THE HAMPSTEAD - Premier LEED Gold Office Development

Page created by Valerie Crawford
 
CONTINUE READING
THE HAMPSTEAD - Premier LEED Gold Office Development
THE HAMPSTEAD
        BUILDING

 Premier LEED Gold Office Development
THE HAMPSTEAD - Premier LEED Gold Office Development
Exceptional office space   THE HAMPSTEAD
with a landmark address                 BUILDING

                           Five storeys built to a
                           LEED Gold Standard

                           Tailored to service the evolving needs of business,
                           The Hampstead Building offers over 58,000 sq.ft
                           of flexible, efficient floorplates and high quality
                           specifications. Nestled beside The Herbert and
                           The Hyde Buildings in The Park, Carrickmines,
                           this office development is a real triumph in this
                           thriving commercial and retail environment.
THE HAMPSTEAD - Premier LEED Gold Office Development
THE HAMPSTEAD
   BUILDING

                Developed by Park Developments Group, The Hampstead
                Building marks an exclusive office opportunity due
                for completion in Summer 2018. Occupants will enjoy
                panoramic views of the distant Dublin Mountains courtesy
                of the extensive glazing that creates a comfortable and
                productive work environment.

                Natural light showcases the innovative interiors and the
                headquarters potential of this striking glass-panelled
                office architecture.

                                                                           4
THE HAMPSTEAD - Premier LEED Gold Office Development
An inspirational setting
    that’s conducive to
    business

    The Hampstead Building façade will feature
    polished reconstituted concrete panels and an
    energy conserving double-glazed curtain wall.
    Panels of opaque glass offer privacy and
    energy efficiency.

    Each adaptable floorplate gives potential
    occupiers functional diversity that can
    work with a company’s requirements.
    Open plan or cellular layouts can
    be easily accommodated giving
    occupiers greater flexibility as
    they choose the best interior
    office configuration.

                                                    Bright, spacious and overlooking a picturesque courtyard, the double height
                                                    reception strikes a welcoming note with its impressive 6.42m floor-to-ceiling
                                                    height. Across the second, third and fourth floors, floor-to-ceiling heights of
                                                    2.7m allows for generous vertical and horizontal configurations. Interiors
                                                    can combine private meeting rooms alongside open plan workstations.
5                                                                                                                                     6
THE HAMPSTEAD - Premier LEED Gold Office Development
A premier business and
    retail park with a sterling
    reputation
    The Park, Carrickmines is a prosperous business and retail
    park occupying a pivotal location in South Dublin. Leading        1   5       6
    international companies like Vodafone, Getty Images and                           The comprehensive nature of
    SIRO are drawn to this dynamic business destination for                           The Park has attracted many
    its high quality amenities and accessibility.                                     popular brands like McDonald’s,
                                                                                      Currys PC World, Lifestyle
    The Hampstead Building is the new superior addition                               Sports and IKEA into its
    joining The Herbert, The Hyde and The Iveagh Buildings.                           immediate environment creating
    Designed to meet LEED Gold Standards, this new office                             a diverse retail world adjacent
    development delivers excellent energy efficiency and an                           to its commercial quarter.
    innovative design style.

                                                                              7                                       8
                                                              2   3   4

                                                                                                                      9

                                                                                      1. The Park, Carrickmines
                                                                                      2. The Hyde Building
                                                                                      3. The Herbert Building
                                                                                      4. The Hyde Building
                                                                                      5. The Holborne Building
                                                                                      6. 7. 8. 9. Amenities at The Park

7                                                                                                                         8
THE HAMPSTEAD - Premier LEED Gold Office Development
Unrivalled amenities all within
    easy reach of The Hampstead                                                                               Making time for relaxation or team-building days
                                                                                                              is easy with a choice of entertainment opportunities

    Building                                                                                                  within The Park’s radius. Leopardstown Racecourse,
                                                                                                              Carrickmines Lawn Tennis Club, Dundrum Town
                                                                                                              Centre and Foxrock Golf Club offer accessible
                                                                                                              leisure pursuits for companies looking for
                                                                                                              sociable outings any time of year.

                                      The Park offers neighbouring businesses a varied and desirable
                                      selection of boutique cafés and restaurants thanks to its central
                                      walkway. Westwood Gym Leopardstown is minutes away on the
                                      M50 helping your team maintain a healthy lifestyle alongside their
                                      work schedule.

                                      Its growing directory of retail occupiers including AIB, Boots, Costa
                                      Coffee, KFC, TK Maxx, Subway and Smyths proves its magnetic
                                      allure for some of Ireland’s biggest brands.

9                                                                                                                                                                    10
THE HAMPSTEAD - Premier LEED Gold Office Development
SANDYFORD                    LEOPARDSTOWN
                                   INDUSTRIAL ESTATE                RACECOURSE                                                M50 MOTORWAY

                                               17
                                                                       18
                                                                                  19            20
                                                                                                     21                       LUAS STOP
                                                                                                                                               Neighbouring occupiers
                                   16                                                                     22
                         14   15
                    13
                                                                                                               23
                                                                                                                                               Top class business credentials and reputations are in abundance within
     12                                                                                                             24                         The Park. The Herbert, The Hyde and The Iveagh Buildings are home to
                                                                                                                                               world-renowned brands and companies enjoying easy access to a highly
                                                                                               26                                              educated workforce in a dynamic European capital.
                                                                                                                         25

          11
                                                       6                                                                                       Business                                Retail
               10
                                                                                                                                               1   The Herbert Building                3    O’Briens Wine
                                                               7                                                                    FUTURE         Park Developments Group                  TC Matthews
                    9                                                                                                              LUAS LINK       State Street                        4    AIB
                                           8
                                                                                                                                                   Getty Images                        5    Power City
                                                                                                                                                   Sysnet Global Solutions             6    KFC
                                                                                                                                                   Bimeda                              7    McDonald’s
                                                                                                                                                   SIRO                                8    Costa Coffee
                                                                                       1                                                           PTC                                 9    Currys PC World
                                                                                                                                               2   The Hyde Building                   10   dfs
                                                                                                                                                   Globalstar Europe			                11   IKEA
                                                                                                                                                   Billings Design Associates			       12   Woodie’s
                                                           2                                                                                       Hospira Ireland			                  13   Next Home
                                                                                                                                                   Prime Active Capital			             14   Home Focus
                                                                                                                                                   Wind Prospect                       15   Fifty Three Degrees North
                                                                                                                                                   Conference Partners                 16   Halfords
                                                                                                                                                   Tennysons Consulting Engineers      17   Smyths
                                                                            3                                                                      SYNERGY Global Housing			           18   TK Maxx
                                                                                                                                                   RSK Ireland			                      19   Harvey Norman
                                                                                                                                                   Home Agencies			                    20   Halpenny Golf
                                                                                                                                                   FIXIY			                            21   Lifestyle Sports
                                                                                                                                                   BCI                                 22   Boots
                                                                                                                    4                              Pentair                             23   Petshop
                                                                                                                                                   Boehringer Ingelheim			             24   Mothercare
                                                                                                                                                   ImpartX 			                         25   Heatons
                                                                                                                                                   WElink Energy Group                 26   The Iveagh Building
                                                                                           5                                                       Barcelona Housing Systems                Vodafone
                                                                                                                                                   JF Hillebrand Ireland                    NetShare
                                                                                                                                                   Citiescapes                              Carphone Warehouse
                                                                                                                                                   Donaldson Filtration Solutions           3M
                                                                                                                                                   Unwired Planet International             Subway
                                                                                                                                                   Meritas Financial Advisors               The Vanilla Pod Eatery
                                                                                                                                                   Carlton Edgeworth                        Barry & Browne
                                                                                                                                                   Triska Energy                            BB’s Coffee & Muffins
                                                                                                                                                   i3PT Certification                       Brown Cow

                                                                                                                               ENTRANCE                                                                                 12
                                                                                                                               TO THE PARK
11
THE HAMPSTEAD - Premier LEED Gold Office Development
Dublin Bus route 63 runs daily
                                                           through this business park giving

     A transport network that                              your staff a direct link to the DART
                                                           station at Dún Laoghaire. At nearby
                                                           Leopardstown and Sandyford,
     brings business your way                              Aircoach services facilitate easy
                                                           transfers to Dublin Airport.

                                                           A short walk to the LUAS at
                                                           Ballyogan Wood gives your
                                                           workforce light rail travel alternatives
                                                           into St. Stephen’s Green and beyond.

     Favourably positioned close to the M50 with instant
     access at Exit 15, this business hub enjoys a high
     volume of trade thanks to its prominent address.

     Integrated transport infrastructure links The
     Hampstead Building to the city centre, Dublin
     Airport and the Port Tunnel in less than
     30 minutes.

     A basement car park with 85 spaces is
     also part of this development giving
     commuting professionals the peace
     of mind of secure parking.

13                                                                                                    14
THE HAMPSTEAD - Premier LEED Gold Office Development
To City
                                                                                                                                               Stillorgan
     Easy striking distance                                                                                                                                             Sandyford
                                                                                                                                                                                                                    DEANSGRANGE
                                                                                                                                                                                                                                                                         SALLYNOGGIN

                                                                                                                                                         Aircoach
                                                                                                                                                        Sandyford

     Wherever your business takes you, The Hampstead Building occupies an
     advantageous location that is highly accessible. Your workforce can choose
     to travel by public transport or by car with the M50 connecting to all major
     national routes.
                                                                                                                                                                                                                                          CORNELSCOURT
                                                                                                               M50                                                                                                   FOXROCK
                                                                                                                                                         Aircoach                                                    GOLF CLUB
                                                                                                                                                       Leopardstown      Central Park
                                                                                                                        SANDYFORD

                                                                                           To Airport                                                                                                                                                      N11
                                                                                                                                                                                                            FOXROCK
                                                                                                                                                            Glencairn                        LEOPARDSTOWN
                                                                                                                                                                                              RACECOURSE

                                                                                                                                                                                     M50
     Driving                                     Public Transport

     M50                           4 mins        Luas to St. Stephen’s Green 33 mins                                                                                                                                                                                                   CABINTEELY
                                                                                                              SWORDS                                                    LEOPARDSTOWN
     Dublin Airport               26 mins        63 bus to Dún Laoghaire       37 mins                                                                        The                                                                                                 CABINTEELY
                                                                                                                                                             Gallops          Leopardstown                                                                          PARK
     Port Tunnel                  26 mins                                                                                                                                        Valley
                                                                                                             BALLYMUN
     Dún Laoghaire                 16 mins       Transport Links                                                                                                                                                    Exit 15

                                                 M50 Motorway

     Walking                                     N11                                     TO
                                                                                         GALWAY
     Ballyogan Wood Luas           12 mins       Luas Green Line                                                          Port                                                                          Ballyogan                           Carrickmines
                                                                                                                          Tunnel                                                                         Wood
                                                 Dublin Bus Route 63
                                                                                               LUCAN
                                                                                                                                                                                                                                                                                             LOUGHLINSTOWN
                                                 Aircoach                                                                                                                                                                                          Laughanstown
                                                                                                                                  DUBLIN BAY
                                                 Future Luas Link                                                                                                                                             63 Bus
                                                                                                                                                                                                             The Park
                                                                                           BALLYMOUNT
                                                                                                              M50

                                                                                                                                                                                                                        Entrance                                        Cherrywood
                                                                                                                                                                                                                                                     M50
                                                                                                                        Exit 15
                                                                                                                                                                                    CARRICKMINES
                                                                                                             CARRICKMINES
                                                                                                                                                                                                                                   CARRICKMINES
                                                                                                                             R117                                                                                                   GOLF CLUB                         CHERRYWOOD
15                                                                                       Location overview                                                                                                                                                                                   Brides Glen   16
THE HAMPSTEAD - Premier LEED Gold Office Development
Ground Floor                                                              First Floor

                                     Not to scale. Indicative purposes only.                                   Not to scale. Indicative purposes only.

     Accommodation Schedule		                                                  Accommodation Schedule
     (GIAs)         Sq.M    Sq.Ft                                              (GIAs)         Sq.M    Sq.Ft
     Ground Floor   1,032   11,108                                             Ground Floor   1,032   11,108
     First Floor    996     10,721                                             First Floor    996     10,721
     Second Floor   1,133   12,196                                             Second Floor   1,133   12,196
     Third Floor    1,133   12,196                                             Third Floor    1,133   12,196
     Fourth Floor   1,133   12,196                                             Fourth Floor   1,133   12,196
     Total          5,427   58,417                                             Total          5,427   58,417
     Basement       1,707   18,374                                             Basement       1,707   18,374

17                                                                                                                                                       18
Second, Third & Fourth Floors                                                                Basement

                                                                                                                                                                                                                                                                                     Entrance/
                                                                                                                                                                                                                                                                                     Exit ramp

                                                                                                                                                                                                    LOBBY/STAIR

                                                                                                                                                          LOBBY                                                                                     34    33      32    31    30

                                                                                                                                                                                                    LIFT    LIFT
                                                                                                                                                                                                                                                   E-CAR E-CAR E-CAR   E-CAR E-CAR

                                                                                                                                                      STORE

                                                                                                                                                                          LOBBY
                                                                                                                                                                                                                     LOBBY
                                                                                                                                                                                           SHOWER
                                                                                                                                                                                                                                                    CYCLE STORE
                                                                                                                                                                  PLANT
                                                                                                  < Entrance/Exit ramp                                                        WASTE ROOM
                                                                                                                                                                                                                  ACC. WC
                                                                                                                                                                                                                             SHOWER   TELECOMS
                                                                                                                                                                                                                                        ROOM
                                                                                                                                                         STAIR

                                                                                                                                         NO ENTRY

                                                                               Basement extends

                                                                                                                                                                                                                                                                                                 Basement extends
                                                                                 >                                                                                                                                                                                                                 >

                                     Not to scale. Indicative purposes only.

     Accommodation Schedule
     (GIAs)         Sq.M    Sq.Ft
     Ground Floor   1,032   11,108
                                                                                                                                                                                   Basement extends

                                                                                                                                                                                                                        >
                                                                                                                                                                                                                                                 Not to scale. Indicative purposes only.
     First Floor    996     10,721
     Second Floor   1,133   12,196                                                                Infrastructure 1,707 Sq.M / 18,374 Sq.Ft             (GIAs)
     Third Floor    1,133   12,196                                                                85 x                                  Car park spaces
     Fourth Floor   1,133   12,196                                                                29 x                                              Cycle bays
     Total          5,427   58,417                                                                5    x                         Designated e-car bays
     Basement       1,707   18,374                                                                2    x      Male & female changing & shower facilities

19                                                                                                                                                                                                                                                                                                                  20
Potential Layout 1                                                                                              Potential Layout 2
     For Professional Services                                                                                       For Technology Services

                                                                           Not to scale. Indicative purposes only.                                                                              Not to scale. Indicative purposes only.

     Infrastructure   1 Person per 6.9 Sq.M                                                                          Infrastructure   1 Person per 7.1 Sq.M

      140   x   Workstations                  2   x   Boardrooms   1   x   Breakout space                             134   x   Workstations                  4   x   Meeting rooms     3   x   Breakout spaces

      6     x        Offices                  4   x   Copy areas   1   x   Reception area                             5     x         Offices                 2   x   Coffee stations   1   x    Reception area

                                                                                                                      2     x   Boardrooms

21                                                                                                                                                                                                                                        22
Specification

     58,417 SQ.FT                           OCCUPANCY
                                            Means of Escape
                                                                               Plant Rooms
                                                                               Dead Load - 9.4 kN/m 2,
                                                                                                                        The stability of the building is
                                                                                                                        provided by reinforced concrete
                                                                                                                                                                  INTERNAL OFFICE FINISHES
                                                                                                                                                                  Floors
                                                                                                                                                                                                        Ceilings
                                                                                                                                                                                                        Skim and paint.
                                                                                                                                                                                                                                               MECHANICAL INSTALLATION
                                                                                                                                                                                                                                               Design Criteria
                                                                                                                                                                                                                                                                           Acoustic Levels
                                                                                                                                                                                                                                                                           Open Plan Office:      NR   35
     OF LEED GOLD OFFICE SPACE              3 no. means of escape              Live Load - 7.5 kN/m 2.                  stairwells and lift shaft /central core   Raised Access Floor, Screw down,                                             Winter Temperature:         Toilet Area:		         NR   40
                                            2 no. means of escape if                                                    area. The external plant is screened      600 mm x 600 mm, Galvanised           Balustrades                            Outside                     Kitchen Area:		        NR   45
     The Hampstead Building is              floor is subdivided.               Area of Roof Outside Plant Areas         using cladding fixed to a steel           steel encapsulated board core.        Painted mild steel handrails           -5�C db 100% Saturated.     Plant Room:		          NR   50
     targeting LEED Gold Certification.                                        Including External Plant Area            structure and a raised deck will                                                and balustrade.
                                            Internal Climate                   Dead Load - 13.5 kN/m 2,                 be provided to house the external         Ceilings                                                                     Open Plan Office            Air Quality
     Secure cyclist parking and shower      1 person per 8 m 2.                Live Load - 4.0 kN/m 2.                  steelwork in these zones.                 “E” 600 mm x 600 mm ceiling tile,                                            21-23�C No RH Control.      Rooms, such as toilets, will be
     facilities promoting sustainable                                                                                                                             E15 suspended grid system. Or         TOILETS                                                            put in under negative pressure
     transport.                             Lift Provision		                   Car Park                                                                           E.A. Proprietary transition strips/   Walls and Floors                       Toilets                     towards surrounding room spaces,
                                            1 person per 8 m 2.                Podium - Dead Load - 14.5 kN/m 2,        EXTERNAL FINISHES                         trims to be used at junctions with    Tiled walls and floors in toilets.     19-21�C No RH Control.      i.e. more exhaust air than make-up
     Proximity to Luas and Dublin Bus.                                         Live Load - 4.0 kN/m 2,                  Façade                                    plasterboard.                                                                                            air. Exhaust discharge points
                                            Toilets 		                         Fire tender wheel load - 50kN/m 2,       Structural Silicone Glazed System /                                             Ceilings                               General Circulation Area    at roof level.
     Detailed energy modelling to           1 person per 10 sq.m as per BCO    Basement - Dead Load - 10.8 kN/m2,       Polished Recon Stone Cladding.            Columns                               Gyproc Moisture Resistant              19-21�C No RH Control.
     validate the proposed energy cost      recommendations and provisions     Live Load - 2.5 kN/m 2.                                                            Encased in plasterboard and           plasterboard skimmed and painted.                                  Operating Periods
     savings.                               as per BS6564-1 2014.                                                       External Landscaped Areas                 skimmed and painted.                                                         Comms                       The building will operate on a
                                                                                                                        Mixed species shrub, grass and fern                                             Doors                                  23 +- 2�C No RH Control.    24 hour / 7 days a week basis.
     7,500 sq.ft of green roof minimising                                      FLOOR HEIGHTS                            planting, and selected stone paving.                                            Toilet Cubicle System.                                             The office areas will be assumed
     heat island effect.                    PLANNING MODULE                    Reception and ground       floor                                                   RECEPTION                                                                    Summer Temperature:         to operate on a 12 hour day with
                                            6 m square generally throughout.   Floor-to-ceiling:           6,420 mm     Roof                                      Walls and Floors                      Sanitary Fittings                      Outside                     extended operation on a floor-by-
     Energy efficient infrastructure to                                        Office slab-to-slab:         3,720 mm    Extensive Sedum Roof.                     Tiled walls and floors in building    Concept wall mounted WC pan            27�C db 20�C wb.            floor basis achievable through the
     serve each tenant space.                                                  Office floor-to-ceiling:     2,700 mm                                              entrance.                             Strada 50 cm rectangular                                           BMS. Computer and individual hub
                                            STRUCTURAL GRID                    Raised floor zone:              150 mm   Main Entrance Doors                                                             Washbasin 1 hole mixer, classic        Open Plan Office            rooms will operate on a 24 hour
     Energy efficient LED lighting with     8.2 m x 7.8 m and 8.8 m x 7.8 m.   Ceiling zone:                  550 mm    Automatic Bi-parting sliding doors.       Ceilings                              single lever. Profile 21 waterless     22-25�C No RH Control.      cooling basis, utilising their own
     sophisticated controls to minimise                                                                                                                           Suspended Metal Frame                 urinal bowl.                                                       tenant fit-out cooling plant (riser
     electrical consumption.                                                                                            U – Values                                plasterboard ceiling, skimmed                                                Comms                       space and plant space provided for
                                            FLOOR LOADINGS                     STRUCTURE                                Flat roof:			0.18                         and painted.                                                                 23+- 2�C No RH Control.     such tenant plant). Riser provision
     Comprehensive commissioning            Office Floors                      Typical reinforced concrete flat slab    External walls:			0.21                                                          BUILDING MAINTENANCE                                               also allowed for fully operable staff
     and testing to ensure energy           Dead Load - 9.0 kN/m 2,            roof and floor structure supported       Ground/Exposed floors:  0.21              Columns                               Façade Window Cleaning                 Internal Heat Gains         canteen / kitchen adjacent to stair
     efficient operation.                   Live Load - 5.0 kN/m 2             on RC columns on pad foundations.        Curtain wall glazing:		 1.40              Encased in plasterboard and           MEWP/ Telescopic brush.                People:                     core no. 2. These services will be
                                            (including partitions).            The basement consists of a tanked        Insulation curtain wall                   skimmed and painted.                                                         75 w per person sensible.   provided as part of a tenant fit-out.
     Low water usage sanitary fittings.                                        reinforced concrete slab and wall        spandrel panels:		      1.00                                                                                           55 w per person latent.     This may also require additional
                                            Lift Lobby and Toilet Areas        with a series of reinforced concrete                                                                                     BASEMENT FACILITIES        & PARKING                               cooling outside of normal hours.
                                            Dead Load - 9.0 kN/m 2,            beams throughout, as required.           Airtightness                              ESCAPE STAIRS                         Car park spaces x           85         Lighting:
                                            Live Load - 5.0 kN/m 2                                                      Target = 3m3/m2/hr @ 50Pa                 Walls and Floors                      Bicycle spaces  x           29         12 w/m 2.
                                            (including partitions).                                                                                               Tiled walls and floors in             Lockers         x           48
                                                                                                                                                                  escape stair areas.                   Showers         x            7         Equipment:
                                                                                                                                                                                                                                               25 w/m 2.

23                                                                                                                                                                                                                                                                                                                 24
Specification

     Heating System                           Air-Conditioning System                 Sustainability Target                  Switchgear and Distribution            Cable Distribution                       be wired/controlled independently        Communication:                          PLANT SPACE & RISER STRATEGY
     High efficiency gas fired condensing     The internal air conditioning units     The building is targeting LEED         Boards                                 Containment Systems                      per floor with the facility for each     Multiple Telecom Providers are          Minimum Service Zones
     boilers will be installed to generate    will generally be above ceiling         Gold accreditation and Building        Distribution Boards will have multi-   The containment system will include      tenant to install a dedicated front      available in the area. 3 separate       Floor Void:   150 mm incl. Tile.
     low temperature hot water (LTHW)         concealed VRF Units ducted to           Energy Rating (BER) of B1.             functional energy meters which         for distribution of low voltage,         end control PC. The landlord system      telecom provider connections are        Ceiling Void: 550 mm incl. Tile.
     to provide heating for the following     high induction diffusers. Return air                                           will record the overall energy         extra low voltage and life safety        will be provided with a front end        entering the development.
     applications:                            grilles in the ceiling will allow for                                          consumption for each distribution      systems as per ETCI rules and HSA        control PC to control the landlord                                               Vertical Distribution
                                              a return path. The fresh air will be    ELECTRICAL                             board. In addition to this, each       regulations. Cabling will be routed      areas.                                   Earthing and Bonding                    Vertical service risers will have
     • Radiant panels within the lift         introduced through two central air      Design Criteria                        service on all distribution boards     through dedicated electrical vertical                                             An earthing installation will be        spare capacity to accommodate
       lobbies and accessible WC              handling units located at roof level.   The building will be designed          will be recorded separately. These     risers on cable ladder, tray, trunking   Lights in toilet and core areas          provided in accordance with ETCI        specialist tenant services such
     • Domestic hot water generation          The central AHUs will include high      on the basis of 1 workstation          services include lighting, general     or basket depending on the type of       will be energy efficient LED             requirements.                           as but not limited to kitchen /
     • Radiators in toilet cores              efficiency thermal wheels as an         per 8 m 2. A minimum total power       services and small power. All new      service.                                 recessed down lighters to CIBSE                                                  restaurant area.
     • Door curtain                           energy saving device. The air will      requirement of 87 w/m 2 is to be       sub-distribution boards are to                                                  recommended levels.                      Testing and Commissioning
                                              be ducted in vertical risers to each    available for building use with a      be Form 2 Type 2, in accordance        Internal diverse vertical routes will                                             All systems will be commissioned        Tenants’ Plant Space
     The LTHW will be distributed via         floor, at each core.                    minimum of 40 w/m 2 available          with IS EN 60439 and of metal          be provided for all ICT cabling.         The emergency lighting installation      in accordance with CIBSE and            Plant space provision within
     dedicated heating circuits pumped                                                on each floor for general services,    construction. A series of local                                                 will comply with IS3217 2013.            BSRIA codes, including controls         screened plant area on roof for
     from the main central plant room         Water Services                          desk power and lighting.               landlord distribution boards will be   All containment systems will have        Emergency lighting will be provided      and Building Management Systems.        future tenant plant e.g. comms
     on the roof. A dedicated radiator        24 hour water storage will be                                                  provided within risers in landlord     a spare capacity of 20%.                 via battery packs contained within                                               room AC units.
     system will be installed for back of     provided based on 45 L per person.      Incoming Power Supply                  lobbies to supply landlord services                                             the fittings. In the event of power
     house areas including toilets and        Potable water will be available         As part of this development, a new     throughout the building. Single        General and Emergency Lighting           failure these battery packs will         LIFTS
     lift lobbies. All radiators will be of   to each floor for tenant fit-out        ESB MV substation will be provided.    distribution boards will be provided   The lighting installation in landlord    power the fittings for 3 hours and       All lifts to comply with current
     the low water content, low surface       canteen/ kitchen facilities and         This substation will provide new LV    per each lettable space in separate    areas will be designed according         will provide adequate light for safe     EN 81. Lift provision /installation
     temperature type. As well as LTHW        suitable for connection of Zip          supplies for both the tenants and      electrical risers on each floor.       to the current EN 12464, CIBSE           escape. An emergency lighting            will be in accordance with CIBSE
     radiators, electric radiators will be    Taps (by others).                       the landlord. The new incoming         20% spare circuit breakers will be     Lighting Guides and SLL Code             central test system will be installed.   guidelines and BCO Guide for
     installed to provide heating to                                                  supply has spare allowances            provided on all switchgear and         for Lighting.                                                                     Offices recommendations.
     the escape corridors.                    Fire Services                           designed into the connection to        distribution boards.                                                            Protective Installation Systems
                                              First aid and firefighting will be      allow the supply to be increased                                              A fully addressable digital lighting     Fire Alarm System:                       Lift Lobby = 2 no. 1,000kg 1.6 m/s
     Cooling System                           provided in accordance with             by 20%. The LV switchroom will         Standby Power Supply                   control and management system            The fire alarm system will comply        lifts providing a 4-star rating under
     Open Plan Office:                        building regulation requirements.       be designed to accommodate a           Allowances have been made for          will be installed for the building to    with IS3218 2013. The system will        the CIBSE rating scheme.
     High efficiency VRF System with          Portable fire extinguishers will        main distribution board suitable for   the connection of back-up power        provide a comprehensive facility         be designed for L2 coverage.
     designated Roof plant area and           be positioned throughout the            multi tenancy metering, provision      generation to any and all tenant       to test and manage the operation         The fire alarm system will be            Average Waiting Time (AWT) –
     Tenant riser space.                      development at all exit routes.         for surge protection equipment         distribution boards if required/       of the lighting systems including        fully addressable and capable of         a 4-star rating results in passenger
                                              Fire hose reels will be provided        with an allocation of 20% for          desired.                               daylighting dimming, occupancy           interfacing with other systems.          lift average waiting time less than
     Landlord Comms Room:                     in the basement.                        new equipment.                                                                detection and time scheduling.                                                    25 seconds.
     High efficiency wall mounted AC                                                                                                                                                                         Security System:
     units (duty / standby). These units      Sanitary                                                                                                              The system shall be the KNX DALI         The security installation will consist
     will be complete with drip trays         The soils and waste installation                                                                                      type with din rail mounted control       of internal CCTV. In addition,
     and leak detection.                      will be in uPVC.                                                                                                      modules/gateways installed in each       intruder alarm and access control
                                                                                                                                                                    tenant distribution board. Each          systems will be installed.
                                                                                                                                                                    tenant and the landlord system will

25                                                                                                                                                                                                                                                                                                                                26
An established                                                                      Park                                         Other Office Developments
                                                                                                                                       The Reflector
                                                                                                                                         The Park Carrickmines
     and experienced                                                                     Developments                                      Leopardstown Shopping Centre
                                                                                                                                             M50 Business Park

     development team                                       M&E Engineers
                                                            Ethos                        Group
                                                                                                                                              Northwest Business Park
                                                                                                                                                 Fashion City

                                                                                         Developers of the Future
                                                            Structural Engineers
                                                            DFK                          Since 1962, Park Developments Group have
                                                                                         become synonymous with commercial and
                                                                                         residential developments of excellent quality.
                                                                                         Award-winning landscape designs and first class
                                                                                         finishes are characteristic of these reliable property
     Developers                   Architects                Fire Consultant              developers. Its professional team are known for having
     Park Developments Group      The O’Toole Partnership   Jeremy Gardiner Associates   a keen environmental awareness and a proud history of
                                                                                         successful partnerships and joint ventures.
                               originate.ie

                                  Agents
                                  Savills

                                  Branding & Marketing
                                  Originate

27                                                                                                                                                                        28
For further information

                                          Savills
                                          PRSA No. 002233

                                          Savills.ie
                                          Andrew Cunningham                           David O’Malley
                                          T + 353 1 618 1300                          T + 353 1 618 1300
                                          E andrew.cunningham@savills.ie              E david.o’malley@savills.ie

     Disclaimer: These particulars are issued by Savills Ireland and
     Park Developments Group on the understanding that all the negotiations
     are conducted through them. Whilst every care has been taken in the
     preparation of these particulars for them and the vendor/lessor whose
     agent they are, they do not constitute an offer or contract. All descriptions,
     dimensions, references to condition, permissions or licenses of use or
     occupation, access and other details are for guidance only, they are given
     in good faith and believed to be correct, and any intending purchaser/
     tenant should not rely on them as statements or representation of fact but
     should satisfy themselves (at their own expense) as to the correctness of
     the information given. Prices are quoted exclusive of VAT (unless otherwise
     stated) and all negotiations are conducted on the basis that the purchaser/
     lessee shall be liable for any VAT arising on the transaction. Neither Savills
     Ireland or any of their employees have any authority to make or give any
     representation or warranty in respect of this property.

29
thehampsteadbuilding.ie
You can also read