PNE - PURE NEW ENERGY - PNE GROUP PRESENTATION, MAY 2020 - PNE AG
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
DISCLAIMER This presentation is for information purposes only and does not constitute a public offer or invitation to subscribe for or purchase any securities of PNE AG and neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever. This presentation is being furnished to you solely for your information and may not be reproduced or redistributed to any other person in whole or in part. All information contained herein has been carefully prepared. Nevertheless, we do not guarantee its accuracy or completeness. The information contained in this presentation is subject to amendment, revision and updating. Certain statements contained in this presentation may be statements of future expectations and other forward-looking statements that are based on the company’s current views and assumptions and involve known and unknown risks and uncertainties. Actual results, performance or events may differ materially from those in such statements as a result of, among others, factors, changing business or other market conditions and the prospects for growth anticipated by the management of the Company. These and other factors could adversely affect the outcome and financial effects of the plans and events described herein. The Company does not undertake any obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. The distribution of this document in other jurisdictions may be restricted by law and persons into whose possession this document comes should inform themselves about, and observe, any such restrictions. Any failure to comply with these restrictions may constitute a violation of applicable Securities Laws. | PNE Group Presentation | May 2020 2 x
PNE – FULL OF ENERGY » Pioneer in wind energy with > 25 years of industry experience » Active in 12 countries on 3 continents with > 400 employees » Leading developer of wind farms in Germany We develop and implement projects and » International O&M manager with > 1,600 MW solutions for the planning, construction and » 8 sold offshore projects with 2,644 MW operation of renewable power plants. » > 3,100 MW of wind energy projects realized onshore » > € 10bn of investments initiated » Clean energy for > 3.3m households » Attractive wind energy pipeline of > 5,000 MW » First photovoltaic projects in development | PNE Group Presentation | May 2020 4 gettyimages
PIONEERS IN THE RENEWABLE ENERGY SECTOR Markus Lesser Chairman of the Board Jörg Klowat (CEO) Chief Financial Officer (CFO) » CEO since May 2016 » CFO since April 2011 » COO 2011–2016 » Industry experience since 1999 » Industry experience since 2000 » Finance and Accounting, Controlling, » Sales, M&A, Procurement, Offshore, Communication/IR Risk Management, Legal, Human Resources » Associations: Member of the Board BDEW, Member of the Board WAB, Chairman of Fachgruppe Energie und Umwelt des Wirtschaftsrates in Lower Saxony | PNE Group Presentation | May 2020 5
ROBUST BUSINESS MODEL THROUGH INTEGRATION ALONG THE VALUE CHAIN approx. 3 – 5 years 20 years Sale* Development Financing Construction Service IPP » Acquisition of site » Financial analysis » Grid connection » Utility » Technical and » Analysis (wind / sun) » Legal concept » Infrastructure » Infrastructure fund commercial management » Selection of » Sales/marketing » Assembly » Insurance companies equipment » Project financing » Start-up of operations » IPP » Permits Power- Wind PV Storage to-Gas *sale as turnkey project or project right, as single project or project portfolio | PNE Group Presentation | May 2020 6
UNIQUE TRACK RECORD 2012 2012–19 2016–17 2017 2017–19 OFFSHORE WIND ONSHORE WIND ONSHORE WIND OFFSHORE WIND ONSHORE WIND GODE WIND Highlights Various project sales Wind farm portfolio ATLANTIS I Pipeline Deal International projects ØRSTED INVESTORS ALLIANZ VATTENFALL PROJECTS Gode Wind ~924 MW » KGAL ~142MW Atlantis I ~584 MW » France >100MW » CEE » €142m received » CHORUS » Enterprise Value (EV) > » Low double-digit €m » Poland ~174MW » Up to €15m due as » ALLIANZ €330m payment received milestone payments » ENBW » Sales price in 2016 » Further milestone payments » Sweden ~138MW » ENEL €103m for 80% possible Borkum Riffgrund ~ 760 MW » JOHN LAING » Subsequent sale price of » USA ~80MW » PATTERN ENERGY €21m in 2017 and increase » QUAERO CAPITAL of EV to > €360m through » STADTWERKE MÜNCHEN optimisation of financing | PNE Group Presentation | May 2020 7
LARGE 5 GW WIND ENERGY PIPELINE PROVIDES EXCELLENT VISIBILITY BEYOND 2020 EUROPE » Onshore wind: in MW* Large, high-quality project D 1,664 pipeline secures stable project F 532 output UK 43 I 40 CANADA » PV: P 111 505 MW* RO 156 First projects under S 59 development in Germany, USA, USA TR 700 Romania; 433 MW* further internationalisation planned PANAMA 352 MW* * only wind onshore SOUTH AFRICA 530 MW* | PNE Group Presentation | May 2020 8
AGENDA I. II. III. | PNE Group Presentation | May 2020 9
STRONG GROWTH OF RENEWABLE ENERGY MARKET AHEAD Key growth drivers: World electricity generation (GWh/yr) » Global commitment to reduce global warming and ambitious 70.000.000 political targets (e.g. COP21) 60.000.000 » Renewable sourced electricity is key for decarbonisation/ CO2 reduction 50.000.000 » Growing demand for renewable energy driven by economic 40.000.000 growth and geostrategic reasons 30.000.000 » Competitive renewable energies due to heavily decreasing 20.000.000 technology costs » High demand especially for premium projects in low interest 10.000.000 environment 0 » Increasing power prices driven by the nuclear phase-out 1990 2000 2010 2020 2030 2040 2050 (Germany, France) and increasing prices for CO2 certificates Coal Oil Gas reduce dependency on subsidies Nuclear Other renewables Hydro Solar Wind onshore Wind offshore Source: DNV GL – Energy Transition Outlook 2018 | PNE Group Presentation | May 2020 10
ELECTRICITY PRICES WILL INCREASE » Electricity prices will increase as nuclear power plants will go offline in Germany and France » Prices of CO2 certificates will increase » This will open up new business opportunities Power price scenario Germany Historic Modelled EUR/ 90 MWh August / September / October 2019, 6.20 ct/kWh 80 70 May 2019, 6.13 ct/kWh 60 May 2017, 5.78 ct/kWh 50 November 2017, 3.82 ct/kWh 40 30 August 2018, 6.16ct/kWh 20 February 2018, 4.73 ct/kWh 10 initiated 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Source: PNE AG EPEX Baseload Electricity price Preisprojektion Spot electricity EPEX Day Ahead EEG EEG Tender historical Auction Remuneration Auction modelled projection price tariff results modelled | PNE Group Presentation | May 2020 11
NEW OPPORTUNITIES THROUGH INTEGRATION OF ENERGY MARKETS Maximising project value through: Battery storage » Focus on value chain after power generation » Combination of wind, PV and storage E-Mobility Natural gas drive » Creating a new sales channel through the integration of storage solutions (e.g. Power-to-Gas) » Offering solutions to bypass grid bottlenecks Solar PV Wind Power grid Electrolysis Methanation Gas grid Pump and Hydrogen compressed drive air storage Power-to-heat Households, businesses Gas and steam and industry power plants Cogeneration Electrocity flow CO2 power plants Hydrogen Artificial natural gas Heat supply (generated through green electricity) Source: e/m/w 2017 | PNE Group Presentation | May 2020 12
DEVELOPING INTO CLEAN ENERGY SOLUTION PROVIDER WITH “SCALE UP“ PROGRAMME TECHNOLOGY OPERATIONS - Wind - Power Generation - PV - Smart Energy - Storage Supply Management - Power-to-Gas TECHNOLOGY OPERATIONS MARKETS SOLUTIONS/ - Wind - Power Generation - Established Markets CONSULTING - Emerging Markets - Engineering & Financing Solutions MARKETS SOLUTIONS/ CONSULTING - Repowering - Established Markets - O&M - Repowering - O&M S » C » A » L » E » | PNE Group Presentation | May 2020 13
STEP BY STEP EXECUTION OF STRATEGIC AGENDA Processes & Tools » Profit center structure introduced Products » Newly defined processes » IT structure unified » Newly defined and Organisational & financial framework expanded product range » Financing optimised: € 100m corporate bond paid back, € 50m Strategy corporate bond placed » Takeover of remaining WKN stake, transformation from AG to GmbH, cross-company standardisation of the organisational structure | PNE Group Presentation | May 2020 14
SCALE UP – EXECUTION FULLY ON TRACK 2023 … 2020 2019 2018 » 500 MW own 2017 » Start of expansion » Add further new power generation » Development of of own generation products/services portfolio in » Completion of project pipeline in power portfolio* » Product range operation » Start of ramp-up ramp-up phase the 1st new market » Completion and of different Hybrid » Finalisation of phase » First new » 1st PV project in sale of 1st Power Plants is in SCALE UP » Structures/ products/services developed project place development People/Processes available in new markets » Provide additional » Ongoing expansion » Implement Smart » First revenues with » 1st PPA of own generation services and Development new products and (Power Purchase power portfolio* expand consulting Team Hamburg services Agreement) in solutions » Market entrance » Start build-up of foreign markets 3rd market » Partnering » Expansion of 200MW portfolio » Market entrance » Improvement of Offshore » Identify remaining Development 2nd market white spots in financing structure » Sale of 1st Hybrid regions, value project chain and products RAMP-UP TRANSFORM EXECUTE DELIVER * Envisaged sale of wind farm portfolio 2020 will not be continued | PNE Group Presentation | May 2020 15
AGENDA I. II. III. | PNE Group Presentation | May 2020 16
DYNAMIC START TO THE YEAR » Q1 developed as planned despite corona crisis Put in operation, » 80.5 MW put into operation or started construction started construction 80.5 » Tender successes in Germany (13.9 MW) » Preparations for the final applications for approval for three further wind farm projects completed MW » 283.5 MW under construction 47,8 Tender successes Own wind generation portfolio » Scale Up – Implementation fully on track » PV pipeline expanded further in Germany 13.9 130.1 MW MW » Expansion of own power generation portfolio up to 500 MW by 2023 – strategy extension to minimize volatility Projects under construction 283.5 MW | PNE Group Presentation | May 2020 17
WELL-FILLED PROJECT PIPELINE WIND ONSHORE Sold/ Germany Country I – II III IV Total MW Services » Projects Langstedt (12.6 MW), Katzenstirn (17.5 MW) and Germany 1,260 365 39 1,664 0 Lentföhrden (8.4 MW) under construction France 271 261 0 532 0 » Projects Lentföhrden (8.4 MW) and Erfurt-Ost (5.5 MW) successful United Kingdom 43 0 0 43 0 in tender Italy 40 0 0 40 0 » Preparations for the final applications for approval for three further Canada 505 0 0 505 0 wind farm projects completed Panama 352 0 0 352 0 Poland 92 19 0 111 132 Sweden Romania 54 102 0 156 0 » Construction management for Målarberget (113 MW) South Africa 500 30 0 530 0 Poland Sweden 0 59 0 59 113 » Construction of Barwice (42 MW) completed Turkey 629 71 0 700 0 » Construction management for Jasna (132 MW) USA 266 167 0 433 0 Bulgaria and Hungary Total 4,012 1,074 39 5,125 245 » Due to unfavourable market conditions development activities have Phase I – II = Exploration & Development As of March 31, 2020 been stopped Phase III = Planning Phase IV = Implementation till handover Sold/Services = sold, but construction management services by PNE | PNE Group Presentation | May 2020 18
PROJECT PIPELINE PHOTOVOLTAIC IS GROWING Country I – II III IV Total MWp Germany Germany 19 0 0 19 » Pipeline expanded to 19 MWp Romania 112 0 0 112 Improved conditions for PV projects USA 1 0 0 1 » Photovoltaic installations have become increasingly cost-effective Total 132 0 0 132 and thus more marketable in the area of electricity generation Phase I – II = Exploration & Development As of March 31, 2020 » Legal and economic framework conditions for the development of Phase III = Planning photovoltaic projects are in place in many countries Phase IV = Implementation till handover Additional markets and projects are being evaluated » Numerous markets are currently being examined in detail and the first rights are being secured » Particular attention will initially be paid to Germany, France, Italy, Romania and the USA as well as other international markets | PNE Group Presentation | May 2020 19
EXPANSION OF OWN POWER GENERATION » PNE Group will expand its own wind farm operations Project MW State Status considerably in the future Kührstedt-Alfstedt 43.2 Lower Saxony in operation since Q4 2017 » Changed framework conditions and favourable financing options Gerdau-Repowering 21.6 Lower Saxony in operation since Q1 2019 led to decision Schlenzer 6.5 Brandenburg in operation since Q2 2019 » Envisaged sale of wind farm portfolio 2020 will not be continued Neuenwalde 7.2 Lower Saxony in operation since Q4 2019 Kittlitz 17.2 Brandenburg in operation since Q4 2019 » Objective of stabilising sales and earnings at a high level Laubuseschbach 3.0 Hesse in operation since 2002 » Aim is to achieve the medium-term EBIT target of € 38-44m* Baden- until 2023 earlier Pülfringen 6.5 in operation since 2002 Württemberg » Individual projects, particularly abroad, will still be marketed Baden- Erfeld 2.6 in operation since 2002 Württemberg » Own generation portfolio currently consists of 130.1 MW of Papenrode 22.3 Lower Saxony in operation since 2002 onshore wind projects Total 130.1 * as defined in Scale up strategy | PNE Group Presentation | May 2020 20
CONTACT Rainer Heinsohn Head of Communication Tel: +49 (0) 4721 – 718 - 453 Fax: +49 (0) 4721 – 718 - 373 E-Mail: rainer.heinsohn@pne-ag.com Christopher Rodler Head of Investor Relations Tel: +49 (0) 40 879 331 14 Fax: +49 (0) 4721 – 718 - 373 E-Mail: christopher.rodler@pne-ag.com | PNE Group Presentation | May 2020 21
You can also read