Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.

Page created by Donald Clarke
 
CONTINUE READING
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
Tesco prove green credentials
    Target Timber
    Systems
    complete
    another Tesco
    Express in
    Folkestone.

    Statement from Tesco...
                                            Planning permitting, this is how
“   Introducing greener stores              every new store will be built in the
                                            UK from now on.                         The Pavilions, Raynes Park, London
    We’ve revolutionised the way we
    build our stores, so they are as        Here’s how our low-carbon stores
                                                                                                                                  Built in partnership with
    green and as sustainable as possible.   can become a reality:
                                                                                                                                  Grove Estates and Target
    In 2009, we have made great progress    •   Build with wood frames instead                                                    Timber Systems The Pavilions
    in our aim to become a zero-carbon          of metal. For every cubic metre                                                   consists of a four storey block
    business by 2050.                           of steel we replace with timber,                                                  of apartments which are all
                                                we save almost a tonne of                                                         complete and occupied, plus
    At the beginning of the year we             carbon because it is less energy-                                                 three storey town houses
    opened our Cheetham Hill store in           intensive to produce.                                                             which are also finished and
    Manchester, which was developed                                                                                               going to market.
    using a low-carbon blueprint and has    •   Use lots of natural light. By
    cut down the store’s carbon footprint       introducing more daylight, it                                                     Phase three and four of
    by 70 per cent.                             means we need less artificial                                                     this development are four
                                                lighting, which means less
                                                                                                                                  storey apartments which are
    In December, our eco store in
    Ramsey, Cambridgeshire, opened
                                                          ”
                                                electricity.
                                                                                                                                  currently in the process of
    to the public and is our first zero-    For further information please visit                                                  being built.
    carbon store.                           Tesco website.

                                            Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                                           2

Target Timber’s new factory
Target Timber Systems new 30,000 sq ft factory in Ebbw Vale, South                                                         Timber frame production lines
Wales which now gives us the additional manufacturing space we require
to manufacture Kingspan TEK, factory fixed insulation and factory fixed
double glazed windows.

                                                                New factory

                                          Completed frames awaiting delivery

Two-storey block of 12 apartments
over undercroft in Caterham, Surrey
                                                                                                   Recently constructed development of 12 apartments at
                                                                                         Phase 2   Croydon Road, Caterham – over masonry ground and first
                                                                                                   floor and drive-through.

                                                                                                   Target Timber Systems erected Phase 1 to enable Phase 2 to
                                                                                                   be constructed ensuring maximum productivity on-site with
                                                                                                   minimum inconvenience to following trades.

                                                                                                                                                   Phase 1

                             Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                                                                            3

Target Timber                                                                                        Fixing ply sarking to vaulted roof

Systems named
suppliers for the
development at
the Porthminster
Hotel, St. Ives,
Cornwall                                                                                                                                  Stunning view of the beach at St. Ives from one
The developer of the Porthminster Hotel           over five storeys with penthouse apartments                                                               of the penthouse apartments
project in St. Ives has taken full advantage of   incorporated within the roof space.
Target Timber Systems’ expertise by naming
the company in the tender documents, ensuring     As well as having to design to “disproportionate
early design input and advice on valued           collapse criteria” Target Timber Systems also
engineering.                                      had the practical problem of building during
                                                  the summer season on the only main road into
This is a very complicated project built          St. Ives Town Centre.

 Apartments during construction

                                        Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                       4

Show houses and apartments
for Ward Homes
                                                              Target Timber Systems are pleased
                                                              to announce the completion of the
                                                              following projects developed in
                                                              conjunction with Ward Homes.
                                                              Ward Homes approached Target to work with their professional team to
                                                              design, supply and erect their show case properties ensuring the best build
                                                              quality and finish possible.

                                                              Top:          Attached houses, Sherway Close, Headcorn, Kent.
                                                              Middle left:  Three storey town houses, Hawksmoor Close, Bromley
                                                                            Common, Kent.
                                                              Middle right: Show house and mixed development of town houses and
                                                                            apartments, Bromley Common, Kent.
                                                              Bottom left: Show house and mixed development of houses and flats,
                                                                            Headcorn, Kent.
                                                              Bottom right: Town houses and apartments, Bromley Common, Kent.

                   Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                                                           5

Student accommodation, University
for the Creative Arts, Epsom Campus
When approached to design a curved timber          Target Timber Systems designed and erected
frame building for student accommodation           the scheme and handed it over ahead of
around an existing oak tree with cantilevered      programme.
windows to make the best use of natural light,
at UCA, Epsom Campus our attitude was “why         Student accommodation and school buildings
not?”.                                             form a large part of our business, not only
                                                   because of lower running costs but they can
This project also had to be designed to            often be erected during periods of close down
incorporate      “disproportionate    collapse     when students are off site causing minimal
criteria” in the event that an additional floor    disruption.
may be added at a later date.

  Student nurse                                                                                        Eastbrook Primary
  accommodation,                                                                                       School, Portslade
  Margate, Kent                                                                                        and St. Johns School,
  Target Timber Systems have now completed
  the second and third phases of Student Nurses
                                                   roofs creating an airy living space which is easy
                                                   to maintain and very cost effective to run.
                                                                                                       Leatherhead
  Accommodation at the Queen Elizabeth the
  Queen Mother Hospital, Margate which is          Student Accommodation and educational               Target Timber Systems are the nominated sub-contractors to
  part of East Kent Hospitals University NHS       buildings now form a large part of our
  Foundation Trust.                                business, we anticipate that this will
                                                                                                       design and supply the timber frame structures for additional
                                                   continue to be the case for the foreseeable         classrooms at Eastbrook Primary School Portslade, East Sussex
  These contemporary designed buildings            future as the student population and                and St Johns School Leatherhead, Surrey.
  incorporate engineered ‘I’ beams to floors and   education sector grow.

                                                                                                       To ensure the project could be accurately priced by the tendering
                                                                                                       building contractors the Architects on these two projects decided
                                                                                                       to nominate Target Timber Systems. This enabled structural
                                                                                                       design to be resolved, beam positions to be identified and line
                                                                                                       and point loads provided, giving all concerned the information
                                                                                                       needed to provide an accurate price and programme. This
                                                                                                       information is important on all projects but particularly so
                                                                                                       on schools where buildings have to be erected and completed
                                                                                                       during school holidays, ensuring minimum disruption to school
                                                                                                       activities and get young children and students settled in there
                                                                                                       new surroundings as quickly as possible.

                                                                                                       If you would like pre-start advice on your next project please do
                                                                                                       not hesitate to call Nick Whittle or email nw@targettimber.com

                                         Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                                       6

Some buildings we made earlier...

                                  Georgian Style mansion, Ascot, Berkshire                                     Six bedroom house, Farnham, Surrey

                   Detached bungalow, Princes Risborough, Buckinghamshire                     Mixed development of flats and houses Biggin Hill, Kent

                                                                                                           Gated development, Medstead, Hampshire

                                         Detached house, Guildford, Surrey                                       Terraced houses, Windsor, Berkshire

                          Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                             7

                       Attached town houses, Thames Ditton, Surrey

                             Luxury apartments, Camberley, Surrey                                          Detached house, Reading, Berkshire

                           Semi-detached houses, Farnham, Surrey                                           Detached houses, Cranleigh, Surrey

                                   Terraced houses, Bentley, Surrey           Mixed development of flats and houses Billingshurst, West Sussex

                   Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                                                          8

                                                                                                                  Case study – St Catherines Hospice, Scarborough

Kingspan Tek (Sip)                                  Target Timber Systems Limited are proud to announce their partnership with
                                                    Kingspan TEK Building Systems to add Structurally Insulated Panels (SIPs)

Building System
                                                    to the Target Timber panel range. Complementing our timber frame and
                                                    pre-insulated panel systems, the Kingspan TEK Building System comprises
                                                    structural insulated panels (SIPs) connected with a unique jointing system
                                                    for walls, roofs and intermediate floors which offers exceptionally low
                       Panel craned into position   thermal bridging. It is a modern method of construction with environmental
                                                    sustainability at its core, that allows an air and weather-tight structure to be
                                                    erected in short time scales.
                                                    The 142mm thick ready to                                                                  solutions whilst retaining
                                                    assemble panels consist of                                                                a solid wall sound and feel,
                                                    112 mm rigid insulation core                                                              ample scope for individual
                                                    sandwiched between two                                                                    design and also low energy
                                                    layers of 15 mm OSB3 which                                                                bills for the occupants
                                                    are autohesively bonded to                                                                due to the highly energy
                                                    the insulation core during                                                                efficient buildings the SIPs
                                                    manufacture. The system can                                                               system can create. Doors
                                                    typically achieve U values                                                                can be opened much quicker
                                                    between 0.19 W/m²K and                                                                    due to the fast, water tight
                                                    0.20 W/m²K, and with extra          Kingspan TEK                                          construction of the Kingspan
                                                    insulation U values as low          Building System Joint                                 TEK Building System and it
                                                    as 0.10 W/m²K are even                                                                    also benefits from achieving
                                                    possible.                                                                                 extra credits under Code for
                                                                                            on site. The panels are available in      Sustainable Homes and Passivhaus
                                                    The Kingspan TEK Building               much larger dimensional sizes than        standards as a result of its green
                                                    System is manufactured off site         other building materials (1,220mm         credentials, approvals and energy
                                                    and delivered complete enabling a       by up to 7,500 mm) therefore fewer        efficient properties. The system
                                                    weather-tight structure to be erected   components need to be handled             is adaptable and can be used in all
                                                    quickly and allowing follow on          during the erection process and there     types of construction up to 4 stories.
                                                    trades to start work sooner. This       are fewer joints – obtaining very         Where a building exceeds these
                                                    means project completion times          high levels of air tightness (as low as   heights, the panels can be used for
                                                    are easier to predict as the system     0.08 air changes per hour at normal       internal structure (Infill Panel) and
                                                    is relatively easy to erect and does    pressures or 0.91 air changes per         a cladding panel is also available to
                                                    not require wet trades. Offsite         hour at 50 Pa).                           enable construction of external walls
                                                    manufacturing also means that                                                     50% time faster than alternative
                                                    Target can deliver peace of mind by     House builders can benefit from           methods.
                                                    ensuring accuracy and less waste        extra living space, service void

                   Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                                                            9

                                                                                Front elevation

  Orpington Halls
  Recently completed landmark building              did Target have to deal with the scale and
  in Orpington High Street. Timber frame            complexity of this building – which has step
  structure designed, manufactured and              backs, splays and balconies – but it is also on                                                            Rear elevation
  erected by Target Timber Systems. Not only        a busy roundabout on the High Street.

                                                                                                      A few of our projects on site
                                                                                                      or ordered awaiting delivery
                                                                                                      We recommend that anyone looking for a reputable timber
                                                                                                      frame manufacturer take time to visit on going projects and
                                                                                                      ensure they are members of the U.K.T.F.A. (United Kingdom
                                                                                                      Timber Frame Association).
                                                                                                      At Target Timber Systems we are very happy to arrange factory and
                                                                                                      site visits to enable our customers to view the quality of our system
                                                                                                      and understand how are structures are erected and integrate with
                                                                                                      following trades.
                                                                                                      We have projects all over the country but here a few that might be
                                                                                                      close to you that can be viewed shortly...
                                                                                                        Extension at The Lewinick Lodge, Pentire Point,
                                                                                                        Newquay, Cornwall.

 Sturgess Road, Ashford
                                                                                                        Three blocks of apartments
                                                                                                        St Peter Port, Guernsey, Channel Islands.
                                                                                                        Ten thousand square foot house Virginia Water, Surrey.
 This was a very complicated design to manufacture and erect. As you can see there are
 curved cantilevered sections with step back balconies, flat roofs and mono pitched roofs all           Three detached four bedroom houses Haslemere, Surrey.
 on a very tight site with very little storage or room to position cranes. But we did it and the        Large five bedroom detached house
                                                                   result is a stunning block of
                                                                   contemporary apartments for          Billingshurst, West Sussex.
                                                                   Hyde Housing Association.            Kingspan TEK house Brighton, East Sussex.
                                                                  Another recently completed            Penthouse apartments Great Eastern Street,
                                                                  project for Hyde H.A. is              East London (near Liverpool Street Station).
                                                                  this development of 45
                                                                                                        New HQ for Kent County Cricket Club, Canterbury, Kent.
                                                                  apartments in Maidstone. Not
                                                                  as complicated as the Sturgess        Three story apartments, Chesham, Hertfordshire.
                                                                  Road project but none the
                                                                                                        Fourteen apartments, Hemel Hempstead, Hertfordshire.
                                                                  less it has created beautiful
                                                                  living accommodation and              Three detached houses and a terrace of three houses
                                                                  fits in perfectly with the            Godalming, Surrey.
                                                                  surrounding properties.
                                                                                                      Please email Nick Whittle at Target Timber Systems –
                                                                                                      nw@targettimber.com for projects in your area.

                                       Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
THE TARGET TIMES                                                                                                                            10

Penthouse Apartments                                                                    As building land and planning approvals
                                                                                        become increasingly difficult to obtain

and Extensions
                                                                                        many of our customers are opting to go
                                                                                        up or out!

      20 bedroom hotel                                                                                          Penthouse Apartments
   extension with                                                                                            on top of converted office
   conference facilities                                                                                     building to create luxury
   at the prestigious                                                                                        apparthotel in the centre
   Bannatyne Spa Resort                                                                                      of Farnborough.
   in Hastings.

                                                                                                               Seven blocks of flats
      Extension to Grade
                                                                                                            in Uxbridge receive “top
   II listed cottage in
                                                                                                            hats” courtesy of Target
   Cranleigh, creating
                                                                                                            Timber Systems. A fantastic
   additional living space
                                                                                                            transformation from 1970s
   quickly, with all the
                                                                                                            flat roofs to mansards giving
   advantages of 21st
                                                                                                            a well needed upgrade and
   century comforts.
                                                                                                            additional apartments.

                             Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES
THE TARGET TIMES                                                                                                                                                    11

Target Timber fills the void with
factory fitted windows and doors...
Designed specifically for
off-site manufacturing, the
new patented KitFix® System
exclusively from Sidey, one of
the UK’s leading
manufacturers of windows and
doors– enables Target Timber
Systems to install fully
glazed, fully finished
windows and doors into their
panels as part of the
production cycle which can
then be stacked, stored and
transported as normal.

The system includes a wide
range of clip on cill solutions
that enable cills over 200mm
to be added after erection of
the timberframe structure as
well as integrated air tightness
solutions for between the
                                    Air tightness
fenestration and the structure
giving an air tightness             performance
performance as low as zero
m³/hr/m² @ 50 Pascals!!               as low as
                                    zero m³/hr/m²
Clip On Cill Options                at 50 Pascals

                                                               This KitFix® process is completed in 3 simple
                                                               stages as shown above.
                                                               Key Features of the Sidey KitFix System include:
                                                                n   Windows/Doors are installed off-site              n
                                                                                                                          Optional high performance air tightness
                                                                    in controlled factory conditions                      solutions to meet Code for Sustainable
                                                               n    Windows/Doors are 1st fixed on site in under          Homes and Passivhaus Standards
                                                                    3 minutes                                         n   Meets Part L of the Building Regulations and
                                                               n    Reduced risk of arson through increased plot          reduces fire risk by limiting oxygen
                                                                    security                                              availability within the structure
                                                               n    Reduction in breakages and site damage
                                                               n    Eliminates need for scaffolding adjustment        Key Benefits
                                                                    or step-ups                                       n   Faster Site Build
                                                               n    Structures are wind and watertight sooner         n   Higher performing structures
                                                               n    Follow on trades start sooner                     n   Cheaper through lower costs
                                                               n    Eliminates window/door deliveries to site         n   Improved Health & Safety
                                                                    thus reducing site traffic
                                                                                                                      n   Higher Consistent Quality
                                                               n    Eliminates manual handling of
                                                                    windows/doors into plots
                                                                                                                      n   Increased Profit for Builder/Developer
                                                               n    No site storage of windows and doors              n   Environmentally favourable & reduced
                                                                                                                          carbon footprint
                                                               n    No reduction in transportation payloads
                                                                    through having to pack panels apart to
                                                                    protect the windows/doors
                                                               n    Savings on site prelims due to faster build       Use your Smart Phone
                                                               n    Clip on Cills for fitting after external fabric
                                                                                                                      to Scan this code for
                                                                    built                                             more information on
                                                                                                                      Sidey’s KitFix System.

                                   Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES                                                                                                                           12

                                                TARGET TIMBER SYSTEMS

                                  For further information on your next timber frame project
                                           please contact Target Timber Systems Ltd
                                                          Target Timber Systems Ltd
                                                            (Sales & Support Office)
                                               29 High Street, Billingshurst, West Sussex RH14 9PP
                                                      Tel: 01403 782 600 Fax: 01403 783 777
                                                           Email: info@targettimber.com

                                                           Target Timber Systems Ltd
                                                            (Manufacturing & Accounts)
                                  Unit 43, Rassau Industrial Estate, Rassau, Ebbw Vale, Blaenau, Gwent NP23 5SD
                                                      Tel: 01495 357 600 Fax: 01495 305 973

                                                                 www.targettimber.com