SPACE OPPORTUNITY CONNECT CORPORATE CENTRE | SEPTEMBER 2018 - Goodman Australia
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
GOODMAN IS PLEASED TO PRESENT AN OUTSTANDING OPPORTUNITY AT CONNECT CORPORATE CENTRE CONTENTS CONNECT CORPORATE CENTRE – STAGE 3 4 PLANS 12 PROPOSED TENANCY 16 CONTACT 20 2 SEPTEMBER 2018
OVERVIEW+ EXCITING OPPORTUNITY “CONNECT CORPORATE CENTRE IS A CONTEMPORARY NEW MIXED USE PRECINCT LOCATED IN THE FAST GROWING MASCOT AREA. THREE MODERN, PURPOSE-BUILT OFFICE BUILDINGS, A 5 STAR 229 ROOM PULLMAN HOTEL AND GROUND FLOOR RETAIL DEVELOPMENT WILL CREATE A VIBRANT, INTERACTIVE BUSINESS COMMUNITY.” Artist’s impression – Stage 3 showroom 3 MODERN Architecturally designed office buildings EXISTING CUSTOMERS 5 STAR HOTEL 229 room Pullman Hotel and retail precinct 4 SEPTEMBER 2018 Qudos Bank, Kone Elevators, JLL, Matrix Technologies, Boston Scientific, TJX Australia, Jaguar Land Rover Australia, Department of Agriculture and Water Resources, Henry Schein Halas and the Accor operated Pullman Sydney Airport Hotel.
OPPORTUNITY+ THIS IS A UNIQUE OPPORTUNITY TO LOCATE TO STAGE 3 OF THIS BRAND NEW, CUSTOM DESIGNED CAMPUS LOCATED ON THE CORNER OF BOURKE ROAD AND O’RIORDAN STREET IN MASCOT. THIS EXCITING DEVELOPMENT OFFERS: A contemporary mixed use office, hotel and retail precinct with total development potential of 51,000 sqm GFA. + Stage 1 – A 229 room, 5 star Pullman Hotel with restaurant, bar and conference facilities and a 6,165 sqm commercial building, leased to Qudos Bank, JLL, Boston Scientific and Matrix Applied Technologies. + Stage 2 – A newly completed 13,054 sqm commercial office building leased to Kone Elevators and Department of Agriculture and Water Resources, MJM Corporate Risk Services and COG Systems. + Stage 3 – A 19,084 sqm commercial office building currently under construction with expected completion in July 2018. Pre-committed customers include TJX Australia, Jaguar Land Rover Australia and Henry Schein Halas. + Environmentally sustainable design 4.5 star NABERS energy rating and 4 star Green Star Design and As-Built. + Innovative design and architecture providing flexible floor plates to create a modern working environment. + End of trip facilities including bike racks, club lockers, shower and gym facilities. + On-site secure parking and two access points from Bourke Road and O’Riordan Street. + Prominent location affords excellent company exposure and signage with impressive regional views. + Close proximity to Mascot train station and public bus services. SEPTEMBER 2018 5
Westlin Castle Hill ale k M7 aV LOCATION+ Frenchs Forest Mon Norwest M Gordon Dee Why 2 Macquarie Corporate Park M Ro ad Glendenning ot M2 M or e otorw v wa Lane Co Penrith y ay Brookvale Mount Druitt Epping Blacktown Epping Roa d Macquarie Great Arndell Park Park West M4 Motorw er n Hig ay hway Manly Chatswood M4 Parramatta Mot North Ryde Eastern Creek orw Artarmon ay Greystanes ad Pa Ro Sydney rra Roa d e Olympic idg Neutral Bay Tempe Br Garden ma Park ns ers Roa Horsley Park tta Gladesville wi d Ro Ur rd Bourke Connect Corporate Centre t Wetherill Park ad re e M7 t y wa S Qantas Driv an gh o ad Drummoyne Vaucluse tlink e e Balmain Sydney Hi Driv Five ort O’Rio es rp Botany R Dock Wolli CBD inc Ai y Wes Pr nd Highwa Creek Mascot Cit Pyrmont y West Link Joy Lidcombe Glebe Paddington ce Road or Driv Parramatta tribut Cecil Hills d e oa Cumberla Kogarah Golf Sydney Bondi City R Course Airport Hu rn Dis me Alexandria So Highway ut hW Greenacre Easte es ter rive n Mo olm es D Randwick Th to r Gene ral H Botany Bankstown e w ay Campsie Kyeemagh ive Fore Dr No Coogee es Mascot sho Prestons lm rth Moorebank Roselands re Ho M5 M ay M5 Motorw R d otorw l er n ra oa ne ay Ge Road Botany Connect Corporate Centre EASY ACCESS Hurstville Banksmeadow Connect Corporate Centre is ideally located adjacent to the established business precinct of Mascot, in vibrant South Sydney. Urban Sans Souci y Ingleburn ay wa renewal has transformed Mascot from a w gh or Hi traditional industrial area to a new vibrant ces Prin ot M Sylvania Kurnell business, retail and residential community. 5 M High profile companies in the surrounding business precinct include TNT, Qantas, Staples, Sutherland Electrolux and DHL. Sydney South/South West Region Engadine Carringbah Sydney North Region DIRECT Cronulla Sydney West Region 5km 400M 800M 7KM to Mascot to Sydney to Sydney 400M 3.5KM LINKS 9 BUS train station Domestic Airport CBD services to Mascot to Sydney Town Centre International Airport 6 SEPTEMBER 2018
HEADLINE#2+ Sydney International Airport Sydney Domestic Airport Airport Drive Connect Corporate Centre General Holmes Drive Bourke Road O’Riordan Street SEPTEMBER 2018 7
STAGE 3+ KEY+FEATURES “THIS EXCITING Connect Corporate Centre features expansive floor plates delivering absolute flexibility and the opportunity to maximise productivity within your workforce. BUILDING The facilities are designed to achieve a 4.5 star NABERS (National Australian Built Environment Rating System) Energy Rating and 4 star Green Star Design. PROVIDES THE OPPORTUNITY Location 189 O’Riordan Street, Mascot TO CREATE A Site access + Vehicular access – Two access points from Bourke Road and O’Riordan Street TRULY MODERN, + Pedestrian access – Mascot train station 400m north of the site. 9 bus routes on O’Riordan Street and Bourke Road adjacent to the site FLEXIBLE WORK Building design + Floor plates of 2,043 sqm. Large floor plates with minimal columns provide opportunity for multiple fitout design solutions ENVIRONMENT.” + Structural design of building will accommodate slab penetrations for interfloor stair. Slab penetrations between structural beams on each floor plate level + End of trip facilities provided for employee cyclists, runners and walkers + Interior design to the ground floor, lobby, amenities and end of trip facilities completed by Woods Bagot Environmental credentials 4.5 star NABERS energy rating and 4 star Green Star Design and as-built Development approvals DA approved for Stage 2 and 3 for 34,350 sqm GFA commercial office development Public transport 400m to Mascot train station. STA bus stop on the street, 9 bus services run regularly Car parking 1 space per 37 sqm Proposed onsite amenities Cafés, general convenience store, gym, hotel, conference facilities, restaurant Exposure Well located on corner of Bourke Road and O’Riordan Street on most prominent site in Mascot. Non exclusive building signage is available. Practical Completion Construction commenced January 2017. Completion July 2018. 8 SEPTEMBER 2018
CONCEPT+ Estate entry from Bourke Road Estate landscaping from O’Riordan Street Connect Corporate Centre – Stage 2, Lobby SEPTEMBER 2018 9
HEADLINE#2+ Artist’s impression – Stage 3 Lobby Entry, Connect Corporate Centre SEPTEMBER 2018 11
PLANS+ STAGE 2 STAGE 3 MASTERPLAN UNDER CONSTRUCTION COMPLETION AUG 2017 UNDER CONSTRUCTION COMPLETION JUL 2018 AREA SCHEDULE GFA SQM NLA SQM Stage 3 Ground floor 1,515 1,341 00 SITE BOUNDARY 60 FFL 8900 Level 1 office 1,584 1,543 1:8 VENT (TBC) 4712 Level 2 office 2,085 2,043 1:8 1:5 RAMP Level 3 office 2,085 2,043 1:5 RAMP Level 4 office 2,061 2,019 OPTION OUTDOOR BBQ AREA Level 5 office 2,061 2,019 Level 6 office 2,061 2,019 Level 7 office 2,061 2,019 SITE BOUNDARY Level 8 office 2,061 2,019 Level 9 office 2,061 2,019 Plant – – Roof – – Total West Tower 19,636 19,084 Y NDAR BOU SITE SUB SUB VENT (TBC) SITE BOUNDARY STAGE 1 COMMERCIAL BUILDING HOTEL COMPLETED 12 SEPTEMBER 2018
1 2 SECTION PLAN – STAGE 2 3 4 5 6 7 8 9 E10 E11 SECTION PLAN – STAGE 3 E12 E13 E14 E15 E16 RL 51000 RL 51000 ROOF EAST ROOF RL 46190 RL 46200 PLANT EAST PLANT OFFICE LEVEL 11 OFFICE LEVEL 9 RL 42390 RL 42400 LEVEL 11 EAST LEVEL 09 OFFICE LEVEL 10 OFFICE LEVEL 8 RL 38710 RL 38750 LEVEL 10 EAST LEVEL 08 OFFICE LEVEL 09 OFFICE LEVEL 7 RL 35030 RL 35100 LEVEL 09 EAST LEVEL 07 OFFICE LEVEL 08 OFFICE LEVEL 6 RL 31350 RL 31450 LEVEL 08 EAST LEVEL 06 OFFICE LEVEL 07 OFFICE LEVEL 5 RL 27670 RL 27800 LEVEL 07 EAST LEVEL 05 PARKING LEVEL P6 RL 24800 OFFICE LEVEL 4 RL 24150 LEVEL P6 PARKING LEVEL P5 EAST LEVEL 04 RL 22150 OFFICE LEVEL 3 LEVEL P5 RL 20500 PARKING LEVEL P4 RL 19500 EAST LEVEL 03 LEVEL P4 PARKING LEVEL P3 OFFICE LEVEL 2 RL 16850 RL 16850 LEVEL P3 EAST LEVEL 02 PARKING LEVEL P2 RL 14200 OFFICE LEVEL 1 LEVEL P2 RL 13200 PARKING LEVEL P1 RL 11550 EAST LEVEL 01 LEVEL P1 GROUND FLOOR RETAIL GROUND LEVEL & SHOWROOM RL 8700 RL 8700 GROUND EAST GROUND RL 5600 RL 5600 BASEMENT - WEST BASEMENT - EAST STAGE 2 CUSTOMERS STAGE 3 CUSTOMERS n Kone n Vacancy n Department of Agriculture and Water Resources n Henry Schein n COG Systems and MJM Corporate Risk Services n TJX Australia n Southside Deli & Rotisserie n Jaguar Land Rover Australia n Retail for Lease n Livingstone n Sims Metal n Colliers n Lendlease n Patterson SEPTEMBER 2018 13
PLANS+ LEVEL 8 PLAN – STAGE 3 994 sqm 455 sqm 509 sqm n Available 14 SEPTEMBER 2018
SEPTEMBER 2018 15
PROPOSED TENANCY+ Location Connect Corporate Centre 189 O’Riordan Street Mascot 2020 Ownership Goodman Australia Industrial Partnership (“GAIP”) Agents Direct with Goodman Management Goodman Property Services will manage the property. A dedicated Building Manager will provide on-site support for day-to-day operations, while a Property, Asset and Portfolio Manager will be available to discuss any lease queries, invoicing issues or modifications to tenancies Building Stage 3 of Connect Corporate Centre. This is the final stage of the development. Stage 3 is a 19,084 sqm NLA 9 storey office building with ground floor retail and showroom space. A secure car park with over 500 car spaces are being built with this development Building services Building Design brief attached as Annexure A Special services Access to common loading dock available ESD features + 4.5 star NABERS Energy Rating + 4 star Green Star and as-built Parking + On-site secure car parking is provided to customers at a rate of 1 space per 37 sqm NLA. + A new 800 car space Park and Fly car park is being completed on adjoining site with access off King Street. The car park is being operated by Alf Wilson Amenities + End of Trip (EOT) facilities will be provided. The EOT facilities are located in the basement car park adjacent to the building core + A secure bicycle store is provided in the basement car park + An unmanned customer only gymnasium is provided on-site and situated on ground floor in the Stage 2 development + Childcare facilities are located nearby the site on Bourke Road + A 5 star 229 room hotel with conference facilities, bar and restaurant are provided in Stage 1 of the development + A 95 seat café is located within Stage 2 of the development 16 SEPTEMBER 2018
Office area (NLA) Level 8 – 514 sqm Floor plate Large floor plates o 2,019 sqm per level Level 8 includes an external balcony area fronting O’Riordan Street – this is not included in the NLA Compliance Brand new facility to be completed in July 2018. Details of compliance certificates can be provided on completion Availability August 2018 Security See Annexure A Design Brief Co-tenant profile Stage 1 Development Pullman Hotel, Qudos Bank, Jones Lang Lasalle, Matrix Technologies, Boston Scientific Stage 2 Development Kone Elevators, Federal Government Department, MJM Corporate Risk Services, COG Systems and Southside Deli Stage 3 Development TJX Australia, Jaguar Land Rover Australia, Henry Schein Halas Australia, Patterson Building Group, Lend Lease, Colliers International, Livingstone International and Sims Metal Timeline Construction start date: January 2017 Early access: Can be accommodated prior to the lease commencement Practical Completion: 1 August 2018 SEPTEMBER 2018 17
Goodman overview OWN+DEVELOP+MANAGE GOODMAN IS ONE With total assets of A$38.3 billion and 366 properties under OF THE LARGEST management, Goodman is one of the largest listed industrial LISTED INDUSTRIAL property groups in the world. We are building value in PROPERTY GROUPS property and fund management with innovative new GLOBALLY. developments, business models and investment offerings. Our integrated own+develop+manage customer service offering is at the heart of everything we do. This approach allows us to build a comprehensive understanding of customer needs, resulting in long-term relationships, superior investment returns and developments that meet organisations’ individual requirements. With approximately 1,000 professionals working in 29 offices across 17 countries, Goodman has the global reach to meet our customers’ changing needs. 18 SEPTEMBER 2018
$ 38.3bn 1,600+ We invest in business parks, office parks, industrial estates, warehouses and distribution centres. We offer a range of listed and unlisted property funds, giving investors access to our specialist business space customer services and property. total assets under management base (approx.) 17.3m 366 17 sqm of business space business space properties total number of countries under management under management operating in $ 3.6bn development work in progress 1,000 29 dedicated property professionals (approx.) offices worldwide As at 30 June 2018 SEPTEMBER 2018 19
CONTACT NAME WILSON DAVID GOODMAN General Title Manager Commercial Address line 1 david.wilson@goodman.com email.address@goodman.com Address line 2 T +61020000 T +61 92300000 7224 T 0 0000 0000 M +61000 M+61 400000 015000 536 M 0 0000 0000 CAMERON RUBENACH www.goodman.com Development Manager cameron.rubenach@goodman.com T +61 2 9230 7347 M +61 450 744 317 GOODMAN Level 17 60 Castlereagh Street Sydney NSW 2000 T +61 2 9230 7492 connectcorporatecentre.com This document has been prepared by Goodman Property Services (Aust) Pty Ltd ABN 40 088 981 793 for general information purposes only. Whilst every care has been taken in relation to its accuracy, no warranty of accuracy is given or implied. You should obtain your own independent advice before making any decisions about the property referred to in this document. Images contained in this document have been used to enable the customer to visualise the development concepts only, and are not intended to definitively represent the final product. September Month 20152018
You can also read