2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation

Page created by Herbert Walsh
 
CONTINUE READING
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
2018 RATE APPLICATION REVIEW
        Customer Consultation Workbook

  For more information, visit www.essexpowerlines.ca/DSP
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
Essex Powerlines Corporation is the local distribution company
responsible for providing reliable and safe power to Amherstburg,
LaSalle, Leamington and Tecumseh.

With approximately 44 employees, Essex Powerlines operates and
maintains a distribution system serving over 28,000 residential
and business customers.

Essex Powerlines is owned by the Town of Tecumseh, Town of
LaSalle, Town of Amherstburg and Municipality of Leamington.

                                                                    1
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
Table of Contents

What is this Consultation About?

Electricity 101

Essex Powerlines’ Grid Today

Cost Pressures

What the Plan Means for You

                                   2
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
What Is This Consultation?

The Purpose of this customer consultation is to collect your feedback on Essex
Powerlines’ investment and spending plan to maintain the local distribution
system over the five year period from 2018 to 2022.
Essex Powerlines’ goal is to deliver safe and         maintaining the local electricity distribution
reliable electricity to homes and local               system, and more importantly how Essex
businesses as efficiently as possible and at an       Powerlines intends to meet those challenges.
affordable price. However, there is a balancing
act that all utilities must consider when             To participate in this review, you do not need
planning for the future; system reliability vs.       to be an expert. The workbook explains key
the cost to consumers. No distribution system         parts of the electrical distribution system, the
delivers perfectly reliable electricity. Generally,   challenges facing the system, Essex
the more reliable the system, the more                Powerlines’ recent work to maintain the
expensive the system is to build and maintain.        system, and the company’s budgetary plan for
                                                      2018 to 2022.
This customer consultation is designed to
collect your feedback on the reliability of the       Essex Powerlines does not expect you to make
electricity distribution system and the               electrical engineering decisions. Essex
spending decisions Essex Powerlines will need         Powerlines wants to hear about the electricity
to make over the next five years. Ultimately,         issues that matter most to you and whether or
this consultation will help Essex Powerlines          not you feel the company’s spending and
ensure alignment between its operational and          investing priorities seem reasonable.
capital investment plans and customers’
                                                      This workbook is designed to give you enough
needs and preferences.
                                                      background about these issues for you to
As an Essex Powerlines customer, this is an           develop an informed opinion.
opportunity for you to tell Essex Powerlines
what you think about the plan and the cost
implications for you. This is also an
opportunity for Essex Powerlines to explain to
its customers the challenges in operating and

                                                                                                    3
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
What’s the Process that Essex Powerlines Must Follow?

How are electricity rates determined in Ontario?
                                                                  Essex Powerlines assesses
The electricity industry in Ontario is regulated by the Ontario
Energy Board (OEB), which recently developed regulatory
                                                                        system needs
requirements for electricity distributors, such as Essex
Powerlines, to gather customer’s preferences on distribution
system investments.                                                Collects customer needs
Essex Powerlines is funded by the distribution rates paid by
                                                                       and preferences
its customers. Periodically, Essex Powerlines is required to
file an application with the OEB to determine the funding
available to operate and maintain the distribution system.           Refines plan (where
Essex Powerlines must submit evidence to justify the                      necessary)
amount of funding it needs to safely and reliably distribute
electricity to its customers.

As a customer, how are my interests protected?                       Reports on how plan
Essex Powerlines’ evidence is assessed in an open and             responds to customer input
transparent public process known as a rate hearing. A
number of public intervenors with electricity industry
expertise submit their own evidence, in some cases
challenging Essex Powerlines’ plans and assumptions. At               Files plan with OEB
the end of the process, the OEB weighs the evidence and
decides on the rates Essex Powerlines can charge for
distribution.
                                                                    Questions & OEB rate
Why is my feedback important?                                         hearing process
Your feedback will be presented to the OEB and public
intervenors (who represent various ratepayer groups) when
Essex Powerlines files its rate application for 2018-2022. As     OEB sets Essex Powerlines'
part of the rate hearing process, the OEB will be reviewing           distribution rates
how Essex Powerlines acquired and responded to customer
feedback in its planning process.

                                                                                            4
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
Consumer Feedback on Ontario’s Electricity System

    There are a number of ways for consumers to voice their opinions on provincial, regional and local
    electricity issues. However, this consultation is about your local distribution system and your
    preferences on how Essex Powerlines Corporation uses your money.

    Distribution Planning: This workbook and consultation concentrates on the plan for Essex
    Powerlines’ distribution system over the next five years. The graphic below shows the various
    planning initiatives ongoing across Ontario’s electricity system. In addition to the short-term
    distribution plan being discussed in this workbook, there are other planning initiatives undertaken to
    ensure that the distribution system maintains reliability and works efficiently for the benefit of
    customers.
       If you’re interested in broader medium- and long-term electricity issues such as Ontario’s Long-
       Term Energy Plan, regional planning, conservation planning and general energy policy in the
       province, there are other opportunities to provide your feedback.

       Ontario’s Long Term Energy Plan: The Ontario Government’s plan details how electricity will be
       generated and the longer-term conservation strategy for the province. It can be found at this
       website: http://www.energy.gov.on.ca/en/ltep/

       Regional Planning: The Independent Electricity System Operator (IESO) looks ahead to the
       future electricity needs of your region and how those needs can be addressed through
       conservation, local generation, and electricity from outside the region. You can follow the
       IESO’s regional planning process at this website: http://www.powerauthority.on.ca/power-
       planning/regional-planning

                                                           Integrated
                                                            Regional
                              Long-term Energy
                                                          Resource Plan               Distribution
                              Plan / Integrated
                                                             (IRRP)                    Planning
                             Power System Plan
                                                               Regional
                                                            Infrastructure
                                                            Planning (RIP)

Provincial System Planning                      Regional Planning                             Distribution System Planning
This involves more long-term planning on        Regional planning involves near- and          Distribution planning involves plans, both
how Ontario’s electricity system is designed    medium-term plans to meet the needs of a      near- and long-term, to ensure the local
and operated.                                   region of the province, and ensure all key    distribution system has the adequate
                                                players (i.e. transmission and distribution   infrastructure to meet required reliability and
This includes planning on:                      operators) are coordinated moving forward.    safety standards, and to otherwise meet the
                                                                                              needs of customers.
     Provincial electricity supply mix (e.g.   This planning process is focused on
      greening the grid and phasing out coal    considering whether conservation & local
      power generation)                         generation options have been considered, in
     System supply and demand forecasting      addition to core infrastructure (“wire”)
     Interconnections and grid design          solutions.

                                                                                                                                         5
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
Customer Electricity Bills

Your Electricity Bill: Every item and charge on your bill is mandated by the provincial government or
regulated by the OEB. There are two distinct cost areas that make up the “Delivery” charge on your bill:
distribution and transmission. While Essex Powerlines collects both, it remits the transmission charge to
Hydro One. The distribution charges are what Essex Powerlines uses to fund its utility needs.
Distribution costs make up about 20% of the typical customer’s (750 kWh per month) total electricity
bill.

Essex Powerlines’ distribution rates are subject to the review and approval of the OEB. The revenues
collected from customers covered Essex Powerlines’ capital investments and operating expenses.
Current monthly distribution charges are approximately $26.16, $59.13, and $453.70 per month for a
typical Essex Powerlines customer who consumes 750 kWh, 2,000 kWh, and 40,000 kWh in a month,
respectively.

It is estimated that – all things being equal – distribution charges will increase gradually with inflation
from 2018 – 2022. This includes the cost of the Essex Powerlines plans to operate, maintain, and
modernize its electricity distribution system.
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
Understanding Essex Powerlines’ Role in Ontario’s Electricity System
There are three main components to all electricity systems:
generation, transmission, and distribution

Where Electricity Comes From
In Ontario, 70% of electricity is generated by Ontario Power Generation (OPG). This provincially-owned
organization has generation stations across Ontario that produce electricity from hydroelectric, nuclear
and fossil fuel sources.

Once electricity is generated, it must be delivered to urban and rural areas in need of power. This
happens by way of high voltage transmission stations and interconnected lines that serve as highways
for electricity. The province has more than 30,000 kilometres of transmission lines, owned mostly by
Hydro One.

Essex Powerlines Corporation
Essex Powerlines is responsible for the last step of the journey: distributing electricity to customers in
the region through our distribution system.

Every distribution system is unique with its own history and challenges. In order to better understand
Essex Powerlines’ current system, we first have to understand all of the different components and how
they impact the way in which you receive electricity when you need it.

Essex Powerlines’ power is supplied at high voltage levels to 4 transmission stations (TS) owned by
Hydro One. The high voltage electricity is then reduced and connected through 27.6kV feeder circuits.
Some of these feeder circuits are used to distribute power to various substations located throughout
the communities Essex Powerlines serves. These substations further transform the electricity voltage to
lower voltage levels for distribution to the neighbourhoods within the communities. Some customers
receive power directly from the 27.6kV system while others receive power via these substations. In
either case, additional transformers are located near each customer, and transform the voltage one
final time to levels safe to distribute through a home or business.

Essex Powerlines’ Overhead System
The overhead system is made up of distribution lines that operate at 4kV, 8kV, or 27.6kV. By 2018,
Essex Powerlines’ overhead system will be mainly made up of distribution lines that operate at 27.6 kV.
Along the line, pole-top transformers step the voltage down. From there, the electricity is delivered to
customers.

Essex Powerlines’ Underground System
The underground system consists of a complex network of cables, vaults, cable chambers and
transformers situated on concrete pads (padmount transformers). In residential areas, underground
cables distribute electricity from substations (or TS’s as the case may be) to padmount transformers
located on customer boulevards. Like the overhead system, these transformers step the electricity
down to a lower voltage, and electricity is delivered to customers.

                                                                                                        7
2018 RATE APPLICATION REVIEW - Customer Consultation Workbook - Essex Powerlines Corporation
Electricity Grid:
How is Ontario’s Electricity System Regulated?

The electricity system in Ontario is regulated by the following bodies:

Ontario Ministry of Energy:
The Ontario Ministry of Energy sets energy policy. It sets the rules and establishes key planning and
regulatory agencies through legislation.

Ontario Energy Board:
The mission of the Ontario Energy Board (OEB) is to promote a viable, sustainable and efficient energy
sector that serves the public interest and assists consumers to obtain reliable energy services at
reasonable cost. It is an independent body established by legislation that sets the rules and regulations
for the provincial electricity sector. One of the OEB’s roles is to review the distribution plans of all
electricity distributors and set their rates.

The Independent Electricity System Operator:
The Independent Electricity System Operator (IESO) is responsible for short, medium and long-term
electricity planning to ensure an adequate supply of electricity is available for Ontario residents and
businesses. It operates the grid in real-time to ensure that Ontario has the electricity it needs, where
and when it needs it. The IESO receives directives from the Ministry of Energy (i.e. energy supply mix,
Green Energy Act), but otherwise works at arm’s-length from the government.

                                                                                                       8
Customer Feedback

1.   Given what you know and what you have read so far, how well do you feel you understand the
     parts of the electricity system, how they work together and which services Essex Powerlines is
     responsible for?

        Very well
        Somewhat well
        Not very well
        I don’t understand at all

2.   Generally, how satisfied are you with the service you receive from Essex Powerlines?

        Very satisfied
        Somewhat satisfied
        Somewhat dissatisfied
        Very dissatisfied
        Not sure

3.   Is there anything in particular that Essex Powerlines can do to improve its service to you?

                                                                                                   9
Essex Powerlines’ Grid Today

This section describes the construction of Essex Powerlines’ distribution grid including its substations,
overhead and underground systems. It also explains the company’s historical growth and current
electrical infrastructure.

Background on Essex Powerlines’ Distribution System

Restructuring of the utility industry presented many challenges and opportunities when Bill 35 was
passed. Existing public utility commissions had to change to standard Ontario business corporations,
owned by the local municipalities. The new corporations answered to the Ontario Energy Board and
were responsible for regulatory, rate setting and licensing matters in the electricity market.

The four municipalities of Amherstburg, LaSalle, Leamington and Tecumseh made a strategic decision
to pool the resources of their utilities together and avoid many deregulation costs. In the new electricity
market new business models would have to be put into place. If the municipalities chose to go alone
into the new environment, the local rate base could not have supported the new costs of the business
model and the utilities may not have had the expertise and knowledge to become market ready.

On June 1, 2000, the Towns of Amherstburg, LaSalle, Leamington and Tecumseh amalgamated their
Utilities to form the Essex Power Group of Companies. Essex Powerlines owns and operates the
physical electricity infrastructure in these areas. Essex Powerlines is the default company from which
consumers purchase electricity from the provincial grid.

In 2016, Essex Powerlines hired the consulting firm METSCO to help establish a formalized asset
management program. Using international engineering standards, METSCO is reviewing all the data
Essex Powerlines currently maintains for its assets, evaluating the integrity of that information,
recommending additional information for collection, assessing the health of the individual asset
classes, and, using a risk-based approach, assisted Essex Powerlines’ engineering team in ranking and
prioritizing the asset replacement work required in order to minimize Essex Powerlines’ operating costs.

This process helped confirm that Essex Powerlines’ approach to capital renewal and preventative
maintenance was successful in keeping the system up to date. The new approach to asset
management will help Essex Powerlines’ create better and more focused plans to continue to keep the
system updated and deliver a better quality of service.

Every distribution system is unique with its own history and challenges. In order to better understand
the current Essex Powerlines system, we first have to understand all of the different components and
how they impact the way in which you receive electricity when you need it. The diagram and terms below
will help guide you through the system.

Essex Powerlines’ distribution system is made up of a number of components which work together to
transport electricity to homes and businesses across the communities it serves.

                                                                                                        10
Essex Powerlines’ service territory covers 66 square kilometers of urban area, encompassed within a
38 square kilometer geographic area.

The distribution system contains 186 km of overhead lines, 263 km of underground, and 0 municipal
substations to step down voltage from 27.6 kV to the remaining old 4 kV and 8 kV systems. (The
remainder of the old 4 kV and 8 kV systems will be converted to the 27.6 kV system by 2018.)

Essex Powerlines is served by a total of 4 transmission stations which are owned and operated by Hydro
One.

Hydro One’s Transmission System

High Voltage Transmission – Connects our distribution system to electricity generating stations across
the province.
Transmission Station – Reduces high voltage electricity from transmission lines to medium voltage
which is fed into Essex Powerlines’ distribution stations.

Essex Powerlines’ Distribution System:
Municipal Substations: Municipal substations are a critical element of the electricity distribution
system—they are the local hubs from where electricity is distributed to an area. Municipal substations
contain:
        Transformers – Important pieces of equipment that reduce the voltage of electricity from a high
        level to a level that can be safely distributed to your area.
        Feeder Circuits – The wires that connect the transmission station to the broader distribution
        system in order to deliver electricity to customers.
        Breakers – Devices that protect the distribution system by interrupting a circuit if a higher than
        normal amount of electricity is detected.
        Switches – Control the flow of electricity and steer the current to the correct circuits.

Overhead System: The overhead system includes the wires that are commonly seen across Essex
Powerlines’ service area. The voltage of the overhead system can range from 4 kV (4,000 volts) to
27.6kV, however, Essex Powerlines is mainly 27.6kV.
       Wires – There are 186 km of wire that carry electricity across the overhead distribution system.
       Poles – Wires are suspended from these, usually wooden (sometimes concrete), poles.
       Pole Top Transformers – These transformers are mounted near the top of utility poles and are
       needed to further step-down the voltage from the lines to the final connection to customers.

Underground System: The underground system includes 261 km of cable, which is directly buried and
or installed in ducts. At certain intervals, underground service chambers (with manholes) are required to
permit cables to be spliced together and to allow underground equipment such as switches to be
housed.

An advantage of underground systems is that they are affected to a lesser extent by extreme weather.
The disadvantage is that they are more expensive to install and maintain, and when there is a power
outage it often takes longer to locate and repair a problem compared to overhead wires.

                                                                                                       11
Underground Cables – Convey the electricity in the underground system. Cables that connect
              the distribution stations and major industrial users to the distribution station are significantly
              larger than cables used to connect residential neighbourhoods.
              Padmount Transformers – Similar to transformers in the overhead system, these reduce the
              voltage to a lower level before final connection to customers. In the underground system there
              are concrete padmounted transformers, which are above ground transformers that are supplied
              by underground cable, and vault transformers, which are housed in underground chambers.

Paying for the Distribution System?
As anyone who runs their own business would expect, Essex Powerlines’ manages its spending in two
budgets – an operating budget and a capital budget.

Essex Powerlines’ operating budget covers regularly recurring expenses such as the costs of running
service vehicles, the payroll for employees, and the maintenance of distribution equipment and
buildings.

Its capital budget covers items that, when purchased, do not need to be repurchased for some time and
that have lasting benefits over many years. This can include much of the equipment that is part of the
distribution system, such as poles, wires and transformers, major computer systems and vehicles.

             $15

             $10                                                       $6.76                 $6.06
                           $5.58                 $4.88
  Millions

             $5
                           $6.81                 $7.02                 $7.04                 $7.21

             $0
                      2015 (actual)         2016 (actual)        2017 (proposed)       2018 (proposed)
                                   New Capital Expenditures             Operating Expenditures

              Managing the distribution system requires millions of dollars in maintenance, system
              renewable and running the day-to-day operations. In its last fiscal year (2016), Essex
              Powerlines’ operating expenses and capital expenditure totalled $11.9 million.

                                                                                                             12
Customer Feedback

4.      How well do you feel you understand the important parts of the electricity system, how they work
        together, and which services Essex Powerlines is responsible for?
           Very well
           Somewhat well
           Not very well
           I don’t understand at all
5.      The average Essex Powerlines customer experiences one power outage per year. Do you recall
        how many outages you experiences in the past year?
           None
           One
           Two
           Three
           Four
           More than four
           Not sure
No system delivers perfectly reliable electricity. There is a balancing act between reliability and the cost
of running the system. Please answer the following questions:

6.      How acceptable were the number of power outages you experiences over the last 12 months?
           Very acceptable
           Somewhat acceptable
           Not very acceptable
           Did not have any power outages
           Not sure
7.      How many power outages do you feel are reasonable in a year?
           No outage is acceptable
           One
           Two
           Three
           Four
           More than four
           Not sure
8.      What do you feel is a reasonable duration for a power outage?
           No outage is acceptable
           30 minutes
           1 hour
           2 hours
           3 hours
           4 hours or more
           Not sure

                                                                                                          13
Cost Pressures
From the day-to-day to major storm events, there are a variety of ever-present pressures on Essex
Powerlines’ operating and capital budget.

                                                    Many of these expenditures are items over
                                                    which Essex Powerlines has little or no control
                                                    over – major storms, and the implementation of
                                                    Smart Meters, for example.

                                                    Other costs are associated with preventative
                                                    maintenance like replacing aging equipment.
                                                    Essex Powerlines has already undertaken
                                                    several large scale projects, and more are
                                                    planned.

                                                    How does Essex Powerlines determine the
                                                    appropriate amount of capital spending related
                                                    to existing infrastructure?

                                                    Essex Powerlines monitors the health of its
                                                    electric infrastructure very closely. As part of its
                                                    rate application, it must show the OEB third
                                                    party reviews of the health of its system’s
                                                    assets. These asset health reviews help Essex
                                                    Powerlines prioritize which parts of its system
                                                    get upgraded or rebuilt first.

                                                    Has Essex Powerlines previously set aside
                                                    funds for required upgrades?

                                                    The OEB does not allow utilities in Ontario
                                                    (including Essex Powerlines) to create reserve
                                                    funds. If reserve funds were allowed, a utility
                                                    would have to charge customers a premium on
                                                    their rates to set money aside. Under OEB
                                                    regulation, a utility can only charge customers
                                                    the rate required to run the distribution system
                                                    at a reliability standard set by regulatory bodies.

                                                                                                     14
Capital Investment Drivers
Essex Powerlines has developed a list of capital investment drivers and proposes investment programs
based on these key drivers.

Reliability: There are two main measures of           Obsolescence: Asset installations that no longer
reliability in the distribution system:               align with Essex Powerlines’ current operating
     1. How often does the power go out?              practices or current standards. This can include
     2. How long does it stay out?                    those assets that:
To achieve maintained or improved reliability,             Are no longer manufactured,
projects are developed to improve asset                    Lack spare parts,
performance and decrease the frequency and                 Cannot be accessed,
duration of power outages.                                 Lack the ability to have maintenance
                                                              performed on them,
Service Requests: Essex Powerlines has a legal
obligation to connect customers to its distribution        Have operational constraints or conflicts,
                                                              which can result in increased reliability
system. This includes both traditional demand
                                                              and/or safety related risks.
customers (new homes and businesses) and
distributed generation customers (e.g. micro-FIT      Aging or Poor Performing Equipment: Where there
customers who have contracts to sell electricity      is the imminent risk of failure due to age or
back to the grid such as rooftop solar panels).       condition deterioration, and these potential
Requests can also include system modifications to     failures will result in severe reliability impacts to
support      infrastructure   development        by   customers as well as potential safety risks to crew
government agencies, road authorities and             workers or to the public, remediation, through
developers.                                           refurbishment or replacement, is required.
Support Capacity Delivery: Where there are            Business Support Costs: Essex Powerlines is not
forecasted changes in demand that will limit the      just the local electricity distribution system itself,
ability of the system to provide consistent service   but a company that operates the system. As a
delivery or where it is incapable of meeting the      company, it needs buildings to house its staff,
demand requirements, new builds or expansion is       vehicles and tools to service the power lines and
required. This is the fundamental infrastructure      IT systems to manage the system and customer
that allows new customers to be hooked up to the      information.
distribution system and is paid for by new
customers served over time.

System Efficiency: To provide customers with the
best service possible, there is always a need to
improve power outage restoration capability.

Mandated Compliance: Compliance with all legal
and regulatory requirements and government
directives, such as compliance with the Ministry of
Energy, the Ontario Energy Board, the
Independent Electricity System Operator and other
regulations.

                                                                                                         15
What are the major issues Essex Powerlines needs to address?

Over the years, Essex Powerlines has worked hard to keep its equipment working well beyond its
originally expected life, to get maximum value for money. However, Essex Powerlines’ key challenge still
comes from the need to replace aging equipment.

        2018 Forecasted Capital Expenditures
                                                        In 2018, the capital expenditures required to
                                                        address system renewal, maintain system
                        $0.5                            reliability and invest in other infrastructure
                               $0.9                     priorities are estimated by Essex Powerlines to
                                                        be $6 million which is consistent with historical
                                                        spending.

                                      $1.7              To assist us in prioritizing what needs to be
              $2.9                                      replaced and by when, Essex Powerlines uses
                                                        an asset management model to drive
                                                        replacement decisions. Using the information
                                                        provided by the asset management model,
        General Plant             System Service        Essex Powerlines plans for four types of capital
        System Renewal            System Access         investment costs:

System Access                                         System Renewal
Definition: Projects that respond to customer         Definition: Projects focused on replacing aging
requests for new connections or new                   equipment in poor condition.
infrastructure development. These are usually a
high priority, “must do” type of request.             Programs (e.g.): Distribution Station
                                                      Refurbishment, Voltage Conversion,
Programs (e.g.): Customer Connections,                Underground Cable Replacement, Overhead Wire
Relocating assets based on infrastructure needs       Replacement

                                                      General Plant
System Service
                                                      Definition: Investments in supporting assets,
Definition: Primarily consisting of projects that     such as tools, vehicles, buildings and information
improve system reliability.                           technology (IT) equipment that are needed so
                                                      that we may perform our task to operate and
Programs (e.g.): Automated Switches, better           maintain the distribution system
distribution system monitoring equipment
                                                      Programs (e.g.): IT, facilities, fleet
Cost Drivers
Capital Investments

    The challenges impacting the Essex Powerlines distribution system can be broken down into 4 broad
    categories:

    Aging Infrastructure
         Essex Powerlines completes a variety of field services on a yearly basis to determine the health
            of its equipment across the four communities that we serve.
         There is a variety of equipment within Essex Powerlines’ distribution system that is aging and
1           beyond its useful life requiring replacement ranging from replacements that require immediate
            action to replacements that need to be addressed in 1-5 years.
         Through its rigorous asset management plan, Essex Powerlines plans to continuously replace
            aging and equipment in danger of failure through various reactive and preventive maintenance
            programs.

    Voltage Conversion
         Essex Powerlines is in the process of finalization its voltage conversion program that will
            position Essex Powerlines as a single voltage utility in 2017/2018. Instead of supplying
2           electricity at multiple voltages, Essex Powerlines will be supplying its customers with electricity
            at 27.6kV only. This will reduce inventory, system complexity and system losses; all things that
            will save Essex Powerlines customers money in the long run.

    Economic Development
        One of Essex Powerlines’ top priorities is to enable economic
          development in our 4 shareholder communities that we
          serve through the facilitation of system connection and by
3         keeping our rates at reasonable levels.
        Power quality and reliability has been mentioned by our
          commercial and industrial customers as a growing concern
          which is why Essex Powerlines is investing in technology like
          SmartMAP and the Self-Healing grid to improve visibility of
          our system and provide faster response times for outages as
          they incur.

    Increasing Cost of Electricity
         With energy costs rising and forecasted to continue rising for
            the foreseeable future, Essex Powerlines has made it a
4           priority to champion Conservation & Demand Management,
            facilitate customer connection of behind-the-meter
            generation or simply providing customers with the tools
            necessary to monitor and control their consumption.

                                                                                                            17
Cost Drivers
Operating Expenses
In addition to its capital budget, Essex Powerlines needs to consider its operating budget which also
impacts customer bills.

Cost drivers contributing to the operating budget can largely
be attributed to on-going maintenance and management of
the distribution system. An example of this cost driver is
Essex Powerlines’ tree trimming service, designed to lessen
the impact of falling tree branches on power lines.

Customer Focus
    It is now an industry requirement for all utilities to
      demonstrate that they have consulted customers before applying for new rates
    Essex Powerlines embraces this concept and wants to gather ongoing customer feedback and
      input through website surveys and focus groups.
    Essex Powerlines continues to enhance its online customer service offerings; this has included
      updating the website as well as increasing social media presence. Essex Powerlines has
      launched automatic outage updates on our Twitter account. This allows customers to get real-
      time updates on any outages that they may be experiencing.
    Further, in 2017 Essex Powerlines enhanced the look of the monthly customer bill and made it
      much easier to read and understand.
Industry Focus
     Industry regulation requires that Essex Powerlines maintain compliance with various regulatory
        bodies in a complex provincial environment.
     The requirements to implement Smart Meters and to adopt the International Financial
        Reporting Standard (“IFRS”) of accounting are examples of recent industry change.
     Meters are now more complex and require specialized troubleshooting. Essex Powerlines
        installed many of its Smart Meters in 2009 and 2010. As these meters age, more focus is
        required on re-verification. Essex Powerlines is now testing groups of these meters at intervals
        throughout their life span rather than waiting for them to cease operating at end-of-life.
     To ensure that Essex Powerlines is in compliance with all regulatory codes, including new
        requirements and reporting, additional staffing and support resources have been added since
        2010.

Operational Effectiveness & Power Quality
    Consistent with industry best practice, Essex Powerlines has established a formalized asset plan
       for distribution system assets. This includes asset health assessments and replacement
       prioritization rules.
    The plan will also include voltage conversion work to modernize the system in order to identify
       the causes of outages more quickly and reduce line losses.
    Essex Powerlines will incur expenses for additional software and engineering resources as the
       distribution system plan is continuously updated.

                                                                                                     18
Finding Efficiencies and Cost Savings

Where possible, Essex Powerlines has extended the life of its equipment through rigorous repair and
maintenance program in order to get maximum value for money. Some of this aging equipment can be
“run to failure”, meaning we can replace it after it ceases to function without significant customer
impact. However, other end-of-life equipment is more mission critical and cannot be “run to failure”
because failure could result in a public safety hazard or an unsupportable economic burden for our
customers.
There are several other ways in which Essex Powerlines works to find efficiencies and cost savings in
the system:
Enhanced Power Quality Metering: Installing power quality meters at select commercial and industrial
sites helps major customers resolve power quality issues so they can better understand and control
their energy usage.
Voltage Conversion Program: Converting to a single higher voltage will eliminate antiquated equipment,
reduce system losses, and reduce ongoing maintenance costs.
Estimated and Scheduling Tool: A new estimating and scheduling tool means Essex Powerlines can
more quickly and more accurately assemble an estimate and lay out work for construction crews.
“Kitting”: Warehouse staff pre-assemble parts and equipment needed for specific repairs, which
reduces the time needed for crews to complete maintenance and service tasks, thereby reducing costs.
Group Buying Program: Essex Powerlines save money by participating in a group buying program with
other local utilities. This means some types of equipment and materials can be purchased much less
expensive.
Remote Fault Indication: Allows Essex Powerlines to better diagnose outages before dispatching work
crews. Reduces expensive after-hours crew visits.
Labour Saving Equipment: Specialized trucks and other equipment reduce manual labour, which
reduces time and costs.
Smart Meter Data: Using Smart Meter data to diagnose outages and power quality issues reduces time
and guess work, and helps resolve issues faster.
Targeted Capital Projects: These projects eliminate equipment from the system that is known to be high
maintenance.
Outage Management System: Quickly and automatically identifies faults, notifies crews and provides
information to help troubleshoot and identify the cause.
SmartMAP: Innovative technology that improves reliability and service and reduces the number of
outages as they can be address proactively.
Social Media: Essex Powerlines uses social media to send automated updates to customers about
outages and keep them informed about the progress toward restoration.

                                                                                                   19
Customer Feedback

9.     With regards to projects focused on replacing aging equipment in poor condition, which of the
       following statements best represents your point of view?
        Essex Powerlines should invest what it takes to replace the system’s aging infrastructure to
            maintain system reliability, even if that increases my monthly electricity bill by a few dollars
            over the next few years.
        Essex Powerlines should lower its investment in renewing the system’s aging infrastructure
            to lessen the impact of any bill increase, even if that means more or longer power outages.
        Not sure
10.    As a company, Essex Powerlines needs buildings to house its staff, vehicles and tools to service
       the power lines and IT systems to manage the system and customer information. Which of the
       following statements best represents your point of view?
        Essex Powerlines should find ways to make do with the buildings, equipment and IT systems
           it already has.
        While Essex Powerlines should be wise with its spending, it is important that its staff have
         the equipment and tools they need to manage the system safely, efficiently and reliably.
        Not sure

11.    How well do you feel you understand the cost drivers that Essex Powerlines is responding to?
          Very well
          Somewhat well
          Not very well
          Not well at all
          Not sure
12.    How well do you think Essex Powerlines is managing these cost drivers while meeting customer
       expectations and keeping rates reasonable?
          Very well
          Somewhat well
          Not very well
          Not well at all
          Not sure
13.    How satisfied are you with the efforts Essex Powerlines has made to find efficiencies and cost
       savings in the distribution system?
          Very satisfied
          Somewhat satisfied
          Not very satisfied
          Not at all satisfied
          Not sure

                                                                                                         20
What Essex Powerlines Corporation’s Plan Means for You
 Residential – 750 kWh per month

In 2018, it is anticipated that residential customers with an average monthly consumption of 750 kWh
will see a moderate increase on the distribution portion of their electricity bills. It is expected that – all
things being equal – distribution rates will increase in line with the rate of inflation.

Essex Powerlines considered gradual inflationary increases, consistent with the industry rate-setting
process, to determine a one-time rate increase between 2018 until 2022. Essex Powerlines’ forecasted
increase over the next five years may see an average annual increase of $0.31 per month or 0.2% on
the total bill for a residential customer with an average monthly consumption of 750 kWh.
By 2020, Essex Powerlines forecasts that the average residential household will be paying an estimated
$1.79 more (6.84%) per month on the distribution portion of their electricity bill; however, this
incorporates an average yearly increase of 1.37% each year through 2020.

The illustrations below will provide better understanding of the one-time change in rates.

                                                                      5 Year %       Average Yearly
                           Current      Proposed      Increase
                                                                      Increase          Increase
       Distribution        $26.16        $27.95         $1.79          6.84%               1.37%
       Total Bill         $147.08        $148.61        $1.53          1.04%               0.21%

             Estimated Residential Annual Increase in Monthly Bill (5 year forecast)

                                                                        $0.30                $0.30
                                                   $0.31
        $0.31                $0.31

                                                 $148.00               $148.31              $148.61
      $147.39               $147.69

        2018                  2019                 2020                  2021                 2022

                      Incremental Rate                          Average Residential Bill

                                                                                                           21
What Essex Powerlines Corporation’s Plan Means for You
 GS
What Essex Powerlines Corporation’s Plan Means for You
 GS>50 kW – 40,000 kWh & 100 kW per month
In 2018, it is anticipated that GS>50kW customers with an average monthly consumption of 40,000
kWh will see a moderate increase on the distribution portion of their electricity bills. It is expected that –
all things being equal – distribution rates will increase in line with the rate of inflation.

Essex Powerlines considered gradual inflationary increases, consistent with the industry rate-setting
process, to determine a one-time rate increase between 2018 until 2022. Essex Powerlines’ forecasted
increase over the next five years may see an average annual increase of $6.19 per month or 0.08% on
the total bill for a GS>50 kW customer with an average monthly consumption of 40,000 kWh.

By 2020, Essex Powerlines forecasts that the average GS>50 kW customer will be paying an estimated
$42.67 more (9.40%) per month on the distribution portion of their electricity bill; however, this
incorporates an average yearly increase of 1.88% each year through 2020.

The illustrations below will provide better understanding of the one-time change in rates.

                                                                     5 Year %        Average Yearly
                          Current       Proposed      Increase       Increase           Increase
       Distribution      $453.70        $496.37        $42.67         9.40%              1.88%
       Total Bill       $7,065.38      $7,096.34       $30.96         0.44%              0.09%

              Estimated GS>50 kW Annual Increase in Monthly Bill (5 year forecast)

                                                                                         $6.19
                                                                      $6.19
                               $6.19               $6.19
            $6.20

                                                $7,083.96          $7,090.15          $7,096.34
         $7,071.58          $7,077.77

            2018               2019                2020               2021               2022
                              Incremental Rate             Average GS>50 kW Bill

                                                                                                           23
Customer Feedback

14.     Now that you have a better sense of the operations of Essex Powerlines, including the cost
        drivers, do you feel the proposed budget is reasonable?
         Yes
         No
         Not sure
15.     From what you have read here and what you may have heard elsewhere, does Essex Powerlines’
        investment plan seem like it is going in the right direction or the wrong direction?
         Right direction
         Wrong direction
         Not sure

16.     How well did Essex Powerlines’ plan cover the topics you expected?
           Very well
           Somewhat well
           Not very well
           Not well at all
           Not sure
If not very or not at all, what is missing?

17.     How well do you think Essex Powerlines is planning for the future?
           Very well
           Somewhat well
           Not very well
           Not well at all
           Not sure
18.     Considering what you know about the local distribution system, which of the following best
        represents your point of view?
           The rate increase is reasonable and I support it
           I don’t like it, but I think the rate increase is necessary
           The rate increase is unreasonable and I oppose it
           Not sure

                                                                                               24
Final Thoughts

Essex Powerlines values your feedback. This is the first time the utility has conducted a review
about its upcoming investment plan in this type of format.

Overall Impression: What did you think about the workbook?

Volume of Information: Did Essex Powerlines provide too much information, not enough, or just the right
amount?

Content Covered: Was there any content missing that you would have liked to have seen included?

Outstanding Questions: Is there anything that you would still like answered?

Suggestions for Future Consultations: How would you prefer to participate in these consultations?

                                                                                                    25
Glossary

Breakers: Devices that protect the distribution system by interrupting a circuit if a higher than normal
amount on power flow is detected.
Distribution Station: These substations are located near to the end-users. Distribution station transformers
change the voltage to lower levels for use by end-users.
Feeder Circuit: Is a wire that connects the transmission station to the broader distribution system in order to
deliver electricity to customers.
General Plant: Investments in things like tools, vehicles, buildings and information technology (IT) equipment
that are needed to support the distribution system.
Generation Station: A facility designed to produce electric energy from another form of energy, such as fossil
fuel, nuclear, hydroelectric, geothermal, solar thermal, and wind.
Kilovolt (kV): 1,000 volts (see volt below).
Kilowatt (kW): 1,000 watts.
Local Distribution Company (LDC): In Ontario, these are the companies that take electricity from the
transmission grid and distribute it around a community.
OM&A: Operations, Maintenance and Administration or operating budget.
Substations: Used to change AC voltages from one level to another and to switch generators, equipment and
circuits and lines in and out of an electrical system.
Switches: These control the flow of electricity—they direct which supply of electricity is used and which
circuits are energized. Distribution systems have switches installed at strategic locations to redirect power
flows for load balancing or sectionalizing.
System Access: Projects required to respond to customer requests for new connections or new infrastructure
development. These are usually a regulatory requirement to complete.
System Renewal: Projects to replace aging infrastructure in poor condition.
System Service: Primarily projects that improve reliability.
Transmission lines: Transmit high-voltage electricity from the generation source or substation to another
substation in the electricity grid.
Transformer: Is an important piece of equipment that reduces the voltage of electricity from a high level to a
level that can be safely distributed to your area or to your residence/business.
Underground Cable: A conductor with insulation, or a stranded conductor with or without insulation and other
coverings (single-conductor cable), or a combination of conductors insulated from one another (multiple-
conductor cable) with an intended use of being buried.
Volt (V): A unit of measure of the force, or ‘push,’ given the electrons in an electric circuit. One volt produces
one ampere of current when acting on a resistance of one ohm.
Watt (W): the unit of electric power, or amount of work (J), done in a unit of time. One ampere of current
flowing at a potential of one volt produces one watt of power.
Wire: A conductor wire or combination of wires not insulated from one another, suitable for carrying electric
current.

                                                                                                               26
Additional Comments

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

__________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

__________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

                                                                                         27
You can also read