South African National Parks - 2023/24 Strategic Plan and 2021/22 Annual Performance Plan

Page created by Carolyn Manning
 
CONTINUE READING
South African National Parks - 2023/24 Strategic Plan and 2021/22 Annual Performance Plan
South African National Parks

2023/24 Strategic Plan and 2021/22 Annual
            Performance Plan

                                  1
South African National Parks - 2023/24 Strategic Plan and 2021/22 Annual Performance Plan
CONTEXT

Vision : A world-class system of sustainable national parks reconnecting and inspiring society.

Mission : To develop, protect, expand, manage and promote a system of sustainable national parks that represents
natural and cultural heritage assets, through innovation, excellence, responsible tourism and just socio -economic
benefits for current and future generations.

Impact Statement

National Parks conserve biodiversity and cultural heritage; contribute to the economy, providing socio-economic
benefits, access, ecotourism experiences to the people of SA and the world.

Outcome Goals

1. Sustainable Biodiversity and Cultural Heritage across land and sea that delivers benefits for the people of South
   Africa and the world, now and in the future

2. Improved Diverse Responsible Tourism

3. Sustainable Socio-Economic Transformation Programme that ensures delivery of benefits to the land claimants,
   historically disadvantaged communities and the people of South Africa

4. Sustainable and Transformed Organization through revenue, people, systems, business processes and
   infrastructure

                                                                                           2
South African National Parks - 2023/24 Strategic Plan and 2021/22 Annual Performance Plan
ALIGNMENT WITH GOVERNMENT PRIORITIES
Government’s priorities    Outcome Goal                       MTSF Targets : 2021/22 – 2023-24
Eradicating poverty and    Sustainable    Socio-Economic      Transformation of wildlife economy through increased
improving people’s lives   Transformation Programme that      Previously Disadvantaged Individual (PDI) participation
                           ensures delivery of benefits to    • ≥ 2 200 animals donated and loaned to Previously
                                                                  Disadvantaged Individual (PDI) game farmers and
                           the land claimants, historically
                                                                  communities increased
                           disadvantaged      communities
                           and the people of South Africa     •   Job opportunities created: Full time Equivalent (FTEs): ≥
                                                                  23,096 ; Youth: ≥ 26,090; Women: ≥ 22,122 ; People with
                                                                  Disability: ≥ 854 (all in EPWP)
                                                              •   Number of SMMEs; Qualifying Small Enterprises (QSEs) &
                                                                  Exempt Micro Enterprises (EMEs) contracted for goods and
                                                                  services : EPWP ≥ 2,411 SMMEs; Goods and Services
                                                                  contracted to 400 EMEs and 400 QSEs for procurement
                                                                  below R500 000 (RFQs) & Goods and Services contracted
                                                                  to 60 EMEs and 60 QSEs for procurementabove R500 000
                                                              •   75% of overall procurement from BBBEE target groups
                                                              •   ≥ 1 600 beneficiaries trained
                                                              •   75 % of activities in the KNP & QwaQwa land claim
                                                                  beneficiation scheme annual plan implemented & 50 %
                                                                  activities implemented as per implementation plan for other
                                                                  registered land claims

                                                                                         3
South African National Parks - 2023/24 Strategic Plan and 2021/22 Annual Performance Plan
ALIGNMENT WITH GOVERNMENT PRIORITIES
Government’s priorities       Outcome Goal                       MTSF Targets : 2021/22 – 2023-24

Providing education, skills   Sustainable     Socio-Economic • ≥ 1000 schools and other target groups accessing national
and health                    Transformation      Programme      parks for educational purposes
                              (SET) that ensures delivery of
                                                              • Continued implementation of the Junior Scientists
                              benefits to the land claimants,
                                                                 programme
                              historically     disadvantaged
                              communities and the people of • Development of a clear Youth development progarmme as
                              South Africa                       part of the implementation of the SET programme
Building a capable state that Sustainable and transformed     Sound corporate governance :
serves the people             organization through revenue,   • Unqualified audit outcome with no findings;
                              people, systems, business
                              processes and infrastructure    • Conformance Rating with the International Standard for the
                                                                Professional Practice of Internal Auditing (ISPPIA) improved;
                                                                 • Matured Enterprise Risk Management (ERM) with
                                                                   rating level 5 according to the DFFE governance maturity
                                                                   framework achieved;
                                                                 • Matured Ethics Management with rating level 5 according to
                                                                   the DFFE governance maturity framework achieved
                                                                 • Integrated Transformation programme implemented including
                                                                   an organisation-wide climate survey and a culture and values
                                                                   review
                                                                 • 1,5% of total budgetspent on skills developmentfor staff

                                                                                               4
South African National Parks - 2023/24 Strategic Plan and 2021/22 Annual Performance Plan
Government’s priorities        Outcome Goal                       MTSF Targets : 2021/22 – 2023-24
Building a better Africa, Sustainable biodiversity and •               ≥ 990 (approved) animals delivered to African Range States
better world              cultural heritage across land                as per Ministerial approval
                          and sea delivers benefits for the
                          people of SA and the world, now •            Continued participation into and implementation of Trans-
                          and in the future                            frontier Conservation Areas (TFCAs)

                                                    Continued contribution to SA’s multi-lateral environmental
                                                                  •
                                                    agreements: e.g. Convention on Biological Diversity (CBD),
                                                    The Convention on International Trade in Endangered
                                                    Species PRIORITIES
                               ALIGNMENT WITH GOVERNMENT      of Wild Fauna and Flora (CITES), Ramsar;
                                                    Intergovernmental Science-Policy Platform on Biodiversity
                                                    and Ecosystem Services (IPBES).

                                                                  •    Climate change preparedness strategy approved & climate
                                                                       change vulnerability assessments compiled for ≥ 8 parks

                                                     CHALLENGES
 •    Continued impact of Covid-19, especially on the return of international visitors to SA : Revenue impact
 •    Financial sustainability
 •    Stakeholder Engagement – maintaining good relationships; maintaining a good reputation
 •    Wild life crime
 •    Employment Equity targets

                                                                                              5
2023/24 Strategic Plan and 2021/22 Annual Performance Plan
OUTCOME GOAL 1: SUSTAINABLE BIODIVERSITY AND CULTURAL HERITAGE ACROSS LAND AND SEA DELIVERS
BENEFITS FOR THE PEOPLE OF SA AND THE WORLD , NOW AND IN THE FUTURE
       PERFORMANCE INDICATOR                 2021/ 22 ANNUAL TARGET               2023/24 TARGET

SUB-OUTCOME 1: PROTECTED AREAS EXPANSION ALIGNED WITH THE NATIONAL PROTECTED AREA EXPANSION
STRATEGY (NPAES) AND SANPARKS LAND INCLUSION PLAN

Number of hectares added to national 4 000 ha                            160 300 ha added to national
parks                                                                    parks

SUB-OUTCOME 2: EFFECTIVE AND EFFICIENT MANAGEMENT OF NATIONAL PARKS
Percentage of Management Effectiveness ≥ 55 % progress against ≥ 70 % progress against
Tracking Tool (METT) corrective actions identified          Management identified     METT     corrective
implemented                             Effectiveness    Tracking   Tool actions
                                        (METT) corrective actions
                                                                         20 National Parks Assessed. Of
                                        20 National Parks Assessed. Of these 80% with a METT Score of
                                        these, at least 80% of parks and ≥ 67% & 6 Marine Protected
                                        33% of six Marine Protected Areas Assessed, 50% with a
                                        Areas with a METT Score of METT Score of ≥ 67%.
                                        ≥67%

                                                                            6
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 1: SUSTAINABLE BIODIVERSITY AND CULTURAL HERITAGE ACROSS LAND AND SEA
DELIVERS BENEFITS FOR THE PEOPLE OF SA AND THE WORLD , NOW AND IN THE FUTURE

     PERFORMANCE INDICATOR             2021/ 22 ANNUAL TARGET   2023/24 TARGET

SUB-OUTCOME 3: DEGRADED ECOSYSTEMS REHABILITATED

Number of degraded hectares of land   9,456 initial ha          74,281 initial ha (cumulative)
under rehabilitation

                                      61,003 follow-up ha       521,608 follow-up ha (cumulative)

Number of m³ of degraded wetlands     5,100 m³ wetlands         27,250 m³ wetlands (cumulative)
under rehabilitation

                                                                       7
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 1: SUSTAINABLE BIODIVERSITY AND CULTURAL HERITAGE ACROSS LAND AND SEA DELIVERS
BENEFITS FOR THE PEOPLE OF SA AND THE WORLD , NOW AND IN THE FUTURE

PERFORMANCE INDICATOR                       2021/ 22 ANNUAL TARGET                                    2023/24 TARGET

SUB OUTCOME 4: CLIMATE CHANGE VULNERABILITY REDUCED AND CLIMATE RESILIENCE IMPROVED

Number of parks assessed for     Wide-scale engagement on draft climate change Climate  change               preparedness      strategy
climate change vulnerabilities   preparedness strategy                         approved
                                 Climate    change     vulnerability    assessments    Cumulatively, climate change vulnerability
                                 compiled for 2 national parks                         assessments compiled for ≥ 8 parks

                                                                                       Green Energy Strategy, Implementation Plan &
Green Energy programme                                                                 implementation of prioritised projects, including
                                 Green Energy Implementation Plan
developed for SANParks                                                                 alternative energy mix options

SUB OUTCOME 5: A FRAMEWORK TOWARDS IMPROVED MANAGEMENT OF CULTURAL HERITAGE DEVELOPED

Number of Cultural Heritage      Cultural heritage resources in 2      national parks Cultural heritage resources in 6 national parks
assessments conducted            assessed                                             assessed
                                                                                       Heritage Register for parks developed

                                                                                                  8
2023/24 Strategic Plan and 2021/22 Annual Performance Plan
OUTCOME GOAL 1: SUSTAINABLE BIODIVERSITY AND CULTURAL HERITAGE ACROSS LAND AND SEA DELIVERS
BENEFITS FOR THE PEOPLE OF SA AND THE WORLD , NOW AND IN THE FUTURE

PERFORMANCE INDICATOR               2021/ 22 ANNUAL TARGET                               2023/24 TARGET

SUB OUTCOME 6 : SUSTAINABLE RHINO POPULATIONS MONITORED AND INCREASED

Percentage          annual Rhino population in KNP increasing at Rhino population in KNP increasing at 1%
increase      in     rhino 0,5%                                  annually
populations

                            Rhino population       in     other    parks Rhino populations in other national parks
                            increasing at 4%                             increasing at 3% annually
SUB OUTCOME 7: CONTRIBUTION TO IMPROVED WILDLIFE POPULATIONS OF AFRICAN RANGE STATES SUSTAINED

Number       of    approved 495 animals       delivered     to    Zinave By 2023, ≥ 990 animals donated
animals     delivered     to National Parks                              (cumulatively) and delivered to African
African Range States as                                                  range states
per Ministerial approval

                                                                                     9
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 1: SUSTAINABLE BIODIVERSITY AND CULTURAL HERITAGE ACROSS LAND AND SEA DELIVERS
BENEFITS FOR THE PEOPLE OF SA AND THE WORLD , NOW AND IN THE FUTURE

PERFORMANCE INDICATOR             2021/ 22 ANNUAL TARGET                       2023/24 TARGET

SUB OUTCOME 8 : WILDLIFE CRIME IN NATIONAL PARKS REDUCED
Number of rhinos poached KNP: Reduce number of rhinos poached in KNP: reduce number of rhinos poached
in KNP and 6 parks KNP to less than 230 animals                  to less than 875 (cumulative)
reduced

                         Other rhino parks: Maintain the number of Other rhino parks: reduce number of
                         rhinos poached to less than 5 animals     rhinos poached to less than 25
                                                                   (cumulative)

Number    of   elephants KNP: Reduce number of elephants KNP: reduce number of elephants
poached reduced          poached to less than 40 animals poached to less than 180 (cumulative)
                         Other parks: Reduce the number of Other parks: reduce number of
                         elephants poached to less than 4 animals elephants poached to less than 20
                                                                  (cumulative)

                                                                          10
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 2: IMPROVED DIVERSE RESPONSIBLE TOURISM

        PERFORMANCE INDICATOR                         2021/ 22 ANNUAL TARGET                        2023/24 TARGET

SUB-OUTCOME 9: IMPROVED TOURISM PERFORMANCE

Percentage improvement in Customer             1% point improvement on the baseline       0,5% point improvement on previous
Satisfaction Index (CSI) rating                annual CSI score of 31 March 2021          year (2022/23)

Percentage increase in number of visitors to   83,3% increase on previous actual          11,0% up on previous year (2022/23)
national parks year on year                    (2020/21) (forecast at 1 800 000)

Percentage increase in Accommodation           20, 0% point increase on previous actual   0,6% points up on previous year
Occupancy                                      (2020/21) (forecast at 35, 0%)             (2022/23)

Total Number of New and Diverse Tourism        10                                         14 ( 38 cumulatively)
Products Implemented
SUB-OUTCOME 10: IMPROVED RESPONSIBLE TOURISM

A responsible tourism auditing framework       Responsible Tourism audit conducted in 4   16 parks audited
implemented                                    National Parks

                                                                                            11
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 3: SUSTAINABLE SOCIO ECONOMIC DEVELOPMENT PROGRAMME THAT ENSURES DELIVERY OF
BENEFITS TO THE LAND CLAIMANTS , HISTORICALLY DISADVANTAGED COMMUNITIES AND THE PEOPLE OF SA

        PERFORMANCE INDICATOR                       2021/ 22 ANNUAL TARGET                          2023/24 TARGET

SUB-OUTCOME 11: TRANSFORMATION OF WILDLIFE ECONOMY THROUGH INCREASED PDI PARTICIPATION

Number of animals delivered to communities and 500 Animals delivered                  ≥ 1 600 animals delivered
individual emerging game farmers.

Number of full-time equivalent employment       EPWP FTE: ≥ 4,275                     EPWP FTEs: ≥ 23,096 (cumulative)
(FTE) job opportunities created through EPWP.

Number of jobs created for youth, women and     Youth EPWP: ≥ 5,500                   EPWP Youth: ≥ 26,090 (cumulative)
people with disabilities through EPWP
                                                Women EPWP: ≥ 4,500                   EPWP Women: ≥ 22,122 (cumulative)
                                                People with Disabilities EPWP : ≥ 210 EPWP People with Disability: ≥ 854
                                                                                      (cumulative)

                                                                                               12
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 3: SUSTAINABLE SOCIO ECONOMIC DEVELOPMENT PROGRAMME THAT ENSURES DELIVERY OF
BENEFITS TO THE LAND CLAIMANTS , HISTORICALLY DISADVANTAGED COMMUNITIES AND THE PEOPLE OF SA

     PERFORMANCE INDICATOR                                2021/ 22 ANNUAL TARGET                                 2023/24 TARGET

SUB-OUTCOME 12: IMPROVED PARTICIPATION OF PDIs IN SANPARKS BUSINESS

Number of SMMEs contracted for provision of   No. of SMMEs’ contracted through EPWP ≥ 442            EPWP ≥ 2,411 SMMEs
services and goods

Number of EMEs and QSEs contracted for        Goods and Services contracted to 100 EMEs and 100      Goods and Services contracted to 400 EMEs
goods and services                            QSEs for procurement below R500 000 (RFQs) & Goods     and 400 QSEs for procurement below R500 000
                                              and Services contracted to 20 EMEs and 20 QSEs for     & Goods and Services contracted to 60 EMEs
                                              procurement above R500 000                             and 60 QSEs for procurement above R500 000

Percentage of expenditure on preferential     70 % of Total procurement spent on Designated Groups   80%
procurement

Integrated Transformation programme           Transformation Integration Implementation Plan and 100%      implementation      of           the
implemented                                   Transformation Dashboard developed                 Transformation Implementation Plan

                                                                                                           13
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 3: SUSTAINABLE SOCIO ECONOMIC DEVELOPMENT PROGRAMME THAT ENSURES DELIVERY OF
BENEFITS TO THE LAND CLAIMANTS , HISTORICALLY DISADVANTAGED COMMUNITIES AND THE PEOPLE OF SA

         PERFORMANCE INDICATOR                          2021/ 22 ANNUAL TARGET                2023/24 TARGET
SUB-OUTCOME 13: INCREASED ACCESS TO EDUCATION AND SKILLS DEVELOPMENT OPPORTUNITIES
Number of beneficiaries from targeted groups ≥ 300                    ≥ 1 600
trained
Number of schools and targeted groups accessing ≥ 100                                ≥ 1000
the national parks for educational purposes

SUB- OUTCOME 14: SUSTAINED CORPORATE SOCIAL INVESTMENT TOWARDS COMMUNITY DEVELOPMENT
Number of individuals/communities where Social ≥ 3                                   ≥ 15
Legacy projects have been completed

SUB OUTCOME 15: IMPROVED PARTICIPATION OF LAND CLAIMANTS IN SANPARKS BUSINESS
Claimant Beneficiation Scheme developed and 30% of the planned activities on KNP     75% of activities in the KNP &
implemented as per Land Claims identified   beneficiation Scheme implemented & 30    QwaQwa land claim beneficiation
                                            % of the planned activities on QwaQwa    scheme annual plan implemented
                                            Land Claim beneficiation       package   & 50% activities implemented as per
                                            implemented                              implementation plan for other
                                                                                     registered land claims

                                                                                     14
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 4: SUSTAINABLE AND TRANSFORMED ORGANISATION THROUGH REVENUE , PEOPLE, SYSTEMS AND
BUSINESS PROCESSES

        PERFORMANCE INDICATOR                      2021/ 22 ANNUAL TARGET                2023/24 TARGET

SUB-OUTCOME 16: FINANCIALLY SUSTAINABLE ORGANIZATION

Revenue      raised   through       resource R75 million                        R 95 million ( R225 cumulatively)
mobilisation
Revenue       raised   through       Tourism R 1.1 billion                      20% increase on actual 2022/23
Performance
Revenue raised through Wildlife sales        ≥ R4 million                        Variable - capture and delivery of
                                                                                 last animals towards target income
                                                                                 of ≥ R 4 million ( R 18 million
                                                                                 cumulatively)
20 Year Financial sustainability model 20 Year Financial          sustainability 20 Year Financial sustainability
developed                              model developed                           model developed and implemented

                                                                                  15
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 4: SUSTAINABLE AND TRANSFORMED ORGANISATION THROUGH REVENUE , PEOPLE, SYSTEMS AND
BUSINESS PROCESSES

    PERFORMANCE INDICATOR                            2021/ 22 ANNUAL TARGET                         2023/24 TARGET

SUB-OUTCOME 17: TRANSFORMED & CAPABLE HUMAN CAPITAL
Percentage of women in management 39.3% Women employees in management positions as a 41% WM
positions                         percentage of all management

Percentage of People with Disabilities 1.1% Employees with disabilities as a percentage of all 1.5 % : PWD
increased                              employees

Black as a percentage of management 62.5% Black employees in management positions as a 64 % : BM
increased                           percentage of all management

Percentage of payroll spent on skills   1% spent on skills development                        1,5%    spent   on     skills
development programmes increased                                                              development

Human Capital Management Strategy Human Capital management strategy developed and 100% implementation of the
Developed and Implemented         100% implemented as per annual operational plan annual operational plan

                                                                                         16
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 4: SUSTAINABLE AND TRANSFORMED ORGANISATION THROUGH REVENUE , PEOPLE, SYSTEMS AND
BUSINESS PROCESSES

      PERFORMANCE INDICATOR                      2021/ 22 ANNUAL TARGET                       2023/24 TARGET

SUB-OUTCOME 18: EFFICIENT, INNOVATIVE SYSTEMS AND BUSINESS PROCESSES SUPPORTIVE OF SANPARKS CORE
BUSINESS

Specifications for Integrated Information Phase 1 of Integrated Information Integrated decision support of enterprise
Decision Support Tool developed           Decision Support Tool Developed and information management systems developed
                                          Implemented

SANParks Digital Strategy developed and SANParks Digital Strategy developed Five ( 5) strategic projects implemented
implemented                             and approved & 1 Strategic project
                                        implemented

Business Process review and re-engineering   Business process mapping approach Business process review and re-engineering
programme developed and implemented          completed                         programme implemented

                                                                                         17
2023/24 Strategic Plan and 2021/22 Annual Performance Plan

OUTCOME GOAL 4: SUSTAINABLE AND TRANSFORMED ORGANISATION THROUGH REVENUE , PEOPLE, SYSTEMS AND
BUSINESS PROCESSES
       PERFORMANCE INDICATOR             2021/ 22 ANNUAL TARGET
                                                                          2023/24 TARGET

SUB-OUTCOME 19: SOUND CORPORATE GOVERNANCE

Rating of International Standard for the Professional   75%     of     corrective    actions General Conformance rating
Practice of Internal Auditing (ISPPIA) where a          implemented
conformance rating of “generally conforms” is           Self-assessments conducted
achieved
Unqualified Audit Opinion without findings              Unqualified Audit Opinion            Unqualified audit opinion without findings

SUB-OUTCOME 20: SOUND CORPORATE GOVERNANCE

Matured Enterprise Risk Management (ERM) with 95% of approved annual ERM ERM matured with level 5 rating
rating level 5 according to the DFFE governance Maturity     improvement        and achieved in an Independent Assessment
maturity framework achieved                     implementation plan implemented

Matured Ethics Management with rating level 5 95% of approved annual Ethics Ethics Management matured with level 4
according to the DFFE governance maturity management Maturity improvement rating achieved in an independent
framework achieved                            and      implementation  plan assessment
                                              implemented

                                                                                                  18
2023/24 Strategic Plan and 2021/22 Annual Performance Plan
OUTCOME GOAL 4: SUSTAINABLE AND TRANSFORMED ORGANISATION THROUGH REVENUE , PEOPLE, SYSTEMS AND
BUSINESS PROCESSES
     PERFORMANCE INDICATOR             2021/ 22 ANNUAL TARGET            2023/24 TARGET

SUB-OUTCOME 21: EFFECTIVE STAKEHOLDER AND PARTNERSHIP ENGAGEMENT
Stakeholder and partnership engagement % of Stakeholder and Partnership Stakeholder and partnership engagement
strategy developed and approved        Engagement        Implementation     Plan plan implemented on an annual basis
                                       implemented as per implementation plan    consisting of 10 formal and proactive
                                                                                 engagements with primary stakeholders

Annual Communications plan between the Annual Communications plan developed 100% Implementation of the annual
Board and SANParks developed and and 100% implemented                       implementation plan
implemented
Number of SANParks Week free visitors to 80 000                                  150, 000 SANParks week
National Parks

SUB- OUTCOME 22: APPROPRIATE AND WELL MAINTAINED INFRASTRUCTURE

Maintenance and Recapitalisation Plan Condition assessment of        prioritised Completion of condition assessment of
towards improvement of Infrastructure infrastructure & final maintenance plan infrastructure and approval of 5 Year
condition developed                   completed                                  Maintenance & Recapitalisation Plan.
                                                                                 20%       condition    improvement       of
                                                                                 infrastructure as per prioritised Five-Year
                                                                                 infrastructure      maintenance        and
                                                                                 recapitalisation plan

                                                                                      19
SANParks MTEF Budget

                 20
2021/22 Budget - context
•   The SANParks 2021 MTEF Budget is set within a context of an uncertain economic
    environment exacerbated by the devastating impact of Covid-19 on Tourism
    revenues
•   International travel restrictions, lockdowns and discovery of new Covid-19 strains
    are expected to continue to have a negative impact on our Tourism revenues over
    the medium term. (Tourism revenue constitutes over 76% of SANParks total
    revenue).
•   In light of the above challenges, SANParks initially projected a deficit of R 645,058
    million which was further reduced to R488,723 million by delaying certain
    infrastructure and land development plans.
•   As a schedule 3A public entity SANParks is not allowed to budget for a deficit
    unless approval is granted by the National Treasury (SANParks is still awaiting
    such approval from the National Treasury).

                                                                     21
Budget alignment to strategic outcome- orientated goals

                                                               2019/20      2020/21       2021/22        2022/23       2023/24
No Goal                                                    Expenditure      Esimate        budget         Budget        Budget

   Sustainable biodiversity and cultural heritage
   across land and sea delivers benefits for the people
   of South Africa and the world, now and in the
 1 future                                                  803,290,852   882,821,392 1,598,117,257 1,290,832,971 1,373,818,919

 2 Improved,   diverse responsible tourism                 780,412,315   258,386,749   411,351,161   405,834,572    427,410,330

   Sustainable socio- economic development
   programme that ensures delivery of benefits to the
   land claimants, historically disadvantaged
 3 communities and the people of South Africa               30,504,716   193,790,062   126,632,039   173,929,102    183,175,856

   Sustainable and transformed organisation through
 4 revenue, people, systems and business processes         927,851,775   818,224,705   616,915,118 1,028,221,726 1,068,525,826

  Total                                                   2,542,059,658 2,153,222,908 2,753,015,575 2,898,818,371 3,052,930,931

                                                                                               22
Alignment to strategic outcome- orientated goals

•   Conservation as the core function of SANParks is allocated an amount R4.262 billion
    over the MTEF to provide leadership in biodiversity and cultural heritage
    conservation
•   For Tourism operations an amount of R1.244 billion is allocated over the MTEF.
•   R483,736 million is allocated over the MTEF to ensure sustainable socio- economic
    development programme.
•   An amount of R2, 713 billion is allocated over the MTEF for HR, ICT, and Finance
    components.

                                                               23
Projected Income and Expenditure over the MTEF
Projected Income Statement

                                                      Actual           Forecast           Budget            Budget            Budget
                                                    2019/2020         2020/2021         2021/2022         2022/2023         2023/2024
A001 - Conservation Fees                            (760,575,265)     (127,466,653)     (289,740,416)     (967,857,721)   (1,016,250,607)
A005 - Concession Fees                              (141,167,294)      (52,188,437)      (64,078,278)     (188,047,117)     (197,449,473)
A010 - Retail Gross Profit                           (40,273,518)      (14,713,714)      (35,076,470)      (32,615,000)      (42,646,000)
B010 - Tourism income                               (945,105,318)     (372,924,966)     (679,520,766)   (1,194,129,057)   (1,253,835,510)
C010 - Other income                                 (245,468,486)      (92,557,780)     (243,734,491)     (242,997,089)     (267,296,798)
D010 - Grant: Conservation - DEA                    (552,897,934)   (1,143,287,826)     (340,001,476)     (501,080,000)     (521,951,548)
D020 - Grant: Roads - DEA                            (13,602,609)      (14,350,431)      (15,140,000)      (15,700,000)      (16,390,435)
D030 - Grant: Forestry - DEA                         (21,496,522)      (22,678,261)      (23,924,348)      (24,809,565)      (25,900,870)
 Total Income                                     (2,720,586,945)   (1,840,168,067)   (1,691,216,245)   (3,167,235,549)   (3,341,721,241)

 Total Expenditure                                2,582,052,564     2,342,308,195     2,384,524,754     3,060,856,665     3,229,530,617
M010 - Human resource costs                       1,328,938,110     1,315,808,185     1,289,962,263     1,620,392,053     1,701,411,656
M020 - Maintenance costs                            171,297,813       112,900,422       156,296,760       273,219,021       286,879,972
M030 - Depreciation                                 171,361,009       198,188,528       172,734,610       204,247,917       214,460,313
M040 - Operating Costs                              910,455,632       715,411,059       765,531,121       962,997,674     1,026,778,676
 Net Operating (Income)/Deficit before Interest    (138,534,381)      502,140,128       693,308,508      (106,378,884)     (112,190,624)
M050 - Interest Received                            (72,969,145)      (60,463,450)      (46,980,000)      (48,389,400)      (49,841,082)
M055 - Finance Costs                                 15,331,523        20,451,311        13,628,209        10,902,567         7,631,797
 Net Operating (Income)/Deficit                    (196,172,003)      462,127,989       659,956,717      (143,865,717)     (154,399,909)
P020 - Grant: Land Acquisition                              -                 -         (92,233,753)      (21,380,860)      (22,231,739)
P030 - Sales Fauna & Flora - LDV                     (6,138,326)       (4,000,000)       (4,000,000)       (6,000,000)       (8,000,000)
P060 - Donation                                     (46,794,812)      (65,000,000)      (75,000,000)      (95,000,000)     (105,000,000)
 Net (Surplus)/Deficit                             (249,105,142)      393,127,989       488,722,964      (266,246,577)     (289,631,648)

                                                                                                               24
Projected Income
•   The assumption is that that annual revenues will be a fifth (20%) of previous revenues
    given the slow recovery of the international tourism market.
•   The total income for 2021/22 financial year is projected at R2, 046 billion which is 25%
    lower than 2019/20 revenue. Included in the revenue is the EPWP funding of
    R354,863m, which is exclusively appropriated and therefore needs to be excluded from
    the revenue available to fund the operations of SANParks. With the exclusion of EPWP
    funding, the total projected revenue drops to R1, 725 billion, this is 37% lower than
    2019/20 revenue.
•   Conservation fees budget represents an average of 38% of the 2019/20 actual figures.
    The 38% has factored in a 5% annual tariff increase and an adjustment of conservation
    fees received from international visitors to 30% of the 2019/2020 actuals. 85% of
    conservation fees are traditionally derived from international visitors who are charged
    higher fees (SANParks utilises a differential fee model).
•   The concession fees budget takes into account the impact of COVID-19, the existing
    relief measures that were approved by the Board and National Treasury which have not
    yet been accounted for in the 2021 financial year. Depending on the recovery of the
    tourism sector and the impact of the 2nd and the expected 3rd wave, it is anticipated
    that there is a risk of further relief measures being requested by concessionaires who
    are particularly dependent on international visitors; however, this has not yet been taken
    into account for the 2021/22 FY.

                                                                                   25
Projected Income
•   Retail gross profit’s revenue is made up of essential goods and curios, with international
    tourists mainly purchasing curios which attract higher pricing and margins and the domestic
    market purchasing essential goods (the impact of fewer international visitors is expected to
    have an impact of 30 – 40% reduction in revenue). Retail gross profit represent 87% of
    2019/20 figures, with a 3.2% inflation rate increase it is therefore adjusted down to R35, 076
    million.
•   The tourism income of which majority is for accommodation was reduced down to R679,
    521 million from the initial R777, 160 million projected in December 2020. The decline on
    revenue received from accommodation is not expected to be extreme as the assumption is
    that the domestic market will maintain occupancy at average levels. The impact of the
    slower recovery of the international market will be felt more keenly on conservation fees for
    reasons indicated earlier.
•   Included in other income is the third party income in the instances where SANParks acts as
    implementing agent and also income from special projects.
•   The 69% decrease on Operational grants in the 2020/21 financial year, is mainly due to
    SANParks having received Covid-19 relief funding from DFFE, to cover operational costs to
    the value of R835, 652 million excluding VAT. This additional funding is not available in the
    outer years, hence the decrease in operational grants.

                                                                                    26
Projected Expenditure
•   The main components of the expenditure are human capital and operating costs, which
    make up 51% and 36% respectively of total expenditure, including EPWP (54% and 32%
    respectively, excluding EPWP)
•   The total budgeted expenditure for 2021/22 is R2, 753 billion (including finance costs) that is
    17% higher than the forecast for 2020/21. Included in the budget for 2020/21, however, are
    the costs associated with the EPWP projects (R354, 863m). If this is excluded, total
    expenditure is R2, 398 billion (including interest). Maintenance is the main contributing
    factor for the higher budget, due to the implementation delays in 2021.
•   The total Human Capital costs excluding EPWP is R1, 289 billion which is 6% higher than
    the 2020/2021 forecast.
      – Included is the R1, 145 billion of permanent and fixed term contracts employees and
         the difference being variable costs which includes post-retirement benefit, overtime and
         public holidays, and other salary related costs.
      – In 2021 financial year, no cost of living increase and performance bonuses were
         budgeted, however the proposed 2021/22 human capital budget includes CPI for bands
         A to D, and CPI minus 1% for bands E and F.

                                                                                      27
Projected Expenditure

•   Maintenance budget for 2021/22 is 69% higher than the forecast of 2020/2021 due to the
    delays in spending the maintenance budget in 2021
•   Depreciation is 10% lower than the forecast of 2020/21, and the expected depreciation is
    R178, 334 million. SANParks plans to significantly reduce capital expenditure hence the
    anticipated reduction in depreciation for the following financial year.
•   The operational costs on the 2020/21 budget provided for CPI of 4%. The other major
    emerging expenditure item is Personal Protective Equipment (PPEs).
•   The PPE expenditure during 2020/2021 year to date amounts to R28, 624 million and this
    includes almost R9 million spent to support our social partners.
•   Included in the operational costs is R10 million which is likely to increase when all the
    workers go back to their stations.
•   The operational costs represent a 31% increase from the forecast of 2020/2021.

                                                                                28
Net Deficit

•   Net operating deficit before interest and tax has increased by 38% from the forecast of
    2020/2021 due to an increase in total expenditure, when compared to a decrease in
    revenue, for the 2021/2022 financial year. The percentage decrease in revenue is
    attributable to the Covid Relief Fund received during the 2020/2021 financial year, which is
    not available in the 2021/2022 financial year. Net operating deficit has increased by 43%
    Year on year and it includes interest earned on operating and infrastructure funds held in
    authorised financial institutions.
•   The interest received is expected to decrease by 22% from the current year forecast due to
    the decline in revenue whereas finance costs are expected to decrease due to reduced
    finance charges, as the capital outstanding for finance leases decreases with the servicing
    of debt. There are no plans to replace these assets and the operational impact of this is yet
    to be determined.
•   The net deficit is arrived at after adding income from wild animal sales and donations, to net
    operating income. The budget for 2021/22 reflects a net deficit of R488, 723 million after
    converting the cash available for land and infrastructure grants to operational grant.
•   The budget for capital expenditure is R18 million for the 2021/22 financial year. This is a
    decrease of 28% from the previous year.

                                                                                    29
SANParks Strategic Risks

                     30
RISK MANAGEMENT PLAN AND PLANNED MITIGATIONS
        OUTCOMES                          KEY RISKS                                              RISK MITIGATIONS
Outcome Goal 1:      Sustainable Loss of Biodiversity, Heritage & 1. Relevant international liaising and influence on key bodies
Biodiversity and Cultural Heritage Land                             2. Rhino     & Elephant management: Rhino Management Strategy & Elephant
across land and sea delivers                                        Management Plan; Ops Rhino - NATJOINTS Strategy implemented - KNP; 4.
benefits for the people of South                                    Implementation of a Ranger Capacity Building Strategy; Implementation of counter
Africa and the world, now and in                                    poaching rhino poaching strategy ("road map"); Park management plans including the
the future                                                          Safety & Security Plans
                                                                    3. Effective & efficient access and movement controls at all entrance gates: Internal
                                                                    integrity & consequence management.
                                                                    4. Implementation of SANParks Biodiversity Monitoring Programme and State of the Area
                                                                    Integrity Assessments; Comprehensive Alien Invasive Plants species Program
                                                                    5. SANParks Climate Change Preparedness Strategy
                                                                    6. Monitoring of key slow and fast ecological variables (e.g. river flows, vegetation
                                                                    change, key species, etc.)

                                                                                                                 31
RISK MANAGEMENT PLAN AND PLANNED MITIGATIONS
        OUTCOMES                        KEY RISKS                                                    RISK MITIGATIONS
Outcome Goal 1: Sustainable Loss            of       Biodiversity, 7. Publication and dissemination of research outputs ; Collaborative networks (e.g. leverage
Biodiversity    and     Cultural Heritage & Land                  research expertise and funding through external networks;
Heritage across land and sea                                      8. Management Effectiveness Tracking Tool (METT)
delivers benefits for the people                                  9.Disaster Management
of South Africa and the world,                                    10. Update Inventories of cultural heritage objects ; MOU with Repository institutions on cultural
now and in the future                                             heritage objects
                                                                  11. Embark on land verification process; Collaborate with DFFE for a land proclamation process

Outcome Goal 2: Improved Inability           to   restore   and 1. Educating the youth with conservation values through the Environmental Education
Diverse Responsible Tourism        sustain tourism                programme
                                                                  2. Establishment of Tourism Revenue Task Team
                                                                  3. Tourism Strategy Growth Plan
                                                                  4. Expanding product diversity to attract new domestic markets
                                                                  5. Crises Communication Management Plan
                                                                  6. Hospitality Improvement Initiative
                                                                  7. Customer Feedback Monitoring system
                                                                  8. CSI managed at 80%
                                                                  9. Marketing Initiatives (e.g. stokvel) - primarily targeting new markets & non-traditional markets
                                                                  10. Tourism Grading implemented

                                                                                                                          32
RISK MANAGEMENT PLAN AND PLANNED MITIGATIONS

         OUTCOMES                          KEY RISKS                                             RISK MITIGATIONS
Outcome Goal 4: Sustainable and Inability to attain & maintain 1. Only funded mandate included in the strategic document & APP of the organisation.
Transformed Organisation through Financial sustainability          2. The budget is approved by the Board
Revenue, People, Systems and                                       3. Financial Report is submitted to the Board with analysis of revenue vs expenditure and
Business Processes                                                 corrective action is taken.
                                                                   4. Public Finance ManagementAct provides guidance on borrowing funds
                                                                   5. Financial Strategy document is in place.
                                                                   6. Investment committee in place to assess projects.
                                                                   7. There is Financial Delegation framework and policies and procedures to ensure
                                                                   expenditure and revenue management.
                                                                   8. Cost containment measures are put in place from time to time to ensure that
                                                                   expenditure is aligned to the revenue available.
                                                                   9. There is also a Covid task team that monitors the financial impact of Covid.

                                                                                                                 33
RISK MANAGEMENT PLAN AND PLANNED MITIGATIONS
       OUTCOMES                           KEY RISKS                                                 RISK MITIGATIONS
Outcome Goal 4: Sustainable and                                     1. Outsource routine maintenance to facilities management company
Transformed Organisation through Inadequate Infrastructure          2. Transversal contracts with DPW Mpumalanga
Revenue, People, Systems and                                        3. Term-agreements to manage maintenance
Business Processes                                                  4. Commercialisation of projects that require infrastructure for income generation.
                                                                    5. Capacitate project management
                                                                    6. Capacitate technical services in parks
Outcome Goal 4: Sustainable and Inadequate       and   demoralised 1. Frameworks, Policies & Plans in place : Attraction and Retention policy; Succession
Transformed Organisation through human capital                      Planning framework ; SANParks Competency Framework; Career Management policy ;
Revenue, People, Systems and                                        Learning & Development Policy; Recruitment and Selection policy; Performance
Business Processes                                                  Management System and Policy; Conditions of Service Policy; Disciplinary and
                                                                    Grievance policy and Procedures
                                                                    2. Career Ladders initiative developed for Conservation and Technical departments +
                                                                    Junior Scientist Programme
                                                                    3. Competencies for managers developed and integrated in the Performance
                                                                    Management System.
                                                                    4. Employment Equity Plan developed and implemented
                                                                    5. South African Board for People Practices (SABPP) Audit report - Assist in improving
                                                                    HCM efficacies
                                                                    6. Limited budget of R5m to fill critical vacant posts (Priority list)
                                                                    7. Climate Survey and Culture and values review

                                                                                                                      34
RISK MANAGEMENT PLAN AND PLANNED MITIGATIONS

          OUTCOMES                       KEY RISKS                                             RISK MITIGATIONS
Outcome Goal 4: Sustainable and Non -compliance with prescripts 1.     Ethics management
Transformed Organisation through and corporate governance best 2.      Ethics Governance
Revenue, People, Systems and practice                            3.    Compliance management
Business Processes                                               4.    Policies, procedures and protocols

 Outcome Goal 4: Sustainable Ineffective & inefficient Business 1. Implementation of the IT Strategy implementation plan: Upgrade of SANParks Wide
and   Transformed     Organisation Processes                     Area Network in progress; Upgrade of the BPM System; Implemented a Gate Access
through    Revenue,       People,                                System for Table Mountain National Park (TMNP) and West Cost National Park (WCNP);
Systems and Business Processes                                   Vulnerabilities at server environment conducted.
                                                                 2. Quarterly roll out of identified business processes
                                                                 3. Annual Procurement Plan & Demand Plan - Quarterly progress reporting
                                                                 4. Monitoring and reporting on Irregular Expenditure
                                                                 5. Appointment of a Legal Panel
                                                                 6. Appointment Loss Control Officer

                                                                                                                35
RISK MANAGEMENT PLAN AND PLANNED MITIGATIONS

           OUTCOMES                      KEY RISKS                                             RISK MITIGATION
Outcome Goal 3 :                    Ineffective      1. Shareholder Agreement in place
Sustainable    socio   economic Stakeholder          2. Stakeholder Engagement Strategy developed including a Communications Plan
development programme that Engagement                3. Media relations including Community radio campaign, Community forum Imbizos,
ensures delivery of benefits to                      4. SET Strategy & implementation plan programme targeting neighbouring communities as key
the land claimants , historically
                                                     stakeholders and beneficiaries
disadvantaged communities and
                                                     5. Policy statement on damage causing animals developed
the people of SA
                                                     6. People and Parks programme
Outcome Goal 4: Sustainable
                                                     7. COVID 19 Food relief programme
and Transformed Organisation
                                                     8. Engage Parliament on quarterly basis
through    Revenue,     People,
                                                     9.Joint Management Board meetings ( on claimed land/ Descendants Forum); Park Forums
Systems       and      Business
                                                     10. Strategic Partnerships (Dept. of Tourism, Tourism SA, Academic Institutions, Health Dept.)
Processes
                                                     11. Timely communication with DFFE and Treasury re funding

                                                                                                                  36
RISK MANAGEMENT PLAN AND PLANNED MITIGATIONS

               OUTCOMES            KEY RISKS                                              RISK MITIGATION
Outcome        Goal        4: Implementing        1. Transformation Strategy and implementation plan developed and implemented including a climate
Sustainable and Transformed transformation at a survey and culture and values review
Organisation          through slow rate           2. Implementation of the SET Strategy
Revenue, People, Systems                          3. Employment Equity Plan
and Business Processes                            5. BBBEE improvement . Preferential procurement – opportunities for SMMEs, QSEs and EMEs
                                                  6. Panel of consultants appointed to support black-owned small companies
                                                  7.Land claim post-settlement agreements - Beneficiation Scheme
                                                  8. Diversity workshops

                                                                                                            37
THANK YOU!
Presenter Name

Branch Name
Department of Forestry, Fisheries and the Environment
Tel: | Mobile:
Website:
Address:

                                                38