Monaghan County Council
Annual Service Delivery Plan
           2019

                   Approved at March 2019 Co Co Meeting

             1
Annual Service Delivery Plan 2019

1.         Introduction

Section 50 of the Local Government Reform Act 2014 (insertion of Section 134A to the Local Government
Act 2001) requires the local authority to prepare a new document called an Annual Service Delivery Plan.
The Annual Service Delivery Plan translated the objectives of the Corporate Plan 2015 - 2019 into more
detailed supporting strategies and strategies for service delivery which link in with annual departmental
activities. It takes account of, and is consistent with, Budget 2019, which was adopted by the members
on 20 November 2018.

The Annual Service Delivery Plan 2019 identifies the services to be provided and the standards to which
they are to be delivered, monitored and evaluated so as to ensure that optimum delivery of services is
achieved.

This plan provides a clear focus to enable the elected members, staff of Monaghan County Council
together with key stake holders to work together to develop and improve the services that are
delivered to our citizens.

In preparing this document, the Council takes account of all plans, statements and strategies that set
out policies and objectives for all of its functional programmes, and in particular the following:

     -     Monaghan County Council Corporate Plan 2015-2019
     -     Service Level Agreement with Irish Water
     -     Monaghan County Development Plan 2013 - 2019
     -     LECP – 2016 – 2021
     -     In addition, a wide range of other local, regional and national plans statements and strategies
           inform and guide the Council’s work, and the provisions of these plans have been taken into
           account in preparing the 2019 Service Delivery Plan.

3.         Principal Services

The allocations to the different Service Divisions of Monaghan County Council in Budget 2019 are as
follows:

                        Service Division                       Funding Approved €
         Housing and Building                                               €7,956,967
         Road Transport and Safety                                         €17,582,022
         Water Services                                                     €6,945,585
         Development Management                                            €11,070,146
         Environmental Services                                             €6,371,395
         Recreation & Amenity                                               €4,803,388
         Agriculture, Education, Health & Welfare                            €468,559
         Miscellaneous Services                                             €5,557,883
         Total Budget                                                      €60,755,945

The following pages set out

     -     the objectives and priorities for the delivery of each of the above services
     -     the strategies for achieving those objectives and priorities
     -     the performance standards intended to be met in the delivery of services
                                                       2
Municipal Districts
Under the Local Government Reform Act, 2014 three Municipal Districts/Electoral Areas were
established by law in June 2014 in County Monaghan. Municipal Districts have responsibility for
delivery of a range of services in their local area with a focus on making towns and districts attractive
places to live, work and invest.

Each Municipal District is required to prepare a schedule of Municipal District Works for adoption in
the first quarter of each year. This schedule sets out priorities for works, services or activities to local
facilities and amenities within their functional division having regard to centrally allocated budgets.
Funding is also allocated through the General Municipal Allocation and other funding opportunities
from national government schemes/programmes, EU/Peace/Intereg or initiatives from other bodies.

Municipal Districts provide support on the ground which is critical to the success of many initiatives
which drive local communities and economic development. These range from local festivals and
events; design of streetscapes and village renewal schemes; support for micro-enterprises and
business parks; involvement in energy efficiency projects; promotion of rural broadband; planning for
major investments.

Services carried out by each Municipal District generally include the maintenance, improvement and
restoration of regional and local roads and footpaths, low cost safety improvement schemes,
sweeping and scavenging, public lighting, public conveniences, school warden services, open spaces,
parks and play parks. Municipal Districts are also responsible for the making of Traffic and Parking
bye laws and the operation of casual traders.

Municipal District’s provide assistance in relation to the maintenance and improvement of Council
buildings, development of car-parking in town centres, development of recreational facilities and
walking and cycling routes. Municipal District meetings are held on a monthly basis and members
and officials also meet regularly with community and business groups.

Support Services
All service departments across the Council are supported internally to deliver on work programmes.
The relevant support services are provided by the departments of Corporate Affairs & Governance,
Finance, Human Resources, and Information Systems. A summary of the objectives and priorities,
strategies and performance standards for the support services is also included in this plan.

Some key principles underpin the delivery of quality services to the public. These include customer care,
good organisational communications, accessibility, performance management, financial control and
data management. Initiatives in these areas are led by the support sections and implemented
organisation-wide with the support and cooperation of all sections. All sections also share the common
goals of promoting the county and enhancing cross-border cooperation.

Key additional responsibilities in these areas for 2019 include the requirement to comply with the
General Data Protection Regulations (GDPR) from May 2018.

                                                     3
Performance Assessment

In assessing performance in the delivery of services, Monaghan County Council operates the
‘MonaghanStat’ leadership management system across all aspects of its work. Under this system, the
leadership teams in all sections hold regular meetings, during which recent performance is analysed
using relevant data, previous decisions and commitments. Forthcoming performance objectives are set,
and effectiveness of overall performance is assessed. MonaghanStat ensures that the organisation
implements strong leadership, and assigns accountability and responsibility at all grades. Individual
development plans are prepared and managed through the PMDS process.

In addition, the audit committee and internal audit process provides independent oversight and
monitoring of the council’s governance and control systems.

NOAC
The establishment of the National Oversight and Audit Commission (NOAC) set up under the Local
Government Reform Act 2014 provides further scrutiny of the performance of local government bodies
against a range of indicators that the Commission has considered appropriate.

Every year, the sector publishes Performance Indicators to show the level of service provided by each
City and County Council. The Local Authority Performance Indicators report provides an overview of the
main indicators annually.

The 2017 NOAC Local Authority Performance Indicator report was published on 19 September 2018. In
2017, there were 35 local authority performance indicators. Each indicator is named to have a general
idea of what is being measured. Two additional indicators have been added for 2019. (full details on
the Service Indicators are included in Appendix 1).

Management Structure

                                                  4
Housing and Building
In its Corporate Plan, Monaghan County Council is committed to seeking to ensure that every household
will have access to secure, good quality housing suited to their needs at an affordable price in a
sustainable community. The Council’s priorities and objectives in this area are outlined below, together
with the performance standards to be met.

 Service                    Service Delivery Strategy        Performance Standards
 Objectives/Priorities
 Deliver MCC’s Housing
 Stock Programme 2016       Deliver Housing Capital
                                                             NOAC H1 Social Housing Stock
 – 2021 “Rebuilding         Programme for 2019
 Ireland”
                                                             NOAC H6: No. of long-term homeless
                            Support the delivery of
                                                             adults
                            Homeless Programme 2018 –
                                                             Number of homeless presentations
                            2021
                                                             minimised
                            Adopt and implement the
                                                             Better quality homes provided to
                            delivery of the Traveller
                                                             Travellers
                            Programme 2019 – 2024
 Manage Housing
                            Implement HAP                    120 units for 2019
 Support
                                                             NOAC H2 Housing Voids
                            Upgrade Housing processes to     NOAC H3 Average re-letting time and
                            improve efficiency where         cost
                            appropriate                      Efficient re-letting of houses
                                                             maintained within time and cost limits
                                                             Increased Social Housing support to
                            Deliver RAS Programme 2019
                                                             persons on Council waiting lists
                            Continue Private Rented
                                                             NOAC H5 Private rented sector
                            inspections and specifically
                                                             inspections
                            enforcement procedures
                            Implement Anti-Social            Improved quality of life
                            Behaviour Strategy               Number of complaints minimised
                            Continued operation of the       Quality of housing stock maintained
                            maintenance repair line          NOAC H3 Average re-letting time and
 Improve estate             Implement tenancy                cost
 management                 consultation initiatives         NOAC H4 Housing Maintenance Cost
 procedures and quality     Implement Tenant Purchase        Increased home ownership and mix
 of estates                 Scheme                           within estates
                            Review allocation policy
                            Carry out Rent Review            Fairness and equality for those
                            Carry out Housing Needs          seeking housing support
                            Assessment 2019

                            Deliver private grants scheme    Improved quality of life for persons
 Enable persons to                                           living in their own homes
 remain in their own
 homes                                                       Number of persons assisted to acquire
                            Manage housing loan scheme       their own homes

                                                   5
Service                     Service Delivery Strategy         Performance Standards
Objectives/Priorities

                            Implement a programme of
                                                              NOAC H4 Housing Maintenance Cost
                            planned and response
                            maintenance
Improve the standard        Seek funding for an energy
                                                              Reduced energy consumption and
of housing stock            efficiency programme for
                                                              costs for tenants.
                            remaining housing stock
                            Continuing to Implement a         NOAC H2 Housing Voids
                            programme of re-letting/voids     NOAC H3 Average re-letting time and
                            works                             cost
                                                              Aim to increase, through ongoing
                                                              acquisition programme and
                            Acquire and construct houses
                                                              construction programme, housing
                                                              stock by 50 units in 2019
Increase the availability   Work with Approved Housing
                                                              Additional provision of 50 social
of Social Housing Stock     Bodies (AHB) to provide
                                                              housing units to be provided in 2019
                            additional social housing units
                            Co-ordinate a programme of
                                                              Additional provision of 21 units to be
                            works to bring derelict/vacant
                                                              commenced in 2019
                            properties back into use

                                                   6
Road Transport and Safety
In its Corporate Plan, Monaghan County Council is committed to developing and managing County
Monaghan’s built and natural assets in partnership with other agencies to best utilise and promote
economic, social and cultural benefits of our citizens. In this regard, a key role is played by the Roads
Service. The specific priorities and objectives for the Roads Service are outlined below, together with
the performance standards to be met.

 Service Objectives/Priorities        Service Delivery Strategy              Performance Standards

                             Progress Phase 3 of the                  Construction programme progressed
                             Emyvale to Monaghan National             in line with the contract schedule.
                             Primary Improvement Works
                             Scheme.
                             Progress Overlay Schemes on              Structural overlay on 2.4Km of
                             N2 Aclint Bridge to                      National Primary and 3.3Km of
                             Annamarran, N54 Clanooney                National Secondary road network
                             N54 Monaghan Town**                      completed.
 Maintain and Improve the (subject to TII approval)
 structural   quality    and Deliver National Road                    Defect survey completed, defects
 operational use of the road Maintenance Programmes.                  identified.
 network.                                                             Roads repairs prioritised and
                                                                      completed on a risk basis.

                                  Deliver Regional and Local          Structural improvement on 38km a
                                  Road Restoration Improvement        of Non – National Network
                                                                      completed.

                                                                      62 Kms of restoration maintenance
                                  Deliver Regional & Local Road       of Non-National Roads Network
                                  Restoration Maintenance.            completed.

                                                                      Discretionary Maintenance works
                                                                      programme identified, prioritised
                                                                      and implemented in conjunction
                                                                      with MDs.
                                                                      NOAC R1: 100% PSCI Survey of
                                                                      Regional Network completed.
                                                                      PSCI resurvey on 100% of Local
                                                                      Tertiary Road Network completed.

                                                                      NOAC R2: Completion of Regional
                                                                      Road Grants Works in accordance
                                                                      with agreed Restoration programme.

                                                                      Roads upgraded in accordance with
                                  Implement LIS & CIS Schemes         available budget

 Service Objectives/Priorities        Service Delivery Strategy              Performance Standards

                                                    7
Maintain appropriate          Progress the replacement of       1 lorry and 2 crew cabs purchased.
resources to provide a core   the fleet and welfare unit        3 new welfare units purchased.
road maintenance service.     programmes.

                              Ensure availability and access    Adequate supplies of critical stocks
                              to stocks.                        in place, e.g. salt, bitumen

                              Review winter maintenance         Winter Maintenance Service Plan
                              and severe weather                delivered. New winter maintenance
                              operations.                       staffing procedures implemented.

Ensure effective              Administer road opening           All online (MRL) applications
administration and            licensing, permits, road          processed. Customer services
governance of Roads           closures, signage and customer    requests actioned, Section 70
Programmes.                   service requests efficiently.     (hedge) and Section 76 (drainage)
                              Enforcement of the 1993 Roads     notices enforced.
                              Act offences.
                              Procure all goods and services    All procurement conducted in line
                              in line with EU guidelines        with EU, national and MCC
                                                                guidelines, as appropriate.
                              Effective administration of all   Effective management of budgets
                              roads funding streams             and recoupment of spend.
                              Complete Monaghan Town            LUTS document approved by TII and
                              Land Use and Transportation       strategies incorporated into new
                              Study.                            Development Plan.
Plan, develop and progress
strategic infrastructural                                       Short term LUTS recommendations
routes.                                                         implemented in conjunction with
                                                                Monaghan MD.

                              Implement Road Improvement        Project progressed to option analysis
                              Schemes identified in the         stage to commence the preferred
                              National County Development       route selection.
                              Plans.

                              a) Clontibret to the Border
                              b) Ardee to Castleblaney
                              Work in close partnership with    Priorities agreed and applications for
                              OPW in delivering the             funding submitted.
                              objectives of the CFRAM
                              Programme.
                              Deliver Minor Flood Mitigation    Works at Kilmore East, Rockcorry;
                              Works Programme.                  Corfad, Ballybay and Bunnoe River
                                                                Catchment Area completed.
Maintain & implement a
                              Deliver Bridge Rehabilitation     N2 Blackwater Bridge: Construction
flood management strategy
                              Works Programme.                  programme progressed in line with
                                                                contract schedule.

                                                                Rehabilitation works on 11 bridges
                                                                on local & regional roads completed
                                                                ** subject to Dept. funding
                                                                allocation.

                                                8
Department of Transport & Sport
                                                             Bridge Survey schedule 2019
                                                             completed.

Enhance the safety of the   Progress N54 Tullybryan          Part 8, CPO, and Detailed Design
road network.               National Secondary Safety        completed.
                            Scheme.
                            Implement actions in the Roads   2019 actions of the Road Safety Plan
                            Safety Plan.                     implemented.
                            Deliver Safety Improvement       Improved road safety through the
                            Schemes on National road         completion of identified HD17 safety
                            network.                         improvement schemes on national
                                                             routes.

                            Address identified junctions     Short term safety measures at
                            from the N2 Castleblayney to     Tullvaragh junction completed.
                            Aclint Safety Review.
                                                             Improved compliance rates for
                                                             Section 70 (Hedge) and Section 76
                            Implement a range of Safety
                                                             (Drainage) Notices as required in
                            Enforcement measures.
                                                             Roads Act 1993.

                            Implement the VRS safety
                                                             VRS inspected, replaced and
                            barriers repair/ replacement
                                                             repaired.
                            programme on national routes.

                            Implement actions in the Noise   Implemented year one actions of the
                            Action Plan.                     2018-2023 Noise Action Plan.

                            Implement Fencing Retrofit       Fencing programme implemented.
                            programme.
                            Implement Safety                 Completion of 10 schemes.
                            Improvement works scheme on
                            non-national roads.
                            Secure funding for regional      Two project proposals submitted to
                            road Specific Improvement        the Department.
                            Grants.

                            Review and provide report to     Reviews conducted and roads
                            Planning Dept. on planning       reports on planning applications
                            applications.                    provided within required
                                                             timeframes.

                                            9
Water Services
Monaghan County Council is committed to the development and management of County Monaghan’s
built and natural assets in partnership with other agencies to best utilise and promote the economic,
social and cultural benefit of our citizens. A key element in the delivery of the strategic objective is
fulfilling our obligations under the Irish Water / Monaghan County Council Service Level Agreement and
managing the implementation of the Rural Water Programme in County Monaghan. These priorities and
objectives are summarised below:

 Service Objectives/
                                   Service Delivery Strategy         Performance Standards
 Priorities

 To fulfil obligations under the   Deliver on the commitments of
                                                                 Performance achieved on each
 Service Level Agreement and       the Irish Water / Monaghan
                                                                 of the Irish Water Key
 Annual Service Plan with Irish    County Council Annual Service
                                                                 Performance Indicators
 Water                             Plan 2019

                                   Administer subsidy                Annual Subsidy Payments
                                   applications                      Processed and Recouped (€’s)

                                                                     Administer and Supervise the
                                                                     Rural Water Programme 2019.

                                   Administer and manage rural       NOAC W1: Percentage of
                                   water capital investment          Private Drinking Water
 To manage and implement the       programme                         Supplies in Compliance with
 Rural Water programme                                               the Drinking Water
                                                                     Regulations

                                   To partner Mayo County
                                   Council and Cork County           Submission of a Shared Service
                                   Council in developing a           bid in partnership with Mayo /
                                   competitive bid for the Rural     Cork County Council.
                                   Water National Shared Service

                                                  10
Planning
In its Corporate Plan, Monaghan County Council is committed to promoting and protecting a clean safe
environment which is viable and sustainable. A further corporate objective is to develop and manage
County Monaghan’s built and natural assets in partnership with other agencies to best utilise and
promote economic, social and cultural benefit of our citizens. The Council’s priorities and objectives for
the Planning Service in these areas, together with the performance standards to be met for 2018 are
outlined below:

 Service Objectives/Priorities     Service Delivery Strategy         Performance Standards

 Operate a Development             Process all planning              Applications processed in
 Management System in              applications, material            compliance with legislative and
 compliance with legislative       contraventions, appeals,          policy framework.
 and policy requirements.          declarations, extensions of
                                   duration applications,            NOAC P2
                                   Part VIIIs, etc.

                                   Operate public consultation &     Pre-planning clinics operated
                                   information service.              weekly, and public telephone
                                                                     morning twice-weekly.

                                                                     One Agents Workshop
                                                                     conducted per year.

                                                                     Public counter facility operated
                                                                     daily.

                                                                     Operate online planning
                                                                     application information system.

                                   Introduce and operate online      Introduction and operation of
                                   planning application system.      system.

 Operate an enforcement            Monitor, investigate and take     Enforcement action taken in
 system in line with legislative   appropriate enforcement           compliance with legislative
 and policy requirements.          action in respect of              requirements and deadlines.
                                   unauthorised development.
                                                                     NOAC P3

 Review and implement              Review and implement              Review and adopt revised
 development contribution          development contribution          development contribution
 scheme within legislative and     scheme and ensure                 scheme.
 policy requirements.              compliance through                Implementation of scheme and
                                   appropriate legislative           collection of contributions
                                   processes.

                                                   11
Service Objectives/Priorities   Service Delivery Strategy         Performance Standards

Develop a planning policy       Conclude the preparation of       Development Plan adopted
framework within legislative    the Monaghan County               within legislative requirements
and policy requirements         Development Plan 2019 –
                                2025, including adoption of
                                the Plan
                                Conclude the preparation of a     Strategy adopted in tandem
                                strategic flood risk assessment   with the County Development
                                for the county                    Plan.
                                Assist Roads Section in the       LUTS prepared and adopted
                                completion and adoption of a
                                Land Use and Transportation
                                Strategy (LUTS) for County
                                Monaghan
                                Process variations of the         Variations of Development Plan
                                Monaghan County                   adopted within legislative and
                                Development Plan as required      policy requirements
                                Complete DoEHLG Housing           Return completed and
                                land availability return          submitted
Manage and protect the built    Manage the Record of              No of additions / deletions
heritage within the County      Protected Structures,
                                including additions and
                                deletions as appropriate.
                                Implement the Historic            Scheme implemented and
                                Structures Fund 2019              funds distributed

                                Implement Built Heritage          Scheme implemented and
                                Investment 2019                   funds distributed

                                Processing of Section 57          Processing Declarations within
                                Declarations                      legislative requirements

                                Complete annual Part IV           Return completed
                                statistical return
Take in charge housing          Process the taking in charge of   No. of developments taken in
developments as required.       housing developments within       charge
Resolve remaining unfinished    legislative and policy
housing developments            requirements
                                Resolve remaining unfinished      All remaining UHDs to be
                                housing developments (UHDs)       resolved in 2019
                                within the county

Manage dereliction and          Reduce dereliction in our         No. of derelict properties which
vacancy in towns within the     towns through the use of          are remediated
County                          powers available under the
                                Derelict Sites Act
                                Implementation of the vacant      No. of properties entered on
                                site levy                         the register

                                               12
Environmental Services
In its Corporate Plan, Monaghan County Council is committed to promoting and protecting a clean, safe
environment in a manner which is viable and sustainable. In this regard, the Council’s priorities and
objectives for the Environment division are outlined below, together with the performance standards
to be met.

 Service                      Service Delivery Strategy       Performance Standards
 Objectives/Priorities

 Implement Litter             Carry out Litter Monitoring     NOAC E3 :% of areas within the 5
 Management Plan 2018-        Survey Programme.               levels of litter pollution.
 2020.                        Implement litter enforcement    NOAC E2: % Environmental
                              programme including CCTV        Pollution Complaints Closed
                              monitoring programme.           CCTV monitoring programme
                                                              completed.
                                                              Number of on spot fines issued.
                                                              Comply with all requirements of
                                                              GDPR.

                              Drawdown Anti -Litter Anti-     Prepare awareness plan for year
                              Graffiti Awareness funding      and get approval from Dept for
                                                              selected projects

                              Deliver enforcement &           RMCEI plan produced and
 Implement Connacht-          inspection regime in            delivered upon being cognisant of
 Ulster Waste                 cooperation with EPA,           National Priorities.
 Management Plan 2015-        CUWERLA, and as per RMCEI       Draw down of Anti-Dumping
 2021.                        plan                            Initiative Funding.
                                                              Assessment rating received from
                                                              EPA.

                              Increase number of              NOAC E1: % of households with
                              householders with access to 3   access to three-bin service
                              bin system.
                              Ensure Monaghan Council         Annual tonnage collected through
                              operated recycling              recycling infrastructure as recorded
                              infrastructure is maintained    in Annual Environmental Report.
                              and operated in accordance      Recycling facilities (bring banks,
                              with contractual obligations.   civic amenity sites and Materials
                                                              Recovery Facility) operated in
                                                              accordance with all EPA
                                                              authorisations.
                              Deliver waste prevention        Submit proposal for funding to EPA
                              projects as part of National    for waste prevention projects and
                              Waste Prevention Programme.     receive approval for same.
                                                              Continue to support
                                                              www.repairmystuff.ie

                                                 13
Progress programme on works        Tier 2 assessments completed as
                              on Historic Landfills identified   per EPA code of practice and Tier 3
                              on Waste Management Act            started on identified sites.
                              Section 22 Register.

Operate Scotch Corner         Completion of closure and          Capping project completed as per
Landfill in accordance with   aftercare works.                   agreed specifications.
EPA Licence requirements
                              Completion of reporting as         Reports completed as per licence
                              required by the licence            requirements.

                              Progress works as required by      All works identified by EPA
                              the EPA                            completed by EPA timeframes.
National Climate Change       Work with Regional Climate         Local Climate Change Adaptation
Adaptation Framework          Change Office in Kildare           Strategy adopted.
                              County Council in preparing
                              Local Adaptation Strategy as
                              per Framework
Implement the River Basin     Carry out water quality related    % of RMCEI inspections completed
Management Plan 2018-         inspections as per 2019 RMCEI      as per 2019 RMCEI plan.
2021 and associated           plan.
Water Framework
Directive requirements.
                              Support the implementation of Completion of requested
                              River Basin Management Plan reports/assessments in conjunction
                              objectives.                   with LAWPRO and Regional
                                                            Catchment Management Team in
                                                            identified areas of action.

                              Prepare and implement Water        RMCEI, prepared, approved and
                              Framework Directive river and      implemented.
                              lake monitoring plan,
                              investigative monitoring plan,     Assessment rating from EPA.
                              bathing water monitoring plan
                              and discharge monitoring plan

Implement the policies of     Continue to assist the Planning    Environmental planning reports to
the County Development        section in assessments of          be submitted on all planning
Plan.                         Planning Applications.             applications of concern.

Ensure food safety            Carry out inspections and          No of inspections and audits
compliance at designated      audits of food businesses          completed
sites                         (FB’s), sampling of food, and
                                                  14
report results to relevant        % of scheduled sampling
                            stakeholders                      completed
                                                              Food Safety Authority returns and
                                                              claims made
                            Issue corrective actions to FB    No. of corrective action reports
                            operators based on results of     No. of enforcement orders issued.
                            inspections, audits and
                            sampling. Monitor response
                            to recommended corrective
                            actions. Implement
                            enforcement where applicable
Ensure animal control and   Ensure the welfare of animals     No. of welfare inspections carried
welfare                     admitted to supervised            out at slaughterhouses
                            slaughterhouses
                            Provide a dedicated dog           No. of stray dog complaints
                            warden service                    investigated,
                                                              No. of stray dogs seized,
                                                              No of dog licences issued
                            Provide access to a dog and       Dog pound and Horse pound in
                            horse pound of a suitable         operation, in compliance with
                            standard                          legislative requirements.

                            Inspect and register dog          % of establishments inspected
                            breeding establishments and       annually
                            ensure they comply with           Register of establishments in place
                            legislative requirements

                            Investigate complaints of stray   No. of complaints investigated
                            horses and enforce horse          No. of stray horses seized
                            control legislation

                                                15
Fire
In its Corporate Plan, Monaghan County Council committed to promote and protect a clean
environment which is viable and sustainable. The Council’s priorities and objectives for the Fire
Service, Civil Defence & Building Control under this remit are outlined below, together with the
performance standards to be met.

 Service Objectives/Priorities     Service Delivery Strategy          Performance Standards

                                   Implementation of Fire &
                                                                      Section 26 Plan 2019
                                   Emergency Operations Plan
                                                                      objectives implemented
                                   2018-2022
                                   Seek capital funding for new
                                   fire station in Ballybay &         Fire Appliance, fleet, facilities
                                   progress construction of           & provisions included in
                                   Castleblayney Fire Station.        DHPLG Capital Programme.
                                   Apply for new Fire Appliance,      Castleblayney Fire Station
                                   review facilities, fleet and       substantially completed
                                   provisions.
                                                                      Facilities Management System
                                                                      in place
                                   Maintain each existing fire
                                                                      Preventative Maintenance
                                   station
                                                                      Programmes adopted and
 Improve effectiveness in Fire                                        implemented
 Brigade preparedness                                                 Vehicles, equipment and
                                                                      communication systems
                                                                      maintenance plan in place.
                                                                      MoU with NIFRS for RTA cross
                                                                      border incidents in applicable
                                                                      area agreed for next phase
                                                                      Actions of Road Safety Plan
                                   Provide a quality response to
                                                                      implemented.
                                   fires and other emergencies
                                                                      New mobilisation equipment
                                                                      and CTri Tetra systems
                                                                      installed
                                                                      NOAC F2: Service Mobilisation
                                                                      NOAC F3: Percentage of time
                                                                      in attendances at scenes
                                                                      Full crewing level maintained

                                                  16
Service Objectives/Priorities   Service Delivery Strategy         Performance Standards

                                                                  New and revised NDFEM
                                                                  Standard Operational
                                                                  Guidance implemented.
                                                                  OHSAS 18001 accreditation
                                Further develop Fire Service      audit.
                                Health and Safety Systems         Staff awareness programme
                                                                  on Health & Safety systems
                                                                  completed.
                                                                  New PPE delivered.

                                Implement During                  Number of inspections
                                Performance Inspection Policy
                                Participate in National Fire      Number of Primary Schools
                                Safety Programme                  visited
                                Participate in Road Safety        Number of meetings attended,
                                Working Group                     and actions implemented
Minimise the effects of fire    To continue to prepare for
and other emergencies           inter-agency operations
                                through participation in          MEM plan reviewed
                                appropriate training and
                                exercises
                                                                  Number of meetings & Fire
                                                                  safety talks with community &
                                Review & implement
                                                                  stakeholder groups
                                recommendations of Task
                                force on Fire Safety in Ireland   Community Fire Safety Policy
                                and prepare, adopt &              adopted and implemented
                                implement Community Fire
                                Safety Policy                     No. of Recommendations
                                                                  implemented
                                Implement Building Control        Number of Inspections
Ensure that the standard of     Inspection Plan                   NOAC P5: Applications for Fire
building construction in                                          Safety Certificates
County Monaghan meets the       Process Dangerous Substance       Number of inspection in-line
relevant requirements and       Licences & Vapour Recovery        with RMCEI
guidelines                      requirements
                                Operate public consultation       No. of pre-application
                                and information service.          meetings completed
                                Provide timely support,           Agents Forum meetings, and
                                assistance and processes          Agents Workshop conducted.
                                applications within statutory     Online Building Control
                                time frames                       Management System (BCMS)
                                                                  operated and implementation
                                                                  of applications module
                                Construction Products             Construction Products
                                Regulations Policy                Regulations Policy implement
                                                                  and number of inspections

                                                17
Implement Civil Defence       No. of objectives implemented
Build and develop a strong and   Strategy
                                                               Construction of CD HQ
responsive Civil Defence Unit
                                                               substantially complete
                                                               Number of events attended
Implement financial control      Prepare quarterly financial   NOAC F1: Cost per Capita of
                                 reports                       Fire Service
                                 Compliance with Public        Financial reports prepared
                                 procurement Guidelines        Charging Policy reviewed.

                                                18
Culture
The Library, Museum, Heritage and Arts services of Monaghan County Council play a key role in the
Council’s commitment to promote economic, social and cultural benefit of our citizens. The main
priorities and objectives for these services are outlined below, together with the performance standards
to be met.

Library
                                                        Service Delivery
  Service Objectives/Priorities                                                Performance Standards
                                                        Strategy
                                                                               Full range of service provided
                                                                               through all branches

                                                                               Improved Opening Hours
                                                                               Identify opportunities to
                                                                               expand opening hours in
                                                                               Ballybay and Castleblayney
                                                                               Branches.
                                                                               Hours to be increased in
                                                                               Castleblayney by a minimum
                                                                               of 40% and Ballybay by a
                                                                               minimum of 20%

                                                                               Promote the new My Open
                                                                               Library Service available in
                                                                               Carrickmacross Branch,
                                                                               providing seven days a week
                                                        Maintain and           access to library facilities.
                                                        develop frontline      Harness Social Media to
 Deliver on the key Aims and Objectives identified in   services and           advertise the service. Target
 the County Library Development Plan 2018 -2022         services to schools    of 200 customers to be
 Service Objectives/Priorities                                                 inducted into the new service
                                                                               in 2019

                                                                               Performance Targets
                                                                               NOAC L1: Number of library
                                                                               visits and number of items
                                                                               issued to customers.
                                                                                    • Target increase of 5%
                                                                                        in visits and items
                                                                                        borrowed for 2019
                                                                               NOAC L2: Cost of operating
                                                                               the Library service
                                                                                    • Target to remain
                                                                                        within Budget for
                                                                                        2019 and to maximise
                                                                                        value for money in all
                                                                                        expenditure
                                                        Market and             Regular contributions made to
                                                        Promote the library    County Council website, map
                                                        service                alerter app, twitter

                                                  19
New Digital Learning spaces
                                                                     established in each of the
                                                                     branch libraries.

                                                                     New Digital Learning
                                                                     Programmes initiated in each
                                                                     of the branch libraries.

                                            Optimise the use of      New self-service tablet kiosks
                                            ICT in managing and      installed in Carrickmacross,
                                            delivering modern        Monaghan and Clones
                                            service systems          Branches

                                                                     Local History Online Digital
                                                                     Collection Established

                                                                     New self-service printing,
                                                                     copying and scanning services
                                                                     installed in Clones Branch
                                                                     Library
                                                                     Continue to identify
                                                                     opportunities to strengthen
                                                                     existing and develop new
                                                                     outreach initiatives.

                                                                     Undertake an overall review
                                                                     of the effectiveness of the
                                                                     current range of outreach
                                                                     events provided by the
                                                                     County Library Service
                                            Strengthen links and
                                            develop outreach
                                                                     Select a second location for
                                            initiatives, including
                                                                     the provision of direct
                                            social inclusion
                                                                     outreach services to isolated
                                            initiatives
                                                                     rural communities (Mullyash
                                                                     Community Centre the 1st
                                                                     location identified)

                                                                     Performance Targets
                                                                     Community Outreach services
                                                                     strengthened

                                                                     Outreach Statistics increased
                                                                     by 5%
                                            Service Delivery         Performance Standards
                                            Strategy
                                            Redevelop                Work with other key
                                            Monaghan branch          stakeholders on the
                                            as part of the           development of the Peace and
Manage, maintain and enhance library
                                            approved Peace           Reconciliation Activities
infrastructure
                                            Campus on the            Programme for the Peace
                                            Machinery Yard site      Campus.

                                       20
Input provided to the Project
                                                                             Design Team regarding the
                                                                             design and layout
                                                                             requirements of the new
                                                                             public library.
                                                     Progress the            Full assistance given to the
                                                     development of a        Design Team to progress the
                                                     new Castleblayney       project and secure funding.
                                                     Branch in Gate
                                                     Lodge 2, Lough          If the combined Stage 1&2
                                                     Muckno                  submission to the Department
                                                                             is successful, proceed to the
                                                                             preparation and submission of
                                                                             Stage 3 application to tender
                                                                             for construction.

                                                                             If funding is not available
                                                                             under the Library Capital
                                                                             Programme, investigate all
Maintain and develop the library’s role as an                                alternative funding options.
active partner in the delivery of tourism,
education, health & wellbeing, arts, culture,                                Progress remedial works to
heritage and business support services                                       County Library HQ and Clones
                                                                             Branch Library

                                                                             Work with Ballybay/Cones MD
                                                     Review condition of
                                                                             to complete the
                                                     all library buildings
                                                                             reconfiguration of Clones
                                                     and initiate
                                                                             Library Car Park, in
                                                     remedial works
                                                                             conjunction with the new
                                                     where necessary
                                                                             Council housing development
                                                                             on the adjoining site.

                                                                             Complete the reconfiguration
                                                                             of Library HQ General Office
                                                     Participate in MCC      Seek out opportunities to be
                                                     energy-reduction        involved in 1-2 MCC energy
                                                     initiatives             reduction programmes
                                                     Implement               Business and enterprise
                                                     enterprise-focused      services for the County
                                                     initiatives             provided in partnership with
                                                                             LEO, Intreo Offices and ETB
                                                     Partner with other      Continue Carrickmacross and
                                                     sections in MCC to      Clones branches as part-time
                                                     deliver tourism-        tourist offices
                                                     focused initiatives
                                                     Partner with other
                                                     agencies in
                                                     education and
                                                     resource-sharing
                                                     initiatives

                                                21
Continue to develop our
                          partnership with CMETB as
                          agreed under the ETBI/LGMA
                          Protocol Agreement.
                          Cavan/Monaghan Science
                          Festival Programme 2019
                          delivered, in partnership with
                          Cavan County Council, CMETB
                          etc.
                          Develop and deliver Right to
                          Read Local Literacy Action
     Partner with other   Plan 2019.
     agencies in          Issue annual report to
     education and        National Steering Group.
     resource-sharing     Right to Read Champion
     initiatives          status achieved on behalf of
                          Monaghan County Council
                          Full Culture Night Programme
                          delivered.
                          Healthy Ireland at your
                          Library initiative will be
                          delivered through the branch
                          library network, in partnership
                          with Monaghan County
                          Councils Healthy Ireland
                          Programme Coordinator
                          Europe Direct Information
                          Centre (EDIC) Service,
                          delivered in Clones Branch
                          Library, in partnership with
                          the European Commission
                          Ensure Peace IV Monaghan
                          Makers Project is completed,
                          and funding is drawn down.
                          Cultural & Creative Plan 2019
                          in place.
                          The Creative Ireland
                          programme will continue to
                          be coordinated through the
                          library service for 2019, based
       Deliver Creative
                          on the Creative Ireland
     Ireland Programme
                          Programme 2017 - 2022. All
         2017 - 2022
                          funding will be sourced and
                          distributed in accordance with
                          the Annual Plan
                          Monaghan Cultural &
                          Creative Programme 2017 –
                          2022 in place.

22
Museum
Service
                                Service Delivery Strategy        Performance Standards
Objectives/Priorities
                                                                 Tender for design of new museum
                                                                 display published.
                                Progress new museum as part
                                                                 Layout of final display agreed
                                of the Peace Campus Project
                                                                 Optimising the space to ensure
                                                                 efficient use of resources
                                                                 Work in partnership with the
                                Develop and build on             Library, Youth Services and all
                                partnerships with relevant       relevant stakeholders in Monaghan
                                organisations, locally and       to develop action plan for 2019
                                nationally                       Peace Campus programme of
                                                                 events
Provide accessible,
                                                                 Deliver on actions outlined in 2019
enjoyable and culturally
                                Develop & Implement              programme plan
diverse exhibitions and
                                Creative Ireland Cultural        Facilitate funding towards
learning resources
                                Strategy                         community groups through
                                                                 Creative Ireland grant programme
                                                                 Launch Monaghan war of
                                                                 Independence Files online research
                                                                 service
                                                                 Host event to unveil restored
                                Develop new exhibition and
                                                                 Uilleann Pipes which belonged to
                                events programme for 2019
                                                                 the third Lord Rossmore, mid
                                                                 1800’s
                                                                 Launch and delivery of programme
                                                                 of events for Museum 2019
                                                                 Publish completed digitised Marron
                                Digitisation and production
                                                                 archive on Museum website.
                                online of nationally important
                                                                 Launch research service to mark
                                resources
                                                                 centenary of War of Independence
                                                                 Plan for new archive service for
                                Develop & implement
                                                                 County Monaghan.
                                archive/document
                                                                 Ensure all Council archives are
Care, manage and develop        management development
                                                                 safely secured and available to the
our outstanding collections     policy
                                                                 public, where possible
and county heritage
                                                                 Deaccession identified objects from
                                                                 collection in line with museum
                                Continue to develop and care     policy
                                for the collections of the       Review entire collection in the
                                county                           context of moving to the new
                                                                 museum store at the Peace
                                                                 Campus
                                                                 New on street exhibition launched
                                Develop museum on-street in      in partnerships with Carrickmacross
Promote the museum and          Castleblayney                    and Castleblyaney MD and
all its work to all potential                                    Castleblayney History Society
users of the service                                             Museums events at Cavan
                                Link in with annual festivals
                                                                 Monaghan Science festival and
                                taking place in the county
                                                                 Blues Festival

                                                  23
Friends Committee constituted and
Promote and develop the   holding meetings.
Monaghan County Museum    Friends Lecture in February
Friends organisation      Friends Behind the Scenes tour of
                          the National Museum in April
                          Consultant appointed to work with
                          museum staff in developing new
Produce new Strategic     plan
Management Plan 2020 -    Consultations carried out with key
2024                      stakeholders
                          New plan drafted and agreed by
                          Monaghan Co Co
                          Proposal document produced
                          detailing new staffing structure.
Research and develop a
management plan for
                          Outline agreement between
proposed new museum
                          perspective council services on
service
                          shared services at the proposed
                          new Peace Campus.

                24
Heritage
In its Corporate Plan, Monaghan County Council committed to promoting and protecting a clean, safe
environment in a manner which is viable and sustainable. The Council’s Heritage Office plays a key role
in this area and in the local implementation of the National Heritage Plan and National Biodiversity Plan.
The Heritage section’s priorities and objectives are outlined below, together with the performance
standards to be met.

 Service Objectives/Priorities       Service Delivery Strategy       Performance Standards
                                                                     Priorities for 2019:
 Protect and enhance the built,                                          • Hold quarterly meetings
 natural, cultural and community                                              of County Monaghan
 heritage of County Monaghan                                                  Heritage Forum to advise
 and increase awareness,                                                      and share information
 understanding, responsibility                                                and best practice.
 and enjoyment of it by all.                                             • Edit and publish Black
                                                                              Pig’s Dyke Archaeological
                                                                              Monograph.
                                                                         • Monaghan County
                                     Implement County                         Council adopt the All-
                                     Monaghan Heritage Plan                   Ireland Pollinator Plan
                                     through:                                 and implement selected
                                         • Research &                         actions for 2019.
                                            collecting heritage          • Update heritage
                                            information                       information on Council
                                         • Conservation and                   website and GIS.
                                            management of                • Deliver heritage
                                            heritage assets                   awareness and best
                                         • Building capacity                  practice events
                                            and awareness                     programme focusing in
                                                                              2019 on pollinators,
                                                                              heritage and climate
                                                                              change.
                                                                         • Publish minutes of
                                                                              meetings on Council
                                                                              website.
                                                                         • Increase involvement of
                                                                              heritage office in capital
                                                                              heritage projects and
                                                                              tourism initiatives.
                                                                          •   Outside funding secured
                                                                              for 2019.
                                                                          •   Work with Culture Team
                                     Seek funding from Heritage
                                                                              on implementation of
                                     Council and other agencies
                                                                              Creative Ireland in
                                     including Creative Ireland.
                                                                              Monaghan.
                                                                          •   Develop package of
                                                                              projects.

                                                   25
•   Adoption of new plan by
                                Draft and agree new County               Council members
                                Monaghan Biodiversity and
                                Heritage Action Plan 2019 –          •   Establish Monaghan
                                2022                                     Biodiversity Forum

                                Co-ordinate Monaghan
                                                                     •   Number of attendees
                                Heritage Week & support
                                                                     •   Requisite feedback
                                other key days – National
                                                                     •   Communications
                                Bee Day, Biodiversity Week,
                                                                         campaign delivered.
                                Culture Night etc.
                                                                     •   Lead County Monaghan
                                                                         Heritage Forum
                                                                     • Support and advise
                                                                         community led heritage
                                                                         groups
                                Support the development of           • Support Local Authority
                                strong local heritage sector             Heritage Officer Network
                                and national heritage sector         • Submission to new
                                                                         National Heritage Plan
                                                                     • Organise local
                                                                         consultation for new
                                                                         National Heritage Plan
                                                                 Heritage assessment reports for
                                Assist the planning authority
                                                                 relevant planning applications
                                with heritage information
                                                                 and other development consent
Contribute to the
                                                                 applications.
implementation of the County
                                Provide advice about
Development Plan
                                heritage policy and              Quality of advice.
                                legislation

                                                                     •   Heritage led approaches
Support the maintenance,        Contribute / lead teams to
                                                                         taken.
management and development      facilitate promotion, access
                                                                     •   Support applications to
of Monaghan County Council’s    and conservation best
                                                                         Historic Town Initiative
property portfolio including    practice at heritage sites and
                                                                         and other programmes
Parks and public spaces         public places
                                                                         including public realm.
                                                                 Attendance and reporting at 6
                                                                 steering group meetings for
                                                                 CANN and cross-border agency
                                                                 meetings
Develop and enhance
                                Deliver year 3 of INTERREG
relationships with Regional                                      Co-ordinate Uplands Site work
                                Collaborative Action for the
Authorities to maximise                                          package and 12 work package
                                Natura Network (CANN)
resources of the region,                                         meetings.
                                biodiversity project
especially border communities
                                                                 Deliver targets for Sliabh Beagh
                                                                 as part of project for 2019:
                                                                     • Bog restoration through
                                                                          drain blocking to meet

                                              26
EU Habitats Directive
                                         requirements.
                                     •   Deliver cross-border Fire
                                         Risk Management Plan.
                                     •   Hold local stakeholder
                                         meetings.

                                 Heritage Officer to participate in
                                 EU Work plan for Culture, OMC
Work with European
                                 for Sustainable Cultural Heritage
structures to deliver benefits
                                 Tourism and deliver new
for heritage.
                                 recommendations.

              27
Arts
Develop and manage county Monaghan’s built and natural assets in partnership with other
agencies to best utilise and promote economic, social and cultural benefit of our citizens.
Develop Arts and Culture in Monaghan by giving greater effect to National Policies with special
emphasis on engaging younger generations to become involved and aware of the benefits of Arts
and Culture in self-development and education

Service
                          Service Delivery Strategy Performance Standards
Objectives/Priorities
                          create opportunities for     Artists Grants rolled out and awarded.
                          artists to develop their     Bursary scheme in association with Tyrone
                          practice                     Guthrie Centre.
                                                       Support Artists in residency in conjunction
                                                       with Venue(s) & arts organisation using
                                                       M.O.U.
                                                       Programme of exhibitions/workshops in The
                                                       Market House.

                            Support Arts venues,       Assist in funding applications for the Arts
                           festivals and events &      across a range of funding opportunities,
                                organisation           through Government Depts, the Arts Council
                                                       and other agencies
                                                       Support Festivals and other events in
   Initiate objectives
                                                       optimising the artistic content in their
         from the
                                                       programmes
   Arts Development
                                                       Maintain the Market House as an artist
    Plan 2016-2020
                                                       resource and information space.
                                                       Support the development of a management
            &
                          Engage in the delivery of    structure for the Arts Studio space in Clones.
 The Creative Monaghan
                           a range of art projects     Work in partnership with local stakeholders
     plan 2018-2022
                              and programmes           to assist in the development of artistic
                                                       programmes.
                                                       Work with and develop partnerships with
                                                       the cultural sections within MCC

                            Develop an artist and      Support and develop Art projects under the
                             arts community led        2019 Creative Monaghan programme in
                          initiatives under creative   conjunction with the cultural team.
                                   Monaghan
                                                       Deliver arts initiatives under Pillar 2 of the
                                                       strategies and advance projects that fulfil
                                                       overall C.I. strategy

                                                28
Support children &      Maintain role to with local Arts in education
Young People through      partnership to develop and enhance youth
 arts-based initiatives   programmes in the area.

                          Work with and assist the Music generation
                          programme in fulfilling some of its core
                          objectives.

                          Under pillar 1 of creative Ireland support
                          development that enhance children & young
                          people

                    29
Community Development
In its Corporate Plan, Monaghan County Council is committed to ensuring that everyone in our
community has an opportunity to become actively engaged in shaping the future development of the
County. Monaghan County Council is committed to leading the promotion and support of Social
Inclusion and access to services through the review, development and implementation of its strategies.
The Council’s priorities and objectives in the area of Community Development are outlined below,
together with the performance standards to be met.

 Service Objectives/
                              Service Delivery Strategy          Performance Standards
 Priorities
                                                                 LCDC process operated in line
                                                                 with guidelines as revised and
                                                                 issued by DRCD
                              Manage and administer the
                                                                 NOAC Y2: % of nominees to LCDC
                              LCDC and sub-structures
                                                                 membership via the PPN
                                                                 structures from the most
 Facilitate and support the
                                                                 marginalised SICAP groups
 work of the Local
                              Deliver and monitor community      Local and Community
 Community Development
                              actions of the Local Economic      programmes delivered
 Committee (LCDC)
                              and Community Plan (LECP)          Annual monitoring reports
                              Implement Mid Year Review of       Mid Year Review of LECP
                              LECP                               conducted
                              Implement changed to LCDC on
                              foot of Departmental review of     Any changes implemented.
                              LCDCs Nationally.
                              Manage the implementation          Programme delivery delivered in
                              and monitoring of the LEADER       line with LDS and targets
                              programme in Monaghan              achieved.
                                                                 Staff trained for delivery of
                              Article 48 Check process
                                                                 Article 48 checks and checks
                              commenced and delivered
                                                                 carried out as required.
                                                                 Achievement by programme
                                                                 implementer of headline targets
                              Manage delivery of the Social
                                                                 and actions
                              Inclusion & Community
                                                                 Expenditure v agreed SICAP
                              Activation programme (SICAP)
                                                                 budget.
                              in Monaghan.
 Lead and manage                                                 Mid-Year and End Year Reviews
 Economic, Social and                                            conducted.
 Community Development        Manage and implement range
                                                                 Programmes delivered, and
 Programmes                   of DRCD funding programmes,
                                                                 funding made available to
                              i.e., Clár, T&V, CEP, Rural Rec,
                                                                 groups.
                              Community Day/Weekend, etc
                                                                 County Monaghan Peace IV
                                                                 Action Plan implemented
                              Implement and monitor the
                                                                 Project activity undertaken
                              PEACE IV programme
                                                                 Spend targets achieved
                                                                 Progress monitored
                              Implement and monitor the          Letter of offer conditions
                              ‘Peace Campus’ project under       approved
                              the regional Shared Spaces         Project activity undertaken
                              PEACE IV programme                 Spend targets achieved

                                                 30
Service Objectives/
                               Service Delivery Strategy          Performance Standards
Priorities
                                                                  Progress monitored

                               Implement delivery of Healthy      Actions delivered
                               Ireland Fund Action Plan
                               Manage and support the Health      9 meetings held
                               & Wellbeing sub committee
                               Develop Healthy Monaghan           Healthy Monaghan Strategy
                               Plan                               produced
                               Support delivery of Interreg
                                                                  Project commenced in line with
                               Project on extension of Ulster
                                                                  programme requirements.
                               Canal Greenway
                               Scope next section of              Route scoped & costed
                               Greenway, from Smithboro to
                               Clones, in anticipation of new
                                                                  Steering committee in place,
                               National programme of funding
                                                                  terms of reference agreed for the
                               being announced in 2019
                                                                  project, design brief devised,
                               Commence work on the
                                                                  budget in place to commission a
                               Innovation/ Science Park
                                                                  designer to proceed to full design
                               concept at Tullyherim site along
                                                                  stage
                               greenway
                                                                  Funding programme rolled out
                               Manage and administer the
                               Community and Environment
                               Fund
                                                                  Community fund presentation
                                                                  event held
Work to strengthen local
                               Support Local Community            Property Marking Scheme in
community groups by
                               sector and Community               place & running well
supporting the Local
                               Development initiatives            A county-wide Community Text
Community Sector in
                                                                  Alert system set up
developing local initiatives
                               Local communities supported
                               by producing Local Community
                               Plans’, 8 per year, until all
                                                                  Four community plans from 2018
                               communities have a plan in
                                                                  finalised and published.
                               place.
                                                                  Eight community plans
                               Each community met once a
                                                                  completed during 2019.
                               year to review progress once
                               plan is in place.

                               Work with agencies and
                                                                  Funding applications made
                               partners to develop suitable
                                                                  Improved governance
                               project ideas and make
                                                                  Action plans prepared
                               successful funding applications
Support the Public                                                Projects identified and
Participation Network          Identify potential sources of      progressed to application stage
(PPN) in realising its role    funding for initiatives            Actions delivered
and function                                                      Quarterly meetings

                                                  31
Service Objectives/
                            Service Delivery Strategy            Performance Standards
Priorities
                            Provide development support
                            to community networks:
                                - Public Participation
                                    Network (PPN)
                                                                 No. Of meetings held
                                - Community Reps
                                                                 Training events held
                                    Network
                                - Tidy Towns Network
                                - Community Safety
                                    Network
                                - Older Peoples Network
                                - Women’s Network
                                - Arts Network
                                - Youth Network

                            Act as an information conduit
                            for groups, passing on
                                                                 Produce quarterly newsletter
                            information on funding
                                                                 Maintain Facebook page
                            opportunities, training,
                                                                 Maintain Community section of
                            fundraising ideas etc as well as
                                                                 Council website
                            motivating, keeping them in
                            touch, giving case studies,
                            project ideas, contact details for
                            help with projects etc
                                                                 NOAC Y1: Participation in
                                                                 Comhairle na nÓg scheme
Support young people to
have a say in their         Manage and deliver Comhairle
                                                                 Programme delivered as per
community & local           na nÓg programme.
                                                                 Action Plan.
decision making.

                            Equality Impact assessment on        Equality Impact assessment
                            customer service delivery            template developed.
                            methods
                                                                 Equality Impact assessment on
                                                                 customer service delivery
                                                                 methods complete.

                            Development of Public Sector         Public Sector Duty pilot project
                            Duty plan for Monaghan County        and case study produced and
                            Council                              launched.

                                                                 Public sector duty plan
                                                                 developed for Monaghan County
                                                                 Council that sets out the actions
                                                                 required in (IHREC ACT 2014).

                                                                 Inclusive consultation process
Promote equality and        Development of Monaghan Age          completed.
inclusion for all service   Friendly Strategy 2019-2024.         Age Friendly Strategy produced
users by developing cross                                        and launched.
departmental actions and

                                                32
Service Objectives/
                                Service Delivery Strategy            Performance Standards
Priorities
policies the support                                                 Establishment of new Older
universal access to the                                              people’s network.
services of Monaghan
County Council                  Develop and deliver Disability       Information workshop with staff
To raise awareness among        action plan for Monaghan             on implementing: Inclusive
staff on the diversity of our   County Council 2019                  playground policy, Inclusive
population and the                                                   consultation policy delivered.
barriers some service users
may experience when                                                  Disabled parking awareness
trying to access services.                                           raising campaign and signage
Facilitate and support the                                           programme delivered.
work of the Local
Community Development                                                Local Election 2019 awareness
Committee (LCDC)                                                     programme delivered.
                                Develop brief cultural profile of    Customer cultural profile
                                county Monaghan and the              produced and circulated to all
                                barriers to accessing services       staff.
                                experienced in our
                                communities.
                                Co-ordinate and support the          6 meetings of Equality
                                work of Monaghan Equality            subcommittee held
                                Sub-committee.

                                Support the implementation of        Customer cultural profile
                                4 social inclusion related actions   produced and circulated to all
                                within Monaghan LECP                 service providers

                                                                     Equality Impact assessment
                                                                     template and guide developed
                                                                     and launched with all service
                                                                     providers

                                                                     Local Election 2019 awareness
                                                                     programme delivered.

                                                                     Social Inclusion week 2019
                                                                     delivered
                                Co-ordinate and facilitate the       6 meetings of Drugs and Alcohol
                                work of Monaghan Drugs and           forum held
                                Alcohol forum within Monaghan
                                LCDC

                                Support the implementation           False Identification campaign
                                Monaghan Drugs and Alcohol           delivered
                                strategy
                                                                     Research into substance misuse
                                                                     in Traveller community
                                                                     completed

                                                    33
Service Objectives/
                              Service Delivery Strategy           Performance Standards
Priorities
                                                                  Service delivery protocol
                                                                  pathway developed
Support Youth                 1 -Co-ordinate and support the      Nine meetings of Network held
Organisations in delivering   work of Monaghan Youth
and developing local          Network
initiatives                   2 – Support the implementation      Actions delivered
                              of youth related actions
Increase Opportunities for    1 – Identify and deliver projects   Three Projects Developed
Youth Development             in each MD
Initiatives in each MD        2 – Support MD’s and Comm           Playground Strategy produced
                              Dev to develop playgrounds
                              plan.
Develop a Migrant             1 - Profile of migrants in the      Migrant Integration/Inclusion
Integration/Inclusion         county produced.                    Strategy produced and launched.
Strategy for County           2 - Inclusive consultation
Monaghan                      process completed.

                              Finalise and Launch the new         New Plan launched by end Q1
                              strategic plan
                              Devise annual operational plan
                                                                  No. of programmes delivered
                              to target specific population
                                                                  (15) targeting rural communities,
                              groups in Co. Monaghan
                                                                  females, people with a disability,
                              (including Children, Older
                                                                  young people, older adults
                              Adults, People with a disability)
                              Support mass participation          Number of National Events
                              events and national events for      Supported (4)
                              play or recreation (e.g.,           At least 1,000 people in the
                              Operation Transformation            County participating across all
                              National Walk, National Bike        events
                              Week, National Play Day,
                              National Recreation Week)
                                                                  50 Teachers to have attended
                              Support programmes directed         training supports
                              at Primary Schools                  20 Schools participating in
                                                                  programmes
                                                                  Education & Training timetable
                                                                  developed Q1 and min 10
                              Support Club development
                                                                  training courses provided for
                              through training and education
                                                                  sports club volunteers 2019
                              timetable
                                                                  Grant Scheme processed
                                                                  New systems in place to add with
                              Develop strong communication
                                                                  communications to general
                              and information systems
                                                                  public vis newsletter, e-zine, etc
                              Deliver on proposed initiatives     Programme of supports
Lead the increased
                              funded by Healthy Ireland           programmes developed for
participation in sports and   including participation             Childcare Services including,
physical activity among all   programmes for Pre-School age       Buntús Training, Balance Bike and
sections of the community     Children in conjunction with        Fundamental Movement Skills
in the county
                              County Childcare Committee          Men’s Community Activity
                              and Men’s Activity Programme        developed and coordinated

                                                  34
Service Objectives/
                      Service Delivery Strategy            Performance Standards
Priorities

                      Finalise and launch new
                                                           New Strategic Plan launched by
                      Strategic Plan for Monaghan
                                                           end Q1
                      Sports Partnership

                      Devise annual operational plan       No. of programmes delivered
                      to target specific population        (15) targeting rural communities,
                      groups in Co. Monaghan               females, people with a disability,
                      (including Children, Older           young people, older adults
                      Adults, People with a disability).
                      Support mass participation           Number of National Events
                      events and national events for       Supported (4)
                      play or recreation (eg Operation
                      Transformation National              At least 1,000 people in the
                      Walk, National Bike Week,            County participating across all
                      National Play Day, National          events
                      Recreation Week)

                      Support programmes directed          50 Teachers to have attended
                      at Primary Schools                   training supports
                                                           20 Schools participating in
                                                           programmes

                      Support Club development             Education & Training timetable
                      through training and education       developed Q1 and min 10
                      timetable                            training courses provided for
                                                           sports club volunteers 2019

                                                           Grant Scheme processed

                      Develop strong communication         New systems in place to add with
                      and information systems              communications to general
                                                           public vis newsletter, e-zine, etc
                      Deliver on proposed initiatives      Programme of supports
                      funded by Healthy Ireland            programmes developed for
                      including participation              Childcare Services including ,
                      programmes for Pre-School age        Buntús Training, Balance Bike and
                      Children in conjunction with         Fundamental Movement Skills
                      County Childcare Committee
                      and Men’s Activity Programme         Men’s Community Activity
                                                           developed and coordinated

                                          35
You can also read