A member of Antea Group - Iceacsa
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
_02 _03 ACTIVITY AND 10 CLIENTS 22 SERVICE AREAS INSTITUTIONAL AND GOVERNMENT PLANNING AND FEASIBILITY AGENCY CLIENTS STUDY AND DESIGN OF CONSTRUCTION COMPANIES INFRASTRUCTURES STUDY AND DESIGN OF URBAN CONCESSIONAIRES PLANNING AND ARCHITECTURE INDUSTRIAL AND SERVICE COMPANIES CONSTRUCTION AND OPERATION PHASE SERVICES PRIVATE INVESTORS TECHNICAL CONSULTANCY IN PUBLIC AND PRIVATE BANKING PUBLIC WORKS PROCUREMENT INSTITUTIONS, AND INVESTMENT FUNDS
INTRODUCTION MAIN STRATEGIES 5 PROVISION OF COMPREHENSIVE SERVICES TO CLIENTS DURING THE ENTIRE LIFE CYCLE OF THEIR PROJECTS Since it was founded in 1985, ICEACSA has achieved Our track record is backed by a portfolio of more COMBINING INTERNATIONAL an outstanding market position as a pioneering leader than 2,500 projects Comprehensive regional plan- EXPERIENCE WITH LOCAL in turnkey projects in the engineering, construction, ning in the highway, port, water engineering, regional KNOWLEDGE regional and urban development and environ- and urban planning and project development fields mental, industrial and energy generation fields. for more than € 40,000 million (45,000 million USD) ICEACSA Grupo has become an international engi- firmly endorses our governance. Studies, designs, TO PROVIDE neering group by continuous development of its structuring, project management and works super- INSTANT experience and know-how and by carefully planned vision for more than € 10,000 million (11,000 million RESPONSE international expansion. USD) certify this. Experience, quality and a result-oriented approach Welcome to ICEACSA Grupo. R&D+I CONTINUOUS provide our clients with the peace of mind that A member of the ANTEA Group. IMPROVEMENT comes from knowing that they are dealing with a fully QUALITY PROCEDURES accredited and highly solvent company. The results AND CONTROL are guaranteed by the talent of a large, multidisci- plinary team.
UNITED KINGDOM THE NETHERLANDS POLAND BELGIUM USA GALICIA ROMANIA / SPAIN FRANCE PORTUGAL INDIA DOMINICANAN REP. BURKINA FASO NICARAGUA PANAMA GUINEA BENIN CONAKRY LIBERIA 6 COLOMBIA PERU BRAZIL BOLIVIA URUGUAY COUNTRIES WITH ICEACSA GRUPO COMPANY OFFICES OTHER COUNTRIES WITH RECENT INTERNATIONAL PROJECTS BY ICEACSA GRUPO COMPANIES COUNTRIES WITH OTHER ANTEA GROUP OFFICES HEAD OFFICES Glorieta de América, 5-1º MEXICO 15004 A Coruña (Spain) PANAMA Tel.: +34 981 279 231 (switchboard) Avenida Insurgentes Sur 1425, 7A COLOMBIA PERU Fax: +34 981 279 406 Colonia Insurgentes Mixcoac Calle 60 Este, Obarrio URUGUAY iceacsa@iceacsa.com Carrera 21 Nº100-20, Of. 1.001 Alcaldía Benito Juárez Edificio Obarrio 60, piso 14, Of. A Av. Reducto Nº1370, Of. 201 International Service: 110111 Bogotá D.C. 03920 Ciudad de México Ciudad de Panamá Miraflores C/ 25 de Mayo Nº 477, Esc. 28 Tel.: +34 981 148 747 Tel.: + 57 1 300 3106 Tel.: +52 55 8790 7800 Tel.: +507 397 8607 Lima 18 11000 Montevideo internacional@iceacsa.com colombia@iceacsa.com mexico@iceacsa.com panama@iceacsa.com peru@iceacsa.com uruguay@iceacsa.com
ICEACSA GRUPO WORLDWIDE 7 In an increasingly globalized environment, the services we provide. As a result, we are endowed ICEACSA Grupo is committed to boosting its with full capacity to tackle any kind of project our international presence while maintaining the same clients may require in the engineering, construc- principles of sustainability, value creation, compet- tion, regional and urban development, envi- itiveness, experience and instant response that ronmental, industrial and energy generation have made it what it is today. fields. A team of more than 3,100 qualified experts around the world distributed among the more than ICEACSA Grupo operates internationally to 80 offices in Europe, America and Asia, enables us provide cross-border services in the areas in which to provide our clients with comprehensive services it operates from its permanent offices in Spain, that contribute real added value. Our mission is Colombia, Mexico, Panama, Peru and Uruguay. to assist our clients to meet all the requirements Thus, the teams based in these places also work encountered in the development of their business in neighboring countries to provide solutions that projects until execution and commissioning of the exactly meet the client’s needs and ensure transfer works and start-up of the commercial activity. of know-how to the client with the frank, open and at the same time comprehensive approach that In addition, ICEACSA Grupo has set up stable characterizes the group as a whole. strategic alliances with important local partners in the countries where we operate. These connec- In 2017 all the ICEACSA Grupo companies joined tions ensure comprehensive knowledge of the the ANTEA Group, thus further reinforcing their various markets and a high response capacity to international positioning and complementarity in any project the client may propose.
5 5 8 BOCAS DEL TORO COLÓN 10 ICEACSA PANAMA CHIRIQUÍ 4 NGÄBE-BUGLÉ 1 4 COCLÉ 11 6 7 8 5 VERAGUAS 7 HERRERA 8 LOS SA ICEACSA Panama opened its doors in 2012 within investment amounts of more than 1,000 million the framework of an ambitious international expan- dollars, including including aqueduct and drainage sion campaign, identifying Panama as a strategic projects, urban and inter-urban infrastructures and market in the context of Latin America. construction; intervening in strategic projects of the country’s infrastructure development. ICEACSA Panama’s success with the studies and designs for planning of 100 kilometers of the main The ICEACSA Panama team, together with qualified collector network of the Institute of Aqueducts and experts from the other ICEACSA Grupo countries, Sewers of Panama (IDAAN) was the beginning of ensure provision of the highest quality service closely an outstanding track record in which we have been adjusted to the client’s real needs, with the frank, open awarded a succession of public and private-sector and at the same time comprehensive approach that engineering, consulting and project management characterizes the group as a whole. ICEACSA Panama contracts in various phases of the project life cycle. has developed local, multidisciplinary work teams to tackle the engineering development, supervision and Since then ICEACSA Panama has played an active project management areas in the engineering, archi- part in the development of infrastructures involving tecture and environmental and social study disciplines.
3 4 9 GUNA YALA PANAMA 9 7 MADUGANDÍ 7 4 5 1 12 3 2 3 4 CERTIFICATIONS 6 2 6 3 6 2 2 6 2 1 5 1 WARGANDÍ PANAMA 8 WEST 1 Quality Management System in accordance with ISO 9001 certified by AENOR. 3 EMBERÁ- 9 WOUNAAN Environmental Management System in accordance with ISO 14001 certified by AENOR. 9 Occupational Health and Safety Management System in accordance with ISO 45001 certified by AENOR. DARIÉN EMBERÁ- WOUNAAN 13 ACCREDITATION ANTOS ICEACSA Panama is a pioneer in the adoption of benchmarking and certification in the consulting and engineering sector, which is why it has acquired a commitment to apply the most demanding quality standards to its projects. This policy enhances the PLANNING AND FEASIBILITY efficiency and competitiveness of the company and drives its firm commitment to sustainability and the STUDY AND DESIGN OF INFRASTRUCTURES environment. STUDY AND DESIGN OF URBAN PLANNING AND ARCHITECTURE ICEACSA Panama is certified and enabled to enter into contracts with official bodies, institutions and CONSTRUCTION AND OPERATION PHASE SERVICES government agencies, with multilateral financial TECHNICAL CONSULTANCY IN PUBLIC WORKS PROCUREMENT organizations and cutting-edge private companies at the international level.
02 ACTIVITY AND SERVICE AREAS
ICEACSA Grupo provides services in the following areas: TRANSPORT INFRASTRUCTURE WATER AND THE ENVIRONMENT INFRASTRUCTURES MANAGEMENT 11 COASTAL, MARINE, AND REGIONAL/URBAN DEVELOPMENT INDUSTRY AND ENERGY FLUVIAL INFRASTRUCTURES AND ARCHITECTURE PROJECT LIFE CYCLE 05 OPERATIONAL CONSULYANCY PHASE SERVICES ENGINEERING 01 SERVICES PLANNING PROJECT 02 04 MANAGEMENT FEASIBILITY CONSTRUCTION PHASE SERVICES 03 DESIGN
PLANNING AND FEASIBILITY Planning is choosing the future. The rational use of public resources, the main driving force of this type of infrastructure, requires a thorough preliminary reflection. ICEACSA Panama has extensive experience providing tech- nical support to government agencies, developers and inves- tors to identify the most suitable alternatives to achieve their objectives, always taking a comprehensive approach to ensure that the selected solutions are feasible from the technical, finan- cial, social, environmental and risk-management viewpoints, among others. 12 GENERAL INFRASTRUCTURE PLANS 01. Preliminary engineering and technical specifi- URBAN PLANNING MASTER PLANS cations of upgrade of the Valle de Antón tourist resort, Antón district, province of Coclé. 22,018 m2 / investment of 6.7 million USD. 02. Reception services, technological empowerment FEASIBILITY STUDIES and operating model for the centralized tra- ffic-light system of Panama City. 1 control center / 75 cameras / 35 panels / 1,000 loops / 210 traffic 02 intersections / investment: 1.4 million USD. COMPREHENSIVE PROJECT STRUCTURING STRATEGIC CONSULTANCY PRELIMINARY ENGINEERING
03. Preliminary engineering and technical specifica- tions of upgrade of the Isla Grande tourist resort, Portobelo district, province of Colón. 4,295 m2 / investment: 2.4 million USD. 04. Preliminary design for a new water intake, treat- ment station and aqueduct for Panama City. 23 km of conduits / 43 km of impulsion line / investment: 300 million USD. 01 05 05. Preliminary engineering and technical specifica- 13 tions of upgrade of the Lajas tourist resort, San Félix district, province of Chiriquí. 6,300 m2 / invest- ment: 1.3 million USD. 06. Feasibility studies, drawings and technical speci- fications for construction of various buildings in the Ngäbe – Buglé area. 154,355 beneficiaries / 5,475.61 m2. 07. Preliminary projects and tender documents for procurement the design and construction moda- lity of sports centers located in Mateo Iturralde, Marcos Gelabert and Belisario Frías, province of Panama. 22,236 m2 / investment: 8.3 million USD. 08. Preliminary engineering and technical specifica- tions of upgrade of the Isla Colon tourist resort, province of Bocas de Toro. 11,054.74 m2 / invest- ment: 4 million USD. 09. Technical, special, economic, social and financial 07 08 feasibility studies for construction of a penitentiary center.
STUDY AND DESIGN OF INFRASTRUCTURES Drawing up detailed construction plans requires accurate calcu- lation and design of all components to be executed including those that can be considered unique such as viaducts, tunnels, drainage infrastructures, drinking water treatment plants, wastewater treatment plants, etc. The quality of the projects managed by ICEACSA Panama ensures its clients the peace of mind of knowing that they are dealing with a fully accredited and highly solvent company. 14 01 PRELIMINARY DESIGN STUDIES DEVELOPMENT OF ALTERNATIVES SOCIAL AND ENVIRONMENTAL ASSESSMENT 01. Design, construction and maintenance plans for extension to six (6) lanes of the Las Playas corridor LAND STUDIES on the Pan-American Highway, section 1: La Cho- rrera - Santa Cruz. 32.75 km / 3 new bridges and 9 TOPOGRAPHY extensions / 12 junctions / investment: 543 million USD. 02. Design, construction operation and maintenance of the Arraiján Este wastewater treatment plant (WWTP), the trunk system and its connections and CONSTRUCTION DESIGN operation and maintenance of the sewage network of Burunga and Arraiján City. WWTP capacity 1.00 m3/s year 2050 horizon / 190,000 inhabitants / 5,000 02 m2 of buildings / investment: 60.5 million USD. HIGHWAYS BRIDGES STRUCTURES AQUEDUCT AND DRAINAGE SYSTEMS PORTS AIRPORTS
03. Final studies and designs for the works and upgra- ding of the aqueduct and sewage of Panama City (Panama). 100 km piping / 13 tanks / maximum diameter 42” / 807,000 inhabitants / investment: 100 million USD. 04. Study, design, construction and commissioning of the toll plaza, adaptation of carriageways and upgrade of public spaces in the San Isidro area, Omar Torrijos district, San Miguelito, Panama City. 100,000 inhabitants / investment: 29 million USD. 05. Studies and designs for the Juan Díaz River Basin Collectors” project and complementary works of 03 05 the Panama City and Bay Area sewage project (Panama). 21 km of conduit / maximum diameter 15 72” / 700,000 inhabitants / investment: 55 million USD. 06. Construction project of the main collector, pumping station and impulse line in the Chorrillo sector, Panama City. 41,233 inhabitants / invest- ment: 6 million USD. 07. Design for upgrading the drinking water network of Parita, province of Herrera. 5 km / 3,500 inhabi- tants / investment: 1.7 million USD. 08. Environmental impact study for extension to six (6) lanes of the Las Playas corridor on the Pan-Ame- rican Highway, section 1: La Chorrera - Santa Cruz. 32.75 km / 3 new bridges and 9 extensions / 12 junctions / investment: 543 million USD. 09. Study and design for works to upgrade the aque- duct system of the Maria Chiquita community in the town of Maria Chiquita, district of Portobelo, 04 06 province of Colón. 5.5 km / investment: 1 million USD.
STUDY AND DESIGN OF URBAN PLANNING AND ARCHITECTURE Drawing up detailed construction plans requires accurate calculation and design of all components to be executed including those that can be considered unique. ICEACSA Panama approaches its work in this field with a transversal focus, combining the three guiding principles of creativity, design and management. The quality of the projects managed by ICEACSA Panama ensures its clients the peace of mind of knowing that they are dealing with a fully accredited and highly solvent company. 16 01 PRELIMINARY DESIGN STUDIES DEVELOPMENT OF ALTERNATIVES 01. Final designs of unpaved roads and infrastruc- tures for the Ciudad Esperanza project, district of SOCIAL AND ENVIRONMENTAL ASSESSMENT Arraiján, province of Panama. 36 km / 9,000 inhabi- tants / 2,250 dwellings / investment: 137.7 million LAND STUDIES USD. TOPOGRAPHY 02. Architectural designs of the control, administra- tion, plant personnel and industrial buildings to house the treatment equipment of the Arraiján 03 Este WWTP. 5,000 m2 buildings. CONSTRUCTION DESIGN RESIDENTIAL PROJECTS BUILDINGS PUBLIC SPACE PROJECTS
03. Studies and designs for the reform project of the 02 Roberto Kelly sports center in the Don Bosco dis- trict, Panama City. 2,600 spectators / 2,300 m2 built 17 area / investment: 7.5 million USD. 04. Drafting of plans and technical reports for cons- truction of the Basilo Lakas correctional center in Maria Chiquita, province of Colón. Capacity: 72 young offenders / plot: 40,000 m2 / buildings: 4,238 m2 / investment: 4.5 million USD. 05. Study and design of the works required to revita- lize the tourist industry in Isla Colón, province of Bocas del Toro. 9,000 inhabitants / 20,000 m2 / investment: USD 3.5 million. 06. Design of the structure and roof of the University of the Isthmus (Universidad del Istmo). 4,040 m2 / investment: USD 1.4 million. 07. Construction plans and technical specifications for construction of various buildings in the Ngäbe – Buglé area. 154,355 beneficiaries / 5,475.61 m2 built area. 04 06
CONSTRUCTION AND OPERATION PHASE SERVICES The support of an engineering firm is also a key factor during execution of the works, both to conduct supervision to check compliance with the specifications set in the design phase and to for control and monitoring of environmental and occupa- tional health and safety impact mitigation measures. Further- more, ICEACSA Panama has the capacity to provide the tech- nical support to construction companies to help to optimize their construction processes and to draw up the as-built draw- ings that represent the works actually executed. ICEACSA Panama’s experience in these areas is manifested in 18 the trust its clients repeatedly place in the Company. 01 PROJECT MANAGEMENT WORKSITE SUPERVISION, INSPECTION AND CONTROL COORDINATION OF OCCUPATIONAL HEALTH AND SAFETY ACTIVITIES DURING WORKS 01. Management, administration, coordination and technical inspection assistance services for the Howard DWTP project, Arraiján district, province TECHNICAL SUPPORT FOR THE of Panama West. 4.5 km network / 1.75 m2/s / WORKS OFFICE 248,000 inhabitants / investment: 211 million USD. 02. Construction supervision of the La Mitra distribu- ENVIRONMENTAL MONITORING tion network, Chorrera, province of Panama. 7.3 01 km of network / investment: 3.2 million USD.. OF THE WORKS WORKS ASSESSMENT PROCESSING PERMITS AS-BUILT DRAWINGS
02 04 03. Management, administration, coordination and 19 technical inspection assistance services for the works of the sewage system of the district of San Carlos, province of Panama West. 20.000 inhabi- tants / 7.8 km of network / investment: 4 million USD. 04. Technical supervision and inspection of the design and construction plans of the sewage conduit system of La Pintada, province of Coclé. 9.4 km of network / 2,217 inhabitants / investment: 4 million USD. 05. Processing and follow-up of approval of the construction drawings for the Ciudad Esperanza project, Arraiján district, province of Panama. 36 ha of urban development / investment: 137.7 million USD. 06. Management, administration, coordination and technical inspection assistance services for the Arraiján Cabecera aqueduct project, Arraiján dis- 03 05 trict, province of Panama West. 40,000 inhabitants / investment: 10.7 million USD.
TECHNICAL CONSULTANCY IN PUBLIC WORKS PROCUREMENT 01. Engineering and technical assistance services for the procurement process of the study, design, The process that public bodies in Panama habitually employ construction and commissioning of the toll plaza, carriageway adaptation and upgrading of public for procurement of works is known as “studies, designs and spaces in the San Isidro area, Omar Torrijos district, construction”. San Miguelito, Panama City. 100,000 inhabitants / investment: 29 million USD. This means that bidders must draw up and submit a technical 02. Engineering and technical assistance for the pro- proposal that describes the works to be executed in detail curement process of the design, construction and maintenance plans for extension to six (6) lanes during the bidding stage of the contract award process. The of the Las Playas corridor, section 1: La Chorrerv– aim of conducting these studies is to reduce risks, optimize Santa Cruz. 32.75 km / 3 new bridges and 9 exten- solutions and achieve proper definition of the plans to enable sions / 12 junctions / investment: 543 million USD. the construction company to draw up the financial tender. 03. Engineering and technical assistance for the pro- The technical solution has the greatest weighting among the 20 assessment criteria in these procurement processes. curement process of the study, design, construc- tion and maintenance of works for refurbishment 01 of the Transistmica highway, Plaza Ágora section - San Isidro Station (Panama). 8 km / 3 pedestrian ICEACSA Panama has wide experience in drawing up technical overpasses / investment: 88 million USD. proposals for the procurement processes of various awarding 04. Engineering and technical assistance for the procu- bodies in Panama and is able to boost our clients’ chances of rement process of the works, studies and designs success for the design and construction of an aqueduct, sewage network and WWTP for the Boquete dis- trict, province of Chiriquí. 14.4 km network / 16,000 beneficiaries / investment: 40 million USD. 05. Engineering and technical assistance services for the procurement process of a study for upgrading the sewage system of Isla Colón and a new sewage system for Isla Carenero in the province of Bocas del Toro. 20 km of network / investment: 16 million USD. PROCUREMENT RFQ 06. Engineering and technical assistance services for the procurement process of the study, design, construction and maintenance of works for exten- sion and refurbishment of the Pan-American 05 CONSTRUCTION METHODS Highway, Puente de las Américas - Arraiján section. 11 km / investment: 300 million USD. ENVIRONMENTAL BASELINE RENDER AND VIDEOS
07. Engineering and technical assistance services for the procurement process of the study, design and construction of works for sustainable upgra- ding of the drinking water system of Panama City: extension and refurbishment of the Panama North aqueduct. 52 km of network/ 184,000 inhabitants / investment: 80 million USD. 08. Engineering and technical assistance services for the procurement process of the study, design and construction of works for sewage system, WWTP and upgrade of the community aqueduct system of Macaracas Cabecera, province of Los Santos. 15 km of network / investment: 25 million USD. 09. Drafting of the procurement RFQ for Phase Three of the sewage network of San Miguelito. 36 km of network / investment: 21 million USD. 06 08 10. Engineering and technical assistance services 21 for the procurement process for the design and construction of the Guabal - Rio Luis - Calovébora highway, Santa Fe district, province of Veraguas. 33 km / 4 bridges / investment: 20 million USD. 11. Engineering and technical assistance for the procurement process of the works, studies and designs for the design and construction of the San Félix - Hato Culantro road. 17.7 km / 1 bridge / investment: 12 million USD. 12. Engineering and technical assistance services for the procurement process of the extension and upgrading of the aqueduct and sewage systems of Panama City. 52 km of network/ 455,000 inhabi- tants / investment: 293 million USD. 13. Engineering and technical assistance services for the procurement process of the works and final design of the project for study, design and construction of works for construction of streets, 06 11 sewage system and WWTP in Paritilla, province of Herrera. 7 km of network / investment: 9 million USD.
03 CLIENTS
AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIBBEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA) | CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTI- TUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIB- BEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA) | CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUC- CIÓN, S.A. | INSTITUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIBBEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA) | CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTITUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIBBEAN TRADING & ASSETS CORP. | CHINA CONSTRUC- TION AMERICA (CCA) | CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUC- CIONES CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUC- TORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTITUTO 23 DE ACUEDUCTOS Y ALCA- NTA RIL L A D OS The quality of the projects carried out by ICEACSA Panama is NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE INVEST- reflected in the prestige of the public and private organizations MENTS, S.A. | PROYECTOS C O N C A B A , in our client portfolio: S.A. | SACYR, S.A. | S EC R E TA R I A NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA JUVENIL | INSTITUTIONAL CLIENTS TEDAGUA, S.A. | UNIVER- SIDAD DEL AND GOVERNMENT AGENCIES ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTO- RIDAD DE TURISMO DE PANAMÁ - ATP CONSTRUCTION COMPANIES | CARIBBEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA) | CONALVIAS CONSTRUC- CIONES, S.A. | CONCESSIONAIRES CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA QUEIROZ GALVAO, S.A. | INDUSTRIAL AND SERVICE COMPANIES CONSTRUCTURA MECO, S.A. | ESTU- DIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTITUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE PRIVATE INVESTORS INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVEN- CION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIBBEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA) PUBLIC AND PRIVATE BANKING INSTITUTIONS | CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES AND INVESTMENT FUNDS CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTITUTO DE ACUEDUCTOS Y ALCAN- TARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO |
A member of Antea Group Version date: May 2020
Calle 60 Este, Obarrio Edificio Obarrio 60, piso 14, Of. A Ciudad de Panamá Tel.: +507 397 8605 Email: panama@iceacsa.com iceacsa.com S PA I N COLOMBIA ME XICO PA N A M A PERU U R U G U AY
You can also read