WILD WATERWORKS AT CONFEDERATION BEACH PARK - HAMILTON, ONTARIO - Page 1 of 79
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Appendix "A" to Report HSC20048 Page 1 of 79 MASTER PLAN STUDY - MAY 2020 WILD WATERWORKS AT CONFEDERATION BEACH PARK HAMILTON, ONTARIO CITY OF HAMILTON PUBLIC WORKS DEPARTMENT, HEALTHY & SAFE COMMUNITIES BY: FORREC LTD. | CBRE | CLOWARD H2O
Appendix "A" to Report HSC20048 Page 2 of 79 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY................................................................................................................. 6 1.1 OVERVIEW............................................................................................................................................... 7 1.2 MASTER PLAN STUDY............................................................................................................................. 7 1.3 OVERVIEW OF FINDINGS......................................................................................................................... 9 1.4 THE WAY FORWARD ............................................................................................................................... 9 1.5 OPTIONS CONSIDERED .......................................................................................................................... 10 2 PURPOSE OF STUDY..................................................................................................................... 12 2.1 CITY OF HAMILTON MISSION STATEMENT.............................................................................................. 14 2.2 BACKGROUND......................................................................................................................................... 15 2.3 PROJECT GOALS AND OBJECTIVES......................................................................................................... 17 2.4 STUDY TEAM AND ACKNOWLEDGMENTS............................................................................................... 19 3 BACKGROUND REPORT REVIEW.................................................................................................. 20 3.1 CONFEDERATION BEACH PARK MASTER PLAN REVIEW & UPDATE (2010)........................................... 21 3.2 SIERRA PLANNING AND MANAGEMENT ................................................................................................ 22 3.3 CITY OF HAMILTON PUBLIC WORKS & HEALTHY AND SAFE COMMUNITIES ......................................... 23 4 SITE EVALUATION AND OBSERVATIONS....................................................................................... 24 4.1 STAKEHOLDERS WORKSHOP AND SITE VISITS...................................................................................... 25 4.2.1 SITE EVALUATION - SWOT ANALYSIS ................................................................................................... 26 4.2.2 FACILITY ANALYSIS.............................................................................................................................. 39 4.2.3 SITE EVALUATION - ANALYSIS SUMMARY............................................................................................ 45 4.3 ANNUAL ATTENDANCE PAST AND FUTURE............................................................................................. 46 4.5 ANALYSIS OF FOUR OPTIONS ................................................................................................................ 47 5 PLANNING AND PROGRAMMING SUMMARY............................................................................... 60 5.1 GUEST EXPERIENCE................................................................................................................................ 71 6 RIDES AND ATTRACTIONS............................................................................................................ 82 7 BUILDING DESIGN ....................................................................................................................... 86 8 MASTER PLAN OPTIONS............................................................................................................... 88 8.1 MARKET AND FINANCIAL ANALYSIS OF WILD WATERWORKS ............................................................. 89 8.2 OPTION 1: DO NOTHING OPTION ($5M CDN.) ANNUAL ATTENDANCE DROPS TO 90,000 IN 5 YEARS.......92 8.3 OPTION 2: REPLACE LIKE FOR LIKE ($24.92M CDN.) .......................................................................... 93 8.4 OPTION 3: MODEST ENHANCEMENTS ($40.14M CDN.) ....................................................................... 97 8.5 OPTION 4: NEW DESIGN, NEW PROGRAM ($61.12M CDN.) ................................................................. 103 9 ROUGH ORDER OF MAGNITUDE BUDGET (THREE OPTIONS) ..................................................... 110 9.1 OPTION 2: REPLACE LIKE FOR LIKE ($24.92M CDN.)............................................................................ 112 9.2 OPTION 3: MODEST ENHANCEMENTS ($40.14M CDN.)........................................................................ 113 9.3 OPTION 4: NEW DESIGN, NEW PROGRAM ($61.12M CDN.).................................................................. 114 10 CONCLUSIONS AND RECOMMENDATIONS................................................................................ 116 10.1 CONCLUSIONS...................................................................................................................................... 117 10.2 RECOMMENDATIONS ........................................................................................................................... 117 11 APPENDIX .................................................................................................................................. 118 A-1 MARKET AND FINANCIAL ANALYSIS OF WILD WATERWORKS OPTIONS................................................ 118 A-2 AQUATIC ENGINEERING FACILITY REVIEW REPORT + RECOMMENDATIONS......................................... 174 A-3 PROGRAM OPTIONS................................................................................................................................ 198 B CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 1
Appendix "A" to Report HSC20048 Page 3 of 79 LIST OF FIGURES FIGURE 1: AERIAL PHOTOGRAPH - EXISTING CONDITIONS. (GOOGLE EARTH) ................................................... 16 FIGURE 31: WATER PARK ATTRACTIONS PROGRAM OPTION 3............................................................................ 78 FIGURE 2: SKETCH-LANDS OF CONFEDERATION BEACH PARK (SURVEYS) ........................................................ 16 FIGURE 32: GUEST AMENITIES................................................................................................................................. 79 FIGURE 3: SWOT ANALYSIS - ARRIVAL AND FACILITIES......................................................................................... 29 FIGURE 33: REVENUE FACILITIES............................................................................................................................ 80 FIGURE 4: SWOT ANALYSIS - RIDES AND ATTRACTIONS........................................................................................ 33 FIGURE 34: WATER PARK ATTRACTIONS PROGRAM OPTION 4............................................................................ 81 FIGURE 5: SWOT ANALYSIS - AMENITIES, LAYOUT AND OPERATIONS.................................................................. 37 FIGURE 35: BUILDING DESIGN, FUNCTIONAL RELATIONSHIP DIAGRAM............................................................. 87 FIGURE 6: ARRIVAL PLAZA AND TICKETING AREA COMPARISONS - FIGURE 36: REPLACE LIKE FOR LIKE PROJECT CAPACITY PLAN.......................................................................... 94 EXISTING 1983 / CURRENT REQUIRED / UPDATE................................................................................ 40 FIGURE 37: REPLACE LIKE FOR LIKE MASTER PLAN............................................................................................. 95 FIGURE 7: FOOD AND BEVERAGE FACILITY AREA COMPARISONS - FIGURE 38: REPLACE LIKE FOR LIKE CIRCULATION.............................................................................................. 96 EXISTING 1983 / CURRENT REQUIRED / UPDATE................................................................................ 41 FIGURE 39: REPLACE LIKE FOR LIKE PHASING...................................................................................................... 96 FIGURE 8: MALE/FEMALE CHANGE FACILITIES AREA COMPARISONS - EXISTING 1983 / CURRENT REQUIRED / UPDATE................................................................................ 42 FIGURE 40: MODEST ENHANCEMENTS PROJECT CAPACITY PLAN...................................................................... 99 FIGURE 9: RETAIL AREA COMPARISONS - EXISTING 1983 / CURRENT REQUIRED / UPDATE.......................... 43 FIGURE 41: MODEST ENHANCEMENTS MASTER PLAN......................................................................................... 101 FIGURE 10: ADMIN/FOH AREA COMPARISONS - EXISTING 1983 / CURRENT REQUIRED / UPDATE............... 44 FIGURE 42: MODEST ENHANCEMENTS CIRCULATION........................................................................................... 102 FIGURE 11: LIKE FOR LIKE OPTION.......................................................................................................................... 52 FIGURE 43: MODEST ENHANCEMENTS PHASING................................................................................................... 102 FIGURE 12: MODEST IMPROVEMENTS OPTION...................................................................................................... 55 FIGURE 44: NEW DESIGN PROJECT CAPACITY PLAN............................................................................................. 105 FIGURE 13: NEW DESIGN OPTION............................................................................................................................ 58 FIGURE 45: NEW DESIGN MASTER PLAN................................................................................................................ 107 FIGURE 14: LOUNGING AREA COMPARISONS - EXISTING 1983 / CURRENT REQUIRED / UPDATE.................. 62 FIGURE 46: NEW DESIGN CIRCULATION.................................................................................................................. 108 FIGURE 15: PARK SIZE REQUIREMENT WITH INCREASED ATTENDANCE - FIGURE 47: NEW DESIGN PHASING.......................................................................................................................... 108 EXISTING 1983 / CURRENT REQUIRED / UPDATE............................................................................. 63 FIGURE 48: WILD WATER WORKS WP R.O.M. ESTIMATE SUMMARY................................................................... 111 FIGURE 16: PARK SIZE REQUIREMENT WITH INCREASED ATTENDANCE - FIGURE 49: WILD WATER WORKS WP R.O.M. ESTIMATE OPTION 2 LIKE FOR LIKE ........................................... 112 EXISTING 1983 / CURRENT REQUIRED / FUTURE............................................................................. 64 FIGURE 50: WILD WATER WORKS WP R.O.M. ESTIMATE OPTION 3 MODEST IMPROVEMENTS ....................... 113 FIGURE 17: WATER RIDES AND WATER ATTRACTIONS ENTERTAINMENT CAPACITY COMPARISONS EXISTING 1983 / CURRENT REQUIRED / UPDATE............................................................................. 65 FIGURE 51: WILD WATER WORKS WP R.O.M. ESTIMATE OPTION 4 NEW DESIGN, NEW PROGRAM ............... 114 FIGURE 18: WHAT IS ENTERTAINMENT UNITS PER HOUR (EUH)?........................................................................ 66 FIGURE 19: CURRENT ENTERTAINMENT CAPACITY ANALYSIS - GUEST DISTRIBUTION..................................... 66 FIGURE 20: ENTERTAINMENT CAPACITY DISTRIBUTION....................................................................................... 67 FIGURE 21: CURRENT ENTERTAINMENT CAPACITY ANALYSIS - ENTERTAINMENT UNITS PER HOUR.............. 67 FIGURE 22: EXISTING NUMBER OF WATER RIDES AND WATER ATTRACTIONS BY GUEST TYPE - GUEST SEGMENTATION......................................................................................................................... 68 FIGURE 23: NUMBER OF RIDES AND ATTRACTIONS BY EXPERIENCE - EXPERIENCE SEGMENTATION........... 68 FIGURE 24: CURRENT ENTERTAINMENT CAPACITY ANALYSIS ENTERTAINMENT UNITS PER HOUR............................................................................................... 69 FIGURE 25: GUEST EXPERIENCE OPTION 2............................................................................................................ 73 FIGURE 26: GUEST EXPERIENCE OPTION 3............................................................................................................ 73 FIGURE 27: GUEST EXPERIENCE OPTION 3............................................................................................................. 74 FIGURE 28: KEY PROGRAMMING METRICS............................................................................................................ 75 FIGURE 29: GUEST AMENITIES................................................................................................................................. 76 FIGURE 30: REVENUE FACILITIES............................................................................................................................ 77 2 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 3
Appendix "A" to Report HSC20048 Page 4 of 79 219 Dufferin Street Suite 100C Toronto Ontario, Canada M6K 3J1 T 416 696 8686 F 416 696 8866 FORREC.COM Romas Keliacius, Senior Project Manager Healthy and Safe Communities Recreation City of Hamilton Attention: Romas Keliacius Romas.Keliacius@hamilton.ca Master Plan Study Wild Waterworks at Confederation Beach Park PROJECT #18-185 May 4th, 2020 Dear Romas, FORREC is pleased to submit our FINAL report for the Master Plan Study of Wild Waterworks at Confederation Beach Park. Our report follows the agreed Scope of Work and provides you with an objective evaluation and analysis of existing conditions, options for programming and redevelopment at four levels. In addition to the work completed by the FORREC team, Cloward H2O Aquatic Engineers have reviewed existing aquatic facilities and have provided detailed recommendations. Their findings are in the report appendices. CBRE have provided a Market and Financial Analysis Valuation and Advisory Services for the water park which we have utilized to help inform reinvestment levels for your consideration. Their findings are in the report appendices. Our report provides you with an evaluation and analysis of the existing parkland, vehicular movements (bus/car parking), required for Wild Waterworks. We have also provided requirements for food and beverage as well as entertainment facilities to improve the water park and dry land recreation extending the seasonal use of the park. Please feel free to contact me directly to respond to any questions you may have on our report. Yours truly, Glenn A. O’Connor, OALA, FCSLA, ASLA Senior Director Water Parks, FORREC Ltd. cc. Scott Torrance, Practice Leader, Landscape Architecture Studio Matthew Dawson, Senior Director Steven C Rhys, Executive Vice President 4 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O
Appendix "A" to Report HSC20048 01 EXECUTIVE SUMMARY Page 5 of 79 1 1 EXECUTIVE SUMMARY 1.1 OVERVIEW 1.2 MASTER PLAN STUDY Wild Waterworks at Confederation Beach Park, is EXECUTIVE This Master Plan Study investigated the feasibility a family, outdoor seasonal water park located on and economic viability of Wild Waterworks based Lake Ontario between the Queen Elizabeth Way on varied levels of investment; including no and Lake Ontario in the City of Hamilton. investment and replacing rides/attractions as the SUMMARY The 4.9hectare (12.1 acre) water park is owned current attractions approach their end of life. by the City of Hamilton and managed by the Hamilton Conservation Authority. The water park A detailed SWOT analysis of existing facilities was is a recreation and entertainment resource for the carried out for the overall park which guided a public that opened in 1983. range of potential solutions to resolve known or newly identified issues. At the time of it’s opening 35 years ago, water parks were still relatively new in the market, Four (4) options were objectively considered for consequently many of the features that we know the water park to provide a comprehensive range and enjoy today, either did not exist, or were of solutions for consideration by Committee and just developing. At the time, Wild Waterworks ultimately, Council of the City of Hamilton. was a new and innovative facility, well ahead of This review of options assessed the existing Wild its time and offered a great family experience. Waterworks Park and provided recommendations Over the years Wild Waterworks has become a for improvements and redevelopment. The viability much -loved, family Regional water park. Guest of the waterpark was considered together with expectations have evolved significantly since the opportunities for improvement and methods of park opened in 1983. Unfortunately, given the increasing annual attendance at the waterpark. age and condition of the rides/attractions and guest areas, the current guest experience is well below the expectations of today’s guest and the market in general. The issue can be summarized as “The guest gets what they pay for and paid for what they got”. In other words, the cost to attend is relatively low and so is the entertainment experience. An important issue is the age of the facility and specifically, the mechanical components and individual water attractions. Each of these components have a limited life expectancy, many have already exceeded that service life. These components require an increasing amount of capital annually to maintain the facility in operating condition until it no longer proves to be economical to operate. A better understanding of lifecycle and replacement costs are required to make better informed decisions and plan for capital expenditures. This study addresses this issue and provides four (4) options for courses of action. The proposed enhancements to the water park are intended to address this situation and enhance guest experience and increase overall annual attendance. 6 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 7
Appendix "A" to Report HSC20048 01 EXECUTIVE SUMMARY Page 6 of 79 1.3 OVERVIEW OF FINDINGS 1.4 THE WAY FORWARD 1 Do Nothing: Most of the existing facilities and infrastructure The Water Park design and facilities options Do nothing, consider the probable remaining are dated and at a point in their life cycle where were planned in a comprehensive way from life cycle of all facilities. they require major refurbishment or replacement. the standpoint of a guest, while considering Others are in reasonable repair and require only opportunities for future expansion. The features minor modifications. are a major component of this destination to create a unique place aimed at an enhanced Many of the weaknesses identified throughout and memorable guest experience. As with any 2 Replace Like for Like: the water park are largely the result of the age park reinvestment, the investment is tied to Replacement of existing rides, attractions, of the facility infrastructure and the pressures and facilities with same/similar. attendance and phasing to achieve the desired current attendance place on aging, end of life The options facilities. All building facilities, while generally results that can be sustained over both the considered can structurally sound, are significantly undersized short and long term. Planning and design work address the issues and opportunities identified be summarized as to meet the current attendance levels and are in the Analysis task. We proposed a range of follows: Modest Enhancements: poorly distributed throughout the site. This 3 solutions to enhance guest experience, improve Replacement of rides and attractions with creates circulation congestion issues throughout, the mix of rides and attractions to provide new, the addition of new dry/wet attractions, and particularly at the entrance area, negative guest improved operational systems more interesting challenges to meet a changing experience and the loss of potential revenue. demographic and increase potential and Outdated POS (Point of Sale) systems compound sustained park attendance. these challenges by reducing the efficiency Wild Waterworks opened in 1983 and achieved with which staff can serve guests’ needs. The its highest annual attendance, with just over 4 New Design: attractions and infrastructure are reaching, at the New design, rides and attractions, and 153,000 guests in its first year. Attendance over end of, or far past a reasonable lifespan and are facilities to meet future guest needs. the past 35 years has averaged and stabilized at having difficulty functioning under the stress of approximately 110,000 with peak attendance of peak attendance days. 140,000 in 2005 and 2016. In 2018, attendance Most of the threats identified in the analysis was approximately 128,000, which was much relate directly to the insufficient size of existing better than the stabilized average. Based on building or site facilities, rides/attractions and past and current revenue, operations costs, the To assist in objectively evaluating these four The four options are presented in this study the physical degradation of attractions and park breaks even operationally at approximately options, an updated Market and Financial Analysis as well as a preferred, recommended option for their corresponding mechanical systems. These 100,000 guests per year. was completed, as well as a review of existing City consideration. Prior to advancing any of the systems, rides/attractions and facilities will Aquatic systems considering current condition Council selected options, there may be additional The analysis reviewed each of the options for the continue downward on the degradation cycle as and remaining service life. This information studies required to further assess impacts. water park, provided estimated attendance levels most have far exceeded a reasonable operating provided much needed background information This includes but is not limited to an updated for each of the four options, programming, area life cycle. for decision making and analysis purposes. traffic analysis. requirements, phasing and resultant budgets. Based on this information, redevelopment Overall, there are many challenges the park faces options were considered including a range of including a number of infrastructure issues which warranted investment levels which were tested must be addressed as soon as possible. by the feasibility consultant. To meet a range of potential attendance levels, the Concept plan options, and programming were refined to suit the warranted investment levels as supported by projected attendance. Capital investment options for revitalization were considered based on the Market and Financial Analysis of Wild Waterworks, included in Appendix 1 of this report. 8 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 9
Appendix "A" to Report HSC20048 01 EXECUTIVE SUMMARY Page 7 of 79 1.5 OPTIONS CONSIDERED Improvements to Wild Waterworks Water Park are 1 Do Nothing 2 Replace Like for Like intended to align with the 2016, City of Hamilton Strategic Plan to support the Vision, Mission, Culture and Priorities of the City of Hamilton. Do Nothing: Do nothing, consider the Replacement of existing Rides, Attractions The recommendations and background contained in probable remaining life cycle of all and Facilities with same/similar. the report will ultimately assist City staff to prepare facilities. Based on the market and a report to Public Works Committee and Healthy and Based on the market and feasibility feasibility analysis and estimated Safe Communities and ultimately, City of Hamilton analysis and estimated attendance, attendance, the overall size of Wild Council. the overall size of Wild Waterworks Waterworks would remain unchanged. would remain unchanged. Attendance Attendance for Option 1: “Do Nothing”, for Option 2: “Like for Like” will slowly would gradually decrease in the next increase over the average current 2-5 years falling well below 100,000. attendance, increasing gradually over As infrastructure, rides and attractions the next 2-5 years. The size of the water continue to age and are taken out of park will remain unchanged for this option service, it is expected that the park will as the current park area can generally become increasingly expensive to operate accommodate the attendance with new and would eventually be closed. building facilities and new rides. This Option was not considered This Option was not considered financially viable and is not financially viable and is not recommended. recommended. 3 Modest Enhancements 4 New Design Replacement of some rides, attractions, New design, Rides and Attractions and dryland climber, sheltered recreation area Facilities to meet future guest needs and for adverse rain conditions, improved attendance. ticketing systems and RFID wristbands. The water park size for Options 4: “New The water park size for Options 3: Design, New Program” would need to “Modest Enhancements” would need be increased to accommodate increased to be increased to accommodate annual (daily) attendance, as well as increased annual (daily) attendance, as provide new rides and attractions for well as provide new rides and attractions guests. Attendance will increase steadily for guests. Attendance will increase over the next 5-8 years until a new initially and stabilize after year 3 as a stabilized attendance level is achieved. stabilized attendance level is achieved. This will require additional park area and This will require additional park area and an increased service level of rides and an increased service level of rides and attractions and expanded parking facilities. attractions and expanded parking facilities. This Option is considered This Option was not considered the most financially viable and financially viable and is is recommended. not recommended. 10 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 11
Appendix "A" to Report HSC20048 02 PURPOSE OF STUDY Page 8 of 79 2 FORREC Ltd. was retained by the City of Hamilton in October 2018 to prepare a Master Plan Study, Wild Waterworks at Confederation Beach Park Hamilton. Wild Waterworks is an existing outdoor seasonal family water park, located at 680 Van Wagners PURPOSE Beach Road, between the Queen Elizabeth Way and Lake Ontario in the City of Hamilton. The 4.9hectare (12.1 acre) water park is a significant OF STUDY anchor within Confederation Beach Park – a 93hectare (228 acre) public park stretches 4 km along Lake Ontario. It is owned by the City of Hamilton and managed by the Hamilton Conservation Authority. The water park is a regional recreation and entertainment resource for the public that opened in 1983. The Master Plan Study Area is approximately 10 hectares (24.7 acres), which includes the guest drop off and adjacent parking lot to the west of the 4.9ha water park. The purpose of this Master Plan Study is to: • Review and assess the existing Wild • Investigate options for extended seasonal Waterworks Park at Confederation Park utilization. in Hamilton and provide • Prepare and update a Market and recommendations and options for Financial Analysis of Options. improvements and redevelopment. • Review existing Aquatic systems and • Create a place to draw visitors to this consider current condition and remaining destination time and time again, enhance service life. the overall guest experience and to meet current guest demands/expectations. • Undertake improvements that support City and Conservation Authority core • Provide water park rides and values. attractions targeted for a primary family demographic, designed to an International standard. This includes family from young children to teens, young adults and older adults while considering wet and dry activities. 12 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 13
Appendix "A" to Report HSC20048 02 PURPOSE OF STUDY Page 9 of 79 2.1 CITY OF HAMILTON MISSION STATEMENT 2.2 BACKGROUND In 2016, the City of Hamilton adopted a new Strategic Plan. The Master Plan Study: Wild Waterworks at Wild Waterworks is an outdoor seasonal water • The current annual attendance for the water Confederation Beach Park helps, in part, to implement this Strategic Plan. park that opened in 1983. park ranges from a low of approximately 87,000 to a high of 145,000 annual visitors. At the time of it’s opening, water parks were still The City of Hamilton intends to revitalize Wild relatively new in the market, consequently many Waterworks water park facilities to enhance of the features that we know today, either did To be the best place to raise a child and age successfully. the guest experience and increase attendance not exist, or were just developing. (Wet n’ Wild in “OUR VISION” Being the best place to raise a child and age successfully means Orlando, is generally considered the first large- scale water park in North America which opened over a sustained period of time. • Target future annual attendance was based on having an inclusive community that actively engages in making Hamilton a better place for everyone. It is creating an accessible in June 1977). Since that time, rides/attractions the 2018 CBRE Market and Financial Analysis environment that encourages the positive development of have evolved significantly, so have the guest of Options and were mutually agreed to during children as they move towards being healthy adults and seniors, expectations. the study. Increases above current attendance supporting residents through all of life’s stages. were expected, provided the offering of rides Further, since 1983, several additions and and attractions were updated to meet current improvements have been made to the rides and expectations. As a starting number, based attractions at Wild Waterworks including the on the Sierra Planning and Management “OUR MISSION” To provide high quality cost conscious public services that Lazy River, which opened in 1994 and the East slide complex (Proslide) which was replaced and Consultants Economic Feasibility Study (2016), an Increase of 130% attendance was contribute to a healthy, safe, and prosperous community, in a reopened in 2008. considered as a minimum guide. Note, the sustainable manner. The Outdoor water park has an existing current Sierra study did not identify an upper area of approximately 49,000 m2 (4.9ha), plus threshold figure. The updated CBRE report will adjacent parking and drop off facilities to the set target annual attendance. west. The total approximate area for review in this • Supplemental economic feasibility work was study is approximately 100,000m2 (10 ha). completed by CBRE who are familiar with “OUR CULTURE” • Collective Ownership the local Ontario market and entertainment See Figure 1: Aerial photograph - Existing • Steadfast Integrity attractions. The findings of their review conditions. (Google Earth). • Courageous Change are contained in Appendix A-1, Market and • Sensational Service Financial Analysis of Wild Waterworks Options. • Engaged Empowered Employees • The water park currently operates during a peak three to four (3-4) month season. 90-100 days approximately. A four (4) season facility is only possible with the addition “OUR • Community Engagement and Participation • Built Environment and Infrastructure of an indoor water park component. The PRIORITIES” • Economic Growth and • Culture and Diversity CBRE feasibility consultant considered if an investment of this scale is warranted and Prosperity • Our People and summarized their findings in the final report. • Healthy and Safe Performance” • As part of the study, a range of additional Communities dry land activities were explored to extend • Clean and Green the seasonal aspects of the park in both the spring and fall and to increase the offerings (City of Hamilton, Strategic Plan, 2016) during cooler or rainy summer weather. • Most of the existing facilities are somewhat dated and at a point in their life cycle where they require major refurbishment or replacement. Others are in reasonable repair and require minor modifications only. 14 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 15
Appendix "A" to Report HSC20048 02 PURPOSE OF STUDY Page 10 of 79 FIGURE 1: 14:Aerial Aerialphotograph photograph- -Existing Existingconditions. conditions. (Google (Google Earth) 2.3 PROJECT GOALS AND OBJECTIVES STUDY LIMITS WILD WATERWORKS The City of Hamilton provided an outline of their Project Goals and Objectives in their RFP, dated July 20, 2018, these are paraphrased as follows. GOALS OBJECTIVES • To investigate the feasibility of Wild 1. Determine the viability of waterpark, CONFED ERATION Waterworks based on different levels areas of strength as well as DRIVE of investment; including no investment opportunities for improvement. and exchanging like for like attractions 2. To identify methods of increasing NORTH SERVICE ROAD as the current attractions approach their annual attendance at the waterpark. end of life. QUEEN ELIZABETH WAY • To identify opportunities to maximize 3. Identify opportunities for increased the economic viability and profitability year -round guest use for all ages. of the waterpark. 4. Provide recommendations for • To provide recommendations for identified changes. new attractions to replace the existing 5. Consider outcomes of “Do Nothing” to FIGURE FIGURE 2: 13:Sketch-Lands Sketch-LandsofofConfederation ConfederationBeach Park (Surveys) Park (Surveys) rides/attractions. improve the facilities/attractions. • To provide recommendations for 6. Provide recommendations for parking expansion or re-visioning of the spaces as required for expansion of waterpark with additional attractions. recreational offerings. • To review general, current operations of the waterpark and provide suggestions for improvements and efficiencies. • To provide redevelopment options that consider a range of warranted investments. • To provide an implementation strategy for each option. STUDY LIMITS • To provide feedback on current remaining life cycle of the park without new investments. • Consider the entire study area to Identify parking, transportation and operational opportunities outside of current waterpark footprint. (study area). • To provide options for phasing redevelopment. 16 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 17
Appendix "A" to Report HSC20048 02 PURPOSE OF STUDY Page 11 of 79 2.4 STUDY TEAM AND ACKNOWLEDGMENTS To achieve these Goals and Objectives, FORREC The Water Park design and facilities were planned FORREC Ltd. led the Consulting team in the CBRE was responsible for Market and Financial prepared a program to address and consider in a comprehensive way from the standpoint of preparation of the Master Plan Study, review and Analysis of Wild Waterworks Options, included the Master Planning and design of a facility a guest while considering opportunities for some analysis of existing site, redevelopment options, here as Appendix A-1. to meet guest needs, projected increased limited future expansion. The features are a major programming and budgets. They were also Fran Hohol, Principal Author annual attendance, operational changes/ component of this destination to create a unique responsible for the preparation of the report. recommendations to adjust the current way of place aimed at an enhanced and memorable Rebecca Godfrey, Writer + Research Glenn A. O’Connor, doing business. guest experience. As with any reinvestment, the Hildegard Snelgrove, Research Assistant Principal Author and Project Manager investment is tied to attendance and phasing to Capital investment options for revitalization and achieve the desired results that can sustained Ingrid Vaivads, Programming + Design opportunities to extend the operational season over both the short and long term. Nadia Pausch, Diagrams, Figures and Assist Cloward H2O was responsible for Aquatic were considered based on the Market and Financial Analysis of Wild Waterworks Options The recommendations contained in the report with text. Engineering Facility Review Report + prepared by CBRE. will ultimately form part of a staff report to Recommendations, included here as Appendix A-2. Tony Zhou, Report Graphics Public Works and Healthy and Safe Communities Allen Clawson, Principal Author Phased implementation options for an Scott Torrance, Review and Advisor and ultimately, City of Hamilton Council for economically viable operation were provided, The study team would like to acknowledge City consideration. Photograph credits: Marketing photographs all with adequate passenger parking lots, bus, of Hamilton and Hamilton Conservation Authority vehicular and pedestrian circulation. were provided by Hamilton Conservation staff members who guided, challenged us and Authority. These were released for use in public helped to shape this Master Plan to plan to create documents and have been used throughout a great water park for the people of Hamilton and this report. Photographs of facilities or existing surrounding communities. infrastructure were taken by FORREC of Cloward H2O. 18 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 19
Appendix "A" to Report HSC20048 03 BACKGROUND REPORT REVIEW Page 12 of 79 3 3 BACKGROUND REPORT REVIEW The Master Plan Study and Capital Improvement Plan is to be done within the context of the overall Confederation Beach Park Master Plan and it’s supporting studies. This Wild Waterworks Study BACKGROUND is a supporting study identified in the PW Report (PW11005 (d) dated August 11, 2016) and as such, must work within that context. REPORT REVIEW 3.1 CONFEDERATION PARK MASTER PLAN REVIEW & UPDATE (2010) Confederation Park Master Plan Review & Update valuable littoral wetlands, savanna and dune 2010, prepared by G. O’Connor Consultants habitats within the park zone. Recommended Inc. was a comprehensive, park wide report removing underutilized and inappropriately with extensive public consultation. This report located recreational uses and re-deploying these considered new development opportunities and lands to better meet community needs. The plan activities taking into consideration: the valuable also applied new design principles to connect the lakefront setting; unifying the overall park waterfront trail and focus new development with elements; integration of the Waterfront Trail and a commercial central village area and provided pedestrian links to the Red Hill Valley and City; improved connections to trails and public while completing improvements that support the transit with surrounding neighbourhoods. Wild City and Conservation Authority core values. Waterworks was viewed as a valuable resource that required further and more detailed study with The report considered numerous upper tier potential to be expanded and enhanced. planning policies, regulations and documents to ensure any park improvements are supported by Overall, Confederation Park Master Plan Update Provincial, Region and City planning requirements. through its implementation will demonstrate A Central Recreation/Commercial Village was and showcase this City-Wide Park as example proposed subject to a feasibility and business of blending built and natural environments to case validation. The plan retained and restored enhance the quality of life for the public. 20 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 21
Appendix "A" to Report HSC20048 03 BACKGROUND REPORT REVIEW Page 13 of 79 3.2 SIERRA PLANNING AND MANAGEMENT 3.3 CITY OF HAMILTON PUBLIC WORKS & HEALTHY AND SAFE CONSULTANTS ECONOMIC FEASIBILITY STUDY (2016) COMMUNITIES, CONFEDERATION BEACH PARK MASTER PLAN – FEASIBILITY STUDY - PW11005D (2016) The Economic Feasibility Study: Confederation specifically to Wild Waterworks, however its aging Park Master Plan was prepared by Sierra facility requires capital investment. The study Planning and Management in 2013 and updated highlighted various revenue generating strategies Report PW11005d was prepared by staff of the The report provided criteria for attractions and in 2016. The basis of the analysis was a review of for the water park, including better marketing of City of Hamilton’s Public Works and Healthy and spaces warranting investment, noting that the 2010 Confederation Park Master Plan Review premium add-ons such as cabana rentals, the Safe Communities and submitted to the chair investment should generate economic return, and Update to consider the potential Commercial addition of attractions which extend the operating and members of the Public Works Committee for improve access to nature, promote sustainability, Development Opportunities and to assess the season, increasing spending by trail users, and consideration on August 11, 2016. encourage health and wellness, create recreation financial feasibility of the development proposed planning activities which cater to a broader opportunities, and capitalize on tourism potential The report made a series of recommendations in the Master Plan Review and Update. demographic. within the broader region. that provided short term budgets for additional The study found that while Confederation Beach Both short-, medium-, and long-term focus studies and mid-long-term budgets for Capital The report recommendation was for an Park has a significant draw from both its primary items were identified within the report and given reinvestment to be incorporated into the City implementation strategy for the redevelopment and secondary markets, it is “an under-developed approximate investment values. Of note for the of Hamilton Capital Budget Process. Further, of Confederation Beach Park be received and asset both in terms of economic potential and waterpark are the following: the report recommended that a program be either all or a portion of the Master Plan be level of utilization”. Given that both the primary developed to implement the capital program and incorporated into the City of Hamilton’s 10-year (Hamilton, Burlington) and secondary (Brampton, SHORT-TERM FOCUS life cycle replacements and develop a funding Capital forecast. It further endorses that Public Mississauga, Oakville, Milton, St. Catharine’s- • The development of a comprehensive master strategy for Confederation Beach Park and Wild Works and Healthy and Safe Communities should Niagara, Kitchener-Waterloo, Guelph) markets plan for Wild Waterworks ($150,000) Waterworks. These recommendations were based work with the Hamilton Conservation Authority in are expected to experience significant population • Replacement of Little Squirt Works upon both the 2010 Confederation Park Master the execution of these recommendations. growth in the coming years, Confederation ($1,500,000) Plan Review and Update prepared by G. O’Connor Beach Park is well-positioned to benefit from the Consultants Inc. as well as the 2016 Economic corresponding potential attendance increase. In Feasibility Study: Confederation Park Master Plan order to strategically position the Park, capital LONG-TERM FOCUS prepared by Sierra Planning and Management. investment is required in addition to programming • Aesthetic upgrades to the entry façade The report confirms that Confederation Beach which distinguishes the Park from nearby draws ($400,000) Park “warrants a renewed capital investment such as the Burlington waterfront. The regional over the next 10-15 years to properly manage the tourism market has the potential to drive activity park and provide adequate waterfront amenities However, there were areas of the report that and revenue in the Park, which meets the goals to support the large volume of seasonal visitors”. were unclear regarding the warranted investment and objectives of the City of Hamilton and the The report also noted several other related levels, annual attendance data and spend per Hamilton Conservation Authority, however staff information reports that were previously person. As a result of discussions with City development is required to maintain and broaden submitted over several years, from 2011-2016 of Hamilton staff, it was agreed the feasibility regional appeal. Aging assets in a “state of under- that identified a variety of issues at Confederation components which were not developed would be investment have the potential to negate any gains Beach Park which support reinvestment in both captured by a more refined report to be prepared to visitation and spending from new development” the overall Park and Wild Waterworks. by CBRE as part of this master plan study. and should be considered a priority. The study identified Wild Waterworks as Confederation Beach “Park’s largest attraction and important revenue generating facility” and noted “the future success of [Wild Waterworks] will be integral to the Park’s continued operations”. Over 20% of visitation in the Park is 22 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 23
Appendix "A" to04Report HSC20048 SITE EVALUATION AND OBSERVATIONS Page 14 of 79 4.1 STAKEHOLDERS WORKSHOP AND SITE VISITS 4 AUGUST 9, 2018 ∙ SITE VISIT & OCTOBER 25TH, 2018 ∙ SITE VISIT START-UP MEETING FORREC staff visited the site again on October 25th, FORREC senior staff attended a start-up workshop 2018 and were led on a comprehensive site walk by meeting with City of Hamilton staff to discuss the Wild Waterworks operations staff. The purpose of overall study, review scope of work and deliverables this site visit was to allow additional team members and review staff objectives for the study. This to collect any remaining background information SITE EVALUATION AND workshop was very productive and resulted in the related to existing conditions, facilities, operations, identification of several existing information gaps in rides, and attractions. available background data or studies. As a result, During the site visit, FORREC staff: the scope and deliverables for the Master Plan Study OBSERVATIONS were revised which have been included in this report. • Discussed operational history, trends, and challenges with staff. FORREC and their team also reviewed the available • Photographed and documented specific site City of Hamilton supplied background documentation elements for reference and use in the SWOT including Building Condition assessments and analysis. the available feasibility, market report by Sierra • Confirmed facility counts (i.e. washroom/shower/ Management Consultants. Based on this review, it locker counts). was agreed to retain CBRE to complete a market • Evaluated the site from the perspective of and financial analysis for Wild Waterworks which was circulation, arrangement of facilities and focused and addressed the range of options required attractions, guest comfort, aesthetic quality, and by City of Hamilton staff. The CBRE report is included park adjacencies. in this report as Appendix 1. AUGUST 29TH, 2018 ∙ SITE VISIT Our team compiled the information gathered to build and generate ideas and identify current FORREC senior staff visited the site together with issues. We reviewed the site from a guest the Aquatic Engineer Cloward H2O and City of experience standpoint and each ride/attraction Hamilton team members including operations to assess the current operational entertainment and management staff from Wild Waterworks. capacity, potential capacity, attendance and flow The purpose of this meeting and site visit was to through of all rides, circulation, food and beverage collect background information related to existing areas, washrooms, guest services, and arrival conditions, evaluate existing equipment, facilities, sequence. Parking, vehicular circulation, and the operations, rides and attractions. proximity to available expansion property (5 ha) We had a detailed site visit to gain a qualitative to the West was also considered. The review of review and debrief, to investigate the current future expansion at this phase is only preliminary features, park attributes, and challenges. to review site attributes and features, adjacency for During the site visit, FORREC and Cloward staff: expansion purposes. • Reviewed the park and pool layout, in-pool The meetings were valuable and allowed a hydraulic conditions, general structures, collaborative effort with input from all who waterproofing or coating issues and other attended. Stakeholder participation was important items as practical to gain a comprehensive to allow a comprehensive range of ideas and understanding of existing conditions observations to be shared between the parties. • We discussed operational history and past repair Site visits led by operational staff were critical work with operations staff. stepping stones to gaining a comprehensive • Photographed and identified components, understanding of the current site, allowing us recording make/model/serial number of key to assist in the subsequent planning analysis, pieces of equipment. programming, and design phases. • Evaluated the condition and operational history of key equipment, controls, and piping. 24 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 25
Appendix "A" to04Report HSC20048 SITE EVALUATION AND OBSERVATIONS Page 15 of 79 4.2.1 SITE EVALUATION - SWOT ANALYSIS Arrival and Facilities ARRIVAL - PARKING, ENTRY, ACCESS FOOD FACILITIES - FOOD & BEVERAGE - BREAKERS STRENGTHS OPPORTUNITIES STRENGTHS OPPORTUNITIES • Mature trees in drop off circle and perimeter • Additional land available to enlarge entry zone • Recent upgrades to facility • Sufficient park area to relocate/enlarge • Bus and car drop off/turn around area • Upgrade POS system and turn styles WEAKNESSES THREATS WEAKNESSES THREATS • Queue interferes with beach seating • N/A • Inadequate bus and car parking area • Poor entry/wayfinding plaza causes backlog • Main cold storage accessed outside building • Visually unappealing entrance • Queues lines cross, creating circulation issues • Entry/park disconnected from waterfront trail • Entry is dark and small, ticket windows • Facilities densely clustered near park entrance backlogged • Concrete posts add to disorientation of plaza • No dedicated entry/exit lanes, no fast pass lane for ticket/seasons pass holders FACILITIES - GUEST SERVICES & RETAIL STRENGTHS OPPORTUNITIES • Location is clearly visible and accessible • Guest demand supports dedicated retail space FOOD FACILITIES - FOOD & BEVERAGE - OLLIE’S LANDING • Size is reasonable STRENGTHS OPPORTUNITIES WEAKNESSES THREATS • Highest revenue restaurant in the park • Sufficient park area to relocate/enlarge • Well loved by guests • Functions as both guest services and retail • N/A (separate) WEAKNESSES THREATS • Poor location, crowded • Misleading signage on administration building, • Insufficient seating guests inadvertently enter staff offices • BOH is undersized, poor garbage access FACILITIES - CHANGEROOMS & WASHROOMS STRENGTHS OPPORTUNITIES • Flow-through layout circulates guests into • Sufficient park area to relocate/enlarge park FOOD FACILITIES - FOOD & BEVERAGE - WAVES STRENGTHS OPPORTUNITIES WEAKNESSES THREATS • Current space is modest, handles small • Sufficient park area to relocate/enlarge • Only guest washroom facility in the park • No family changerooms or washrooms groups • Insufficient number of showers, lack privacy • Number of washrooms is significantly under • Insufficient locker space code WEAKNESSES THREATS • Lockers inside changeroom are an inefficient and expensive use of space • Poorly located, queue causes congestion • N/A • Queue blocks circulation, washrooms and • Understaffed - increases congestion, lowers changerooms poorly organized revenue 26 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 27
Appendix "A" to04Report HSC20048 SITE EVALUATION AND OBSERVATIONS Page 16 of 79 FIGURE 12: 3: FIGURE SWOT ANALYSIS SWOT ANALYSIS- Arrival - Arrivaland andFacilities Facilities FACILITIES - TUBE STORAGE 1 2 3 STRENGTHS OPPORTUNITIES • Tube rentals generate significant revenue • Sufficient park area to relocate/enlarge WEAKNESSES THREATS 1 • Insufficient number of tubes, inadequate • N/A space • Location is removed from water attractions 9 • Current location creates circulation congestion 4 7 3 Unsightly chain-link fence with barbed wire at Lack of access between water park and Dated signage, poorly defined entrance. park entrance. waterfront trail; insufficient bicycle parking Dark, cramped entry with only two ticket for trail users. booths. 10 FACILITIES - BACK OF HOUSE (BOH) 8 4 5 6 STRENGTHS OPPORTUNITIES 6 • N/A • Sufficient park area to relocate/enlarge 5 WEAKNESSES THREATS 2 • Severe lack of storage space • N/A • Garbage area is not buffered from waterfront trail • Staff washroom count is below code, undersized change and locker facilities 11 Frequent backlog of guests waiting to enter Ollie’s Landing is in an awkward, removed Ollie’s Landing has insufficient seating for the park, no shade or defined queuing. location and lacks prominent signage. guest demand. 7 8 9 10 11 Signage for Ollie’s Landing located on the Insufficient locker count to meet guest First Aid is undersized and poorly located for Changerooms are used for off-season Garbage pick-up area is unsightly and has no admin building is confusing to guests. demand. EMS personnel. storage. buffer from the waterfront trail users. 28 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 29
Appendix "A" to04Report HSC20048 SITE EVALUATION AND OBSERVATIONS Page 17 of 79 Rides and Attractions RIDES & ATTRACTIONS - WAVE POOL STRENGTHS OPPORTUNITIES • Reasonable size wave pool, good capacity • Provide lounge chair seating • Excellent water clarity and wave quality • Provide planting islands, shade • Centrally located with large beach area • Site additional cabanas around wave pool • Newer wave equipment, good working • Enhance wave pool backdrop condition WEAKNESSES THREATS • Wave pool requires daily makeup in water • Wave pool surfacing and tiles are degrading • Certain equipment end of life cycle (safety concern) • Beach return grating below current standards • Paving around wave pool is rough, hot to touch • No planting or shade on beach • Tubes allowed in wave pool increases lifeguarding difficulty THIS PAGE IS INTENDED TO BE BLANK RIDES & ATTRACTIONS - LAZY RIVER STRENGTHS OPPORTUNITIES • Creative river structure, well-integrated • Add water features to open space on river with site banks • Nice planting along river edges • Theme queue railing, improve guest experience • River queue functions well operationally • Both zero entry ramp and stair access provided WEAKNESSES THREATS • Caulked joints are unsightly, moldy • Long lifeguard patrol areas with blind spots • River is poorly waterproofed • Exposed pipe on beach spray nozzles poses • Insufficient propulsion traps debris safety risk • Significant leaf litter, inadequate drain grates • Degradation of the surfacing, rough to touch • Narrow width reduces capacity, increases lifeguarding difficulty 30 CIT Y OF HAMILTON | FORREC Ltd. | CBRE | CLOWARD H2O MAY 2020 MASTER PLAN STUDY WILD WATERWORKS AT CONFEDERATION BEACH PARK 31
You can also read