QHSE PERFORMANCE REPORT
2016-2017
Message from the Managing Director                       4

Introduction		                                           5

Our certificates                                         6
   GeoSea, GOCM and EverSea certificates                 6
   DEME Group certificates                               6
   DEME and GeoSea prizes                                6

Client satisfaction                                      8
    Measure client satisfaction                          8
    Client feedback                                      9

DEME Offshore’s integrated management system             10

GeoSea’s project management system                       11

Quality management of EPCI projects                      12
   Process owners                                        12
   Document controllers                                  13

DRIVE and Safety hand in hand                            14
   DEME innovation awards                                14

Health				                                               14

Environment		                                            16
   Green initiatives2                                    16
   Corporate sustainability                              16
   Green & blue energy                                   17
   Update - Environmental topics!                        17
   Spill response campaign                               17
   ISO14001:2015                                         17

QHSE performance                                         18
  HSE management team dashboard 2016                     18
  TRIFR			                                               18
  1,000 QHSE inductions                                  18
  13,300 toolbox participations                          19
  600 SHOC cards                                         19
  500 QHSE inspections                                   20
  350 Drills for emergency preparedness                  20

Incident management                                      21
    Frequency rate DEME Group                            21
    Frequency rate GeoSea                                21
    GeoSea project incident management                   22
    Vessel incident management                           22
    Environmental incident management                    23
    Focus on high potential incidents                    24

Awareness campaigns                                      26
  Safety moment day 2016                                 26
  Gangway campaign                                       26
  Year Action Plan 2016                                  27

Subcontractor and supplier management                    28
   Subcontractor Towing Day                              28
   Racebank Project Subcontractor Day 2016               28

Projects in 2016                                         30

New GeoSea vessels                                       34
  Offshore Heavy Lift DP 2 Vessel ‘Apollo’               34
  Next Generation Offshore Installation Vessel ‘Orion’   35
                                                              3
QHSE Performance Report 2016-2017 - DEME Group
Message from the
    Managing Director

     2016 did not pass unnoticed…                                      I am proud to see that we also involve our clients,
     • highly satisfied clients on the Galloper and Racebank           subcontractors and suppliers in multiple actions related
       projects                                                        to QHSE. Every project organizes their own subcontractor
     • further promotion and extension of GeoSea’s process             day. Mutual agreements, teamwork and communication are
       owner principle                                                 essential and will always lead to a higher safety performance
     • winning of 3 Innovation Awards                                  level.
     • implementation of new Green Initiatives                         Major projects are successfully prepared and being executed
                                                                       as we’re speaking. Our future is guaranteed with 2 brand new
     Last year I mentioned that I wanted us to be humble and alert     vessels: the Apollo and the Orion. With these two ships we
     and that we should always keep in mind that we are working        will be able to strengthen our leading role, with an unlimited
     in an offshore environment with high risks. For the first time    respect for safety and life, in this fast growing and changing
     in 5 years we see that our TRIFR (Total Recordable Injury         sector.
     Frequency Rate) is slightly going up. And for the first time in
     3 years we were confronted with a lost time injury.               Please, sit down and take your time to have a look in this
                                                                       brochure about the QHSE performances of 2016 and 2017.
     More than ever, I want the GeoSea group to stay vigilant.
     We are growing fast and we are continuously engaging new                                                      Luc Vandenbulcke
     people. We have to focus on the basics as stated in the new                                             Managing Director GeoSea
     Year Action Plan.

4
QHSE Performance Report 2016-2017 - DEME Group
Introduction

   This annual report gives a clear and sound overview of which                                                                                                           • The continuous search to develop new techniques and tools
   way GeoSea and her daughter companies and branches watch                                                                                                                      resulted in GeoSea winning 3 DEME Innovation Awards.
   over the Health & Safety of every person involved in our
   activities, the care for the environment and the quality of our                                                                                                        • A ‘healthy mind in a healthy body’ is a philosophy
   services and activities.                                                                                                                                                      imbedded in the GeoSea DNA, shown by all the
                                                                                                                                                                                 participations to several DEME Health activities.
   • DEME and GeoSea are proud to have received multiple prizes
     such as the Trends Gazelle and the IADC Safety Award.                                                                                                                • GeoSea’s environmental awareness campaign ‘Green
                                                                                                                                                                                 Initiatives’ was taken to the next level.
   • The feedback from our clients on the safe and successful
     completion of our projects remains highly positive. This                                                                                                             • The essentials are treated in the management team
     pushed us to even increase our ‘client satisfaction’ target.                                                                                                                dashboard and incident management is a valuable input for
                                                                                                                                                                                 future awareness campaigns and yearly QHSE action plans.
   • The Integrated Management System keeps evolving, a
     specific brochure has been developed to show the latest                                                                                                              • GeoSea is preparing for the future with the expansion of its
     changes.                                                                                                                                                                    fleet with 2 major vessels.

   • Project specific sites can be built from a generic project
     navigator and are being customized to the project needs, by
     adding the required modules.

         POLICY STATEMENT
         Quality, health, safety and environment

         Vision         What we want to be                                                                                      Strategy                How we will do it
          GeoSea stands for the excellent high-quality design, procurement, construction and installation of offshore pro-
                                                                                                                                   In order to deliver the above objectives GeoSea makes an inventory of all relevant risks and opportunities on
          jects. Our trademark is our determination to be successful in activities demanding the use of the most innovative
                                                                                                                                   corporate level. Existing risks and opportunities are assessed during project preparation and execution. Control
          techniques. GeoSea resolutely chooses for the delivery of sustainable projects for man and environment.
                                                                                                                                   measures are determined and followed-up.
          The successful application of the most modern equipment, the use of prototypes, the development and use of new
                                                                                                                                   In practice this means that:
          methods distinguish the way GeoSea finds solutions for every new challenge.
                                                                                                                                          • clear agreements are made with our client(s);
          Innovative Marine & Offshore Solutions!                                                                                         • we meet the requirements of our clients;
                                                                                                                                          • company processes are constantly optimized and adjusted;
         Values          What we believe in                                                                                               • we constantly strive for improvement on the basis of measurable objectives;
                                                                                                                                          • products and services supplied by third parties are followed-up;
          As GeoSea management team we consider “Quality - Safety - Health - Environment” as our key values. The underlying
                                                                                                                                          • we strive to satisfy our clients, employees and stakeholders in every respect;
          principles of the “Zero accidents and zero environmental incidents” slogan constitute our objectives. We must do
          everything we can to provide the necessary means for achieving this target.                                                     • an open communication exists, in which our partners are involved;
                                                                                                                                          • we ensure a profitable and competitive market position;
                                                                                                                                                                                                                                                                      Bart De Poorter
          Furthermore, every employee has the right and the duty to halt any activity whenever (s)he believes that the
          execution thereof involves unacceptable risks.
          We believe that good work preparation can avoid high risks.
                                                                                                                                          • our subcontractors are early involved and we strive towards collective goals.
                                                                                                                                   The QHSE department has the task and receives the means to verify the application and effectiveness of the global
                                                                                                                                                                                                                                                                General Manager GeoSea
                                                                                                                                   care system by means of audits and inspections of projects and ships.

         Policy        What we want to achieve                                                                                     QHSE is a fixed item on the agenda of the Monthly Management Meeting and on that of the bimonthly Board of Direc-
                                                                                                                                   tors. Within every level of the organization action lists are used. Action points can be transferred from one list to ano-
          We aim for a constantly increasing QHSE level based on the relevant industrial standards used in the industry            ther. There are actions lists on board of the jack-ups as well as on Project Management Team and Process Owner level.
          (onshore and offshore sites, offices and quays).                                                                         All required financial and physical resources are made available to bring this strategy into practice.
          Our priority is and remains the well-being of our employees and subcontractors through the creation of a high-qua-
          lity, healthy, safe, and environmentally friendly work environment. Every employee receives the necessary infor-
          mation, instructions and training needed to execute their tasks.All subcontractor activities are professionally       Scorecards                    How we will measure it
          coordinated and all subcontractor employees are fully integrated in the project organization.                            GeoSea uses multiple Key Performance Indicators - KPI’s (SHOC, accidents at work, incidents, non-conforman-
          The GeoSea management system processes are systematically assessed and constantly reviewed taking into                   ce, customer satisfaction, training, etc…), which are continuously monitored and adjusted where required.
          account any improvements.
          Our QHSE system shall be in conformity with all legal obligations and the requirements described in the fol-
          lowing standards:
                                                                                                                                Plans & actions                          What we have to do
                                                                                                                                   Thanks to the use of action lists we can continuously adjust and assess our processes and organization.
                  • ISO 9001                   Quality assurance Management Systems;
                  • ISO 14001                  Environmental Management Systems;                                                   Our yearly Management Review will be the foundation for our next Year Action Plan (YAP). The action lists contain
                                                                                                                                   priorities for the different levels within the organization.
                  • VCA**                      Safety, Health and Environmental Checklist for Constructors;
                                                                                                                                   This policy statement will be displayed on the notice board of every project, on board of every jack-up and is part
                  • ISM                        International Management Code for the Safe Operation of Ships and for
                                                                                                                                   of the introduction of every new GeoSea employee and is reviewed on a yearly basis.
          			                                  Pollution Prevention;
                                                                                                                                                                                                                              Zwijndrecht, 02/05/2017
                  • ISPS                       International Ship an Port facility Security;
                  • OHSAS 18001                Occupational Health and Safety management Systems.
          The industrial standards for offshore activities of the IMCA (International Marine Contractors Association),
          UK-renewables, FPAL and the offshore Oil & Gas sector serve as a reference for the execution of our activities.
                                                                                                                                Nicolas Degand           Niels Van Berlaer         Bart De Poorter          Koen Vanderbeke            Luc Vandenbulcke
          EverSea has a Major Accident Prevention Policy (MAPP) applicable for the activities executed within the scope         General Manager          General Manager           General Manager           General Manager           Managing Director
          of the Oil & Gas Industry.                                                                                           GeoSea Maintenance             EverSea                  GeoSea                    GeoSea                     GeoSea
          All applicable guidelines and standards recommended by the IMO Flagstate and Class shall be taken into account.

                                                                                                                                                                                                                                                                    Koen Vanderbeke
         DEME: creating land for the future                                                                                                                                                                                                                     General Manager GeoSea

                                                                                                                                                                                                                                                                                         5
QHSE Performance Report 2016-2017 - DEME Group
Our certificates

     GeoSea, GeoSea Maintenance and                                       Notified Bodies
     EverSea Certificates

     • VCA** & OHSAS 18001 for occupational health and safety

     • ISM for safety at sea and marine environmental protection

     • ISO 14001 for environmental protection

     • ISPS for security on vessels

     • ISO 9001 for quality assurance

     • FPAL Assessment Certificate - Verified Advanced Registration
       Capability Profile for Quality, Health & Safety, Environment
       and Competence & Training

     DEME Group Certificates

     • CO2-Awareness Certificate (CO2 Prestatieladder Certificatie v2.1
     Niveau 5 published and owned by SKAO)

     DEME and GeoSea prizes

     • TRENDS Gazelle - Nationaal

     • DELOITTE Fast 50 - Most Sustainable Grower

     • IADC Safety Award 2016 (enhanced muster station)

     • Randstad Lifetime Achievement Award for most attractive
                                                                          IADC Safety Award
       employer in Flanders

                          DELOITTE Fast 50
6
QHSE Performance Report 2016-2017 - DEME Group
“Clear
communication
between partners
rewards.”
              7
QHSE Performance Report 2016-2017 - DEME Group
Client satisfaction

     Measure client satisfaction                                        Measure client satisfaction per semester
                                                                        (Source: Questionnaire Management Team)
                                                                        100
     GeoSea wants to keep close track of client feedback.
     For this reason client satisfaction question lists are completed    80
     for all operational projects every 6 months.
                                                                                                                                 target

                                                                         60
     Following the management review, the client satisfaction
     question list was updated. GeoSea’s performance is now              40
     assessed in four areas: financial and contractual, operational,
     HSE and quality. In 2016, GeoSea’s target was raised to             20
     receive as a minimum an average overall score of 80%
     across the projects.                                                 0

                                                                                2014                  2015                2016

     Results from the client satisfaction surveys are discussed
                                                                              objective Measure client satisfaction in
     during management team meetings and reviewed during                      order to improve the quality of our work.
     the yearly management review. If required, intermediate or
     additional actions are taken by the Responsible Managers                                           achieved

     based on the results and recommendations of our clients.

8
QHSE Performance Report 2016-2017 - DEME Group
Client feedback

GeoSea received some nice feedback from clients                      Matthias Volmer, Senior Project Lead from Dong
on our safety performance and successful and safe                    congratulated the Racebank project team on their successful
completion of the projects.                                          SHOC campaign:
                                                                     “Please allow me to jump in here and congratulate everyone on
Roy Dickson, UK H&S Manager of RWE sent an e-mail                    this fantastic intermediate result. The huge number of SHOCs
to congratulate and thank the Galloper project team for their        issued so far shows how dedicated and enthusiastic everyone
safety performance during the Transition Piece Mock Up Trial         is about making your working environment safer and reduce
at the Smulders facility in Hoboken.                                 risk. This is exactly the spirit and mindset that we want, and we
                                                                     also need to keep it up until the end of the campaign as well as
“As you know we take the health and safety of all those of the       beyond.”
project very seriously. Part of this includes recognising good
health and safety performance. As such GWFL would like to thank      After completion of the Racebank project, the Dong Energy
GeoSea for their recent safety performance during the Transition     Project Manager explicitly thanked GeoSea for the focus on
Piece mock up trial at the Smulders facility in Hoboken. In          safety:
particular we would like to recognise the following:                 “… An even greater achievement, is this long offshore campaign,
• Documentation and communication to all involved of the             has been executed with outstanding safety performance,
   safety standards and procedures to be followed                    contributing to DONG Energy’s best safety result ever.
• Enforcement of standards for personnel safety training and
   equipment certification                                           All the way great cooperation, communication and care between
• Thorough induction process                                         DONG Energy as employer and GeoSea as contractor, has been
• Coordination with the fabrication yard to ensure safe and          the key to a great and safe campaign.
   timely provision of resources and prompt resolution of safety     GeoSea has been proactive and ambitious on their safety
   issues                                                            performance, with several campaigns launched, with focus on
• Dedication and effort of the Geosea personnel involved in          Safety feedback (SHOC card system), and complacency.
   safely and successfully facilitating the other parties’ trials”   This continuous feedback on safety has created a dynamic
                                                                     environment, kept every and all persons on the toes, being
As a token of appreciation RWE has awarded GeoSea with the           focused in the moment, and aware of the importance of the safe
Project Safety Award.                                                working environment, which is never compromised!”

                                                                                                                                         9
QHSE Performance Report 2016-2017 - DEME Group
DEME Offshore’s integrated
     management system

      GeoSea’s Integrated Management System has evolved                    For this update, we were looking for a visual recognition and
      enormously throughout the years. Recently, the entire structure      a clear link between the overview of the QHSE management
      has been reviewed to a DEME Offshore Management System.              system and the company navigator. They are based on the
      This also entailed an analysis of the set-up of the Navigator. The   same structure, so the set-up of both had to be visualized in
      system has been divided into 6 different sections or “blocks”,       the same way.
      each representing another level in the organisation.
                                                                           The way the new structure is now set up for GeoSea can also be
      The management structure has been updated thoroughly to              extended to the navigators of other DEME business units.
      give a solution for the new demands of bigger projects and           The icing on the cake is the publication of an attractive
      to make the system even more integrated and to provide a             brochure that can replace the original document that describes
      clear overview for everyone. The structure of the system is          the QHSE management system. It contains a clear overview
      corresponding with the structure of the Navigator. Together          and description of the structure of the integrated management
      with the updated structure, the Navigator was also given a new       system.
      look and feel and the user-friendliness has been improved.

10
GeoSea’s project
management system

   Block 3 shows how GeoSea manages the complete life cycle          Projects and Project Navigators
   of a project, from tender start-up to project end of work.        For current projects, the project management system, and
                                                                     all data and documentation related to the project, can be
   Project Management                                                consulted via the individual Project Navigators.
   GeoSea has translated the DEME Project Management Manual to
   GeoSea level, by identifying key Project Management Processes     These project specific sites are set up during the preparation
   and providing generic management plans for each process:          phase of a new project. The sites are started up from a
   • Project Management Plan                                         generic project structure and ‘modules’, which are adapted to
   • Project Opportunities and Risk Management Plan                  the needs of the project:
   • Project Schedule and Progress Management Plan                   • Core Project Management items such as Project
   • Project Resources and Procurement Management Plan                 Management Plans, financial information, contracts &
   • Project Interface Management Plan                                 requirements.
   • Project Communications Management Plan                          • Every single project activity (based on system engineering
   • Project Documentation Management Plan                             principles) has its specific way of gathering information.
   • Project Quality Management Plan                                   Everyone can find in an easy way the method statements,
   • Project HSE Management Plan                                       inspection and test plans, procedure, risk assessment, etc.
                                                   P-M Plan
                                                                       related to a specific activity.
                                                   P-Q(A) Plan
     Generic Versions Templates                    P-HSE Plan
                                                   P-QC Plan (ITP)   The generic project structure and ‘modules’ are continuously
                                                   P-MST
                                                                     updated and improved with the insights and feedback from
                                                   P-RA
                                                   P-ER Plan         projects, vessels and departments.
   Content Table
                                                   P-DOC Plan
                                                   P-LOG Plan
                                                   P-ITP Plan                                        Document
                                                                         Drive & production                                   HSE performance
                                                   P-COMM-Plan                reporting
                                                                                                    management
                                                                                                                                monitoring
                                                                                                     & As-Built
                        Project                    P-INT-Plan
                        Vessel                     P-Site M-Plan
                        Activity
                        Site
                                                                              Planning             Correspondence                  System
                        Specific Document                                                                                        engineering

   Within the GeoSea organisation a Process Owner is assigned
   for each of these processes. The Process Owners are point of
   contact and experts on their process, and are responsible for           Opportunities &         QC performance           Building Information
                                                                          Risk management            monitoring               Modelling (BIM)
   maintaining the generic template management plans.
   Once a contract is awarded, a Project Manager and project
   team are assigned to a project. During the preparation and
                                                                             Equipment                  HR
   execution phase, the Project Management is guided by the                 management              management

   DEME Project Management Manual and GeoSea template
   management plans.
                                                                       Subcontractor & supplier          Finance        Overview of the modules
                                                                            management                                  available: These can be
   Project Management will make the template plans specific                                                             used by every project, vessel,
                                                                                                                        department and will be
   to the project, site, vessel and activities. On request and in                                                       adapted to specific needs.

   consultation with the client, the names and content of the
   plans are tailor made. Where applicable, the plans will refer
   to the GeoSea requirements or procedures. All project plans
   are ‘living documents’: they are subject to changes during the
   progress of the work.

                                                                                                                                                         11
Quality management
     of EPCI projects

      Process Owners

      The complexity of EPCI projects within GeoSea has raised the                 • Procurement Management is the process of Jan Van Rossum
      need for specialists in different activities and management                    that involves the requirements for steel subcontractors, the
      processes, but also for an overarching management approach                     procurement process flow and the risk assessment.
      that ensures the smooth preparation, execution and delivery                  • Fabrication Management by Frank Theuns establishes a
      of products and services. GeoSea’s integrated management                       clear relation between this process and the input/output on
      system provides efficient guidelines and tools that apply                      the other lifecycle processes.
      throughout the project lifecycle, from Design to Procurement                 • Transportation and Installation is described by Frank
      and from Fabrication to Transportation and Installation. Each                  Jonckheere regarding the pre-contractual arrangements,
      of these project lifecycle processes are appointed to a specialist             main strategy and risks, preparations, mobilization,
      process owner who assures the quality of the process and its                   execution and demobilization.
      documentation and assesses the inherent risks.
                                                                                   In addition to these process owners, each activity developed
      • Design Management is under the responsibility of Wouter                    and performed within the EPCI contract by GeoSea or with
        Haring, who has been recognized in 2016 among other                        GeoSea’s resources is appointed to a specialist process owner.
        process owners for “the continuous improvement and high                    There are in total 73 process owners who act as single point
        quality of his process and risk analysis”.                                 of contact for their respective processes, making use of
                                                                                   reports, lessons learned, corporate requirements and industry
                                                                                   standards to improve such processes. All process owners
                                                                                   use a SIPOC model to determine who contributes with which
                                                                                   resources and who benefits from which products regarding
                                                                                   their processes.

                                                Wouter Haring received the Award
                                                for Process Owner 2016

12
Document Controllers

My name is Conny Pallen and I’m a Document Controller.                        session, which will be followed up by monthly meetings, so
When I started my first assignment with GeoSea 5 years ago, I                 that we continue to discuss and improve the document control
must have been one of the first document controllers working                  processes.
for GeoSea in Zwijndrecht. Many co-workers did not really know
what a document controller did, so I was sent to Ostend for a                 During those 2 days of training and meeting we noticed that
day to learn the tricks from George Brownlee and his team who                 we all face the same challenges. While 5 years ago it was still
were then working on the Northwind Windfarm project. When I                   possible to store all project information and communication in a
returned, I was assigned to a project, put in a container office, I           maze of folders on ‘the server’, we are now using very different
was added to the project distribution list and one of the project             tools like Aconex and SharePoint which are supported and
engineers pushed an MDR (Master Document Register) in my                      maintained by DEME, we are also required to use other tools
hands. And so my career as a document controller had started.                 for our client’s system. This shift to the usage of online data
                                                                              management systems implies that the document controllers
Now, 5 years later, windfarm projects have become increasingly                Continuously have to Improve the document control processes
complex and we are now a very diverse group of 18 document                    and at the same time they need to convince their project team
controllers working for T&I and EPCI or EPCM projects in                      members that it is in their best interest if they also get to know
various locations: Zwijndrecht, Bremen, Ostend, Luxemburg,                    and start to use these systems.
Scotland.

To avoid that each of us will have to reinvent document control
procedures for every project we start working on, and to make
sure that we learn from each other, we are now trying to evolve
from a group of document controllers into a team of document
controllers. This team can share best practices and expertise. To
achieve this we organized our first 2-day training and meeting

                                                                      Members of the Document Controllers Team

Conny Pallen                                                          Members of the Document Controllers Team

                                                                                                                                                   13
DRIVE and Safety
     hand in hand                                                        Health

      GeoSea Wins 3 Innovation Awards!                                   GeoSea attaches great importance to the health and
                                                                         wellbeing of our employees.
      In April last year, DEME launched the Innovation Awards to
      gather and reward ideas from the entire DEME-group. All            Already for some years, there is the start to run initiative,
      submittals were carefully evaluated and for the final selection,   which gives everyone the opportunity to go for a run on
      30 nominees were invited to the Atomium to pitch their ideas       Thursday noon every week. Every year GeoSea sponsors a
      to DEME management.                                                number of running competitions and the Sterke Peer Trio
                                                                         Triathlon in which employees can participate.
      On Friday the 5th of February the final winners of the first
      DEME Innovation Awards were announced during a reward              GeoSea employees also participate in the DEME steps
      ceremony. GeoSea is proud to have won the following prizes:        challenge. The new challenge for 2017 is to try and
      1. New tool, original process or innovative technique:             synchronize each month a team total of at least 3 million
         Modular jacket gas platform - Niels Van Berlaer,                steps. In order to achieve this goal, people who prefer to
         Jan Steenackers and Maciej Mroczek                              walk, can also join the Thursday runners to take a walk.
         This re-usable, modular jacket can be used to exploit           Since last year, a number of colleagues also participate in
         several smaller gas fields and can be installed with smaller    a bootcamp, a ‘crossfit’ work out organized on Tuesday
         installation vessels.                                           evenings.

      2. New tool, original process or innovative technique:
                                                                         In 2016 DEME participated in the Dragon Boat Festival in
         Damped Pile Gripper - Evi Smets, Sven De Bock,
                                                                         Antwerp with 2 rowing teams. In 2017 we plan to participate
         Dieter Rabaut, Jan Lefever, Tony Van Driel, Henk
                                                                         with 3 teams.
         Van Mol and Floris D’Haeze
         The damped pile gripper was already successfully implemented
                                                                         In 2016, GeoSea colleagues Conny Pallen and Youri Sioen
         on the Westermost Rough project and makes sure we can still
                                                                         were selected as DEME Heroes. They participated in a
         install foundations when the waves get higher.
                                                                         training program, in which 10 DEME employees were closely
      3. Special jury prize: Revised muster station
                                                                         monitored and could count on unique personal coaching to
         arrangements on board GeoSea platforms -
                                                                         prepare them for the participation in the Climbing for Life
         Dirk Pauwels, Michiel Visser and the Neptune crew
                                                                         2016 event in Les Deux Alpes, France.
         By painting numbered circles on deck near the muster
         station, the assembly and head count of the people on
                                                                         Also in 2017 two of our GeoSea colleagues will become DEME
         board takes place in a much smoother and efficient way.
                                                                         Heroes. Dirk Pauwels will join the cycling training program
                                                                         to prepare for the Climbing for Life event in the Vogezen in
                                                                         September 2017 and Nikita Pauwels will participate in the
                                                                         newly added running part of the coaching program.

       Some of the GeoSea winners

14
Participants of the Dragon
                                                                                               Boat Festival

   DEME Bootcamp

                                                        Conny Pallen

              Nikita Pauwels

                               Dirk Pauwels

                                                                Youri Sioen

Sterke Peer

                                              Sterke Peer

                                                                                                               15
Environment

      Green initiatives2                                                   Corporate Sustainability

      In 2015 the ‘Green Initiative’ campaign was launched by GeoSea.      In 2016, DEME joined the Flemish Climate Change Conference
      The goal of this campaign was to raise the environmental             and together with around 90 other companies, NGOs and
      awareness of all GeoSea employees and to improve the                 government bodies signed the Belgian SDG Charter for
      environmental performance on the GeoSea projects.                    International Development. An initiative of the Deputy Prime
                                                                           Minister and Minister of Development Cooperation Alexander
      In 2016 this campaign continued with a renewed focus on              De Croo.
      implementing Green Initiatives during the design / preparation
      phase of each project. This was realized by selecting an             This Charter is based on the 17 Sustainable Development Goals
      environmental friendlier piece of equipment or product, by           (SDG) unveiled by the United Nations end 2015. These 17 topics
      organizing the deck layout more efficiently or by reviewing the      are clustered within 5 P’s: peace, people, planet, prosperity and
      fuel efficiency of supply vessels during the selection process.      partnership and they provide a framework for the sustainable
      Environmental improvements were also realized in other               development priorities for the forthcoming 15 years.
      categories by optimizing the separation of waste streams or the
      storage of hazardous products.                                       Within this charter, there is an important role for the private
                                                                           sector. DEME’s commitment to this charter highlights our
      To ensure the continuous improvement of our Environmental            ambition to evolve further to a sustainable business. It also
      performance, the Green Initiative campaign will remain a vital       stresses the importance of the Environmental performance of
      part of our integrated management system.                            our own activities and those of our subcontractors & suppliers.

      Green Initiative spotlight

      On the Year Action Plan of 2016, we aimed for expanding
      the scope of our Green Initiatives from the execution phase
      to the preparation phase of the projects. The Galloper project
      has put this into practice and focused on the environmental
      aspects which can be tackled during the design phase. A major
      environmental aspect of the construction of offshore foundations
      is the application of anti-corrosion paint systems. The heavy-duty
      paints for offshore wind farms are typically solvent-based and
                                                                           Alain Bernard signs the Belgian SDG Charter
      consist of large concentrations of Volatile Organic Compounds        with Minister De Croo

      (VOC’s). These VOC’s contribute to the formation of smog,
      which can be harmful to both human health and vegetation.
      In cooperation with our coating supplier, we have combined a                                    “I welcome the launch of the Belgian SDG
      solvent-based sealer coat and a heavy duty solvent free paint.                                  Charter, which brings together the private
      This led to a VOC reduction of more than 80%!                                                   sector, public sector and civil society
                                                                                                      behind the 2030 Agenda for Sustainable
                                                                                                      Development”
                                                                                                                                 Bang Ki-moon
                                                                                                                             UN Secretary-General

16
Spill response campaign
                                                                 In 2016 a Spill Prevention and Response campaign was
                                                                 launched on all GeoSea vessels and projects. The goal of this
                                                                 campaign was to provide everyone with a refresher on the
                                                                 correct spill response process. The focus should always be on
                                                                 preventing spills, but if a spill should occur, a correct response
                                                                 will minimize the potential impact to the environment. This
                                                                 process is known as the ‘3x C’s’.

Artist Impression of the MeyGen Project                               Spill Response: The three C’s

Green & Blue Energy                                                                   Contain

Global CO2 emissions could be dramatically reduced by the
                                                                       Control
production of green and blue energy. From the start, GeoSea
has been taking the lead by investing in human capital,
equipment and resources for the installation of large offshore
wind farms. Meanwhile, GeoSea has become a renowned player
on the European offshore wind market.                                                                  Clean-Up

GeoSea is also a pioneer in generating blue energy – wave
and tidal energy – with the MeyGen Project and is constantly
looking for solutions to complex energy issues such as the
storage of renewable energy.

Update - Environmental Topics!                                   ISO 14001:2015

With the update of the corporate management system, the          The ISO 14001 describes the core elements to set up and
environmental section received a make-over as well. All of       implement an environmental management system. In 2015,
the relevant items are now grouped behind a new button           just like for the ISO 9001, a new version of this standard was
‘Environmental Topics’ in the QHSE process and consist of        published. The basic principle of these new standards is the
following chapters:                                              ‘High Level Structure’ (HLS). In 2017 the corporate integrated
1) Energy Management                                             management system of GeoSea will have a recertification for
2) Hazardous Substances                                          ISO 14001 according to this new version.
3) Spill Prevention
4) Waste Management
5) Marine Fauna protection

The existing Safe Working Procedures are being moved to the
latest template and all related documents are streamlined and
updated according to the latest industry standards.

                                                                                                                                      17
QHSE performance

      HSE management team dashboard

      During the Management Review meeting it was decided to
      use an extensive list of KPI’s (Key Performance Indicators) to
      monitor and if necessary adjust GeoSea activities. KPI’s are
      placed at all levels of our organization.

      Some of these KPI’s are published quarterly in the QHSE
      Management Team Dashboard. The dashboard displayed here
      shows the overview of 2016. In the graphs that follow, some of
      these KPI’s are published and discussed in more detail.

      TRIFR

      The Total Recordable Injury Frequency Rate is an indicator that takes into account all Medical Treatments, Restricted Work Cases, Lost
      Time Incidents and Fatalities. It’s a useful tool to evaluate our safety performance. Over the past 5 years we’ve been able to lower our
      TRIFR to 6.36 in 2015. In 2016 we saw a slight increase to 6.50.

      16

      12

      8

      4

      0
                   2012                      2013                       2014                 2015                        2016

      1,000 QHSE inductions                                                                         Award Safety Person of the Year
                                                    objective Anyone present on a vessel,
                                                    site or in a building where GeoSea is           Dmitry Malanda won the Award for Safety
                                                    responsible gets an appropriate and
      Inductions are a key                                                                          Person of the Year for his ceaseless positive
                                                    specific HSE induction.
      element for a successful                                                                      efforts to keep the safety on his project at an
      QHSE performance                                                        achieved              optimal level.

           1400

           1200

           1000

            800

            600

            400

            200

              0
                     Q1          Q2          Q3            Q4        2016

18
13,300 toolbox participations                                                             objective Communicate safety topics
                                                                                          throughout the company, by the
                                                                                          registration of the number of toolbox
Minimal 1.200 toolbox participations/ 100.000 working hours                               participations in relation to the
                                                                                          working hours.
Minimal 1 toolbox participation per employee per week
                                                                                                                      achieved

   7000

   6000

   5000

   4000

   3000

   2000

   1000                                                                                                                          target

      0

               JAN    FEB    MAR    APR      MAY        JUN      JUL      AUG       SEP      OCT      NOV       DEC       2016

600 SHOC cards
                                                                                          objective Increasing safety awareness
                                                                                          by promoting the receiving of enough
                                                                                          SHOC cards per employee in relation to
Minimal 75 SHOC cards/100.000 working hours
                                                                                          the working hours.
Minimal 3 SHOC cards per employee per year
                                                                                                                      achieved

   350

   300

   250

   200

   150

   100
                                                                                                                                 target
    50

     0

              JAN     FEB   MAR     APR      MAY       JUN       JUL      AUG      SEP       OCT      NOV      DEC        2016

                                                   Award: Best SHOC card of 2016

                                                   Improvement idea by Innovation Crew member Jeroen Martin: He reported
                                                   that the black anti-slip profiles of the gangway were not sufficiently visible
                                                   during the night shift when accessing the TP, creating a trip hazard. The black
                                                   steps were painted yellow for higher visibility.

                                                                                                                                          19
500 QHSE inspections
     Minimal 1 inspection per operational staff member / month (green)
     Minimal 1 inspection for every Master and every Chief Engineer / week (blue)

     Every project has the responsibility to control and inspect
     their work and workforce. This should be demonstrable and
     necessary actions should be taken in case of deficiency.
     Therefore GeoSea highlights the importance of inspections
     conducted by each supervisor. Each superintendent up to
                                                                                                   objective Stimulate engagement
     Project Manager should perform one inspection per month;                                      of top, middle and vessel
     (barge) masters and chief engineers one per week.                                             management by monitoring the
                                                                                                   number of inspections done.

                                                                                                                              achieved
       300%

       250%

       200%

       150%

                                                                                                                                          target
       100%

        50%

         0%

                       JAN      FEB      MAR      APR     MAY        JUN    JUL     AUG      SEP      OCT      NOV      DEC       2016

     350 Drills for emergency preparedness
                                                                                                   objective Prepare for emergencies by
     Minimal 1 drill on each vessel per week                                                       monitoring the number of drills.

                                                                                                                              achieved

      300%

      250%

      200%

      150%
                                                                                                                                          target

      100%

       50%

       0%

                      JAN      FEB     MAR       APR     MAY        JUN    JUL     AUG       SEP     OCT      NOV       DEC       2016

     Emergencies, such as fire, man over board and collisions,               Planning and execution of these drills has to be based on
     immediately threatening the health of the crew, cannot be               the experience of real scenarios, it has to involve the crew,
     ruled out our line of work. In order to minimize the impact,            and the performance has to be evaluated. The drills have to
     it is necessary that every person in such a situation knows             be performed frequently to ensure that no one forgets the
     exactly what to do. This requires repeated exercises and drills.        processes.

20
Incident
management

  Frequency rate DEME Group

  The frequency rate of the DEME group is
  calculated as follows:

  (Number of LTI > 1 day x 200.000)
       Number of manhours worked

                              Example graph for follow-up of
                                       DEME frequency rate

  Frequency rate GeoSea

  There was one lost time injury in 2016, which means that the LTI frequency rate increased for the first time in three years.

  20                                                                                                                                    500

  18                                                                                                                                    450

  16                                                                                                                                    400

  14                                                                                                                                    350

  12                                                                                                                                    300

  10                                                                                                                                    250

  8                                                                                                                                     200

  6                                                                                                                                     150

  4                                                                                                                                     100

  2                                                                                                                                     50

  0                                                                                                                                     0
                2007        2008           2009                2010       2011         2012   2013      2014         2015        2016

  • Frequency rate GeoSea   • Turnover (without procurement)          • Number of employees

                                                                                                                                              21
GeoSea project incident management

                                               0                                 Fatal accidents

                                               1                                 Lost time incidents

                                               3                                 Restricted work cases

                                               4                                 Cases medical treatment

                                              15                                 First aid cases

                                               6                                 Near misses

                                              21                                 Dangerous situations

                                              558                                SHOC cards

                          Type of reported incidents 2016

     Vessel incident management

     GeoSea tracks the number of days each vessel has gone          Vessel name                    Last LTI   Days since last LTI
     without a Lost Time Injury being sustained.                    Innovation                                       587
                                                                    Neptune                                          1770
     The table shows the results by vessel.                         Thor                       29/03/2016            272
                                                                    Goliath                    29/08/2009            2642
     The Zeebouwer still leads the way with 3154 days without       Vagant                     6/03/2013             1375
     LTI. There has never been an LTI on the Innovation, Neptune,   Buzzard                    15/11/2008            2926
     Arista and Aquata. The number of days mentioned is the
                                                                    Arista                                           1444
     actual number of days since they became operational for
                                                                    Aquata                                           1444
     GeoSea.
                                                                    Zeebouwer                  27/03/2008            3154
                                                                                                                 12462
                                                                                                     fleet total 15,614 days
                                                                                                           without LTI

      GeoSea fleet

22
Environmental incident management

Incident statistics differentiate between severe and minor environmental
incidents. Severe environmental incidents are those which involve restitution
costs (consequence > 3 in GeoSea’s Risk Matrix). No major environmental
accidents were recorded in 2016, however 5 minor environmental incidents
occurred. There were e.g. minor oil spills on the deck of a vessel.

                                                      2012             2013     2014   2015   2016
 Severe environmental incidents                         0                  0     0      0      0
 Minor environmental incidents                          3                  7     7      7      5

                                                                                                     23
Focus on High Potential Incidents

     In 2016 we had almost the same number of incidents as in        HIPO Incident Analysis 2016
     2015 (124 instead of 125), but the number of HIPO’s went
     down from 42 to 33. This is a trend we definitely want to       Review with all process owners:
     continue in the next years!                                     • In 33 HIPO’s, 15 Crew Transport Vessels were involved!
                                                                     • In 33 HIPO’s, 10 dropped objects occured!
     Lifting Operations, Working at Height and Maritime
     Operations remain our most important activities, but they are
     at the same time our strongest points to convince our clients
     that the safety level within GeoSea is very high.
     Nevertheless, we cannot lose sight of our other, possibly
     combined, operations. The analysis of the incidents in 2016
     showed that in 15 of the 33 HIPO’s Crew Transport Vessels
     were involved.

24
Lifting
                                           activities
                                              12

   124        33
incidents   HIPO’s

                                           Working
                                           at height
                                                 9

                                             Marine
                                            activities
                                                 8

                                     Use of
                                   (new) tools
                                       3

                      Abuse of
                     Regulations
                      (alcohol)
                         1

                                                         25
Awareness
     campaigns

      Safety Moment Day 2016                                             Gangway Campaign

      The DEME Safety Moment Day 2016 addressed “Slips,                  After our Awareness Campaigns of 2013 (Manual of Standard
      Trips and Falls” in staircases, ladders and gangways. The          Lifts), 2014 (Lifting Management) and 2015 (Dropped
      purpose of this initiative was to increase the awareness of        Objects), in Q4 of 2016 we launched our latest awareness
      all employees in all sites and offices about the risks of taking   campaign regarding GANGWAYS. The campaign started with
      stairs, particularly when running, eating, talking on the          a Hazard Hunt, in order to have a good view on the current
      phone, carrying loads, passing by other people and using           situation and how it could be improved.
      inadequate type of shoes. For this edition, DEME has prepared
      a video of real stories of lost time injuries with a clear         The objective of this Hazard Hunt was also: “to assure the
      message: “Taking the stairs is working, beware of the risks”.      good condition and correct use of our gangways”. Via a
      In 2016, more than 40% of DEME’s Lost Time Injuries were           poster we showed some good and bad examples of the
      caused by slips, trips and falls.                                  condition and use/installation of the gangways on our vessels
                                                                         and load out areas onshore.
      Within GeoSea, a dedicated presentation of this topic
      was provided to all managers and subsequently to their             Together with this poster, a number of inspection cards/check
      subordinates across offices, projects and vessels. This            lists and card holders were provided to all vessels. Also a
      presentation served as a reminder to this type of incidents in     PowerPoint presentation with all the necessary information
      previous years and their consequences. Additionally, GeoSea        to get the campaign started at the same time and under the
      has implemented the Gangways inspection card and handrail          same conditions.
      stickers as initiatives to mitigate the risks.
                                                                         This awareness campaign was set up after we had several
                                                                         incidents last year with twisted ankles, slips, trips and falls.
                                                                         Most of them on or nearby a gangway. We believe that this
                                                                         kind of incidents can be reduced if we all pay extra attention
                                                                         when positioning our gangways.

26
Year Action Plan 2017

GeoSea subscribes the DEME Global action plan and develops                                                                                               planned in 2017 and is spread all over the company. Behind
a specific year action plan. This plan integrates Quality,                                                                                               this poster, over 70 specific action points have been described
Health, Safety, Environment and Security actions.                                                                                                        and appointed to responsible persons. These persons get all
It is the popular and glossy version of the actions GeoSea                                                                                               necessary resources to realize their packages of actions.
2017

                                               YEAR ACTION PLAN
                                               For Quality, Health, Safety, Environment and Security

                                                                                    He
                                        lity                                   A      alt
                                     uait rigthttime                        in a soun

                                                                                                                         1 Quality - Do it right the first time
                                                                                 sou d m
                                       o irs                                        nd i
                       Q

                                                                                       h nd

                                        ef                                            b
                                    th D

                                                                                      od
                                                                                        y

                                                                                                                         			   1.1   Training for Document controllers
                                                                                                                         			   1.2   Update Project Management Plans: structure, templates, content
     S e c _ rit y is n ut U

                                                                                                o ur m th e st art
                 S e c ur

                                                                                                             a wa r d

                                                                                                                         			   1.3   Develop Project Dashboards
                                                                                            fety
                  w it h o

                                                                                                      b e st

                                                                                                                         			   1.4   Improvement of QA during installation activities
                        ot c

                                                                                            is y t y fr o
                                                                                           Sa
                         i t y lete
                             om

                                                                                               fe
                                p

                                                                                            Sa

                                               Env
                                                         i ro n m e n t
                                                                                                                         2 Health - A sound mind in a sound body
                                                  A bet
                                                           t e r e ir o n m e n t
                                                   s t a rt s w n v o u r s e lf
                                                                 it h y

                                                                                                                         			 2.1 Stop Smoking Campaign
                                                                                                                         			 2.2 Implementation of the Restricted Work Case Program

                                                                                                                         3 Safety - Safety from the start is your best award
                                                                                                                         			 3.1 Fight Complacency
                                                                                                                         			 3.2 Stop the drop
                                                                                                                         			 3.3 Back2Basics:
                                                                                                                         					             • Risk Management Training
                                                                                                                         					             • GeoSea Personal Protective Equipment (PPE) Catalogue
                                                                                                                         					             • Flexible HSE Inspection form
                                                                                                                         			 3.4 Logistic Operations with Crew Transfer Vessels

                                                                                                                         4 Environment - A better environment starts with yourself
                                                                                                                         			 4.1 ISO14001:2015 Certification
                                                                                                                         			 4.2 Develop Project Environmental Management Plan template
                                                                                                                         			 4.3 Framework agreement with waste collecting companies in main ports

                                                                                                                         5 Security - Sec_rity is not complete without U
                                                                                                                         			 5.1 Secure document access for external parties in online SharePoint
                                                                                                                         			 5.2 Safe bicycle storage at Kallo offices
                                                                                                                         			 5.3 Info leaflet with joining instructions for Subcontractors

                        Karel Huybrechts                                                                                Bart De Poorter               Koen Vanderbeke             Luc Vandenbulcke
                         QHSE-S Manager                                                                                 General Manager                General Manager            Managing Director
                           GeoSea NV                                                                                      GeoSea NV                      GeoSea NV                    GeoSea NV

                       DEME: creating land for the future

                                                                                                                                                                                                                           27
Subcontractor and
     supplier management

      Subcontractor Towing Day                                      Racebank Project Subcontractor day 2016

      In 2016 GeoSea organised a “Towing Subcontractor” day.        As one of the first projects, the Racebank team has taken the
      This event was entirely dedicated to the different aspects    initiative to organize a Subcontractor Safety Awareness day.
      of towing of barges and jack-up platforms as this is a high   The target was to align our subcontractors on the project
      risk operation. The ultimate goal of the day was to make      towards the same level of QHSE standards. Additionally each
      recommendations and suggestions to:                           subcontractor was requested to identify 3 HSE initiatives
      • Improve safety and environmental performance                to achieve safety awareness for his teams on board of the
      • Enhance the towing operations                               installation vessel.
      • Strengthen the contractual aspects
      • Implement improvement ideas                                 Out of those HSE initiatives the Racebank Project
                                                                    Management Team has selected 5 challenging HSE
      A movie of this successful                                    commitments for further follow-up during transport and
      event can be viewed by scanning this QR code.                 installation:
                                                                    • Train and Inform
                                                                    • Plan the Unplanned
                                                                    • Break the Habit
                                                                    • Focus on Contingency
                                                                    • Open Communication

                                                                    At the end of this interesting day all subcontractors were
                                                                    asked to sign the Safety Awareness Charter specially designed
                                                                    for the Racebank Project.

28
29
Projects in 2016

      Nordsee One OWF, Germany                                          Race Bank OWF, United Kingdom
      Foundations Transport and Installation of 54 MP-TP Foundations.   Foundations Transport and Installation of 91 MP-TP
                                                                        Foundations.
      Bonny Island, Nigeria
      Provision of the VAGANT for lifting, removal and transportation   Galloper OWF, United Kingdom
      of LNG lifting arms and other marine works, charter.              Transport and Installation of 56 MP-TP Foundations.

      Rentel EPCM, Belgium                                              MeyGen 1A Underwater Turbines, United Kingdom
      Design, Fabrication and Supply, Installation and                  Design, construction, operation and maintenance of a tidal
      commissioning of foundations (42 monopiles and transition         energy project located in the Inner Sound of the Pentland
      pieces) and inter-array cabling. Transport and installation of    Firth, Scotland. Transport and Installation of 4 gravity based
      42 turbines, and OSS foundation inclusive topside.                tidal turbine foundations including 4 x 6 ballast blocks.
                                                                        Procurement of Lifting Frames and Seafastening of tidal
                                                                        turbines, foundations and ballast blocks.

       Bonny Island, Nigeria

       Nordsee One OWF, Germany                                         Flinterstar, Belgium

30
Merkur EPCI, Germany                                                             Borkum Riffgrund 2, Germany
Engineering, Procurement, fabrication, Transport and                             Transport and installation of 20 suction bucket jackets,
Installation of 66 MP-TP Foundations.                                            including grouting operations.

Hohe See OWF EPCI, Germany                                                       Hornsea One, United Kingdom
Design, fabrication and installation of 71 foundations consisting                Transport and installation of 116 MP-TP foundations. Design
of a monopile, transition piece and grouted connection.                          and installation of scour protection.

Horns Rev 3 PCI, Denmark                                                         Hinkley Point C, United Kingdom
Foundations Supply (Procurement and Construction) and                            ECI Study for the NPP - Hinkley Point C Project - Marine Works
Installation for the Horns Rev 3 Wind Farm, 49 Monopiles and                     - Installation of Shafts (In- & Outfall).
Transition Pieces.
                                                                                 Flinterstar, Belgium
                                                                                 Flinterstar wreck removal.

                                                         Galloper OWF, United Kingdom

                                        MeyGen 1A Underwater Turbines, United Kingdom                                                Race Bank OWF, United Kingdom

                                                                                                                                                         31
C-Power, Thornton Bank, Belgium                                 Nordsee Ost, Germany
     • Offshore maintenance activities                               • Exchange of rotor shaft assembly and gearbox
     • Marine services & structural maintenance                      • Blade exchange
                                                                     • Transformer exchange
     Ormonde, Ireland
     Exchange of rotor shaft assembly and gearbox                    Gemini, The Netherlands
                                                                     Operations & maintenance agreement for the Gemini
     Thorntonbank, Belgium                                           windpark BOP.
     • Exchange of rotor shaft assembly and gearbox
     • Transformer exchange                                          Adwen, Germany
     • Marine services                                               Rotorstar, Nacelle, Transformer replacement

     Adwen, Germany                                   Nordsee Ost, Germany

32
P11-E minimum facility platform T&I,                         Vent Tower & Crane Boom removal, United Kingdom
The Netherlands                                              Removal of Vent Tower and crane boom, transport and unload
Transport and installation works of a standard Satellite     items.
Platform P11-E in the Dutch Continental Shelf.

                                                           Award for best
                                                                                         2016
                                                           safety performance of
                                                                                      tform T&I,
                                                           P11-E minimum facility pla
                                                           The Netherlands

Decommissioning vent tower Thames, United Kingdom

                                                                                                                          33
New GeoSea vessels

      Offshore Heavy Lift DP 2 Vessel ‘Apollo’

      The new green jack-up vessel Apollo will join GeoSea’s current    GeoSea’s ambition to build one of the greenest ships
      fleet of self-propelled jack-ups. The vessel will be equipped     in the world, resulted in the following features:
      with an 800 t leg-encircling crane. The vessel deck provides a    • power generation by solar panels
      free area of 2000 m² with a load carrying capacity of 15 t/m².    • power generation by wind turbines
      The jack-up Apollo will be outfitted with 84.2 m long lattice     • highly efficient cooling-water system
      legs that can be extended to 106.8 m allowing her to operate      • recuperation of heat from the engines to warm up the
      in water depths of up to 70 m. Apollo will have standard            accommodation
      accommodation for 92 persons on board, upgradable to 150,         • pollution prevention of sea and air discharges
      and will be launched in October 2017.                             • biodegradable oil and grease
                                                                        • recuperation of rain water
      The greenest vessel of the jack-up fleet                          • low NO and SO emissions for engines
      With Apollo, GeoSea keeps the lead of environmental friendly      • level of insulation above standards
      innovation. Apollo combines supreme operability with the          • use of motion sensors for lighting
      highest green standards. She will remain the greenest vessel of   • compliant with ENVIRO+ requirements (ABS class notation
      the entire jack-up fleet, and one of the greenest in the world.     for environmental protection)
                                                                        • sails with a Green Passport
      Apollo complies with the ENVIRO+ certificate. This is the         • optimization of use of grease
      most stringent class notation for environmental protection,       • improved sludge water system
      awarded by the American Bureau of Shipping (ABS). As such,        • streamlined shape of the hull
      the vessel meets the strictest environmental criteria in terms    • key card system for the accommodation units to reduce
      of design characteristics, management and support systems,          energy waste
      and sea and air discharges.

      Offshore Heavy Lift DP 2 Vessel ‘Apollo’

34
Next Generation
Offshore Installation Vessel ‘Orion’

‘Orion’ will feature an unrivalled combination of exceptionally    components and structures in a single shipment. With this
high transport and load capacity, impressive lifting heights       unmatched combination of high load and lifting capacity,
and green technology. The vessel will be built at COSCO in         ‘Orion’ can transport and install the next generation of giant
China and is set to be delivered in 2019.                          multi-megawatt wind turbines.

‘Orion’ will be deployed by GeoSea for the construction of the     Environmental considerations have been an important element
largest offshore wind farms, to service the oil and gas industry   of the vessel design. ‘Orion’ has dual fuel engines and can
and for decommissioning of offshore installations.                 run on natural gas (LNG). It will have a Green Passport and
                                                                   Clean Design notation. It will also have other environmental
With a total installed capacity of 44,180 kW ‘Orion’ will          innovations on board, such as a waste heat recovery system
be equipped with a high-tech crane with lifting capacity of        that converts heat from the exhaust gasses and cooling water
5,000 tons. The loads can be lifted to an unrivalled height        to electrical energy.
of more than 170 m. Deck space has been maximized to
provide exceptionally high transport and load capacity. The        The 216.5 meters long ‘Orion’, featuring DP3 capability, can
vessel can take the heaviest monopiles, jackets, wind turbine      accommodate a crew of up to 131 people.

Next Generation Offshore Installation vessel ‘Orion’

                                                                                                                                    35
GeoSea Maintenance nv                   EverSea nv                      GeoSea Procurement &
Member of the DEME Group                Member of the DEME Group        Shipping Luxembourg sa
Haven 1025 - Scheldedijk 30             Haven 1025 - Scheldedijk 30     Member of the DEME Group
B-2070 Zwijndrecht, Belgium             B-2070 Zwijndrecht, Belgium     136, Route d’Arlon
T +32 3 250 53 12                       T +32 3 250 53 12               L-1150 Luxembourg, Luxembourg
info.geoseamaintenance@deme-group.com   info.eversea@deme-group.com     T +352 26 39 30 55
www.deme-group.com/geoseamaintenance    www.deme-group.com/eversea      F + 352 26 39 30 56
                                                                        www.deme-group.com/geosea

GeoSea nv                               GeoSea Luxembourg sa            GeoSea Australia Pty Ltd
Member of the DEME Group                Member of the DEME Group        Member of the DEME Group
Haven 1025 - Scheldedijk 30             136, Route d’Arlon              Level 1/8 Clunies Road Ross Court
B-2070 Zwijndrecht, Belgium             L-1150 Luxembourg, Luxembourg   Brisbane Technology Park
T +32 3 250 53 12                       T +352 26 39 30 55              Eight Mile Plains, Brisbane
info.geosea@deme-group.com              F + 352 26 39 30 56             QLD 4113 Australia