7th October 2011 RE-Shaping workshop Development of Renewable Energy Joint Projects with Third Countries Development of electrical interconnections Mission of Terna in the Balkans Milano, 7th October 2011
7th October 2011 Table of contents • Terna’s evidences • Key figures of Italian Network Development Plan 2011 • Italian transmission network: electrical gate of Mediterranean power systems • Development of European Grid on the North - South axis (ENTSO-E TYNDP) • Terna’s mission in the Balkans
7th October 2011 Terna and the Italian Transmission System Evidences 1st independent operator in Europe and 7th in the world Primary owner of the National High Voltage Electricity Transmission Grid Terna is responsible for grid planning, development and maintenance as well as for energy transmission and dispatching Over 62.500 km of EHV and HV lines 1.122 km underground cables, 917 km subsea cables, 11.261 km operated to 380 kV Over 390 transforming and switching stations Transforming capacity 122 GVA n.18 interconnection lines with France (4), Switzerland (9), Austria(1), Slovenia (2), Greece (1), Corsica (1) 326 TWh the 2010 energy demand (+1,8% vs 2009) 56.425 MW the 2010 maximum power demand (16th July 2010)
7th October 2011 Italian Transmission Network Development Plan 2011 Forecast of energy and power demand Development scenarios: +2,3% the energy annual growth rate in the next 10y Trend of energy demand, Gross domestic CAGR product and electrical intensity CAGR CAGR [TWh] 2009 - 2020 % 1990 -2009 2009 -2020 410.0 2,3% 2.0 Domanda elettrica Energy demand +1,6% +2,3% 362.1 Gross domestic product PIL +0,9% +1,6% 6 0,5% 1.8 Electrical Intensità intensity elettrica +0,7% +0,7% ITALY 320.3 5,9 25 1,9% 1.6 Agricolture 5,6 22,6 85,9 2,0% Losses 1.4 20,4 75,9 Household 68,9 1.2 139,7 3,6% Service 115,2 1.0 94,8 Sector 0.8 1990 1995 2000 2005 2010 2015 2020 Industry 130,5 142,4 153,4 1,5% Forecast of power demand 2009 2015 2020 Year Power 2009 51.873 MW 2016 low/high hypothesis 64/66 GW 2020 low/high hypothesis 70/74 GW
7th October 2011 Italian Transmission Network Development Plan 2011 Wind and Photovoltaic installed capacity Wind installed capacity from 2001 to 2010 (MW) Photovoltaic installed capacity from 2007 to 2010 (MW) +260% +160% In the last 5 years in the last year * Provisional data
7th October 2011 Italian Transmission Network Development Wind and Photovoltaic expected capacity increase Actual Short -Mid Term •Minimum target 2.420 2.160 of Energy Action 630 1.081 3 266 0 243 5 520 Plan 1.840 0 0 10 0 1.007 Wind 0 2.180 10 Wind 2020 881 6.466 MW 10.050 MW 1.069 1 Source GW 14 50 Photovoltaic Photovoltaic 18 10.851 MW 40 1.460 23.000 MW Hydro 17,8 19 44 685 20 100 457 930 590 40 Geothermal. 0,9 45 266 0 Solar 8,6 2 190 5 780 Tide,…
7th October 2011 Italian Transmission Network Development Plan 2011 Main project on the EHV internal network about the North-South axis Udine O.-Redipuglia LAVORGO ROBBIA Trino-Lacchiarella ' SOAZZA ' ' EDOLO UDINE OVEST Link accross Veneto RONCOVALGRANDE "" "" MUSIGNANO ' ' "' S.FIORANO CORDIGNANO PLANAIS ' BULCIAGO ( ' PIANCAMUNO ' $ $ DIVACA ALBERTVILLE ' ' SANDRIGO GORLAGO ' TORVISCOSA ' ' ' MONFALCONE ' MERCALLO ' FLERO NAVE ' ' ' ' Dolo-Camin OSPIATE ' ' ' VENEZIA N. $' ' '' ' ' ' DOLO ' ' LONATO DUGALE( TURBIGO ' CASSANO ' ' ' ' $ ' $ CAMIN VILLARODIN LEYNI TRINO C.LE ' ' ( ' ' TAVAZZANO$ ' ' $ S.ROCCO ' MANTOVA ' "" ' $ '$ CAORSO $ OSTIGLIA ADRIA SUD $ ' $ ( ' ' ' ' ' PORTO TOLLE VENAUS CHIVAS.TER ' $ PIACENZA $ ' $ ' ' $ ' $ VOGHERA ST Mantova-Modena PIOSSASCO CASANOVA SERMIDE ' ' PARMA VIGH. ' ' FERRARA NORD ' ' VIGNOLE B. ' ' PORTO CORSINI MAGLIANO RUBIERA ' $( RAVENNA CANALA S.DAMASO ' ' COLUNGA ' $ ENIPOWER RAVENNA Colunga-Calenzano '$ ' FORLI' VIA ORAZIANA " ' BARGI C.LE VADO TERMICA ""' Casanova-Vignole ENTRACQUE $' S.MARTINO IN XX ' SPEZIA C.LE CALENZANO FANO E.T. MARGINONE ' ' ' ' POGGIO A CAIANO ' CANDIA ROSIGNANO ' $ ' $ ROSEN ' TAVARNUZZE PIAN DELLA SPERANZA ' Adriatic backbone and PST ROSELECTRA Voghera-Lacasella PIOMBINO TERMICA $ ' SUVERETO ' ROSARA SF6 TERAMO 380 Foggia-Benevento and PST ' ' ' "" VILLAVALLE VILLANOVA ' MONTALTO C.LE S.GIACOMO Chignolo-Maleo TORREVAL.NORD TORREVAL. SUD $ ' $ '' $ AURELIA S.LUCIA ' ROMA N. GISSI ' ' $ ENERGIA M. TERMOLI Calabria-Campania axis ROMA E. ' $ ' ROMA O.' LARINO ' VALMONTONE ' FOGGIA ROMA S. CEPRANO380 ' ' PRESENZANO "" ANDRIA ' SPARANISE LATINA NUCL. GARIGLIANO ST ' $ CANDELA BARI O ' $ ' ' ' BENEVENTO 2 S. TERESA S.MARIA CAPUA V. ' ' BRINDISI NORD $ MATERA PATRIA ' BRINDISI SET TEVEROLA ' BRINDISI S. $ $ FIUMESANTO ' $ ' $' MONTECORVINO ' BRINDISI SUD CE ' TARANTO N2 SACOI repowering CODRONGIANOS ' GALATINA ' ' LAINO ARACHTHOS(GRECIA) ALTOMONTE $' ROSSANO TE $ M.Corvino-Benevento SCANDALE SELARGIUS MAGISANO ' ' SARLUX ' ASSEMINI FEROLETO ' Link accross Calabria $ ' $ SIMERI CRICHI ' $CAGLIARI SUD ' RIZZICONI SORGENTE CORRIOLO ' Sorgente-Rizziconi Sicily EHV ring PATERNO ' MISTERBIANCO MELILLI CHIARAMONTE GULFI ' $ ISAB ENERGY '
7th October 2011 Italian Transmission Network Development Plan 2011 Energy National Action Plan: 10y network investment for renewable energy • Projects completed and in service 2010/11 SA.PE.I. 380 kV Ittiri-Codrongianos S/E 380/150 kV Bisaccia, Completati Deliceto, nel 2010 Maida,Troia others ~ 900 M€ Adriatic backbone • Main projects in construction 380/150 kV Larino Sorgente-Rizziconi (existing) 380/150 kV S.Severo Benevento II - Foggia (existing) 380/150 Tuscania 380/150 kV 380/150 kV Foggia S/E 380/150 kV Spinazzola, Castellaneta, Rotello (existing) Montesano M., Rotello, Tuscania, Aliano, HVDC interconnection PST Foggia Sardinia-Continent Development on existing S/E 380/150 kV 380/150 kV 380/150 kV P. del Colle (Scandale, Foggia, Galatina, Brindisi, 380 kV Foggia- Spinazzola (existing) Feroleto,…) Benevento II 380/150 kV Brindisi S. (existing) S/E Villanova (PST) 380 kV Deliceto-Bisaccia others Intervento > 600 M€per rinnovabile 380/150 kV Galatina 380 kV (existing) Calabria-Basilicata-Campania 380/150 kV Aliano 380/150 kV 380/150 kV Castellaneta • Main projets in permitting phase Marcellana 380/150 kV Scandale Montecorv.-Avellino N. Laino-Altomonte (existing) Paternò-Priolo 380/150 kV Feroleto Calabria Foggia-Gissi (existing) Crossbone 380/150 kV Belcastro others > 600 M€ 380 kV Sorgente-Rizziconi Intervento per rinnovabile Partinico-Fulgatore 380/150 kV Sorgente 2 1 Atcompletion total cost 380 kV ring of Sicily 2 Connection projects of new power plant in permitting not included 380/150 kV Mineo
Rome, October 11th 2011 Italy: electrical gate of the Mediterranean New capacity by interconnection projects HVDC Italia-Austria CURRENT NET TRANSFER (under consideration) Italy-Switzerland CAPACITY1 : (under feasibility study) Italia – Austria (planned) 7.540 MW NORTH BORDER Udine O.-Okroglo by French (4 tie-lines) (planned) by Switzerland (9 tie-lines) HVDC Grand’Ile-Piossasco HVDC Italy-Slovenia by Austria (1 tie-lines) (under construction) (under feasibility study) by Slovenia (2 tie-lines) HVDC Italy-Croatia FR 500 HVDC MW Italy-French (under consideration) (under consideration) 500 MW GREECE Repowering of SACOI HVDC Villanova-Tivat/Kotor DEVELOPMENTS: (planned) (under construction) +3.000/5.000 MW ON NORTH HVDC SAPEI HVDC Italy-Albania (completed in 2010) (authorized) DEVELOPMENTS: +1.500/4.000 MW ON BALCANS AND NORTH AFRICA Sicily-Mainland AC link HVDC Galatina-Arachthos (under construction) HVDC Italy-Algeria (under feasibility study) Sorgente-Rizziconi Existing submarine cable HVDC Italy-Tunisia Terna’s development plan projects (under consideration) HVDC Italy-Malta Projects by private funding (ML and interconnectors) (planned) 1 Referred to winter peak NTC value in import Direzione Operations Italia | Investment Planning/Grid Planning
Rome, October 11th 2011 Progress of main development projects Completed in 2010/2011 Under construction Reinforcements Valcamonica-Valtellina In authorization Udine Ovest – Okroglo Reinforcements of Milan Area Redipuglia – Udine Ovest Trino – Lacchiarella Line across Veneto Reinforcements of Turin Area Reinforcements Verona (Bussolengo) HVDC Grand’Ile-Piossasco Dolo – Camin -Fusina La Casella – Caorso Colunga – Calenzano Fano – Teramo and S.E. Macerata HVDC Italia -Montenegro S.Barbara – Casellina Villanova-Gissi Isola d’Elba – Continente SACOI 3 SAPEI Foggia – Benevento S. Teresa – Buddusò Ittiri-Codrongianos Deliceto - Bisaccia In service from decembrer2010 Reinrforcements Montecorvino – Benevento of Napoli Area Reinforcements Nord Calabria Feroleto-Maida Sorgente – Rizziconi Paternò – Priolo Chiaramonte Gulfi - Ciminna Direzione Operations Italia | Investment Planning/Grid Planning 10
Entso-e system Key Drivers for Transmission Investments and TYNDP Terna is involved as a member of ENTSO-E, being the body of transmission system operators of electricity at European level. ENTSO-E's mission: to guarantee Security and Adequacy, improve Market competition and promote Sustainability Main European transmission projects are included in the TYNDP TYNDP was approved after six weeks of public consultation from 1 March till 11 April 2010
Entso-e system Key Drivers for Transmission Investments and TYNDP European transmission investments driven by Security of Supply, Renewable Energy Sources, Market Integration TYNDP covers about 23-28 bn€ of about n. 500 transmission projects in next 5 years over 10 % in charge of Terna over 42.000 km in next 10 years; the main technology remains 400 kV HVAC OHL, other technical solutions are being implemented in specific situations (HVDC links, subsea cables, etc.)
Entso-e system Future scenarios of load and generation • Demand Growth [GW] •Generation capacity trends + 17 % in next 10 years + 132 % renewable power in next 10 years 600 100% 90% 500 489 80% 455 439 453 346 411 415 418 425 70% 388 400 429 398 60% 362 369 334 50% 300 93 154 167 216 262 40% 200 30% 111 110 108 106 107 20% 100 10% 139 151 156 168 171 0% 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 January 19:00 July 11:00 Hydro Power Nuclear Power Renewable Energy Sources Fossil Fuels Source: ENTSO-E – TYNDP scenarios
Entso-e system Transmission needs – the highways perspective
7th October 2011 ENTSO-E: Ten Years Network Development Plan (2010-2020) Developments of North-South axis by Italy Roads of priority network corridors Italian network system fully involved on the implementation of TYNDP on the axis North - South: North Sea Continental Central South Central Continent South (Italy) Central South Est South (Italy) 16 14 DE 12 FR CH AT 10 SI bn€ 8 IT 6 16 4 14 CONTINENTAL SI HU 2 CENTRAL SOUTH HR RO 12 IT BA RS 0 10 ME BG MK bn€ 8 GR 6 4 CONTINENTAL SOUTH CY EAST 2 0
ENTSO-E: Ten Years Network Development Plan South-Eastern Region Mid Term horizon 2011-2015 Long Term horizon 2016-2020
TERNA DEVELOPMENT STRATEGIES IN THE BALKANS as regulated TSO, the development of interconnections with the region, aimed at the electricity system’s safety and at increasing electricity market competition; as a private industrial company, investigating business opportunities in Balkan network infrastructures development, based on its own professional and technological resources. Balkan Area has a significant unused energy potential with particular regard to hydro power resources as well as renewable sources, lignite and carbon mines
TERNA DEVELOPMENT STRATEGIES IN THE BALKANS Development activities in Balkans include: the construction of new electricity interconnections with Balkan area the development of new transmission infrastructures within Balkan area in order to improve local electricity grids and strengthen exchange corridors with Italy the implementation of technical assistance programs for local authorities and stakeholders participation in public bodies, supporting the creation of a Regional electricity market and its integration into the European electricity market
MAIN NETWORK DEVELOPMENTS IN SEE Villanova-Tivat/Kotor 2015
SUBMARINE INTERCONNECTIONS WITH BALKANS Contributing to the diversification of sources and energy supply areas and of reducing the electricity prices Increasing the safety levels of the interconnected electricity system. New submarine interconnection Italy - Montenegro 1000 MW “electricity bridge” with Balkans length of 415 km between Villanova (Abruzzo) and Tivat/Kotor (Montenegro), 760 million euros of investments. On November 2010 intergovernmental agreement Italy (Terna) – Montenegro (CGES) Permitting procedures completed on Italian side Going to be concluded also on Montenegrin side Further initiatives for interconnections with the Balkans Italy – Slovenia INTERCONNECTOR (private funding project according to 99/2009 Law) Under evaluation new interconnections with Croatia and Albania
BALKAN TRANSMISSION SYSTEM INFRASTRUCTURING 400 kV Montenegrin backbones with Serbia/Bosnia Montenergo is of primary importance for transmission infrastructuring of Balkan area thanks to: • its geographical location • the availability of a transmission grid in good condition and well connected with the future generation hubs of the area – Bosnia-Herzegovina, Serbia, Kosovo, Albania, and (via Serbia) Bulgaria and Romania These features together with its unused energy potential and a significant energy surplus at lower costs available in the mid-to-long term, make it ideal for the role of an electricity-trading platform between Italy and Southeastern Europe.
7th October 2011 400 kV Montenegrin backbones with Serbia/Bosnia Transmission Network of Montenegro in 2015
7th October 2011 400 kV Montenegrin backbones with Serbia/Bosnia Transmission Network of Montenegro in 2020
BALKAN TRANSMISSION SYSTEM INFRASTRUCTURING 400 kV Tirana – Elbasan - construction activities Terna, in association with SAE Power Lines, worked on developing the 400 kV Tirana-Elbasan overhead line nearly 50 kilometers long. TERNA activities were completed in december 2010. The remaining 20%, concerning 110 and 220 kV connections, will be completed by the end of 2011. Interest in international bids for the construction of further grid infrastructures in the area.
TRANSMISSION SYSTEM REGULATION IN BALKAN AREA Technical assistance contracts Terna is present in the Balkan area with 2 job orders for technical assistance: • In Serbia, for the energy regulatory authority AERS, with an 18-month contract in partnership with the Spanish consultant Mercados and the Dutch consultant Kema, financed by the European Commission • In Kosovo, for the TSO, KOSTT, focused on the operation of the electricity system and aspects of the international regulation of the electricity market, with a 24-month contract – recently extended for 22 more months – in partnership with the Scottish company IPA, financed by the European Commission. In 2009 Terna successfully concluded its provision of technical assistance to the Ukrainian Ministry of Energy, as well as to the Albanian distribution company (KESH) and the Albanian TSO (OST) and in 2010 to the Turkish TSO (TEIAS).