Appeal Decision
 Inquiry held over 30 days between 12 January 2021 and 12 March 2021
 Site visits made on 17 December 2020 and 10 March 2021

 by Michael Boniface MSc MRTPI, G D Jones BSc(Hons) DipTP MRTPI and
 Nick Palmer BA (Hons) BPl MRTPI
 Panel of Inspectors appointed by the Secretary of State
 Decision date: 26 May 2021

 Appeal Ref: APP/C1570/W/20/3256619
 London Stansted Airport, Essex
 •   The appeal is made under section 78 of the Town and Country Planning Act 1990
     against a refusal to grant planning permission.
 •   The appeal is made by Stansted Airport Limited against the decision of Uttlesford
     District Council.
 •   The application Ref UTT/18/0460/FUL, dated 22 February 2018, was refused by notice
     dated 29 January 2020.
 •   The development proposed is airfield works comprising two new taxiway links to the
     existing runway (a Rapid Access Taxiway and a Rapid Exit Taxiway), six additional
     remote aircraft stands (adjacent Yankee taxiway); and three additional aircraft stands
     (extension of the Echo Apron) to enable combined airfield operations of 274,000 aircraft
     movements (of which not more than 16,000 movements would be Cargo Air Transport
     Movements) and a throughput of 43 million terminal passengers, in a 12-month
     calendar period.

Decision

1. The appeal is allowed and planning permission is granted for airfield works
   comprising two new taxiway links to the existing runway (a Rapid Access
   Taxiway and a Rapid Exit Taxiway), six additional remote aircraft stands
   (adjacent Yankee taxiway); and three additional aircraft stands (extension of
   the Echo Apron) to enable combined airfield operations of 274,000 aircraft
   movements (of which not more than 16,000 movements would be Cargo Air
   Transport Movements) and a throughput of 43 million terminal passengers, in a
   12-month calendar period at London Stansted Airport, Essex in accordance
   with the terms of the application, Ref UTT/18/0460/FUL, dated
   22 February 2018, subject to the conditions contained in the attached
   Schedule.

Application for Costs

2. At the Inquiry an application for costs was made by Stansted Airport Limited
   against Uttlesford District Council. This application is the subject of a separate
   Decision.

Preliminary Matters

3. The Inquiry was held as a wholly virtual event (using videoconferencing) in
   light of the ongoing pandemic. The Panel undertook an accompanied site visit
   to the airport on 10 March 2021 and an unaccompanied visit around the

https://www.gov.uk/planning-inspectorate
Appeal Decision APP/C1570/W/20/3256619

       surrounding area on the same day. An unaccompanied visit to the publicly
       accessible parts of the airport and surrounding area also took place on
       17 December 2020.

4. On 18 May 2018, during the course of the planning application, the Council
   agreed to a request from the appellant to change the description of
   development to include a restriction on cargo air transport movements. This is
   the basis upon which the Council subsequently determined the application. The
   appeal has been considered on the same basis.

5. The Council resolved to grant planning permission for the development on
   14 November 2018 but subsequently reconsidered its position before formally
   refusing planning permission. In light of the Council’s reasons for refusal, its
   subsequent statement of case in this appeal and given the length of time that
   had passed since the application was made, an Environmental Statement
   Addendum (October 2020) (ESA) was produced to update the original
   Environmental Statement (February 2018) (ES). The Council consulted on
   the ESA so that all parties had an opportunity to consider its content. As such,
   the Panel is satisfied that no party is prejudiced by its submission at the appeal
   stage.

6. The ES and ESA were prepared in accordance with the Town and Country
   Planning (Environmental Impact Assessment) Regulations 2017 (EIA
   Regulations), including technical appendices and a non-technical summary.
   They cover a range of relevant topics, informed at the ES stage by a Scoping
   Opinion from the Council. The Panel is satisfied that the totality of the
   information provided is sufficient to meet the requirements of Schedule 4 of
   the EIA Regulations and this information has been taken into account in
   reaching a decision. Accordingly, while some of the evidence is critical of the
   ES and ESA, including in respect to their conclusions regarding carbon
   emissions, there is no significant contradictory evidence that causes the ES or
   the ESA to be called into question.

7. A local campaign group known as Stop Stansted Expansion (SSE) was granted
   Rule 6 status and participated as a main party to the Inquiry. However, shortly
   before the Inquiry opened it elected to rely on its written evidence for several
   topics so that a witness was not made available for cross-examination on
   those topics1. As such, this evidence was untested and has been considered by
   the Panel on this basis.

8. Rule 6 status was also granted jointly to Highways England and Essex County
   Council (the Highway Authorities) who initially opposed the proposal on
   highway grounds. However, these issues were resolved before the exchange of
   evidence and the Highway Authorities subsequently withdrew from the appeal
   proceedings, subject to appropriate planning obligations being secured.

9. The Council’s fourth reason for refusing planning permission referred to the
   adequacy of infrastructure and mitigation measures needed to address the
   impacts of the development. This reason was partly addressed following
   agreement with the Highway Authorities about the scope of highways
   mitigation required, including at Junction 8 of the M11. The adequacy and
   need for other forms of mitigation are addressed in the body of this decision in

1
    Historical Background, Noise, Health and Well-Being, Air Quality, Surface Access (Rail)

https://www.gov.uk/planning-inspectorate                       2
Appeal Decision APP/C1570/W/20/3256619

       relation to relevant topics and/or in relation to the discussion on conditions and
       planning obligations, such that this is not a main issue in the appeal.

10. Upon exchange of evidence between the parties, it became clear that the
    Council accepted that planning permission should be granted for the
    development, subject to conditions and obligations. However, there remained
    significant divergence between the parties as to the form and extent of any
    conditions and much time was spent discussing this matter over the course of
    the Inquiry.

11. On 20 April 2021, the Government announced that it would set a new climate
    change target to cut emissions by 78% by 2035 compared to 1990 levels and
    that the sixth Carbon Budget will incorporate the UK’s share of international
    aviation and shipping emissions. The parties were invited to make comment
    and their responses have been taken into account in reaching a decision2.

Main Issues

12. The main issues are the effect of the development on aircraft noise, air quality
    and carbon/climate change.

13. However, it is first necessary to consider national aviation policy and some
    introductory matters.

Reasons

National Aviation Policy and Introductory Matters

14. The Aviation Policy Framework (March 2013) (APF) sets out the Government’s
    high-level objectives and policy for aviation. It recognises the benefits of
    aviation, particularly in economic terms, and seeks to ensure that the UK’s air
    links continue to make it one of the best-connected countries in the world.
    A key priority is to make better use of existing runway capacity at all UK
    airports. Beyond 2020, it identifies that there will be a capacity challenge at all
    of the biggest airports in the South East of England.

15. There is also, however, an emphasis on the need to manage the environmental
    impacts associated with aviation and a recognition that the development of
    airports can have negative as well as positive local impacts. Climate change is
    identified as a global issue that requires action at a global level, and this is said
    to be the Government’s focus for tackling international aviation emissions,
    albeit that national initiatives will also be pursued where necessary.

16. More recently, the Government published the ANPS3 and MBU4, on the same
    day, as early components of the forthcoming Aviation Strategy. The ANPS is
    primarily concerned with providing a policy basis for a third runway at
    Heathrow and is relevant in considering other development consent
    applications in the South East of England. It is of limited relevance to the
    current appeal as it is not a Nationally Significant Infrastructure Project (NSIP).
    Although the ANPS does refer to applications for planning permission, it notes
    the findings of the Airports Commission on the need for more intensive use of

2
  Having heard a significant amount of evidence on carbon and climate change during the Inquiry, the matters
raised by the announcement did not necessitate reopening the Inquiry. Nor was it necessary for the ES to be
further updated, as the announcement does not have a significant bearing on the likely effects of the development
3
  Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of
England (June 2018)
4
  Beyond the horizon, The future of UK aviation, Making best use of existing runways (June 2018)

https://www.gov.uk/planning-inspectorate                   3
Appeal Decision APP/C1570/W/20/3256619

       existing infrastructure and accepts that it may well be possible for existing
       airports to demonstrate sufficient need for their proposals, additional to (or
       different from) the need which is met by the provision of a Northwest Runway
       at Heathrow.

17. MBU builds upon the APF, again referencing work undertaken by the Airports
    Commission which recognised the need for an additional runway in the South
    East by 2030 but also noted that there would be a need for other airports to
    make more intensive use of their existing infrastructure. On this basis, MBU
    states that the Government is supportive of airports beyond Heathrow making
    best use of their existing runways5. There is no requirement flowing from
    national aviation policy for individual planning applications for development at
    MBU airports, such as Stansted, to demonstrate need 6 for their proposed
    development or for associated additional flights and passenger movements.
    This was not disputed by the Council and whilst SSE took a contrary view, even
    its witness accepted that there was a need for additional capacity within the
    London airport network, beyond any new runway at Heathrow7.

18. The in-principle support for making best use of existing runways provided
    by MBU is a recent expression of policy by the Government. It is given in full
    knowledge of UK commitments to combat climate change, having been
    published long after the Climate Change Act 2008 (CCA) and after the
    international Paris Agreement. It thoroughly tests the potential implications of
    the policy in climate change terms, specifically carbon emissions. To ensure
    that Government policy is compatible with the UK’s climate change
    commitments the Department for Transport (DfT) aviation model was used to
    look at the impact of allowing all MBU airports to make best use of their
    existing runway capacity8. This methodology appears to represent a robust
    approach to the modelling.

19. International aviation emissions are not currently included within UK carbon
    budgets and are instead accounted for through ‘headroom’ in the budgets, with
    a planning assumption for aviation emissions of 37.5Mt of CO2. Whilst the
    Government has recently announced that international aviation will expressly
    form part of the sixth Carbon Budget, its budget value has not yet been
    defined.

20. Of course, the headroom approach of taking account of emissions from
    international aviation which has been used to date means that accounting for
    such carbon emissions as part of the Carbon Budget process is nothing new.
    What is set to change, however, is the process by which it is taken into
    account. As of yet, there has been no change to the headroom planning
    assumption. Nor has there been any indication from the Government that
    there will be a need to restrict airport growth to meet the forthcoming budget
    for international aviation, even if it differs from the current planning
    assumption. The specific carbon/climate change implications of this appeal are
    considered in more detail below.

5
  There is nothing in MBU which suggests that making best use proposals cannot involve operational development
of the type proposed in this case
6
  Notwithstanding conclusions in relation to Manston Airport, which is not comparable to the current proposal
(being a Development Consent Order scheme, involved an unused airfield and was a cargo-led proposal rather
than passenger)
7
  Brian Ross in response to questions from the Inspector
8
  Emissions from UK airports not included in the model are unlikely to be significant as they are small and offer
only short-range services

https://www.gov.uk/planning-inspectorate                    4
Appeal Decision APP/C1570/W/20/3256619

21. MBU sets out a range of scenarios for ensuring the existing planning
    assumption can be met, again primarily through international agreement and
    cooperation, considering carbon traded or carbon capped scenarios. It
    concludes that the MBU policy, even in the maximum uptake scenario tested,
    would not compromise the planning assumption.

22. Notwithstanding that conclusion, no examples of MBU-type airport
    development having gained approval since the publication of MBU were brought
    to the attention of the Inquiry9 and whilst numerous other airports have plans
    to expand, none of those identified appear to have a prospect of receiving
    approval before this scheme. As such, it can be readily and reasonably
    concluded that this development would not put the planning assumption at
    risk.

23. Consistent with the APF, MBU differentiates between the role of local planning
    and the role of national policy, making it clear that the majority of
    environmental concerns, such as noise and air quality, are to be taken into
    account as part of existing local planning application processes. Nonetheless,
    it adds that some important environmental elements should be considered at a
    national level, such as carbon emissions, which is specifically considered by
    MBU. The Council apparently understood this distinction in resolving to grant
    planning permission in 2018. However, it subsequently changed its position,
    deciding that carbon is a concern for it as local planning authority despite MBU,
    and this led, at least in part, to the refusal of planning permission, as well as to
    its subsequent case as put at the Inquiry.

24. Since publication of MBU, UK statutory obligations under the CCA have been
    amended to bring all greenhouse gas emissions to net zero by 2050, compared
    to the previous target of at least 80% reduction from 1990 levels. In addition,
    the Government has indicated a new climate change target to cut emissions by
    78% by 2035 compared to 1990 levels, effectively an interim target on the
    journey to net zero. Notwithstanding these changes, MBU has remained
    Government policy. There are any number of mechanisms that the
    Government might use to ensure that these new obligations are achieved which
    may or may not involve the planning system and may potentially extend to
    altering Government policy on aviation matters.

25. These are clearly issues for the Government to consider and address, having
    regard to all relevant matters (not restricted to aviation). The latest advice
    from the Committee on Climate Change (CCC) will be one such consideration
    for the Government but it cannot currently be fully known to what extent any
    recommendations will be adopted. The Government is clearly alive to such
    issues and will be well aware of UK obligations10.

26. The ES and ESA contain detailed air traffic forecasts which seek to demonstrate
    the difference between a ‘do minimum’ scenario, where the airport makes use
    of its existing planning permission within its relevant restrictions, and the
    ‘development case’ scenario where the appeal development were to proceed.
    The forecasts are prepared in accordance with industry guidance and practise

9
  With the potential exception of the Southampton Airport scheme, which involved a runway extension to
accommodate larger aircraft. No detailed evidence in relation to this scheme was provided by the parties, but it
would not alter the Panel’s conclusions on MBU support even if an increase in capacity resulted from the scheme
10
   Not least from the recent Supreme Court Judgement in respect of the ANPS - R (on the application of Friends of
the Earth Ltd and others) v Heathrow Airport Ltd [2020] UKSC 52

https://www.gov.uk/planning-inspectorate                    5
Appeal Decision APP/C1570/W/20/3256619

     by a professional in this field working as a Director in the aviation department
     for a global consulting service.

27. The Council, whilst highlighting the inherent uncertainty in forecasts and
    projections into the future, did not dispute the appellant’s position on
    forecasting, concluding that the predictions were reasonable and sensible11.
    SSE made a series of criticisms of the inputs and assumptions used by the
    appellant, but these were largely based on assertion and often lacked a clear
    evidential basis. Different opinions about the likely number of passengers per
    air transport movement, fleet replacement projections, dominance of / reliance
    on a single airline at Stansted and cargo expectations were all rebutted by the
    appellant with justification for the inputs and assumptions used. The Panel was
    not persuaded that the conclusions in the ES and ESA were incorrect or
    unreliable. Indeed, they are to be preferred over the evidence of SSE on this
    matter, which was not prepared by a person qualified or experienced in air
    traffic forecasting. Accordingly, the forecasts contained within the ES and ESA
    are sufficiently robust and the best available in this case.

28. The appellant’s forecasts do not align with those prepared by the Government
    in 2017 (DfT forecasts) which are used as the basis for conclusions in MBU, as
    referred to above. However, there is no reason why they should. The DfT
    makes clear that its forecasts are a long-term strategic look at UK aviation,
    primarily to inform longer term strategic policy. They do not provide detailed
    forecasts for each individual airport in the short-term and the DfT acknowledge
    that they may differ from local airport forecasts, which are prepared for
    different purposes and may be informed by specific commercial and local
    information not taken into account by the DfT. As such, the DfT states that its
    forecasts should not be viewed as a cap on the development of individual
    airports.

29. On this basis, the Panel does not accept that a divergence between the
    appellant’s and the DfT’s forecasts indicate any unreliability in the data
    contained in the ES and ESA. Nor is there any justification for applying a
    reduction to the appellant’s forecasts12. Furthermore, SSE’s forecasting
    witness recently challenged the validity and reliability of the DfT forecasts in
    the High Court while acting for SSE, thereby further calling into question the
    credibility of their now contradictory evidence to this Inquiry.

30. It remained unclear throughout the Inquiry, despite extensive evidence, why
    the speed of growth should matter in considering the appeal. If it ultimately
    takes the airport longer than expected to reach anticipated levels of growth,
    then the corresponding environmental effects would also take longer to
    materialise or may reduce due to advances in technology that might occur in
    the meantime. The likely worst-case scenario assessed in the ES and ESA, and
    upon which the appeal is being considered, remains just that. Conversely,
    securing planning permission now would bring benefits associated with
    providing airline operators, as well as to other prospective investors, with
    significantly greater certainty regarding their ability to grow at Stansted, secure
    long-term growth deals and expand route networks, potentially including long
    haul routes.

11
  Proof of Hugh Scanlon, UDC/4/1
12
  This is notwithstanding examples of previous air traffic forecasts for Stansted and other airports that have not
be borne out for whatever reason. Any reduction to account for perceived optimism bias would be arbitrary and
unlikely to assist the accuracy of the forecasts

https://www.gov.uk/planning-inspectorate                     6
Appeal Decision APP/C1570/W/20/3256619

31. SSE argued that the ‘do minimum’ case had been artificially inflated to
    minimise the difference from the ‘development case’. However, there is no
    apparent good reason why the airport would not seek to operate to the
    maximum extent of its current planning restrictions if the appeal were to fail.
    Indeed, as a commercial operator, there is good reason to believe that it
    would. The fact that it does not operate in this way already does not mean it
    cannot or will not in future. In fact, the airport has seen significant growth in
    passenger numbers in recent years, since Manchester Airports Group took
    ownership, albeit that these have latterly been affected by the pandemic.

32. As such, there is no good reason to conclude that the air traffic forecasts
    contained within the ES and ESA are in any way inaccurate or unreliable. Of
    course, there is a level of uncertainty in any forecasting exercise but those
    provided are an entirely reasonable basis on which to assess the impacts of the
    proposed development. The Panel does not accept that there has been any
    failure to meet the requirements of the EIA Regulations, as concluded above.

Aircraft Noise

33. The overarching requirements of national policy, as set out in the National
    Planning Policy Framework (the Framework) and the Noise Policy Statement for
    England (NPSE), are that adverse impacts from noise from new development
    should be mitigated and reduced to a minimum and that significant adverse
    impacts on health and quality of life should be avoided. It is a requirement of
    the NPSE that, where possible, health and quality of life are improved through
    effective management and control of noise.

34. The APF states that the overall policy is to limit and, where possible, reduce the
    number of people significantly affected by aircraft noise. The APF expects the
    aviation industry to continue to reduce and mitigate noise as airport capacity
    grows and that as noise levels fall with technology improvements the benefits
    are shared between the industry and local communities.

35. While the APF states that the 57 dB LAeq 16 hour contour should be treated as
    the average level of daytime aircraft noise marking the approximate onset of
    significant community annoyance, the 2014 Survey of Noise Attitudes (SoNA)
    indicates that significant community annoyance is likely to occur at
    54 dB LAeq 16 hour. The latter metric has been used by the Civil Aviation
    Authority in its Aviation Strategy: Noise Forecast and Analysis – CAP 1731. It
    has also been used in the Government’s consultation Aviation 2050, The future
    of UK aviation. The Council and the appellant agree that the 54 dB LAeq 16 hour
    contour should be the basis for future daytime noise restrictions in this case.

36. The NPSE describes the concepts of Lowest Observed Adverse Effect Level
    (LOAEL) and Significant Observed Adverse Effect Level (SOAEL). The LOAEL is
    set at 51 dB LAeq 16 hour in the DfT’s Air Navigation Guidance and is the level
    above which adverse effects on health and quality of life can be detected.
    These levels apply to daytime hours. The corresponding levels at night are
    a LOAEL of 45 dB LAeq 8 hour and onset of significant annoyance at
    48dB LAeq 8 hour.

37. The World Health Organisation’s (WHO) Environmental Noise Guidelines
    2018 (ENG) recommend lower noise levels than those used in response to
    SoNA. The Government has stated in Aviation 2050 that it agrees with the
    ambition to reduce noise and to minimise adverse health effects, but it wants

https://www.gov.uk/planning-inspectorate      7
Appeal Decision APP/C1570/W/20/3256619

     policy to be underpinned by the most robust evidence on these effects,
     including the total cost of action and recent UK specific evidence which the
     WHO did not assess. These factors limit the weight that can be given to the
     lower noise levels recommended in the ENG.

38. Aircraft modernisation is reducing aircraft noise over time. It has been
    demonstrated that the daytime 57 dB and 54 dB noise contours will decrease in
    extent over the period to 2032, both with and without the development, albeit
    that the 54 dB contour would be slightly larger in the development case (DC)
    compared to the do minimum (DM) scenario. The 51 dB LOAEL contour is
    however predicted to increase slightly in extent compared to the 2019 baseline.

39. The night-time 48 dB contour is also predicted to decrease in extent and this
    reduction would be greater in the DC than in the DM scenario. This is based
    upon there being a greater amount of fleet modernisation, including fewer of
    the noisier cargo flights.

40. The ESA compares the DC with the DM scenario at 2032, which is when the
    maximum passenger throughput is predicted to be reached, and at 2027 which
    is identified as the transition year. In 2032 there would be an increase in air
    noise levels during the daytime of between 0.4 and 0.6 dB which is assessed as
    a negligible effect. There would be a beneficial reduction in night-time noise of
    between 0.3 and 0.8 dB in the DC compared to DM, but this is also assessed as
    negligible.

41. Saved Policy ENV11 of the Uttlesford Local Plan 2005 (ULP) resists noise
    generating development if this would be liable to adversely affect the
    reasonable occupation of existing or proposed noise sensitive development
    nearby. The ESA demonstrates that this would not be the case.

42. It is necessary to ensure that the benefits in terms of the reduction in noise
    contours over time arising from fleet modernisation, and the reduction in night
    noise are secured in order that these are shared with the community in
    accordance with national policy in the APF. The Council’s position is that the
    development is acceptable in terms of aircraft noise, subject to suitable
    mitigation measures. Condition 7 defines the maximum areas to be enclosed
    by 54 dB LAeq 16hour, and 48 dB LAeq 8 hour noise contours and requires that the
    area enclosed by each of those contours is reduced as passenger throughput is
    increased, in accordance with the findings of the ESA.

43. There is no control of the night-time noise contour under the existing
    permission. This is instead subject to control under the Government’s night
    flight restrictions which impose a Quota Count. It is noted that the Secretaries
    of State in granting the last planning permission considered that there was no
    need for such a condition because of the existing controls.

44. However, the night flight restrictions do not cover the full 8 hour period used in
    the LAeq assessment. Consequently, if only the night flight restrictions were to
    be relied upon, there would be no control of aircraft noise between 23:00 and
    23:30 hours and between 06:00 and 07:00 hours. The ESA has demonstrated
    that the reductions in night noise would be beneficial to health. For these
    reasons, inclusion of the LAeq 8hour restriction in condition 7 would be necessary.
    In coming to this view, the Panel has taken into account the dual restrictions
    that would apply. However, the night noise contour requirement in condition 7

https://www.gov.uk/planning-inspectorate      8
Appeal Decision APP/C1570/W/20/3256619

     would be necessary to secure the benefit and it has not been demonstrated
     that the night noise restrictions would be sufficient in this respect.

45. The Panel has considered SSE’s submissions concerning the methodology used
    in the ES and ESA. The use of LAeq levels in the assessment is in accordance
    with Government policy and reflects the conclusions of SoNA, but the ES and
    ESA also include assessments of the number of flights exceeding 60 and
    65 dB(A) and maximum single event noise levels. The assessments of aircraft
    noise are comprehensive, and the methodology used is justified and widely
    accepted as best practice, including by the Government and industry. The
    Council considers that the methodology used is robust. The Panel has also
    considered the evidence on air traffic forecasts and, for the reasons given
    elsewhere in this decision, is satisfied that the assumptions regarding fleet
    replacements are robust.

46. SSE has referred to the number of complaints about noise increasing in recent
    years. However, it is also relevant to consider the number of complainants
    which has significantly decreased. These factors have been taken into account
    in the ES and ESA.

47. The existing sound insulation grant scheme (SIGS) provides for financial
    assistance to homeowners and other noise-sensitive occupiers, to be used to
    fund sound insulation measures. This uses a contour which is based on
    63 dB LAeq 16 hour for daytime and the aggregate 90 dBA SEL footprint of the
    noisiest aircraft operating at night.

48. The submitted Unilateral Undertaking (UU) provides for an enhanced SIGS
    whereby a 57 dB daytime contour is used, thereby increasing its extent and the
    number of properties covered. This is consistent with the evolving perceptions
    of the level of significant adverse effects and exceeds the levels recommended
    for such measures as stated in the APF. The use of this contour together with
    the 90 dBA SEL footprint as qualifying criteria would provide mitigation against
    both daytime and night-time noise. The latter criterion recognises that sleep
    disturbance is more likely to arise from single events than average noise levels
    over the night-time period.

49. The UU also applies to specific identified noise-sensitive properties including
    schools, community and health facilities and places of worship. An assessment
    of these properties has been undertaken using the daytime 57 dB contour used
    for residential properties, the number of flights above 65 dB and the maximum
    sound levels of aircraft flying over properties. Inclusion of properties in the list
    in Schedule 2 Part 1 of the UU means that bespoke measures may be discussed
    between the property owner and the airport operator and that further noise
    surveys may be undertaken. Thaxted Primary School does not qualify for
    inclusion in the list under the criteria used. However, submissions were made
    to the Inquiry that the school should be included. It has provisionally been
    included in the list subject to the Panel’s decision.

50. Thaxted Primary School is outside, but adjacent to the boundary identified for
    the SIGS. This is represented by the 57 dB LAeq 16 hour and 200 daily flights
    above 65 dB (N65 200). The school is well outside the 63 and 60 dB contours,
    the former being the level that Government policy recognises, in the APF, as
    requiring acoustic insulation to noise-sensitive buildings and the latter the level
    to which this may potentially be reduced.

https://www.gov.uk/planning-inspectorate      9
Appeal Decision APP/C1570/W/20/3256619

51. Departing aircraft predominantly take off towards the south-west, away from
    the school. Those that do take off towards the north-east turn onto standard
    routes away from the school before reaching it. The school is, however
    exposed to noise from arriving aircraft.

52. Standards for internal noise levels in schools are set out in Building Bulletin
    93 – Acoustic design of schools: performance standards (BB93). These
    use LAeq 30mins as a metric because school pupils experience noise over limited
    periods and not over the full daytime period. No assessment has been
    undertaken using this metric. It is, however, possible to determine the effect
    of the proposal having regard to the maximum sound levels of aircraft flying
    over the property in question.

53. It has been demonstrated that the school would not be exposed to LAmax
    flyover levels of 72 dB or more. The Council agrees that this maximum level
    would ensure that internal noise levels would not exceed 60 dB, with windows
    open. This provides a good degree of certainty that noise levels would be in
    accordance with BB93 which states that indoor ambient noise levels should not
    exceed 60 dB LA1, 30 mins.

54. No representations have been made either by the school or the education
    authority with regard to inclusion of Thaxted Primary School in the list. It has
    not been demonstrated that the school should be included in the list in terms of
    any specific need for mitigation. For these reasons the inclusion of Thaxted
    Primary School in the list of properties in Schedule 2 Part 1 of the UU would not
    be necessary and on this basis this provision would not meet the tests in the
    Community Infrastructure Levy Regulations 2010 (the CIL Regulations).

55. The noise assessments in the ES and ESA take into account ground noise from
    aircraft. The Council’s reason for refusal concerns only aircraft noise and not
    noise from ground plant and equipment or surface access. The Panel has
    considered the evidence provided by SSE in respect of the latter, but these do
    not alter its conclusions on this main issue.

56. It has been demonstrated beyond doubt that the development would not result
    in unacceptable adverse aircraft noise and that, overall, the effect on noise
    would be beneficial. Subject to the mitigation provided by the UU and the
    restrictions imposed by condition 7, the development would accord with
    Policy ENV11 of the ULP and with the Framework.

Air Quality

57. Although air pollution levels around the airport are for the most part well within
    adopted air quality standards, an area around the Hockerill junction in Bishop’s
    Stortford has nitrogen dioxide levels that are above those standards. This is
    designated an Air Quality Management Area (AQMA). The development would
    increase emissions from aircraft, other airport sources and from road vehicles,
    but this would be against a trend of reduction in air pollution as a result,
    amongst other things, of increasing control of vehicle emissions.

58. The pollutants which are assessed are oxides of nitrogen (NOx), particulate
    matter (PM10) and fine particulate matter (PM2.5). Ultrafine particulates (UFP)
    are recognised as forming a subset of PM2.5 and they are likely to affect health.
    However, there is no recognised methodology for assessing UFP and the most
    that can be done is a qualitative, rather than quantitative assessment.

https://www.gov.uk/planning-inspectorate     10
Appeal Decision APP/C1570/W/20/3256619

59. Policy ENV13 of the ULP resists development that would involve users being
    exposed on an extended long-term basis to poor air quality outdoors near
    ground level. The Policy identifies zones on either side of the M11 and
    the A120 as particular areas to which the Policy applies.

60. Paragraph 170 of the Framework states that development should, wherever
    possible, help to improve local environmental conditions such as air quality.
    Paragraph 181 states that planning decisions should sustain and contribute
    towards compliance with relevant limit values or national objectives for
    pollutants, taking into account the presence of AQMAs and the cumulative
    impacts from individual sites in local areas. Opportunities to improve air
    quality or mitigate impacts should be identified.

61. Emissions of NOx, PM10 and PM2.5 would increase slightly in the DC compared
    to the DM scenario. They would also increase in comparison to the 2019
    baseline. However, pollutant levels resulting from other sources, notably road
    traffic, are forecast to decline. The ES and ESA demonstrate that there would
    be no exceedance of air quality standards at human receptors and that air
    quality impacts would be negligible. The overall effect of the development in
    terms of air quality would be in accordance with the Framework and with the
    Clean Air Strategy, which refers to the need to achieve relevant air quality limit
    values. While the Framework seeks to improve air quality where possible, it
    recognises that it will not be possible for all development to improve air quality.

62. While the proposed development would not improve air quality, the UU secures
    a number of measures to encourage the use of public transport and to reduce
    private car use, including single occupancy car trips. The airport has a
    Sustainable Development Plan which, whilst not binding, commits to reducing
    air pollution. It has already achieved significant increases in use of public
    transport, thereby limiting emissions and these initiatives would be continued.
    The measures would have other objectives such as reducing carbon emissions,
    which would not necessarily benefit air quality but nonetheless the provisions
    of the UU would overall be likely to secure improvements in air quality.

63. Although it has raised a number of issues concerning the methodology used
    and the robustness of the assessments during the appeal process, the Council
    made no request for further information under the EIA Regulations.

64. SSE has commented on a number of aspects of the air quality assessments,
    including the transport data used, the receptors assessed and modelling.
    The appellant has provided clarification of the aspects that have been queried
    by SSE and has justified the approach taken and the assumptions made. The
    appellant’s responses provide sufficient reassurance that the assessments are
    soundly based and that they are conservative.

65. The air quality assessment depends on the assessment of road traffic in terms
    of vehicle emissions. Surface access is dealt with elsewhere in this decision,
    but the transport modelling forms a robust assessment which has been
    accepted by the Highway Authorities. Consequently, this forms a sound basis
    for the air quality assessment.

66. The Clean Air Strategy includes a commitment to significantly tighten the
    current air quality objective for fine particulates, but no numerical standard has
    yet been set. The current objective for PM2.5 is 25µg/m3. The 2008 WHO
    guidelines recommend an ultimate goal for annual mean concentrations of

https://www.gov.uk/planning-inspectorate     11
Appeal Decision APP/C1570/W/20/3256619

     PM2.5 of 10µg/m3. The Clean Air Strategy commits to examine the action that
     would be necessary to meet this limit but no timescale for this has been set.

67. The ESA assesses the largest concentration of PM2.5 in 2032 to be 11.6µg/m3 in
    the DC. This is well below the current objective but slightly above the more
    ambitious WHO guideline. The great majority of the modelled concentrations
    would be below that guideline value. The assessment also shows that the
    effect of the development by comparison to the DM scenario would be
    negligible. The proposal would not unacceptably compromise the Clean Air
    Strategy in reducing concentrations of PM2.5 and accords with the current
    objective.

68. The Bishop’s Stortford AQMA is within East Hertfordshire District Council’s
    (EHDC) administrative area. Policy EQ4 of the East Hertfordshire Local Plan
    2018 requires minimisation of impacts on local air quality. That Policy also
    requires, as part of the assessment, a calculation of damage costs to determine
    mitigation measures. The ES and ESA demonstrate that there would be
    negligible effects for which the UU secures mitigation measures. EHDC has
    consequently raised no objection to the proposal.

69. The AQMA is centred around a traffic signal-controlled road junction which is
    enclosed by buildings on all sides. The A1250 is at a gradient on both sides of
    the junction. It is likely that the high monitored levels of pollutants here result
    from emissions from queuing traffic and the enclosing effect of the buildings.
    Nitrogen dioxide (NO2) levels have been declining here in recent years, with a
    reduction in levels between 2012 and 2019. However, NO2 levels remain
    above the air quality standard for 3 of the 4 locations monitored and
    significantly above the standard for 2 of those locations.

70. An adjustment factor has been used to compensate for the difference between
    modelled and measured concentrations of NO2 in the AQMA. Uttlesford District
    Council is concerned that this factor is unusually high, but it has been
    undertaken in accordance with Defra’s Local Air Quality Management Technical
    Guidance TG16 and on this basis, is not considered unreasonable. This
    guidance was used together with the Emission Factor Toolkit and Defra’s
    background pollutant concentrations maps in predicting future improvements in
    air quality. Sensitivity tests using less optimistic assumptions regarding future
    improvements in air quality were incorporated in the ES and ESA. While there
    is acknowledged uncertainty in predicting future levels, a rigorous approach
    has been used in the assessment.

71. It is not disputed that airport activities contribute less than 1% to NOx
    concentrations in Bishop’s Stortford. The appellant’s transport modelling
    demonstrates that any increase in traffic along the A1250 and through the
    Hockerill junction would, at worst be 1.3% of current traffic flow in the DC
    compared to DM. This extra traffic would not necessarily be evenly distributed
    throughout the day. Queuing traffic would tend to increase emissions and the
    adjacent buildings would have an enclosing effect. Nonetheless, this level of
    additional traffic would be unlikely to appreciably affect pollution levels in
    the AQMA.

72. It is common ground that UFPs result from combustion sources including
    burning of aviation fuel, which contains higher levels of sulphur than fuel used
    for road vehicles. It is also agreed that there is no reliable methodology for
    assessing the quantity of UFPs that would result from the development. It is

https://www.gov.uk/planning-inspectorate      12
Appeal Decision APP/C1570/W/20/3256619

        the quantity of these particulates, rather than their mass, that is particularly
        relevant in terms of implications for human health.

73. Although the development would result in increases in PM2.5, the ES and ESA
    demonstrate that those increases would be negligible compared to the DM
    scenario. It is also the case that ambient levels of PM2.5 are predicted to
    reduce over time. The assessment considers the mass of PM2.5. While
    assumptions can be made about the mass of UFPs as a subset of PM2.5
    reducing over time, it is not possible to conclude on the number of UFPs in the
    absence of any recognised assessment methodology. That said, the Health
    Impact Assessment considered epidemiological research, which includes the
    existing health effects of PM2.5 and thus UFPs as a subset. This concluded that
    there would be no measurable adverse health outcomes per annum.

74. The Aviation 2050 Green Paper proposes improving the monitoring of air
    pollution, including UFP. While the significance of UFP as a contributor to the
    toxicity of airborne particulate matter is recognised, footnote 83 of the Green
    Paper notes that the magnitude of their contribution is currently unclear.

75. The Council, while raising concern over UFPs, is nonetheless content that
    permission could be granted subject to conditions requiring monitoring of air
    quality. The UU secures such monitoring, and condition 10 requires
    implementation of an air quality strategy, which is to be approved by the
    Council.

76. The nearby sites of Hatfield Forest and Elsenham Woods are Sites of Special
    Scientific Interest (SSSI). Policy ENV7 of the ULP seeks to protect designated
    habitats.

77. The ES and ESA assessments were undertaken in accordance with Environment
    Agency13 and Institute of Air Quality Management (IAQM)14 guidance. The ESA
    demonstrates that the development would result in long-term critical loads for
    NOx concentrations at the designated sites being increased by less than 1%.

78. Previous monitoring has shown that 24-hour mean NOx concentrations can
    greatly exceed annual mean concentrations. Condition 10 requires a strategy
    to minimise emissions from airport operations and surface access. A condition
    has also been suggested which would require assessment of 24-hour mean
    NOx concentrations at the designated sites and provision of any necessary
    mitigation. The IAQM guidance states that the annual mean concentration
    of NOx is most relevant for its impacts on vegetation as effects are additive.
    The 24-hour mean concentration is only relevant where there are elevated
    concentrations of sulphur dioxide and ozone which is not the case in this
    country. Natural England has accepted the assessment and has not requested
    use of the 24-hour mean concentration.

79. The UU includes obligations to monitor air quality, and to discuss with the
    Council the need for any measures to compensate for any adverse effect on
    vegetation within the designated sites. Because monitoring of air quality and
    necessary mitigation in respect of the SSSIs would be secured by the UU, the
    suggested condition to assess 24-hour mean NOx concentrations would not be
    necessary.

13
     Environment Agency H1 guidance
14
     Institute of Air Quality Management: Land-Use Planning & Development Control: Planning for Air Quality (2017)

https://www.gov.uk/planning-inspectorate                      13
Appeal Decision APP/C1570/W/20/3256619

80. The ES concluded that there would be no significant effect at ecological
    receptors. The Council considers that the development would be acceptable in
    air quality terms subject to imposition of suitable conditions to limit the air
    quality effects and to secure mitigation measures.

81. For the reasons given, it has been demonstrated that the development would
    not have an unacceptable effect on air quality and that it accords with
    Policies ENV7 and ENV13 of the ULP.

Carbon and Climate Change

82. There is broad agreement between the parties regarding the extremely serious
    risks associated with climate change. These risks are acknowledged and
    reflected in Government policy. Indeed, in this regard, the Framework states,
    amongst other things, that the environmental objective of sustainable
    development embraces mitigating and adapting to climate change, including
    moving to a low carbon economy. It adds that the planning system should
    support the transition to a low carbon future in a changing climate … and …
    should help to shape places in ways that contribute to radical reductions in
    greenhouse gas emissions.

83. Nonetheless, in spite of that general accord there remains much disagreement
    between the main parties to the Inquiry over how the effects of the
    development on climate change should be assessed, quantified, monitored and
    managed, including into the future.

84. The Government has recently made it clear that it will target a reduction in
    carbon emissions by 78% by 2035 compared to 1990 levels and that the sixth
    Carbon Budget, scheduled to be introduced before the end of June 2021, will
    directly incorporate international aviation emissions rather than by using the
    headroom / planning assumption approach of the previous budgets. The first
    of these measures will introduce a target for reducing emissions prior to the
    net zero target of 2050, acting as an intermediate target, and is set to be
    enshrined in law.

85. The latter measure will alter the way in which such emissions are accounted
    for. The Government intends to set the sixth Carbon Budget at the
    965 MtCO2e level recommended by the CCC. As outlined above, carbon
    emissions from international aviation have always been accounted for in past
    carbon budgeting. There is no good reason to assume that the coming change
    in how they are accounted for will significantly alter Government policy in this
    regard or that the Government intends to move away from its MBU policy.

86. Indeed, the Government’s press release expressly states, amongst other
    things, that following the CCC’s recommended budget level does not mean we
    are following their policy recommendations. Moreover, it also says that the
    Government will ‘look to meet’ this reduction through investing and capitalising
    on new green technologies and innovation, whilst maintaining people’s freedom
    of choice, including on their diet. For that reason, the 6CB will be based on its
    own analysis, and ‘does not follow each of the Climate Change Committee’s
    specific policy recommendations.’

87. As outlined in the National Aviation Policy and Introductory Matters subsection,
    there is in-principle Government policy support for making best use of existing
    runways at airports such as Stansted, and MBU thoroughly tests the potential

https://www.gov.uk/planning-inspectorate     14
Appeal Decision APP/C1570/W/20/3256619

     implications of the policy in terms of carbon emissions. International aviation
     carbon emissions are not currently included within UK carbon budgets, but
     rather are accounted for via an annual ‘planning assumption’ of 37.5MtCO2.
     MBU policy establishes that, even in the maximum uptake scenario tested, this
     carbon emissions planning assumption figure would not be compromised.

88. The contents of the ES and ESA, which - unlike MBU - specifically assess the
    potential impacts of the appeal development, support the conclusions of MBU in
    this regard. Indeed, they indicate that the proposed development would take
    up only an extremely small proportion of the current ‘planning assumption’.
    For instance, the ESA shows in 2050 that the additional annual carbon
    emissions from all flights resulting from the development are likely to be in the
    region of 0.09MtCO2, which would equate to only 0.24% of the 37.5MtCO2
    planning assumption15.

89. This assessment assumes that the airport would not seek to use its permitted
    total of 274,000 ATMs in the event that the appeal were to be dismissed. Yet,
    in practice, it seems more likely that it would, as a commercial operator, seek
    to maximise flights. Consequently, the relative increase in carbon emissions
    resulting from the development would be likely to be less than as predicted in
    the ESA compared to what might happen if the proposed development were not
    to proceed.

90. In light of the CCC’s recommendations and the Government’s 20 April 2021
    announcement, the 37.5MtCO2 planning assumption, as a component of the
    planned total 965 MtCO2e budget, may well change. Even if it were to be
    reduced as low as 23MtCO2, as is suggested might happen by the Council’s
    carbon/climate change witness with reference to the advice of the CCC on the
    sixth Carbon Budget, an increase in emissions of 0.09MtCO2 resulting from the
    appeal development in 2050 would be only some 0.39% of this potential,
    reduced figure.

91. Unsurprisingly, the carbon emission figures in the ESA vary across the years
    modelled to 2050 and over the three scenarios employed from 2032
    (‘Pessimistic’, ‘Central’ and ‘Best practice’). For instance, the predicted
    additional annual carbon emissions from flights increases steadily from the
    base-year of 2019 over the years to 2032 leading to a predicted increase of
    some 0.14MtCO2 in 203216, which equates to 0.38% of the planning
    assumption. Notwithstanding these variations, in each case the annual values
    for all years and scenarios would, nonetheless, remain only a very small
    proportion of both the Government’s established planning assumption and a
    potentially reduced assumption of 23MtCO2.

92. Of course, these are annual emissions figures and, as such, they need to be
    summed in order to give the full, cumulative amount of predicted additional
    carbon emissions resulting from flights associated with the appeal development
    for any year on year period, such as the 2019 to 2050 period used in the ESA.
    Consequently, the cumulative additional emissions predicted in the ESA for the
    entire 2019-2050 period or for the 2032-2050 period are far greater than the
    0.09MtCO2 forecast for the year 2050. However, the Government’s planning

15
   0.09MtCO2 is the difference between the ‘Annual Development Case Central’ and the ‘Annual Do Minimal Central’
scenarios of the ESA
16
   0.14MtCO2 is the difference between the ‘Development Case Pessimistic’ and the ‘Do Minimum Pessimistic’
scenarios of the ESA

https://www.gov.uk/planning-inspectorate                   15
Appeal Decision APP/C1570/W/20/3256619

        assumption of 37.5MtCO2 is also an annual figure, as is the figure of 23MtCO2,
        such that the relative cumulative amounts of carbon emissions would remain
        proportionately small.

93. Notwithstanding reference to a range of planned airport development as part of
    the appeal process, the fact that no examples of MBU-type development having
    been approved since the publication of MBU were brought to the attention of
    the Inquiry lends further support to the conclusion that this development alone
    would not put the planning assumption at risk17.

94. Although UK statutory obligations under the CCA have been amended since the
    publication of MBU to bring all greenhouse gas emissions to net zero by 2050,
    with an additional target of a 78% reduction in carbon emissions by 2035 set
    to be introduced, MBU remains Government policy. Given all of the foregoing
    and bearing in mind that there are a range of wider options that the
    Government might employ to meet these new obligations and that aviation is
    just one sector contributing to greenhouse gas emissions to be considered,
    there is also good reason to conclude that the proposed development would not
    jeopardise UK obligations to reach net zero by 2050 or to achieve the planned
    2035 intermediate target. On this basis, given the very small additional
    emissions forecast in relative terms, there is also no reason to expect that the
    Council’s climate emergency resolution should be significantly undermined.

95. The aviation emissions assessments of the ES and ESA are reported as CO2
    only rather than in the wider terms of carbon dioxide equivalent emissions
    (CO2e), which also includes nitrous oxide (N2O) and methane (CH4), and which
    the Government has adopted for its sixth Carbon Budget. While it may have
    been beneficial to have used CO2e in preference to CO2 in the ES and ESA, this
    was not a matter raised by the Council during scoping, nor at any other stage
    prior to the exchange of evidence. The approach of the ES and ESA, in this
    regard, is also consistent with the DfT’s 2017 Forecasts and with the MBU
    policy. Consequently, the approach adopted in the ES and ESA is not flawed or
    incorrect as such. In any event, the evidence indicates that were N2O and CH4
    to have been included in the ES and ESA assessments, the results would not
    change significantly on the basis that N2O and CH4 account for in the region of
    only 0.8 to 1.0% of total international aviation CO2e emissions.

96. In addition to carbon and carbon dioxide equivalent emissions, other
    non-carbon sources have the potential to effect climate change. Nonetheless,
    they are not yet fully understood, with significant uncertainties remaining over
    their effects and how they should be accounted for and mitigated. There is
    currently no specific Government policy regarding how they should be dealt
    with and uncertainty remains over what any future policy response might be.
    Moreover, no evidence was put to the Inquiry which clearly and reliably
    establishes the extent of any such effects.

97. The nature of non-carbon effects resulting from aviation has parallels with
    carbon effects in that they are complex and challenging, perhaps even more so
    than carbon effects given the associated greater uncertainties, and that they
    largely transcend national boundaries. Consequently, in the context of MBU
    development, it is reasonable to conclude that they are matters for national
    Government, rather than for individual local planning authorities, to address.

17
     Subject to footnote 9 above

https://www.gov.uk/planning-inspectorate        16
Appeal Decision APP/C1570/W/20/3256619

     It is also noteworthy that the current advice on this matter from the CCC to the
     Government appears largely unchanged compared to its previous advice.

98. In this context, therefore, the potential effects on climate change from
    non-carbon sources are not a reasonable basis to resist the proposed
    development, particularly bearing in mind the Government’s established policy
    objective of making the best use of MBU airports. Moreover, if a precautionary
    approach were to be taken on this matter, it would be likely to have the effect
    of placing an embargo on all airport capacity-changing development, including
    at MBU airports, which seems far removed from the Government’s intention.

99. The reason for refusal relating to carbon emissions and climate change refers
    only to the proposed development’s effects resulting from additional emissions
    of international flights. Nonetheless, the evidence put forward as part of the
    appeal process also refers to wider potential effects on climate change,
    including carbon emissions from sources other than international flights.

100. Discussion and testing of the evidence during the Inquiry process revealed
   no good reasons to conclude that any such effects would have any significant
   bearing on climate change. Indeed, the Statement of Common Ground on
   Carbon between the appellant and Council states that the emissions from all
   construction and ground operation effects (i.e. all sources of carbon other than
   flight emissions) are not significant. It adds that Stansted Airport has achieved
   Level 3+ (carbon neutrality) Airport Carbon Accreditation awarded by the
   Airport Council International.

101. Given the conclusions outlined above regarding the potential effects of the
   appeal development arising from international flights, the evidence does not
   suggest that the combined climate change effects of the development would be
   contrary to planning policy on such matters, including the Framework, or that it
   would significantly affect the Government’s statutory responsibilities in this
   regard. Furthermore, no breach of the development plan associated with
   carbon/climate change is cited in the relevant reason for refusal and none has
   been established as part of the appeal process.

102. Accordingly, for all of the foregoing reasons, having due regard to current
   national aviation policy and wider planning policy, including the development
   plan and the Framework, the proposed development would not have a
   significant or unacceptable effect on carbon/climate change.

Other Matters

103. Other topic areas considered during the Inquiry that are not expressly
   assessed above included Local Context, Health & Well Being, Ecology, Socio-
   Economic Impacts, and Surface Access (Road & Rail). Before assessing the
   planning balance, these are considered in turn, followed by any remaining
   matters raised by interested parties during both the planning application stage
   and the appeal process.

Local Context

104. The airport is located in a pleasant rural context. Hamlets, villages and
   small towns, many of which have conservation areas and listed buildings, are
   dispersed amongst countryside. Nonetheless, the operational development
   proposed in this case would all be well contained within the airport boundaries.

https://www.gov.uk/planning-inspectorate     17