A Path to Building Safety Excellence DBI's FY2015 - 2020 Strategic Plan - Department of Building Inspection
A Path to Building Safety Excellence
DBI’s FY2015 – 2020 Strategic Plan
A Path to Building Safety Excellence DBI's FY2015 - 2020 Strategic Plan - Department of Building Inspection
Table of Contents
Opening Messages                               1

Vision & Goals                                 2

Goal 1						1A                                 3
							1B
Review Plans and Issue Permits                 4
Safeguarding Life and Property in
							1C
Compliance with City and State Regulations.    5
							1D                                      6

Goal 2						2A                                  7
							2B
Provide Inspections to Enforce Codes and
Standards to Protect Occupants’ Rights
                                                8
							2C
Ensuring  Safety and Quality of Life.           9
							2D                                      10
							2E                                      11
							2F                                      12

Goal 3						3A                                 13
							3B
Deliver the Highest Level of Customer          14
Service.
							3C                                      15

Goal 4						4A                                 16
							4B
Implement Efficient and Effective
                                               17
Administrative Practices.
							4C                                      18
							4D                                      19

Goal 5						5A                                 20
							5B
Proactively engage and educate customers,
                                               21
contractors, and stakeholders on DBI’s
services, functions and legislated programs.
A Path to Building Safety Excellence DBI's FY2015 - 2020 Strategic Plan - Department of Building Inspection
Message                                                                                     Message
From the Mayor                                                                              From The Director
     In the last five years, San Francisco       DBI is an integral role player at the           I am pleased to present the                As a City built in one of the world’s
     has seen the most remarkable                forefront of housing and commercial             Department of Building Inspection’s        most at-risk seismic zones, DBI’s
     construction boom since the rebuild         developments, especially as we                  (DBI) “Path to Building Safety             Strategic Plan is designed to ensure
     that followed the 1906 Great                continue our goal of building 30,000            Excellence” Strategic Plan for Fiscal      all buildings are code-compliant
     Earthquake and Fire.                        units of housing by 2020. This is               Years 2015–2020—a plan that                and, where necessary, retrofitted to
                                                 coupled with the Soft Story program,            focuses DBI’s goals, objectives and        minimize the kinds of injuries, fatalities
     Every day, the Department of Building       the legalization of existing units and          performance metrics on building            and damage to structures that we
     Inspection (DBI) works to protect           the addition of new units as well               safety targets over the next two years;    know from first-hand experience
     life and building safety within the 49      as supporting the construction of               and a plan that upon daily, weekly         will be caused by the next major
     square miles of San Francisco. This is      transportation hubs such as the                 and monthly execution will enable us       earthquake. While no engineer or
     done through the hard work of its staff     Transbay Transit Center, throughout             to realize DBI’s Mission and Vision,       architect can design an ‘earthquake-
     as mechanical and structural engineers      the City.                                       ensuring the fundamentals of building      proof’ building, code changes and
     review plans to ensure adherence to                                                         safety for all who visit, work and         improvements every three years
     State and local code requirements           I join DBI as they introduce their              recreate in San Francisco.                 provide us with the opportunity to
     while our building, plumbing, electrical    five-year strategic plan for 2015–2020,                                                    prepare ourselves for rapid and
     and housing inspectors ensure that          setting us on a “Path to Building Safety        Through this Strategic Plan, DBI           effective emergency response,
     all permits issued are inspected for        Excellence.” This living document will          sets forth a viable framework and          and to protect our families and our
     life and building safety as well as         serve as a long-term strategic tool to          its management team begins the             properties. DBI continues to work
     maintenance of habitability. They           help DBI continue to accomplish their           multiple tasks of bringing the plan        tirelessly on staff training programs to
     are assisted by an exceptional              mission of protecting life and building         to life through specific actions. As       assure we are as ready as humanly
     administrative staff that provides great    safety in San Francisco.                        you will see in the Plan’s details, we     possible.
     customer service as well. Together,                                                         have laid out specific objectives and
     this department successfully enforces       With warmest regards,                           measurable actions tied to DBI’s           DBI staff and management are
     and regulates the appropriate codes                                                         core services of Plan Review and           especially appreciative of the
     to ensure all who live, work and visit in                                                   Permit Issuance, Inspections, Code         Mayor’s ongoing support for all our
     San Francisco can do so safely.                                                             Enforcement and the delivery of            programs, as well as for the Board of
                                                                                                 consistently high quality customer         Supervisors, and we look forward to
     As new buildings are constructed,                                                           services. The Plan’s Goals and             achieving the goals and performance
     DBI is ensuring that it is done safely      Edwin M. Lee, Mayor                             Actions, in turn, are connected to the     metrics that will continue to make a
     and in accordance with code. They                                                           Mayor’s vision and leadership for the      difference as we enact this Strategic
     also ensure the existing 200,000                                                            entire City – providing code compliant     Plan.
     commercial and residential buildings                                                        and safely-built buildings that are,
     found throughout the City continue                                                          in fact, the homes and buildings           Sincerely,
     to be structurally safe and habitable.                                                      where our citizens live, raise families,
     They are also helping to transform,                                                         work and recreate in ways that are
     revitalize and bring economic vitality                                                      productive, creative and generate
     to blighted neighborhoods and                                                               what both our nation and the world
     merchants’ corridors by ensuring                                                            understand as the unique ethos that is     Tom Hui, S.E., C.B.O. and Director
     commercial storefronts, restaurants                                                         San Francisco in the 21st Century.
     and small businesses are safe.
A Path to Building Safety Excellence DBI's FY2015 - 2020 Strategic Plan - Department of Building Inspection
VISION                      Ensuring that Life and Property are Safeguarded, Through Fair and Transparent Processes.

The Department of Building Inspection (DBI) Strategic Plan,
“A Path to Building Safety Excellence” for Fiscal Years
2015–2020, is the result of six months of intense collaboration
between management and staff from all divisions. The strategic
planning process was a rigorous endeavor that included input
from industry professionals and community stakeholders from
across the City. The end result is a DBI blueprint that establishes
five concrete goals and 19 objectives that will serve as a viable
road map to the most efficient, effective DBI, providing the
highest levels of customer service. This plan is to be updated,
based upon lessons learned, as needed, annually at a minimum,
to allow for adjustments in the dynamic, always changing,
building safety environment.

Goal 1                                           Goal 2                                            Goal 3                                           Goal 4                                        Goal 5
Review Plans and Issue Permits                   Perform Inspections to Enforce Codes              Deliver the Highest Level of Customer            Utilize Efficient and Effective               Proactively Engage and Educate
Safeguarding Life and Property in                and Standards to Protect Tenants’                 Service.                                         Administrative Practices.                     Media, Contractors, Stakeholders and
Compliance with City and State                   Rights and Ensuring Safety and Quality                                                                                                           Customers on DBI’s Services, Functions
Regulations.                                     of Life.                                                                                                                                         and Programs.

 • Objective 1A: Review Plans using a             • Objective 2A: Ensure Quality and Timely         • Objective 3A: Implement Technology             • Objective 4A: Ensure Timely Response to     • Objective 5A: Review and Update Legislative
   Transparent Process and with Standards           Inspections.                                      Improvements.                                    Records Requests.                             and Public Affairs Plan.
   Applied Uniformly.                             • Objective 2B: Electrical Inspection Division    • Objective 3B: Maintain Adequate Staffing to    • Objective 4B: Manage Department Funds.      • Objective 5B: Continuously Update
 • Objective 1B: Issue Permits.                     Conducts Electrical Inspections to Ensure         Meet Customer Demands.                         • Objective 4C: Manage Department Fleet to      and Implement a Multi-Prong Strategic
                                                    Code Compliance.                                • Objective 3C: Manage Department Facility.        Ensure Maximum Use of Vehicles.               Communications Plan.
 • Objective 1C: Update and Interpret Codes
   and Standards.                                 • Objective 2C: Plumbing Inspection Division                                                       • Objective 4D: Review and Update
                                                    Conducts Plumbing Inspections to Ensure                                                            Department’s Disaster Response Plan.
 • Objective 1D: Ensure Convenient, Efficient,
                                                    Code Compliance.
   and Timely Permit Processing Coordinated
   with other City agencies.                      • Objective 2D: Building Inspection Division
                                                    Conducts Inspections of Buildings and
                                                    Properties/Structures to Ensure Code
                                                    Compliance.
                                                  • Objective 2E: Inspect Housing to Enforce
                                                    Codes and Standards to Protect Tenants’
                                                    Rights and Ensuring Quality of Life.
                                                  • Objective 2F: Manage Notice of Violations
                                                    and Complaints.
A Path to Building Safety Excellence DBI's FY2015 - 2020 Strategic Plan - Department of Building Inspection
Goal 1: Review Plans and Issue Permits Safeguarding Life and                                                                                                                                                                                              3
    Property in Compliance with City and State Regulations.

           Year 1: 2015 – 2016                                 Year 2: 2016 – 2017                                Year 3: 2017 – 2018                                 Year 4: 2018 – 2019                                Year 5: 2019 – 2020

1A: Review 80% of all building permit               1A: Review and update the 80% goal of all           1A: Review and update the process that             1A: Implement an electronic plan review check      1A: Review and update as needed the
applications at Over-the-Counter (OTC) for same     building permit applications processed OTC for      encourages customers on an ongoing basis to        system to allow for faster, more efficient plan    implemented electronic plan check system.
day issuance service.                               same day issuance service annually.                 convert site permits to OTC.                       review and to improve customer convenience.
                                                                                                                                                                                                              Review the goal of all building permit applications
Senior Plan Check staff will review a minimum of    Review and update the goal of Senior Plan Check     Evaluate public experience improvements on         Review and update the standard for all building    at OTC for same day issuance service.
5% of plan checks conducted by junior staff to      staff reviewing plan checks conducted by junior     DBI’s 1st and 5th floors and improve, as needed.   permit applications at OTC for same day issuance
ensure codes and standards are applied uniformly.   staff to ensure codes and standards are applied                                                        service and update as needed.
                                                    uniformly annually.
Manage Plan Review turnaround time by
reviewing 90% of Site Permit Applications with      Review and update the goal of reviewing 90%
construction valuation of greater than $4,000,000   of Site Permit Applications with construction
within 28 calendar days.                            valuation of less than $4,000,000 within 28
                                                    calendar days annually.
Manage Plan Review turnaround time by
reviewing 90% of Site Permit Applications with      Review and update the goal of reviewing 90%
construction valuation of less than $3,999,999      of Site Permit Applications with construction
within 21 calendar days.                            valuation of less than $3,999,999 within 21
                                                    calendar days annually.
Manage Plan Review turnaround time by
reviewing 90% of Permit Applications for one and    Review and update the goal of reviewing 90%
two family dwellings within 28 calendar days.       of Permit Applications for one and two family
                                                    dwellings within 28 calendar days annually.
Manage Plan Review turnaround time by
reviewing 90% of Permit Applications for multi-     Review and update the goal of reviewing 90% of
family residential, mixed-used buildings, office,   Permit Applications for multi-family residential,
commercial, and other such buildings within 42      mixed-used buildings, office, commercial, and
calendar days.                                      other such buildings within 42 calendar days
                                                    annually.
Conduct 90% of requested Pre-Application
Meetings within 14 days.                            Review and update the goal of conducting 90%
                                                    of requested Pre-Application Meetings within 14
Submitted projects will be audited to ensure that   days annually.
the intake process meets a quality assurance
standard of 90%.                                    Review and update the quality control standard
                                                    for submitted projects annually.
Develop and implement a plan that encourages
customers to convert site permits to OTC and        Review and update the plan that encourages
track results, to increase participation rates      customers on an ongoing basis to convert site
annually.                                           permits to OTC.

Review and audit process that ensures that 100%     Initiate and develop public experience
of all premium applications commence review
within five business days of receipt.
                                                    improvements on the 1st and 5th floors in
                                                    response to 2015 Customer Satisfaction Survey                                                  1A: Review Plans Using a Transparent Process
                                                    results.
                                                                                                                                                   and with Standards Applied Uniformly.
Goal 1: Review Plans and Issue Permits Safeguarding Life and                                                                                                                                                                                        4
    Property in Compliance with City and State Regulations.

           Year 1: 2015 – 2016                                    Year 2: 2016 – 2017                                Year 3: 2017 – 2018                              Year 4: 2018 – 2019                              Year 5: 2019 – 2020

1B: Ensure customer compliance Soft Story              1B: Ensure customer compliance Soft Story           1B: Ensure customer compliance Soft Story        1B: Ensure customer compliance Soft Story        1B: Ensure Private School Seismic Safety
Program’s Tier 1 requirements.                         Program’s Tier 2 requirements.                      Program’s Tier 3 requirements.                   Program’s Tier 3 requirements.                   Ordinance Program
                                                                                                                                                                                                             compliance.
Develop simple Online Permit                           Ensure Private School Seismic Safety Ordinance      Ensure Private School Seismic Safety Ordinance   Ensure Private School Seismic Safety Ordinance
Submittals and Issuance portal for basic work          Program compliance.                                 Program compliance.                              Program compliance.
without plans, i.e. re-roofing, siding or stucco
replacement or repair not visible from the public      Evaluate and review the new Online Permit           Review the results and update the Unit           Review the results and update the Unit
way (non-historical).                                  submittals and issuance portal for basic work       Legalization Program.                            Legalization Program.
                                                       without plans, i.e. re-roofing, siding or stucco
For on-going Soft Story Program, scan all              replacement or repair not visible from the public   Audit the results and update the Accessory       Audit the results and update the Accessory
screening forms to allow faster and easier retrieval   way (non-historical).                               Dwelling Unit Program.                           Dwelling Unit Program.
on the Permit Tracking System.
                                                       Review the Unit Legalization Program.
Establish Unit Legalization Counter.
                                                       Review the Establish Accessory Dwelling Unit
Establish Private School Seismic Safety Counter.       Program.

Establish Accessory Dwelling Unit Counter.

                                                                                                                                                                                                             1B: Issue Permits.
Goal 1: Review Plans and Issue Permits Safeguarding Life and                                                                                                                                                                                                              5
    Property in Compliance with City and State Regulations.

           Year 1: 2015 – 2016                                    Year 2: 2016 – 2017                                      Year 3: 2017 – 2018                                    Year 4: 2018 – 2019                                    Year 5: 2019 – 2020

1C: Post and update Information Sheets and             1C: Order and maintain current hard copies of            1C: Post and update Information Sheets and             1B: Ensure customer compliance Soft Story              1C: Post and update Information Sheets and
Administrative Bulletins for code interpretations on   Title 8 (Cal OSHA), Title 19 (Public Safety), Title 20   Administrative Bulletins for code interpretations on   1C: Post and update Information Sheets and             Administrative Bulletins for code interpretations on
DBI’s website.                                         (Public Utilities) and Title 25 (Housing).               DBI’s website.                                         Administrative Bulletins for code interpretations on   DBI’s website.
                                                                                                                                                                       DBI’s website.
Update DBI Policies and Procedures in response         Post and update Information Sheets and                   Review and update DBI Policies and Procedures                                                                 Review and update DBI Policies and Procedures
to implementation and enforcement of locally           Administrative Bulletins for code interpretations on     in response to implementation and enforcement          Update DBI Policies and Procedures in response         in response to implementation and enforcement
adopted ordinances                                     DBI’s website and notify                                 of locally adopted ordinances                          to implementation and enforcement of locally           of locally adopted ordinances
as required annually.                                  DBI & SFFD staff as required.                            as required.                                           adopted ordinances                                     as required.
                                                                                                                                                                       as required.
Improve email response to inquiries that come to       Update DBI Policies and Procedures in response
techQ@sfgov.org regarding code questions and           to implementation and enforcement of locally                                                                    Update code as required by the code cycle.
procedures.                                            adopted ordinances
                                                       as required.
Work with California Building Standards
Commission and other agencies to develop,              Work with California Building Standards
update, and interpret California and San Francisco     Commission and other agencies to develop,
Building Code,                                         update, and interpret California and San Francisco
Mechanical Code, Energy Code, Green Building           Building Code, Mechanical Code, Energy Code,
Code and related local ordinances.                     Green Building Code and related local ordinances.

Update code as required by the code cycle.
Ensure that all code updates are posted on DBI’s
website within two business days.

Organize Technical Services Division (TSD) library
into separate categories: Documents, Standards,
Standards, Model Codes, Interpretation Manuals,
Code Adoptions, Accessibility and Reference to
be more user friendly for internal use.

                                                                                                                                                         1C: Interpret and Update Codes and Standards.
Goal 1: Review Plans and Issue Permits Safeguarding Life and                                                                                                                                                                                                   6
    Property in Compliance with City and State Regulations.

           Year 1: 2015 – 2016                                   Year 2: 2016 – 2017                                 Year 3: 2017 – 2018                                  Year 4: 2018 – 2019                                 Year 5: 2019 – 2020

1D: Approve or deny requests for OTC review of        1D: Approve or deny requests for OTC review of      1D: Approve or deny requests for OTC review of       1D: Approve or deny requests for OTC review of      1D: Approve or deny requests for OTC review of
submitted plans within two business days after        submitted plans in a timely manner after receipt.   submitted plans in a timely manner after receipt.    submitted plans in a timely manner after receipt.   submitted plans in a timely manner after receipt.
receipt. Audit to ensure compliance.                  Audit to ensure compliance.                         Audit to ensure compliance.                          Audit to ensure compliance.                         Audit to ensure compliance.

Update and review process which ensures that          Review and update the quality control review of     Update plan coordination and distribution            Update and review process to ensure that OTC        Update the quality control review of the 5th floor
OTC (no-plans) building permits are reviewed          the 5th floor Permit Processing Center.             between departmental review agencies.                no-plans building applications are reviewed in a    Permit Processing Center.
within a maximum of 20 minutes of waiting time                                                                                                                 timely fashion.
after sign-in and audit compliance annually.          Review the monthly OTC clerical training program    Update and refine a quality control review process
                                                      and report recommendations to the Deputy            of the 5th floor Permit Processing Center.           Update the quality control review process of the
Improve plans coordination and distribution           Director.                                                                                                5th floor Permit Processing Center.
between departmental review agencies and
evaluate annually.

Further develop and refine a quality control review
of the 5th floor Permit Processing Center. Develop
a monthly OTC clerical training program.

                                                                                                                                                        1D: Ensure Convenient, Efficient, and Timely
                                                                                                                                                        Process Coordinated with Other City Agencies.
Goal 2: Provide Inspections to Enforce Codes and Standards to Protect                                                                                                                                                                                            7
    Occupants’ Rights Ensuring Safety and Quality of Life.

          Year 1: 2015 – 2016                                  Year 2: 2016 – 2017                                  Year 3: 2017 – 2018                                Year 4: 2018 – 2019                                     Year 5: 2019 – 2020

2A: Building, Electrical and Plumbing inspections   2A: Review polices to ensure that Building,          2A: Update the Policy and Procedure Manual for     2A: Maintain Policy and Procedure Manual yearly         2A: Maintain Policy and Procedure Manual yearly
are performed in a timely manner with inspectors    Electrical and Plumbing Inspections are performed    all inspection divisions (BID, EID, PID, CES and   to capture revised office policy from legislative and   to capture revised office policy from legislative and
performing on average at least 11 inspections per   in a timely manner.                                  HIS) every three years.                            code changes.                                           code changes.
day and 9 inspections per day on average in the
Downtown districts                                  Audit the inspection records to ensure that 80% of   Review and enhance DBI’s process and               Monitor State mandates for updates to Energy            Review policies to ensure that Building, Electrical
                                                    Complaint Inspections are being performed within     procedures for verification of customer            Codes.                                                  and Plumbing Inspections are performed in a
Perform 80% of Building, Electrical and Plumbing    three business days of date received annually.       compliance for State mandated Title 24 Energy                                                              timely manner.
Complaints Inspections within three business                                                             Codes.                                             Review policies to ensure that Building, Electrical
days of date received. Produce monthly reports      Review policies to ensure 80% of non-life hazard                                                        and Plumbing Inspections are performed in a             Review policies to ensure that Housing
and audit results.                                  Housing Complaints are performed within three        Review the Building, Electrical and Plumbing       timely manner.                                          Inspections are being performed in a timely
                                                    business days of date received annually.             Complaints inspection process to update the 80%                                                            manner.
Perform 80% of permit inspections within two                                                             within the three business days of request date     Review policies to ensure that Housing
business days of request date. Produce monthly      Audit inspection records to ensure that 100% of      policy.                                            Inspections are performed in a timely manner.           Update State mandates for updating Energy
report and audit results annually.                  Life Hazard inspections are responded to within                                                                                                                 Codes.
                                                    one business day.
Perform 80% of non-life hazard Housing
Complaints Inspections within three business        Audit the inspections records to ensure that 80%
days of date received. Produce monthly report       of permit inspections are being performed within
and audit results.                                  two business days of request date annually.

Perform 100% of Life Hazard inspections within
one business day of request.

                                                                                                                                                                2A: Ensure Quality & Timely Inspections.
Goal 2: Provide Inspections to Enforce Codes and Standards to Protect                                                                                                                                                                                   8
    Occupants’ Rights Ensuring Safety and Quality of Life.

           Year 1: 2015 – 2016                                  Year 2: 2016 – 2017                                    Year 3: 2017 – 2018                             Year 4: 2018 – 2019                                Year 5: 2019 – 2020

2B: Evaluate and monitor electrical inspection and   2B: Enhance policies and procedures for Title 24       2B: Establish and develop a collaboration with   2B: Update the implementation of outreach          2B: Review the collaboration with PG&E in
complaint turnaround times, to ensure a response     and Green Code mandates.                               PG&E in reviewing codes and construction         program with Contractors and review annually.      reviewing codes and construction changes.
rate of 80% of inspections performed within three                                                           changes.
business days of receipt.                            Review and update policies and procedures for                                                           Update and review the collaboration with PG&E in
                                                     newly passed legislation pertaining to Cell Phone      Review and update the implementation of the      reviewing codes and construction changes.
Address Title 24 Energy Conservation                 sites, Solar and Electric Vehicle Chargers annually.   outreach program with contractors.
Compliance, by educating customers to meet its
requirements.                                        Review and update the goals for electrical
                                                     inspection and complaint turnaround times
Update and review Solar Plan review process to       annually.
meet AB-2188 requirements.
                                                     Establish and implement outreach program with
Annual update of Division Operations Manual to       contractors.
improve customer service and staff compliance.

                                                                                                                                                     2B: Electrical Inspection Division (EID) Conducts
                                                                                                                                                     Inspections to Ensure Code Compliance and
                                                                                                                                                     Responds to Complaints.
Goal 2: Provide Inspections to Enforce Codes and Standards to Protect                                                                                                                                                                           9
    Occupants’ Rights Ensuring Safety and Quality of Life.

          Year 1: 2015 – 2016                               Year 2: 2016 – 2017                                Year 3: 2017 – 2018                               Year 4: 2018 – 2019                               Year 5: 2019 – 2020

2C: Review and update the Boiler Permit           2C: Update continuing education of staff program   2C: Implement and work with other City agencies   2C: Review and update the implementation of the   2C: Update the Flood Program, Grey Water
complaints procedures in order to ensure timely   to provide consistency of code enforcement         to establish a Flood Program, Grey Water          Flood Program, Grey Water Program and Storm       Program and Storm Water Program.
processing. Implement recommendations             interpretation annually.                           Program and Storm Water Program                   Water Program.
annually.
                                                  Review the implementation the RAD Program          Review and update continuing education of
Prepare for the upcoming California Plumbing      by reviewing and updating the plan review and      staff program to provide consistency of code
Code / San Francisco addendum process.            inspection process.                                enforcement interpretation annually.

Update continuing education of staff program                                                         Review and update the implementation the RAD
to provide consistency of code enforcement                                                           Program by reviewing and updating the plan
interpretation.                                                                                      review and inspection process.

Complete implementation the Rental Assistance
Demonstration (RAD) Program by providing a plan
review and inspection process.

                                                                                                                                          2C: Plumbing and Mechanical Inspection Division
                                                                                                                                          (PID) Conducts Inspections to Ensure Code
                                                                                                                                          Compliance and Responds to Complaints.
Goal 2: Provide Inspections to Enforce Codes and Standards to Protect                                                                                                                                                                              10
    Occupants’ Rights Ensuring Safety and Quality of Life.

           Year 1: 2015 – 2016                                 Year 2: 2016 – 2017                                 Year 3: 2017 – 2018                                 Year 4: 2018 – 2019                              Year 5: 2019 – 2020

2D: Measure inspector performance through daily     2D: Review and update Inspectors use of             2D: Review and update inspectors use of the         2D: Review and update inspectors use of the       2D: Review and update inspectors use of the
evaluations of inspections and day ratios and       technology, including wireless devices for access   latest technologies to improve productivity.        latest technologies to improve productivity.      latest technologies to improve productivity.
produce daily reports.                              to inspection schedules, to ensure efficiency and
                                                    productivity.                                       Review and update outreach program to               Review and update the continuing staff training   Review BID complaints and approve at each step
Ensure the quality and consistency of inspections                                                       Contractors.                                        educational program.                              by a Senior Inspector from compliance to case
by conducting Senior Building Inspector Spot        Design outreach program to educate Contractors                                                                                                            closure.
Checks. Audit results.                              on new code changes.                                Ensure the quality and consistency of inspections
                                                                                                        by conducting Senior Building Inspector Spot
Establish a quality control program to ensure       Implement an updated continuing staff training      Checks. Audit results.
consistency in the Notice of Violation Process.     educational program.

Review BID complaints process that requires         Review the measure for inspector performance
approval at each step by a Senior Inspector from    through daily evaluations of inspections and day
compliance to case closure.                         ratios annually.

Establish greater focus with Inspectors in the      Review and update the quality and consistency
use of technology, including wireless devices for   of inspections by conducting Senior Building
access to inspection schedules. Produce report      Inspector Spot Checks annually.
on findings.
                                                    Review and update the Notice of Violation
                                                    Process and make recommendations to ensure
                                                    the quality and consistency of inspections
                                                    annually.

                                                    Review BID complaints and approve at each step
                                                    by a Senior Inspector from compliance to case
                                                    closure. Produce report on findings.

                                                                                                                               2D: Building Inspection Division (BID) Conducts
                                                                                                                               Inspections of Buildings and Properties/Structures to
                                                                                                                               Ensure Code Compliance and Responds to Complaints.
Goal 2: Provide Inspections to Enforce Codes and Standards to Protect                                                                                                                                                                                           11
    Occupants’ Rights Ensuring Safety and Quality of Life.

           Year 1: 2015 – 2016                                  Year 2: 2016 – 2017                                   Year 3: 2017 – 2018                                     Year 4: 2018 – 2019                                    Year 5: 2019 – 2020

2E: Ensure that routine Housing Inspection           2E: Coordinate to improve HIS enforcement and         2E: Update the Operating Procedures Manual by           2E: Update the Operating Procedures Manual to          2E: Update the Operating Procedures Manual
Services (HIS) inspections are performed in timely   cost recovery models with SFFD to determine           adding a section identifying Chief’s operating daily,   identify and create enhanced procedures for five       to identify and implement enhanced code
manner and conducted 80% of inspections on           which items can be mutually utilized.                 weekly, and monthly bench marks.                        year code enforcement policy improvements.             enforcement procedures such as administrative
non-life complaints within three business days.                                                                                                                                                                           penalties.
Audit results.                                       Review and update to ensure that routine              Develop comprehensive online tools for residential      Update the Division’s RAD Program
                                                     inspections are performed in a timely manner and      property owners regarding proactive property            responsibilities by coordinating and implementing      For the RAD Program compile data with CEOP
Respond to 100% of Life Hazard and Heat              evaluate the goal for response time for inspections   maintenance.                                            a new MOU with SF Housing Authority and Code           on MOU implementation and related complaint
Complaints within one business day. Report           on complaints annually.                                                                                       Enforcement Outreach Program (CEOP) vendors.           response/inspection services for reporting to BIC.
results weekly.                                                                                            Develop a program to increase inspection and
                                                     Audit records to validate that 100% of Life           reporting ability to issue Notices & retrieve           Review and update comprehensive online tools
Monitor, evaluate and track inspector performance    Hazards and Heat Complaints are responded to          reference materials and permit histories in the field   for residential property owners regarding proactive
weekly and produce monthly report to track           within one business day annually.                     on a regular basis.                                     property maintenance.
results.
                                                     Review and update the HIS process that                Review and update the recommendations of the            Review and update the program to increase
Participate in and provide administrative support    monitors, evaluates and tracks inspector              Emergency Interagency Fire Safety Task Force.           inspection and reporting ability to issue Notices &
to the Emergency Interagency Fire Safety Task        performance weekly. Use findings to produce                                                                   retrieve reference materials and permit histories in
Force to review and make recommendations to          recommendations for department annually.                                                                      the field on a regular basis.
the Board of Supervisors to implement findings
and recommendations to improve fire safety in        Implement the findings and recommendations
multi-unit residential buildings.                    of the Emergency Interagency Fire Safety Task
                                                     Force.

                                                     Develop a joint database with SFFD regarding fire
                                                     damaged buildings.

                                                     With SFHA, review and update the current
                                                     DBI/SFHA MOU pertaining to Housing Code
                                                     complaints to reflect the transition to private
                                                     management of the SFHA buildings (RAD
                                                     Program).

                                                                                                                                       2E: Inspect Housing to Enforce Codes and Standards
                                                                                                                                       to Protect Tenants’ Rights and Ensure Quality of Life.
Goal 2: Provide Inspections to Enforce Codes and Standards to Protect                                                                                                                                                                                   12
    Occupants’ Rights Ensuring Safety and Quality of Life.

           Year 1: 2015 – 2016                                Year 2: 2016 – 2017                                   Year 3: 2017 – 2018                                Year 4: 2018 – 2019                                   Year 5: 2019 – 2020

2F: Monitor and track inspection complaints with   2F: Review and update Code Enforcement                2F: Review and update the process on abated        2F: Update and review how DBI monitors and            2F: Track and produce the Lien Property List for
Notice of Violations Issued. Report results on a   policies and procedures. Produce report and           complaints with Notice of Violations. Report       tracks complaints with Notice of Violations Issued.   the Board of Supervisors.
monthly basis.                                     make recommendations.                                 findings annually.
                                                                                                                                                            Report on cases with Orders of Abatement              Complete an assessment survey with the City
Monitor and track number of cases sent to          Update and review how DBI monitors and tracks         Monitor and track number of cases sent to          issued.                                               Attorney Office to reassess outstanding cases.
Director’s Hearings. Report findings monthly.      all inspection complaints with Notice of Violations   Director’s Hearings. Report results monthly.
                                                   Issued annually.                                                                                         Review and update Code Enforcement policies           Track and update the Vacant Buildings Report per
Report on cases with Orders of Abatement                                                                 Produce report on cases with Orders of             and procedures.                                       the required ordinances.
issued. Ensure that new cases are assessed a       Review process on abated complaints with              Abatement issued.
monthly monitoring fee within 60 days.             Notice of Violations. Use findings to make                                                               Complete an assessment survey with the City
                                                   recommendations.                                      Ensure that new cases are accessed a monthly       Attorney Office to reassess outstanding cases.
Perform annual audit to ensure that monitoring                                                           monitoring fee within 60 days. Audit annually.
fees are properly assessed.                        Review and update the process in which cases                                                             Track and produce the Lien Property List for the
                                                   are sent to Director’s Hearings annually. Audit the   Complete an assessment survey with the City        Board of Supervisors.
Complete an assessment survey with the City        number of cases sent to Director’s Hearings.          Attorney Office to reassess outstanding cases.
Attorney Office to reassess outstanding cases.                                                                                                              Track and update the Vacant Buildings Report per
                                                   Complete an assessment survey with the City           Track and produce the Lien Property List for the   the required ordinances.
Track and produce the Lien Property List for the   Attorney Office to reassess outstanding cases.        Board of Supervisors.
Board of Supervisors.
                                                   Track cases with Orders of Abatement issued.          Track and update the Vacant Buildings Report per
Track and update the Vacant Buildings Report per   Ensure that new cases are assessed a monthly          the required ordinances.
the required ordinances.                           monitoring fee within 60 days on an annually
                                                   basis.

                                                   Track and produce the Lien Property List for the
                                                   Board of Supervisors.

                                                   Track and update the Vacant Buildings Report per
                                                   the required ordinances.

                                                                                                                                                2F: Manage Notice of Violations and Complaints.
Goal 3: Deliver the Highest Level of Customer Service.                                                                                                                                                                                                       13

           Year 1: 2015 – 2016                                    Year 2: 2016 – 2017                                    Year 3: 2017 – 2018                                 Year 4: 2018 – 2019                                  Year 5: 2019 – 2020

3A: Continue to establish routine maintenance          3A: Continue with the development of the Permit        3A: Implementation and integration of the updated   3A: Prepare, develop and provide the equipment       3A: Develop and provide digital signage, audio
of technology systems. Downtime is planned             and Project Tracking System (PPTS).                    version of PPTS.                                    for the IT infrastructure data center in the         and video equipment for the proposed DBI
after business hours and weekends to minimize                                                                                                                     proposed DBI building for use by DBI along with      building.
business interruption.                                 Provide a cloud-base file sharing platform to          Research and implement an electronic plan           other City departments.
                                                       collaborate with or exchange large files with          check system to conduct faster, more efficient                                                           Develop and provide replacement equipment for
Ensure system uptime by replacing and ensuring         business partners and colleagues as well as            plan reviews and to enable customers to submit      Provide phone system for the proposed DBI            the DOC (Department Operations Center), Point-
computers are standardized using business-             provide an efficient storage for inspectors on the     plan set electronically along with the permit       office using VOIP technologies. The new system       of-Sale system and public kiosk computers to
class models that have longer support from the         field when they document inspections with photos       applications conveniently.                          will provide phone, voicemail, conferencing          sustain system reliability and functionality.
manufacturer and easier maintenance for IT staff.      and videos using mobile devices.                                                                           and integration to existing IVR (interactive voice
                                                                                                              Expand current Online Permit functionalities for    response) system which automates call traffic and
Research to replace Atlas, document                    Replace existing IT infrastructure equipment to        DBI customer by offering issuance of additional     routes calls accordingly.
management system with a new document                  maintain system reliability and business continuity.   permit type via the web portal.
management solutions to simplify the ability to        Work in coordination with Communication Office                                                              Prepare and develop Wi-Fi infrastructure for new
search, retrieve, process and archive documents        to research and develop a scope of work for a                                                              office.
from anywhere in the department.                       robust, innovative customer focused website.
                                                       Launch pilot plan for electronic sign-in process on
Research and develop a plan for implementing a         selective floors and evaluate program.
cloud-based disaster recovery solution to improve
disaster recovery and business continuity of DBI’s
IT operations.

Develop plan to better manage, monitor and
secure all devices connecting to the network and
to preserve reliability and integrity of the network
management and monitoring system.

Research and develop pilot plan for electronic
sign-in process on selective floors.

                                                                                                                                                                  3A: Implement Technology Improvements.
Goal 3: Deliver the Highest Level of Customer Service.                                                                                                                  14

          Year 1: 2015 – 2016             Year 2: 2016 – 2017                               Year 3: 2017 – 2018                Year 4: 2018 – 2019   Year 5: 2019 – 2020

3B: Develop Recruitment Plan    3B: Develop department-wide onboarding training   3B: Develop and fully implement Leadership
                                for new staff.                                    Program to strengthen leadership and
                                                                                  performance.
                                Develop Workforce Succession Plan.

                                                                                      3B: Maintain Adequate Staffing to Meet to Customer Demands.
Goal 3: Deliver the Highest Level of Customer Service.                                                                                                                                                                       15

          Year 1: 2015 – 2016                              Year 2: 2016 – 2017                                 Year 3: 2017 – 2018                                Year 4: 2018 – 2019                     Year 5: 2019 – 2020

3C: Complete HVAC improvements from first to     3C: Coordinate and meet with other City agencies   3C: Coordinate and meet with other City agencies   3C: Coordinate and meet with other City agencies
fifth floors at 1660 Mission.                    on the steering committee that is planning the     in finalizing the plans and design of the new      in finalizing the plans and design of the new
                                                 development and design of the new DBI building.    Permit Center building.                            Permit Center building.
Coordinate and meet with other City agencies
through the steering committee meetings in the                                                      Develop and implement a strategy to finalize the   Develop and implement a strategy to finalize the
planning, development and design of the new                                                         plan to move to the new Permit Center building.    plan to move to the new Permit Center building.
Permit Center building.

                                                                                                                                                                             3C: Manage Department Facility.
Goal 4: Implement Efficient and Effective Administrative Practices.                                                                                                                           16

          Year 1: 2015 – 2016                               Year 2: 2016 – 2017                               Year 3: 2017 – 2018                    Year 4: 2018 – 2019   Year 5: 2019 – 2020

4A: Efficient and prompt processing of 3R         4A: Efficient and prompt processing of 3R         4A: Review and update the goal of 3R requests
requests by meeting a goal of processing 90% of   requests by meeting a goal of processing 90% of   by meeting a standard of processing 90% of
requests within seven business days.              requests within seven business days.              requests within seven business days.

Efficient and prompt processing of records        Efficient and prompt processing of records        Review and update the goal of records requests
requests by meeting a goal of processing 90% of   requests by meeting a goal of processing 90% of   by meeting a standard of processing 90% of
requests within 20 business days.                 requests within 20 business days.                 requests within 20 business days.

                                                                                                                                        4A: Ensure Timely Response to Records Request.
Goal 4: Implement Efficient and Effective Administrative Practices.                                                                                                                        17

          Year 1: 2015 – 2016                             Year 2: 2016 – 2017                            Year 3: 2017 – 2018             Year 4: 2018 – 2019            Year 5: 2019 – 2020

4B: Update and Complete Finance Policies and   4B: Develop consistent division cost tracking   4B: Conduct Fee Study.          4B: Adopt and implement new Fee Study.
Procedures.                                    reports to assist fee study collection.

                                                                                                                                                    4B: Manage Department Funds.
Goal 4: Implement Efficient and Effective Administrative Practices.                                                                                     18

          Year 1: 2015 – 2016                             Year 2: 2016 – 2017          Year 3: 2017 – 2018     Year 4: 2018 – 2019   Year 5: 2019 – 2020

4C: Implement Global Positioning System (GPS)   4C: Establish Fleet Management Plan.
for vehicles.

                                                                                                             4C: Manage Department Fleet to Ensure
                                                                                                             Maximum Use of Vehicles.
Goal 4: Implement Efficient and Effective Administrative Practices.                                                                                                                                                                                             19

            Year 1: 2015 – 2016                                   Year 2: 2016 – 2017                                   Year 3: 2017 – 2018                                    Year 4: 2018 – 2019                                  Year 5: 2019 – 2020

4D: Review and update DBI emergency                    4D: Review and update the process that ensures       4D: Provide advanced emergency management               4D: Review and update the advanced emergency         4D: Develop the Floor Evacuation Monitors list for
Operations Plan on an annual basis.                    that all DBI building inspectors and engineers       training to senior inspection staff at the California   management training to senior inspection staff at    the new DBI building Emergency Evacuation Plan
                                                       obtain or renew their SAP Evaluator registration.    Specialized Training Institute (CSTI).                  CSTI annually.                                       and replace floor monitors as vacancies occur
Update the Floor Evacuation Monitors list for the      Coordinate training for new building inspectors                                                                                                                   due to staffing changes.
1660 Mission Street Emergency Evacuation Plan          and engineers as a part of the onboarding            Implement and provide all staff having supervisory      Review and update the process for staff having
and replace floor monitors as vacancies occur          process annually.                                    responsibilities with training in ICS-200, ICS-300,     supervisory responsibilities with training in ICS-
due to staffing changes.                                                                                    & ICS-400, where appropriate.                           200, ICS-300, & ICS-400, where appropriate           Conduct drills and training exercises on a regular
                                                       Review and update to ensure a minimum of                                                                     annually.                                            basis for all staff coordinated with the DEM
Update the Department Operations Center (DOC)
                                                       70% attendance rate by Disaster Preparedness         Conduct drills and training exercises on a regular                                                           Emergency Response Plan.
Building Safety Organization Chart annually.
                                                       Coordination Unit staff at recurring disaster        basis for all staff in coordination with the DEM        Conduct drills and training exercises on a regular
Provide training for all DBI Building Safety Team      preparedness meetings. Audit compliance              Emergency Response Plan.                                basis for all staff coordinated with the DEM
staff in Incident Command System (ICS)-100 for         annually.                                                                                                    Emergency Response Plan.
foundational training in emergency management
and incident command organizational principles         Deploy the 120 newly acquired 800 MHz
annually.                                              radios, including radio ID engraving, radio unit
                                                       programming, system testing and staff training.
Distribute updated DBI Emergency Action Plan
to all new employees during the onboarding             Develop Disaster Coordination Unit budget on an
process.                                               annual basis.
Ensure that all DBI building inspectors and
                                                       Conduct drills and training exercises on a regular
engineers attain or renew their Safety Assessment
                                                       basis for all staff in coordination with DEM
Program (SAP) Evaluator registration. Review
                                                       Emergency Response Plan.
and update semiannually each year. Coordinate
training for new building inspectors and engineers
as a part of the onboarding process annually.

Update Staff Mass Notification & Emergency
Management System on an annual basis.

Distribute Survival Kit backpacks and disaster
response related Personal Protective Equipment
(PPE) for new employees during the onboarding
process and replace contents according to
expiration dates.

Ensure minimum of 70% attendance rate by
Disaster Preparedness Coordination Unit staff at
recurring disaster preparedness meetings.

Conduct DOC training exercises around the
anniversaries of the 1906 Earthquake (April) and
the Loma Prieta Earthquake (October) on an
annual basis.                                                                                                                                                                    4D: Review and Update Department
Conduct drills and training exercises on a
regular basis for all staff in coordination with the                                                                                                                             Disaster Response Plan.
Department of Emergency Management (DEM)
Emergency Response Plan.
Goal 5: Proactively engage and educate customers, contractors, and stakeholders                                                                                                                                                                                     20
    on DBI’s services, functions and legislated programs.

           Year 1: 2015 – 2016                                    Year 2: 2016 – 2017                                    Year 3: 2017 – 2018                                    Year 4: 2018 – 2019                                    Year 5: 2019 – 2020

5A: Involve Legislative Review Committee and           5A: Involve Legislative Review Committee and           5A: Convene and manage DBI Legislative                 5A: Convene and manage DBI Legislative                 5A: Convene and manage DBI Legislative
appropriate DBI staff in specific ordinances           appropriate DBI staff in specific ordinances           Review Committee, per Director, on bi-weekly           Review Committee, per Director, on bi-weekly           Review Committee, per Director, on bi-weekly
under way, including mandatory disability              under way, including mandatory disability              and as-needed basis throughout the year, to            and as-needed basis throughout the year, to            and as-needed basis throughout the year, to
access improvements, Additional Dwelling Units,        access improvements, Additional Dwelling Units,        identify all legislative proposals with impacts upon   identify all legislative proposals with impacts upon   identify all legislative proposals with impacts upon
Legalization of in-law units, a new Fire Safety        Legalization of in-law units, a new Fire Safety        DBI budget, operations and code requirements.          DBI budget, operations and code requirements.          DBI budget, operations and code requirements.
ordinance for older existing buildings, a new          ordinance for older existing buildings, a new          Committee to make recommendations and assist           Committee to make recommendations and assist           Committee to make recommendations and assist
Gray Water ordinance that exempts projects             Gray Water ordinance that exempts projects             with language, as needed, in drafting ordinances       with language, as needed, in drafting ordinances       with language, as needed, in drafting ordinances
from plumbing code permit requirements, on-            from plumbing code permit requirements, on-            and amendments.                                        and amendments.                                        and amendments.
going mandatory soft story seismic retrofits, per      going mandatory soft story seismic retrofits, per
deadline requirements in this and subsequent           deadline requirements in this and subsequent           Pro-actively schedule one-on-one meetings              Pro-actively schedule one-on-one meetings              Pro-actively schedule one-on-one meetings
fiscal years, private schools seismic evaluations,     fiscal years, private schools seismic evaluations,     quarterly between DBI Director and Members of          quarterly between DBI Director and Members of          quarterly between DBI Director and Members of
and a new code enforcement uniformity ordinance        and a new code enforcement uniformity ordinance        Board, and/or with key legislative staff, to discuss   Board, and/or with key legislative staff, to discuss   Board, and/or with key legislative staff, to discuss
(among others).                                        (among others).                                        building department issues, ideas that may lead        building department issues, ideas that may lead        building department issues, ideas that may lead
                                                                                                              to specific legislation.                               to specific legislation.                               to specific legislation.
Convene and manage DBI Legislative Review              Convene and manage DBI Legislative Review
Committee, on bi-weekly and as-needed basis            Committee, on bi-weekly and as-needed basis            Continue to work closely daily and on as as-           Continue to work closely daily and on as as-           Continue to work closely daily and on as as-
throughout the year, to identify all legislative       throughout the year, to identify all legislative       needed basis with DBI Communications team              needed basis with DBI Communications team              needed basis with DBI Communications team
proposals with impacts upon DBI budget,                proposals with impacts upon DBI budget,                to plan, develop and implement newly passed            to plan, develop and implement newly passed            to plan, develop and implement newly passed
operations and code requirements. Committee            operations and code requirements. Committee            legislation to ensure that requirements and            legislation to ensure that requirements and            legislation to ensure that requirements and
to make recommendations and assist with                to make recommendations and assist with                impacts upon DBI operations are communicated           impacts upon DBI operations are communicated           impacts upon DBI operations are communicated
language, as needed, in drafting ordinances and        language, as needed, in drafting ordinances and        effectively to internal and external audiences, and    effectively to internal and external audiences, and    effectively to internal and external audiences, and
amendments.                                            amendments.                                            ensuring public awareness and understanding of         ensuring public awareness and understanding of         ensuring public awareness and understanding of
                                                                                                              the new measures.                                      the new measures.                                      the new measures.
Pro-actively schedule one-on-one meetings              Pro-actively schedule one-on-one meetings
quarterly between DBI Director and Members of          quarterly between DBI Director and Members of
Board, and/or with key legislative staff, to discuss   Board, and/or with key legislative staff, to discuss
building department issues, ideas that may lead        building department issues, ideas that may lead
to specific legislation.                               to specific legislation.

Continue to work closely daily and on as as-           Continue to work closely daily and on as as-
needed basis with DBI Communications team              needed basis with DBI Communications team
to plan, develop and implement newly passed            to plan, develop and implement newly passed
legislation to ensure that requirements and            legislation to ensure that requirements and
impacts upon DBI operations are communicated           impacts upon DBI operations are communicated
effectively to internal and external audiences, and    effectively to internal and external audiences, and
ensuring public awareness and understanding of         ensuring public awareness and understanding of
the new measures.                                      the new measures.

                                                                                                                                                                                        5A: Review and Update Legislative
                                                                                                                                                                                        and Public Affairs Plan.
Goal 5: Proactively engage and educate customers, contractors, and stakeholders                                                                                                                                                                     21
    on DBI’s services, functions and legislated programs.

           Year 1: 2015 – 2016                                  Year 2: 2016 – 2017                                 Year 3: 2017 – 2018                                Year 4: 2018 – 2019                               Year 5: 2019 – 2020

5B: Continue to implement improvements               5B: Develop and execute a public awareness           5B: Review and update Electrical Inspection       5B: Develop and execute a new Customer            5B: Assess and implement recommendations
relating to 2015 Customer Satisfaction Survey        campaign on “Getting to know DBI” to improve         outreach program with contractors.                Satisfaction Survey by 2018.                      from results of the Customer Satisfaction Survey.
recommendations, which include improvements          customer understanding of DBI’s role in protecting
to building signage and public experience at DBI’s   building and life safety every day.                  Review and update Building Inspection outreach    Develop and implement comprehensive online
1st and 5th floors.                                  Develop DBI’s communication and engagement           program to educate contractors on new code        tools for residential property owners regarding
                                                     strategy.                                            changes.                                          proactive property maintenance.
Develop and implement a multi-prong balcony/
deck safety outreach program with Housing            Continue to conduct public outreach, including       Conduct outreach on the expanded online permit    Conduct outreach on the electronic plan check
Inspection Services.                                 paid advertising, to ensure compliance with DBI’s    portal.                                           system.
                                                     Mandatory Soft Story Program, annually.
Conduct public outreach to ensure customer                                                                Expand the seismic safety outreach program in     Prepare and develop public outreach efforts on
compliance with DBI’s programs: Mandatory Soft       Evaluate and implement outreach program tools        new districts.                                    DBI’s move to new Permit Center in coordination
Story, Unit Legalization, and Accessory Dwelling     for Code Enforcement Outreach Program with                                                             with other City agencies.
Unit.                                                Housing Inspection Services.                         Develop DBI’s digital and online customer
                                                                                                          strategy.                                         Expand the seismic safety outreach program in
Evaluate and coordinate outreach efforts on Title    Establish and implement Electrical Inspection                                                          new districts.
24 Energy Conservation Compliance and the            outreach program with contractors.                   Develop scope of work for website redesign
Solar Plan review.                                                                                        efforts by December 2017.
                                                     Develop Building Inspection outreach program to
Manage the seismic safety outreach program.          educate contractors on new code changes.

Develop a brand and style guideline for DBI.         Develop an internal and external outreach
                                                     program for the launch of the Permit & Project
                                                     Tracking System.

                                                     Assess and evaluate the development of an
                                                     updated and more customer oriented website.

                                                     Expand the seismic safety outreach program in
                                                     new districts.

                                                     Begin the update of DBI’s outreach materials by
                                                     prioritizing existing brochures and informational
                                                     materials.

                                                                                                                                                           5B: Continuously Update and Implement a
                                                                                                                                                           Multi-Prong Strategic Communications Plan.