MICROWAVE FACILITY

   UNIMI-OAC COLLABORATION REVIEW MEETING
                                                  Università degli Studi di Milano
                                                               13th February 2014

P. Battaglia, F. Cavaliere, S. Incorvaia, E. Pagana, L. Stringhetti, G. Toso, G. Trevisan
Introduction
The Sardinia Radio Telescope (SRT) is a major radio astronomical facility
located near San Basilio (Cagliari) for:

 radio astronomy
 geodynamical studies
 space science

SRT is a collaboration among:

 Istituto Radio Astronomia (Bologna)
 Cagliari Observatory (Cagliari)
 Arcetri Astrophysical Observatory (Florence)
UNIMI-OAC Collaboration Contract
Three main workpackages:

 WP 1000 – Scientific Objectives
 WP 2000 – Synergy with enterprises for technological development
 WP 3000 - Education
WP 2000 – Synergy with enterprises

                                       WP 2000
                              Synergy with enterprises
                                 for technological
                                   development

    WP 2010             WP 2020                      WP 2030             WP 2040
Microwave facility   SMEs involvment             Microwave facility   SMEs involvment
   (Lombardy)          in Lombardy                   (Sardinia)         in Sardinia
WP 2010 – MW Facility in Lombardy
Object
Carrying out of an RF anechoic chamber dedicated to scientific research
and SEMs enterprises.

RF Anechoic Chamber
Room designed to completely absorb electromagnetic waves in order to
simulate a quiet open-space of infinite dimension.
WP 2010 – MW Facility in Lombardy
Requirements
  Ability to test antenna radiation patterns and antenna sub-systems
  Frequency operative range: 10 GHz – 150 GHz
  Possibility to extend the operative range to frequencies > 150 GHz
(compliance to future demands of TC market, enterprises and scientific
research)

                  CONSTRAINTS         IN-HOUSE SKILLS
           Budget                  RF engineering, design and
                                   test
           Time                    Mechanical Design
                                   Mechanical Manufacturig
WP 2010 – MW Facility in Lombardy
             The start
WP 2010 – MW Facility in Lombardy
            The building
WP 2010 – MW Facility in Lombardy
            The building
WP 2010 – MW Facility in Lombardy
            The building
WP 2010 – MW Facility in Lombardy
            The building
WP 2010 – MW Facility in Lombardy
     The building: TX and RX supports
              (INAF, Milano)
WP 2010 – MW Facility in Lombardy
     The building: TX and RX supports
              (INAF, Milano)
WP 2010 – MW Facility in Lombardy
     The building: TX and RX supports
              (INAF, Milano)
WP 2010 – MW Facility in Lombardy
Thecnical characteristics:

 RF anechoic chamber dimensions: 400 cm x 330 cm x 840 cm
 sides covered with Very High Performance (VHP) Eccosorb type NRL-2
and NRL-4*
 Eccosorb Geometric Properties

Eccosorb Electromagnetic Properties

* NRL-suffix refers to its compliance with the fire retardancy requirements of the U.S. Naval Research Laboratory (NRL) test
8093
WP 2010 – MW Facility in Lombardy
Actual Configuration
WP 2010 – MW Facility in Lombardy
Final Configuration
WP 2010 – MW Facility in Lombardy
Equipment (available)
  RX: ORBIT FR azimuth positioner medium duty AL-1260-1 (vertical
load: 9000 kg; 1.3 rpm; standard accuracy: ± 0.03 deg)
WP 2010 – MW Facility in Lombardy
Equipment (available)
  RX: ORBIT FR azimuth positioner medium duty AL-1260-1 (vertical
load: 9000 kg; 1.3 rpm; standard accuracy: ± 0.03 deg)
  ORBIT FR Controller AL-48062 (6 axis with built-in PCU)
WP 2010 – MW Facility in Lombardy
Software
      Work progress:

      1 – Approach to Labview programming Study!
      2 – Lock-in programming, via GPIB, using an old
      workstation
      3 – Buy Workstation and USB/GPIB interface
WP 2010 – MW Facility in Lombardy
Software
      Work progress:

      1 – Approach to Labview programming Study!
      2 – Lock-in programming, via GPIB, using an old workstation
      3 – Buy Workstation and USB/GPIB interface
      4 – Write a Labview VI to control ORBIT FR Positioner with AL-
      48062 Positioner Controller
      5 – Software upgrade to manage multiaxis control and data
      acquisition from VNA. (To be completed!)
WP 2010 – MW Facility in Lombardy
Actual Configuration

                Positioner and VNA Addresses
WP 2010 – MW Facility in Lombardy
Actual Configuration

                       Motion Parameters setting Panel
WP 2010 – MW Facility in Lombardy
Parameters Setting Panel

    Common Parameters:
    - Contains all necessary parameters to perform all motion
    modes;
    Limits :
    -Contains Limits and Offset values, which are not necessary
    Bus Increments:
WP 2010 – MW Facility in Lombardy
Parameters Setting Panel

   Common Parameters:
   - Contains all necessary parameters to perform all motion modes;
   Limits :
   -Contains Limits and Offset values, which are not necessary
   Bus Increments:
WP 2010 – MW Facility in Lombardy
Parameters Setting Panel

   Track to Target:
   -Sets a movement (direction, Speed) of one or two selected
   axes until a target position is reached
   -If Data Acquisition is enabled, reads angular position and
   Values from VNA and plots them on the dinamic Graph
   Synchronization
WP 2010 – MW Facility in Lombardy
Parameters Setting Panel

   Slew Mode:
   -Sets a movement (direction, Speed) on one selected axis
   until a STOP command (quit) is given;
   -Allows direction changes;
WP 2010 – MW Facility in Lombardy
Code Philosophy

   Based on State Machine (JKI State Machine):
WP 2010 – MW Facility in Lombardy
Code Philosophy

   Based on State Machine (JKI State Machine):
WP 2010 – MW Facility in Lombardy
Code Philosophy

   Based on State Machine (JKI State Machine):
WP 2010 – MW Facility in Lombardy
Code Philosophy

 Based on State Machine (JKI State Machine):
 Read and Write Commands performed with VISA Blocks (Agilent GPIB interface)
WP 2010 – MW Facility in Lombardy
Next Steps
 - Study VNA Manual to upgrade the VI with VNA settings
 - Ask Anritsu the possibility to temporary borrow a similar VNA for
   testing procedures.
 - Optimization
WP 2010 – MW Facility in Lombardy
Equipment (available)

 TX and RX aluminum supports
 Maximum height : 1,5 m
 Adjustable in height (50 mm steps)
 Maximum I/F flexibility
WP 2010 – MW Facility in Lombardy
Equipment (available)
  Agilent N1914A Power Meter (dual channel)
  Agilent N8487A Power Sensor (thermocouple; 50 MHz ÷ 50 GHz;
 -35 ÷ +20 dBm, 0.3 µW ÷ 100 mW)
  Agilent 8487D Power Sensor (diode; 50 MHz ÷ 50 GHz; -70 ÷ -20 dBm,
1e-7 mW ÷ 0.01 mW)
WP 2010 – MW Facility in Lombardy
Equipment (available)
   Quantity      Description           Note       Part Number   Manufacturer
               Standard Gain Horn
       2                             Gain 20 dB     23240-20    FLANN/DSPM
               (33-50 GHz WR22)

                Standard Gain Horn
       2                             Gain 20 dB     22240-20    FLANN/DSPM
              (26.4-40.1 GHz WR28)

              Waveguide to 2.4mm
       2                                           23093-TF30   FLANN/DSPM
              Coax Adaptor WR22

              Waveguide to 2.4mm
       2                                           22093-TF30   FLANN/DSPM
              Coax Adaptor WR28

               Straight Waveguide
       2                                                        FLANN/DSPM
                  section WR22
               Straight Waveguide
       2                                                        FLANN/DSPM
                  section WR28
WP 2010 – MW Facility in Lombardy
Equipment (ordered)
 TX ORBIT FR Roll Positioner AL-160-1P (light duty, operating load: 23
kg, 1.5 rpm, standard accuracy: ± 0.02 deg)
 RX ORBIT FR Roll Positioner Al-360-1P30 (light duty, operating load:
30 kg, 30 rpm, standard accuracy: ± 0.25 deg)
 splitter J box and cables to I/F with ORBIT FR Controller AL-48062

                   Height: 31,3 cm
                   Weight: 18 kg

Time for delivery - 30 days from order (order will be processed this
week).
WP 2010 – MW Facility in Lombardy
Equipment (call for bids running)

 VNA System ANRITSU:
 Vector Network Analyzer (VNA) MS4647B
 RF Signal Generator MG3697C (GPIB connection to VNA), 2 to 70 GHz
 Test Set SM5922A
 Automatic Calibration Kit 36585V
 V(f) – V(m) Cable 1m
 Diode Sensor 10 MHz to 18 GHz

Time for delivery
35 days (from February 3 rd to complete the procedure for the call
(9 th March)
90 days for VNA system delivery (10 th June)
WP 2010 – MW Facility in Lombardy
Equipment (under evaluation)

   Cables - ANRITSU will be contacted at the end of February to define
  details of the cable forniture.
   Particular attention will be dedicated to:
1. RF Signal Generator position (GPIB cable lenght constraints; RF
  signal cable)
2. cables routing inside the chamber

Time for task completion: 3 weeks
WP 2010 – MW Facility in Lombardy
Equipment (under evaluation)

     TX, RX linear stages
1.   manual movement (possible upgrade to remote control)
2.   30 kg load capability for both stages
3.   TX stage with x and z direction movements
     (x total travel: 100 mm ± 0.1 mm; z total travel: 200 mm ± 0.1 mm)
4.   RX stage with x and y direction movements
     (x total travel: 100 mm ± 0.1 mm; y total travel: 300 mm ± 0.1 mm)

Time for task completion: 4 weeks (TBC).
WP 2010 – MW Facility in Lombardy
RF Anechoic Chamber Validation Test

  Antenna test on a 30 GHz feed horn with test repetition at France
  Telecom - Orange Labs (La Turbie, FR) [from september 2014]
  LSPE focal plane (?)
  Low gain maritime VSAT antenna (dual gain antenna)

  Future: near field upgrade; frequency upgrade (>150 GHZ)
WP 2020 – SMEs Involvment in Lombardy
Small and Medium Enterprises
In Europe, there are three broad parameters which define SMEs:

 micro-entities (companies with up to 10 employees)
 small companies (up to 50 workers)
 medium-sized enterprises (up to 250 employees)

Moreover the annual turnover is not exceeding 50 million euro, and/or an annual
balance sheet total not exceeding 43 million euro.
WP 2020 – SMEs Involvment in Lombardy
Object
Carrying out of an RF facility and built of a staff with RF skills (design,
engineering, testing, reporting).

What have been done
  identification of SMEs located in Lombardy and, more generally, on
Italy
  visit to the Tecnolambro premises in Miradolo Terme (PV)
WP 2020 – SMEs Involvment in Lombardy
What to do
 Inauguration of the facility (INAF MI, OAC, INAF BO, ARCETRI, POLI-
TO, Officina Dipartimento di Fisica UNIMI, POLIMI)

point out the synergy
(ability to realize the DUT to be tested in the RF facility)

 extend the participation to the inauguration to ESOC (Piermario Besso)
and ESTEC (Luca Salghetti Drioli)

 Workshop with SMEs
WP 2020 – SMEs Involvment in Lombardy
                  AZIENDA             TIPOLOGIA                 INDIRIZZO
   Compagnia Generale per lo Spazio      ME           Via Gallarate, 150 20151 Milano
   Elettronica Aster S.p.A.                       Via Longoni, 110 20825 Barlassina (MB)
   Faini Telecommunication Systems                Via Firenze, 11 20063 Cernusco s/n (MI) –
   S.r.l                                                             Italy
                                                    Via Manzoni Alessandro, 39 – 20010
   Gemelli S.p.A.
                                                             Canegrate (MI)
                                                   Via Rosselli, 30 – 21018 Sesto Calende
   G. Barberi S.n.c.
                                                                      (VA)

   HUAWEI

   Italiana Ponti Radio                               Via Ca' Bassa, 67 – 21100 Varese
                                                    Strada Statale, 11 – 20060 Cassina de
   Jabil
                                                                    Pecchi
                                                    Via Edmondo De Amicis, 49 – 20123
   Positech S.r.l.
                                                                Milano
                                                     Via Senatore Simonetta, 26 20667
   Sira
                                                              Caponago (MB)
                                                   Via Lodi, 86 21042 Caronno Pertusella
   Belco s.r.l.                          SE
                                                                    (VA)
   TECNOLAMBRO snc di PASQUINI                     Via degli Spinedi, 20 - 27010 Miradolo
                                         SE
   P. & M.                                                       Terme (PV)
WP 2020 – SMEs Involvment in Lombardy

                 AZIENDA               TIPOLOGIA                        INDIRIZZO
  AEROSOFT S.p.A.                   ME (150 employees)     Centro Direzionale, 7/E 80143 Napoli
  AEROSTUDI s.r.l.                  SE (20 employees)       Via A. Gregorcic, 31 34170 Gorizia
  MOREGGIA                                 ME                  Via Borgone, 25 10139 Torino

  DEMA S.p.A.                               -                 Via Partenope, 5 80121 Napoli

  MEDIA LARIO TECHNOLOGIES s.r.l.          ME            Località Pascolo, 23842 Bosisio Parini (LC)

  OMPM s.r.l                               ME                 Via Fontana, 5 84012 Angri (SA)

  COSPAL COMPOSITES s.r.l.                 ME            Via Aldo Moro, 8 24030 Ambivere (BG)

  PASQUALI MICROWAVE SYSTEMS               SE            Via del Palazzo dei Diavoli, 124b Firenze

  AEROSEKUR S.p.A.                         ME               Via delle Valli, 46 04011 Aprilia (LT)

  FLYBY s.r.l.                             SE                   Via Puini, 97 57128 Livorno