Places for All A School Place Planning Strategy 2018 to 2023 newham.gov.uk - Newham Connect
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Contents 1.0 Executive Summary ..................................................................................................................... 3 1.1 Mainstream Education ............................................................................................................ 3 1.2 Special Education Needs and Disabilities................................................................................ 4 1.3 Early Years ............................................................................................................................... 4 1.4 Post-16 Education and Training .............................................................................................. 5 1.5 Next Steps ............................................................................................................................... 5 2.0 Compulsory Education ................................................................................................................ 6 2.1 Monitoring Demand for Mainstream Pupil Places ................................................................. 6 2.2 Pupil demographics for Primary and Secondary Schools ....................................................... 6 2.3 Funding to commission new school places ............................................................................. 8 2.4 Process to provide additional mainstream school places....................................................... 9 3.0 Forecasting for Mainstream School Places ............................................................................... 11 3.1 Planning areas ............................................................................................................................. 11 3.2 Secondary School Places Forecasts ....................................................................................... 12 3.3 Schools within the Secondary Pupil Place Planning Area ..................................................... 14 3.4 Year 7 Forecasts .................................................................................................................... 14 3.5 Overall Secondary Forecasts ....................................................................................................... 16 3.6 Primary School Place Forecasts .................................................................................................. 17 3.7 Beckton Planning Area ................................................................................................................ 20 3.8 Canning Town and Custom House Primary Planning Area ......................................................... 21 3.9 East Ham Planning Area .............................................................................................................. 25 4.0 Forest Gate Planning Area .......................................................................................................... 27 4.1 Manor Park Primary Planning Area............................................................................................. 29 4.2 Plaistow Primary Planning Area .................................................................................................. 31 4.3 Stratford Primary Planning Area ................................................................................................. 33 5.0 Special Educational Needs provision .................................................................................... 36 5.1 Duties for children and young people aged 0 to 25 with SEND ............................................ 36 5.2 SEND Provision ...................................................................................................................... 36 5.3 An inclusive approach to special educational needs and disability (SEND) .......................... 38 5.4 SEND Needs analysis ............................................................................................................. 38 5.5 SEND Emerging plans ............................................................................................................ 38 1|Page
5.6 Pupil Referral Units and Alternative Provision ..................................................................... 39 Appendix A: Births ................................................................................................................................ 40 Appendix B: Types of Schools in Newham ............................................................................................ 42 Appendix C: School place planning methodology................................................................................. 43 Appendix D: Capital Basic Need Projects Undertaken .......................................................................... 45 Appendix E: 16-19 place analysis and projections ................................................................................ 47 2|Page
1.0 Executive Summary Local Authorities have a statutory duty towards the spiritual, moral, mental and physical development of the community by securing sufficient education provision to meet the needs of the population within their area. This duty encompasses provision for all primary and secondary aged pupils from to sixteen years of age; provision of post-16 places; provision of early years places from birth to the age of five; and provision of specialist education places for any child that requires a place from birth extending to the age of 25. This place planning strategy makes recommendations for adjustments in the supply of future provision based on forecasts of need. The five year forecasts include population growth that is anticipated from Newham’s housing development programme. The strategy has been developed with engagement from head teachers and governors from schools in Newham. It includes provision for Special Education Needs and Disabilities, Early Years, and Post-16 planning. By providing information to residents and stakeholders, the purpose of this strategy is to provide a platform for transparency and engagement on decision-making for future school provision. The last ten years has seen an increasing child population in Newham which has increased the demand for education provision. The Office of National Statistics mid-year population estimates have identified Newham as having the third highest 0 to 15 aged population in London. Although recent birth trends indicate that the large increases previously experienced in births have now slowed down, this has also been reflected in the birth rate in Newham. Newham’s Local Plan has identified approximately 19,000 new homes to be delivered over the next five years and beyond. This place planning strategy incorporates the latest pupil projections based on known live births, housing yields and current trends to ensure resources are prioritised accordingly to deliver the best provision for all. 1.1 Mainstream Education Newham has responded proactively to the increases in its mainstream primary aged population by providing additional primary places through the expansion of existing schools. The primary January School Census (2018) evidenced an increase of an additional 6,000 pupils being educated within Newham from January 2010 to January 2018. After a period of continuous primary school roll growth the latest pupil projections have identified: 1. The level of live births has stopped rising and has levelled out over recent years. The significant increases in the number of pupils joining reception year is not forecast to increase further and therefore primary numbers will stabilise into the future, other than in those areas where significant additional housing is planned. 2. A number of primary schools have raised concerns over an increasing number of unfilled places experienced in their schools. This is a trend that has been experienced across London due to a decrease in births. Factors such as the unaffordability of homes, the economic viability of families to remain in London and trends in migration rates have caused uncertainty. 3. Sufficient infrastructure is required to meet the need of 19,000 planned new homes in the borough. The occupation of these developments will increase the population of Newham 3|Page
and subsequently the demand for school provision. The potential pupil yield from residential developments impacts specifically in the pupil place planning areas of: Beckton - forecasts show a deficit of places from 2021/22; Canning Town & Custom House - a potential deficit of places from 2023/24; and Stratford - a deficit of places from 2022/23. Canning Town & Custom House primary place planning area shows the largest deficit of places arising from the pupil yield from new housing. Potential increases from pupil yield will have an impact across all school year groups. Provision has been made within the Infrastructure Delivery Plan to provide additional primary places in response to the housing developments. It is important to acknowledge that forecasts based on anticipated pupil yield are more volatile than forecasts based on known birth data and school cohort growth patterns. Many external factors impact pupil yields such as the completion date of the development; changes in housing mix or number of bedrooms; the development being occupied by existing Newham residents thereby not increasing the overall population but moving from over-crowded housing to new housing; economic and social factors, national and local policies and trends can impact the build and occupation of future developments. 4. Following the increases in the primary school roll over the last ten years there is now a rising need for additional secondary school places in Newham. The existing secondary supply together with the proposed additional expansions of two secondary schools is insufficient to meet the additional demand of the increased primary cohorts transitioning into the secondary sector. The latest secondary roll projections indicate that there will be considerable pressure on secondary school places of around 3,177 places (the equivalent of 21 forms of entry) up to 2025/26. These are based on pupils already within the primary setting. Projections beyond this date will rely on projected reception rolls and projected births. The Council is proposing to provide some of these additional places through the expansion of existing secondary schools. To ensure the places are available it is necessary to postpone some of the existing primary projects to make to enable capital funding to be directed to the area of greatest need. 1.2 Special Education Needs and Disabilities There has been increased pressure for provision for children and young people with special education needs and disability (SEND) or an Education Health Care Plan (EHCP) particularly relating to complex autism. To address this there has been additional resourced provision provided within existing Newham primary schools. There is a pressing need for additional specialist places for secondary age children. 1.3 Early Years There are sufficient places within the early years sector for the birth to under five year olds. Provision in this sector has been increased since 2015 by 11%. Changes in the childcare market and the extended 30 hour free entitlement, introduction of tax-free childcare, and the increase in the child population has the potential for further growth. The local authority has a role to play in facilitating and promoting sufficient early years provision. 4|Page
1.4 Post-16 Education and Training Local authorities are required to promote participation in education and training of 16 and 17 year olds. For those with Education Health Care plans this duty extends to the age of 25. In Newham the majority of secondary schools provide education up to the age of 16. Additional provision for education and training has been provided through places at NewVic and the UTC colleges. Past trends indicate significant mobility in the post-16 population, in recent years this trend has reversed with an increased take-up of Newham students taking up places in Newham. With the projected increases in the secondary school sector this has a significant effect on post-16 provision which is forecasted to increase by approximately 2,500 pupils over the next five years described in Appendix E. 1.5 Next Steps There are significant pressures for additional secondary school places within the mainstream and SEND sector over the next five academic years. Current funding and future funding needs to be prioritised to ensure sufficiency and best value is achieved for all. It is therefore necessary to review all planned schemes to identify how best to utilise the funding. To ensure sufficient education places for all the Council is working with its partners, educational providers, service users and the Department for Education to engage all interested parties in the dialogue. . 5|Page
2.0 Compulsory Education The Education Act 1996 (section 14) imposes a duty on local authorities to secure sufficient school provision for all pupils of ages four to sixteen within its area. This duty requires the local authority to monitor and review its current supply of school provision against the forecasted demand; making necessary adjustments to the supply to ensure there is not an unnecessary surplus or deficit of places. Newham has 66 state-funded schools providing primary aged education and 21 schools providing secondary aged education. Approximately 50% of the state-funded schools are academies or free-schools. Appendix B provides further details of these. In addition to this education is also provided for pupils that are not in mainstream provision due to reasons of illness, exclusion or otherwise at Pupil Referral Units at Tunmarsh School and New Directions; The Reintegration to Education Team; the Coborn Centre at Newham University hospital; and other provisions for those most vulnerable. 2.1 Monitoring Demand for Mainstream Pupil Places Demand for pupil places within the mainstream sector is monitored using a forecasting methodology based on guidance from the Department for Education’s projection toolkit. The outputs from the methodology are used to inform strategic decision making and allocate capital resources to the areas of greatest need. The results of the forecasting methodology are compared with the known supply of school places to identify any surpluses or deficits in school places. The Audit commission recommends an operating surplus of 5% to allow for in-year admissions. The projection methodology is checked for accuracy against the outcome of the January School Census. The projections produced annually by the authority and reported to Cabinet and to the Department for Education (DfE) as part of the annual School Capacity Return (SCAP). The data in this return is used by the DfE to calculate projected shortfalls in pupil numbers to determine Basic Need Funding capital allocations. Basic Need Funding is provided to local authorities to meet the capital costs of additional school places, with allocations from previous years being awarded primarily for primary provision. 2.2 Pupil demographics for Primary and Secondary Schools Over the past five years, the pupil population has increased by over 12% which represents nearly 6,000 additional pupils. Continued growth in the secondary sector is expected (Appendix A) as increased primary numbers transfer to the secondary sector. 6|Page
55000 53694 52582 53000 51538 51000 49944 48897 Number of Pupils 49000 47729 46370 47000 45568 44633 44516 44710 44902 45000 43000 41000 39000 37000 35000 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Figure 1: Total number of primary and secondary mainstream pupils, 2006 to 2017 (excluding post-16, Special schools and Alternative education)1 5500 5012 5046 4921 4948 5000 4834 4771 Number of Pupils 4493 4500 4253 4071 3959 4000 3835 3551 3500 3000 R 1 2 3 4 5 6 7 8 9 10 11 National Curriculum Year Figure 2: Total number of pupils in each year group, January 2017 (excluding post-16, Special schools 2 and Alternative education) Figure 3 shows that recent growth has focused on primary year groups. The growth in the primary phase is now progressing through to the secondary phase. 1 Newham January School Census data (2006 to 2017) 2 Newham January 2017 School Census data 7|Page
60000 19,669 18,941 50000 18,587 18,019 17,872 17,921 17,751 17,662 17,836 17,694 17,731 17,568 40000 34,025 33,641 Secondary 32,951 30000 31,925 31,025 29,808 Primary 28,619 27,906 27,066 27,016 26,948 26,902 20000 10000 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Figure 3: Total number of primary and secondary mainstream pupils, 2006 to 2017 (excluding post- 16, Special schools and Alternative education) broken into phases. Figure 4 illustrates historically the relatively modest rise in secondary numbers compared to the significant rise in primary numbers. 2.3 Funding to commission new school places Basic Need Funding To enable local authorities to deliver school provision brought about by the increases in birth rates and population the Department for Education provides basic need capital funding based on current and future school provision and anticipated pupil forecasts. In addition to this the free-school programme delivers school places that are funded directly by the Department’s Education and Education and School Funding Agency. Newham has received £228,523,658 in Basic Needs Funding from financial year 2011/12 to 2019/20. The capital programme for school places is determined annually by the Council to meet the priority for school places. This means that the capital programme may change depending on emerging priorities. When new schemes are identified these are normally estimates based on high level feasibility studies. Actual costs are often unknown until a number of processes are completed such as: full design, procurement and tendering of contracts, planning conditions and commencement of contractual works onsite. Appendix D provides a list of projects undertaken using the Basic Need funding. When additional school places are opened, the Schools Forum is able to determine whether a proportion of revenue funding is retained centrally to fund those places in advance of the school’s budget. This enables schools to resource new places in a way which is timely, effective and maximises the opportunity of high quality places. 8|Page
New Free School Programme In addition to Basic Need Funding new free-schools can be funded through the DfE’s new free school programme. This requires providers to express interest in establishing a new free-school through the DfE. The DfE has currently opened wave 13 of its free-school programme requesting providers to focus on opening schools in the areas of greatest need, with Newham identified as having a need for secondary provision3. Previously there have been a number of free-schools delivered through the new free-school programme (School 21, Bobby More Academy) providing additional places which have been funded centrally by the ESFA. Housing Developer Contributions In addition to capital grants from central government, the Community Infrastructure Levy (CIL) and Section 106 agreements may also provide additional funds from residential developers to fund new school places. These are agreed by the planning authority, for Newham, either London Borough of Newham (LBN) or the London Legacy Development Corporation (LLDC). Special Provision Fund For Special Education Needs and Disability, the DfE announced the Special Provision capital fund to assist local authorities in delivering and improving such places. For this Newham has been awarded a total of £2,761,274 across three financial years from 2018/19 to 2020/21. New Special Free School Bid The DfE invited expressions of interest from local authorities to establish new special free school provision in the autumn of 2018. Newham has submitted a bid for a 100 place special school and is awaiting the outcome. If the bid is unsuccessful consideration needs to be given on how the Council will meet the need for such provision. 2.4 Process to provide additional mainstream school places Local authorities still maintain the duty to secure sufficient school provision, however the process in which to deliver this has altered through various legislative changes in school organisation and the introduction of free-schools and academies. Forecasting future school demand against the known and future supply of provision is an important mechanism for fulfilling this duty. This enables local authorities to review and make recommendations on potential shortfalls and surplus provision of places. Local authorities and education providers are to work in partnership to ensure sufficiency and quality of provision. Having identified a need for additional places a local authority is able to deliver this by: Permanent Expansion of existing schools by increasing floor areas and extending school building’s to provide for a permanent increase in the number of pupils to be admitted. Expansions can be subject to legal processes, planning and building permissions. This often is seen as more cost-effective than opening a new school which entail higher build and 3 https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/706188/ Wave_13_Map_of_estimated_number_of_secondary_places_needed.pdf Newham January School Census data (2006 to 2017) 9|Page
land costs. Many authorities are not able to identify and secure suitable sites for new schools. Temporary Expansions and Bulge Classes these are delivered for a fixed number of years, usually while a cohort moves through the school system. These may be within existing accommodation, mobile classrooms or permanent alterations to the school. They can require planning permission and adaptations to internal buildings, however statutory school organisation proposals are not required. Temporary expansions can be provided to meet an unexpected need or be planned to accommodate foreseen need. Increases in Planned Admission Number the admitting authority for a school is able to provide additional places through an increase in admission numbers. This can be through increasing the PAN for future years (within existing accommodation) or over-offering of places. Establishing a New School Generally there are two options in which a new school can be established. The first route is through the DfE’s new free-school waves where providers express an interest to open provision within a local authority area. Capital funding for the provision is provided by the DfE/EFSA through the central free-schools programme. In Newham a number of schools have been delivered through this route. (Bobby More Academy, School 21). The other option requires local authorities to seek proposals to establish an academy/free school under the Education Act 2011 free-school presumption. Under the presumption route the local authority is responsible for providing the site for the new school. It is the department’s expectation that the site be made available free or on a peppercorn basis by the local authority to the free-school provider. The local authority is also responsible for meeting the associated capital and pre/post-opening revenue costs. Basic need capital funding is provided on a non-ring-fenced basis; so that local authorities can provide the places that they need, including through new presumption schools. The decision on all new free school proposals lies with the Secretary of State. Newham has not delivered a free- school under the free-school presumption route. 10 | P a g e
3.0 Forecasting for Mainstream School Places The statutory duty for the provision of school places includes forecasting future demand and making recommendations to adjust the supply accordingly. Newham uses a school projections method in line with other authorities. Data used to forecast school roll projections includes ONS live birth data for the borough; previous trends identified in the School Census; current and planned housing developments; cohort survival patterns; and cross- border movements. Trends in school applications, parental preference, school performance and local demographic knowledge are also used to inform the forecasts. Pupil forecasts provide a good indication of future need at a given point in time. It is important to emphasise the forecasts are not absolute certainties, as information and future trends are subject to change. Forecasts are reviewed annually in the spring and summer term as new data and trends emerge. 3.1 Planning areas Each year the DfE collects information on school places from local authorities as part of the annual school capacity SCAP collection. Local authorities are required to provide, at pupil planning area level, information about the number of registered pupils and the capacity of state funded schools in their area. The annual return also includes local authorities’ own forecasts of pupil numbers by year group and for whom primary and secondary education will be provided. Guidance from DfE states that planning areas should take account of, local geography; parental preference patterns; distance between schools; schools located in close proximity; For primary planning purposes Newham is divided into seven planning areas (shown in Figure 5): Beckton; Canning Town & Custom House; East Ham; Forest Gate; Manor Park; Plaistow; and Stratford. For secondary there is one planning area covering all of Newham. The following sections gives an analysis of the planning areas showing current and projected supply and demand of school places, with opportunities for potential new provision highlighted. Please note that capacity figures are based on the published admission numbers (PAN) for each year. The demand for school places is based on a number of factors and this is outlined in more detail in Appendix C – School place planning methodology. School expansions are listed as either confirmed or unconfirmed. The latter will be due to a number of factors including, necessary consultations statutory or otherwise; planning approvals; the availability of sites; procurement; costs; and capital programme priorities. Unconfirmed expansions are subject to review. 11 | P a g e
Figure 5 – Primary Place Planning Areas 3.2 Secondary School Places Forecasts Demand for secondary school places within Newham is forecasted to increase over the next five years. This is due to the larger primary cohorts which are now transitioning to secondary schools. The Local Plan will deliver approximately 19,000 new homes in Newham over the next five years and will place additional pressure on secondary school provision. The forecasted increases in secondary demand are in line with those being experienced in many London authorities. The existing supply of places and potential places, from additional free- schools, is insufficient to meet the forecasted demand. Since the academic year 2011/12 to the current academic year 2018/19 there has been an increase of 32% of pupils on roll in Year 7 within Newham schools. The 2018/19 academic year evidenced an increase on 282 pupils from the previous year, equivalent to ten forms of entry. Increase in Year 7 Numbers on Roll School Academic Year 7 Increase from Census Year Roll Previous Year Jan-12 2011/12 3509 12 | P a g e
Jan-13 2012/13 3530 21 Jan-14 2013/14 3729 199 Jan-15 2014/15 3960 231 Jan-16 2015/16 4038 78 Jan-17 2016/17 4253 215 Jan-18 2017/18 4345 92 Oct-18* 2018/19 4627 282 Oct-18 Census data will be replaced by Jan-19 Census when available Recent trends indicate that a higher number of Year 6 Newham pupils (in the last year of their primary education) are transitioning to take up Year 7 places in Newham (the first year of secondary education) than previously identified. This together with the higher number of primary pupils progressing through the school system translates to an increased demand for secondary school places. Year 6 to Year 7 Transition Rate Year 6 Pupils Transitioning to Year 7 Entry Year 7 September 2011 -8.50% September 2012 -6.81% September 2013 -4.90% September 2014 -4.14% September 2015 -4.52% September 2016 -6.38% September 2017 -3.29% September 2018* -2.57% Based on Oct-18 School Census data The following shows the actual numbers in Year 7 based on the Schools Census over the last three academic years, at each termly census point. Data will be added for 2018/19 when available. 2015/16 2016/17 2017/18 2018/19 National Offer 4103 4413 4441 4743 Day offers Oct census 3978 4263 4159 4627 Jan census 4038 4253 4214 May census 4046 4288 4231 Vacancies reported by schools – year 7, for the last three academic years 13 | P a g e
2015/16 2016/17 2017/18 2018/19 Oct census 208 71 224 153 Jan census 196 32 222 May census 184 55 221 3.3 Schools within the Secondary Pupil Place Planning Area Bobby Moore Academy Langdon Academy Sarah Bonnell School Brampton Manor Academy Lister Community School School 21 Chobham Academy Little Ilford School St Angela's Ursuline School East London Science School London Design and St Bonaventure's RC School Engineering UTC Eastlea Community School Oasis Academy Silvertown Stratford School Forest Gate Community School Plashet School The Cumberland School Kingsford Community School Rokeby School The Royal Docks Community School 3.4 Year 7 Forecasts Year 7 forecasts from the academic year 2019/20 are illustrated in the table below and include pupil yield from the Council’s Local Plan. The places available for 2019/20 include, a proposed 174 additional bulge places at Eastlea (60), Lister (60), St Bonaventure’s RC (24) and the possibility of Royal Docks increasing its PAN to lift its cap by 30. The planned expansions at Brampton Manor and Forest Gate will provide an additional 90 places (rising to 120 the year after) and 60 places from September 2019 respectively. Academic Year Newham Year 7 2019/20 2020/21 2021/22 2022/23 2023/24 Places Available 4,737 4,563 4,563 4,563 4,563 Potential Places (unconfirmed) 4,911 4,857 4,947 5,037 5,037 Places required 4,802 4,798 4,915 4,995 5,024 14 | P a g e
5200 Forecast Year 7 Forecasts Actual + 2019 Bulge 5000 Unconfirmed Expansions 4800 4600 4400 4200 4000 Sept 19 Sept 20 Sept 21 Sept 22 Sept 23 Sept 24 Sept 25 Plans for proposed additional secondary places are underway to deliver further provision to meet the increased demand. These include permanent expansions at the following secondary schools categorised in the table above as unconfirmed expansions: Brampton Manor Academy – permanent expansion of 4 forms of entry (120 additional places per year group) to provide a total of 600 places. For September 2019 an additional 90 will be available incrementing to 120 in the subsequent academic year ; Forest Gate – permanent expansion of 2 forms of entry (60 additional places per year group) to provide a total of 300 places from September 2019; There are plans for two new free-schools to be provided through DfE approved free-school programme within the vicinity of strategic housing sites. These are both proposed by School 21, Campus a 3FE school and Sugar Lane a potential 2.8FE school. These are expected to open by September 2021 subject to suitable sites being secured. The September 2019 forecasted position shows a deficit of two forms of entry against a supply of 4,737 known places available (includes temporary and bulge provision). Should the expansions at Brampton Manor Academy and Forest Gate be delivered for September 2019 with the proposed 174 bulge places at the above mentioned schools there would be sufficient places with marginal operating headroom of 2%. The need for ‘bulge’ classes for September 2019 will be kept under review once confirmed data is available on numbers of pupils offered places for year 7 entry, early in 2019. It is important to avoid excessive over provision of places in order to support Newham’s schools to be financially sustainable. To ensure sufficient Year 7 places beyond September 2019 additional provision is required. 15 | P a g e
3.5 Overall Secondary Forecasts The graph below illustrates the forecasted secondary position (Year 7 to Year 11) including pupil yield from residential development in the five year housing supply. The forecasts show that without the above proposed increase in places the secondary estate would have a deficit of around 3,177 places, around 21 forms of entry by 2025/26. With the proposed additional school provision in place this deficit for 2025/26 reduces to 897 places or six forms of entry. 27000 Total (Years 7 to 11) Numbers on Roll including Pupil Yield 26000 Forecast with Pupil Yield Actual Actual + 2019 bulge 25000 Unconfirmed expansions 24000 23000 22000 21000 20000 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 The Council is facing increased demand for places as pupils move through the secondary school system. For the academic year 2017/18 provision was made for an additional Year 9 bulge class. There is continued pressure in the current academic year 2018/19 across the higher secondary year group. The above graph illustrates the forecasted demand against the actual provision and provision with unconfirmed expansions. Unconfirmed/planned expansions include proposed permanent provision at Brampton Manor, Forest Gate; increases in PAN at Royal Docks, Oasis Academy and the Chobham Academy. Head teachers of all secondary schools were consulted earlier in the autumn term to express an interest for future proposed permanent expansions. Lister, Rokeby and Little Ilford have expressed an interest for proposed expansions. Following an expression of interest, feasibilities will be conducted and schools to be expanded will be selected upon the following criteria: Ofsted rating of good or outstanding; Site and existing building capacity – ease of deliverability and associated capital costs; geographical location; parental preferences 16 | P a g e
There are also proposals for two new free-schools to open as part of Wave 12 of the DfE free-schools programme to be provided by School 21. Should any of the unconfirmed expansions be delayed or not occur this will increase the forecasted deficit. It is necessary to ensure pupil yield and cohort growths from the primary to secondary transfer is closely monitored. To ensure the Council is able to provide the proposed secondary places funding needs to be aligned meet this need. Therefore, it is necessary to review all basic need funded programmes to ensure priority is given to the provision of secondary places. Headlines for Secondary Planning Area Necessary to prioritise funding to provide additional secondary places Proposed future expansions are awaited at Brampton Manor, Forest Gate and Oasis Proposed two new all-through free schools are anticipated Bulge classes needed for 2019 – the number will be kept under review Around 19,000 new homes in the next five years yield approximately 1,551 secondary pupils With known future expansions, by 2025 there will be a deficit of around 900 places 3.6 Primary School Place Forecasts The starting point for forecasting primary school projections is the live births that have occurred to mothers resident in the borough. This data is provided by ONS annually in July for the previous calendar year. A birth to reception ratio is calculated to identify how many births transpire to reception aged pupil in a Newham state-funded school. The turn of the century evidenced an increase in births across England and Wales, with London recording birth rates substantially higher than the national average. The increase in births and migration into Newham has been evidenced in the primary school roll. Since January 2010 the primary school roll has evidenced an increase of 6,000 additional pupils from Reception to Year 6. The Council has successfully responded to the increased demand by providing additional primary provision. 17 | P a g e
Growth in Primary School Roll No. on School Academic Roll Census Year (YR-Y6) Growth %Change Jan-10 2009/10 27,906 Jan-11 2010/11 28,619 713 2.56% Jan-12 2011/12 29,810 1,191 4.16% Jan-13 2012/13 31,025 1,215 4.08% Jan-14 2013/14 31,944 919 2.96% Jan-15 2014/15 32,953 1,009 3.16% Jan-16 2015/16 33,666 713 2.16% Jan-17 2016/17 34,025 359 1.07% Jan-18 2017/18 34,282 257 0.76% Oct-18* 2018/19 34,237 -45 -0.13% *Oct-18 Census data will be replaced by Jan-19 Census when available The growth in the primary sector is now reducing due to a decrease in births. The current academic year 2018/19 has seen a decrease in the primary school roll of 45 pupils across Reception to Year 6. This impact is most apparent in the Reception year group with a number of schools experiencing low roll numbers. A similar trend has been reported in many authorities across London including neighbouring authorities. Plausible reasons include the decrease in births from 2013 onwards combined with increasing housing costs, limited availability of family housing leading to families moving away from London. Latest primary forecasts indicate that while overall there is sufficient primary provision across Newham, there are planning areas that will experience increased demand from residential housing developments from 2021 onwards. To ensure there is not an over-provision of school places it is necessary to ensure timeliness for delivery of proposed provision and closely monitor the delivery of new housing developments. 3.6.1 Borough wide Reception Forecasts The table below illustrates the demand and supply for future local authority wide reception places. Academic Year Newham Reception 2019/20 2020/21 2021/22 2022/23 Year 2023/24 Places available 5,540 5,540 5,540 5,540 5,540 Places required 4,780 4,728 4,646 4,701 4,735 18 | P a g e
3.6.2 Borough wide Primary Forecasts Across the borough there is sufficient primary provision (Reception to Year 6) until 2022 when demand increases due to pupil yields from housing. Academic Year Newham Rec to Year 6 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 37,655 37,940 38,135 38,330 38,510 Potential Places available 37,795 38,340 38,795 39,250 39,500 Places required 34,929 35,387 35,599 35,913 36,134 Primary forecast all year groups (Rec to Year 6) including pupil yield 40,000 39,000 38,000 37,000 36,000 35,000 34,000 33,000 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Forecast with Pupil Yield Known places Potential places 19 | P a g e
3.7 Beckton Planning Area The Beckton planning area is forecasted to have shortfall of primary places with 1,438 new homes planned in the next five years. Estimated primary pupil yield for Beckton is 255 primary pupils. There are a number of strategic development sites for housing with the Beckton planning area and a potential for a new school in the Albert Basin development. Ellen Wilkinson Primary School North Beckton Primary School Gallions Primary School Winsor Primary School 3.7.1 Beckton Reception Forecasts Reception forecasts are in line with Reception places in the Beckton area. Academic Year Beckton Reception Year 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 330 330 330 330 330 Forecasts 286 283 278 281 285 20 | P a g e
Beckton Reception Year 900 800 700 600 500 400 300 200 100 0 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 3.7.2 Beckton Primary Forecasts YR to Y6 The anticipated pupil yield and primary cohort growth will create additional pressure on the demand for school places within Beckton. Academic Year Beckton Rec to Year 6 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 2,310 2,310 2,310 2,310 2,310 Forecasts 2,152 2,216 2,314 2,361 2,347 Beckton Primary YR to Y6 2,400 2,350 2,300 2,250 2,200 2,150 2,100 2,050 2,000 1,950 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 21 | P a g e
3.8 Canning Town and Custom House Primary Planning Area Canning Town and Custom House planning areas have a number of strategic sites with large scale planned housing development of 7,336 new homes. This will generate an estimated pupil yield of 1,262 primary pupils. Additional primary places (subject to the housing developments coming on board) will be required from September 2021 onwards. Current proposed plans for expansion of Hallsville School will be postponed until 2022 when the places maybe required. In addition to this there are plans for a 2FE Royal Wharf free- school to be established from the wave 11 free-schools programme. Britannia Village Keir Hardie Primary St Joachim's RC Primary Calverton Primary Ravenscroft Primary St Luke's Primary Drew Primary Rosetta Primary Star Primary Hallsville Primary Scott Wilkie Primary Royal Wharf primary (Wave 11 free school) 22 | P a g e
3.8.1 Canning Town and Custom House Reception Forecasts There is a sufficiency of Reception Places in the Canning Town and Custom House planning area. Academic Year Canning Town Reception 2019/20 2020/21 2021/22 2022/23 2023/24 Year Places available 810 810 810 810 810 Places required 639 632 621 628 633 Canning Town and Custom House Reception 900 800 700 600 500 400 300 200 100 0 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 3.8.2 Canning Town and Custom House Primary Forecasts The table and chart below illustrate the demand and supply for places within this planning area. Confirmed expansions at St Joachims and the Royal Wharf free school have been incorporated into the places available. Potential places available include the expansion at Hallsville from 2022 onwards. Academic Year Canning Town Rec to 2019/20 2020/21 2021/22 2022/23 2023/24 Year 6 Places available 5,160 5,250 5,340 5,430 5,520 Potential Places available 5,160 5,280 5,400 5,520 5,640 Places required 4,813 5,030 5,242 5,498 5,708 23 | P a g e
6,000 Canning Town and Custom House 5,500 5,000 4,500 4,000 3,500 3,000 2,500 2,000 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Academic Year Places required Places available (Confirmed) Potential Places available(Unconfirmed) 24 | P a g e
3.9 East Ham Planning Area The East Ham planning area has the highest pupil population of all the primary planning areas. Nearly 1,400 new homes are expected in the next five years. There is a surplus of primary place which will be available for the anticipated increases from the additional housing. Altmore Infant Hartley Primary Roman Road Primary Brampton Primary Langdon Academy St Michael's Catholic Central Park Primary Lathom Junior St Stephen's Primary Cleves Primary Nelson Primary Vicarage Primary 3.9.1 East Ham Reception Forecasts There is not a need for additional reception places in the East Ham planning area. Academic Year East Ham Reception 2019/20 2020/21 2021/22 2022/23 2023/24 Year Places available 1,110 1,110 1,110 1,110 1,110 Places required 987 977 979 999 966 25 | P a g e
East Ham Reception Year 900 800 700 600 500 400 300 200 100 0 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 3.9.2 East ham Primary Forecasts YR-Y6 There is sufficiency of primary provision within this planning area as depicted in the data below. The surpluses are higher than 5% but below 10%. Academic Year East Ham Reception 2019/20 2020/21 2021/22 2022/23 2023/24 to Year 6 Places available 7,740 7,740 7,770 7,770 7,770 Places required 7,176 7,215 7,231 7,203 7,021 East Ham Primary YR-Y6 7,800 7,600 7,400 7,200 7,000 6,800 6,600 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 26 | P a g e
4.0 Forest Gate Planning Area Forest Gate planning area is in the north of the borough bordering Redbridge and Waltham Forest. There is a high density of housing, mainly Victorian terraced family housing. The Local Plan identifies 186 new homes in the next five years, which is significantly minimal when compared to other areas within the borough. It is estimated that there will be an additional 32 primary pupils over the next five years from additional housing. Should there be a requirement for additional places there is potential to expand Odessa and St James schools. Earlham Primary Odessa Infant St Antony's RC Primary Woodgrange Infant Elmhurst Primary Sandringham Primary St James' CofE Junior Godwin Junior Shaftesbury Primary William Davies Primary 4.0.1 Forest Gate Reception Forecasts Reception forecasts with places available are illustrated below. Academic Year Forest Gate Reception Year 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 690 690 690 690 690 Places required 640 633 622 630 638 27 | P a g e
Forest Gate Reception 900 800 700 600 500 400 300 200 100 0 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 4.0.2 Forest Gate Primary Forecasts YR-Y6 Academic Year Forest Gate Reception to Year 6 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 4,800 4,830 4,830 4,830 4,830 Places required 4,549 4,551 4,541 4,515 4,481 Forest Gate Reception to Year 6 8,000 7,800 7,600 7,400 7,200 7,000 6,800 6,600 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 28 | P a g e
4.1 Manor Park Primary Planning Area The Manor Park primary Planning area is in the north-east of the borough and borders the neighbouring borough of Redbridge. This is a high density of Victorian housing within this area with very little land for additional housing developments. There are no proposed new housing units within this area. Forecasts indicate a healthy surplus of places and there is no requirement for further provision. Avenue Primary Kensington Primary Sheringham Primary Dersingham Primary Monega Primary Sir John Heron Primary Essex Primary Salisbury Primary St Winefride's RC Primary 4.1.1 Manor Park Reception Forecasts Academic Year Manor Park Reception 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 800 800 800 800 800 Places required 739 731 719 732 737 29 | P a g e
Manor Park Reception Forecast 900 800 700 600 500 400 300 200 100 0 2019/20 2020/21 2021/22 2022/23 2023/24 Forecasts Places available 4.1.2 Manor Park Primary Forecasts Academic Year Manor Park Reception to Year 6 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 5,570 5,600 5,600 5,600 5,600 Places required 5,238 5,237 5,200 5,168 5,152 Manor Park Primary 7,000 6,800 6,600 6,400 6,200 6,000 5,800 5,600 5,400 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 30 | P a g e
4.2 Plaistow Primary Planning Area The Plaistow primary planning area has sufficient primary provision. There are a negligible 162 new homes planned in the next five years yielding an estimated 28 primary pupils over next five years. The planning area has sufficient places for the level of demand. Curwen Primary New City Primary Selwyn Primary St Helen's Primary Grange Primary Plaistow Primary Southern Road Primary Tollgate Primary Kaizen Primary Portway Primary St Edward's Primary Upton Cross Primary 4.2.1 Plaistow Reception Forecasts Academic Year Plaistow Reception 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 990 990 990 990 990 Places required 848 839 825 834 845 31 | P a g e
Plaistow Reception Forecasts 1000 900 800 700 600 500 400 300 200 100 0 2019/20 2020/21 2021/22 2022/23 2023/24 Forecasts Places available 4.2.1 Plaistow Primary Forecasts Academic Year Plaistow Reception to Year 6 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 6,750 6,780 6,810 6,840 6,840 Places required 6,023 5,994 5,993 5,981 5,940 Plaistow Primary Forecasts 7,000 6,800 6,600 6,400 6,200 6,000 5,800 5,600 5,400 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available 32 | P a g e
4.3 Stratford Primary Planning Area The Stratford primary planning area incorporates the areas of Stratford and West Ham. The Stratford area has evidenced significant change with regard to housing developments and investment from the Olympic Park and stadium. There are plans for a further 6,722 new homes in the next five years, with an estimated primary pupil yield of 1,156 pupils. Reception forecasts for this planning area indicate sufficient provision in the short-term. The pupil yield from the proposed housing developments may produce greater demand for overall primary places within this planning area. This will need to be monitored to ensure timeliness of any proposed additional places is in line with occupancy of the housing developments. There are proposed expansions at Colegrave, Maryland and Ranelagh primary schools within this area. Two free-school proposals have also been confirmed (School 21 Sugar House and School 21 Campus) to provide all-through education. It is necessary to evaluate all proposed provision to ensure provision it is brought on in line with housing occupancy. Due to this it has been projects at Maryland and Colegrave have been selected to be postponed by one to two years, as they are in the early stages. 33 | P a g e
Bobby Moore Academy Gainsborough Primary Ranelagh Primary Carpenters Primary Manor Primary School 21 Chobham Academy Maryland Primary St Francis' Catholic Primary Colegrave Primary Park Primary West Ham Church Primary 4.3.1 Stratford Reception Academic Year Stratford Reception 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 810 810 810 810 810 Places required 652 658 651 655 655 Stratford Reception 1000 900 800 700 600 500 400 300 200 100 0 2019/20 2020/21 2021/22 2022/23 2023/24 Forecasts Places available 4.3.2 Stratford Primary Academic Year Stratford Reception to Year 6 2019/20 2020/21 2021/22 2022/23 2023/24 Places available 5,325 5,400 5,475 5,550 5,610 Potential Places 5,355 5,520 5,735 6,040 6,330 Places required 5,104 5,263 5,504 5,791 5,748 34 | P a g e
7,000 Stratford Primary 6,500 6,000 5,500 5,000 4,500 4,000 3,500 3,000 2,500 2,000 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 Places required Places available (Confirmed) Potential Places available(Unconfirmed) Headlines Primary Provision Birth rate within Newham is falling in line with London births Since January 2010 the primary roll has increased by 6,000 pupils Newham has accommodated this increase by investing in its primary provision Sufficient Reception places across Newham Next increases are likely to be from housing developments Increases expected in Canning Town & Custom House, Stratford and Beckton Pupil yield from housing dependent upon various factors occupancy, social, economic Proposed planned provision in the primary sector to be reviewed and postponed (where possible) to ensure timeliness of provision in line with new housing occupancy 35 | P a g e
5.0 Provision for Special Educational Needs and Disabilities Local authorities have legal duties to identify and assess the special educational needs (“SEN”) and disability of children and young people within their area and ensure there is sufficient provision to meet the needs. 5.1 Duties for children and young people aged 0 to 25 with SEND 4 The relevant legislation is within Part 3 of the Children and Families Act 2014 and associated regulations. It sets out the statutory special educational needs and disability (SEND) system for children and young people aged 0 to 25 in England. The Act places duties on Local Authorities to ensure: reasonable adjustments for disabled children and young people; and auxiliary aids and services to disabled children and young people. a clearer focus on the views of parents, children and young people and their role in decision- making. Guidance is now provided on the joint planning and commissioning of services to ensure close co-operation between education, health services and social care; 0-25 Education, Health and Care Plans(EHCP); support that pupils and students should receive in education and training settings; focus on support that enables those with SEN to succeed in their education and make a successful transition to employment and adulthood; parents can express a preference for any maintained school, academy, free school or non-maintained school. 5.2 SEND Provision Most children and young people with special educational needs and disability (SEND) have their needs met in mainstream provision and Newham has a strong legacy and commitment towards inclusion. Around 90% of high needs funded pupils with autism attend mainstream schools, including resourced provision. The high levels of need of a small number of children and young people require even more support and expertise than can be offered in mainstream and resourced provision. The existing provision at JFK School is at capacity and more pupils are having to attend Out of Borough (OOB) provision due to the lack of suitable places. In their ‘Do the Maths 2018’ report London Councils highlighted that London will require approximately 2,340 specialist secondary school places over the next five years. The report states the average capital cost of providing a specialist school place is £67,043 (three times the cost of an average mainstream place at £23,641), with some specialist places for severe complex needs costing £300,000 per place.5 The increases in the school aged population are well documented rising by around 21% from 2010 to 2018. Over the same period, the increase in high needs funded pupils has risen by 4 Special educational needs and disability code of practice: 0 to 25 years – January 2015 https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/398815/SEND_Code_of_Pra ctice_January_2015.pdf 5 https://www.londoncouncils.gov.uk/our-key-themes/children-and-young-people/education-and-school- places/do-maths-2017/special 36 | P a g e
88% and analysis shows that the highest rise is ASD funded pupils increasing by 278%. Out of Borough (OOB) ASD places have increased by 54 pupils. The next highest increase was SEMH that increased by 11 pupils. The current high number of primary ASD pupils will transfer into the secondary sector in a similar way as also seen in the mainstream sector. Based on school census data only, without any further increases in numbers and a year 6 to year 7 transfer rate of 100%, this would see the numbers on roll in schools increase by around 53% over the next 10 years. There are two special schools in Newham as shown in Table 1. Table 1 - Summary of special school provision Age Range Year Groups Specialism John F Kennedy Special 5 to 19 15 PMLD/ASD5 School Academy Eleanor Smith School and Primary Support Service - 5 to 16 12 SEMH6 Academy In Newham, there are 21 specialist resource provisions based in a nursery and mainstream schools providing 315 places, as shown in Table 2. Table 2 – Current Resource Provision School Name & Cohort Provision Commissioned RP Need Places Brampton Primary SCLN 10 Calverton Primary ASD 21 Cleves Primary SCLN 23 Colegrave Primary SCLN 14 Cumberland Secondary ASD 20 Eastlea Secondary SCLN 14 Essex Primary ASD 14 Gainsborough Primary ASD 14 Gallions Primary ASD 8 Langdon ASD 26 Lister Secondary HI 18 Little Ilford Secondary ASD 5 Nelson Primary SSLD 14 North Beckton Primary SCLN 14 Ravenscroft Primary ASD 10 Ronald Openshaw Nursery SCLN 6 Selwyn Primary HI 32 Sir John Heron Primary SCLN 14 Stratford Secondary ASD 6 5 PMLD Profound and Multiple Learning Disabilities and ASD Autistic Spectrum Disorder 6 SEMH – Social Emotional and Mental Health, 37 | P a g e
Stratford Secondary SCLN 5 Royal Docks Secondary SCLN 25 Tollgate Primary ASD 14 Ranelagh Primary ASD 8 Sandringham ASD 8 Newham College ASD 6 Totals 335 5.3 An inclusive approach to special educational needs and disability (SEND) The Council undertook a wide consultation in 2017 identifying key areas for development across services, phases of education and broad areas of special educational needs and disabilities. The findings formed the Best for All strategy that is part of a wider Council strategy to improve education, health and well-being outcomes for children and young people. This strategy provides a blueprint for our providers and all those working in the local authority and health services with children, young people and their families. This includes working with education providers and universal services where necessary to be inclusive of children and young people with special educational needs or who are disabled. 5.4 SEND Needs analysis There has been significant growth in the number of children and young people with high level of needs, particularly complex autism, and we are forecasting significant further growth particularly as the current increase in primary numbers moves into secondary. Between 2010 and 2018 the number of high needs funded pupils has risen by 88%. The highest rise is Autism Spectrum Disorder (ASD) funded pupils (increasing by 278%). There are 68 pupils placed out of borough, a rise of 113% in the last five years. The trend for funded ASD pupils suggests a further increase of around 800 pupils to 2025. Around 90% of high needs funded pupils with autism attend mainstream schools, including resourced provision. If this proportion is maintained, this would mean 720 more pupils in mainstream and resourced provision; and 80 more pupils attending out of borough settings and borough special school places. 5.5 SEND Emerging plans The high level of inclusion that Newham is well known for both nationally and internationally is being maintained. This is supported by the 34 additional resource provision places made for September 2018 rising to an additional 105 places in the next two to three years; 79 of those places are specifically for ASD children and young people. However no additional ASD places have been secured in the secondary sector. Reducing the number of pupils attending schools in other local authorities and independent settings is an essential part of the approach. This would at the same time reduce in real 38 | P a g e
You can also read