Cover Letter

April 06, 2021

Mr. Evan Lockhart-Borman
Historic Preservationist
Park County
Department of Heritage and Tourism

Dear Mr. Lockhart-Borman and Members of the Selection Committee,

BVH Architecture is excited to present this proposal to Park County for the Historic Restoration and Rehabilitation
Services for the Tarryall-Cline Ranch. BVH brings a 50+ year history of working with municipalities around the country
to preserve their historic structures. Together with our proposed subconsultants, our team brings the following specific
advantages to the rehabilitation of these important historic structures:

+ Experienced Team Over the past 50 years, BVH has developed a purpose-driven practice intent on bettering the
   communities we are fortunate to work in. We understand communities take great pride in their historic buildings
   because they are an extension of how they feel about their community. BVH and their design team share a belief in
   the importance of historic preservation and have been working on similar projects around the state for many years.

+ Project Understanding A successful project will build from the visioning and investigation which has already been
   undertaken and our team’s goal is to surpass the expectations of the County and the greater Park County community.
   Our project manager, Ms. Short, is one of the most experienced preservation architects in the state of Colorado—
   having worked on over 100 historic preservation projects throughout Colorado over the past 20 years.

+ Preservation Design Skill & Expertise BVH is passionate about preserving buildings that enhance the vitality
   of communities and continue to serve for years to come. We have further enhanced our team by including JVA
   Consulting Engineers for civil and structural engineering, 360 Engineering for mechanical and plumbing, IES for
   electrical engineering, Spectrum General Contractors for cost consulting, DHM Design for landscape design services,
   geotechnical services with Martinez Engineering, and land surveying with Pinnacle Surveying.

We believe this will be a comprehensive team that will successfully plan and design the rehabilitation of the Tarryall-Cline
Ranch. Thank you for the opportunity to present our qualifications and submit this proposal. We would be delighted to
work with you. Please feel free to contact us if there is any additional information we can provide.

Respectfully,

Cleve Reeves, AIA				Melanie Short, AIA, NCARB, LEED AP
Principal-in-Charge				Historical Architect, Project Manager
BVH Architecture				BVH Architecture

01 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
Firm Information

                                                                         Firm Information
                                                                         BVH Architecture
                                                                         1415 Park Ave W
                                                                         Denver, CO 80205
                                                                         303.495.6998
                                                                         bvh.com
                                                                         Industry Experience
                                                                         Historic Preservation
                                                                         Architectural Design
                                                                         Sustainable Design
                                                                         Facility Analysis
                                                                         Programming
                                                                         Master Planning
                                                                         Interior Design Environmental Design
                                                                         Primary Contact
                                                                         Melanie Short, AIA, NCARB, LEED AP
                                                                         mshort@bvh.com
                                                                         303.495.6998

BVH Architecture has engaged in the design and
preservation of our built environment through the practices       BVH Architecture has
of architectural design, interior architecture, and planning
since 1968. Our studio locations in Denver, Lincoln, and          engaged in the design
Omaha are home to a multi-disciplinary design team
dedicated to making the world better by designing
exceptional places to live, work, learn, and play. At the core
                                                                  and preservation of
of our design practice lies the desire to transform lives by
creating places that contribute to the vitality of communities.
                                                                  our built environment
It is with this prevailing attitude of optimism we are uniquely
positioned to advocate for the quality and protection of the
                                                                  through the practices
built environment.
                                                                  of architectural design,
                                                                  interior architecture,
BVH’s practice and values are rooted in the firm’s philosophy
of protecting and conserving our nation’s historic and
cultural resources. BVH is recognized as a national expert in
historical research, investigation, and historical analysis for
the documentation and preservation of historic buildings
                                                                  and planning since 1968.
and structures. BVH is known for its skilled technical
preservation competence and many years of hands-on
experience with historic buildings and sites nationwide. Our
team teaches and speaks nationally on best practices of
historic preservation building technology, including Section
106, and the Secretary of Interior’s Standards application,
sustainable design, and quality assurance, both through
internal and external programs.

02 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
Firm Information

Historic Preservation Experience

 2,000+
 HISTORIC PRESERVATION
 COMMISSIONS

 220+
 NATIONAL PARK SERVICE
 PROJECTS SINCE 1999

                                                        Stuhr Museum of the Prairie Pioneer - Grand Island, NE

BVH has completed more than 2,000 historic preservation       Throughout its history, BVH has been a leader regionally
commissions, including more than 500 on the National          and nationally in sustainable design as well as preservation
Register for Historic Places, including National Historic     of historic buildings and sites. BVH has been at the
Landmarks. In the past five years, BVH has also been          forefront for decades by blending existing building
directly involved in the preservation and rehabilitation of   renewal with emerging practices in sustainable design and
four of the “Eleven Most Endangered” buildings identified     helping developing tools, documenting best practices, and
by the National Trust for Historic Preservation.              preparing educational materials to achieve the sustainable
We have also successfully completed more than 220             use of the existing building stock. In just over the past
projects for the National Park Service since 1999, with a     seven years BVH has restored or designed over $150 M of
wide variety of project types:                                LEED certified projects.
+ Condition assessments                                       Our team’s experience in providing realistic solutions
                                                              to unique building problems enables our project teams
+ Value analysis workshops
                                                              to achieve the complementary goals of preserving our
+ Historic structures reports                                 cultural heritage and preserving our natural resources.
+ Land restoration studies and workshops                      Historic preservation is, by its nature, “green” and very much
+ Town hall meetings with public and interested parties       part of a sustainable design strategy. In designing repair or
                                                              preservation of a historic building, we seek to provide the
+ Park surveying and mapping
                                                              means to repair, reinforce, maintain, repair, and extend the
+ Hazardous materials reports                                 useful life of the building—using methods that are technically
+ NEPA services                                               sound, aesthetically appropriate, durable, and reasonable
+ Title I, II and III architectural and engineering design    in cost. Repairs that are durable tend to be environmentally
  services                                                    friendly by minimizing the energy and materials required for
Our project team also has extensive nationwide experience:    subsequent maintenance or replacement.
+ Historic American Buildings Survey (HABS) standards         By extending the life of an existing building, preservation
                                                              sustains the usefulness of building materials manufactured
+ Historic American Landscape Survey (HALS) standards
                                                              and constructed in the past, reducing the need to
+ Historic American Engineering Record (HAER)                 manufacture new materials and construct new buildings,
  standards.                                                  thereby conserving natural resources and energy.
03 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
Timeline for Submission

Timeline for Submission
of Deliverables
Proposed Timeline

Task 1   Initial Consultation & Site Visit with Project Stakeholders .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . April 15, 2021
Task 2   Schematic Design Deliverables .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . May 20, 2021
         100% Draft and Final Schematic Design Documents for Review
         Includes but is not limited to:
         +     Design Concepts Assessment
         +     Basis of Design Report (BDR)

Task 3   Design Development Deliverables .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . July 15, 2021
         100% Draft Design Development Documents for Review
         Includes but is not limited to:
         +     Design Development Drawings
         +     Division 1 Specifications
         +     Divisions 2 through 49 Outline Specifications
         +     Product File
         Resolve Design Development Review Comments
         Submit 100% Design Development Documents for Review
Task 4   Construction Documents Deliverables  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . August 30, 2021
         100% Draft Construction Documents for Review
         Includes but is not limited to:
         +     Construction Drawings
         +     Division 1 Specifications
         +     Divisions 2 through 49 Construction Specifications
         +     Final Product File
         +     Statement of Structural Tests and Special Inspections (as needed)
         Resolve 100% Draft Construction Documents Review Comments
         100% Complete Construction Documents for Review
Task 5   Cost Estimate Based on Work Shown in Construction Drawings .  .  .  .  .  .  .  .  .  .  .  . September 10, 2021
Task 6   Presentation to Park County Board of County Commissioner .  .  .  .  .  .  .  .  .  .  .  .  .  . September 14, 2021

04 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
Cost Estimate

Cost Estimate & Payment Schedule
Proposed Fee
                                                              Task. . . . . . . . . . . . . . . . Cost                                      Firm/Service
For purposes of this proposal, we have included basic         Task 1. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .     $5,623    BVH, MEP, Structural
services to improve the existing site drainage away           Task 2 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   $20,175   MP, Structural, Electrical & Civil
from the main building, establish a dry zone, and pro-        Task 3. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .     $25,318   MP, Structural, Electrical & Civil
vide ADA accessibility. It is our understanding that a        Task 4. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .     $32,281   MP, Structural, Electrical & Civil
master plan was completed in 2016, and this scope of          Task 5. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .     $2,500    Spectrum
work is limited to the main building and the immediate        Task 6. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .     $2,433    BVH
area around the building. The project intends to con-         Design Phase Total.  .  .  .  .  . $88,330
sist of two phases, with the exterior work to be includ-
ed within Phase 1, and no civil construction in Phase         Geotechnical (2 borings). . $4,100                                            Martinez
2. Minor grading and erosion control measures will be         Land Survey. .  .  .  .  .  .  .  .  .  .  .  .  . $3,800                     Pinnacle
designed to improve stormwater drainage around the
existing structures, and provide necessary exterior
ADA accessibility. This work is for the immediate area        Reimbursable Expenses. .  . $2,000                                            (Not to exceed)
around the main building. If additional roadway, utility
infrastructure, or fire mitigation are required outside       Total Project Fee.  .  .  .  .  .  .  . $98,230
this area, we have assumed that this will be negotiated
separately as an additional service to this proposal.

Architectural rehabilitation of the interior and exterior
will be included to bring the building in line with
current requirements for public reuse. This will include
life safety upgrades and accessibility modifications in
line with recommendations contained in the Secretary
of the Interior’s Standards for Rehabilitation. Reha-
bilitation work on the exterior will include masonry
restoration at the chimney and porch, stucco and
metal mesh replacement, front porch floor repairs,
restoration of the original roof line, parapets and new
roofing and drainage system. Faux viga replacement
and wood trim to be rehabilitated and painted. Resto-
ration of original doors and windows, including frames,
sashes and hardware will be documented and speci-
fied. Energy efficiency upgrades will include insulation
in walls, ceiling, and storm windows. On the interior
walls, flooring, ceilings, doors and trim will be repaired,
rehabilitated, and refinished. A kitchen and bathrooms
will be incorporated into the floor plan—including an
accessible restroom on the first floor.

It is understood that the building will be rehabilitated
and used for meeting space and offices. As such there
will be a change in use but not a change in Risk Cate-
gory. Therefore, comprehensive upgrading of struc-
tural systems to current Code is not triggered, but it is
understood that the Ranch House is in poor structural

05 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
Cost Estimate

condition. Based on the findings of the HSA and the pre-proposal
site visit, significant structural treatments are anticipated includ-
ing the repair of damaged floor framing, strengthening of floor
framing to meet the live load requirements accordant with public
use, roof framing strengthening, and foundation underpinning or
replacement. Structural treatments will conform to the Secretary
of Interior’s Standards for the Treatment of Historic Proper-
ties. Treatments will address damaged and deficient structural
systems and bring them into Code compliance for the proposed
new use. It is understood that non-contributing additions will
be removed. The structural design will address potential minor
modifications to accommodate the proposed new uses.

Mechanical and plumbing engineering is included. The project
intent is to provide an interior rehabilitation of the building and
allow for year-round use. The final use of the building is yet to be
determined, but uses include a small gathering area, display/in-
formation area, and a potential caretaker residence on the upper
floor. The new mechanical system shall be for year-round use of
the building and provide thermal zoning that separates the main
level from the upper level. Mechanical systems shall consider
the historic nature of the building and be provided with simple
control systems. Plumbing design to 5’-0” outside the building
for the water, waste, and gas lines. It is anticipated that a well will
be provided on-site (by others) along with a septic system (by
others). Based on layout of the building, plumbing fixtures, and
intended usage, a daily water usage will be calculated for the well
and septic design teams.

Electrical engineering for the two story, roughly 2,400 sf ranch
house will include lighting, lighting controls, electrical distribution
and service, as well as connections to any required equipment
such as mechanical units. The electrical design will also provide a
performance specification and rough layout for any required fire
alarm systems in the building. The fee excludes all other low volt-
age systems such as security, access control, audio systems, visu-
al systems, and telecom systems. Electrical can provide necessary
rough-in for these excluded systems as directed by the owner.

Survey and geotechnical engineering would be included in Task
2 and included as a part of the basis-of-design document. These
fees are broken out if Park County would prefer to contract for
these services separately. Otherwise, BVH will include under
their master contract.

A fee has not been included for landscape architecture as that
scope is not defined in this phase of the RFP. DHM is on board to
perform services as needed at their typical hourly rates or as an
additional service to this proposal.

06 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
Proposed Team

Please see Appendix for full firm profiles and resumes for the
subcontractors proposed for this project. Further subcontractors
can be added as needed upon consultation with Park County.

Proposed Subcontractors

JVA Consulting Engineers                                                    Bozeman, and Missoula. DHM's roster now includes professionals in
STRUCTURAL & CIVIL ENGINEER                                                 landscape architecture, natural resource management, horticulture,
JVA has a strong background in preservation and renovation work on          land use planning, graphic design, 3D modeling, and computer
historic buildings, with their historic preservation work starting in the   imaging—plus some who also hold degrees in enriching fields like
early 1970s. Since that time, JVA’s preservation work has included          studio art, anthropology, and philosophy.
Building Engineering Reports, Historic Structure Assessments, and
Construction Documents for several hundred building projects                Spectrum General Contractors
in the Rocky Mountain Region and nationwide. JVA also helped                COST CONSULTANT
to preserve three of Colorado’s Most Endangered Places in the               For more than 40 years, Spectrum General Contractors has
Dearfield Townsite—the Thomasville Lime Kilns, and the Greek                established a reputation for building some of the most challenging
Theatre/Voorhies Memorial.                                                  and creative projects in the Colorado market. Spectrum's project
360 Engineering, Inc.                                                       types include adaptive reuse, historical restoration, and commercial
MECHANICAL & PLUMBING ENGINEER                                              construction and remodel. Spectrum focuses on working closely
360 Engineering is a full-service woman-owned mechanical                    with Owners and Architects to build a project with the greatest
engineering firm headquartered in Golden, CO. Founded in 2003               value and craftsmanship attainable.
by Denise Dihle, PE, the firm was built on providing exceptional            Martinez Associates, Inc.
customer service—which remains 360's core value and top priority.           GEOTECHNICAL ENGINEER
360 Engineering’s diverse range of mechanical and plumbing                  Formed in 2011, Martinez is a small, minority owned business
engineering experience includes over 30 historic rehabilitation             providing geotechnical engineering and construction materials
projects with the National Park Service, as well as historic structure      testing services for a wide variety of projects throughout Colorado
projects for State, Local, and private clients. 360's historic work         and the western US. Working throughout Colorado and extensively
experience includes mechanical and plumbing system Historic                 within the Denver metropolitan area, Martinez engages their staff
Structure Assessments, Historic Structure Reports, and consulting/          of personnel—including 3 professional engineers, 3 staff engineers,
design for full building rehabilitations.                                   and a variety of engineering technicians and inspectors —utilizing
Innovative Electrical Systems, Inc.                                         their collective 35+ years of experience. Martinez maintains a fully
ELECTRICAL ENGINEER                                                         equipped laboratory for the evaluation and testing of soils, bedrock,
Les Yingling of IES has worked on many notable historical restorations      concrete, and asphalt. Field and laboratory tests are performed by
and historical adaptive reuse projects over the years. Notable              trained, experienced technicians who are certified through ACI,
projects include the Boettcher Mansion, Byers/Evans Mansion and             WAQTC, CAPA and CDOT.
the award winning adaptive reuse of the Malo Mansion. Most recent           Pinnacle Land Surveying Company
of these was with the Melanie Short on the historic evaluation of the       LAND SURVEYOR
Carpenter Ranch House outside of Steamboat Springs, CO. IES' work           Pinnacle Land Surveying Company has operated successfully in the
included a detailed electrical assessment, as well as documentation         Pikes Peak Region since 1993 with the best land survey field crews
of the electrical work required to bring the Ranch House up to code         in the industry. Pinnacle's surveying team is a tight-knit group and
compliance. Other historic projects working alongside Melanie               all have been with the company for 18+ years. Pinnacle's team has
Short include The Julie Harris Theater and Hayden Heritage Center           extensive experience in both conventional and GPS field surveying
assessment in Hayden, CO.                                                   methods and can apply both within the same job, when required.
DHM Design                                                                  The office team consists of experienced drafters and professionals
LANDSCAPE ARCHITECT                                                         with the latest in computerized drafting equipment and methods
DHM are landscape and ecological professionals who call the                 for very efficient and prompt service. Pinnacle Land Surveying, as a
West home. Much like the region itself, DHM employs pragmatic,              company, pursues each job with diligence and speed to produce an
independent and resilient individuals who are also steeped in the           ethical, precise, and cost-effective survey for their clients. To provide
values of teamwork. Vigorous users and lovers of the outdoors,              the most efficient surveys, Pinnacle uses GPS, Robotics, ATV’s, 4WD
DHM is committed to both environmental and cultural preservation.           vehicles, and hiking/climbing when necessary.
Since their founding in Denver in 1975, DHM's employee-owned
Corporation has expanded with offices in Carbondale, Durango,

07 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
Demonstration of Ability

Demonstration of the Consultant's Ability to meet the Secretary
of the Interior's Professional Qualification Standards for Historic
Architecture (36 CFR 61).
Cleve Reeves will be the Principal in Charge for the project and       Melanie Short AIA, NCARB, LEED AP
will be responsible for ensuring the overall quality and contractual
obligations. Melanie Short will serve as the on-site presence and      Melanie Short meets the qualification standards in the categories
the project manager for the duration of the project. If the project    above for Historic Architecture. Further information is included in
continues into Construction Administration, she will be the primary    her resume, located in the Appendix.
architect in charge of those services. Julie Cawby will be the         Melanie holds a Master’s degree in Architecture from the
consulting preservation architect and provide quality assurance        University of Wisconsin-Milwaukee, with a graduate certificate in
and internal team coordination.                                        Historic Preservation. She is a licensed professional architect in 4
                                                                       states, including Colorado. She has over 20 years of experience on
                                                                       historic preservation projects throughout the country. This work
Architecture                                                           includes historic structure assessments and the preparation of
The minimum professional qualifications in architecture are a          plans and specifications for many preservation projects. She meets
professional degree in architecture plus at least two years of         the requirements for both Architecture and Historic Architecture.
full-time experience in architecture; or a State license to practice
architecture.                                                          * Melanie Short performed a site visit with
Historic Architecture                                                    Evan Lockhart-Borman on March 5, 2021.
The minimum professional qualifications in historic architecture
are a professional degree in architecture or a State license to
practice architecture, plus one of the following:                      Julie Cawby RA, NCARB, APT RP
 1.    At least one year of graduate study in architectural
       preservation, American architectural history, preservation      Julie Cawby meets the 36 CFR 61 qualification standards for
       planning, or closely related field; or                          Historic Architecture in the categories of Architecture and Historic
                                                                       Architecture. Further information is included in her resume.
 2. At least one year of full-time professional experience on
    historic preservation projects.                                    Julie graduated from Kansas State University with a Bachelor’s
                                                                       degree in Interior Architecture. Since graduation, she has
Such study or experience shall include detailed investigations of      worked predominantly for over 24 years on historic and existing
historic structures, preparation of historic structures research       structures throughout the Midwest. These structures have
reports, and preparation of plans and specifications for               encompassed a vast array of time periods and have included all
preservation projects.                                                 facets of work focused on the treatment of the historic structures’
                                                                       preservation, rehabilitation, or restoration.
                                                                       Julie also has vast experience working with local Park
                                                                       Commissions during a variety of historic preservation projects
                                                                       including historic fountains, monuments, mausoleums, and
                                                                       boulevard structures. Julie has extensive experience in
                                                                       working with the Secretary of the Interior’s Standards during
                                                                       numerous Federal and multiple State Historic Preservation
                                                                       Office rehabilitation tax credit projects. Julie’s current work is
                                                                       focused on a variety of historic structures and National Historic
                                                                       Landmarks throughout the Midwest.

08 /
Tarryall-Cline Ranch PROPOSAL FOR PLANNING, DESIGN & CONSTRUCTION DOCUMENTS FOR APRIL 06, 2021 - Park County
References

References
Elizabeth Hamilton*                                                  Gary Bowen, FAIA
Project Manager, Senior Architect                                    Board Representative
City & County of Denver (retired)                                    Board of Directors for Dr. Susan La Flesche Picotte Center
hamilton.elizabeth@comcast.net                                       bowen6044@cox.ne
Multiple Preservation projects over the past 20 years for the City   Dr. Susan LaFlesche Picotte Memorial Hospital Restoration
and County of Denver—including CCC Barracks and Zoo Admin-
istration buildings.                                                 John Rosemurgy
* Reference for Melanie Short with a previous firm as well as JVA.   Contracting Officers Technical Representative
                                                                     National Park Service, MWRO
Tim Gilbert*                                                         john_rosemurgy@nps.gov
Project Manager                                                      906.483.3036
State of Colorado                                                    Beauvais Amoureux House HSR
timothy.gilbert@co.state.us
                                                                     Jill Dolberg
Governor's Residence Restoration
                                                                     Deputy State Historic Preservation Officer
* Reference for Melanie Short with a previous firm as well as JVA.   Nebraska State Historical Society
                                                                     jill.dolberg@nebraska.gov
Jane Daniels*                                                        402.525.4927
Project Manager                                                      Historic Kennard House Conceptual Design
Colorado Preservation Inc.
jdaniels@coloradopreservation.org
                                                                     Trevor Jones
Mathews-Gotthelf House Restoration                                   Director, State Historic Preservation Officer
                                                                     Nebraska State Historical Society
* Reference for Melanie Short with a previous firm.
                                                                     trevor.jones@nebraska.gov
                                                                     Historic Kennard House Conceptual Design

09 /
Relevant Project Experience

Dr. Susan LaFlesche
                                                             Susan LaFlesche Picotte was the first Native American doctor and
                                                             one of the most extraordinary figures in American history. In 1913, Dr.
                                                             Picotte opened her hospital doors in Walthill, NE, a small town on the

Picotte Memorial                                             Omaha Indian Reservation. The one-and-a-half story building features
                                                             a recessed porch that embodies Dr. Picotte’s love for “fresh air and

Hospital Restoration                                         sunshine.” In 1993, the National Park Service declared the Susan
                                                             LaFlesche Picotte Memorial Hospital a National Historic Landmark.
                                                             This small wood framed building has been neglected over the years
BVH ARCHITECTURE                                             and has had water infiltration from the roof and basement which
                                                             caused severe deterioration of the interior. In 2018, the National
Location /                                                   Trust for Historic Preservation listed the hospital as one of its “Eleven
Walthill, NE                                                 Most Endangered Historic Sites.” This project is being designed for
                                                             its rehabilitation in multiple design phases and is in the process of
Time Period /                                                completing State of Nebraska historic tax credit requirements.
1913 / American Craftsman Style
                                                             BVH has led the following redevelopment process:
Project Date /                                               + Building investigation and existing condition analysis of the
2018–Present                                                   property. During the assessment a thorough understanding of the
                                                               historic integrity of the materials and spaces was revealed.
Owner Contact /
                                                             + Treatment recommendations and master planning report,
Gary Bowen, FAIA
                                                               including exterior renderings for fundraising activities.
Board Representative
Board of Directors for Dr. Susan La Flesche Picotte Center   + Phase 1: Roof replacement contract documents and cost estimates.
bowen6044@cox.ne                                             + Phase 2 Exterior Restoration & Rehab: Exterior assessment
                                                               of all wood components, wood windows and features for their
                                                               repair; below grade waterproofing, stucco repairs, structural
                                                               improvements, and cost estimating services.
                                                             + Phase 3: Interior adaptive reuse planning.

10 /
Relevant Project Experience

Beauvais Amoureux
                                    The Jean-Baptiste Amoureux House (now known as the
                                    Beauvais-Amoureux House) is the main attraction in the
                                    newly created Ste. Genevieve National Historical Park in Ste.

House HSR                           Genevieve, MO. Built in 1792, it is one of only three known
                                    surviving poteaux-en-terre style houses in Ste. Genevieve
                                    which is the first permanent European settlement in Missouri.
BVH ARCHITECTURE
                                    Poteaux-en-terre means “post in earth” and refers to the vertical
                                    style of log construction where the posts are set directly
Location /                          into the ground. There are five known buildings of this kind
Ste. Genevieve, MO                  in the country. The house also represents a long history of
                                    early African American ownership. Successive generations of
Time Period /                       Amoureux lived in the house until it was transferred to various
c. 1792 / Poteaux-en-terre Style
                                    non-profit organizations and finally to the National Park Service.
Project Date /                      Currently unoccupied, the building was recently purchased by the
2020–Present                        National Park Service and BVH’s team was chosen to evaluate the
Anticipated completion Fall 2021    condition of the structure and evaluate several potential future
                                    reuse opportunities. In conjunction with BVH’s assessment work,
Owner Contact /                     structural, landscape and historical research were all undertaken
John Rosemurgy, Contracting         to contribute to the Historic Structure Report.
Officers Technical Representative
National Park Service, MWRO         Recommendations for preserving both the architectural and
906.483.3036                        historic integrity of Beauvais-Amoureux site will be submitted
John_Rosemurgy@nps.gov              along with recommended measures for repairing the existing
                                    buildings according to the Secretary of the Interior’s Standards.
                                    The preservation team will also develop a series of design
                                    solutions which would allow the new park grounds to grow
                                    and adapt with future use while still retaining the architectural
                                    integrity relating to this significant period in history.

11 /
Relevant Project Experience

Historic Kennard                                Constructed in 1869, the Thomas P. Kennard House in
                                                downtown Lincoln, NE is the oldest remaining building

House
                                                in Lincoln’s original plat. Initially restored in 1967 as the
                                                Nebraska Statehood Memorial, BVH has been hired
                                                to provide concept design for an addition to provide
BVH ARCHITECTURE                                accessible features as well as additional educational and
                                                public spaces for the community. The interior has been
Location /                                      previously restored close to its c. 1870s appearance. The
Lincoln, NE                                     building is currently owned by the State of Nebraska.
                                                Archaeological and historical evidence has identified a
Time Period /                                   removed addition from the rear and this serves as the
1869 / Italianate Style
                                                inspiration for the new addition.
Project Date /
                                                The new addition will house a multi-purpose space, offices,
2020–Present
                                                accessible restrooms, an elevator and accessible entrance
Owner Contact /                                 to provide equal access to all levels of the building. A new
Jill Dolberg                                    accessible route is envisioned along the east. Interpretive
Deputy State Historic Preservation Officer      art will express the isolation this magnificent building was
402-525-4927                                    initially constructed in and emphasize the vastness of the
jill.dolberg@nebraska.gov
                                                prairie surrounding it. The optimism of the earlier settlers
Trevor Jones                                    is apparent in the grand Italianate detailing, elaborate
Director, State Historic Preservation Officer   porches and widows’ walk and cupola. The new addition
Nebraska State Historical Society               will be a 21st century extension of the ever evolving history
trevor.jones@nebraska.gov
                                                of the building.

12 /
Appendix

13 /
Appendix

                                   Cleve Reeves, AIA
                                   PRINCIPAL-IN-CHARGE | BVH ARCHITECTURE

                                   Cleve is an architect and design principal with more than 20 years of experience in
                                   programming, design, and community engagement for education, civic, and recreational
                                   projects. His skills in formulating client-centered concepts and ideas help bring teams
                                   together in a collaborative process. Cleve leads BVH’s future-focused learning space
                                   design initiatives, shaping BVH’s practice and projects to deeper levels of achievement.
                                   With his calm inquisitive approach, project challenges are ushered through the inherently
                                   complex layers to successful resolution.
Education
University of Nebraska-Lincoln     Relevant Project Experience
  M.S., Architecture               Capital Humane Society / Lincoln, NE
  B.S., Architectural Studies        Pieloch Pet Adoption Center Admissions & Assessment Center
Licensure
                                   Wisner-Pilger School / Wisner, NE
Licensed Architect: CO, NE, IA     OPS Transition Program / Omaha, NE
                                   Duchesne Academy Master Plan / Omaha, NE
Affiliations
American Institute of Architects   Westside Middle School Addition / Omaha, NE
                                   Council Bluffs Community School District / Council Bluffs, IA
Learn for Tomorrow Community
  Group                              Pre-Kindergarten Facility
                                     Kirn & Wilson Middle School Renovations
Lincoln Public Schools High
                                   Lincoln Public Schools / Lincoln, NE
  School Task Force
                                     Schoo Middle School & Fallbrook YMCA
Lincoln STEM Ecosystem
                                   Madison Public Schools / Madison, NE
  Founder
                                   Pender Public Schools / Pender, NE
Lincoln Public Schools
                                   Holdrege Public Schools / Holdrege, NE
  Superintendent’s Facility
  Advisory Committee               McCook Public Schools / McCook, NE
Omaha STEM Ecosystem               Lexington Public Schools / Lexington, NE
 Member Lincoln Arts Council         Sandoz Elementary
                                     Pershing Elementary
                                     High School Renovations
                                     YMCA/Middle School Addition
                                     Majestic Theater Renovation
                                   Centennial Public Schools / Utica, NE
                                   South Sarpy Public Schools / Springfield, NE
                                   Whittier School Building Study / Lincoln, NE
                                   Omaha Hearing School / Omaha, NE
                                   Lied Center for Performing Arts Commons / Lincoln, NE
                                   Malone Recreation Center Master Plan / Lincoln, NE
                                   Carter Lake Library / Carter Lake, IA
                                   Holdrege YMCA / Holdrege, NE
                                   Downtown Lincoln YMCA Study / Lincoln, NE
                                   Sherman Field Renovation and Restoration / Lincoln, NE

14 /
Appendix

                                   Melanie Short, AIA, NCARB, LEED AP
                                   PROJECT MANAGER, HISTORICAL ARCHITECT | BVH ARCHITECTURE

                                   Melanie Short has 20 years of professional experience as an architect and project manager in
                                   Colorado. She has extensive expertise in design and construction as well as a passion for historic
                                   preservation, Melanie has been on the Colorado Historic Preservation Review Board, the Lakewood
                                   Historic Landmark Commission, and the board of APT Rocky Mountain Chapter. She has written
                                   multiple articles and delivered numerous presentations on the junction of historic preservation,
                                   architecture, and sustainability. She has spent her career working for municipalities, non-profits, school
                                   districts and library districts. She has made it an emphasis in her career to give back to the community,
                                   through volunteering, mentoring, and teaching the next generation of architects, urban planners and
Education
                                   preservationists. She currently serves on the Colorado Preservation, Inc. Saving Places Conference
University of Wisconsin            Committee and on Historic Denver’s easement review committee.
  Master of Architecture
  Certificate in Historic
                                   Relevant Project Experience
  Preservation
Grinnel College, IA                Beauvais - Amoureux House Historic Structure Report / Ste. Genevieve, MO
  B.A., Art History                Kennard House Addition and Rehabilitation Conceptual Study / Lincoln, NE
Licensure
                                   Colorado Governor's Mansion Restoration, Phases I-III / Denver, CO*
Licensed Architect: CO, UT, OK,    Taylor Hall Renovation / Gunnison, CO*
NM, NE, AZ, KS                     Hotel de Paris Water Intrusion / Georgetown, CO*
Registrations                      Carpenter Ranch Construction Documents / Hayden, CO*
LEED Accredited Professional       Baca Ranch Intensive Survey / San Luis Valley, CO*,
Affiliations
                                   Drennan Schoolhouse Exterior Rehabilitation / Ellicott, CO* [NR]
American Institute of Architects   The Molkery Rehabilitation / Denver, CO* [NR]
AIA Historic Resources             Washington Park Maintenance Facility Rehabilitation Construction Documents (Whitehead
  Committee                          Farmhouse) / Denver, CO*
Association for Preservation       Bowles House Exterior Restoration / Westminster, CO* [NR]
  Technology (APT)                 Denver and New Orleans Railroad Section House Rehabilitation / Elizabeth, CO*
Colorado Preservation, Inc         Dickinson House Rehabilitation / Hugo, CO*
Historic Denver, Inc               Lee Avenue Miner’s Cabins Relocation Study / Louisville, CO*
National Trust for Historic        Mathews-Gotthelf House Exterior Restoration Phases I-III / Denver, CO* [NR]
 Preservation                      Shoenberg Farmhouse and Carriage House Construction Documents / Westminster, CO* [NR]
Publications                       Semper Farm Barn Exterior Rehabilitation Construction Documents / Westminster, CO* [NR]
Author, Keep Your Historic         Semper Farmhouse Exterior Restoration / Westminster, CO*
  Windows and Reduce Your          Thomas Skerritt House Restoration / Englewood, CO*
  Carbon Footprint, Historic
                                   First Methodist Episcopal Church of Windsor Rehabilitation / Windsor, CO* [NR]
  Denver News
                                   Ault Pump House Museum Adaptive Reuse Construction Documents / Ault, CO*
Co-Author, Adaptive Reuse,
                                   CCC Camp Barracks #3 Adaptive Reuse Construction Documents / Morrison, CO*
 School Planning and
 Management                        Fort Lupton Museum Preservation / Fort Lupton, CO*
                                   Frederick Town Hall Rehabilitation / Frederick, CO*
                                   Hedlund House Rehabilitation / Hugo, CO*
                                   Long Meadow Community Club Exterior Restoration / Wiggins, CO*

                                   *Work completed while at another firm

15 /
Appendix

                                    Julie Cawby, RA, NCARB, APT RP
                                    HISTORICAL ARCHITECT | BVH ARCHITECTURE

                                    Julie’s expertise in rehabilitation, restoration, preservation, and adaptive reuse is made evident by
                                    her exceptional work. Her vast experience has included work on projects of various sizes, budgets
                                    and building types that reach from historic grand residences to a variety of municipal, commercial,
                                    federal, ecclesiastical, multi-family, and higher education project types. As a historical architect,
                                    Julie’s experience in the research, documentation, and restoration efforts of numerous regional
                                    and national historic sites has contributed to a refined understanding of construction techniques,
                                    character defining features, and aesthetics of historic buildings and structures that enable their
                                    modernization within their original historic contexts. Her portfolio includes high profile projects that
Education
                                    have gained recognition with numerous local, regional, and national awards. Julie’s current work is
Kansas State University             focused on a variety of historic structures and National Historic Landmarks including the Nebraska
  Bachelor of Interior              State Capitol HVAC system replacement and the Dr. Susan LaFlesche Picotte Memorial Hospital.
  Architecture

Registrations                       Relevant Project Experience
Registered Architect: CO, NE,       NPS Beauvais - Amoureux House Historic Structure Report / Ste. Genevieve, MO [NHP]
  MO
                                    Kennard House Addition and Rehabilitation Conceptual Study / Lincoln, NE [NR]
National Council of Architectural
  Registration Boards               Governor’s Mansion Chiller Replacement & Roof Rehabilitation / Lincoln, NE [NR]
                                    Susan LaFlesche Picotte Memorial Hospital Restoration / Walthill, NE [NR, NHL]
Affiliations
APT Recognized Professional         Nebraska State Capitol HVAC Replacement & Window Restoration / Lincoln, NE [NHL]
  2020                              Gateway Arch National Monument Conservation / St. Louis, MO [NM]
Association for Preservation
                                    Platte County Courthouse / Columbus, NE
  Technology (APT) Central
  Plains Chapter
                                      Limestone & Stucco Preservation
  Founding Member 2008              Pender Downtown Revitalization Study / Pender, NE
  Board of Directors 2008-18        Duchesne Academy Facilities Master Plan / Omaha, NE [NR]
  Treasurer 2010-2018
                                    Scotts Bluff National Monument Historic Preservation Plan / Scotts Bluff County, NE [NM]
APT Rocky Mountain Chapter
APT Kansas City 2015                Lincoln University President's Residence / (1913) Jefferson City, MO*
  International Conference:           Preservation & Rehabilitation, Masonry and Site
  Local Conference                  Cawby Residence (c.1840, 1976) / Lee’s Summit, MO*
  Committee & Field Session          Log Cabin Reconstruction & Additions
  Chair
                                    Duquesne Heights Condominiums (1908) / Kansas City, MO* [NR]
APT Standing Committee for
                                     Four Colonnaded Apartment Conversion & Rehabilitations—Masonry, wood windows, interiors,
  Training & Education
                                     site. [State and Federal Tax Credits]
Association for Preservation
  Technology International          Beeman Residence (c.1870) / Kansas City, MO*
                                      Preservation & Rehabilitation—Masonry, Slate Roof, Wood Windows, Interiors, Site
Docomomo US
                                    Captain Thomas C. Harris House (1875) / Kirksville, MO*
                                     National Trust for Historic Preservation Gift of Heritage Residence
                                     Exterior Preservation, Restoration & rehabilitation and Porch Reconstruction
                                    Atkins-Johnson House & Site (1826) / Gladstone, MO*
                                      Log Construction, Assessment, & Feasibility Study
                                    National Fred Harvey Museum (1869) / Leavenworth, KS*
                                     Roof Rehabilitation & Reconstruction
                                    Mermis-Dreiling Residence (c.1900) / Kansas City, MO*
                                     Renovation & Elevator Addition
                                    Bodde Residence (1858 & 1866) / Leavenworth, KS*
                                      Rehabilitation & Restoration—Masonry, roof, windows, interiors, site
                                    Zander Residence (c.1840) / Camden Point, MO*
                                      Log Cabin Reconstruction & Additions
                                    Duffey Residence (c.1890) / Liberty, MO*
                                     Rehabilitation & Additions
16 /
                                    *Work completed while at another firm
Appendix

JVA Consulting
Engineers
CIVIL & STRUCTURAL ENGINEER

JVA is a consulting engineering firm headquartered in
Boulder, CO with offices in Fort Collins, Winter Park,
Denver, and Glenwood Springs. Since 1956, JVA has
provided structural engineering services to architects
and owners throughout the Rocky Mountain region and
nationwide. JVA's Civil Engineering department offers site
design and environmental services that complement their
structural experience.

JVA has contributed to a variety of historic projects
recognized by local and national preservation
organizations. Creative thinking, design sensitivity, and
cost-efficient engineering lead to innovative, yet practical,
solutions that fit within the Secretary of the Interior’s
Standards for the Treatment of Historic Properties,
architectural parameters, and project specific constraints.

JVA has a strong background in preservation and
renovation work on historic buildings. Our historic
preservation work started in the early 1970's with                                                            Bosler House
the stabilization, renovation, and preservation of the                                                          Denver, CO
Chautauqua Auditorium and Dining Hall structures in
                                                                roof system and deteriorating brick masonry walls. JVA was
Boulder, Colorado. Since that time, JVA’s preservation
                                                                part of the team that rehabilitated the mansion and earned
work has included Building Engineering Reports, Historic
                                                                a Mayor’s Design Award in 2018. Our extensive structural
Structure Assessments, and Construction Documents for
                                                                retrofit of the Many Glacier Hotel earned us an Excellence
several hundred building projects in the Rocky Mountain
                                                                in Structural Engineering Award from the National Council
Region and nationwide. We also helped to preserve three
                                                                of Structural Engineers in 2018.
of Colorado’s Most Endangered Places in the Dearfield
Townsite, the Thomasville Lime Kilns, and the Greek             JVA has a dedicated studio of engineers specializing in
Theatre/Voorhies Memorial. JVA is continuing design             Historic Preservation with team members dispersed in four
work on the phased stabilization of the Paris Mill, named a     of our five offices. JVA is also conversant with the Colorado
Most Endangered Place in 2004.                                  State Historic Fund's requirements for grant funding and the
                                                                appropriate treatment of historic properties. Memberships
JVA was the structural engineer on the Bromley Farm
                                                                in Colorado Preservation, Inc., the Colorado Historical
/ Koizuma-Hishinuma Farm Rehabilitation project that
                                                                Society, The National Trust for Historic Preservation, and the
was recognized at the 2018 Steven Hart Awards during
                                                                Association for Preservation Technology, Inc. help the firm
Colorado Preservation Inc.’s annual conference. The Bosler
                                                                keep updated with important historic preservation issues.
House in Denver was at risk of demolition due to a failed

17 /
Appendix

                                 Mark Rocheleau, PE
                                 CIVIL ENGINEER | JVA, INC.

                                 297 Bonus Gulch Way Site Grading & OWTS Design / Jefferson, Park County, CO
                                 As a Project Manager and Property Owner, tasks included the design of an on-site wastewater
                                 treatment system, site and driveway for a single-family residence to adhere to Park County and
                                 CDPHE standards. Wildfire mitigation implemented per Jefferson-Como Fire Protection District.
                                 502 & 504 Peak to Peak Highway / Nederland, CO
                                 As a Project Engineer, tasks included design improvements of site drainage, stormwater
                                 infrastructure, water quality and detention basin, vehicular and pedestrian safety and ADA routes,
                                 parking areas, water and sanitary sewer utilities. Stormwater Drainage Report completed that
Education                        included analysis of upstream drainage basins, stormwater infrastructure sizing, and detention and
University of Massachusetts-     water quality basin sizing. Coordination with Owner, Town of Nederland Staff, architect, structural,
  Amherst                        mechanical engineer, and contractor.
  B.S., Civil Engineering
                                 Boulder County Building Services, Walden Ponds VNC Building / Boulder, CO
Registrations                    As a senior project engineer, tasks included coordinating with Boulder County staff to see the
Professional Engineer, CO        project through the Site Plan Review Waiver process; providing ADA accessible parking and walking
Certified Floodplain Manager     paths to proposed building improvements; providing grading and drainage improvements to adhere
(CFM)                            to geotechnical engineer requirements; providing re-vegetation plans and details for erosion and
Colorado Association of          sedimentation controls; and generating Boulder County Grading Permit submittal. Coordinated with
Floodplain Stormwater Managers   Boulder County Planning and Permitting, and Boulder County Building Services team members.
Member (CASFM)                   Boulder County Parks & Open Space Altona Schoolhouse / Boulder, CO
                                 As a project engineer, tasks included analyzing overland stormwater drainage paths; creating cutoff
Affiliations                     swales to protect existing Altona schoolhouse; providing ADA accessibility improvements; providing
Mile High Flood District,        stormwater infrastructure, site, access and parking improvements per Boulder County standards.
 Member                          Coordinated with Boulder County Parks & Open Space, Landscape Architect, and Historic
                                 Preservation team members.
                                 Boulder County Parks & Open Space Braly Barn Rehabilitation / Longmont, CO
                                 As a project engineer, tasks included analyzing flood loads, and designing wet flood-proofing
                                 improvements at the existing Braly Barn; grading in cut-off swales, berms, grading away from the
                                 building per Boulder County standards. Coordinated with Boulder County Parks & Open Space,
                                 Landscape Architect, and Historic Preservation team members.
                                 Buena Vista School District High School & Middle School Replacement / Buena Vista, CO.
                                 Project Engineer for the high school and middle school campus replacement that included site,
                                 parking lot and ADA access design and grading, right-of-way drainage improvements, stormwater
                                 detention and water quality basin design per UDFCD guidelines, heavy coordination with consultant
                                 team and contractor throughout design and construction process. Limited grant funding required
                                 extensive coordination and creative thinking to deliver an economical construction set of documents.
                                 City of Salida Floodplain Administrator / Salida, CO
                                 Acting as City of Salida Floodplain Administrator, tasks include reviewing projects and processing
                                 floodplain development permits in the FEMA regulated floodplains, providing floodplain development
                                 guidance, reviewing NFIP map revision documents, coordinating with FEMA and CWCB for proposed
                                 watercourse revisions, evaluating and correcting violations, and maintaining floodplain development
                                 records.
                                 City of Salida Riverside Park Water Quality Improvements / Salida, CO.
                                 Senior Project Engineer for the public water quality improvements to the existing stormwater
                                 infrastructure directly discharging to the Arkansas River that included coordination for water
                                 quality equipment, modifications to existing stormwater infrastructure for stormwater diversion
                                 and bypass, ADA parking modifications, relocation of stormwater discharge location for pedestrian
                                 safety measures, bank stabilization within a FEMA regulated floodplain, and preparation of local
                                 Floodplain Development Permits and USACE nationwide permitting.
                                 Many Glacier Hotel Improvements, National Park Service / Many Glacier National Park,
                                 Babb, MO As a Design Engineer, tasks included design of stormwater, transportation, ADA, and
                                 utility improvements of existing conditions per National Park Service design standards for historic
                                 preservation and rehabilitation Project.
18 /
Appendix

                                    Christine Britton, PE
                                    STRUCTURAL ENGINEER | JVA, INC.

                                    Christine Britton is a Sr. Project Engineer in the structural engineering department at
                                    JVA, Inc. Her focus is on historic preservation projects and she holds a master’s degree in
                                    Historic Preservation. Since joining JVA over seven years ago, Christine has helped prepare
                                    numerous historic structures reports and assessments, as well as construction documents
                                    for historic buildings across Colorado and the western United States. Christine co-led
                                    an NPS preservation workshop at Pinnacles National Park in 2019 and is currently the
                                    President of the Rocky Mountain Chapter of the Association for Preservation Technology.
Education
University of Pennsylvania          Relevant Project Experience
  M.S., Historic Preservation       Church of the Holy Redeemer Sanctuary Strengthening / Denver, CO
University of Colorado-Boulder      O’Kane Farm Structures Rehabilitation / Lakewood, CO
  B.S., Architectural Engineering
                                    Goodnight Barn HSA & Temporary Stabilization / Pueblo, CO
Registrations                       Paris Mill Stabilization / Alma, CO
Professional Engineer, CO
                                    Columbia Cemetery Shed Stabilization / Boulder CO
                                    Lyons Library Depot Rehabilitation / Lyons, CO
Affiliations
Association for Preservation        Quigley Hall at Western State Colorado University Renovations / Gunnison, CO
  Technology International          Red Rocks Park CCC Camp Structure Assessments / Morrison, CO
Rocky Mountain Chapter of the       Bosler House HSA & Permanent Rehabilitation / Denver, CO
  Association of Preservation       Welborn House Rehabilitation & Renovation / Lakewood, CO
  Technology, President
                                    4 Bar 4 Stagecoach Hotel & Barn HSAs & Stabilization / Fraser, CO
Structural Engineers                DeLaney Loafing Shed HSA & Rehabilitation / Aurora, CO
  Association of Colorado
                                    Red Rocks Park CCC Camp Barracks 1 & 3 Rehabilitations / Morrison, CO
Women in Design, Denver
                                    Kolb Barn Rehabilitation / Boulder, CO
                                    Dagle-Wright Farmstead Rehabilitation / Boulder, CO
                                    DeLaney Farm Loafing Shed Rehabilitation / Aurora, CO
                                    Delaney Farm Structures Assessments / Aurora, CO
                                    Schofield Farm Structures Assessments / Erie, CO
                                    Quincy Farm Structures Assessments / Cherry Hills, CO
                                    Nunn Water Tower HSA / Nunn, CO
                                    Altona Schoolhouse HSA / Boulder, CO
                                    Dowis Hall at Northeastern Junior College HSA / Sterling, CO
                                    Byers-Evans House HSA / Denver, CO
                                    Fort Morgan School for the Performing Arts HSA / Fort Morgan, CO
                                    World’s Wonder View Tower HSA / Genoa, CO
                                    Bay Window House HSA / Grand Lake, CO
                                    St. Mary’s Catholic Church HSA / Central City, CO
                                    Longmont Elks HSA / Longmont, CO
                                    National Park Service, Various Locations
                                     Peaceful Valley Ranch HSR; Theodore Roosevelt National Park, ND
                                     Cusack Potato Barn Adaptive Reuse; Florissant Fossil Beds NM, CO
                                     Visitor Center Seismic Assessment / Retrofit; Joshua Tree National Park, CA
                                     Many Glacier Hotel Safety/Seismic Upgrades; Glacier National Park, MT
                                     Scotts Bluff Visitor Center Rehabilitation; Scotts Bluff, NE
                                     Far View Visitor Center HSR; Mesa Verde National Park, CO
                                     Spring Hill Ranch House & Site Wall Rehabilitation; Tallgrass Prairie National Preserve, KS
                                     Lake McDonald Cabins HSR; Glacier National Park, MT
19 /
                                     Quincy Mine Office and Calumet & Hecla Library HSR; Keweenaw National Historical Park, MI
Appendix

                                  Ian Glaser, PE
                                  STRUCTURAL ENGINEER | JVA, INC.

                                  Ian Glaser is a structural engineer with JVA and he leads their Historic Preservation group. The group
                                  combines technical aptitude, creative thinking, design sensitivity and effective communication to
                                  deliver successful preservation, rehabilitation, stabilization, and investigation projects. For the past
                                  16 years Ian has been focused on this work regionally and nationwide. Ian is a regular presenter at
                                  Colorado Preservation Inc.’s annual Saving Places Conference. Much of his work is funded by the
                                  Colorado State Historical Fund and the National Park Service.
                                  Ian was the project engineer on the Dinosaur National Monument Quarry Exhibit Hall which
                                  was recognized in Civil Engineering magazine and featured JVA's micropile underpinning design.
Education                         He worked for over a decade on the phased rehabilitation of the Many Glacier Hotel in Glacier
Stanford University               National Park, MT which won a 2018 Excellence in Structural Engineering Award from the National
  M.S., Civil & Environmental     Council of Structural Engineers Association.
  Engineering
University of Pennsylvania
  B.S.E, Mechanical Engineering   Relevant Project Experience
                                  Bromley Farm Structures Rehabilitation / Brighton, CO
Registrations
Professional Engineer, CO         O’Kane Farm Structures Rehabilitation / Lakewood, CO
                                  DeLaney Farm Loafing Shed Rehabilitation / Aurora, CO
Affiliations                      Metzger Farm Structures Rehabilitation / Westminster, CO
Association for Preservation
                                  Governor’s Mansion Rehabilitation / Denver, CO
  Technology International,
  Rocky Mountain Chapter          Goodnight Barn Rehabilitation / Pueblo, CO
                                  Paris Mill Stabilization / Alma, CO
                                  Louisville Grain Elevator HSA and Stabilization / Louisville, CO
                                  Silverton School Renovation / Silverton, CO
                                  Braly/Wencel Barn Stabilization / Longmont, CO
                                  Redstone Coke Ovens Stabilization and Restoration / Redstone, CO
                                  Frying Pan Kilns Stabilization / Basalt, CO
                                  Montrose Elks Building & City Hall Stabilization & Rehabilitation / Montrose, CO
                                  Chautauqua Auditorium Assessment and Truss Strengthening / Boulder, CO
                                  Breckenridge Community Building Adaptive Reuse & Rehab / Breckenridge, CO
                                  Hannah Barker House Rehabilitation / Boulder, CO
                                  Leadville Train Depot (FREIGHT) Adaptive Reuse / Leadville, CO
                                  Altona Schoolhouse HSA and Rehabilitation / Boulder, CO
                                  Bosler House Rehabilitation / Denver, CO
                                  Montrose County Courthouse HSA / Montrose, CO
                                  National Park Service, Various Locations
                                   Sperry Chalet Restoration; Glacier National Park, MT
                                   Peaceful Valley Ranch HSR; Theodore Roosevelt National Park, ND
                                   Cusack Potato Barn Adaptive Reuse; Florissant Fossil Beds NM, CO
                                   Visitor Center Seismic Assessment & Retrofit; Joshua Tree NP, CA
                                   Old Santa Fe Trail Building Exterior Rehabilitation; Santa Fe, NM
                                   Many Glacier Hotel Seismic Retrofit and Rehab; Glacier National Park, MT
                                   El Tovar and Hopi House HSRs; Grand Canyon National Park, AZ
                                   Quarry Exhibit Hall Rehabilitation & Underpinning; Dinosaur NM, UT
                                   Big Springs Rehabilitation; Ozarks National Scenic Riverway, MO
                                   Scotts Bluff Visitor Center HSR, Rehab & Addition; Scotts Bluff NM, NE
                                   Bright Angel Trailhead Improvements; Grand Canyon NP, AZ
                                  USFS Promontory Fire Lookout Tower Assessment; Apache-Sitgreaves NF, AZ

20 /
Appendix

360 Engineering,
Inc.
MECHANICAL & PLUMBING ENGINEER

360 Engineering is a full-service woman-owned mechanical
engineering firm headquartered in Golden, Colorado.
Founded in 2003 by Denise Dihle, PE, the firm was built
on providing exceptional customer service, which remains
360's core value and top priority. 360 Engineering’s
diverse range of mechanical and plumbing engineering
experience includes over 30 historic rehabilitation
projects with the National Park Service, as well as historic
structure projects for State, Local, and private clients.
360's historic work experience includes mechanical and
plumbing system Historic Structure Assessments, Historic
Structure Reports, and consulting/design for full building
rehabilitations.

                                                                  Many Glacier Hotel
                                                               Glacier National Park

  Scotty's Castle
     Death Valley
    National Park

21 /
Appendix

                                      Denise Dihle, PE, LEED AP BD+C, HBDP, CxA
                                      MECHANICAL & PLUMBING ENGINEER, PRINCIPAL | 360 ENGINEERING, INC.

                                      With over 25 years of experience Denise M. Dihle, PE, has provided mechanical engineering
                                      consulting and design services for historic rehabilitation projects in Colorado and across the United
                                      States. Denise spends time upfront to understand the uniqueness of each project and coordinates
                                      with the client and architectural team to design effective and sustainable HVAC and plumbing systems
                                      while maintaining historical integrity.

                                      Relevant Project Experience
                                      Bosworth House Historical Landmark Renovation / Denver, CO
Education
Postgraduate Dale Carnegie
                                      Rock Ledge Ranch House Historic Greenhouse Steam Boiler Documents for Pricing & Fundraising /
  Training                              Colorado Springs, CO
  CSU Project Management              Belmar Farm Estate Outbuildings (Caretaker’s Cottage) Remodel & Mechanical Upgrades /
Colorado School of Mines                Lakewood, CO
  B.S., Mechanical Engineering
                                      Belmar Heritage Center Exhibit Room Upgrades / Lakewood, CO
Registrations                         Belvidere Theatre Rehabilitation / Central City, CO
Professional Engineer: CO, AK,        Colorado Springs Pioneers Museum Restroom / Colorado Springs, CO
AL, AZ, CA, FL, HI, ID, IL, IN, KS,
MI, MO, MT, ND, NE, NM, NJ,
                                      Schofield Farm Open Space HSA and Recommendations / Erie, CO
NV, NY, OH, OK, OR, SD, TN,           Rifle Masonic Lodge Assessment/SD Narrative / Rifle, CO
TX, UT, VA, WA, WI, WY; NCEES         St Luke’s Episcopal Church HSA / Denver, CO
Record Holder
                                      Quincy Farm HSA / Cherry Hills Village, CO
Certifications                        O’Kane Farm HSA and Mechanical Recommendations / Lakewood, CO
ASHRAE HBDP High-                     Nomad Playhouse New Mechanical System / Boulder, CO
  Performance Building Design         La Junta Plaza Block New Mechanical/Plumbing System / La Junta, CO
  Professional
                                      Alma Ladies Aid Building Performing Arts Addition / Alma, CO
ACG Certified Commissioning           Pearce McAllister Cottage HSA / Denver, CO
 Authority (CxA)
                                      Cheyenne Building Phantom Canyon Remodel / Colorado Springs, CO
USGBC LEED AP Building
                                      1909 Breckenridge Town Hall Schoolhouse - Summit County Library South Branch, Renovation /
  Design + Construction
                                        Breckenridge, CO
                                      Redstone Castle ADA Guest Rooms & Restrooms / Redstone Historic District, CO

22 /
You can also read