WINDOW INSTALLATION INSTRUCTIONS THE FOLLOWING INSTALLATION METHODS ARE INCLUDED IN THIS BOOKLET: Custom Window Systems

Page created by Gloria Holmes
 
CONTINUE READING
WINDOW INSTALLATION INSTRUCTIONS

THE FOLLOWING INSTALLATION METHODS ARE INCLUDED IN THIS BOOKLET:

   Installation with Nail Fin
   Installation of a Box Frame
   Installation with Front Flange

IMPORTANT SAFETY AND PRODUCT INFORMATION − WINDOW

CAUTION: Many windows in older homes are painted with lead-based paint. Removal of old windows may disturb this paint.
Proper precautions must be taken to minimize exposure to dust and debris. Consult state or local authorities and/or go to
www.epa.gov/lead for more information.
     WARNING: To ensure safety and security and help prevent property damage, including possible damage to your window or
  !  door, close and lock windows and doors any time they are not being used for venting on a nice day, and particularly during high
winds or rain.
IMPORTANT NOTICE
Because all construction must anticipate some water infiltration, it is important that the wall system be designed and constructed to properly
manage moisture. CWS is not responsible for claims or damages caused by anticipated and unanticipated water infiltration; deficiencies
in building design, construction and maintenance; failure to install CWS products in accordance with CWS’s installation instructions; or the
use of CWS products in wall systems which do not allow for proper management of moisture within the wall systems. The determination of
the suitability of all building components, including the use of CWS products, as well as the design and installation of flashing and sealing
systems are the responsibility of the Buyer or User, the architect, contractor, installer, or other construction professional and are not the
responsibility of CWS.
CWS products should not be used in barrier wall systems which do not allow for proper management of moisture within the wall systems,
such as barrier Exterior Insulation and Finish Systems (EIFS) (also known as synthetic stucco) or other non-water managed systems. Except
in the states of California, New Mexico, Arizona, Nevada, Utah and Colorado, CWS makes no warranty of any kind on and assumes no
responsibility for CWS windows and doors installed in barrier wall systems. In the states listed above, the installation of CWS Products in
barrier wall or similar systems must be in accordance with CWS’s installation instructions. Product modifications that are not approved by
CWS will void the warranty.

CLEANING INSTRUCTIONS
  GLASS: Remove any protective film and labels and clean the glass, using a soft, clean, grit-free cloth and mild soap or detergent. Be sure
  to remove all liquid by wiping dry or use a clean squeegee.

  ALUMINUM FRAMES: The interior and exterior frame and sash are protected with a tough factory finish. Clean this surface with mild soap
  and water. Stubborn stains and deposits may be removed with mineral spirits. DO NOT use abrasives. DO NOT scrape or use tools that
  might damage the surface.

  VINYL FRAMES: The vinyl frame may be cleaned using the same method as the glass. For stubborn dirt, a “non-abrasive" cleaner such as
  Bon-Ami® or Soft Scrub® may be used. Do not use solvents such as mineral spirits, toluene, xylene, naphtha or muriatic acid as they can
  dull the finish, soften the vinyl and/or cause failure of the insulated unit seal. Keep door tracks clear of dirt and debris. Keep weep holes
  open and clear of obstructions.

DO NOT use abrasives. DO NOT scrape or use tools that might damage the surface. DO NOT use inappropriate solvents or brickwash or
cleaning chemicals. If you do, permanent damage can result and the product failure, loss or damage would not be covered by the Limited
Warranty.

BY PURCHASING, INSTALLING OR USING CWS PRODUCTS (INCLUDES CWS GOODS AND CWS SERVICES), YOU AGREED TO THE TERMS OF THE
LIMITED WARRANTY AND YOU AND CWS FURTHER AGREE TO ARBITRATE DISPUTES ARISING OUT OF OR RELATING TO CWS PRODUCTS, AND
YOU WAIVE ANY RIGHT TO PARTICIPATE IN A CLASS ACTION RELATED TO CWS PRODUCTS unless you notify CWS of your decision to opt out of the
Arbitration Agreement no later than ninety (90) calendar days from the date you purchased or otherwise took ownership of Your CWS Goods. Opting
out of the Arbitration Agreement will not affect the coverage provided by any applicable limited warranty pertaining to Your CWS Products. For opt out
information and additional details please read the Limited Warranty and Arbitration Agreement for your CWS Products at www.CWS.com/arbitration.

CWS – 1                                                                © 2022 CWS                                             Window Installation Instructions
ROUGH OPENING VERIFICATION AND PREPARATION (ALL METHODS)

 YOU WILL NEED TO SUPPLY:                                TOOLS REQUIRED:
 • Moisture resistant shims/spacers                      • Tape measure               • Stapler                             • Screw Gun with
                                                                                                                              a Phillips Driver bit
 • Fasteners (see nail fin anchor instructions           • Level                      • Scissors or utility knife
   and tables at the end of this booklet)                                                                                   • Drill with 1/8", 5/32",
                                                         • Square                     • Small flat blade
                                                                                                                              3/16" & 3/8" drill bits
 • Closed cell foam backer rod/sealant backer                                           screwdriver
                                                         • Hammer
                                                                                                                            • 1/8" Allen wrench
 • High quality, multi-purpose sealant     SEALANT
                                           SEALANT
                                                                                      • Sealant Gun

Other construction materials may be required. Read and understand the instructions and inspect the wall conditions before you begin.
Store windows in upright position, out of direct sunlight.

                        TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE WINDOW INSTALLATION.

1      REMOVE THE EXISTING WINDOW
                                                                                                                    Interior

                                                                                                                           1A
                                                                                                                           A
                                                                                                                                                Interior

   CAUTION: Many windows in older homes are painted with lead-based paint. Removal of old                                                         B
                                                                                                                                                  1B

   windows may disturb this paint. Proper precautions must be taken to minimize exposure to
   dust and debris. Consult state or local authorities for more information.
A. Remove the exiting window and dispose of it properly.
B. Make any modifications or repairs to the opening at this time.
C. Cut the stucco and existing window fin along the opening sill to ensure the stucco does not
   project above the sill framing.                                                                                  Inte                       Inte
                                                                                                                        rior                       rior

D. Clean the rough opening by vacuuming all dust and debris.

2      PREPARE THE OPENING
A. Measure the width and height of the opening frame. The new window must be 1/2" to 3/4"
   smaller in width and height.
B. Seal or apply flashing to the opening according to your specific wall condition.
   These instructions were developed and tested for use with wall systems designed to manage
   water. These instructions are not to be used with any other construction methods or window
   frame types. Building designs, construction methods, building materials, and site conditions                                               2A
                                                                                                                                              1A
   unique to your project may require an installation method different from these instructions and/
   or additional care. Determining the appropriate installation method is the responsibility of you,
   your architect, or construction professional.
C. Dry fit the window into the opening.
D. Install and level sill shims. Place 1" wide x 1/4" to 3/8" thick shims 1/2" from each side. Keep
   shims back 1/2" from the interior face of the window. Place additional shims under each mullion
   and sliding window interlocker.
E. Attach shims to prevent movement after they are level.
                                                                                                                                         1B
                                                                                                                                         1D
   NOTE: Improper placement of shims may result in bowing the bottom of the window.

3      PREPARE THE WINDOW FOR INSTALLATION

A. Remove plastic wrap and cardboard packaging from the window. Do not cut checkrail bands (if present) or remove plastic or foam
   shipping spacers located between the window sash and frame. DO NOT open the window until it is securely fastened.
B. Inspect the product for any damage such as cracks, dents or scratches. DO NOT install damaged windows.
C. Remove hardware (if necessary). Label it and set aside in a protected area.
D. Read the entire instruction before proceeding.

CWS – 2                                                             © 2022 CWS                                                  Window Installation Instructions
INSTALLATION WITH NAIL FIN

                                                  R
                                                IE
                                              RR
                                             BA
                                         VE
                                     STI
                                   SI

                                                  R
                                                IE
                                 RE

                                              RR

                                                                        R
                                           BA

                                                                        IE
                            R
                          IE

                                                                      RR
                                                                             Window Top
                                          E
                        RR

                                         V

                                                                  BA
                                      TI
                      BA

                                     S

                                                                  E
                                   SI

                                                               IV
                                                 R
                    E

                                                                  Nailing Fin
                                               IE
                                 RE
                  V

                                                            ST
               TI

                                             RR

                                                          SI
               S

                                         BA
             SI

                            R

                                                      RE
                          IE
           RE

                                                     ER
                                       E
                        RR

                                      V

                                                  AT
                                   TI
                      BA

                                  S

                                                              R
                                              W
                                SI

                                                            IE
                  V E

                              RE

                                                          RR
               TI

                                                     BA
               S

                                          R
             SI

                          R

                                       IE
                        IE
           RE

                                                    E
                                     RR

                                                  IV
                      RR

                                  BA

                                                ST
                   BA

                                              SI
                                 E

                                           RE
                E

                               IV
                V

                             ST
             TI

                                        ER
           S

                           SI

                                                  ER
                                     AT
         SI

                        RE
       RE

                                                 I
                                   W

                                              RR
                    ER

                                             BA
                 AT

                               R
                             IE

                                          E
               W

                                         V
                           RR

                                      TI
                        BA

                                     S
                                   SI

                                                                                    Window Bottom
                       E

                                 RE
                      V
                 S TI
               SI
             RE

       1               SET AND FASTEN THE WINDOW                                                                                       1      SET AND FASTEN THE WINDOW
                                                                                                                                               (continued)
       A. Insert the window into the opening on the sill spacers. Center                                                               D. Check the window placement by measuring                                Interior

          the window between jambs.                                                                                                       from the interior surface of the window frame
                                                                                                                                          or jamb extension to the interior surface of                            2C
       B. Drive two fasteners,
                       Corner    one near each end of the top nailing fin.
          Reference product
                       Flashing specific Florida Product Approval drawings for                                                            the wall for consistency.
                       Tape
          anchorCorner
                 locations and size.
                           Flashing                                                                                                                                        2D
                           Tape
                                                                                                                                                                                          1
                      Top                                                                                                                                                           mm
                                                                                                                                                                                         20 3
                                                                                                                                                                                              INCHES

                                                                                                                                                                                              0 40
                                                                                                                                                                                                   2
                                                                                                                                                                                                             3
                      Flashing                                                                           2B
                                                                                                                                                                                                   50 6
                                                                                                                                                                                                        0 70
                                                                                                          2E
                      Tape
           Side
           Flashing
           Tape
Side
Flashing                                                              2B
                                                                      2E
Tape

               2B                                                                                                                      E. Drive two fasteners, one near each end of the sill nailing fin.
              2B

                                                                                                                                       F. Check window operation. Adjust shims to correct any issues with
                                                                                                                                          plumb, square, operation or reveal.

       C. Plumb and square the window using shims at the locations
          shown. Adjust shims to plumb and square the window. Keep                                                                     G. Close and lock the window.
          shims 1/2" short of window frame depth.
                                                                                                                Interior View          H. Finish driving fasteners into the nailing fin. Reference product
             DO NOT shim above                                                   Interior
                                                                                                    1”                                    specific Florida Product Approval drawings for anchor locations
             the window. Additional
                                                                                                                                          and size.
             shims are required at                                                                                 2C
             screw locations for large
             units and combinations.                                              2C                Mid
                                                                                                                                       I. Install exterior selant between the window frame and the finished
             Reference product                                                                                                            wall material. Refer to the exterior sealant instructions at the end
             specific Florida Product                                                                                                     of this booklet.
             Approval drawings for                                                                  1”
                                                                                                          For windows over 53” tall.
             anchor locations and size.

       CWS – 3                                                                                                                  © 2022 CWS                                           Window Installation Instructions
INSTALLATION OF BOX FRAME

1      PREPARE THE WINDOW

FRAME SCREW INSTALLATION:
A. Verify pilot holes are drilled correctly according to Florida
   Product Approval drawings, and drill pilot holes (if necessary).
   Reference product specific Florida Product Approval drawings
   for anchor locations and size.

2      SET AND FASTEN THE WINDOW
A. Insert the window in the opening.                           INTERIOR VIEW
   Check to make sure the distance from
   the interior of the new window to the
   interior of the wall is consistent all
   around the window.

B. Place shims and begin driving screws
   at each predrilled hole in the window                   1

   frame or through each clip.                        in
                                                      2

 Reference product specific Florida

                                                  3

 Product Approval drawings for anchor
 locations and size.
   Shim behind each anchor location.
   NOTE: Keep shims 1/2" from the
   interior surface of the window to allow
   for a continuous interior seal and
   1/2" from the exterior surface of the
   window to allow for exterior backer
   rod and sealant.

C. Check for plumb, level, square and
   window operation. Make any necessary
   adjustments to shims and finish
   installing frame screws or clip anchors
   according to Florida Product Approval
   specifications.

D. Install interior sealant. Refer to the
   interior sealant instructions at the end
   of this booklet.

E. Install exterior sealant between the
   window frame and the finished wall
   material. Refer to the exterior sealant
   instructions at the end of this booklet.

CWS – 4                                                                        © 2022 CWS   Window Installation Instructions
INSTALLATION WITH FRONT FLANGE

                                                      Front Flange

                                                    Drain Slots

1      PREPARE THE OPENING                                                 3      SET AND FASTEN THE WINDOW
A. Dry fit the window into the opening from the exterior. Confirm          A. Insert the window into the opening by
   the flange will overlap the existing frame or stucco by at least 3/4"      placing the front edge of the window sill on                 Ex
                                                                                                                                             te
                                                                                                                                                rio
                                                                                                                                                   rV
   on all 4 sides.                                                            the opening sill and tilting the window up.                             iew

                                                                              Center the window between jambs.
   NOTE: Fix any problems before proceeding.                                                                                               3A

                                                                           B. Place shims and begin driving screws at
                                                                              each predrilled hole in the window frame.
                                              Window                          Add additional shims at the ends of the
                                               Frame
                                                                              meeting rails and as necessary to ensure
                                                                              even reveal between the frame and sashes.
                                                                              NOTE: Keep shims 1/2" from the interior
                                      3/4"                                    surface of the window to allow for a
                                      Min.                                                                                                  3C
                                                                                                                                            3D
                       1D
                       2B                                                     continuous interior seal.

                                                                           C. Check for plumb, level, square and window
                                                                              operation. Make any necessary adjustments
                                                                              to shims and finish installing frame screws.

                                                                           D. Install exterior sealant between the window
                                                                                                                                     3C

2
                                                                              frame and the finished wall material. Refer to
                                                                              the exterior sealant instructions at the end of
       PREPARE THE WINDOW                                                     this booklet.

A. Drill pilot holes (if necessary) in the new window frame.
 Reference product specific Florida Product Approval drawings

 for anchor locations and size.

CWS – 5                                                              © 2022 CWS                                          Window Installation Instructions
INTERIOR AND EXTERIOR SEALANT

Interior Sealant Instructions
   CAUTION: Use low pressure polyurethane window and door insulating foams. Follow the directions
   on the can. Do not use high pressure or latex foams.                                                       Interior
A. Insert the nozzle or straw between the rough opening and window frame. This can be done from
   the interior or exterior.
B. Place a 1" deep bead of foam approx. 1" from the interior of the frame to allow for expansion. DO
   NOT fill the entire depth of the rough opening cavity.
C. To ensure a continuous interior seal, apply sealant over the interior surface of any shims or clips
   interrupting the foam seal.
   Backer rod (as necessary) and sealant can be used in place of the low expansion foam to create the
   interior seal. However, foam has greater insulating properties. Fiberglass batt or similar insulation is
   not recommended as it can absorb water and does not act as an air seal.
   Use sealant instead of foam at all 4 sides on the interior of windows installed in masonry
   construction. Add backer rod if the gap exceeds 3/16"
   Re-check window operation and remove shipping spacers after foam installation. Excess foam may
   be removed with a serrated knife after it cures.

                                                             Backer rod
                                                             and
                                                             sealant typical

                                    3/16" or                                          Less than
                                    greater                                             3/16"

                                                1/4” Min.

Exterior Sealant Instructions                                                                                   Exterior

   CAUTION: Use a high quality, multi-purpose exterior sealant. Follow the
   directions on the cartridge.
Front Flange Windows:
A. Place a corner bead of sealant on the top, sides and bottom of the window
   along the edge of the flush flange where it meets the stucco. Leave a 2"
   gap in the sealant bead at the bottom below the weep hole location in the
   existing aluminum frame.
                                                                                                                                2"