAND SURVEYOR WHO IS
                               LICENSED PURSUANTTO
                               MINNESOTA STATUTES, SECTIONS
                               326.02TO326.15.

111                            TRAFFIC CONTROLPERSON            FOR RATE CALL 651.284-509I OR EMAIL
                               (TEMPORARY SIGNAGE)              DLI.PREVWAGE@ STATE.MN.US

SPECTAL EQLmMENT (201 - 204)

zol*                           ARTICULATED HATJLER              20t9-12-16              16.O4           20.30   56.34

202                            BOOM TRUCK                       2019-12-16              32.39           11.74   44.13

203*                           LANDSCAPING EQUIPMENT,           2019-12-t6              24.N            16.96   40.96
                               INCLUDES HYDRO SEEDER OR
                               MI,JLC}IER, SOD ROLLER, FARM
                               TRACTOR WTTH ATTACHMENT
                               SPECIFICALLY SEEDING, SODDING,
                               OR PLANT, AND TWO-FRAMED
                               FORKLIFT (EXCLIJDING FRONT,
                               POSIT-TRACK, AND SKID STEER
                               LOADERS), NO EARTHWORK OR
                               GRADING FOR ELEVATIONS

204*                           OFF-ROAD TRUCK                   201.9-12-t6             40.08           20.55   60.63

                                                                2020-05-01              40.93           21.70   62.63

2
LABORCODEAND CLASS                                               EFIECTDATE BASICRATE FRINGERATE TOTALRATE

205                        PAVEMENT MARKING OR                   FOR RATE CALL 65 1-284.509I OR EMAIL
                           MARKING REMOVAL EQIIIPMENT            DLI.PREVWAGE@ STATE.MN.US
                           (oNEORTWOPERSON
                           OPERATORS); SELF-PROPELLED
                           TRUCK OR TRAILER MOI'NTED
                           UNITS-

IIIGHWAY/HEAVY POWER EQUIPMENT OPERATOR

GROI,JP   2'i                                                    2019-12-16              30.00          6.76   36.76

306                        GRADER OR MOTOR PATROL

308                        TUGBOAT    1OO   H.P. AND OVER WHEN LICENSE REQI]IRED (HIGHWAY AND HEAVY ONLY)

GR.OTJP 3   *                                                    2019-12-16              2'1.45         6.76   34.21

309                        ASPHALT BITI,JMINOUS STABILZER PLANT

310                        CABLEWAY

312                        DERRTCK (GUY OR STIFFLEGXPOWERXSKIDS OR STATIONARY) (HIGHWAY AND HEAVY ONLY)

tt4                        DREDGE OR ENGINEERS, DREDGE (POWER) ANDENGINEER

316                        LOCOMOTryE CRANE OPERATOR

320                        TANDEM SCRAPER

322                        TUGBOAT    IOO H.P   AND OVER (HICTIWAY AND HEAVY ONLY)

GROUP 4     *                                                    2019-12-16              23.55          6;16   30.31

323                        AIR TRACK ROCK DRILL

t24                        AUTOMATIC ROAD MACHINE (CMI OR SIMILAR) (HIGHWAY AND I{EAVY ONLY)

325                        BACKFILLER OPERATOR

327                        BITUMINOUS ROLLERS, RI.JBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER)

328                        BITI.IMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLT]DING PAVERS, MACRO SURFACING
                           AND MICRO SURFACING, OR SIMILAR TYPES (OPERATOR AND SCREED PERSON)

329                        BROKK OR R.T.C. REMOTECONTROL OR SIMILARTYPEWITHALL ATIACHMENTS

330                        CAT CHALLENGER TRACTORS OR SIMILAR TYPES PI,]LLING ROCK WAGONS, BULLDOZERS AND
                           SCRAPERS

331                        CHIP HARVESTER AND TREE CUTTER

332                        CONCRETE DISTRIBUTOR AND SPREADER FIMSHING MACHINE, LONGITUDINAL FLOAT, JOINT
                           MACHINE, AND SPRAY MACHINE

334                        CONCRETEMOBIL (HIGHWAY AND HEAVY ONLY)

335                        CRUSHING PLANT (GRAVEL AND STONE) ORGRAVEL WASHING, CRUSHINGAND SCREENING PLANT

336                        CI,JRB MACHINE

137                        DIRECTIONAL BORING MACHINE

338                        DOPE MACHINE (PIPELINE)

340                        DUALTRACTOR

3
LABORCODEAND CLASS                                       EFIECTDATE BASICRATE FRINGERATE TOTALRATE

341                  ELEVATING GRADER

345                  GPS REMOTE OPERATING   OFEQUIPMENT

347                  TTTDRAI'LIC TREE PLANTER

348                  LAUNCI{ER PERSON (TANKER PERSON OR PILOT LICENSE)

349                  LOCOMOTTVE (HIGHWAY AND HEAVY ONLY)

350                  MILLING, GRINDING, PLANNING, FINE GRADE, OR TRIMMER MACHINE

352                  PAVEMENTBREAKER OR TAMPING MACHINE (POWERDRIVET9 MIGHTY MITE OR SIMILAR TYPE

354                  PIPELINE WRAPPING, CLEANING OR BENDING MACHINE

356                  POWER ACTUATED HORZONTAL BORING MACHINB, OVER SIx INCHES

357                  PUGMILL

359                  RI.JBBER.TIRED FARM TRACTOR   wTru BACKHOE INCLUDING ATTACHMENTS (HIGTIWAY AND IIEAVY
                     ONLY)

360                  SCRAPER

361                  SELF.PROPELLED SOIL STABILIZER

362                  SLIP FORM (POWER DRTVEN) (PAVING)

363                  TIETAMPER AND BALLAST MACHINE

365                  TRACTOR, WHEELTYPE, OVER 50 H.P. WTn{ PTOTJNRELATED TO LANDSCAPING (HIGHWAY AND
                     tmAvYoNLY)
36'7                 TUB GRINDER, MORBARK, OR SMILAR TYPE

GROI,JP 5   *                                            2019-12-16           21.90         6.76        28.66

370                  BTfl.IMINOUS ROIIER (I,JNDER EIGHT TONS)

3'71                 CONCRETE SAW (MIJLTIPLE BLADE) (POWER OPERATED)

372                  FORM TRENCH DIGGER (POWER)

375                  FTYDRAI,JLIC LOG SPLITTER

376                  LOADER (BARBER GREENE OR SIMILAR TYPE)

3't7                 POST HOLE DRIVING MACHINE/POST HOLE AUGER

3'.19                POWER ACTUATED IACK

3El                  SELT-PROPELLED CHIP SPREADER (FLAHERTY OR SIMILAR)

382                  SI{EEP FOOT COMPACTOR WTIH BLADE . 2OO H.P. AND OVER

383                  SHOI'LDERING MACHINE (POWER) APSCO OR SIMILAR TYPE INCLIJDING SELF.PROPELLED SAND AND
                     CHIPSPREADER

384                  STI]MP CHIPPER AND TREE CHIPPER

385                  TREE FARMER (MACHINE)

GROIP6*                                                  2019-t2-16           23.65         6.76         30.41

387                  CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER

389                  DREDGEDECKHAND

391                  GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING)

393                  LEVERPERSON

395                  POWERSWEEPER

4
LABOR CODE AIID CLASS                                               EFFECTDATE BASICRATE FRINGERATE TOTALRATE

396                       STIEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS

397                       TRACTOR, WHEEL TYPE, OVER 50 H,P,, UNRELATED TO LANDSCAPING

COMMERCIAL POWER EQUIPMENT OPERATOR

GROUP 1 *                                                           2019-12-16       43.59         20.55         @.t4

                                                                    2020-05-01       44.44         2r.70         66.r4

501                       HELICOPIER PILOT (COMMERCTAL CONSTRUCTION ONLY)

502                       TOWER CRANE 250 FEETAND OVER (COMMERCIALCONSTRUCTION ONLY)

503                       TRUCK CRAWLER CRANE WTrH 200 FEET OF BOOM AND OVER, INCLLIDING JIB (COMVmRCIAL
                          CONSTRUCTION ONLY)

GROT]P 2                                                            2ot9-t2-16        43.25        20.55         63.80

                                                                    2020-05-01        44.10        21.70         65.80

504                       CONCRETE PUMP WTTH 50 METERS/I64 FEET OF BOOM AND OVER (COMMERCIAL CONSTRUCTION
                          ONLY)

505                       PILEDRIVING WHEN THREE DRT]MS IN USE (COMMERCIALCONSTRUCTION ONLY)

506                       TOWER CRANE   2OO   FEETAND OVER (COMMERCIAL CONSTRUCTION ONLY)

507                       TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING     2OO   FEET,
                          INCLUDING JIB (COMMERCIAL CONSTRUC"TION ONLY)

GROUP 3    *                                                        2019-12-16       41.84         20.55         62.39

                                                                    2020-05-01       42.69         2r.70         64.39

508                       ALL.TERRAIN VEHICLE CRANES (COMMERCIAL CONSTRUCTION ONLY)

509                       CONCRETE PTJMP 32.49 METERS/I02.I64 FEET (COMMERCIAL CONSTRUCTION ONLY)

510                       DERRICK (GUY & STIFFLEG) (COMMERCIAL CONSTRUCTION ONLY)

5ll                       STATIONARY TOWER CRANE UP TO        2OO   FEET

512                       SELF-ERECTING TOWER CRANE     IOO   FEET AND OVER MEASURED FROM BOOM FOOT PIN (COMMERCIAL
                          CONSTRUCTION ONLY)

513                       TRAVELING TOWER CRANE (COMMERCIAL CONSTRUCTION ONLY)

514                       TRUCK OR CRAWLER CRANE IJP TO AND NOT INCLUDING 150 FEET OF BOOM, INCLI,JDING JIB
                          (COMMERCIAL CONSTRUCTION ONLY)

GROUP 4                                                             2019-12-16        37.95        19.45         57.40

5r5                       CRAWLER BACKHOE INCLUDING AT'TACHMENTS (COMMERCIAL CONSTRUCTION ONLY)

516                       FIREPERSON, CHIEF BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY)

517                       HOIST ENGINEER (THREE DRUMS OR MORE) (COMMERCIAL CONSTRUCTION ONLY)

518                       LOCOMOTTVE (COMMERCIAL CONSTRUCTION ONLY)

519                       OVERHEAD CRANE ( INSIDE BTJILDING PERIME'TER) (COMMERCIAL CONSTRUCTION ONLY)

520                       TRACTOR. BOOM TYPE (COMMERCIAL CONSTRUCTION ONLY)

5
LABOR CODE AIID CLASS                                                    EFFECTDATE BASICRATE FRINGERATE TOTALRATE
GROTJP 5   *                                                             2019-12-16              40.08         2055            60.63

                                                                         2020-05-01              40.93         21.70           62.63

521                     AIR COMPRESSOR 450 CFM OR OVER (TWO OR MORE MACHINES) (COMMERCIAL CONSTRUCTION ONLY)

522                     CONCRETE MXER (COMMERCIAL CONSTRUCTION ONLY)

523                     CONCRETE PUMP UP TO 3I METERS/1ol FEET OF BOOM

524                     DRILL RIGS, TIEAVY ROTARY OR CHURN OR CABLE DRILL WHEN USED FOR CAISSON FOR ELEVATOR
                        OR BUILDING CONSTRUCTION (COMMERCIAL CONSTRUCTION ONLY)

525                     FORKLIFT (COMMERCIAL CONSTRUCTION ONLY)

526                     FRONT END, SKID STEER I C YD AND OVER

527                     HOIST ENGINEER ( ONE OR TWO DRUMS) (COMMERCIAL CONSTRUCTION ONLY)

528                     MECHAMC-WELDER (ON POWER EQTIIPMENT) (COMMERCIAL CONSTRUCTION ONLY)

529                     POWER PLANT (100 KW AND OVER OR MLJLTIPLFJ EQUAL TO l00KW AND OVER) (COMMERCIAL
                        CONSTRUCTION ONLY)

530                     PIJMP OPERATOR AND/OR CONVEYOR (TWO OR MORE MACHINES) (COMMERCIAL CONSTRUCTION
                        ONLY)

531                     SELF-ERECTING TOWER CRANE UNDER                  IOO   FEET MEASIJRED FROM BOOM FOOT PIN (COMMERCIAL
                        CONSTRUCTION ONLY)

532                     STRADDLE CARRIER (COMMERCIAL CONSTRUCTION ONLY)

533                     TRACTOR OVER D2 (COMMERCIAL CONSTRUCTION ONLY)

534                     WELL POINT PUMP (COMMERCI,AL CONSTRUCTION ONLY)

GROUP 6    *                                                             2019-12-16              26.05          6.76           32.81

535                     CONCRETE BATCH PLANT (COMMERCIAL CONSTRUCTION ONLY)

536                     FIREPERSON, FIRST CI.A,SS BOILER LICENSE (COMMERCIAL CONSTRUCTION ONLY)

537                     FRONT END, SKID STEER      TJP   TO   I   C YD

538                     GUNTTE MACHINE (COMNiIERCIAL CONSTRUCTION ONLY)

539                     TRACTOR OPERATOR D2 OR SI]VIJLAI{ SITF (COMMERCIAL CONSTRUCTION ONLY)

540                     TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER

GROUP 7                                                                  2019-12-16              37.45         20.5s           58.00

                                                                         2020-05-01              38.30         21.70           60.00

541                     AIR COMPRESSOR 600 CFM OR OVER (COMMERCIAL CONSTRUCTION ONLY)

542                     BRAKEPERSON (COMMERCIAL CONSTRUCTION ONLY)

543                     CONCRETE PIJMP/PI]MPCRETE OR COMPLACO TYPE (COMMERCIAL CONSTRUCTION ONLY)

544                     FIREPERSON, TEMPORARY HEAT SECOND CLASS BOILER LICENSE (COMMERCIAL CONSTRUCTION
                        ot{LY)
545                     OILER (POWER SHOVEL, CRANE, TRUCKCRANE, DRAGLINE, CRUSIMRS AND MILLING MACHINES, OR
                        OTI{ER SMILAR POWER EQI.IIPMENT) (COMMERCIAL CONSTRUCTION ONLY)

546                     PICK   I,JP   SWEEPER (ONE CUBIC YARD HOPPER CAPACTTD (COMMERCIAL CONSTRUCTION ONLY)

547                     PI.'MP AND/OR CONVEYOR (COMMERCIAL CONSTRUCTION ONLY)

GROUP 8    *                                                             2019-12-16              15.44         20.s5           55.99

                                                                         2020-05-01              36.29         21.70           57.99

6
LABOR CODEAIID CLASS                                       EFFECTDATE BASICRATE FRINGERATE TOTALRATE

548                    ELEVATOR OPERATOR (COMMERCIAL CONSTRUCTION ONLY)

549                    GREASER (COMMERCIAL CONSTRUCTION ONLY)

550                    MECHANICAL SPACEMATER (TEMPORARYI{EATNO BOILERLICENSEREQI,NRED) (COMMERCIAL
                       CONSTRUCTION ONLY)

TRUCK DRIVERS

GROUP   I*                                                 20t9-12-16             23.65    6.76         30.41

601                    MECHAMC.WELDER

602                    TRACTOR TRAILER DRTVER

603                    TRUCKDRIVER (HAIJLING MACHINERYINCLI.]DING OPERATION OFHAND AND POWER OPERATED
                       WINCHES)

GR.OUP2     *                                              2019-12-16             19.90     6.76        26.66

604                    FOUR OR MORE AXLE I]NIT, STRAIGTIT BODY TRUCK

GROI,]P 3   *                                              2019-12-16             22.35     6.76        29.11

605                    BITUMINOUS DISTRIBUTOR DRTVER

606                    BTTUMINOUS DISTRIBUTOR (ONE PERSON OPERATION)

607                    THREEAXLEUMTS

GROI,]P4    *                                              2019-12-16             22.40     5.65        28.05

608                    BITI.JMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER)

609                    DUMP PERSON

610                    GREASER

611                    PILOT CAR DRIVER

6t2                    RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS

613                    TWOA)(LEI.JNIT
614                    SLT'RRY OPERATOR

615                    TANKTRUCK TIELPER (GAS, OIL, ROAD OIL, AND WATER)

616                    TRACTOR OPERATOR, I,'NDER 50 H.P.

SPECIAL CRAFTS

701                    HEATING AND FROST   INSULATORS      2019.12.16             42.31    19.55        61.86

7024                   BOILERMAKERS                        20t9-t2-t6             38.33    21 .43       65;16

703                    BRICKLAYERS                         20t9-12-t6             34;71    26.92        61.63

                                                           2020-05-ot             3't.21   26.92        64.13

7
LABOR CODE AND CLASS                                EFFECT DATE   BASIC RATE       FRINGE RATE     TOTALRATE

704                    CARPENTERS                   20t9-t2-t6          38.   l8          22.55          60.73

                                                    2020-05-01          q.23              22.55         62.78

705*                   CARPET LAYERS (LINOLEUM)     20t9-t2-16          38.84             20.29         59.1 3

                                                    2020-05-01          40.89             20.29         61.18

706*                   CEMENT MASONS                20t9-12-t6          39.81             20.42          60.23

                                                    2020-05-01          4l.81             20.42          62.23

707                    ELECTRICIANS                 2019-t2-16          38.44             27.12          65.56

                                                    2020-05-31          40.04             2'1.84         67.88

708*                   ELEVATOR CONSTRUCTORS        2019-12-16          49.9r             39.24          89.15

                                                    2020-01-01          5   1.55          40.48          92.03

709                    GLAZIERS                     20t9-12-16          42.19             t9.64          61.83

                                                    2020-06-ot          44.24             19.64          63.88

710+                   LATHERS                      2019-12-16          38.   l8          22.55          60;13

                                                    2020-05-01          40.23             22.55          62.78

7t2                    IRONWORKERS                  2019-12-16          33.   l9          29.40          62.59

                                                    2020-05-01          35.29             29.40          &.69

7   14*                MILLWRIGHT                   20t9-t2-16          35.73             26.43          62.t6

                                                    2020-05-01          3'1.83            26.43          &.26

715                    PAINTERS (INCLI]DING HAND    20t9-12-16          37.20             22.76          59.96
                       BRUSHED, HAND SPRAYED, AND
                       THE TAPING OF PAVEMENT
                       MARKINGS)

                                                    2020-05-01          39.20             22.76          61.96

716*                   PILEDRIVER (INCLI'DING       2019-t2-16          38.91             22.08          60.99
                       VIBRATORY DRTVER OR
                       EXTRACTOR FOR PILING AND
                       SHEETING OPERATIONS)

717*                   PIPEFITTERS . STEAMFITTERS   20t9-12-16          41.o2             22.03          63.05

718*                   PLASTERERS                   20t9-12-16          38.96              19.45         58.41

8
LABOR CODE AI{D CLASS                              EFFECTDATE    BASIC RATE    FRINGE RATE    TOTAL RATE

719                     PLUMBERS                   2019-12-16          41.O2          22.03         63.05

720                     ROOFER                     20t9-t2-16          34.15          17.94         52.O9

                                                   2020-0'7-0t         35.55          t7.94         53.49

721                     SHEET METAL WORKERS        20t9-12-16          44.46          29.17         73.63

722*                    SPRINKLER FITTERS          2019-t2-t6          38.19          21.O4         59.83

723                     TERRAZZOWORKERS            2019-t2-16          40.53          19.83         60.36

'724                    TILE SETTERS               2019-12-16          27.44          24;79         52.23

725*                    TILEFINISHERS              20t9-12-16          29.45          20.33          49.78

726                     DRYWALLTAPER               20t9-12-16          35.40          23.44         58.84

                                                   2020-05-04          37.40          23.44         60.84

7n                      WIRING SYSTEM TECHNICIAN   2019-12-16          40.t7          17.63         s7.80

                                                   2020-07-ot          41.42          17.61         59.05

728                     WIRING SYSTEMS INSTALLER   20t9-t2-16          28.t4          14.71         42.85

                                                   2020-07-0r          29.02          14.71          43.73

729*                    ASBESTOSABATEMENTWORKER    2019-12-16          32.68          19.66          52.34

730*                    SIGN ERECTOR               2019-12-16          29.78          15.59          45.37

I
RFQ Protest Procedures

a   Protest Procedures
    This section sets fonh the exclusive protest remedies available with respect to this RFQ.
    Each Proposer, by submitting its Proposal, expressly recognizes the limitation on its
    rights to protest contained herein. These provisions are included in this RFQ expressly in
    consideration for such waiver and agreement by the Proposers. Such waiver and
    agreement by each Proposer are also consideration to each other Proposer for making the
    same waiver and agreement. If a Proposer disregards, disputes or does not follow the
    exclusive protest remedies set forth in this RFQ, it shall indemniff, defend, protect and
    hold harmless Arrowhead Transit, its officers, officials, employees, agents,
    representatives and consultants from and against all liabilities, expenses, costs (including
    attorneys' fees and costs), fees and damages incurred or suffered as a result. The
    submission of a Proposal by a Proposer shall be deemed the Proposer's irrevocable and
    unconditional agreement with such indemnification obligation.
a   Protests Reeardine Facially Apparent D                  in RFO and Selection Procedures
    The Proposer may protest the terms of this RFQ or selection procedures prior to the time
    for submission of Proposals on the grounds that (a) a material provision in this RFQ or
    selection process is ambiguous, (b) any aspect of the procurement process described
    herein is contrary to legal requirements applicable to this procurement, or (c) this RFQ in
    whole or in part exceeds the authority of Arrowhead Transit. Protests regarding this RFQ
    and selection procedures shall be filed only after the Proposer has informally discussed
    the nature and basis of the protest with Arrowhead Transit Assistant Director Joe Gentile
    in an effort to remove the grounds for protest. Protests regarding this RFQ shall
    completely and succinctly state the grounds for protest and shall include all factual and
    legal documentation in sufficient detail to establish the merits of the protest. Evidentiary
    statements, if any, shall be submitted under penalty of perjury. Protests regarding this
    RFQ shall be filed as soon as the basis for protest is known to the Proposer, but in any
    event it must be actually received no later than ten calendar days before the Proposal due
    date, provided that protests regarding an addendum to this RFQ shall be filed and actually
    received no later than five calendar days after the addendum to this RFQ is issued (or no
    later than the Proposal due date, if earlier).
    Protests regarding this RFQ shall be filed in writing by hand delivery or courier to the
    Protest Official with a copy to Arrowhead Transit Assistant Director Joe Gentile. The
    "Protest Official" is:
                  Chief Procurement Officer Betsy Hayes or her designee
                              Department of Administration
                               1 12 Administration Building

                                   50 Sherbume Avenue
                                    St. Paul, MN 55155

    Arrowhead Transit will distribute copies of the protest to the other Proposers and may,
    but need not, request other Proposers to submit statements or arguments regarding the
protest and may, in its sole discretion, discuss the protest with the protesting Proposer. If
    other Proposers are requested to submit statements or arguments, they may file a
    statement in support of or in opposition to the protest within seven calendar days of the
    request. Arrowhead Transit may also file a written statement with the Protest Official.

    No hearing will be held on the protest. The Protest Official or designee will review the
    facts and arguments presented in the written submissions and will decide the protest on
    the basis of the written submissions and any clarifications or additional information from
    Arrowhead Transit, the Proposers, or other resources as may be required. The Protest
    Offrcial will consider whether Arrowhead Transit's position (a) is reasonable, (b) is in
    compliance with the Minnesota CMGC statute, Minn. Stat. $161 .3207 et. seq. and (c)
    meets applicable legal standards. The Protest Official will recommend to Arrowhead
    Transit Assistant Director Joe Gentile whether any changes or addenda to the RFQ and
    procurement process are warranted. The Protest Official's recommendation will be in
    writing and will state the reasons for the decision. Arrowhead Transit will furnish copies
    of the decision in writing to each Proposer. The Commissioner will issue Arrowhead
    Transit's final decision within ten calendar days of receiving the recommendation and
    include written reasons for the decision (or incorporate those of the Protest Official). The
    decision shall be final and conclusive. If necessary, to address the issues raised in the
    protest, Arrowhead Transit will make appropriate revisions to this RFQ by issuing
    addenda. Arrowhead Transit may extend the proposal due date, if necessary, to address
    any protest issues.

    The failure of a Proposer to raise a ground for a protest regarding this RFQ within the
    applicable period shall constitute an unconditional waiver of the right to protest the terms
    of this RFQ and shall preclude consideration of that ground in any protest of qualification
    of a Proposer unless such ground was not and could not have been known to the Proposer
    in time to protest prior to the final date for such protests.

a   Protests Reearding Responsive
    A Proposer may protest the results of the responsiveness evaluation by filing a written
    notice of protest by hand delivery or courier to the Protest Official with a copy to
    Arrowhead Transit's Assistant Director Joe Gentile. The notice of protest shall
    specifically state the grounds of the protest.
    Notice of protest of any decision to accept or disqualifu a Proposal on responsiveness
    grounds must be filed within five calendar days after the earliest of notification of non-
    responsiveness, or the public announcement. Within seven calendar days of the notice of
    protest, the protesting Proposer must file with the Protest Official, with a copy to
    Arrowhead Transit's Assistant Director Joe Gentile, a detailed statement of the grounds,
    legal authorities and facts, including all documents and evidentiary statements, in support
    of the protest. Evidentiary statements, if any, shall be submitted under penalty of perjury.
    Failure to file a notice of protest or a detailed statement within the applicable period shall
    constitute an unconditional waiver of the right to protest the evaluation process and
    decisions thereunder, other than any protest based on facts not reasonably ascertainable
    as   ofsuch date.
Arrowhead Transit may, at its option, file a written response to the Protest with the
    Protest Official, with a copy to the Proposer and any Proposers who have filed statements
    with the Protest Offrcials. Arrowhead Transit will respond within l4 calendar days upon
    receipt of the protesting proposer's detailed statement of protest.
    The Protest Official will consider whether the Committee's decision (a) is reasonable; (b)
    is in compliance with the Minnesota CMGC statute, Minn. Stat. $161 .3207 et. seq. (c)
    meets applicable legal standards. The Protest Official will review the facts and arguments
    presented in the written submissions of the protesting firm, and the written submission of
    Arrowhead Transit, if any. The Protest Official may also seek clarifications and
    information from Arrowhead Transit, Proposers or other resources as may be required.
    The Protest Official will recommend, within 14 calendar days after Arrowhead Transit's
    response, that the Arrowhead Transit Assistant Director, acting through the Committee,
    either (l) affirm the Committee's original decision; or, depending on the nature of the
    protest, (2) reinstate a firm disqualified on responsiveness grounds. If Arrowhead Transit
    does not submit a written response, the Protest Official will make a recommendation
    within 2l calendar days upon the receipt of the detailed statement of protest. The Protest
    Official's recommendation will be in writing and include the reasons for the decision.
    The Assistant Director will issue MnDOT's final decision within ten calendar days of
    receiving the recommendation and include written reasons for the decision (or
    incorporate those of the Protest Official). The Assistant Director will deliver the written
    decision to the protesting Proposer and copies to the other Proposers.
    If the Protest Official or designee concludes that the Proposer filing the protest has
    established a basis for protest, the Protest Official or designee will determine what
    remedial steps, if any, are necessary or appropriate to address the issues raised in the
    protest. Such steps may include, without limitation, withdrawing or revising the
    decisions, issuing a new request for Proposal or taking other appropriate actions.

a   Protests Regarding Determination or Award of P/T Services Contract
    A Proposer may protest any determination by Arrowhead Transit regarding the award of
    the P/T Services contract made by Arrowhead Transit by filing a written notice of protest
    by hand delivery or courier to the Protest Official with a copy to Arrowhead Transit's
    Assistant Director Joe Gentile. The protest shall specifically state the grounds of the
    protest.

    Protest shall be filed no later than five calendar days after notification from Arrowhead
    Transit of the results of our evaluation. The Proposer shall file the protest to the Protest
    Official, with a copy to Arrowhead Transit Assistant Director Joe Gentile. The protest
    shall include a detailed statement of the grounds, legal authorities, and facts, including all
    documents and evidentiary statements, in support of the protest. Evidentiary statements,
    if any, shall be supported by affidavit based on personal knowledge except where stated
    to be based on information and belief.
    Failure to file a protest within the applicable period shall constitute an unconditional
    waiver of the right to protest the applicable evaluation process and decisions thereunder,
    other than any protest based on facts not reasonably ascertainable as ofsuch date.
Arrowhead Transit may, at its option, file a written response to the protest with the
    Protest Official. The Protest Official will only consider, based on a preponderance of the
    evidence, whether Arrowhead Transit's determination of award is arbitrary, capricious, or
    contrary to law. The Protest Official will recommend, within l5 calendar days after the
    Protest Official receives the protest or Arrowhead Transit's response (if applicable), that
    the Commissioner either affirm Arrowhead Transit's original determination or
    recommend remedial steps, if appropriate, to address the issues raised in the protest. Such
    steps may include, without limitation, withdrawing or revising the determination, issuing
    a new Request for Proposal, or taking other appropriate actions. The Protest Official may
    also request extensions to the 15 calendar days. Extension will only be granted if both
    Arrowhead Transit and the protesting Proposer agree to such request. The Protest
    Official's recommendation will be in writing and will include the reasons for the
    decision. The Protest Official will furnish copies of the recommendation to the
    Commissioner of Transportation and the Protestor. The Assistant Director will issue
    Arrowhead Transit's final decision within 10 calendar days of receiving the
    recommendation and include written reasons for the decision (or incorporate those of the
    Protest Official). The Assistant Director will deliver the written decision to the protesting
    Proposer and copies to the other Proposers. The decision shall be final and conclusive
    and not subject to legal challenge unless arbitrary.

    Arrowhead Transit will not execute the Contract until at least seven calendar days after
    the results of the CMGC evaluations are posted on MnDOT's CMGC website. This
    timeline may be waived if all Proposers agree to such waiver.
o   Costs and Damages
    All costs of a protest shall be the responsibility of the protestor and undertaken at the
    protestor's expense. In addition, if the protest is denied, the Proposer filing the protest
    may be liable for Arrowhead Transit's costs reasonably incurred in defending against the
    protest, including legal and consultant fees and costs, and any unavoidable damages
    sustained by Arrowhead Transit as a consequence of the protest. Arrowhead Transit shall
    not be liable for damages to the Proposer filing the protest or to any participant in the
    protest, on any basis, express or implied.
lnsurance
11.1    Certilicote oI tnsurdnce.' For the term of the Grant Agreement Recipient will obtain the
        insurance required under clause 11 for the term of this Grant Agreement. Within 30
        days of expiration of an insurance policy, Recipient will provide State with evidence
        that a new policy has been obtained. Recipient will notify State immediately upon   a

        change in the terms or conditions of an insurance policy.
11.2    Types oI lnsurunce Required
         77.2.! Wo*efs    Compensotion lnsuronce: Recipient will provide workers' compensation
                insurance for all Recipient's employees and, in case any work to be performed by
                a third party contractor, Recipient will require the third party contractor to
                provide workers' compensation insurance in accordance with the statutory
                requirements under Chapter 176 ofthe state of Minnesota.
         71.2.2 Commerciol General Liobility lnsuronce: Recipient is required to maintain
                insurance protecting them from claims for damages for bodily in.lury, including
                sickness or disease, death and for care and loss of services as well as from claims
                 for property damage, including loss of use which may arise from operations under
                 the Grant Agreement whether the operations are by Recipient or by a
                 subcontractor or by anyone directly or indirectly employed under this Grant
                 Agreement.

                 For Recipients that are governmental entities, the   tort liability amounts provided in
                 Minnesota Statutes, Section 455.04 govern. All other Recipients must have minimum
                 insurance coverage of S2,000,000 per occurrence.

                 The following coverages will be included:
                     .   Premises and Operations Bodily lnjury and Property Damage
                     .   Personal and Advertising lnjury
                     .   Blanket Contractual Liability
                     .   Products and Completed Operations Liability
                     .   State of Minnesota named as an Additional lnsured

        77.2.3 Commercidl Automobile Liabirity; Recipient is required to maintain insurance
        protecting them from claims for damages for bodily injury, death, and for care and loss of
        services, as well as from claims for property damage including loss of use which may arise
        from operations under this Grant Agreement whether such operations were by Recipient
        or by a subcontractor or by anyone directly or indirectly employed under this Grant
        Agreement.
For RECIPIENTS that are governmental entities, the      tort liability amounts provided in
        Minnesota Statutes, Section 466.04 govern. All other      RECIPIENTS   must have minimum
        insurance coverage of S2,000,000.00 combined single limit.
 ln addition, the following coverages should be included:

                      o   Owned, Hired, and Non-owned Automobile
         LL.?.4   Excess lnsuronce: An Umbrella or Excess Liability insurance policy may be
                  used to supplement Contractor's policy limits to satisfy the full policy limits
                  required by this GrantAgreement.
         17.2.5 Roting:
        RECIPIENT  will obtain insurance policies from an insurance company having an "AM
        BEST" rating of A- (minus); Financial Size category (FSc) Vll or better and must be
        authorized to do business in the State of Minnesota or RECIPIENT will obtain coverage
        comparable under a program of self-insurance.

lL.3 Set-ln sured Requi re ments:

         lf RECIPIENT is self-insured the following is required:
                       . RECIPIENT is able to provide for the tort liability amounts provided in
                   M innesota Statutes, section 466.04.
lL.4 Buildels Risk:
         For purpose of construction or rehabilitation of a facility funded by this Grant
         Agreement Recipient or Recipient's contractor shall be responsible for providing and
         maintaining "All Risk" or equivalent Builder's Risk policy insuring the interest of Owner,
         Contractor, and any tier of Subcontractor. Coverage on all "All Risk" or equivalent basis
         shall include the perils of flood, earthquake and pollution cleanup expense. Builder's Risk
         limit of liability shall be equal to the amount of the contract. Any deductible shall
         be the sole responsibly of the Contractor.
PROPOSAL EVALUATION CRITERIA

     The Evaluation Committee willmake a recommendationto award to the , based upon the
     Evaluation Committees' determination of the responsible Offer or whose quotation is most
     advantageous to (Recipient). lt is anticipated that the evaluation and selection will be completed by

     Thefollowing-items makruptheevaluation criteria (andtheir respective weights)- Which
     (Recipient) Evaluation Committee will use in evaluating proposals submifted in response to this
     RFQ.

                                 Evaluation Criteria                                  Weight
                                                                                    Percentage
      Project Understanding                                                             25o/o

      Work Plan/ Detailed Deliverables                                                  15o/o
                                                                                        10o/o
      Background and Experience of Company
      Background and Experience of Personnel                                            10o/o

      Quality Management Plan                                                           10o/o

      Cost Detail                                                                       30%

     Quotations will be evaluated on a "best value" basis with 70% qualifications and 30% cost considerations

Notification to Unsuccessful Proposals

     Unsuccessful Proposers shallbe notilied of (Recipient) Evaluation Committee's
     recommendation of award tothe successful Proposer within five (5) working days of said
     recommendation.
NON-COLLUSION DECLARATION

The following Non-Collusion Declaration shall be executed by the bidder:

Operation Of

State Of Minnesota

County Of

t,                                                                 do state under penalty
            (name of person signing this declaration)

of perjury under 28 U.S.C. 1746 of the laws of the United States

(1)    that I am the authorized representative of

                (name of person, partnership, or corporation submitting this proposal)

and that I have the authority to make this declaration for and on behalf of said bidder;

(2)    that, in connection with this proposal, the said bidder has not either directly or indirectly

entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free

competitive bidding;

(3)    that, to the best of my knowledge and belief, the contents of this proposal have not been

communicated by the bidder or by any of his/her employees or agents to any person who is not an

employee or agent of the bidder or of the surety on any bond furnished with the proposal and will not be

communicated to any person who is not an employee or agent of the bidder or of said surety prior to

the official opening of the proposal, and

(41     that I have fully informed myself regarding the accuracy of the statements made in this

declaration.

                                  Signed
                                                (bidder or his authorized representative)

                                  Dated:
oRGANIZATIONAL CONFLTCT OF TNTEREST (SPECTFTCATION PREPARATION)

(a) This contract, in whole or in part, provides for the Contractor to draft and/or furnish specifications
    in support of Sandstone Garaqe Parkinq Lot Repair lContracting officer identify system or
    programl. Further, this contract may task the Contractor to prepare or assist in preparing work
    statements that directly, predictably and without delay are used in future competitive acquisitions
    in support of Sandstone Garaqe Parkinq Lot Repair lContracting officer identify programl. The
    parties recognize that by the Contractor providing this support a potential conflict of interest arises
    as defined by FAR 9.505-2.

(b) During the term of this contract and for a peri od of Ninety (90)      lContracting officer i n sert period
    of time after contract completion that contractor will not be allowed to supply timel after completion
    of this contract, the Contractor agrees that it will not supply as a prime contractor, subcontractor at
    any tier, or consultant to a supplier to the Department of Commerce, any product, item or major
    component of an item or product, which was the subject of the specifications and/or work
    statements furnished under this contract. The contractor shall, within 15 days after the effective
    date of this contract, provide, in writing, to the Contracting Officer, a representation that all
    employees, agents and subcontractors involved in the performance of this contract have been
    informed of the provisions of this clause. Any subcontractor that performs any work relative to this
    contract shall be subject to this clause. The Contractor agrees to place in each subcontract
    affected by these provisions the necessary language contained in this clause.

(c) For the purposes of this clause, the term "contractor" means the contractor, its subsidiaries and
    affiliates, joint ventures involving the contractor, and entity with which the contractor may hereafter
    merge or affiliate and any other successor or assignee of the contractor.

(d) The Contractor acknowledges the full force and effect of this clause. lt agrees to be bound by its
    terms and conditions and understands that violation of this clause may, in the judgment of the
    Contracting Officer, be cause for Termination for Default under FAR 52.249-6. The Contractor
    also acknowledges that this does not represent the sole and exclusive remedy available to the
    Government in the event the Contractor breaches this or any other Organization Conflict of
    lnterest clause.

Contracting System Name                                    Contractor Agency Name

Contracting System Representative                          Contractor Rep resentative
Exhibit ll
                                       PRITIE COIiITRACTOR RESPONSE

            RESPONSIBLE CO}.ITRACTOR VERIFIGATION AND CERTIFICATION OF COMPLIANCE

       PROJECTTITLE: Sands tone Garaqe Parkinq Lot Repair                                                    This
form lncludes changer by statutory reicrcnces from the Laws of finnesota 2015, chapter 64,
sactons l{. Thls form muct be submttted wtth tfte ru3ponse to thls sollc}tation. A rcsponse
received wlthout thls     wlllbe

Minn. Stat. S 16C.285, Subd. 7. IHPLEilEI{TATION. ... any prime contractor or subcontractor or motor
canier that does not meet the minimum criteria in subdivision 3 or fails to verify that it meets those criteria
is not a responsible @ntractor and is not eligible to be awarded a construction contract for the project or
to perform work on the project...

Minn. Stat. S 16C.285, Subd.3. RESPONSIBLE CONTRACTOR, MlNNlllulll CRITERIA.'Responsible
contractor' means a contractor lhat conforms to the responsibility requirements in the solicitation
document for its portion of the work on the project and verifies that it meets the following minimum criteria:

(1)
      The Contractor:
      (i) is in compliance wtth workers'compensation and unemployment insurance requirements;
      (ii) is in compliance with Department of Revenue and Department of Employrnent and
      Economic Development registration requirements if it has employees;
      (iii) has a valid federaltax identification number or a valid Social Security number if an individual; and
      (iv) has filed a certificate of authority to lransact business in Minnesota with the Secretary of State if
      a foreign corporation or cooperative.

(2)
      The contractor or related entity is in compliance with and, during the three-year period before
      submitting the verification, has not violated section '177.24, 177.25, 177 .41 lo 177.&, 181 .13,
      181.14, or 181.722, and has notviolated United Strates Code, title 29, sections 201 to 219, or United
      States Code, title 40, sections 3141 to 3148. For purposes of this clause, a violation occurs when a
      contractor or related entity:
      (i)      repeatedly fails to pay statutorily required wages or penalties on one or more separate
      projec*s for a total underpayment of $25,000 or more wilhin the three-year period, provided that a
      failure to pay is "repeated" only if il involves two or more sepamte and distinct occunences of
      underpayment during the three'year period;
      (ii)  has been issued an order to comply by the commissioner of Labor and lndustry that has
      become final;
      (iii)     has been issued at least two determination letters within the three-year period by the
      Department of Transportation finding an underpaynent by the contractor or related entity to its own
      employees; (iv) has been found by the commissioner of Labor and lndustry to have repeatedly or
      willfully violated any of the sections referenced in this clause pursuant to section 177.27;
      (v)     has been issued a ruling or findings of underpaynent by the administrator of the Wage and
      Hour Division of the United States Department of Labor that have bemme final or have been upheld
      by an administrative law judge or the Administrative Review Board; or
      (vi)    has been found liable for underpayrnent of wages or penalties or misrepresenting a
      construc{ion worker as an independent contractor in an action brought in a court having jurisdiction.
      Provided that, if the contractor or rslated entity contests a determination of underpaynent by the
      Department of Transportation in a contested case proceeding, a violation does not occur until the
      contested case proceeding has concluded with a determination that the contractor or related entity
      underpaid wages or penalties;'
(3)   The contractor or related entity is in oompliance with and, during the three-ytar period before
      submitting the verification, has not violated section 181.723 or chapter 3268. For purposes of this
      clause, a violation oocurs when a contractor or related entity has been issued a final administrative
      or licensing order;'

(4)   The contractor or related entity has not, more than twice during the three-year period before
      submitting the verification, had a certificate of compliance under section 363A.36 revoked or
      suspended based on the provisbns of section 3634.36, with the revocation or suspension becoming
      final because it was upheld by the Office of Administative Hearings or was not appealed to the
      offi@;'
(5)   The contractor or related entity has not rec€ived a final determination assessing a monetiary sanction
      from the Departrnent of Administration or Transportation for failure to maet targeted group business,
      disadvantaged business snterprise, or veteran-owned business goals, due to a lack of good faith
      efiort, more than once during the three-year period before submitting the verification;'

          '   Any violations, suspensions, revocations, or sanctions, as defined in clauses (2) to (5),
              occuning priorto July 1, 2014, shall not be considered in determining whether a contractor or
              rehted entity meets the minimum criteria.
(6)   The contractor or related entity is not cunently suspended or debaned by the federal govemment or
      the state of Minnesota or any of irls departrnents, commissions, agencies, or political suMivisions
      thal have authority to debar a contracioq and
(71   All subcontractors and motor caniers that the contractor intends to use to perform project work have
      verified to the contractor through a signed statement under oath by an owner or ofiicer that they
      meet the minimum criteria listed in chuses (1) to (6).

Minn. Stat. S 16C.285, SuM.    5.   SUBCONTRACTOR VERIFICATION
A prime contractor or subconEaclor shall include in its verification of complianco under suMivision 4 a list
of all of its lirsltior subcontractors that it intends to retain for wod( on the projsct. Prior to sxocution of a
@nstsuclion contEct, and as a condition precedent to the sxgcution of a @nstruc{ion contract, th6 apparent
successful primo contraclor shall submit to the contracting authority a supplemental verification under oath
conlirming complianc€ with suMivision 3, clause (7). Each cofitraclor or subcontraclor shall obtain from all
subcontractors with which it will have a diroct contradual relationship a signsd statemont und6r oath by an
owner or offic€r verifying that they me€t all of th6 minimum criteria io subdivision 3 prior to exocution of a
construc'tion contract with each subcontraclor.
    lf a primo contraclor or any subcontrac{or rstains additional subcontractors on the prorecl after
    submitting its verification of compliancs, the prime contraclor or subcontractor shall obtain verifrcations
    of complianca from each additional subcontractor with which it has a direcl contraclual rslationship and
    shallsubmit a supplamental verificaton confirming complianc€ with subdivision 3, chuso (7), wthin 't4
    days of retaining the additonal subcontractors.
    A prime contractor shall submit to the contracting authority upon requsst copies of the signed
    verifications of cornplianc€ from all subcontraclors of any tior pursuant to subdivision 3, dause (7). A
    prime contraclor and subcontractors shall not be responsible for the false statemsnts of any
    subcontractor with which thsy do not have a direcl contractual relationship. A primo contractor and
    subcontractors shall b6 rosponsible for false stataments by their lirst-ti€r subcontractors with which they
    have a direct contraclual rolationship only if they accapt the wrification of mmpliance with actual
    knowledg€ that it contains a false statement.
    Subd. 5a. otor carder yc llcatlon. A prime contractor or subcontractor shall obtain annually from all
    motor canisrs with which it will have a dirsct contraclual relationship a signed stabment under oalh by
    an owner or officsr verifying that they meel all of tho minimum criteria in subdMsion 3 prior to execution
    of a consEuction contracl with each motor car er. A prim6 conlraclor or subcontraclor shall require
    each such motor canier to pmvide it wfi immediatg written notirication in lhs avant that tha motor
    cani€r no longer mo€ts one or mors o, the minimum cdteria in subdMsion 3 aflor subrnitting its annual
    vorification. A motor canier shall b€ ineligiblo to perform ulork on a project ooverod by this section if it
    doos not meet all the minimum ctiteria in subdivision 3. Upon roquest, a primo conlractor or
    subcontractor shall submit to the conEacting authority the signed verifications of compliance from all
    motor cani€rs providing for-hire fansportation of matsrials, equipment, or supplies for a projecl.

Minn. Slat. S 16C.285, Subd.   4. VERIFICATION OF COfPLlAltlCE.

A contraclor rsspoflding to a solicitalion documont of a conu"aciing aulhority shall submit to ths contracting
authority a signed statgmsnt undar oath by an owner or officsr verifying compliance with sach of the
minimum criteria in subdivisbn 3, with th€ exc€ption of clause (7), at the tim€ that it responds to the
solicitation document.
A contracling authodty may accopt a suned statamsnt und€r oath as sufficient to demonstrats that a
contraclor is a responsible contraclor and shall not be held liable for awarding a contracl in reasonable
roliance on that strat€mont. A prime contraator, subconlraclor, or motor canier that fails to vorify compliance
with any one of the requirod minimum critoria or makes a fals6 slatement under oath in a verifrca$on of
cornplhncs shall be ineligiblo to be awarded a constuclion contract on the proioct for whk$ the verification
was submitted.
A talso statement und€r oath vorifying compliance with any of the minimum critaria may result in
terminalion of a construc{ion contrac{ that has already b€en awardsd lo a prime contrac'tor or subcontractor
or motor canisr that submits a false slatemont. A contracting authority shall not b€ liable for doclining to
award a contract or terminating a contract bas€d on a roasonable dotermination that tho contractor failsd to
verify compliance with the minimum critoria or falsely statod that it me€ts the minimum criteria. A
voriiication of compliance nsod not bo notarized. An electronic vsritication of compliance mads and
submitted as part of an ol€ctronic bid shall be an acceptabls writicalion of compliance under lhis section
provided lhal it contains an electronic signalure as detined in seciion 325L.02, paragraph (h).

CERTIFICATION