Tesco prove green credentials - Target Timber systems complete another Tesco express in Folkestone.
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Tesco prove green credentials Target Timber Systems complete another Tesco Express in Folkestone. Statement from Tesco... Planning permitting, this is how “ Introducing greener stores every new store will be built in the UK from now on. The Pavilions, Raynes Park, London We’ve revolutionised the way we build our stores, so they are as Here’s how our low-carbon stores Built in partnership with green and as sustainable as possible. can become a reality: Grove Estates and Target In 2009, we have made great progress • Build with wood frames instead Timber Systems The Pavilions in our aim to become a zero-carbon of metal. For every cubic metre consists of a four storey block business by 2050. of steel we replace with timber, of apartments which are all we save almost a tonne of complete and occupied, plus At the beginning of the year we carbon because it is less energy- three storey town houses opened our Cheetham Hill store in intensive to produce. which are also finished and Manchester, which was developed going to market. using a low-carbon blueprint and has • Use lots of natural light. By cut down the store’s carbon footprint introducing more daylight, it Phase three and four of by 70 per cent. means we need less artificial this development are four lighting, which means less storey apartments which are In December, our eco store in Ramsey, Cambridgeshire, opened ” electricity. currently in the process of to the public and is our first zero- For further information please visit being built. carbon store. Tesco website. Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 2 Target Timber’s new factory Target Timber Systems new 30,000 sq ft factory in Ebbw Vale, South Timber frame production lines Wales which now gives us the additional manufacturing space we require to manufacture Kingspan TEK, factory fixed insulation and factory fixed double glazed windows. New factory Completed frames awaiting delivery Two-storey block of 12 apartments over undercroft in Caterham, Surrey Recently constructed development of 12 apartments at Phase 2 Croydon Road, Caterham – over masonry ground and first floor and drive-through. Target Timber Systems erected Phase 1 to enable Phase 2 to be constructed ensuring maximum productivity on-site with minimum inconvenience to following trades. Phase 1 Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 3 Target Timber Fixing ply sarking to vaulted roof Systems named suppliers for the development at the Porthminster Hotel, St. Ives, Cornwall Stunning view of the beach at St. Ives from one The developer of the Porthminster Hotel over five storeys with penthouse apartments of the penthouse apartments project in St. Ives has taken full advantage of incorporated within the roof space. Target Timber Systems’ expertise by naming the company in the tender documents, ensuring As well as having to design to “disproportionate early design input and advice on valued collapse criteria” Target Timber Systems also engineering. had the practical problem of building during the summer season on the only main road into This is a very complicated project built St. Ives Town Centre. Apartments during construction Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 4 Show houses and apartments for Ward Homes Target Timber Systems are pleased to announce the completion of the following projects developed in conjunction with Ward Homes. Ward Homes approached Target to work with their professional team to design, supply and erect their show case properties ensuring the best build quality and finish possible. Top: Attached houses, Sherway Close, Headcorn, Kent. Middle left: Three storey town houses, Hawksmoor Close, Bromley Common, Kent. Middle right: Show house and mixed development of town houses and apartments, Bromley Common, Kent. Bottom left: Show house and mixed development of houses and flats, Headcorn, Kent. Bottom right: Town houses and apartments, Bromley Common, Kent. Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 5 Student accommodation, University for the Creative Arts, Epsom Campus When approached to design a curved timber Target Timber Systems designed and erected frame building for student accommodation the scheme and handed it over ahead of around an existing oak tree with cantilevered programme. windows to make the best use of natural light, at UCA, Epsom Campus our attitude was “why Student accommodation and school buildings not?”. form a large part of our business, not only because of lower running costs but they can This project also had to be designed to often be erected during periods of close down incorporate “disproportionate collapse when students are off site causing minimal criteria” in the event that an additional floor disruption. may be added at a later date. Student nurse Eastbrook Primary accommodation, School, Portslade Margate, Kent and St. Johns School, Target Timber Systems have now completed the second and third phases of Student Nurses roofs creating an airy living space which is easy to maintain and very cost effective to run. Leatherhead Accommodation at the Queen Elizabeth the Queen Mother Hospital, Margate which is Student Accommodation and educational Target Timber Systems are the nominated sub-contractors to part of East Kent Hospitals University NHS buildings now form a large part of our Foundation Trust. business, we anticipate that this will design and supply the timber frame structures for additional continue to be the case for the foreseeable classrooms at Eastbrook Primary School Portslade, East Sussex These contemporary designed buildings future as the student population and and St Johns School Leatherhead, Surrey. incorporate engineered ‘I’ beams to floors and education sector grow. To ensure the project could be accurately priced by the tendering building contractors the Architects on these two projects decided to nominate Target Timber Systems. This enabled structural design to be resolved, beam positions to be identified and line and point loads provided, giving all concerned the information needed to provide an accurate price and programme. This information is important on all projects but particularly so on schools where buildings have to be erected and completed during school holidays, ensuring minimum disruption to school activities and get young children and students settled in there new surroundings as quickly as possible. If you would like pre-start advice on your next project please do not hesitate to call Nick Whittle or email nw@targettimber.com Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 6 Some buildings we made earlier... Georgian Style mansion, Ascot, Berkshire Six bedroom house, Farnham, Surrey Detached bungalow, Princes Risborough, Buckinghamshire Mixed development of flats and houses Biggin Hill, Kent Gated development, Medstead, Hampshire Detached house, Guildford, Surrey Terraced houses, Windsor, Berkshire Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 7 Attached town houses, Thames Ditton, Surrey Luxury apartments, Camberley, Surrey Detached house, Reading, Berkshire Semi-detached houses, Farnham, Surrey Detached houses, Cranleigh, Surrey Terraced houses, Bentley, Surrey Mixed development of flats and houses Billingshurst, West Sussex Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 8 Case study – St Catherines Hospice, Scarborough Kingspan Tek (Sip) Target Timber Systems Limited are proud to announce their partnership with Kingspan TEK Building Systems to add Structurally Insulated Panels (SIPs) Building System to the Target Timber panel range. Complementing our timber frame and pre-insulated panel systems, the Kingspan TEK Building System comprises structural insulated panels (SIPs) connected with a unique jointing system for walls, roofs and intermediate floors which offers exceptionally low Panel craned into position thermal bridging. It is a modern method of construction with environmental sustainability at its core, that allows an air and weather-tight structure to be erected in short time scales. The 142mm thick ready to solutions whilst retaining assemble panels consist of a solid wall sound and feel, 112 mm rigid insulation core ample scope for individual sandwiched between two design and also low energy layers of 15 mm OSB3 which bills for the occupants are autohesively bonded to due to the highly energy the insulation core during efficient buildings the SIPs manufacture. The system can system can create. Doors typically achieve U values can be opened much quicker between 0.19 W/m²K and due to the fast, water tight 0.20 W/m²K, and with extra Kingspan TEK construction of the Kingspan insulation U values as low Building System Joint TEK Building System and it as 0.10 W/m²K are even also benefits from achieving possible. extra credits under Code for on site. The panels are available in Sustainable Homes and Passivhaus The Kingspan TEK Building much larger dimensional sizes than standards as a result of its green System is manufactured off site other building materials (1,220mm credentials, approvals and energy and delivered complete enabling a by up to 7,500 mm) therefore fewer efficient properties. The system weather-tight structure to be erected components need to be handled is adaptable and can be used in all quickly and allowing follow on during the erection process and there types of construction up to 4 stories. trades to start work sooner. This are fewer joints – obtaining very Where a building exceeds these means project completion times high levels of air tightness (as low as heights, the panels can be used for are easier to predict as the system 0.08 air changes per hour at normal internal structure (Infill Panel) and is relatively easy to erect and does pressures or 0.91 air changes per a cladding panel is also available to not require wet trades. Offsite hour at 50 Pa). enable construction of external walls manufacturing also means that 50% time faster than alternative Target can deliver peace of mind by House builders can benefit from methods. ensuring accuracy and less waste extra living space, service void Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 9 Front elevation Orpington Halls Recently completed landmark building did Target have to deal with the scale and in Orpington High Street. Timber frame complexity of this building – which has step structure designed, manufactured and backs, splays and balconies – but it is also on Rear elevation erected by Target Timber Systems. Not only a busy roundabout on the High Street. A few of our projects on site or ordered awaiting delivery We recommend that anyone looking for a reputable timber frame manufacturer take time to visit on going projects and ensure they are members of the U.K.T.F.A. (United Kingdom Timber Frame Association). At Target Timber Systems we are very happy to arrange factory and site visits to enable our customers to view the quality of our system and understand how are structures are erected and integrate with following trades. We have projects all over the country but here a few that might be close to you that can be viewed shortly... Extension at The Lewinick Lodge, Pentire Point, Newquay, Cornwall. Sturgess Road, Ashford Three blocks of apartments St Peter Port, Guernsey, Channel Islands. Ten thousand square foot house Virginia Water, Surrey. This was a very complicated design to manufacture and erect. As you can see there are curved cantilevered sections with step back balconies, flat roofs and mono pitched roofs all Three detached four bedroom houses Haslemere, Surrey. on a very tight site with very little storage or room to position cranes. But we did it and the Large five bedroom detached house result is a stunning block of contemporary apartments for Billingshurst, West Sussex. Hyde Housing Association. Kingspan TEK house Brighton, East Sussex. Another recently completed Penthouse apartments Great Eastern Street, project for Hyde H.A. is East London (near Liverpool Street Station). this development of 45 New HQ for Kent County Cricket Club, Canterbury, Kent. apartments in Maidstone. Not as complicated as the Sturgess Three story apartments, Chesham, Hertfordshire. Road project but none the Fourteen apartments, Hemel Hempstead, Hertfordshire. less it has created beautiful living accommodation and Three detached houses and a terrace of three houses fits in perfectly with the Godalming, Surrey. surrounding properties. Please email Nick Whittle at Target Timber Systems – nw@targettimber.com for projects in your area. Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 10 Penthouse Apartments As building land and planning approvals become increasingly difficult to obtain and Extensions many of our customers are opting to go up or out! 20 bedroom hotel Penthouse Apartments extension with on top of converted office conference facilities building to create luxury at the prestigious apparthotel in the centre Bannatyne Spa Resort of Farnborough. in Hastings. Seven blocks of flats Extension to Grade in Uxbridge receive “top II listed cottage in hats” courtesy of Target Cranleigh, creating Timber Systems. A fantastic additional living space transformation from 1970s quickly, with all the flat roofs to mansards giving advantages of 21st a well needed upgrade and century comforts. additional apartments. Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES THE TARGET TIMES 11 Target Timber fills the void with factory fitted windows and doors... Designed specifically for off-site manufacturing, the new patented KitFix® System exclusively from Sidey, one of the UK’s leading manufacturers of windows and doors– enables Target Timber Systems to install fully glazed, fully finished windows and doors into their panels as part of the production cycle which can then be stacked, stored and transported as normal. The system includes a wide range of clip on cill solutions that enable cills over 200mm to be added after erection of the timberframe structure as well as integrated air tightness solutions for between the Air tightness fenestration and the structure giving an air tightness performance performance as low as zero m³/hr/m² @ 50 Pascals!! as low as zero m³/hr/m² Clip On Cill Options at 50 Pascals This KitFix® process is completed in 3 simple stages as shown above. Key Features of the Sidey KitFix System include: n Windows/Doors are installed off-site n Optional high performance air tightness in controlled factory conditions solutions to meet Code for Sustainable n Windows/Doors are 1st fixed on site in under Homes and Passivhaus Standards 3 minutes n Meets Part L of the Building Regulations and n Reduced risk of arson through increased plot reduces fire risk by limiting oxygen security availability within the structure n Reduction in breakages and site damage n Eliminates need for scaffolding adjustment Key Benefits or step-ups n Faster Site Build n Structures are wind and watertight sooner n Higher performing structures n Follow on trades start sooner n Cheaper through lower costs n Eliminates window/door deliveries to site n Improved Health & Safety thus reducing site traffic n Higher Consistent Quality n Eliminates manual handling of windows/doors into plots n Increased Profit for Builder/Developer n No site storage of windows and doors n Environmentally favourable & reduced carbon footprint n No reduction in transportation payloads through having to pack panels apart to protect the windows/doors n Savings on site prelims due to faster build Use your Smart Phone n Clip on Cills for fitting after external fabric to Scan this code for built more information on Sidey’s KitFix System. Sales & Support Office Tel • 01403 782600 Email • info@targettimber.com Website • www.targettimber.com
THE TARGET TIMES 12 TARGET TIMBER SYSTEMS For further information on your next timber frame project please contact Target Timber Systems Ltd Target Timber Systems Ltd (Sales & Support Office) 29 High Street, Billingshurst, West Sussex RH14 9PP Tel: 01403 782 600 Fax: 01403 783 777 Email: info@targettimber.com Target Timber Systems Ltd (Manufacturing & Accounts) Unit 43, Rassau Industrial Estate, Rassau, Ebbw Vale, Blaenau, Gwent NP23 5SD Tel: 01495 357 600 Fax: 01495 305 973 www.targettimber.com Registered Address as above Company Registration No. 5162107 Registered in England & Wales Target Times was produced by: info@alisoncummins.co.uk www.alisoncummins.co.uk
You can also read