Résume Trimestriel des Operations (A Mars 2021) Quarterly Operations Summary (As at March 2021) Département des Services Fiduciaires et de l’Inspection Fiduciary and Inspection Department
Quarterly Operations Summary – March 2021 African Development Bank This document is subject to copyright. This document may be used and reproduced for non-commercial purposes only. Any commercial use, including without limitation reselling, charging to access, redistribute, or for derivative works such as unofficial translations based on this document is not allowed.
Quarterly Operations Summary – March 2021 African Development Bank CONTENTS NOTES ...................................................................................................................................................... 4 PROCESSING STAGES ............................................................................................................................... 5 NEW PROJECTS ........................................................................................................................................ 7 PROJECTS APPROVED ............................................................................................................................ 23 LIST OF SECTORS Agriculture Communications Finance Environment Social Transport Urban Development Water Supply / Sanitation Multi-Sector Power Miscellaneous NOTES 1. The information provided in this publication relates to projects in regional member countries, for which financing has been approved by the Boards of Directors of the Bank Group during the last six months and those which are expected to be submitted to the Boards for approval during the next six months. 2. New projects are listed in the publication after the Bank is satisfied that they are suitable for possible financing. Approved projects will be deleted from this document after two subsequent publications. Projects may also be dropped if a decision is made not to proceed with further processing. 3. If the Government of a borrowing country is the borrower, the name and address of the Department, Ministry or Agency which is expected to implement the project are given. If the Government is not the borrower, the borrower's name is given in capital letters. 4. The titles and descriptions of projects are tentative. 5. Details relating to each project shown in this issue of the publication are based on information available at the end of the quarter under reference. The information will be updated quarterly as project processing advances. 6. The amount of the probable loan is tentative and is subject to review after project appraisal. 7. Reference to "Bank Group" in this publication refers to the African Development Bank (ADB), African Development Fund (ADF) and the Nigeria Trust Fund (NTF). Probable financing is expressed in: UA1. Also "TAF" refers to Technical Assistance Fund loans under ADF. 8. All enquiries regarding information on any project should be referred to the Executing Agency and not to the Bank. 9. For further information please contact the Division Chief in charge of the relevant country. 1 1 UA = 1.375 USD & 1 UA = 1.240 EUR. For more information, please find the following link (Exchange Rates)
Quarterly Operations Summary – March 2021 African Development Bank PROCESSING STAGES financing plan; c) a tentative list of goods and The processing stages reflect phases of the services to be procured; d)the schedule of AfDB’s project cycle. Those stages are described execution and expenditure; e) the disbursement below: methods selected by the borrower; f) the Project identification: AfDB Group works with tentative schedule of disbursements including each borrowing regional member country to the precise information on the account numbers define a medium-term to long-term and correspondence banks; g) the procurement development strategy and operational program methods and dates of bidding announcements; in a document called country strategy paper h) the precise information on the executing (CSP), formerly Economic Prospects and Country agency and the project implementation unit; i) Programming (ECPC) papers. The CSP or CSPAR proposed realistic date for loan signature and taking into consideration an exigency for deadlines for first and last disbursements; j) for performance and results, is aligned to the co-financed projects, respective financing plans, country's own development plan and poverty cross-effectiveness and other miscellaneous reduction goals, and its preparation or planning information. cycle. Board approval: After negotiations with the Project preparation: This phase starts with AfDB government, the loan proposal is submitted to Group’s interest to finance a given project or AfDB's Board of Directors for approval. This programme and includes both in-bank and report is known as the Board Resolution. It is external collection of information and data which posted on the web after Board approval, along will help the Bank’s Experts to appraise the with the associated legal agreements. project. A preparation mission to a country is Loan signing: After Board approval, the multi-disciplinary and usually led by an Expert document is sent to the borrowing country's from a Sector Department. During the Government for cabinet authorization. Following preparation mission Bank Experts review the the authorization from the cabinet, the loan project in line with the country’s CSP, obtain agreement is generally signed by AfDB's existing documentation such as feasibility studies President or Vice-President and the on the project, and cross-check information with Representative of the Government. After loan the authorities of the country. approval a Borrower is allowed a maximum Project appraisal: During project appraisal, AfDB interval of about 90 days to sign the loan or grant Group examines project feasibility through an agreement with the Bank Group. Commitment or appraisal mission. The appraisal mission - in service charges start running on a loan 45 days consultation with the government and other after loan signature irrespective of whether stakeholders - examines the project's technical, disbursement has been made or not. Before financial, economic, technical, institutional, disbursement commences the loan or grant must environmental, marketing, and management be entered into force or declared effective. aspects as well as potential social impact. Loan effectiveness: The loan takes effect once Loan negotiation: After the Senior Management certain conditions agreed to be precedent to first Committee has completed its work and disbursement are met. This is also known as loan recommended the project or programme for effectiveness. In addition to "other conditions" Board approval, a draft project proposal is which may be fulfilled later, the following are submitted to all parties involved including the some of the standard conditions said to be Government for review. Feedback is collected, precedent to first disbursements: a) designate and the Government is then called for authorized signatories for the loan resources; b) negotiation with AfDB. During negotiations, present a legal opinion; c) submit the investment agreement should be reached or reconfirmed on schedule; d) present a list of goods and services the following: a) Objectives and description of the to be procured; e) open and maintain a special project, studies or programmes; b) loan amount project account; f) establish a project in foreign and local costs of the project and the implementation unit; g) any other condition agreed during negotiation as necessary to Page 5/50
Quarterly Operations Summary – March 2021 African Development Bank precede first disbursement. Generally, these stipulated in the loan agreement. AfDB's Legal conditions are limited to the legal requirements Counsel and Project Coordinating Officer review as mentioned above, as well as cross- if the conditions are met, after which the loan is effectiveness of co-financing, and execution of formally declared effective. Normally, loan subsidiary loan agreements. The requirements documents allow 90 days for the loan agreement and deadlines for loan effectiveness are to become effective. Implementation: Project implementation starts Post evaluation: After the project facilities and from the moment the project is declared technical assistance activities are completed, effective. AfDB Group projects are implemented AfDB prepares a project completion report (PCR) by the executing agency according to the agreed or technical assistance completion report to schedule and procedures. The supervision of document the implementation experience. These implementation however enables the Bank Group reports are prepared within 12 - 24 months of the to make sure the physical realization of the completion of the project. project is progressing smoothly and in Page 6/50
Quarterly Operations Summary – March 2021 African Development Bank NEW PROJECTS BENIN BOTSWANA Agriculture et développement rural Agriculture PROJET DE DEVELOPPEMNET DES ZAMBEZI INTEGRATED AGRO-COMMERCIAL COMPETENCES POUR L’EMPLOI DANS LES DEVELOPMENT PROJECT - TAF FOR PROJECT SECTEURS PRIORITAIRES (PDCESP) PREPARATION Sortir les jeunes de la précarité en les aidant à Status: Approved by the board on 25-01-2021 devenir entrepreneurs, à bénéficier d’une Estimated total cost: 1.00 million UA formation et d’une subvention pour lancer ou Loan amount: 1.00 million UA développer des activités artisanales, Executing agency: Ministry of Agriculture touristiques ou de transformation agricole. Expense Category: Services, Goods, Works Status: Pour Approbation le 25-11-2020 Estimated total cost: 50 million UA BURUNDI Loan amount: 50 million UA Agriculture et développement rural Executing agency: Gouvernement du Benin PROJET D'APPUI AU DEVELOPPEMENT Expense Category: Biens, Services DURABLE DES CHAINES DE VALEUR DE L’AGRICULTURE ET D’ELEVAGE (PADCAE-B) BENIN The project aims to intensify agricultural production in a sustainable manner with the Agriculture et développement rural goal of reducing food, Department of PROJET APPUI DÉVELOPPEMENT FILIÈRES Agriculture and rural Affairs, youth VIANDE et LAIT ET PROMOTION DES empowerment, responsible sourcing of and ENTREPRISES D'ÉLEVAGE investments in cocoa. Ce projet ambitionne, par une approche Status: Board Approval is postponed for inclusive, de contribuer à lever les contraintes further date to be determined. susmentionnées et améliorer la contribution Estimated total cost: 15.00 million UA. des filières lait et viande à l’économie Loan amount: 15.00 million UA. nationale. Le projet vise la promotion des Executing agency: Ministère de l'agriculture et exploitations et entreprises agricoles de de l'Elevage. production intensive de lait et de viande, la Expense Category: Services, Goods, Works. promotion des chaines de valeurs ajoutées (CVA) lait et viande performantes et compétitives. L’objectif sectoriel du projet est CAMEROUN de contribuer à l’accroissement de la sécurité Transport alimentaire et nutritionnelle et du volume des PROJET D’AMENAGEMENT DES ROUTES recettes d’exportation pour le Benin. d’’ACCES A LA ZONE INDISTRUELLE DE KRIBI Status: Pour Approbation le 30-11-2020 Ce projet se situe dans le cadre d'un vaste Estimated total cost: 20 million UA programme d’aménagement des Routes de Loan amount: 20 million UA Désenclavement de la Zone Industrielle et Executing agency: Ministère de l’Agriculture, Portuaire de Kribi (PAR-ZIK). Il va contribuer au de l’Elevage et de la Pêche désenclavement de la zone et jouer un rôle Expense Category: Biens, Services majeur dans la desserte des grandes Page 7/50
Quarterly Operations Summary – March 2021 African Development Bank métropoles du Cameroun et au-delà, de la l’amélioration de la sécurité et de la sûreté du zone CEMAC. transport aérien dans le pays. Le projet se justifie donc par le souci de permettre à la RCA, Status: Pour Approbation le 16-12-2020 dans une approche progressive, de : (i) mettre Estimated total cost: 130 million UA aux normes les installations et services du Loan amount: 130 million UA transport aérien à l’aéroport international de Executing agency: Ministère Des Travaux Bangui/M’Poko ; (ii) améliorer la sécurité et la Publics sûreté aéroportuaire et renforcer les capacités Expense Category: Travaux, Biens, Services en matière de sécurité/sûreté au niveau de cette plate-forme. CAMEROUN Status: Pour Approbation le 05-10-2020 Estimated total cost: 8 million UA. Muti-Sector Loan amount: 8 million UA. MIC-TAF PROMOT ENTREPRE JEUNES Executing agency: Ministère Mines Energie & AMELIOR COMPETENCES ET COMPETITIVITE Hydraulique. SECT BTP, TRANSPORT, ENERGIE Expense Category: Travaux, Services, Biens. Status: Approved by the board on 22-12-2020 CENTRAFRIQUE Estimated total cost: 516.47 million UA. Loan amount: 516.47 million UA Energie Executing agency: Gouvernement du FINANCEMENT COMPLÉMENTAIRE PROJET Cameroun. BOALI PHASE II Expense Category: Services, Goods, Works. Le projet a pour objectif sectoriel de contribuer à l'amélioration des conditions de vie des CENTRAFRIQUE populations, de supporter le développement économique et social de la RCA et de la RDC et Agriculture de renforcer la coopération et l’intégration PROJET D'APPUI AU RENFORCEMENT DE LA énergétique régionale. Le projet a pour RESILIENCE ET DE LA SECURITE ALIMENT. ET objectif spécifique i) la réhabilitation et le NUTRITIONNELLE PARSANKO renforcement des unités de production ; ii) la Status: approved by the Board on 25-01-2021 réhabilitation et le renforcement des réseaux interconnectés de transport et de distribution ; Estimated total cost: 19.136 Million UA iii) l’accroissement de l’énergie disponible et Loan amount: 19.136 million UA l’amélioration de la qualité des services Executing agency: Gouvernement du d’électricité ; iv) l’accroissement du taux Centrafrique. d’accès à l’électricité, et v) la réduction des Expense Category: Travaux, Biens, Services coûts encore très élevés de l’énergie dans les deux pays CENTRAFRIQUE Status: Pour Considération le 15-10-2020 Estimated total cost: 2,5 million UA Energie Loan amount: 2;5 million UA PROJET D'APPUI A LA MODERNISATION DE Executing agency: Ministère des Finances, des L'AEROPORT INTERNATIONAL DE BANGUI- Mines M'POKO PHASE II (PAMAB 2) Expense Category: Travaux, Biens, Services Le projet d’Appui à la Modernisation de l’Aéroport de Bangui/M’Poko (PAMAB) a pour objectif de contribuer au relèvement économique et à la relance des secteurs productifs de la Centrafrique à travers Page 8/50
Quarterly Operations Summary – March 2021 African Development Bank CHAD EGYPT PROJET DE DÉVELOPPEMENT DE LA Food Crops COMPÉTITIVITÉ DE LA CHAÎNE DE VALEUR ASSISTANCE AMIDST COVID-19 OUTBREAK VIANDE AU TCHAD Provide food packages to households of Status: For board approval on 21-09-2021 informal workers affected by COVID-19. Estimated total cost: 15 Million UA Loan amount: 15 Million UA. Status: Approved by the board on 06-05-2020 Executing Agency: Tchad Government Estimated total cost: 73,27million UA Expense Category: Services, Works, Goods Loan amount: 73,27million UA Executing agency: Government of Egypt Expense Category: Services EGYPT Power CHAD KOM OMBO 200 MW SOLAR PV IPP Social Status: approved by the Board on 25.10.2020 PROJET DE PROMOTION DE LA FORMATION Estimated total cost: 160.00 million UA DES FILLES ET DE L’ALPHABÉTISATION DES Loan amount: 160.00 million UA FEMMES PHASE II Executing agency: ACWA Power Kom Ombo i) Construction et/ou réhabilitation des Project H établissements d’enseignement secondaire , Expense Category: Services,Works, Goods (ii) dotation en équipements pédagogiques, scientifiques et numériques ainsi que des équipements pour l’enseignement pratique des filières porteurs d’emploi, (iii) Information et de sensibilisation sur la scolarisation des EGYPT filles, la santé sexuelle et reproductive, les mariages et grossesses précoces, les violences Power basées sur le genre (VBG), la sécurité et la ELECTRICITY AND GREEN GROWTH SUPPORT nutrition (iv) soutien à la formation des jeunes PROGRAM (EGGSP) PHASE I filles défavorisées dans les établissements The main goal of the program is to promote a cibles du projet et,(vi) renforcement des sustainable, competitive and diversified capacités et formation. electricity sector for ensuring security of supply and supporting climate change mitigation and Status: Pour Approbation le 15-10-2020 green growth. Estimated total cost: 11 million UA. Loan amount: 11 million UA. Status: Approved by the Board on 17-06-2020 Executing agency: Ministère de Estimated total cost: 18,53 million UA l'Environnement et de l'Eau. Loan amount: 18,53 million UA Explense Category: Travaux, Biens, Services. Executing agency: Ministry of Electricity and Renewable Energy. Expense Category: Services Page 9/50
Quarterly Operations Summary – March 2021 African Development Bank ETHIOPIA GABON Multi-sector Multi sector APPROACH FOR STUNTING REDUCTION PROGRAMME D’APPUI BUDGÉTAIRE PROJECT (MASREP) D’URGENCE EN REPONSE AU COVID-19 (PABURC-GAB) The overall goal of Multi Sectoral Approach for Stunting Reduction Project is to end stunting Status: Pour approbation le 25-06-2021 by the year 2030. To achieve the goal the Estimated total cost: 84.64 Million UA government has put in place twelve strategic Loan amount: 84.64 Million UA objectives, these are: Improve the health and Executing agency: Ministère de l’Economie et nutritional status of women, children under Finances. two and adolescent girls. Ensure 100% access Expense Category: Services, Biens. to adequate food all year round, transform smallholder productivity and income, ensure zero post-harvest food loss, and increase financial allocation from domestic and external resources. GABON Status: For Board Approval on April 2021 Communications Estimated total cost: 27.00 million UA PROJET DE LA DORSALE D’AFRIQUE CENTRALE Loan amount: 27.00 million UA – COMPOSANTE - GABON Executing agency: Government of Ethiopia Expense Category: Services, Goods. Le projet vise à contribuer à augmenter l'extension géographique des réseaux large bande et à réduire des coûts de services de ETHIOPIA communications en Afrique Centrale. Le Gabon a des coûts de connectivité Finance internationale élevés. COMMERCIAL BANK OF ETHIOPIA - RENEWABLE ENERGY ACCESS FACILITY Status: Pour approbation le 09-12-2020 Estimated total cost: 102,33 million UA Scaling up investments in energy, is the African Loan amount: 102,33 million UA Development Bank Group's top priority, with Executing agency: Agence Nationale des the aspirational goal of achieving Infrastructures Numériques et des Fréquences universal access to energy in Africa by 2025 (ANINF) Expense Category: Travaux, Biens, Services Status: For Board Approval on 01-07-2020 Postponed to Q1 2021 Estimated total cost: 71.40 million UA. Loan amount: 71.40 million UA. Expense Category: services GHANA Urban Development GHANA INFRASTRUCTURE INVESTMENT ESWATINI FUND (GIIF) GOVERNANCE AND ECONOMIC SUPPORT The establishment of the GIIF is one such PROGRAMME (Phase I) innovative approach in catalyzing other sources of finance by leveraging its capital with Status: For the Board approval on 26-05-2021 private sector capital for financing Estimated total cost: 25 Million UA infrastructure projects. The establishment of Loan amount: 25 Million UA the Fund further provides the nation with the Page 10/50
Quarterly Operations Summary – March 2021 African Development Bank opportunity to systematically tackle the projets en PPP ; et (iv) un meilleur complex demands of infrastructure financing fonctionnement de la chaine PPBSE. and investment. The objective of the GIIF is to mobilize, manage, coordinate and provide Status: Pour approbation le 08-10-2020 financial resources; to catalyze the Estimated total cost: 9 million UA. development of critical infrastructure in Ghana; Loan amount: 9 million UA. and to generate a financial return for its Executing agency : Ministère Du Plan Et De La shareholders. Cooperation I. Expense Category: Biens, Services. Status: For Board Approval on 11-11-2020 Estimated total cost: 365 million UA Loan amount: 54 million UA GUINEA-BISSAU Executing agency: Ministry of Finance Social Expense Category: Goods, Works, Services PROJET D’URGENCE D’APPUI A LA LUTTE CONTRE LA COVID-19 (CRBS) GUINEA L’objectif stratégique visé par l’opération est i) de renforcer la riposte sanitaire à la pandémie Power de COVID-19 et d’arrêter la propagation de PROJET D’AMELIORATION D’ACCES A nouvelles infections, ii) de protéger les moyens L’ELECTRICITE de subsistance et de renforcer les mesures de protection sociale contre la COVID-19, et iii) de Vise à (i) permettre l’accès à l’électricité à réduire au minimum le risque pour la stabilité l’ensemble de la population à l’horizon 2030 (ii) macroéconomique et de rendre résilientes les Améliorer la qualité de vie de la population activités économiques (iii) Accélérer le développement économique du pays. Status: Pour approbation le 05-11-2020 Estimated total cost: 5 million UA. Status: Pour approbation le 26-11-2020 Loan amount: 5 million UA. Estimated total cost: 15 million UA. Executing agency: Ministère des Finances, du Loan amount: 15 million UA. Commerce, de l’Industrie et de la Planification Executing agency : Ministère de économique L’Énergie et de l’Hydraulique Expense Category: Travaux, Biens, Services Expense Category: Travaux, Biens, Services. MADAGASCAR GUINEA Power Finance SAHOFIKA HYDROPOWER PLANT PROJECT PROJET D’APPUI A LA MOBILISATION DES RESSOURCES INTERNES ET FORMALISATION The Sahofika project development was DES ENTREPRISES (PAMORIFE) awarded to the consortium formed by companies Eiffage, Eranove, Themis and HIER, L’objectif général du PAMORIFE (Ancien which agreed on 2 December, 2016 with the PAGEF) est de contribuer à améliorer la gestion Ministry of Water, Energy and Hydrocarbons of budgétaire et assurer un meilleur pilotage du Madagascar a Project agreement to design, Programme national de développement finance, build, operate and maintain the économique et social. De manière spécifique, Sahofika hydro-power project, further to a le projet vise à: (i) amélioration du cadrage concession contract to be signed with the macroéconomique ; (ii) amélioration de la State. A Malagasy company has been gestion de la dette publique ; (iii) une meilleure established by the Consortium in this purpose, gestion du patrimoine financier de l’état et des which is called Nouvelle Energie Hydroélectrique. Page 11/50
Quarterly Operations Summary – March 2021 African Development Bank Status: Approved by the board on 13-05-2020 The Sahofika project development was Estimated total cost: 72 million UA awarded to the consortium formed by Loan amount: 72 million UA. companies Eiffage, Eranove, Themis and HIER, Executing agency: Ministry of Water, Energy which agreed on 2 December, 2016 with the and Hydrocarbons. Ministry of Water, Energy and Hydrocarbons of Expense Category: Services, Goods, Works. Madagascar a Project agreement to design, finance, build, operate and maintain the Sahofika hydro-power project, further to a LESOTHO concession contract to be signed with the State. A Malagasy company has been Institutional Support established by the Consortium in this purpose, LESOTHO TAX MODERNISATION which is called Nouvelle Energie PROJECT - SUPPLEMENTARY FINANCING Hydroélectrique Le projet de modernisation du système Status: Approved by the board on 13-05-2020 fiscal est un appui institutionnel conçue Estimated total cost: 72 Million UA pour s’attaquer à certaines carences et Loan amount: 72 Million UA défaillances ciblées qui appellent des Executing agency: Ministry of Water, Energy améliorations et constituent les sources and Hydrocarbons. principales de la faiblesse de Expense Category: Services, Goods, Works. l’administration fiscale du Lesotho. Status: For Board Approval on 18-06-2021 Estimated total cost: 3 million UA Loan amount: 3 million UA MADAGASCAR Executing agency: MINISTRY OF FINANCE Expense Category: Services Industry INDUSTRIALIZATION SUPPORT PROJECT Status: For board approval on 05-11-2020 Estimated total cost: 10 million UA LYBIA Loan amount: 10 million UA. Agriculture Executing agency: The Government of Madagascar. HARNESSING DIGITAL TECHNOLOGIES TO Expense Category: Services, Goods, Works. IMPROVE FOOD SYSTEM OUTCOMES Groupe de la Banque Mondiale 2019. Future of MALAWI Food : Exploiter les technologies numériques pour améliorer les résultats du système Institutional Support alimentaire. SUPPLEMENTARY FINANCING FOR PROMOTING INVESTMENT AND Status: For Board approval on 30-06-2021 COMPETITENESS IN THE TOURISM SECTOR Estimated total cost: 173.7 million UA PROJECT. Loan amount: 173.7 million UA. Executing agency: GOVERNMENT OF LYBIA. Create a conducive environment for enterprise Expense Category: Services, Goods, Works. development and community participation. Project management. MADAGASCAR Status: Approved by the board on 30-04-2020 Power Estimated total cost: 692.000,00 million UA SAHOFIKA HYDROPOWER PLANT PROJECT Loan amount: 692.000,00 million UA Page 12/50
Quarterly Operations Summary – March 2021 African Development Bank Executing agency: GOVERNMENT OF MALAWI Status: For Board Approval on 15-05-2020 Expense Category: services Estimated total cost: 1.50 million UA Loan amount: 1.50 million UA. Executing agency: Gouvernement de MAURITANIA Mauritanie. Multi-Sector Expense Category: Services. PROJECT SUPPORT TO IMPROVE THE BUSINESS CLIMATE. MAURITANIA The objective of the Business Environment Social Enhancement Project for Mauritania are to GOVERNANCE AND HUMAN CAPITAL enhance the business climate through DEVELOPMENT, PHASE I improvement in the financial, legal and judiciary sectors, and regulatory environment Access to qualitative and equitable healthcare for business, and the support of measures to is a major challenge in Mauritania. In order to restructure selected Public Enterprise (PEs). support the country’s efforts, a health sector This will facilitate private sector led growth strengthening program was set up with investment in the economy and improve the participatory action research at its core. services of the PEs that directly impact private Reinforcing a health system requires a sector growth and development. There are two customized and comprehensive approach to components to the project. The first face the complexity inherent to health systems. component is for the improving the business climate to foster private sector development. Status: For Board Approval on 06-06-2020 The first component supports Government of Estimated total cost: 3 million UA. the Islamic Republic of Mauritania. Loan amount: 3 million UA. Executing agency : Gouvernement de Status: For Board Approval on 25-06-2020 Mauritania. Estimated total cost: 3 Million UA Expense Category: Services. Loan amount: 3 Million UA Executing agency: Government of Mauritania Expense Category: Services MAURITANIA Finance FINANCIAL INFRASTRUCTURE MODERNIZATION SUPPORT PROJECT - SUPPLEMENTARY LOAN Is considered as a starting point for the MAURITANIA establishment of the basic infrastructure of the financial sector in Mauritania. The project will Social contribute to creating the necessary conditions AFRICA DISASTER RISKS FINANCING for a sustained economic recovery, in particular PROGRAM (ADRIFI) by improving the financing of economic activities to further support the development The comprehensive programme, open to of the private sector, the main engine of regional member countries, will enhance their growth. The project is divided into two main ability to evaluate climate-related risks and components. The first component is aimed at costs, respond to disasters and review modernizing the national payments system adaptation measures at both national and sub- and setting up an information system at the national levels. It will also facilitate initial Central Bank. The second component, relating financing for countries in need of support. The to the modernization of foreign exchange programme’s initial phase is expected to run operations and strengthening the stability of from 2019 to 2023. the financial sector, will make it possible to Page 13/50
Quarterly Operations Summary – March 2021 African Development Bank support the implementation of the exchange MULTINATIONAL (Multinational-Nigeria) rate policy through the installation of an interbank market trading room change; and Agriculture and Rural Development the establishment of supervision tools for the MULTINATIONAL-TECHNOLOGIES FOR banking and microfinance sectors, which have AFRICAN AGRICULTURAL TRANSFORMATION seen significant development in recent years. (2ND FINANCING PHASE) Status: Approved by the board on 01-04-2020 Technologies for African Agricultural Estimated total cost: 0.40 million UA. Transformation (TAAT) supports Feed Africa by Loan amount: 0.40 million UA. providing the needed, proven agricultural and Executing agency: The Central Bank of food processing technologies and Mauritania (BCM). implementation strategies for inclusion within Expense Category: Services. the Bank’s loans to Regional Member Countries (RMCs). TAAT’s approaches revitalize and transform agriculture while restoring MAURITIUS degraded and maintaining or strengthening the ecosystems that underpin agriculture, Multi-Sector while modernizing and more fully COVID_19 CRISIS RESPONSE BUDGET commercializing agriculture. SUPPORT PROGRAMME Status: For Board Approval on 18-03-2020 The Program is to support national measures Estimated total cost: 48 million UA in response to COVID-19, and mitigate its Loan amount: 48 million UA health, social and economic impacts. Executing agency: International Institute of Status: Approved by the board 22-05-2020 Tropical Agriculture (IITA) Estimated total cost: 14,96 million UA. Expense Category: Goods, Services Loan amount: 14,96 million UA. Executing agency: Government of Mauritius, Ministry of Finances Expense Category: Services. MULTINATIONAL (Zambia) Transport NACALA ROAD CORRIDOR DEVELOPMENT MOROCCO PROJECT IV SUPPLEMENTARY LOAN Inclusive and Sustainable Development Project The proposed project will involve rehabilitation for Agricultural and Rural Areas (PADIDZAR) of a 75 km road between Liwonde and Mangochi in Malawi along the Nacala Road Status: For Board approval on 30-06-2021 Corridor as well as establishment of One-Stop- Estimated total cost: 60 Million UA Boarder-Posts (OSBPs) between Malawi and Loan amount: 60 Million UA Mozambique and between Malawi and Executing agency: Zambia. The total project cost estimate for Expense Category: Goods, Works, Services Malawi is UA45.390 million net of taxes. Zambia will contribute UA 0.5 million (9%). The project duration is expected to be 5 years as MULTINATIONAL (Central region) follows: design review, preparation of bidding documents and tendering (12 months), CEMAC Financial Sector Deepening Project construction period (36 months), and defects (PASFIC) liability period (12 months). Status: For Board approval on 21-04-2021 Estimated total cost: 2.5 Million UA Status: Approved by the board 11-10-2019 Loan amount: 2.5 Million UA Estimated total cost: 8.8 million UA Expense Category: Goods, Services Page 14/50
Quarterly Operations Summary – March 2021 African Development Bank Loan amount: 8.8 million UA NAMIBIA Executing agency: Road Development Agency. Expense Category: Services, Goods, Works. Agriculture and Rural Development AGRICULTURAL BANK OF NAMIBIA NAMIBIA Agribank contributed N in a co-financing Water Supply and Sanitation arrangement with the Development Bank of WATER SECTOR SUPPORT PROGRAMME Namibia. The funding was expected to meet the growing local demand. It is the largest The aim of the program is to increase access, agro-industry in Namibia and is expected to quality, security and sustainability of water create 120 direct permanent jobs and supply and sanitation services in Namibia. The approximately 600 throughout the dairy program implementation is planned in two industry. phases; The Phase I which is planned to cover all the 14 regions of Namibia is scheduled to Status: For Board Approval on 13-05-2020 be implemented in the next 5 years (2020 – Estimated total cost: 29 million UA 2025) and Phase II immediately after the Loan amount: 29 million UA completion of Phase I. Phase I is intended to Executing agency: The Government of Namibia address short term, immediate water solutions Expense Category: Services, Goods, Works. and Phase II will focus on long term solutions to the water shortage. Twenty-five sub- NIGER projects are proposed under NWSSP. Social Status: Approved by the board on 11-03-2020 FINANCEMENT ADDITIONNEL PROJET APPUI Estimated total cost: 93.60 Million UA AU DEVELOPPEMENT DE L’ENSEIGNEMENT ET Loan amount: 93.60 Million UA DE FORMATION (FA/PADEFPT) Executing agency: The Government of Namibia Expense Category: Goods, Works L’objectif sectoriel du projet est de contribuer à la scolarisation primaire universelle, et au développement équilibré de l’ensemble du NAMIBIA système éducatif. Les objectifs spécifiques sont Finance les suivants : (i) Accroître l’accès, l’équité et la ECONOMIC GOVERNANCE AND qualité de l’éducation de base ; et (ii) Renforcer COMPETITIVENESS SUPPORT PROGRAMME – les capacités de gestion du système éducatif. SUPPLEMENTAL FINANCING Sur la base de ces objectifs, trois composantes ont été définies : (i) Amélioration de la The program will continue to focus on couverture scolaire, de l’équité et de la qualité supporting fiscal consolidation, PFM and de l’éducation de base ; (ii) Appui institutionnel public sector efficiency (particularly SOE ; et (iii) Gestion du projet. L’intervention reform) and investment climate reforms pertinente de la Banque dans le secteur de geared towards supporting industrialization l’éducation, a contribué directement à la efforts. The program will create a strong réduction de la pauvreté. platform for policy dialogue and advisory services, with the Bank’s Directorate General Status: Pour approbation le 05-11-2020 South playing a pivotal role. Estimated total cost: 5 million UA Loan amount: 5 million UA Status: Approved by the board on 11-03-2020 Executing agency: Unité de Gestion du Projet Estimated total cost: 97 million UA PADEFPT Loan amount: 97 million UA Expense Category: Biens, Travaux, Services Executing agency: The Government of Namibia Expense Category: Services Page 15/50
Quarterly Operations Summary – March 2021 African Development Bank NIGER NIGERIA Agriculture and Rural Development Agriculture and Rural Development PROJET RENFORCEMENT LA RESILIENCE NIGERIA - SPECIAL AGRO-INDUSTRIAL COMMUNAUTES RURALES A L'INSECURITE PROCESSING ZONES (SAPZs) ALIMENTAIRE NUTRITIONNELLE The country’s agricultural economy has Renforcer la résilience des communautés qui historically been characterized by poor yield, se focalise sur les capacités des individus, des high postharvest losses, slow technological ménages et des structures communautaires à innovation, and significant deficits in support se préparer, à réagir, à anticiper, et à se relever systems such as infrastructure, productivity- des chocs externes. enhancing inputs, financial backing, commercial orientation, and effective related Status: Pour approbation le 15-10-2020 policies. To address these issues, Nigeria’s new Estimated total cost: 25 million UA agricultural investment framework seeks to Loan amount: 25million UA. stimulate private sector investments to drive a Executing Agency : Ministère de l'Agriculture Et market-led agricultural transformation, one de l'environnement such major investment initiatives being the Expense Category: Services development of Special Agro-Industry Processing Zones (SAPZs) aimed at boosting the rapid development of modern agro- NIGERIA processing capacity in the country. COVID619 RESPONSE SUPPORT PROGRAM (C19RSP) Status: RDNG in collaboration with SNFI team undertake some preparation done but moved The goal of the proposed program is to to July 27, 2021 due to COVID-19 constrained support Nigeria’s efforts at fighting the Estimated total cost: 387 million UA COVID-19 pandemic and protecting its citizens Loan amount: 145 million UA and businesses from the socioeconomic Executing agency: Federal Ministry of impact of the pandemic. Consistent with the Agriculture and Rural Development FGN program/plan to address the crisis, the Expense Category: Works, Goods, Services overall operational objective of the proposed operation is to support the implementation of the Government’s “Integrated Policy NIGERIA Framework” comprising critical and Transport complementary measures to attempt to LAGOS CABLE CAR TRANSIT SYSTEM (LCCT) forestall a decline into a prolonged recession to ensure that the country’s healthcare system Development of a cable car ropeway solution and social services, fiscal position and to the commuter congestion in Lagos, Nigeria economy are sufficiently supported to respond comprising of three lines using Tri-cable to and weather the negative impacts of the detachable grip technology. The civil works COVID-19 pandemic. consist of piling works, construction of tower Status: Board Approved on 05-05-2020. bases (14 No), and concrete towers (3 No. 150 Approved amount: 228 million US$. to 180 m high) erection of steel towers (11 No), Executing agency: Federal Ministry of Finance construction of stations (10 No) and associated & others. infrastructure for the stations. Expense Category: Services. Status: Initial preparation was undertaken but the task team consider the project not ready due to understandings issue to be addressed with the client. Project moved to 2022 on the RDNG IOP but however, could be Page 16/50
Quarterly Operations Summary – March 2021 African Development Bank reprogrammed for 2021 subject to its transformative sectors of agribusiness, readiness. manufacturing, commerce / trade and Estimated total cost: 245 million UA UC renewable energy. It is expected that up to Loan amount: 36 million UA forty per cent of the LoC proceeds will be Executing agency: Ropeways Transport Limited channeled to women empowered business in Expense Category: Goods, Works alignment with the Bank’s AFAWA Program. FCMB has also indicated commitment to (in the process of signing a non-binding letter of NIGERIA interest) participate in the proposed AFAWA program risk sharing mechanism. Water supply and Sanitation Status: RDNG in collaboration with SNFI YOBE KOMADUGU MULTIPURPOSE DAM undertake some preparation leading to PAR PROJECT but moved to April 24, 2021 due to reprioritization for COVID-19 CRF The Komadugu Yobe Basin is of strategic national and international importance as it (i) For Board Approval on 22-04-2021 supports the livelihood of over 15 million Estimated total cost: 195 million UA people in six Nigerian States and (ii) it Loan amount: 36 million UA represents approximately 35% of the Lake Executing agency: Chad Basin and hence its importance as a Expense Category: transboundary water resource. The Federal Government of Nigeria (through financing by the AfDB) has prepared the Komadugu Yobe NIGERIA Basin Strategic Action Plan (SAP) which is a Urban Development long-term development strategy promoting FAMILY HOMES FUND AND INTEGRATED the use of the basin water resources for SKILLS DEVELOPMENT PROJECT inclusive and sustainable growth. The Family Homes Funds is a Social Housing Program initiated by the Federal Government Status: RDNG in collaboration with SNFI to provide inexpensive mortgages for low- undertake some preparation done but moved income individuals and families across the to June 24 2021 due to COVID-19 constrained country. For Board Approval on 24-06-2021 Estimated total cost: 250 million UA. Status: following some intense preparation, Loan amount: 73 million UA. the Project had to be moved to Q3 2021 due Executing agency: Federal Ministry of Water to headroom constrained. Resources For Board Approval on 20-09-2021 Expense Category: Services Estimated total cost: 72 million UA Loan amount: 72 million UA Executing agency: Nigeria Integrated Social Housing (NISH) Expense Category: Services NIGERIA NIGERIA Finance Finance ACCESS BANK REGIONAL TRADE FINANCE NIGERIA FIRST CITY MONUMENT BANK SUPPORT FACILITY (FCMB) LTD The program seeks to reduce the trade finance The proposal is for a Thematic Line of Credit gap in Africa by “crowding in” global banks and (LoC) to FCMB to support the growth of its strengthening local Africa Financial Institutions term lending activities to local and women that are critical to the promotion of trade on empowered businesses involved in the continent. To this end, greater emphasis is Page 17/50
Quarterly Operations Summary – March 2021 African Development Bank placed on the promotion of regional audit; (v) project implementation (vi) ESMF and integration and intra-Africa trade. RAP implementation. Status: Project reprioritized for 2021 Lending Status: Approved by the Board on 12-05-2021 due to headroom constraint. Estimated total cost: 199.2 Million UA. Estimated total cost: 94 million UA Loan amount: 68.7 Million UA. Loan amount: 94 million UA Executing agency: Energy Development Executing agency: ACCESS BANK PLC Company Limited (EDCL). Expense Category: Services Expense Category: Services, Goods, Works. NIGERIA Multi-sector NIGERIA INNOVATION FUND PROJECT SAO TOME Power The project will be anchored by (i) boosting ENERGY TRANSITION AND INSTITUTIONAL human capital for relevant learning, skills and SUPPORT PROGRAM (ETISP). job creation; (ii) enabling infrastructure through innovation bubs, physical The broad objective of the proposed Program infrastructure, virtual infrastructure, data is to ensure sustainable development of STP’s center/sandbox; and (iii) financing power system and promote green growth by infrastructure. supporting the implementation of the LCDP. This will involve the diversification of the Status: Project reprioritized for 2021 Lending country’s electricity matrix by increasing power due to headroom constraint. generation capacity based on renewable Estimated total cost: 214 million UA energy, increasing the reliability of power Loan amount: 73 million UA system, and promoting the sustainable and Executing agency: Federal Ministry of Finance efficient use of electricity. The Programme will and Others ensure: (i) development of renewable energy, Expense Category: Services thus reducing the country’s carbon footprint and dependency on fossil fuels; (ii) RWANDA implementation of energy efficiency improvement throughout the country;(iii) Power improvement of the utility’s performance and TRANSMISSION SYSTEM REINFORCEMENT financial sustainability, including improved AND LAST MILE CONNECTIVITY PROJECT environment and social management, and governance; (iv) increase electricity access by The main project development objective is to allowing new connections (households, contribute towards strengthening of the business and industries) to a more transmission system, increasing electricity reliable grid; and (v) development of local access and subsequently enhancing expertise in hydropower, solar energy and electrification strategy as highlighted in the energy efficiency, summarizes the Program Country’s National Transformational Strategy components and intended benefits. (NST1) and the Energy Sector Strategic Plan (ESSP), while lowering the system’s Status: Approved by the board on 25-02-2020 greenhouse gas emissions. Key Project Estimated total cost: 7 million UA components include: (i) last mile grid access; Loan amount: 7 million UA (ii) distribution network reinforcement; (iii) Executing agency: GOUVERNEMNT DE SAO transmission line (137 km of 110 kV line) and TOME AND PRINCIPE. substations construction; (iv) project Expense Category: Services, Goods, Works. engineering, supervision, feasibility study and Page 18/50
Quarterly Operations Summary – March 2021 African Development Bank SEYCHELLES SAO TOME GENERAL BUBGET SUPPORT Operation Multi-Sector ECONOMIC REFORM AND POWER SECTOR Status: For Board Approval on 16-06-2021 SUPPORT PROGRAM Estimated total cost: 14 Million UA Loan amount: 14 Million UA Enhanced budget credibility, cash Expense Category: Services. management and expenditure efficiency, strengthened debt management, enhanced tax revenue mobilization, improved business climate. SOUTH AFRICA Status: Approved by the board on 08-01-2020 Water Supply and Sanitation Estimated total cost: 5 million UA. POSEIDON WATER PRIVATE EQUITY Loan amount: 5 million UA. Executing agency: Ministry of Planning Poseidon Water uses a Public-Private Finance and the Blue Economy. Partnership approach to water project Expense Category: Services, Goods. development. The so-called “P3” approach provides a clear framework for assigning roles and responsibilities to those best able SAO TOME (Multinational) to manage various project risks. As the Disease Control overall project development partner, SUPPORT TO SADC & SAO TOME COVID19 Poseidon plays a lead role in identifying and RESPONSE optimizing the allocation of risk among all parties. Each contract party is able to focus Status: Approved by the board on 23-06-2020 on its area of greatest expertise. Municipal Estimated total cost: 5 million UA. agencies are able to use their scarce Loan amount: 5 million UA. resources more efficiently, and private Executing agency: GOUVERNEMNT DE SAO project partners earn benefits in line with TOME AND PRINCIPE MINISTRY. their project contribution and at-risk capital. Expense Category: Services, Goods. Status: For Board Approval on 16-09-2020 Estimated total cost: 6.63 million UA SENEGAL Loan amount: 6.63 million UA. Executing agency: Land Agricultural Water Supply / Sanitation Development Bank. Eskom Ltd. PROJET d’ACCES AUX SERVICES D’EAU ET Development Bank of Southern Africa D’ASSINISSEMENT - INITIATIVES 2021 Expense Category: Services, Goods, Works. Le projet s’inscrit dans les objectifs d’accès à l’eau potable et à l’assainissement adéquat, SOUTH AFRICA l’un des axes majeurs identifiés par la communauté internationale pour la réduction Health de la pauvreté et l’amélioration des conditions COVID-19 CRISIS RESPONSE BUDGET de vie des populations. SUPPORT PROGRAMME Status: Approved by the board on 26-11-2020 The operation is designed as a Crisis Estimated total cost: 20 million UA Response Budget Support Operation Loan amount: 20 million UA prepared following a request from the Executing agency: Gouvernement du Sénégal government of South Africa. Expense Category: Services, Goods, Works. Page 19/50
Quarterly Operations Summary – March 2021 African Development Bank Status: Approved by the Board on 22-07- TUNISIA 2020 Estimated total cost: 210 million UA. Social Loan amount: 210 million UA. COVID19 - FACILITY TO THE "CAISSE DES Executing agency: The Government of South DEPOTS CONSIGNATIONS (CDC)"- Africa. Expense Category: Services. Status: For Board Approval on 09-06-2021 Estimated total cost: 16 Million UA Loan amount: 16 Million UA TUNISIA Expense Category: Services. Social PROGRAMME D’APPUI A LA REPONSE COVID-9 PAR L’INCLUSION SOCIALE ET L'EMPLOI – PARISE. TUNISIA Les principaux produits attendus du Social programme sont : (i) l’atténuation des PROGRAMME D’APPUI A LA REPONSE COVID- impacts sanitaires, économiques et sociaux 9 PAR L’INCLUSION SOCIALE ET L'EMPLOI – du COVID 19 et (ii) la préservation des PARISE. emplois, des entreprises ainsi que l’appui à la l’accélération de la relance économique Les principaux produits attendus du post crise COVID 19. programme sont : (i) l’atténuation des impacts sanitaires, économiques et sociaux du COVID Status: Approved by the board on 03-06- 19 et (ii) la préservation des emplois, des 2020 entreprises ainsi que l’appui à la l’accélération Estimated total cost: 14,32 million UA. de la relance économique post crise COVID 19. Loan Amount: 14,32 million UA. Executing Agency : Ministère du Status: Approved by the board on 03-06-2020 Développement, de l'Investissement et de Estimated total cost: 14,32 Million UA la Coopération Internationale. Loan amount: 14,32 Million UA Expense Category: Services, goods. Executing Agency: Ministère du Développement, de l'Investissement et de la Coopération Internationale. Expense Category: Services, Goods. SOUTH AFRICA Health COVID-19 CRISIS RESPONSE BUDGET UGANDA SUPPORT PROGRAMME Transport KABALE-LAKE BUNYONYI/KISORO- The operation is designed as a Crisis Response MGAHINGA ROADS UPGRADING Budget Support Operation prepared following a request from the government of South Africa. The Uganda National Roads Authority (UNRA) is proposing to upgrade a select number of Status: Approved by the Board on 22-07-2020 national roads from gravel to paved standard Estimated total cost: 210 million UA. to facilitate mobility, trade and tourism within Loan amount: 210 million UA. southwestern Uganda. The select national Executing agency: The Government of South roads have the following characteristics: (i) LOT Africa. 5a: Kabale-Lake Bunyonyi (7.8km), including Expense Category: Services. Bunyonyi- Kabeho link (7.3km); (ii) LOT 5b: Page 20/50
Quarterly Operations Summary – March 2021 African Development Bank Kisoro-Mgahinga (13km), including Nyarusiza trade activities and global competitiveness of - Muhavura gate (5km). Zambia and Botswana. Status: For Board Approval in December 2020 Status: Approved by the board on 12-02-2020 Estimated total cost: 60 Million UA Estimated total cost: 34,13 million UA. Loan amount: 60 million UA. Loan amount: 34,13 million UA. Executing agency: Uganda National Roads Executing agency: Government of Republic of Authority. Zambia. Expense Category: Works, Goods, Services. Expense Category: Services, Goods, Works. UGANDA Industry, Mining & Quarrying ZIMBABWE DEI INDUSTRIES INTERNATIONAL LTD Agriculture Empower Africa through innovation, research, AFRICA DISASTER RISK FINANCING CAPACITY manufacturing and technology. BUILDING PROGRAMME We believe in direct community engagement The program is aiming to strengthen the and excellent service delivery to make an capacity of the country to understand climate- overall positive impact on society. related risks, estimate their related costs for the country, and elaborate subsequent Status: For Board Approval in 2021 adaptation measures to extreme events at Estimated total cost: 7.90 million UA national and sub -national levels. Loan amount: 7.90 million UA Executing agency: Dei Group Ltd. Status: Approved by the board on 22-01-2020 Expense Category: Services, Goods, Works. Estimated total cost: 5 million UA. Loan amount: 5 million UA. Executing agency: THE GOVERNMENT OF ZAMBIA (Multinational) ZIMBABWE MINISTRY OF FINANCES. NACALA ROAD CORRIDOR DEVELOPMENT Expense Category: Services, goods. PROJECT IV SUPPLEMENTARY LOAN The project is expected to contribute to ZIMBABWE improving efficiency along the Nacala Road Corridor. At a regional level, the objective is to Health contribute to improving road transportation COVID-19 RESPONSE PROJECT (CRF) and trade facilitation along the Nacala Road Corridor. The project is for strengthening the COVID-19 case management response, Handwashing Status: Approved by the board on 28-02-2020 Facilities, and project management and Estimated total cost: 8.8 million UA. implementation support. Loan amount: 8.8 million UA. Executing agency: Road Development Agency. Status: Approved by the board on 13-05-2020 Expense Category: Services, goods, Works. Estimated total cost: 10 million UA. Loan amount: 10 million UA. Executing agency: THE GOVERNMENT OF BOTSWANA /ZAMBIA ZIMBABWE MINISTRY OF FINANCES. KAZUNGULA BRIDGE PROJECT (ZAMBIA Expense Category: Services, goods. SUPPLEMENTARY GRANT) The objective of the project is to improve the efficiency of transit traffic through the Kazungula border to facilitate and increase Page 21/50
Quarterly Operations Summary – March 2021 African Development Bank ZIMBABWE The Vulnerability Alleviation Project (VAP) aims Industry, Mining & Quarrying to contribute to the cushioning of the vulnerable populations of Zimbabwe, OLIVINE INDUSTRIES LIMITED particular in the urban areas, from the impacts of the ongoing economic reforms in the The proposed expansion project that will be country. The proposed operation builds on the financed by AfDB and FMO involve the extensive in-country Public Works Project purchasing and installation for the production experience, to strengthen urban resilience by of tomato ketchup and margarine. The existing reinforcing coping mechanisms across priority margarine plant has a maximum production sectors. capacity of 2 tones per hour. With the machinery to be acquired with the financial Status: For Board Approval on 15-04-2020 support of AfDB and FMO, the production will Estimated total cost: 24.000.000,00 million UA increase to 8 tones per hour. The machinery to Loan amount: 8,86 million UA be acquired for the margarine includes the Executing agency: Ministry of Youth processing units and the packaging plant while Development Indigenisa. the tomato ketchup will have production lines Expense Category: Services, Goods. for tomato ketchup, tomato sauce, mayonnaise, takatala sauce and mild mustard sauce. The maximum production capacity of the ketchup plant will be 8 tones hour combined for the five products it will produce, MULTINATIONAL (SADC) other utility facilities that will be upgraded, include the boiler section which will see two 8 Disease Control ton boilers being installed and factory SUPPORT TO SADC COVID19 RESPONSE renovations financed by local resources of Olivine Industries. A regional project that will be implemented in the form of a Regional Public Good (RPG) over Status: Approved by the board on 05-02-2020 Increase the availability of personal protective Estimated total cost: 8,86 million UA equipment in beneficiary countries for front Loan amount: 8,86 million UA. line health care workers. Executing agency: The government of Zimbabwe. Status: Approved by the board on 23-06-2020 Expense Category: Services, Goods, Works. Estimated total cost: 6.5 million UA. Loan amount: 6.5 million UA. Executing agency: SADC - SOUTHERN AFRICA DEVELOPMENT COMMUNITY. Expense Category: Services, goods. ZIMBABWE Social VULNERABILITY ALLEVIATION PROJECT Page 22/50