NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott

Page created by Wesley Floyd
 
CONTINUE READING
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
NIPN
  Sustainability
    Webinar
NIPN Country Teams Niger & Ethiopia
Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl,
Melissa Kennie Scott

24th June 2021
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
Rules of Order

• Please turn off your microphone and camera.
• Please ask questions using the chat box.
• When speaking or sending a chat message, please identify
  yourself.

We would like to remind you that this webinar will be recorded
and uploaded onto the NIPN website.

                                                                 2
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
Agenda

 Time (CET)                       Topic
09:30 – 09:35   Overview of objectives of the webinar
09:35 – 09:45   C4N-NIPN: Introductory presentation
09:45 – 10:05   Niger: Sustainability Study for NIPN
10:05 – 10:25   Ethiopia: Sustainability Plan for the NIPN
10:25 – 10:55   Discussion
10:55 – 11:00   Conclusions and potential next steps

                                                             3
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
Sustainability

                  Objectives of the webinar

1. To summarise previous discussion on institutionalisation
   frameworks.
2. To understand what sustainability can mean for NIPN
   platforms.
3. Sharing experience on conducting a Sustainability Study.
4. How to develop a feasible Sustainability Plan (contents,
   process, etc.)?

                                                              4
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
Terminology & previous NIPN discussions

• Sustainability
• Ownership
• Institutionalisation

➔ NIPN previous discussions have been focusing on “ownership” and
  “institutionalisation” rather than sustainability
➔ Two main frameworks have been introduced and discussed for NIPN
   (Global Gathering 2019)

                                                                    5
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
1st Framework option for NIPN institutionalisation

                                                 NIPN Ownership Matrix

• Developed by Mokoro, in Sept. 2018*
• In parallel to NIPN Theory of Change elaboration
• Look at three dimensions that remain valid and relevant:
       – Progress in achieving the co-conditions of a platform
       – Progress in ownership of the NIPN
       – Progress in ownership of a NIPN’s outputs
• Considered complex for country adoption
* Derived from the World Bank (WB, 2010; Zida, Lavis et al. International Journal of Health Policy and Management, 2018)

                                                                                                                           6
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
2nd Framework option for NIPN institutionalisation

 Framing the discussion using Rapid Response Unit case study,
                         Burkina Faso
• Derived from the World Bank approach*
• Three dimensions:
       – Existence of an institutional framework,
       – Consistent production of relevant outputs,
       – Adequate resources availability.
• Five maturity levels:
       –   Awareness
       –   Experimentation
       –   Expansion
       –   Consolidation
       –   Maturity
* Derived from the World Bank (WB, 2010; Zida, Lavis et al. International Journal of Health Policy and Management, 2018)

                                                                                                                           7
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
Introduction: Common Results Framework for NIPN Phase II

             Ownership is an expected result of NIPN Phase II
                              Specific objective:
        Evidence-based nutrition governance in NIPN partner countries is
                                 strengthened.

Result 1: Technical output
   National institutions provide relevant nutrition information and analysis required for policy
   decisions.
Result 2: Policy enhancement
   Stakeholders increasingly demand for NIPN outputs that support decision making at policy level.
Result 3: Ownership
   All countries have strengthened their ownership of NIPN.

                                                                                                     8
NIPN Sustainability Webinar - NIPN Country Teams Niger & Ethiopia Ingo Neu, Julien Chalimbaud, Youssouf Keita, Juliane Pfuhl, Melissa Kennie Scott
Niger: Summary
of Sustainability
     Study

     24th June 2021
TOR   OF   SUSTAINABILITY STUDY

            Objective: To define a sustainability plan with
            assumption that NIPN external funding end in 2021

• Analyse the recurring costs of maintaining the NIPN platform and
  developing its products
• Study the integration of the NIPN in strategic and financial
  programming documents (PA/PNSN, DPPD, PAP, etc.)
• Analyse the strengths and weaknesses of the NIPN at mid-term
• Propose a sustainability plan
• To ensure the support of the validation at the level of a steering
  committee

                                                                       10
PRODUCTS AND SERVICES

   By integration into a unique platform, accessibility is
                          ensured
  The NIPN analytical      The system to access        The support service for
    cycle is known       micro-data and indicators        end users and/or
  upstream and has a      was established quickly    specialists in the field, has
   broad consensus            and efficiently             been developed

                                                  There is a communication
  The documents are well                            issue: How to provide
   presented in different                       additional and more targeted
forms: news, short version,                     information to additional and
       long version.                               more specific audiences?

                                                                                     11
FORMULATION AND    MONITORING OF
                              PUBLIC POLICIES

NIPN products and tools as a basis for monitoring the PNSN
    The valuable contributions of NPIN have been particularly
        important at the level of the HC3N Nutrition Unit

  For the sectoral            For advocacy and          For the mobilisation
guidance in support     coordination of technical and    of the contributing
  of the CT/PNSN              funding partners                 sectors

Consideration will probably need to be given to visually separating the
"information system" documents from the political/strategic communication
documents, especially if they expand on NSNP Commitment 8 in particular.

                                                                               12
ENGAGEMENT WITH BENEFICIARIES:
                 NATIONAL INSTITUTE FOR STATISTICS (INS)

The organisational structure of the project unit may have
                        limitations
At the INS level, this organisational form is not yet integrated into the
structure strongly marked by a purely hierarchical organization.

                                       The limited mobilization of INS staff
                                       argues for increased transfer of
                                       responsibilities within INS; losses in
                                       effectiveness can be compensated by
                                       efficiency and sustainability.
  Past experiences
  show that financial                  The job profiles of the unit must be
  sustainability is more               well defined within the organizational
  important than                       structures and nutrition integrated
  institutional form.                  into INS programs.

                                                                                13
ENGAGEMENT WITH BENEFICIARIES:
                       CONTRIBUTING SECTORS

   The solution adopted by the Sectoral Support Officers
                  (SAS) is just pragmatic

 In theory, the NIPN and even the INS, should be a user of secondary
 sectoral statistical data, i.e., use the results. This requires that the
 sectors are able to produce regular, high-quality data.

                                       The indicators useful for analysis are
                                       well identified, it is the construction
                                       of homogeneous historical series that
                                       takes time.
The results are quite
uneven (but the NIPN                   It is necessary to maintain support
project is only halfway                to the sectors, especially since this
through).                              is part of the INS's remit.

                                                                                 14
ENGAGEMENT WITH BENEFICIARIES:
                                HC3N

                     An important institutional implication
As a project unit attached to the Presidency of the Republic, the NPIN activities
have allowed to strategically organise the nutrition field from a political and
strategic point of view. However, its sustainability is dependent on the
sustainability of the institution (HC3N).

                                         By integrating the oversight of the NPIN
                                         in the steering committees of the PNSN
                                         (in particular the CT/PNSN and more
                                         recently the GTT-Plaidoyer)

Its role as an institution
defining the demand for                   There remains the question of the
information and its use for               solvability of the demand. Indeed, the
decision-making has been                  question of financing an information
accepted.                                 sub-sector cannot be dissociated from
                                          the financing of this sub-sector in
                                          general, and thus from the
                                          implementation of the NSNP.
                                                                                    15
EXÉCUTION

          Le coût additionnel de l’analyse est « supportable »
Le coût additionnel des produits et services PNIN représente
un surcoût de 35% aux coûts de collecte
                 Services PNIN (FCFA)                    52 000 000   Aux coûts actuels de
                                                                      la subvention et hors
Maintien du portail WEB (cout annuel : maintenance
corrective et actualisation contenu)
                                                          8 871 096   investissements (AT,
Maintien des bases de données indicateur (coût annuel)   15 678.191   formation), mais avec
Maintien des bases de micro-données (coût annuel)         13 12 075   investissements
Appui aux utilisateurs (coût annuel)                     14 457 897
                                                                      matériels.

                         Produits PNIN (FCFA)
Plan cadre d'analyse annuel (coût d'un programme ramené à l'année)       4 683 727

Document d'analyse (coût d'un produit) *                                16 152 160

                                                                                              16
SUMMARY

The preconditions       The conditions for         There are persistent
for sustainability          technical              difficulties with the
     are met         internalisation are only       involvement of the
                          partially met            contributing sectors

                     + Capitalisation has been        These (structural)
The products and     done from the start;        difficulties are inherent to
services have been   + The strengthening of      the functioning of the NSS
well defined,        skills has been done,        as a whole and will take a
implemented and      - The transfer of           long time to resolve, given
appreciated.         responsibility is weak.       the current duration of
                                                         the project.

                                                                                17
STRATEGIC    PERSPECTIVES
                               FOR   2021

                      Take advantage of the programmatic opportunities:
                      PNSN action plan, revision of the SNDS, new PDES,
                      formulation of phase II of the NPIN

Revise at the              Include nutrition        Include in the priority
PA/PNSN level the          as a priority            actions of the INS, a
result related to          activity in the          nutrition line ensuring
the information            NSDS                     at least the
system, taking into                                 management of HR
account the NPIN
cycles

This constitutes the basis for sustainability.
Institutionalisation can then be studied, depending also on the current
revisions of the INS's organizational framework.

                                                                              18
CHALLENGES FOR PHASE   II

Maintain the relevance requirements of the
analysis framework                                    Still requires external inputs

(PCA)Propose complementary and/or                     This is the intangible investment program
alternative investigation tools                       Can be carried out rapidly in addition to the
Complete the transfer of services and skills to       support to users
the INS                                               Its realisation during Phase II still requires
Ensure effective transfer of responsibilities for     strengthening of skills, especially through
product development to the INS/HC3N                   mentoring

Continue the strengthening and transfer of            Need to clearly define the distinction
skills, particularly at the sub-national level        between information systems and
                                                      monitoring
Support the monitoring and evaluation of the
PNSN

                                                                                                       19
LE   PLAN DE PÉRENNISATION: LES   CYCLES   DE
                               PRODUCTION ET DE VALORISATION

                     Basé sur les besoins de suivi de la PNSN …
   Le programme de travail est basé sur l’hypothèse de valorisation des
   investissements, c’est-à-dire sur le fait qu’il faudrait à peu près 5 ans pour
   «rentabiliser» les investissements de la première phase de la PNIN, soit une
   période allant de 2022-2026

                   … et sur les cycles de plans d’action de la PNSN

    Concernant le cycle d’élaboration des PA/PNSN, sachant qu’il s’agit de
    programmes plus ou moins quinquennaux, il existera donc un (1) exercice de
    programmation d’ici 2025 et un exercice de révision de la politique à long terme.

    Pour supporter la valorisation, il faut que les services PNIN soient maintenus
    et développés, en visant la diversification des supports notamment pour
    atteindre les décideurs régionaux.

21 juin 2021                                                                            20
HR, INVESTMENT AND FINANCING
                                                 NEEDS

Priority to the institutionalisation of functions ...
Mobilisation and capacity building must be at the heart of the phase II of NPIN, with
full involvement of all staff with domestical financial support, both at INS and at the
HC3N (in particular, 4 full-time positions at the INS).

... Investment needs are essentially immaterial
Continuation and strengthening of support to users; complementary studies and
technical assistance (that of CT, must be more restricted and focused on
communication).
... finally, the financing needs will be calculated from the unit
costs of products and services
A total estimated cost of around 3.2 million euros;
Progressive transfer of the costs of products and services over the four (4) cycles covered by
the plan, with priority given to:
- The transfer of services, which should be completed after 2 years;
- The transfer of products, which should be fully implemented after 3 years.

                                                                                                 21
LE   PLAN DE PÉRENNISATION: LES   CYCLES   DE
                            PRODUCTION ET DE VALORISATION

                  Basé sur les besoins de suivi de la PNSN …
Le programme de travail est basé sur l’hypothèse de valorisation des
investissements, c’est-à-dire sur le fait qu’il faudrait à peu près 5 ans pour
«rentabiliser» les investissements de la première phase de la PNIN, soit une
période allant de 2022-2026

                … et sur les cycles de plans d’action de la PNSN

Concernant le cycle d’élaboration des PA/PNSN, sachant qu’il s’agit de
programmes plus ou moins quinquennaux, il existera donc un (1) exercice de
programmation d’ici 2025 et un exercice de révision de la politique à long terme.

Pour supporter la valorisation, il faut que les services PNIN soient maintenus
et développés, en visant la diversification des supports notamment pour
atteindre les décideurs régionaux.

                                                                                    22
BUDGET

                                                                    Quantité      PU         Total CFA     Partenaires     Etat
               Fonctionnement                                                                909 027 158   203 157 216 450 023 847
               Produits Système d'information                                                463 184 592
               Elaboration PCA                                         2          940 301      1 880 602       940 301     940 301
               Elaboration analyses                                   25       18 452 160    461 303 991   276 782 394 92 260 798
               Services Système d'information                                                309 382 506   141 949 776 167 432 730
               Maintien du portail WEB                                 4        8 871 096     35 484 382    17 742 191 17 742 191
               Maintien des bases de données indicateurs               4       28 741 664    114 966 654    28 741 664 86 224 991
               Maintien des bases de micro-données                     4       11 866 340     47 465 361    11 866 340 35 599 021
               Appui aux utilisateurs                                  4       27 866 527    111 466 108    83 599 581 27 866 527
               Produits politique/communication                                               84 330 736    25 321 104 158 689 121
               Elaboration PCA                                         2        4 631 676      9 263 353     4 631 676   9 263 353
               Elaboration du cadrage des plans d'action du            2        3 845 163      7 690 326     3 845 163   7 690 326
               PNSN à partir des résultats d'analyse (cout d'un
               exercice)
               Elaborer "policy brief à l'intention des décideurs      4        6 710 637     26 842 547     6 710 637   20 131 910
               régionaux
               Elaboration d'une « newsletter » suivi du PNSN          4       10 133 628     40 534 511    10 133 628 121 603 533
               Services politique/communication                                               52 129 324    35 886 336 123 901 996
               Maintien de la veille informationnelle (GED)            4        4 910 837     19 643 348    19 643 348 58 930 045
               Maintien de la page nutrition du portail HC3N           4        8 121 494     32 485 976    16 242 988 64 971 952

               Investissements                                                              1 216 258 748 1 216 258 748           0
               Formation continue                                                              15 600 000    15 600 000
               Formation diplômante                                                            34 400 000    34 400 000
               Etudes et recherche                                                            327 978 500   327 978 500
               Assistance technique                                                           838 280 248   838 280 248
               Total                                                                        2 125 285 906 1 419 415 964 450 023 847

21 juin 2021                                                                                                                          23
REGARDS/POINT DE VUE
                                 RÉTROSPECTIF …

                                      Disponibilité de la documentation (aucune activité
                Point fort            n’a pas fait l’objet de documentation spécifique)

                Aspects qui méritent plus d'attention
               • Le temps nécessaire à l’étude et la disponibilité. Maintenir la
                 soumission en ligne des questionnaires de collecte d'information avec
                 des interviews virtuelles et maximiser le temps d’entretien avec
                 chaque acteurs clés de la PNIN (surtout les secteurs)
               • Bien définir le calendrier d’intervention en : 1/ évitant des périodes
                 critiques de campagnes électorales et; 2/en assurant la présence et la
                 disponibilité de toute l'équipe dans le même temps pour plus de
                 synergie et d'interactions avec le consultant.
               • Nécessité d’avoir un fort leadership politique dans la mise en œuvre de
                 l’exercice pour assurer une forte implication à Haut-niveau.

21 juin 2021                                                                               24
PORTAIL DE LA PNIN

                 www.pnin-niger.org/web/

21 juin 2021                               25
Wa fonda goy aran kam ka ga aï hangane
 Na gode da kou ka bani hankalin kou
       Merci de votre attention
      Thanks for your attention
The Sustainability Plan for
 the National Information
  Platform for Nutrition
    (NIPN) in Ethiopia

          24th June 2021
NIPN Ethiopia

• Since 2018, hosted within the Food Science and Nutrition Research
  Directorate (FSNRD) of the Ethiopian Public Health Institute (EPHI).
• Technical support provided by the International Food Policy Research
  Institute (IFPRI).
• The NIPN applies a dual approach in the oversight of its
  implementation:
  1) The NIPN Advisory Committee (AC) provides high-level advice.
  2) The national nutrition program Monitoring, Evaluation and
     Research Steering Committee (MER SC) provides advice and
     guidance on operational issues and NIPN implementation.
OBJECTIVES OF SUSTAINABILITY PLAN

Overall objective:
To describe how the NIPN will continue
beyond the project end-date (December
2021) and ensure long-lasting impact in the
nutrition sector.

The specific objectives describe:
  – The NIPN’s interventions and specific
    actions which foster sustainability.
  – The future plans for the sustained use of
    the NIPN and its services.
  – The NIPN’s fundraising plan to diversify its
    funding portfolio.
1. Fostering Sustainability

1. Proximity to National Nutrition Decision Makers:
  – The integration of the NIPN within an existing
     government institution (EPHI) ensures the NIPN is
     country-led and country-owned and reinforces the
     sustainability of the platform.

  – EPHI chairs national nutrition program MER SC. NIPN
    helps structure and organize the meetings.

  – NIPN AC members high-level officials with
     close links with ministers and decision makers
1. Fostering Sustainability

2. Multisectorality and Institutional Capacity
Strengthening:

  –       Strengthening monitoring, evaluation and research capacity
          within EPHI and across multisectoral NIPN stakeholders.
      •      Short-term trainings in specific areas.
      •      Longer term mentorship.
      •      Funds PhD students from different sectors.

  –       Multisectoral engagement in NIPN activities:
      •      Policy question formulation, capacity needs assessment.
      •      Trainings.
      •      Policy and research seminars/webinars.
      •      Responding to research questions.
      •      Etc.
1. Fostering Sustainability

3. Documenting Approaches as Guidance Documents
  – Multiple documents and processes developed to ensure institutional
     memory and shared knowledge.
  Examples:
  • The NIPN communication strategy, NIPN M&E Plan, Sustainability Plan;
  • The guideline for rapid literature reviews, guidelines for the data
    repository;
  • NIPN capacity needs assessment, PQF process documented;
  • Research outputs documented;
  • Blogs, event pages and blogs, shared via website, social media accounts

                                                               https://www.nipn.ephi.gov.et/
2. Future Plans

1. Continuous Support from the EU Delegation:
   – Secure a no-cost extension (NCE) from the EUD to start in 2022.
   – Conduct meetings with EUD and IFPRI to plan for NCE
   – Prepare documentation and justification for NCE together with IFPRI and EUD.
   – Develop clear vision and plan for NIPN Ethiopia with NCE and NIPN2.0
     supporting it jointly in 2022.

2. Prepare for NIPN 2.0:
   – Participate in appraisal meetings, debriefing meetings with GIZ, EUD.
   – Develop a clear vision and plan for NIPN Ethiopia.
   – Engage with GIZ to finalize project description and contracts with EPHI and
     IFPRI for NIPN 2.0 to start in 2022 for 3 years.
2. Future Plans

3. Vision, plans and implement NIPN interventions
  – Communicate clear vision, results framework and activities for the NIPN
  – Ensure NIPN continued relevance and space within Food and Nutrition Strategy
    Coordination structures
  – Support to the FNS M&E Framework and implementation
  – Contribute to multisectoral platforms and programs
3. Fundraising Plans

1. Fundraising for New Potential Donors:
  – Search for other new potential donors to cost-share interventions with the
    EUD in support of the NIPN’s activities.
  Activities:
      • Establish fundraising committee and fundraising strategy
      • Conduct donor landscape analysis
      • Develop NIPN concept note and flyer targeting interests of donors
      • Conduct individual meetings with new potential donors and share
        materials
      • Continue and increase visibility of the NIPN and outreach
      • Train staff in resources mobilization, proposal writing and fundraising
        processes
3. Fundraising Plans

2. Co-financing through Internal Sources:
  – Advocate for the institutionalization of the NIPN within EPHI and have funds
    allocated to it.
  Activities:
      • Develop key messages to make the case for the NIPN’s
        institutionalization.
      • Establish high-level committee (EPHI leadership/AC members) to
        advocate for NIPN institutionalization.
      • Develop scenario documents with staffing, interventions, budgets for
        institutionalization.
      • Conduct meetings with MOH, MOF, MOA and others to advocate for NIPN
        institutionalization.
Thank you
DISCUSSION

             38
CONCLUSIONS
         &
POTENTIAL NEXT STEPS

                       39
THANK YOU !

              40
You can also read