PUBLIC PROTECTOR
      SOUTH AFRICA
ANNUAL PERFORMANCE
   PLAN 2020-2021

                     PUBLIC PROTECTOR VISION 2023

TAKING THE SERVICES OF THE PUBLIC PROTECTOR TO THE GRASSROOTS
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
PUBLIC PROTECTOR SOUTH AFRICA
  ANNUAL PERFORMANCE PLAN
          2020-2021
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
STATEMENT BY
THE EXECUTIVE
AUTHORITY
I am pleased to present the Public Protector Annual Performance Plan (APP) 2020/21. The plan is an
extension of the Strategic Plan we have adopted for the period 2020-2025.

It continues on the path of previous APPs, which sought to breathe life into the constitutional and
legislative mandates of the Public Protector through what we call the Public Protector Vision 2023.
The vision is a detailed plan through which we seek to take the services of this institution to the
grassroots. It is underpinned by eight pillars, namely enhancing access to our services; engaging
targeted communities in vernacular; expanding our footprint; and leveraging stakeholder relations,
formalising those relationships in Memoranda of Understanding.

Other pillars include empowering people to understand their rights; projecting an image of a safe
haven for the downtrodden; encouraging organs of state to establish effective internal complaints
resolution units; and ultimately turning communities into being their own liberators.

As can be seen in performance indicators and targets, we want to resolve complaints within stipulated
turnaround times, issue a specific number of investigation reports in a year, dispose of backlog cases,
deal with systemic bottlenecks which stand in the way of the delivery of quality public services and
good governance as well as engage in interventionist dialogues with problematic organs of state.

We also want to be more accessible to those that need our services the most as can be seen in our
outreach indicators and targets. At the same time, as one of the leading integrity bodies, we want to
lead by example and obtain a clean audit. Where we have adjusted our performance targets, we have
done so to be more realistic given the environment within and conditions under which we operate,
especially from a resourcing perspective.

There was full participation of management and staff in developing these targets. Accordingly, over
the next twelve months, the entire Public Protector Team will roll up their sleeves and put shoulder
to the wheel with a view to ensuring that the institutions performs optimally.

_______________________________________

ADV. BUSISIWE MKHWEBANE
PUBLIC PROTECTOR OF SOUTH AFRICA
PUBLIC PROTECTOR SOUTH AFRICA
                                                                                                          5
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
FOREWORD BY
THE ACTING CHIEF
EXECUTIVE OFFICER

The financial year 2020/21 marks the first year of the implementation of the 2020-2025 Strategic
Plan. As an institution, we strive to resolve complaints against organs of state alleged to have acted
improperly to the prejudice of individuals or communities. We also assist organs of state to establish
and maintain efficient administration. Ultimately, the empowerment of citizens to exercise their rights
when prejudiced by organs of state remain an important aspect of our vision.

Our achievements in the 2018/19 financial year pertaining to the investigations programme include
the finalisation of 46 investigation reports and following up on remedial actions pertaining to all pre
selected reports. We also engaged 13 organs of state on systemic challenges that were identified in
the course of the financial year. In the same 2018/19 financial year, we managed to finalise 99% of
identified cases within turnaround times, reduced backlog cases with finalisation of 77% and finalised
6 systemic investigations. On the accessibility front, we conducted 277 outreach clinics, 69 more than
planned. Nine Public Protector Roadshows were held in all provinces, reaching numerous targeted
communities. Seven national events were conducted, while 64 radio interviews were held with various
radio stations on the offering of PPSA. The Public Protector was able to honour commitments of
AOMA and AORC as per the set targets and as President and Chairperson of these bodies respectively.

In the 2020/21 financial year, we will focus on streamlining our intake and assessment processes where
among other things, complaints may be referred to other competent bodies with the purpose of
expediting finalisation of cases. We also targeted to finalise 80% of cases within approved turnaround
times and to hold dialogues with organs of state in cases where emerging systemic challenges are
identified. We also intend to begin a process that can potentially assist the institution to supplement
its revenue in the long run, thus help in the implementation projects that have been suspended due
to financial challenges. In making this office accessible to all persons and communities, in line with our
constitutional mandate, we will continue using the modalities of outreach clinics, Public Protector
Roadshows and media interviews.

My team and I are energised to work towards achieving the set targets for the 2020/21 financial year.

______________________
MS YALEKILE LUSIBANE
ACTING CHIEF EXECUTIVE OFFICER
PUBLIC PROTECTOR SOUTH AFRICA

                                                                                    ANNUAL PERFORMANCE PLAN 2020/21   7
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
OFFICIAL SIGN-OFF
     It is hereby certified that this Annual Performance Plan:

     Was developed by employees and management of the Public Protector South
     Africa under the guidance of Advocate Busisiwe Mkhwebane
     Takes into account all relevant policies, legislation and other mandates for which
     the Public Protector South Africa is responsible
     Accurately reflects the Outcomes and Outputs which the Public Protector South
     Africa will endeavour to achieve over the period 2020/21.

    Mr Sibusiso Nyembe
    Acting Executive Manager: Administrative Justice and Service Delivery and Good Governance
    and Integrity

                                                                           Signature: _____________

    Ms Nelisiwe Thejane
    Executive Manager: Provincial Investigation and Integration (Inland)
                                                                           Signature: _____________

    Adv. Stoffel Fourie
    Executive Manager: Provincial Investigation and Integration (Coastal)
                                                                       Signature: _____________

    Ms Nthoriseng Motsitsi
    Executive Manager: Complaints and Stakeholder Management
                                                                       Signature: _____________

    Mr Futana Tebele
    Acting Executive Manager: Corporate Services
                                                                       Signature: _____________

8
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
Mr Tshiamo Senosi
Acting Chief Financial Officer
                                    Signature: _____________

Ms Machebane Mothiba
Senior Manager: Strategic Support

                                     Signature: _____________

Ms Yalekile Lusibane
Acting Accounting Officer
                                    Signature: _____________

Adv. Kholeka Gcaleka
Deputy Public Protector
                                    Signature:   _____________

Approved by:
Adv. Busisiwe Mkhwebane

Signature: __________________
Public Protector of South Africa

                                                                 9
ANNUAL PERFORMANCE PLAN 2020-2021 - PUBLIC PROTECTOR SOUTH AFRICA - annual performance plan 2020 ...
CONTENTS
     Part A: Our Mandate.................................................................................................... 11

     1.       Updates to the relevant legislative and policy mandates .......................... 11
     2.       Updates to the Institutional Polices and Strategies. ................................... 14
     3.       Updates to Relevant Court Rulings ................................................................ 14

     Part B: Our Strategic Focus ........................................................................................ 16

     4.       Situational Analysis ......................................................................................... 16
     4.1      External Environmental Analysis ................................................................... 17
     4.2      Internal Environmental Analysis ................................................................... 18

     Part C: Measuring Our Performance ........................................................................ 21

     5.       Institutional Programme Performance Information ................................... 21
     5.1      Programme 1: Administration ........................................................................ 21
     5.2      Programme 2: Investigations .......................................................................... 24
     5.3      Programme 3: Stakeholder Management ..................................................... 29
     6.       Technical Indicator Descriptions .................................................................... 34

     Acronyms..................................................................................................................... 46

10
PART A: OUR MANDATE
1. Updates to the relevant legislative and policy mandates

The Public Protector South Africa’s mandate is to strengthen constitutional democracy through the
pursuit of the Constitution and the following key statutory mandate areas:

1.1 Maladministration and related improprieties
(a) To implement the Public Protector Act 23 of 1994 through investigating maladministration or
improper or prejudicial conduct, including abuse of power and abuse of state resources in all state
affairs;

(b) To resolve administrative disputes or rectifying any act or omission in administrative conduct
through mediation, conciliation or negotiation; and

(c) To advise on appropriate remedies or employing any other expedient means.

1.2 Executive Ethics Enforcement
To enforce the Executive Ethics Code as mandated by the Executive Members’ Ethics Act 82 of 1998.

1.3 Investigating Corruption
To investigate allegations of corruption as mandated by section 6(4) (a) (iv) of the Public Protector
Act, read with the Prevention and Combating of Corrupt Activities Act 12 of 2004.

1.4 Protected Disclosures
To receive and address protected disclosures from whistle blowers as mandated by the Protected
Disclosures Act

1.5 Review of decisions of the National Home Builders Registration Council (NHBRC)
To review decisions of the National Home Builders Registration Council as mandated by the Housing
Protection Measures Act 95 of 1998.

1.6 In addition, the following laws either recognise the inherent investigative powers of the Public
rotector or assign some administrative role to the office:

1.6.1 Electoral Commission Act 51 of 1996 – The Public Protector must serve as a member of
a panel that recommends a list of candidates to a National Assembly Committee that nominates
Electoral Commissioners

                                                                                                        11
1.6.2 National Archives and Record Service Act 43 of 1996 – The Public Protector must be
     consulted on investigations into the unauthorised destruction of records otherwise protected under
     this Act

     1.6.3 National Energy Act 40 of 2004 – The protection (from civil or criminal liability, dismissal,
     disciplinary action, prejudice or harassment) of people who make disclosures of health and safety
     risks or failure to comply with a duty imposed by this Act to the Public Protector.

     1.6.4 Promotion of Equality and Prevention of Unfair Discrimination 4 of 2000 – recognises the
     Public Protector as an alternative forum to resolve equality disputes.

     1.6.5 Promotion of Access to Information Act: Access to information disputes under the Promotion
     of Access to Information Act (PAIA) 2 of 2000 (The function will no longer rest with the PPSA once
     the process of transferring this mandate to a specialised information regulator is finalised);

     1.6.6 Public Finance Management Act 1 of 1999 – The Public Protector must receive a certificate
     from an accounting officer of an organ of state that has received donations or sponsorship from
     donors or sponsors who wish to remain anonymous, stating that the identity of the donor or sponsor
     has been revealed to them, that they have noted it and have no objection. This provision does not
     limit the Public Protector from supplying this information to his/her staff, and where she/he deems
     it in the public interest, to report on this.

     1.6.7 Lotteries Act 57 of 1997 – The Public Protector receives bona fide confidential disclosures
     in respect of publishing any information in connection with any grant application or the grant itself

     1.6.8 Special Investigating Units and Special Tribunals Act 74 of 1996 – Referral of cases between
     the Public Protector and the SIU.

     1.6.9 National Environmental Management Act 108 of 1999 – Records and annual reports on
     environmental conflict management referred to in the Act include proceedings by the Public Protector

     1.6.10 Public Audit Amendment Act 05 of 2018 – The expanded mandate of the Auditor-General
     provides for the power to refer material irregularities to relevant public bodies, including the Public
     Protector and the Hawks for further investigations.

     1.7 Policy mandates

12
1.7.1 The National Development Plan, 2030 (NDP)

Chapter 14 of the NDP states that corruption undermines good governance, and that poor governance
“can critically undermine national development”. The NDP reiterates that it is crucial in an effective
and democratic state that political leaders and public officials account to the citizens for their actions.

According to the NDP, the country needs an anti-corruption system that “makes public servants
accountable, protects whistle-blowers and closely monitors procurement.”

The NDP singles out four areas in which policies should be implemented towards an accountable
state:
a) Building a resilient anti-corruption system
b) Strengthen accountability and responsibility of public servants
c) Create a transparent, responsive and accountable public service
d) Strengthen judicial governance and the rule of law.

The NDP calls for South Africa’s “anti-corruption arsenal”, including the Public Protector and
the Auditor-General “to have the resources, independence from political influence, powers to
investigate corruption, and their investigations should be acted upon”. The NDP highlighted that a
functioning anti-corruption system requires “sufficient staff and resources with specific knowledge
and skills; special legislative powers; high level information sharing and co-ordination; and operational
independence”. Independence entails insulating institutions from political pressure and interference.
The NDP specifically states that -

“… competent, skilled institutions like the Public Protector and Special Investigating Unit need to be
adequately funded and staffed and free from external interference.”

And further “strengthening the anti-corruption system requires increasing the agencies’ specialist
resources. More capacity should be created for corruption investigations – more funding is required
to employ skilled personnel and sophisticated investigative techniques”.

The following proposals of the NDP impact directly on the mandate areas of the Public Protector:
a) Strengthen the multi-agency anti-corruption system
b) Strengthen the protection of whistle-blowers
c) Greater central oversight over the awarding of large tenders or tenders with long duration
d) Empower the tender compliance monitoring office to investigate corruption and the value for
money of tenders.

                                                                                                              13
1.7.2 The Sustainable Development Goals
     The Sustainable development Goals (Goal 16: Peace, Justice and Strong Institutions) Promoting peace
     and justice is one of 17 Global Goals that make up the 2030 Agenda for Sustainable Development.
     Peace, stability, human rights and effective governance based on the rule of law are regarded as
     important conduits for sustainable development.

     Goal 16, contains several sub-priorities which are relevant to the role and mandate of the Public
     Protector, including reducing corruption; developing effective, accountable, and transparent
     institutions; ensuring inclusive, participatory, and representative decision-making; and ensuring access
     to information.

     2. Updates to the Institutional Polices and Strategies
     Key policies and strategies that Public Protector South Africa plans to initiate/implement are the
     following:
     • Vision 2023
     • Public Protector rules
     • Clean audit strategy
     • Institutional Turnaround Strategy

     3. Updates to Relevant Court Rulings

     3.1. In Economic Freedom Fighters v Speaker of the National Assembly and Others; Democratic
     Alliance v Speaker of the National Assembly and Others[1], the Constitutional Court per Chief
     Justice Mogoeng stated the following when confirming the powers of the Public Protector:

     3.1.1. Complaints are lodged with the Public Protector to cure incidents of impropriety, prejudice,
     unlawful enrichment or corruption in government circles;

     3.1.2. An appropriate remedy must mean an effective remedy, for without effective remedies for
     breach, the values underlying and the rights entrenched in the Constitution cannot properly be
     upheld or enhanced;

     3.1.3. Taking appropriate remedial action is much more significant than making a mere endeavour
     to address complaints which was the most the Public Protector could do in terms of the Interim
     Constitution. However sensitive, embarrassing and far–reaching the implications of her report and
     findings, she is constitutionally empowered to take action that has that effect, if it is the best attempt
     at curing the root cause of the complaint;

     3.1.4. The legal effect of these remedial measures may simply be that those to whom they are

14
directed are to consider them properly, with due regard to their nature, context and language, to
determine what course to follow;
3.1.5. Every complaint requires a practical or effective remedy that is in sync with its own peculiarities
and merits. It is the nature of the issue under investigation, the findings made and the particular kind
of remedial action taken, based on the demands of the time, that would determine the legal effect it
has on the person, body or institution it is addressed to;

3.1.6. The Public Protector’s power to take appropriate remedial action is wide but certainly not
unfettered. What remedial action to take in a particular case, will be informed by the subject-matter
of the investigation and the type of findings made;

3.1.7. Implicit in the words “take action” is that the Public Protector is herself empowered to decide
on and determine the appropriate remedial measure. And “action” presupposes, obviously where
appropriate, concrete or meaningful steps. Nothing in these words suggests that she necessarily has
to leave the exercise of the power to take remedial action to other institutions or that it is power
that is by its nature of no consequence;

3.1.8. She has the power to determine the appropriate remedy and prescribe the manner of its
implementation;

3.1.9. “Appropriate” means nothing less than effective, suitable, proper or fitting to redress or undo
the prejudice, impropriety, unlawful enrichment or corruption, in a particular case.

3.1.10. The remedial action taken by the Public Protector has a binding effect. The Constitutional
Court further held that: “When remedial action is binding, compliance is not optional, and whatever
reservations the affected party might have about its fairness, appropriateness or lawfulness. For this
reason, the remedial action taken against those under investigation cannot be ignored without any
legal consequences.”

                                                                                                             15
PART B: OUR STRATEGIC FOCUS
     4. Situational Analysis
     In an endeavour to better understand the environment within which PPSA operates,
     the institution used the SWOT analysis below:

              Strengths               The PPSA derives its mandate from the Constitution
                                      and is subject only to the Constitution and the law
                                      The PPSA is part of Chapter 9 institutions that uphold our
                                      constitutional democracy
                                      The PPSA is generally regarded as a professional institution
                                      with a good reputation for resolving complaints of
                                      conduct and service delivery failures by organs of state.
                                      Sound financial management
                                      Knowledgeable and competent staff
                                      Outcomes of the PPSA investigations that changes the lives
                                      of ordinary South Africans
                                      Accessible to the public

             Weaknesses               Inadequate publishing/sharing of good work performed
                                      by the PPSA
                                      Absence of a Case Management System
                                      Inadequate subject matter specialists (e.g. forensic
                                      investigators)
                                      Inadequate office space

            Opportunities             Referral of matters in terms of section 6(4) of the Public
                                      Protector Act
                                      Sharing resources with other investigative organs of state
                                      and stakeholders to improve accessibility.
                                      Income generation (funding model)
                                      Expand PPSA footprint to reach far flung areas
                                      Reach out to people with disabilities
                                      Leverage on PPSA success stories in the media coverage
                                      Intake of interns
                                      Involvement in AOMA and AORC to influence and learn
                                      from ombudsman institutions in Africa
                                      Leverage relations with FISD for mutual benefit
                                      Escalate non-implementation of remedial action to
                                      Parliament to improve the effectiveness of the office

                                      Inadequate funding
               Threats                Unstable electricity supply in the country (load-shedding)
                                      Increase in litigation and associated costs
                                      Negative press/media coverage
                                      No security provision in the Provinces and Regions
                                      Non-implementation of remedial action
                                      Decay in governance within the state

16
4.1 External Environmental Analysis
During our planning, PESTEL analysis below was used as a tool to take into account and to assess
external environmental factors that could potentially affect the implementation of the strategic plan
and Annual Performance Plan.

            Political                  New government policies and/or the failure on the part
            factors                    of organs of state to effectively implement and sustain
                                       the impact of existing policies resulting in many
                                       complaints to the PPSA

           Economic                    Competing demands (e.g. service delivery) on a dwindling
            factors                    budget resulting in less resources being available to fund
                                       institutions such as the PPSA.
                                       PPSA is solely dependent on allocations of funding by the
                                       national government.
                                       Budget cuts to different spheres of government may lead
                                       to more service failure complaints
                                       The slow growth in the country’s economy affects
                                       allocation of budgets, resulting into the office’s operations
                                       being negatively affected

        Social factors                 The demographics of the country: the poorest of the
                                       poor in vast areas in provinces that do not have access to
                                       the services of the PPSA
                                       Media influence to the public on reporting
                                       Impact of service delivery protests
                                       Ordinary people are really benefiting from the PPSA

        Technological                  The use of technology to develop a cellular phone
           factors                     application for better accessibility to PPSA and referral
                                       services
                                       Impact of the fourth industrial revolution and automation
                                       of processes
                                       Technology as a vehicle for communication with
                                       complainants
                                       The lack of an electronic Case Management System
       Environmental                 The ongoing development of townships and suburbs which
           factors                   result in an increase in the population in certain areas
                                     requiring access to basic services, the lack of which will lead
                                     to more people approaching to the PPSA for assistance.

         Legal factors               The PPSA has a strong legal basis in terms of its empowering
                                     legislation.
                                     High number of review and other court applications against
                                     the Public Protector as a result of binding remedial action
                                      Application and implementation of the relevant
                                      jurisprudence and Public Protector Rules

                                                                                                        17
The PPSA services people in all nine provinces, thus the representation of our offices in all provinces
     through the provincial and regional offices.We took into account the people who need to access our
     services in the development of the strategic plan.

     The challenges that the PPSA need to address range from organs of state that may not respond to
     PPSA timeously during investigations to non-implementation of remedial action by organs of state.
     For PPSA to make an impact in the lives of complainants who were prejudiced by organs of state,
     cooperation from the same organs of state in the implementation of remedial action is key.

     The nature of complaints received by the institution is affected by the environment within organs of
     state. For example, poor service delivery in certain municipalities may cause a spike in the number of
     service delivery related issues the institution receive. Another notable trend is the increase in the
     number of conduct failure complaints against office bearers close to election periods, which are
     taken into account when planning. There are also a notable receipt of complaints of a similar nature
     which point to systemic administrative deficiencies in state organs.

     Throughout the years, the Auditor-General has been reporting on irregular expenditure and fruitless
     and wasteful expenditure which could be linked to fraud and corruption.With its expanded mandate
     to refer material irregularities to relevant public bodies (including the Public Protector), the office is
     in a position to deal with specific requests for investigations from the Auditor-General.

     Organs of state have a right to exercise their legal remedies to take Public Protector’s reports on
     judicial review. This legal right however, has led to certain organs of state taking matters on judicial
     review even though there are no justifiable grounds. The process of judicial review also prejudices
     complainants who need their matters resolved timeously.

     An increasing number of complaints such as those pertaining to tender irregularities is on the rise,
     prompting PPSA to prepare for such complex investigations, such as training investigators and
     coming up with more efficient ways of investigating such matters.

     4.2 Internal Environment Analysis
     The institution is structured mainly in terms of core and support functions. The institution is also
     represented in all nine provinces, including nine regional offices. In total, there are nineteen offices
     across the country. Key to the performance of the institution is our ability to fulfil our legislative
     mandate and the realisation of vision 2023.We receive cases that are categorised as Early Resolution,
     Service Delivery and Good Governance. Early Resolution cases are predominantly simple matters
     that deal with bread and butter issues such as the undue delay in processing a pension pay out.
     Service Delivery cases deal with alleged failure of organs of state to deliver services to
     communities such as water provision. Good Governance cases focuses on conduct failure

18
investigations where allegations such as tender irregularities and conduct of members of the Executive
are investigated. Furthermore, it is vital for the Public Protector to work with organs of State on a
continuous basis until the remedial action imposed by the Public Protector is implemented.

The institution has an obligation to finalise cases that have already superannuated, while at the same
time having to deal with new cases with limited resources at hand. The caseload per investigator is
unreasonably high considering the increasing number of complex cases received by the institution.
Complex cases take time to be finalised and may require specialised skills in other fields such as
forensics, quantity surveying, etc. that the institution does not have in-house.

In terms of remedial action, the compliance unit is under capacitated to effectively deal with all the
required follow-ups with organs of state. The effectiveness of this office may be undermined by the
non-implementation of remedial action and organs of state are therefore urged to comply with the
implementation of remedial action.

Risk Management in the Institution is another important area that complements the efficiencies and
effectiveness of the organisation. Early warnings are derived from a risk register and as a result, the
institution is in a better position to respond to such early warnings. Therefore the Risk Management
Unit needs to have increased capacity.

The expansion of services to comply with the constitutional injunction on universal access has also
been severely affected by financial constraints, leading to a strategic decision to partner with other
institutions in the coming years.We are exploring options for optimal physical access by approaching
organs of State to utilise state owned buildings such as magistrates courts based on the conclusion of
relevant Memoranda of Understanding (MOUs) with the Department of Justice and Correctional
Services and other institutions such as traditional councils and municipalities.

As a result of budgetary constraints, the institution has had to cut down on important projects or
defer them to other financial years. Such projects include implementation of the Disaster Recovery
System, having an integrated security system, expanding the footprint of the office as well as training
and development of staff. The financial situation has gotten worse and threatens the institution’s
ability to execute its constitutional mandate effectively.

The approved organisational structure of PPSA has never been fully funded, which hampers its ability
to rigorously investigate and finalise cases on time. When compared with the corporate structure
of the Auditor General, a fellow Chapter 9 institution with a similar oversight mandate covering the
entire state and even more, the PPSA’s approved organisational structure is grossly inadequate. PPSA
is expected to investigate any conduct in state affairs meaning, the kind of resourcing is inadequate
for an institution whose mandate is so broad it covers over a

                                                                                                          19
thousand organs of state including, National Government Departments, Provincial Government
     Departments, Municipalities, State-Owned Enterprises, universities, etc.

     Limited office space also continues to be a challenge. This has resulted in a deterioration of working
     conditions with several employees being forced to share offices and some offices not meeting the
     basic requirements of the Occupational Health and Safety Act. Security in various offices has also
     become a major risk and several break-ins and muggings have been reported in Provincial and
     Regional Offices.This is a matter of serious concern. Due to financial constraints, PPSA has not been
     able to relocate high risk Provincial Offices with the required urgency. Over the medium term, PPSA
     will explore the option of procuring/renting state-owned buildings.

     Pertaining to Broad-Based Black Economic Empowerment Act 53 of 2003 compliance, the institution
     is in a process of acquiring a compliance certificate.

     PPSA has a policy on people with disabilities and special needs, with an emphasis on enabling people
     with disabilities (both employees and clients) to have access to PPSA premises and events. In as
     much as implementation of the policy is dependent on financial resources, PPSA intends to continue
     catering for people with disabilities such as having materials printed in braille for visually impaired
     clients, having sign language translators at big events as well ensuring our offices cater for the needs
     to people using wheelchairs.

     The institution is playing an important role in empowering the youth through a partnership with
     SASSETA where graduates are employed in different fields ranging from investigations to administration
     with a focus on providing the graduates with experience. It is envisaged that the experiential training
     will open opportunities to these graduates to enter into full-time employment.

     The institution is a member of the AOMA , where the Public Protector holds the position of
     President. AOMA’s role is to strengthen the Ombudsman Institutions in Africa to become among the
     best in the world. AOMA established the AORC. AORC’s main role is to support AOMA’s goals of
     promoting ombudsmanship, good governance, the rule of law and human rights in Africa. Secondly,
     AORC seeks to develop the capacity and knowledge of AOMA members. AORC is funded by the
     Department of International Relations’ (DIRCO’s) African Renaissance Fund. The Public Protector is
     the chairperson of AORC.

20
Part C: Measuring Our Performance
5. Institutional Programme Performance Information

5.1 Programme 1: Administration

Purpose: The purpose of administration programme is to create effective systems within
the institution to ensure optimal performance and compliance to laws and regulations. The
administration programme supports the Public Protector in fulfilling the constitutional mandate.

Outcomes, outputs, performance indicators and targets

                                                           Annual Targets
Outcome Output         Output
                       Indicator                                     Estimated
                                     Audited / Actual                                         MTEF Period
                                                                     Perform-
                                     Performance                     ance
                                   2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
                                                                   Target  Target  Target

Clean        Clean      Obtain
                           The             The          The          Clean         Obtain    Maintain   Maintain
                           institut-       instituti-   instituti-   Audit         a clean   a clean    a clean
audit        audit      clean                                        Strategy
                           ion             on           on recei-    reviewed      audit     audit      audit
achieved obtained audit    received         received    ved an       and           opinion   opinion    opinion
and main          annually an               an          unqualif-    impleme-
                           unquali-        unquali-     ied audit    nted. The
tained                     fied            fied         opinion      institution
                                                                     to receive
                           audit           audit                     an unqu-
                           opinion         opinion                   alified
                                                                     audit
                                                                     opinon

Implemen-    ICT       Percent-      N/A   Video        Hard          N/A          100%      100%      N/A
tation                                     conferen-    drive                                impleme-
             infrastru- age of                                                     implem-
 of ICT                                    cing and                                          ntation
                                                        encryp-
 systems     cture     implem-             integrated                              ntation
                                                        tion                                 of a Case
to                                         telephone                               of a
             implem-   entation                         was                                  Manage-
optimally                                  managem-
             ented      of ICT                          implem-                    Mobile    ment
support                                    ent system
                                                                                             Applica-
business               infrastr-           were not     ented at                   Referral
objectives                                 implemen-                                         tion
                       ucture                           100%                       Applicat- by 31
                                           ted, while
                                           e-mail                                  ion       March
                                           encryption                              by 31     2022
                                            was                                    March
                                           implemen-                               2021
                                           ted

                                                                                                                   21
Output indicators: annual and quarterly targets

        Output
        Indica-      2020/21         Quarter 1         Quarter 2         Quarter 3          Quarter 4
          tor         Target
     Obtain clean Obtain a    Review the             N/A                50%               100% Implem-
     audit        clean audit clean audit                               Implementa-       entation of the
     annually     opinion     strategy                                  tion of the       clean audit
                                                                        clean audit       strategy (impleme-
                                                                        strategy          ntation and
                                                                        (implemen-        monitoring
                                                                        tation and        of audit action
                                                                        monitoring        plan)
                                                                        of audit
                                                                        action plan)

     Percentage       100%        Submit for         Finalise the      Deploy, test        Rollout and
     of impleme-      implem-     approval           development       and provide         implematation
     ntation          entation    business           of the Mobile     training on         of Mobile
     of ICT           of a        case for the       Referral          Mobile Referral     Referral
     infrastru-       Mobile      development        Application       Application         Application
     cture                        of the Mobile      (60%)             (80%)               (100%)
                      Referral
                                  Referral
                      Applicat-   Application
                      ion         (30%)
                      by 31
                      March
                      2021

     Explanation of planned performance over the medium-term period

     PPSA is an integrity institution and it is very important for the institution to obtain and maintain
     clean audit outcomes from AGSA year on year. The institution has planned to review its clean audit
     strategy and to implement it in order to attain a clean audit outcome in the 2020/21 financial year
     and to maintain the clean audit outcome in subsequent financial years.

     A functional Case Management Application is crucial to PPSA fulfilling its mandate in assisting
     investigative staff to finalise cases timeously, therefore benefitting complainants. Since investigators
     spend more time on reporting using time-consuming manual systems, the CMA will cut reporting
     time, thus freeing investigators to focus on investigations. PPSA plans implement a Case Management
     Application in 2021/22 financial year. In the meantime, a Mobile Referral Application will be
     implemented to assist complainants on appropriate complants handling mechanism available prior
     to approaching the Public Protector

22
Programme Resource Considerations

              2016/17 2017/18 2018/19 2019/20 2020/21                      2021/22           2022/23

                                                                Revised     Revised           Planning
              Audited     Audited     Audited    Approved       budget      budget
                          Outcome     Outcome                                                  budget
              Outcome                             budget        estimate    estimate          estimate
   Rand          000         000         000           000        000        000                 000
 thousand
 Objective/
  Activity
 Administ-    113 519      149 285     129 626    128 972       135 554    142 555            148 801
  ration
   Total      113 519      149 285     129 626     128 972      135 554    142 555            148 801

Explanation of the contribution of resources towards achievement of outputs

The clean audit strategy is implemented by PPSA employees, thus the allocation is covered under
compensation of employees. Furthermore, a budget has been made available to procure an Internal
Audit software that is key to strengthening certain internal controls. Provision has also been
made for the implementation of the Mobile Referral Application in the 2020/21 financial year. The
administration programme is funded from National Treasury allocation to PPSA.

Updated Key Risks

  Outcome                          Key Risk                     Risk Mitigation
  Clean audit           Inadequate monitoring of        Strengthen internal controls and
  achieved and          internal controls and           monitoring mechanisms by
  maintained            inadequate implementation of    improving compliance monitoring
                        internal controls
 Implementation of       Inadequate funding             Use an alternative Open Source System
 ICT
 systems optimally
 support
 business objectives

                                                                             ANNUAL PERFORMANCE PLAN 2020/21   23
24
                                                         41

                                                 Finalise 60%
                                                          60% of

                                                   cases within
                                                  the following
                                                   turnaround
                                                       9
                                                      times:
                                                                                                                                                                                                                                                                                                                                                                             5.2 Programme 2: Investigations

                                                  ER : 9 months
                                                 SD : 18 months
                                                      18                               by 31 March
                                                 GGI : 30 months
                                                                                           2023
                                                   GGI : (very
                                                  complex) 3036
                                                  months by 31
                                                   March 2021
                                                                                                           Outcomes, outputs, performance indicators and targets

                                                                    by 31 March
                                                                       2022

                                                   by 31 March
                                                       2021

     30 months   Percentage    N/A   N/A   N/A          60%                         Finalise 80% of 30
                   of 30                         30 months and     of 30 months     months and older
                 months and                                                       cases (expect GGI very
                 older cases                                                      complex matters) by 31
                                                                                                                                                                   in line with fulfilling the mandate of the Public Protector to strengthen constitutional democracy.

                  finalised                                                            March 2023
                                                                                                                                                                                                                                                                         Purpose: The purpose of the investigations programme is to ensure speedy resolution of complaints
by 31
     March 2022

25
Output indicators: annual and quarterly targets

26
        Output Indicators          2020/21 Target             Quarter 1           Quarter 2               Quarter 3             Quarter 4

      Number of                   Finalise 41          Finalise 14             Finalise 4               Finalise 12           Finalise 11
      investigation               investigation        investigation           investigation reports    investigation         investigation reports
      reports finalised           reports by 31        reports                                          reports
                                  March 2021
      Percentage of               Finalise 60% of      Finalise 60% of cases    Finalise 60% of cases   Finalise 60% of        Finalise 60% of cases
      adherence to                cases within         within the following     within the following    cases                  within the following
      turnaround times in         the following        turnaround times:        turnaround times:       within the             turnaround times:
      finalisation of cases       turnaround times:    ER: 9 months             ER: 9 months             following             ER: 9 months
                                  ER : 9 months        SD: 18 months            SD: 18 months           turnaround times:      SD: 18 months
                                  SD : 18 months       GGI: 30 months           GGI: 30 months          ER: 9 months           GGI: 30 months
                                  GGI : 30 months      GGI (very                GGI (very               SD: 18 months          GGI (very
                                  GGI : (very          complex): 36             complex): 36            GGI: 30 months         complex): 36
                                  complex) 36          months                   months                  GGI (very              months
                                  months by 31                                                          complex): 36
                                  March 2021                                                            months

      Percentage of 30 months     Finalise 60% of 30   Finalise 20% of 30      Finalise 30% of 30       Finalise 50% of 30    Finalise 60% of 30
      and older cases finalised   months and older     months and older        months and older         months and older      months and older
                                  cases (except GGI    cases (except GGI       cases (except GGI        cases (except GGI     cases (except GGI
                                  very complex         very complex            very complex             very complex          very complex
                                  matters)             matters) by the end     matters) by the end      matters) by the       matters) by the
                                  by 31 March 2021     of the quarter          of the quarter           end of the quarter    end of the quarter

     Investigation and            Finalise 2 systemic   N/A                    N/A                      N/A                   Finalise the 2 systemic
     finalisation of systemic     investigations/interv                                                                       investigations/
     investigations /             entions identified in                                                                       intervention
     interventions                2019/20 by 31 March                                                                         identified in 2019/20
                                  2021                                                                                        financial year and
                                                                                                                              produce reports signed
                                                                                                                              by the Public Protector

                               10 dialogues held with 2 dialogues held with 3 dialogues held with       2 dialogues held with 3 dialogues held with
      Number of dialogues held
                               organs of State on     organs of State on    organs of State on          organs of State on    organs of State on
      with organs of State on  systemic challenges
      systemic challenges                             systemic challenges systemic challenges           systemic challenges systemic challenges
                               by 31 March 2021
Explanation of planned performance over the medium-
term period
The outputs of finalising investigation reports, systemic investigations, finalising cases within turnaround
times, prioritising the finalisation of cases that are two years and older as well as continually holding
dialogues with organs of state to address systemic challenges are key to achieving the core mandate
of PPSA. This is aimed at changing the lives of the complainants we serve once investigations are
finalised and appropriate remedies are implemented by relevant organs of state. Women, the youth
as well as people with disabilities are welcome to lodge complaints that will be investigated and
finalised.

The institution has planned to finalise 50 investigations reports over the MTEF period. The number
50 was arrived at after considering factors such as capacity (number of investigative staff) along with
complexity of matters the office has been receiving lately. Pertaining to timeframes within which
investigations should be finalised, the plan is to finalise ER cases within 6 months, SD cases within
12 months, GGI cases within 24 months and very complex GGI cases within 36 months. There are
however, ER, SD and GGI cases that had already superannuated and are 2 years and older, prompting
a focus on ensuring their finalisation.

On systemic investigations, the plan is to finalise two systemic investigations every two years due to
their complexity. The purpose of these systemic investigations is to assist organs of state to resolve
systemic challenges and to improve service delivery. Related to systemic challenges, when PPSA
notes a trend or an influx of complaints pertaining to a specific organ of state, those organs of state
are contacted in order for dialogues to take place with the aim of resolving those identified systemic
challenges. The target is to hold at least ten dialogues per annum.

Programme Resource Considerations

               2016/17      2017/18       2018/19      2019/20       2020/21       2021/22           2022/23

                                                                     Revised      Revised           Planning
               Audited     Audited        Audited     Approved       budget        budget            budget
               Outcome     Outcome        Outcome      budget        estimate                       estimate
                                                                                  estimate
  Rand           000          000           000          000           000           000                000
thousand
Objective/
 Activity
Investigati-   174 673      181 991       180 795      180 567       192 457      203 523           213 836
    ons

   Total       174 673      181 991       180 795      180 567       192 457      203 523           213 836

                                                                                     ANNUAL PERFORMANCE PLAN 2020/21   27
Explanation of the contribution of resources towards achievement of outputs
     The biggest cost driver for PPSA investigations is compensation of employees since investigative staff
     is responsible for investigating, finalising cases and referring the matters. The service provided by
     PPSA is labour intensive and manual.The Investigations programme is funded from National Treasury
     allocation to PPSA.

     Updated Key Risks

        Outcome                        Key Risk                       Risk Mitigation
       Investigations          Lack of cooperation from          Apply the Public Protector rules
       finalised within        organs of state
       turnaround times
                               Possible budget cuts that         Adjust targets in line with
                               can potentially lead to           investigative capacity
                               fewer investigators being in
                               the employ of PPSA and
                               limited funding to acquire
                               specialised skills (e.g.
                               forensic investigators) to
                               assist in certain
                               investigations

28
5.3 Programme 3: Stakeholder Management

     Purpose: The purpose of the programme is to enhance accessibility of Public Protector services to all persons and communities as well as to assist
     in improving complaints handling mechanisms in organs of state and ombudsman institutions.

     Outcomes, outputs, performance indicators and targets

                      O

                                                 2016/17      2017/18        2018/19        2019/20           2020/21            2021/22            2022/23

                                                                                           208 were           N/A                Conduct 208        Conduct 208
                                                                                           conducted                             outreach clinics   outreach clinics
                                                                                           outreach clinics                      across the         across the
                                                                                           across the                            country by 31      country by 31
                                                                                           country by 31                         March 2022         March 2023
                                                                                           March 2020
                      Public       Number                                   7 national     9 Public           Conduct 5          Conduct 5          Conduct 5
                      Protector    of Public                                events were    Protector          Public             Public             Public
                      webinars     Protector                                conducted      Roadshows          Protector          Protector          Protector
                      / national   webinars                                                (including         webinars /         webinars /         webinars /
                      events       / national                                              national events)   national events    national events    national events
                      conducted    events                                                  conducted by 31    by 31 March        by 31 March        by 31 March
                                   conducted                                               March 2020         2021               2022               2023

                                                                                           2 radio slots      Conduct
                                                                                           conducted per      87 radio
                                                                                           province by 31     interviews
                                                                                           March 2020         nationally by 31
                                                                                                              March 2021

29
30
     Bilateral              1 bilateral
     agreements             agreement
     entered
                            entered
     into
                            into with an
                            ombudsman
                            or organ of
                            state by 31
                            March 2020

                            by 31 March
                            2020

     chaired                               chair   chair   chair
                  chaired

                            by 31 March
                            2020
Output indicators: annual and quarterly targets

                                   Conduct   5 Public
                                   Conduct 208        Protector
                                                 outreach   clinics   Conduct 52 outreach
                                                                      N/A                              Conduct
                                                                                                        Conduct52    outreach
                                                                                                                  3 Public       Conduct        outreach
                                                                                                                                  Conduct 152Public          Conduct
                                                                                                                                                              Conduct152    outreach
                                                                                                                                                                          Public
                 webinars /        webinars
                                   across the/ country  events
                                               national by 31 by      clinics across the               clinics across
                                                                                                        Protector     the
                                                                                                                   webinars  /    clinics across
                                                                                                                                 Protector   webinar
                                                                                                                                                 the /        clinics across
                                                                                                                                                             Protector   webinar
                                                                                                                                                                             the /
      national events              31 March
                                   March  20212021                    country per quarter              country
                                                                                                        national per quarter
                                                                                                                 events          national   per quarter
                                                                                                                                  country event              national   per quarter
                                                                                                                                                              countryevent
      conducted                                                                                         (Mandela Day,            (16 days of Activism)       by the end of the
                                   Conduct 9 Public Protector
                                   roadshows (including national                                        Women’s Day and          by the end of the           quarter
                                   events) by 31 March 2021                                             Heritage Day) by the     quarter
                                                                                                        end of the quarter

      Number of radio interviews   Conduct 87 radio interviews                                         Conduct 27 radio         Conduct 2727radio                          radio
                                                                                                                                                             Conduct 2727radio
      conducted                    nationally by 31 March 2021                                         interviews nationally by interviews nationally by     interviews nationally by
                                                                                                       the end of the quarter the end of the quarter         the end of the quarter
      Number of radio interviews                                      Identify an ombudsman
      conducted                                                       institution to enter into a
                                                                      bilateral agreement with or
                                                                      identify
                                                                      Identify an
                                                                                an organ of state to
                                                                                   ombudsman
                                                                      assist in strengthening
                                                                      institution  to enter intoitsa
                                                                      internal
                                                                      bilateral complaints
                                                                                 agreement handling
                                                                                            with or
                                                                      mechanisms
                                                                      identify an organ of state to
     Percentage of AORC board                                         assist in strengthening its
     meetings chaired by the                                          internal complaints handling
     Public Protector                                                 mechanisms
     Percentage of AORC board
     meetings chaired
     Percentage        by the
                 of AOMA           Public Protector to chair          Public Protector to chair any    Public Protector          Public Protector to chair   Public Protector to chair
     Public Protector
     meetings  chaired by the      100% of scheduled AOMA             scheduled AOMA meeting           to chair any              any scheduled AOMA          any scheduled AOMA
     Public Protector              meetings by 31 March 2021                                           scheduled AOMA            meeting                     meeting
     Percentage of AOMA            Public Protector to chair          Public Protector to chair any    Public Protector          Public Protector to chair   Public Protector to chair
     meetings chaired by the       100% of scheduled AOMA             scheduled AOMA meeting           to chair any              any scheduled AOMA          any scheduled AOMA
     Public Protector              meetings by 31 March 2021                                           scheduled AOMA            meeting                     meeting

31
Explanation of planned performance over the medium-term period
     The outputs concerning conducting of clinics across the country, Public Protector roadshows
     and radio interviews are pivotal in making PPSA accessible to as many people in South Africa as
     possible, in fulfilling the institution’s mandate as stipulated in Section 182 (4) of the Constitution
     of being accessible to all persons and communities. Planned targets for outreach clinics is to reach
     communities through conducting at least 208 clinics per annum. Nine roadshows are planned to take
     place each financial year. As for radio interviews, it is expected that every province will conduct at
     least four interviews every financial year.

     At least one bilateral agreement is planned to be entered into between the Public Protector and
     ombudsman institutions/organs of state annually. These bilateral agreements are at the heart of
     assisting the complainants PPSA is created to assist in expediting resolution of their matters. On
     the one hand, the bilateral agreements with ombudsman institutions among others, talks to referral
     of complaints to more appropriate bodies, therefore improving efficiency. Furthermore, bilateral
     agreements with organs of state focus mainly on assisting organs of state to establish internal
     complaints handling mechanisms in order for complainants to be assisted within the institutions they
     complain about. In short, the abovementioned bilateral agreements will assist complainants to be
     assisted expeditiously.

     The Pubic Protector as president of AOMA and chairperson of AORC is expected to attend and
     chair key meetings of these bodies. These bodies are key to assisting Ombudsman Institutions in
     Africa to become among the best in the world. In this way, the Public Protector is engaged in a
     process that will see complainants in the rest of Africa being assisted.

      Programme Resource Considerations

                            2016/17   2017/18   2018/19    2019/20      2020/21     2021/22      2022/23

                                                                        Revised    Revised      Planning
                           Audited    Audited   Audited   Approved      budget      budget       budget
                           Outcome    Outcome   Outcome    budget       estimate                estimate
                                                                                   estimate
         Rand                   000     000        000       000          000         000         000
       thousand
      Objective/
        Activity
     Stakeholder
     manageme-                5 275   13 937     12 045    13 087       13 804      14 535       15 285
          nt
           Total              5 275   13 937     12 045    13 087       13 804      14 535       15 285

32   PUBLIC PROTECTOR SOUTH AFRICA
Explanation of the contribution of resources towards achievement of outputs
The budget allocation for the stakeholder management programme is apportioned in line with the
targets set to ensure that some of the goals of vision 2023 are attained and contribute towards
making PPSA more accessible, especially to those people staying in remote areas within the country.
In addition, the contribution to ombudsman institutions in Africa is also catered for through the
budget allocated to AOMA and AORC activities.The Stakeholder Management programme is funded
from National Treasury allocation to PPSA.

Updated Key Risks

  Outcome                         Key Risk                      Risk Mitigation
  Accessible PPSA       Inability to reach people in    Outreach interventions to target far
  services              remote areas/Inadequate         flung/remote areas will include:
                        inaccessibility to rural/
                        remote areas                     The use of local radio stations
                                                          to get the message PPSA needs to
                                                          communicate to those communities

                                                          Outreach clinics being held in some
                                                          of the identified remote areas

                                                                                                      33
6. Technical Indicator Descriptions
     Programme 1: Administration

         Indicator title         Obtain clean audit annually

                                  The Public Protector South Africa to obtain and sustain a
            Definition            clean audit opinion from Auditor-General South Africa

          Source of data         Clean Audit Action Plan, quarterly reports on implementation
                                 of Clean Audit Action Plan, AGSA audit report

       Method of calculation /   Verification against AGSA audit report if the clean audit is obtained
       Assessment

          Assumptions            Operational systems of producing financial statements

      Disaggregation of          Target for women: N/A
      beneficiaries (where       Target for youth: N/A
      applicable)                Target for people with disabilities: N/A
      Spatial Transformation     N/A
      (where applicable)
      of Clean Audit Action
      Plan, AGSA audit report

     Calculation Type            N/A

     Reporting cycle             Quarterly

     Desired performance         100% achievement of target

     Indicator responsibility    CFO, all executive managers, all senior managers

         Indicator title         Percentage of implementation of ICT infrastructure

                                  PPSA will develop a Mobile Referral Application (MRA) that will
            Definition            serve as a guide to prospective complainants on appropriate
                                  complaint handling mechanisms available prior to approaching the
                                  Public Protector
          Source of data         MRA
       Method of calculation /   Functional MRA
       Assessment

      Means of verification      Review of the functionality of the MRA

          Assumptions            People have access to mobile technology

34
Indicator title         Percentage of implementation of ICT infrastructure

 Disaggregation of          Target for women: N/A
 beneficiaries (where       Target for youth: N/A
 applicable)                Target for people with disabilities: N/A

 Spatial Transformation     Prospective complainants in all provinces will benefit from the MRA
 (where applicable)
 Calculation Type           N/A

 Reporting cycle            Quarterly

 Desired performance        100% achievement of the target

 Indicator responsibility   Senior Manager: ICT, Executive Manager: CSM and Manager:
                            Knowledge Management

Programme 2: Investigations

             Indicator title               Number of investigation reports finalised
             Definition                 The indicator refers to investigations that are concluded
                                        where investigation reports (formal and closing reports)
                                        which are signed off by the Public Protector are
                                        produced.
                                        Technical Terms:
                                        Formal Report: An investigation report signed by the
                                        Public Protector in which the Public Protector makes
                                        finding against those investigated
                                        Closing report: An investigation report signed by
                                        the Public Protector where no findings are made against
                                        those investigated.
                                        Investigation Branches and Provincial reports; formal and
          Source of data                closing reports signed by the Public Protector; register of
                                        finalised cases
Method of calculation / Assessment      Simple count

                                        Investigation reports signed by the Public Protector
        Means of verification
                                        (formal and closing reports)

           Assumptions                  All investigation reports followed processes stipulated in
                                        PPSA policies, manuals and procedures

Disaggregation of Beneficiaries         Target for women: N/A
(where applicable)                      Target for youth: N/A
                                        Target for people with disabilities: N/A
  Spatial Transformation (where       The spatial impact area is in all nine provinces within
             applicable)              South Africa

                                                                                                      35
Indicator title                Number of investigation reports finalised
              Calculation Type               Cumulative (Year-end)

              Reporting cycle                Quarterly

           Desired performance               Performance higher than the one targeted is desired

          Indicator responsibility           Executive Managers for: AJSD, GGI and PII

                                 Percentage of adherence to turnaround times in
        Indicator title          finalisation of cases

                                 The indicator measures the number of cases that get
                                 finalised within stipulated timeframes of 9 months for Early
            Definition           Resolution (simple) cases, 18 months for Service Delivery
                                 cases, 30 months for Good Governance and Integrity
                                 (conduct failure) cases and 36 months for very complex
                                 Good Governance and Integrity (conduct failure) cases
          Source of data         Investigation files / Statistical reports / investigations reports
                                 / closing letters and register of cases finalised falling within
                                 the set parameters/ cases register
      Method of calculation /    Percentage = number of finalised cases within turnaround
      Assessment                 times/total number of cases finalised X 100
     Means of verification       1. List of cases finalised indicating the date on which files
                                 were received, the classification of cases (ER, SD, GGI,
                                 GGI (complex matters) and the date of finalisation of
                                 cases
                                 2. Complaint form/complaint e-mail/complaint letter with
                                 date on which the complaint was received
                                 3. Assessment form or investigation file cover indicating
                                 how the cases were classified or reclassified as ER, SD,
                                 GGI or GGI (complex matters)
                                 4. Formal report/Closing report/closing letter/closing note
         Assumptions             All finalised investigations followed processes stipulated in
                                 PPSA policies, manuals and procedures
     Disaggregation of           Target for women: N/A
     beneficiaries (where        Target for youth: N/A
     applicable)                 Target for people with disabilities: N/A
     Spatial Transformation      The spatial impact area is in all nine provinces within South
     (where applicable)          Africa
     Calculation Type            Cumulative (Year-end)

     Reporting cycle             Quarterly

     Desired performance         100% achievement of target

     Indicator responsibility    Executive Managers for: CSM, AJSD, GGI and PIII

36
Indicator title          Percentage of 30 months and older cases finalised

                           These are cases that will be 30 months and older at the time
                           of reporting till from 1 April 2020 till 31 March 2021. It should
       Definition          be noted that this is a moving target as cases age daily. The
                           abovementioned cases are consided a backlog. The
                           target exclude very complex GGI as their turnaround for
                           finalisation is 36 months
     Source of data        Investigation files / Statistical reports / investigations reports
                           / closing letters and register of 30 months and older cases

 Method of calculation /   Percentage = number of finalised 30 months and older cases
 Assessment                / total number of 30 months and older cases X100

Means of verification      1. List of casess that are 30 months months and older
                           (both finalised and active cases) except for very complex
                           GGI cases with turnaround times of 36 months
                           2. Complaint form/complaint e-mail/complaint letter with
                           date on which the complaint was received by PPSA
                           3. Formal report/Closing report/closing letter/closing note

    Assumptions            All finalised investigations followed processes stipulated in
                           PPSA policies, manuals and procedures

Disaggregation of          Target for women: N/A
beneficiaries (where       Target for youth: N/A
applicable)                Target for people with disabilities: N/A
Spatial Transformation     The spatial impact area is in all nine provinces within South
(where applicable)         Africa

Calculation Type           Cumulative (Year to date)

Reporting cycle            Quarterly

Desired performance        Performance higher than the one targeted is desired

Indicator responsibility   Executive Managers for: AJSD, GGI and PII

                                                                                                37