CONTRACT DOCUMENTS AND SPECIFICATIONS CITY OF WAUKEGAN DEPARTMENT OF PUBLIC WORKS Waukegan Public Works 2018 Water Plant High Service Pump # 2 Refurbishment JANUARY 25, 2018
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS Sealed bids are invited and will be received by the City of Waukegan, at City Hall, 100 ML King Drive, Waukegan IL 60085-4316 until February 13, 2018, at 10:00 a.m. Central Standard Time (CST) for: Water Plant High Service Pump #2 Refurbishment In accordance with the specifications on file in the office of the Public Works Director, this will be made available to all parties desiring to bid. Bids will be opened in City Hall in the Council Chambers, 100 ML King Drive, scheduled for 10:00 a.m. CST, February 13, 2018. A MADATORY PRE-BID will be held on February 7, 2018 from 9:00 am until 10:00 a.m. All prospective bidders are required to attend. Bidders that do not attend the MANDATORY PRE-BID will have their bids rejected. Bids shall be submitted in a sealed envelope, plainly marked on the outside with the name and address of the bidder and the words: Sealed Bid: February 13, 2018 Water Plant High Service Pump #2 Refurbishment Bids shall be addressed to Janet Kilkelly City Clerk, City of Waukegan 100 ML King Drive, Waukegan Illinois 60085-4316 and shall be in her hands before 10:00 a.m. CST February 13, 2018. Bids shall be accompanied by a completed, notarized application form and submitted on the enclosed proposal form. Any questions regarding the actual bid should be directed to Brian Andersen 847-599-2687. Electronic copies of the bid documents and specifications may be obtained by e-mailing a request along with contact information to brian.andersen@waukeganil.gov Each bidder, by making a bid to furnish the aforementioned, signifies their intention and good faith to enter into a contract with the City of Waukegan should they be awarded the bid. The City Council reserves the right to reject any and all bids and to make an award on those bids which in its opinion are the most advantageous to the City of Waukegan. By the order of the City Council of the City of Waukegan. Janet Kilkelly City Clerk 1|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS 2|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS Full Name of Bidder ______________________________________________________________________________(“Bidder”) Office Address _________________________________________________________________________________________ City, State Zip _________________________________________________________________________________________ Contact Person _________________________________________________________________________________________ Telephone Number ____________________________________ Fax Number __________________________________ Email Address_______________________________________________________________________________________ TO: City of Waukegan (“City”) City Clerk’s Office 100 N Martin Luther King Jr Waukegan, Illinois 60085 ATTN CITY CLERK Janet Kilkelly Bidder warrants and represents that Bidder has carefully examined the Work Site described below and has reviewed and understood all documents included, referred to, or mentioned in this bound set of documents, including Addenda Nos._____________ [if none, write “NONE”], which are securely stapled to the end of this Contract/Proposal. 1. Work Proposal A. Contract and Work. If this Contract/Proposal is accepted, Bidder proposes, and agrees, that Bidder shall, at its sole cost and expense, provide, perform, and complete, in the manner specified and described, and upon the terms and conditions set forth, in this Contract/Proposal and the City’s written notification of acceptance in the form included in this bound set of documents, all of the following, all of which is herein referred to as the “Work”: 1. Labor, Equipment, Materials, and Supplies. Provide, perform, and complete, in the manner specified and described in this Contract/Proposal, all necessary work, labor, services, transportation, equipment, materials, supplies, information, data, and other means and items necessary for the refurbishment of High Service Pump # 2 at the City’s Water Treatment Plant located at 360 E Seahorse Drive, Waukegan, Illinois 60085(“Work Site”); 2. Permits. Procure and furnish all permits, licenses, and other governmental approvals and authorizations necessary in connection therewith; 3. Bonds and Insurance. Procure and furnish all bonds and all insurance certificates and policies of insurance specified in this Contract/Proposal; 4. Taxes. Pay all applicable federal, state, and local taxes; 5. Miscellaneous. Do all other things required of Bidder by this Contract/Proposal; and 6. Quality. Provide, perform, and complete all of the foregoing in a proper and workmanlike manner, consistent with the standards of recognized professional firms in performing Work of a similar nature, in full compliance with, and as required by or pursuant, to this Contract/Proposal, and with the greatest economy, efficiency, and expedition consistent therewith, with only new, undamaged, and first quality equipment, materials, and supplies. 3|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS B. Performance Standards. If this Contract/Proposal is accepted, Bidder proposes, and agrees, that all Work shall be fully provided, performed, and completed in accordance with the specifications attached hereto as Attachment A and by this reference made a part of this Contract/Proposal. C. Responsibility for Damage or Loss. Bidder proposes, and agrees, that Bidder shall be responsible and liable for, and shall promptly and without charge to City repair or replace, any damage done to, and any loss or injury suffered by, the City, the Work, the Work Site, or other property or persons as a result of the Work. D. Inspection/Testing/Rejection. City shall have the right to inspect all or any part of the Work and to reject all or any part of the Work that is, in City’s judgment, defective or damaged or that in any way fails to conform strictly to the requirements of this Contract/Proposal and the City, without limiting its other rights or remedies, may require correction or replacement at Bidder's cost, perform or have performed all Work necessary to complete or correct all or any part of the Work that is defective, damaged, or nonconforming and charge Bidder with any excess cost incurred thereby, or cancel all or any part of any order or this Contract/Proposal. Work so rejected may be returned or held at Bidder's expense and risk. 2. Contract Price Proposal If this Contract/Proposal is accepted, Bidder proposes, and agrees, that Bidder shall take in full payment for all Work and other matters set forth under Section 1 above, including overhead and profit; taxes, contributions, and premiums; and compensation to all subcontractors and suppliers, the compensation set forth below. A. SCHEDULE OF PRICES For providing, performing, and completing all Work, the sum of products resulting from multiplying the number of acceptable units of Unit Price Items listed in Attachment B Schedule of Prices incorporated into the Work by the Unit Prices set forth therein. B. BASIS FOR DETERMINING PRICES It is expressly understood and agreed that: 1. All prices stated in the Schedule of Prices are firm and shall not be subject to escalation or change; 2. The City is not subject to state or local sales, use, and excise taxes, that no such taxes are included in the Schedule of Prices, and that all claim or right to claim any additional compensation by reason of the payment of any such tax is hereby waived and released; and 3. All other applicable federal, state, and local taxes of every kind and nature applicable to the Work are included in the Schedule of Prices. 4. The approximate quantities set forth in the Schedule of Prices for each Unit Price Item are the City’s estimate only, that the City reserves the right to increase or decrease such quantities, that payment for each Unit Price Item shall be made only on the actual number of acceptable units of such Unit Price Item installed complete in place in full compliance with this Contract/Proposal, and that all claim or right to dispute or complain of any such estimated quantity, or to assert that there was any misunderstanding in regard to the nature or amount of any Unit Price Item to be provided or performed, is hereby waived and released. C. TIME OF PAYMENT It is expressly understood and agreed that all payments shall be made in accordance with the following schedule: Within 45 days from Receipt of Invoice All payments may be subject to deduction or setoff by reason of any failure of Bidder to perform under this Contract/Proposal. Each payment shall include Bidder's certification of the value of, and partial or final waivers of lien covering, all Work for which payment is then requested and Bidder's certification that all prior payments have been properly applied to the payment or reimbursement of the costs with respect to which they were paid. 4|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS 3. Contract Time Proposal A. If this Contract/Proposal is accepted, Bidder proposes, and agrees, that Bidder shall commence the Work in MARCH 2018, specific dates to be determined, following the City’s acceptance of this Contract/Proposal provided Bidder shall have furnished to the City all bonds and all insurance certificates specified in this Contract/Proposal (“Commencement Date”). If this Contract/Proposal is accepted, Bidder proposes, and agrees, that Bidder shall perform the Work diligently and continuously and shall complete the Work not later than APRIL 30, 2018 (“Time of Performance”). The City may modify the Time of Performance at any time upon 15 days prior written notice to the Bidder. Delays caused by the City shall extend the Time of Performance; provided, however, that Bidder shall be responsible for completion of all Work within the Time of Performance, notwithstanding any strike or other work stoppage by employees of either Bidder or of the City. 4. Financial Assurance A. Bonds. The contractor shall furnish a satisfactory Performance Bond in the amount of 100% of the Contract Price as security for the faithful performance and payment of all of Contractor’s obligations under the Contract Documents. B. Insurance. If this Contract/Proposal is accepted, Bidder proposes, and agrees, that Bidder shall provide certificates of insurance evidencing the minimum insurance coverages and limits set forth below within 10 days following the City’s acceptance of this Contract/Proposal. Such policies shall be in form, and from companies, acceptable to the City. The insurance coverages and limits set forth below shall be deemed to be minimum coverages and limits and shall not be construed in any way as a limitation on Bidder's duty to carry adequate insurance or on Bidder's liability for losses or damages under this Contract/Proposal. The minimum insurance coverages and limits that shall be maintained at all times while providing, performing, or completing the Work are as follows: 1. Workers' Compensation and Employer's Liability Limits shall not be less than: Worker's Compensation: Statutory Employer's Liability: $500,000 ea. accident-injury $500,000 ea. employee-disease $500,000 disease-policy Such insurance shall evidence that coverage applies to the State of Illinois. 2. Comprehensive Motor Vehicle Liability Limits for vehicles owned, non-owned or rented shall not be less than: $1,000,000 Bodily Injury and Property Damage Combined Single Limit 3. Comprehensive General Liability Limits shall not be less than: $1,000,000 Bodily Injury and Property Damage Combined Single Limit. Coverage is to be written on an “occurrence” basis. Coverage to include: - Premises Operations - Products/Completed Operations - Independent Contractors - Personal Injury (with Employment Exclusion deleted) - Broad Form Property Damage Endorsement - “X,” “C,” and “U” - Contractual Liability Contractual Liability coverage shall specifically include the indemnification set forth below. 4. Umbrella Liability Limits shall not be less than: $2,000,000 Bodily Injury and Property Damage Combined Single Limit. 5|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS This Policy shall apply in excess of the limits stated in 1, 2, and 3 above. C. Indemnification. If this Contract/Proposal is accepted, Bidder proposes, and agrees, that Bidder shall indemnify, save harmless, and defend the City against all damages, liability, claims, losses, and expenses (including attorneys' fee) that may arise, or be alleged to have arisen, out of or in connection with Bidder's performance of, or failure to perform, the Work or any part thereof, or any failure to meet the representations and warranties set forth in Section 6 of this Contract/Proposal. D. Penalties. If this Contract/Proposal is accepted, Bidder proposes, and agrees, that Bidder shall be solely liable for any fines or civil penalties that are imposed by any governmental or quasi-governmental agency or body that may arise, or be alleged to have arisen, out of or in connection with Bidder's performance of, or failure to perform, the Work or any part thereof. 5. Firm Proposal All prices and other terms stated in this Contract/Proposal are firm and shall not be subject to withdrawal, escalation, or change provided the City accepts this Contract/Proposal within 60 days after the date this sealed Agreement is opened. 6. Bidder's Representations and Warranties In order to induce the City to accept this Contract/Proposal, Bidder hereby represents and warrants as follows: A. The Work. The Work, and all of its components, shall strictly conform to the requirements of this Contract/Proposal, including, without limitation, the performance standards set forth in Subsection 1B of this Contract/Proposal; and shall be fit, sufficient, and suitable for the purposes expressed in, or reasonably inferred from, this Contract/Proposal and the warranties expressed herein shall be in addition to any other warranties expressed or implied by law, which are hereby reserved unto the City. B. Compliance with Laws. The Work, and all of its components, shall be provided, performed, and completed in compliance with, and Bidder agrees to be bound by, all applicable federal, state, and local laws, orders, rules, and regulations, as they may be modified or amended from time to time, including without limitation the Prevailing Wage Act, 820 ILCS 130/0.01 et seq. (in furtherance of which, a copy of City’s ordinance ascertaining the prevailing rate of wages, in effect as of the date of this Contract/Proposal, has been attached as an Appendix to this Contract/Proposal; if the Illinois Department of Labor revises the prevailing rate of hourly wages to be paid, the revised rate shall apply to this Contract); any other prevailing wage laws; any statutes requiring preference to laborers of specified classes, including, without limitation, the Employment of Illinois Workers on Public Works Act, 30 ILCS 570/0.01 et seq.; any statutes prohibiting discrimination because of, or requiring affirmative action based on, race, creed, color, national origin, age, sex, or other prohibited classification; and any statutes regarding safety or the performance of the Work. Further, Bidder shall have a written sexual harassment policy in compliance with Section 2-105 of the Illinois Human Rights Act during the course of the work. C. Not Barred. Bidder is not barred by law from contracting with the City or with any other unit of state or local government as a result of (i) a delinquency in the payment of any tax administered by the Illinois Department of Revenue unless Bidder is contesting, in accordance with the procedures established by the appropriate Revenue Act, its liability for the tax or the amount of tax, as set forth in 65 ILCS 5/11-42.1-1; or (ii) a violation of either Section 33E-3 or Section 33E-4 of Article 33 of the Criminal Code of 1961, 720 ILCS 5/33E-1 et seq. D. Qualified. Bidder has the requisite experience, ability, capital, facilities, plant, organization, and staff to enable Bidder to perform the Work successfully and promptly and to commence and complete the Work within the Contract Price and Contract Time Proposals set forth above. 6|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS 7. Acknowledgements In submitting this Contract/Proposal, Bidder acknowledges and agrees that: A. Reliance. The City is relying on all warranties, representations, and statements made by Bidder in this Contract/Proposal. B. Reservation of Rights. The City reserves the right to reject any and all proposals, reserves the right to reject the low price proposal, and reserves such other rights as are set forth in the Instructions to Bidders. C. Acceptance. If this Contract/Proposal is accepted, Bidder shall be bound by each and every term, condition, or provision contained in this Contract/Proposal and in the City’s written notification of acceptance in the form included in this bound set of documents. D. Remedies. Each of the rights and remedies reserved to the City in this Contract/Proposal shall be cumulative and additional to any other or further remedies provided in law or equity or in this Contract/Proposal. E. Time. Time is of the essence in the performance of all terms and provisions of this Contract/Proposal and, except where stated otherwise references in this Contract/Proposal to days shall be construed to refer to calendar days and time. F. No Waiver. No examination, inspection, investigation, test, measurement, review, determination, decision, certificate, or approval by the City, whether before or after the City’s acceptance of this Contract/Proposal; nor any information or data supplied by the City, whether before or after the City’s acceptance of this Contract/Proposal; nor any order by the City for the payment of money; nor any payment for, or use, possession, or acceptance of, the whole or any part of the Work by the City; nor any extension of time granted by the City; nor any delay by the City in exercising any right under this Contract/Proposal; nor any other act or omission of the City shall constitute or be deemed to be an acceptance of any defective, damaged, or nonconforming Work, nor operate to waive or otherwise diminish the effect of any representation or warranty made by Bidder; or of any requirement or provision of this Contract/Proposal; or of any remedy, power, or right of the City. G. Severability. It is hereby expressed to be the intent of the parties to this Contract/Proposal that should any provision, covenant, agreement, or portion of this Contract/Proposal or its application to any Person or property be held invalid by a court of competent jurisdiction, the remaining provisions of this Contract/Proposal and the validity, enforceability, and application to any Person or property shall not be impaired thereby, but the remaining provisions shall be interpreted, applied, and enforced so as to achieve, as near as may be, the purpose and intent of this Contract/Proposal to the greatest extent permitted by applicable law. H. Amendments and Modifications. No amendment or modification to this Contract/Proposal shall be effective until it is reduced to writing and approved and executed by the corporate authorities of the parties in accordance with all applicable statutory procedures. I. Assignment. Neither this Contract/Proposal, nor any interest herein, shall be assigned or subcontracted, in whole or in part, by Bidder except upon the prior written consent of the City. J. Governing Law. This Contract/Proposal shall be governed by, construed, and enforced in accordance with the internal laws, but not the conflicts of laws rules, of the State of Illinois. K. Certified Payrolls. Bidder shall, in accordance with Section 5 of the Illinois Prevailing Wage Act, 820 ILCS 130/5, submit to the City, on a monthly basis, a certified payroll. The certified payroll shall consist of a complete copy of those records required to be made and kept by the Prevailing Wage Act. The certified payroll shall be accompanied by a statement signed by the Bidder or subcontractor which certifies that: (1) such records are true and accurate; (2) the hourly rate paid is not less than the general 7|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS prevailing rate of hourly wages required by the Prevailing Wage Act; and (3) Bidder or subcontractor is aware that filing a certified payroll that he or she knows to be false is a Class B misdemeanor. A general contractor may rely upon the certification of a lower tier subcontractor, provided that the general contractor does not knowingly rely upon a subcontractor's false certification. Upon two business days' notice, Bidder and each subcontractor shall make available for inspection the records required to be made and kept by the Act: (i) to the City, its officers and agents, and to the Director of the Illinois Department of Labor and his or hers deputies and agents; and (ii) at all reasonable hours at a location within this State. L. Conflicts of Interest. Bidder represents and certifies that, to the best of its knowledge, (1) no elected or appointed City official, employee or agent has a personal financial interest in the business of the Bidder or in this Agreement, or has personally received payment or other consideration for this Agreement; (2) as of the date of this Agreement, neither Bidder nor any person employed or associated with Bidder has any interest that would conflict in any manner or degree with the performance of the obligations under this Agreement; and (3) neither Bidder nor any person employed by or associated with Bidder shall at any time during the term of this Agreement obtain or acquire any interest that would conflict in any manner or degree with the performance of the obligations under this Agreement. DATED January 25, 2018. 8|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS PROPOSAL NAME: ___________________________________________ TITLE: ___________________________________________ COMPANY NAME: ___________________________________________ ADDRESS: ___________________________________________ CITY/STATE: ___________________________________________ PHONE NO: ___________________________________________ FAX NO: ___________________________________________ E-MAIL: ___________________________________________ 9|P age
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS Prospective Bidder Application Form 1. Applicant (Firm or Individual) ___________________________________________________ 2. Address ____________________________________________________________________ Phone(____) _______________________ 3. How long have you been in business? _____________________________________________ 4. State the general nature of the services you desire to bid upon. _____________________________________________________________________________________ _____________________________________________________________________________________ ________________________________________________________________ 5. How long at present address? ___________________________________________________ 6. Are you a: (answer each part "yes" or "no") (a) Manufacturer? _________________________________ (b) Jobber or Dealer? _______________________________ (c) Authorized Distributor? _________________________ (d) Factory Representative or Agent? ___________________ 7. If incorporated, state date of incorporation _____________ State _______________________ 8. List below names and addresses of officers of the Corporation. 10 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS Name Address Title _________________ ___________________ __________________ _________________ ___________________ __________________ _________________ ___________________ __________________ 9. Are you a partnership? ______If so, list name and addresses of all partners. Name Address Title _________________ ___________________ __________________ _________________ ___________________ __________________ _________________ ___________________ __________________ 10. If you are doing business under a trade name, indicate State and County. ________________________________________________________________________ ______________________________________________________________________________ __________________________________________________________________ 11. Average number of employees _________________________________________________ 12. Do you share office with any other firm or firms? __________________________________ If so, give the name of the other firm or firms. ________________________________________________________________________ ______________________________________________________________________________ __________________________________________________________________ 11 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS 13. Do you own and operate a warehouse? _____________________ If answer is yes, give address and how long ______________________________________________________________________________ 14. Have you ever bid on City of Waukegan business under another name? ________________ If answer is yes, list the name or names ______________________________________________________________________________ 15. Give names and addresses of three of your largest customers (Please include Federal, State or City Government) Name Address _______________________ _____________________________ _______________________ _____________________________ _______________________ _____________________________ 16. Bank References _____________________________________________________________________________________ _____________________________________________________________________________________ ________________________________________________________________ ____________________________________ Signature of Applicant _____________________________________ Title Sworn before me This _____________day of ________________ 20____ NOTARY PUBLIC: 12 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS AFFIDAVIT State of _________________________________________________ County of ________________________________________________ being first duly sworn, deposes and says: That he is (A partner or officer of the firm of, etc.) _______________________________________ the party making the foregoing proposal or bid, that such proposal or bid is genuine and not collusive or sham: that said bidder has not colluded, conspired, connived or agreed, directly or indirectly with any bidder or person, to put in a sham bid or to refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference, with any person to fix the bid price of affidavit or of any other bidder, or to fix the overhead, profit or cost element of said bid price, or of that of any other bidder, or to secure any advantage against the City of Waukegan, Illinois or any other person interested in the proposed contract; and that all statements in- said proposal or bid are true. Signature of Bidder, if bidder is an individual: ________________________________________ Partner, if the bidder is a partnership: _______________________________________________ Officer, if the bidder is a corporation: _______________________________________________ 13 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS PROPOSAL BID BOND WE ____________________________________________________________________ ________________________________as PRINCIPAL and _______________________ _____________________________________________________________ as SURETY, are held firmly bound unto the City of Waukegan in the penal sum of 10% of the total bid price. We bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly to pay to the City of Waukegan this sum under the conditions of this instrument. WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that, the said PRINCIPAL is submitting a written proposal to the City of Waukegan acting through its awarding authority for the construction of the work designated as the above section. THEREFORE, if the proposal is accepted and a contract awarded to the PRINCIPAL by the City of Waukegan for the above-designated section, and the PRINCIPAL shall within fifteen (15) days after award enter into a formal contract, furnish surety guaranteeing the faithful performance of the work, and furnish evidence of the required insurance coverage, all as provided in the “Standard Specifications for Road and Bridge Construction” and applicable Supplemental Specifications, then this obligation shall become void; otherwise it shall remain in full force and effect. IN THE EVENT the City of Waukegan determines the PRINCIPAL has failed to enter into a formal contract in compliance with any requirements set forth in the preceding paragraph, then the City of Waukegan acting through its awarding authority shall immediately be entitled to recover the full penal sum set out above, together with all court costs, all attorney fees, and any other expense of recovery. IN TESTIMONY WHEREOF, the said PRINCIPAL and the said SURETY have caused this instrument to be signed by their respective officers this ____________________ day of ____________________________ A.D., 20 . Principal ___________________________________ ______________________________ (Company Name) (Company Name) By: _______________________________ By: __________________________ (Signature & Title) (Signature & Title) (If PRINCIPAL is a joint venture of two or more contractors; the company names, and authorized signatures of each contractor must be affixed.) 14 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS SURETY ___________________________________ By: __________________________ (Name of Surety) (Signature of Attorney-in-Fact) STATE OF __________ ____________) ) SS COUNTY OF ________ ____________) I, _______________________________, a Notary Public in and for said county, do hereby certify that _______________________________________________________ (Insert names of individuals signing on behalf of PRINCIPAL & SURETY) who are each personally known to be the same persons whose names are subscribed to the foregoing instrument on behalf of PRINCIPAL and SURETY, appeared before me this day in person and acknowledged respectively, that they signed, and delivered said instrument as their free and voluntary act for the uses and purposes therein set forth. Given under my hand and notarial seal this ________________ day of ___________ A.D. 20_ My commission expires __________________________. ______________________________________________ Notary Public NOTICE Improper execution of this form (i.e., missing signatures or seals or incomplete certification) will result in bid being declared irregular. If bid bond is used in lieu of proposal guaranty check, it must be on this form and must be submitted with bid. 15 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS CONTRACTOR'S DRUG-FREE WORKPLACE CERTIFICATION Pursuant to Ill. Rev. State. ch. 127 par. 132.311 et. seq. (“Drug Free Workplace Act”), the undersigned contractor hereby certifies to the contracting agency that it will provide a drug-free workplace by: Publishing a statement: Notifying employees that the unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance, including cannabis, is prohibited in the grantee’s or contractor’s workplace. Specifying the actions that will be taken against employees for violations of such prohibition. Notifying the employee that, as a condition of employment on such contract or grant, the employee will: Abide by the terms of the statement; and Notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than 5 days after such conviction. Establishing a drug-free awareness program to inform employees about: The dangers of drug abuse in the workplace; The grantee’s or contractor’s policy of maintaining a drug-free workplace; Any available drug counseling, rehabilitation, and employee assistance program; and The penalties that may be imposed upon employees for drug violations. Making it a requirement to give a copy of the statement required by subsection (a) to each employee engaged in the performance of the contract or grant and to post the statement in a prominent place in the workplace. Notifying the contracting agency within 10 days after receiving notice under part (B) of paragraph (3) of subsection (a) from an employee or otherwise receiving actual notice of such conviction. Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by any employee who is so convicted, as required by Ill. Rev. Stat. ch. 127 par. 132.315. Assisting employees in selecting a course of action in the event drug counseling treatment, and rehabilitation is required and indicating that a trained referral team is in place. Making a good faith effort to continue to maintain a drug-free workplace through implementation of this Section. 16 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS Failure to abide by this certification shall subject the contractor to the penalties provided in Ill. Rev. State. ch. 127. par. 132.316. ______________________________ Contractor ATTEST: _____________________________________ DATE: ______________________________ 17 | P a g e
2018 WATER PLANT HIGH SERVICE PUMP # 2 REFURBISHMENT SPECIFICATIONS HOLD HARMLESS AGREEMENT The contractor hereby agrees to indemnify, keep and save harmless the City, its City Council, agents, officials, and employees against all injuries, judgments, costs and expenses which may in anywise accrue against the City, its City Council, agents, officials, and employees in consequence of the granting of this contract or which may in anywise result therefrom, whether or not it shall be alleged or determined that the act was caused through negligence or omission of the contractor or his employees, if any, or of the City, its City Council, agents, officials, and employees and the contractor shall, at his own expense, appear, defend and pay all charges of attorneys and costs and other expenses arising therefrom or incurred against the City, its City Council, agents, officials, and employees in any such action, and shall at his own expense discharge same. The contractor expressly understands and agrees that any performance bond or insurance protection required by this contract, or otherwise provided by contractor, shall in no way limit the responsibility to indemnify, keep and save harmless and defend the City, its City Council, agents, officials, and employees as herein provided. CONTRACTOR: By: ___________________________________ ATTEST: ___________________________________ Corporate Seal 18 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS CERTIFICATION OF COMPLIANCE The undersigned, being first duly sworn on oath, deposes and states that he has the authority to make this certification on behalf of the bidder, ______________________________________________________________________________ (Name of Company) (a) That in connection with this procurement, (1) the prices in this bid have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or with any competitor; (2) the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not be knowingly disclosed by the bidder prior to opening directly or indirectly to any other bidder or to any competitor; and (3) no attempt has been made or will be made by the bidder to induce any other person or firm to submit or not to submit a bid for the purpose of restricting competition. (b) The undersigned further states (1) he is the person in the bidder's organization responsible within that organization for the decision as to the prices being bid herein and that he has not participated, and will not participate, in any action contrary to (a)(1) through (a)(3) above; or (2a) he is not the person in the bidder's organization responsible within that organization for the decision as to the prices being bid herein but that he has been authorized to act as agent for the persons responsible for such decision in certifying that such persons have not participated, and will not participate, in any action contrary to (a)(1) through (a)(3) above, and as their agent does hereby so certify; and (2b) that he has not participated, and will not participate, in any action contrary to (a)(1) through (a)(3) above. 19 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS (c) The undersigned certifies that, pursuant to Chapter 720, Sec. 5/33E-11 of the Illinois Compiled Statues, 1992, the bidder is not barred from bidding on this contract as a result of a conviction for the violation of State of Illinois laws prohibiting bid-rigging or bid-rotating. (d) The undersigned certifies that, pursuant to Chapter 65, Sec. 5/11-42.1-1 of the Illinois Compiled Statues, 1992, the bidder is not delinquent in the payment of any tax administered by the Illinois Department of Revenue. (e) It is expressly understood that the foregoing statements, representations, and promises are made as a condition to the right of the bidder to receive payment under any award made hereunder. Authorized-Signature: ______________________________________________ Title: ____________________________________________________________ Sworn before me This _____________day of ________________ 20____ NOTARY PUBLIC: 20 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS Certified Payroll Report Statement of Compliance I, ______________________________ Payroll Officer do hereby state: 1.) That I pay or supervise the payment of the persons employed by _____________________ , on the City of Waukegan's 2018 Water Treatment High Service Pump # 2 Replacement, that during the payroll period commencing on ________________and ending on the ___________________, all persons employed on said project have been paid the full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or on behalf of ___________________ from the full weekly wages earned by any person and that no deductions have been made either directly or indirectly from the full wages earned by any person, other than permissible deductions as defined in Regulations, part 3 (29 CFR subtitle A) issued by the secretary of labor under the Copeland Act, as amended (48 stat. 948; 63 Stat. 108; 72 stat. 967;76 stat. 40 U.S.C. 276 C), and described below: Withholding tax, State tax, Insurance, F.I.C.A., Union, I.R.A. 2.) That any payrolls otherwise under this contract required to be submitted for the above period are correct and complete; that the wage rate for laborers or mechanics contained therein are not less than the applicable wage rates contained in any wage determination incorporated into this contract; that the classifications set forth therein for each laborer or mechanic conform with the work performed. 3.) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a state apprenticeship agency recognized by the Bureau of Apprenticeship and Training, United States Department of Labor, or if no such agency exists in a state, are registered with the Bureau of Apprenticeship and Training United States Department of Labor. 4.) That: Where fringe benefits are paid to approved plans, funds or programs in addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced payroll, payments of fringe benefits as listed in the contract have been or will be made to appropriate programs for the benefit of such employees except as noted in section 4 ( c )below. Where fringe benefits are paid in cash Each laborer or mechanic listed in the above listed in the above referenced payroll has been paid, as indicated on the payroll, an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe benefits as listed in the contract, except as noted in section 4( c) below. (c) Exceptions Exceptions (craft) Explanation ____________________________ _____________________________ ___________________________ _____________________________ Name and Title: _______________________________ _____________________________________________ (Signature) 21 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS The willful falsification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution. See section 1001 of title 18 and section 231 of title 31 of the United States code. END OF SECTION 22 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS ATTACHMENT A GENERAL CONDITIONS 1. DEFINITIONS As used herein: "Contractor" means the person or organization undertaking to do the work required by the Contract Documents; "Owner" means City of Waukegan; "Work" means all or any part of the performance of the Contractor, the Contractor's agents and subcontractors, pursuant to, and whether or not in compliance with this specification; and "By Others" shall mean performance by persons or parties other than the Contractor. Anything mentioned in the specifications, or reasonably implied, shall be furnished and performed as though specially shown and mentioned. Should anything necessary to a clear understanding of the Work be omitted specifications, or should any error appear in the various instruments furnished or in work to be done by other contractors affecting the Work included in this specification the Contractor shall notify the Owner. If Contractor fails to give such notice, the Contractor shall make good any damage or defect caused thereby. 2. SAFETY AND HEALTH REGULATIONS Personal safety equipment is to be furnished by and worn by all Contractor and subcontractor employees as follows: a) Compliance with the Construction Industry and the General Industry provisions of the Occupational Safety and Health Act of 1970 is required in all cases. b) Contractors and subcontractors shall comply with all provisions relating to their particular assignment. c) The delivery and use of equipment in the construction site shall comply with all provisions relating to the particular piece of equipment regarding guards, operation, air contamination, hazardous materials, fire protection, and material handling. d) Contractor will familiarize himself and his employees with the Water Treatment Plant's safety procedures including Electrical safety, Lock Out/Tag Out, Hazardous materials, and Confined Space Entry and coordinate his work with Plant personnel so as to comply with these rules. 3. ASSIGNMENT AND SUBCONTRACTING OF WORK Work shall neither be assigned nor subcontracted in whole or in part by the Contractor without the Owner's prior written consent. Although approved by the Owner, the Contractor shall be solely responsible for the direction and performance of his subcontractors. 4. PROTECTION OF PROPERTY AND PERSONNEL Contractor shall furnish, erect, and maintain all railings, barricades, shields, lights, warning signs, etc., required to protect personnel from hazards of excavations, falling objects, general hazards, etc. 5. FIRE PROTECTION The Contractor shall provide adequate fire protection in the Work area, particularly where burning or welding is done. No burning or welding shall be performed without adequate notice thereof to the Owner. 6. PARKING Employees and representatives of Contractor and any subcontractors, while on the Owner's property, shall park private cars where directed by the Owner. 7. REMOVAL OF MATERIAL AND REFUSE 23 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS When Work is completed, the Contractor, at his own expense, shall remove from the premises all tools, excess material, refuse, etc., arising from the Work under this specification. On a daily basis, the contractor shall leave the premises in a clean and orderly condition. 8. EXECUTION a) The Work will include three phases: Phase 1 includes all work for the removal and transport of the Pump #2 rotating assembly from the City’s Water Plant to shop. Phase 2 includes all shop work such as machining, balancing, reassembly of the rotating assembly of Pump #2. Phase 3 includes all work for the transport to the City’s Water Plant, installation and test run of completed Pump #2. b) The Work shall be carried on with diligence and dispatch in a manner satisfactory to the Owner, without interference to the Owner's operations and in cooperation with other Contractors. c) The Contractor shall comply with all applicable laws, rules and regulations of local, state, or national governmental bodies and agencies; and all codes and standards, whether governmental or otherwise, applying to work of the type performed by the Contractor. d) Sequence of operation. See under Special Conditions section. 9. STORAGE OF TOOLS, EQUIPMENT, AND MATERIALS Contractor shall safeguard and store at the Contractor's own risk, tools, equipment, and materials so as not to interfere with Owner's operations and shall furnish locked receptacles, tool boxes, and containers suitably marked to indicate ownership. The Owner will not be responsible for any loss of such items. 10. COMPLETION AND ACCEPTANCE The Work shall be properly completed to the satisfaction of the Owner or the Owner's authorized representative as a condition precedent to acceptance by the Owner. The Owner shall not be obligated to make final payment until the Work has been accepted. Such acceptance, however, shall not release the Contractor under said guarantee. 11. SUPERVISION The Contractor shall furnish competent personnel to constantly supervise and coordinate the Work. As far as is possible, the Contractor shall keep the same supervision and workmen throughout the project duration. 12. EXTRA WORK No extra work will be permitted except under prior written authority from the Owner. 13. PAYMENTS Payments to the Contractor will be made by the Owner by bank draft. Final payment will be made thirty- one (31) days after completion of all Phases and acceptance by the Owner's Representative of the completed Contract. No final payment will be due until the Contractor has certified to the Owner's Representative that materials, labor and services involved in each payment have been paid for. Payment will be withheld in whole or in part to protect the Owner on the basis of claims filed by subcontractors or material suppliers against the Contractor or such claims of which the Owner has reasonable notice as to their existence. Payment will be based on the following elements: PHASE 1 Work at City’s Water Treatment Plant 1. Mobilization 24 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS 2. Removal of pump rotating assembly from the City’s Water Plant. Includes decoupling from motor, removal of complete rotating assembly and bearings, and physical removal of assembly for inspection and / or refurbishment at machine shop. PHASE 2 Shop work at contractor’s facility 1. Disassemble blast and clean rotating assembly. Detail as found conditions in a report to Owner. 2. Replace shaft with new manufactured unit of 416 Stainless Steel. 3. Install Owner supplied Shaft Sleeves. 4. Furnish and install new shaft bearings. 5. Furnish and install new shaft sleeve nuts; casing wear rings; and casing bushings from ASTM A743 Type CA40 material. 6. Sandblast to SSPC SP 10/NACE 2 Standards and recoat interior and exterior of upper pump head. 3 coats of Tnemec Series L140F shall be used (primer coat white 5-7 mils, intermediate coat beige 5-7 mils, finish coat blue 5-7 mils). 7. Inspect / clean / repair / machine / balance impeller assembly. Include new gaskets, stainless steel bolts and nuts, and consumables. PHASE 3 Work at City’s Water Treatment Plant 1. Reassemble, reinstall, reconnection of pump and motor assemblies Include gaskets, stainless steel bolts and nuts, and consumables. 2. 72 Hour Proof Run, de-mobilize. Include new gaskets, stainless steel bolts and nuts, and consumables. Each line item is to include all labor, tools, equipment and transport to perform the tasks identified. END OF GENERAL CONDITIONS 25 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS ATTACHMENT A SPECIAL CONDITIONS 1. FORM OF SPECIAL PROVISIONS: Omissions of words or phrases such as "the contractor shall," "in conformance with," "shall be," "as noted on the plans," "according to the plans," "a," "the," and "all" are intentional, and the Contractor must supply omitted words or phrases by inference. 2. MINOR WORK: Any minor work not specifically mentioned in the specifications, but necessary for the proper completion of the work, shall be part of and included in the contract. The Contractor shall not be entitled to extra or additional compensation for the same. 3. CONTRACT TERM: This work will occur March 1, 2018 thru April 30, 2018. 4. WORKING DAYS: Normal work hours at the Plant are Monday through Friday 6:30 a.m. through 4:00 p.m. At the Contractor's discretion with advance approval of the Water Utilities Superintendent (and subject to City noise ordinance restrictions) work hours can be extended beyond the normal work hours. Weekend work may be performed by advance, mutual consent of Contractor and Water Utilities Superintendent [see 8.d below]. Except for such work as may be required to properly maintain lights and barricades, no work will be permitted on federal holidays. 5. CONSTRUCTION SAFETY: The Contractor shall take all precautions necessary to protect the general public and workmen from hazards within the limits of the worksite. All openings shall be fenced or otherwise secured (locked) at all times when work is not in progress. Contractor's machinery will be locked and secured when Contractor is not on premise. Encroachment onto the roadway will be avoided. Any such encroachment will be protected by appropriately lighted barricades. 6. TIME CONSTRAINTS: Plant Operation interruptions: continued water production will take precedence over this WORK. 7. CITY PROVIDES: a. Power: 480 VAC 3 Phase available. Contact Water Treatment Plant for specifics. b. Water: Potable water, garden hose with RPZ protection. For larger water source requirements contact Plant. c. Inspection: City personnel will be on-site and inspect all contract work and operate City equipment (pumps, valves, etc.) d. Toilet facility e. Operator supervision: minimum 8 hours per day, five days per week. Arrangements may be made for extended hours. See Paragraph 4 above, "WORKING DAYS") f. Access to Crane for transferring rotating assembly from Pump Floor to overhead door at grade level g. Shaft sleeves 8. CONTRACTOR PROVIDES: a. Equipment: i. Crane ii. Hand and power tools iii. Conveying device (to roll-off box) iv. Transportation of pump components to and from Contractor’s Shop v. Balancing of rotating assembly vi. Stripping and coating b. Manpower labor c. Performs all electrical and mechanical connections. 26 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS d. Chemicals as needed. e. Repairs, spare and consumable parts for Contractor's equipment (See Paragraph 4). f. Refuse disposal: Refuse will be removed in a suitable container to be transported for proper disposal by Contractor. g. Transportation of all necessary equipment to and from the City's Water Plant h. Shop work for refurbishment and repair of components and assemblies. i. Cleanup: Contractor will maintain assigned work areas in a clean and neat manner with daily clean-up and a thorough clean-up at job's end. 9. WARRANTY: Contractor will complete the WORK within the agreed-upon time. Contractor shall provide a 1 year warrantee on all workmanship, parts and labor at no additional cost to the City. Warrantee to commence after successful completion of 72 hour Proof Run. (See 11. Sequence of Operations) 10. REFERENCES: Contractor will furnish a minimum of three references, preferably from water treatment plants, which ideally, are using similar vertical turbine pump arrangement. 11. SEQUENCE OF OPERATIONS: There are six horizontal split case High Service Pumps at the Water Plant. These pumps pump treated potable water from the Water Treatment Plant to the City’s distribution system. The Plant operates 24 / 7 and therefore these High Service Pumps are critical to the proper operation of the Plant. This Project entails the refurbishment of one of the six High Service Pumps. The Work entails all work associated with the removal, rehabilitation, re-installation of the rotating assembly, and testing of High Service Pump #2. Pump #2 must be fully and completely operational and accepted before proceeding with demobilization. A successful completion of a 72 hour Proof Run without issue is required for acceptance. Failure of any portion of the pump during the 72 hour Proof Run shall constitute restarting the 72 hour time clock. Original configuration is as follows: PUMP 2 MOTOR DATA Ideal Electric Induction Motor, SN 257915, Type AP, HP 250, RPM 1774, Volts 4160, Amps 30.8, Duty Cont, Frame 587-S PUMP DATA, Allis Chalmers, SN 17540, Type SH, Size 10x8, GPM 3500 @ 210 Ft Head END OF SPECIAL CONDITIONS 27 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS ATTACHMENT B SCHEDULE OF PRICES BASE BID Service PHASE 1 PHASE 2 PHASE 3 Unit Price Extension 1 Mobilization 1 N/A N/A Removal of Pump 2 Rotating Assembly 1 X N/A Disassembly cleaning and inspection of Rotating Assembly; blasting & 3 coating of upper casing N/A 1 N/A Pump Bearing Machining 4 & Replacement N/A 1 N/A Shaft nuts; wear rings; & 5 casing bushings N/A 1 N/A Shaft Replacement, 6 cleaning, polishing N/A 1 N/A 7 Assembly balancing N/A 1 N/A Reinstallation of Rotating Assembly and 72 hour 8 Proof Run N/A N/A 1 Contingency (applied by 9 CITY) X 1 X $10,000.00 $10,000.00 Total Total Extended Cost (in words): _________________________________________Dollars and_______Cents Please provide hourly rate for shop manhours SHOP HOURLY RATE / Hr END ATTACHMENT B 28 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS ACKNOWLEDGMENT OF ADDENDA The undersigned acknowledges receipt of the following Addenda to the 2018 Water Treatment Plant High Service Pump # 2 Refurbishment Project. Addendum Number Date Received ________________ __________________ ________________ __________________ ________________ __________________ Respectfully Submitted, Contractor: __________________________________________________________ By: __________________________________________________________ Title: __________________________________________________________ Address: __________________________________________________________ __________________________________________________________ 29 | P a g e
2018 WATER TREATMENT HIGH SERVICE PUMP #2 REFURBISHMENT SPECIFICATIONS ACCEPTANCE The Contract/Proposal attached hereto and by this reference incorporated herein and made a part hereof is hereby accepted by the order of the City of Waukegan (“City”) this _____________ day of ___________________, 2018. This Acceptance, together with the Contract/Proposal attached hereto, constitutes the entire and only agreement between the parties relating to the accomplishment of the Work and the compensation therefore and supersedes and merges any other prior or contemporaneous discussions, agreements, or understandings, whether written or oral, and shall prevail over any contradictory or inconsistent terms or conditions contained in any purchase order, acceptance, acknowledgement, invoice, or other standard form used by the parties in the performance of the Contract/Proposal. Any such contradictory or inconsistent terms or conditions shall be deemed objected to by the City without further notice of objection and shall be of no effect nor in any circumstances binding upon the City unless accepted by the City in a written document plainly labeled “Amendment to Agreement.” Acceptance or rejection by the City of any such contradictory or inconsistent terms or conditions shall not constitute acceptance of any other contradictory or inconsistent terms or conditions. ATTEST: CITY OF WAUKEGAN By:_________________________ By:______________________ Print Name:______________________________ Sam Cunningham, Mayor Title:____________________________________ 30 | P a g e