Long Term Plan Schedule update for the LTP 2021/2031 - October 2020
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Schedule Phase three and four Phase three –Mid 2020 May Phase four – Late 2020 April • Maori contribution to decision making July • Prepare engagement strategy • Strategic Assets • Activity profiles (Session 2) • Activity review (Session 1) • Revenue and Financing Policy • Infrastructure projects / AMPs • LoS review/ Performance Measures • Growth Assumptions • Financial Strategy • Infrastructure Strategy • Engagement concepts – Deferred June • Treasury policy (Seen by ARF – Proposed adoption at August Meeting) • Policy review • Remission Policies – Deferred Aug • Ratings • Remissions Policies (Deferred to September) • Financial Strategy - Deferred July • Revenue and Financing • Significant Forecasting Assumptions (Deferred June to October) • Significance and Engagement • Asset Management Plans (AMPs) including August priorities • Draft Infrastructure strategy • S&E Policy • Activity Profiles (Session 3 - additional) • Climate Change • Engagement concepts 2
Schedule Phase three and four September December March • Activity Profiles (Session 4 -additional) • Adopt Significance and Engagement policy • Formal consultation • Infrastructure Strategy tba • CD concepts and draft April • Financial Strategy - Final • Adopt AMPs • Submissions and Hearings • Revenue and Financial Policy - Final Phase six –Mid 2021 October Phase five –Early 2021 May • Preparation of CD concepts January • Review budgets and update from consultation • Financial forecasts • Audit CD • Formal audit • DC Policy (moved from Sept) February June • Financial Contributions (moved from July) • Council decision making • Final LTP adopted • Significant Forecasting Assumptions • Adopt all outstanding source documents November • Adopt CD for consultation • Adopt Ratings policies • Adopt Revenue and Financing policies • Adopt Infrastructure Strategy • Adopt Financial Strategy • Review of outstanding source documents 3
Financial Strategy Long Term Plan Briefing 08 July 2020 This Photo by Unknown Author is licensed under CC BY-SA
Auditor-General Councils are forecasting higher spending to improve levels of service and fund normal Comments operations Councils need to better manage and reinvest in their existing assets Councils face a risk of only spending 66% of their capital expenditure Councils funding sources are continuing to increase-rates and debt 2
A local authority must ensure that each year’s projected LGA s100 operating revenues are set at a level sufficient to meet that Balanced Budget year’s projected operating expenses Depreciation is an operating expense We use funded depreciation in the first instance to fund renewals In the year 2021/22, Council will increase funded depreciation on water, wastewater and stormwater assets to 100% (currently 67%) with the exception of the MWWS which wont be 100% funded until 2025 (currently 55%) Some councils reduce funding depreciation on libraries and hall We don’t have many non essential assets 1% rates $346,000 3
Challenges – We can’t have everything Costs/Recoveries coming up to think about $000 Depreciation up to 100% on water/wastewater excl. 150 MWWP One-off harvesting fees 200 Rotu intake slip 99 21/22 188 for 3 years Regional economic CCO 25-89 Asset Management increase ?? Maintenance on new walking/cycling ?? Dargaville Community Capital works previously funded 250 by financial contributions New Capital Projects ?? Maintenance/ depreciation on new capital projects ?? 4
Key Drivers Key Drivers Drivers 2018 LTP Drivers 2021 LTP Balance Sheet Balanced Budget Balanced Budget Financially resilient Attention to risk management to be more financially resilient Equitable and sustainable funding Strong Balance Sheet Debt Reducing risk and quantum of debt Manage debt Meeting debt ratios Meeting debt ratios Prudently use debt Capital Expenditure Just in time policy as regards capital Delivery of new capital program as specified expenditure Maximum funding of depreciation on all strategic assets (Do we need to consideration what not to fund) Asset Renewals Avoid loan funding for operational Minimal changes to level of service expenditure by increasing Aging Infrastructure - Reinvest in infrastructure to address depreciation levels historical underinvestment - Additional renewals Base levels of service and no extras Bridges Water Renew/Upgrade public assets?? Rates Rates affordable LGCI plus allow for improvements Treat the district equitably Recognise COVID-19 impacts on affordability Growth Have a sustainable plan Recognition of high growth district- Change in population and land use Sustainable growth supported by Spatial Plan, additional infrastructure provided for, and development and financial contributions for Mangawhai, Kaiwaka, Maungaturoto Climate Smart / Sustainability Climate change resilient Investigate Carbon footprint 5
Key Challenges Key Challenges Key challenges 2018 Key Challenges 2021 Asset Renewals Didn’t have full asset information Reality of Aging Infrastructure and Get preferred approach to renewals Affordability funding by 2021 Smooth out the maintenance programme Renewals deferred as long as possible to Improve the whole network resilience ensure affordability Much of the depreciation on infrastructure is unfunded (MCWWS until 2025) Rates Revaluation moved the incidence of rates Revaluation (always in an LTP year) could change the incidence again Small population and economic base Economic Growth within Kaipara especially Holiday and visitor population Mangawhai Drought on communities Development Holiday and visitor population Govt money - Consider impact on maintenance and funded depreciation thereby impacting on rates Climate Smart/ Decline in markets for Recyclables may mean recognising local NZ demand Sustainability Know our carbon emissions Customer Services Frontline and back office services Getting the right balance with digital neglected improvements and staffing 6
Solutions Solutions Solutions 2018 Solutions 2021 Debt Seek external advice on debt management Access better interest funding rates Borrowing used minimally Refinancing large tranche of debt Debt will be used to fund desludging Middle of the pack debt per ratepayer Sale of assets to decrease debt Capital Expenditure Ensure development contributions maximised Use financial contributions for capital for east Maximise external funding-look for partners, identify alternative funding Asset renewals Renewals cleared over a 30-year period Renewals cleared over a 30-year period Get preferred approach to renewals funding by Smooth out the maintenance programme 2021 Improve the whole network resilience Rates Mangawhai differential rate to fund capital Revenue and Financing Policy reviewed Historic separation of Te Kopuru wastewater Implement forestry rate till 2027 UAGC fair Capitalise 50% interest on development contributions. Rest funded by general rate Economic Development • Regional CCO Climate Smart Kaipara Adaptation Action Plan Kaipara Mitigation Action Plan Kaipara Sustainability Action Plan Further waste minimisation Customer Service Investment in technology and staff as service levels below desired levels, statutory obligations not being addressed, IT failing in support 7
Thank You Sue Davidson GM Sustainable Growth & Development sdavidson@kaipara.govt.nz Kaipara District Council 8
Activity Profiles Review of activity profiles for the Long Term Plan 2021/31
Groups of Activities Recap of the proposed Groups 2
Feedback Based on your feedback from the previous briefing the below changes have been made. These changes will be reviewed at the LTP Briefings in August and September. • Keep the activity Pensioner Housing • Economic Development should be it’s own Activity • Keep the activity Northern Wairoa War Memorial within DL,F and IS Hall • Keep District Leadership, Finance and Internal • Include the sources of Funding in the activity Services as the name for the activity template (Also in R&F Policy) • District Planning sit along with Policy due to • Include risks and issues as well as Significant budgets Negative effects in the template • Re look at the name Community Development • Sub-activity Wharves should fit under Open Spaces and not Transportation 3
Groups of activities 1. Open Spaces and Facilities Open Spaces Community Development Libraries Pensioner Housing Northern Wairoa War memorial Hall District Leadership, Finance and Internal Services Governance 2. Policy and District Planning Emergency Management Economic Development Internal Services: • Financial Services • P&C • Digital Services • Communications • Customer Services 3. Flood protection and Land Drainage Flood protection and land drainage Transportation Roading and footpaths 5. Waste minimisation Refuse and recycling 6. Water Supply Water supply 7. Stormwater Stormwater 8. Wastewater Wastewater 9. Building, Resource consents and Compliance Resource consents Building Compliance Add a footer 4
Feedback General Feedback 5
Activities Review Building, Resource Consents and Compliance Add a footer 6
Feedback on each activity We would like feedback on: 1) Performance Measures 2) What we will deliver Please note that proofing and design is still to be done and Feedback content changes will be amended as budgets are determined Each Activity Manager will discuss their activity profile for feedback 7
Building, Resource consents and Compliance • Resource Consents • Compliance • Building Add a footer 8
Building Proposed sections in the Activity Profile for the LTP 2021/2031 Add a footer 9
Resource Consents Proposed sections in the Activity Profile for the LTP 2021/2031 Add a footer 10
Compliance Proposed sections in the Activity Profile for the LTP 2021/2031 Add a footer 11
Thank You Michaela Borich +64 9 4391196 mborich@kaipara.govt.nz Kaipara District Council 12
KAIPARA INFRASTRUCTURE STRATEGY & Strategic Activity Management Plans Seeking direction and feedback as we progress towards a Consultation Document in November 2020. 1
Kaipara District Infrastructure Strategy 1.1 PURPOSE AND SCOPE Why do we need an The purpose infrastructure strategy? The purpose o f th is d o cu m e n t is to id e n tify th e sign ifica n t in fra stru ctu re issu e s The Local Government Act fo r Ka ip a ra District Co u n cil (KDC, o r ‘Co u n cil’) o ve r a 30-ye a r p e riod . Th is in clu d e s (2002) stipulates that a local id e n tifica tion o f p rin cip a l o p tio n s fo r m a n a gin g th o se issu e s a n d th e im p lica tion s authority must , as part of its o f th o se o p tion s. long-term plan, prepare and adopt an infrastructure In a way that co n trib u te s to th e lo n g-te rm su sta in a b le m a n a ge m e n t o f Co u n cil's strategy for a period of at least in fra stru ctu re . 30 consecutive financial years. So that fin a n cia l a n d im p le m e n ta tio n co n se q u e n ce s o f Co u n cil’s vision , co m m u n ity p rioritie s a n d stra te gie s a re a n a lyse d , u n d e rsto o d a n d in te gra te d in to Co u n cil’s p rim a ry fo rwa rd p la n n in g d o cu m e n t - th e KDC Lo n g Te rm Pla n . The LTP is a ten year programme and we will need to prioritise what we do in this period against what we can afford 2 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 1.3 KAIPARA DISTRICT INFRASTRUCTURE STRATEGIC FRAMEWORK The strategic framework diagram shows the interrelationships between Council’s key strategy documents as they relate to the infrastructure area. The highest level is the vision and community priorities. The next level is the Spatial Plans and District Plan that guide development and signals the infrastructure required in the future. To service the infrastructure requirements from the spatial plans and to keep maintaining the core assets, four large programmes are proposed within this strategy. The Activity Management Strategy outlines the individual activity plans that provide the detail on the infrastructure activities including condition, level of service, valuation, forecast expenditure and issues. The two bottom levels show the Infrastructure Strategy Financial Strategy significant projects currently proposed within the programmes and activity plans. These projects are not an exhaustive list but show some of the more significant and diverse range of projects Council is proposing over the upcoming two LTP cycles. 3 Re silio Stu d io | AR+Asso cia te s
Kaipara District Infrastructure Strategy 1.2 LONG TERM PLAN TIMEFRAME The Infrastructure Strategy is part of a suite of strategy documents that form part of the Council Long-Term Plan (LTP). This LTP process details KDC’s investment priorities over the next 10 years. The current LTP 2018-2028, was adopted by Council in 2018. The LTP is reviewed every three years, with the Annual Plan providing the opportunity to review the impact of this process on a yearly basis. 4 Re silio Stu d io | AR+Asso cia te s
Kaipara District Infrastructure Strategy 1.3 KAIPARA DISTRICT INFRASTRUCTURE STRATEGIC FRAMEWORK RELATIONSHIPS BETWEEN STRATEGIC DOCUMENTS: This diagram shows the relationships between Council’s ECONOMIC DEVELOPMENT Spatial Plans, future Economic STRATEGY KAIPARA SPATIAL PLANS DISTRICT PLAN Development, Structure Plans (Mangawhai Spatial Plan Key Urban (Whole of Plan Review or Rolling Review and other key planning Areas - Dragavilles, Maungatūroto & through Plan Changes) Kaiwaka Sub-Regional Spatial Plan) STRUCTURE PLAN documents. It also shows how (For Key Urban Areas, Urban Centres and Neighbourhoods) the Infrastructure Strategy will play an important role in determining future infrastructure investments for INFRASTRUCTURE STRATEGY Kaipara’s Key Urban Areas (Dargaville, Maungatūroto and Kaiwaka) by Council to enable DRAFT LONG TERM PLAN FINANCIAL STRATEGY LONG TERM PLAN sustainable development and (Infrastructure Funding) (Reviewed every three years) renewal of its existing asset network. ACTIVITY MANAGEMENT PLANS The Kaipara Spatial Plans, as well as the strategy documents (economic development, infrastructure and financial) operate on a 30 year planning horizon. The LTP and District Plan operate on a 10 year horizon, while the Annual Plan is based on a 3 year horizon. 5 Re silio Stu d io | AR+Asso cia te s
Ka ip a ra District In fra stru ctu re Stra te gy 1.5 VISION AND MISSION VISION Growing a better Kaipara MISSION Nurturing our people and place by inspiring a vibrant, healthy and caring community 6 Re silio Studio Resilio Stu d io || AR+Associates AR+Asso cia te s
Kaipara District Infrastructure Strategy 1.6 COMMUNITY OUTCOMES Climate Smart Climate change and its impacts are reduced through community planning Celebrating Diversity Our local heritage and culture are valued and reflected in the community Vibrant Communities Kaipara communities offer an attractive place to live and visit Healthy Environment Our natural environment is protected and open to the community Prosperous Economy Development is encouraged, supported and sustainable A Trusted Council An open organisation working for our community 7 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 1.7 TRENDS AFFECTING KAIPARA Population Growth Kaipara’s population growth from 2013 -2019 has made it the fastest growing district in Northland As part of the requirements for the Infrastructure Strategy , a Economic Changes summary of the trends that Agriculture and manufacturing are the main drivers of Kaipara’s economy, and have seen continual growth over recent years. However, there remains uncertainty in the wake of the COVID -19 pandemic. could affect Kaipara, and therefore the future provision of infrastructure have been provided under four themes as shown on the right. Climate Change and Sea Level Rise The provision and maintenance Climate change will increase the frequency and severity of extreme weather events in Kaipara, including sea level rise, but also drought, as has been observed in 2019/2020 of infrastructure in Kaipara is a continuous, long-term effort to ensure the continuation of sustainable development and enabling people to thrive in Regionally Significant Infrastructure Projects Kaipara. Numerous significant regional level infrastructure projects will have an influence on future development patterns in the Kaipara District. Understanding what the future holds for Kaipara, both within and outside district borders, is crucial to enable Council to make educated planning decisions for local infrastructure. 8 Resilio Studio | AR+Associates
Ka ip a ra District In fra stru ctu re Stra te gy 1.7 TRENDS AFFECTING KAIPARA - REGIONALLY SIGNIFICANT INFRASTRUCTURE PROJECTS Th is m a p d e p icts th e fu tu re in flu e n ce o f so m e o f th e re gio n a lly sign ifica n t p ro je cts if o r wh e n th e y a re re a lise d . 9 Re silio Stu d io | AR+Asso cia te s
Ka ip a ra District In fra stru ctu re Stra te gy 1.8 WHAT ARE OUR INFRASTRUCTURE CHALLENGES? Aging infrastructure Over the past three years, Many of Kaipara’s infrastructure assets are approaching or past their useful life, particularly its water the Council has engaged supply and wastewater assets. Significant expenditure can be expected on renewal work in the future. broadly as part of projects such as the Spatial Meeting customer expectations and legislative requirements Planning for Dargaville, Maungatūroto, Kaiwaka and Mangawhai, Kaipara Kaipara’s residents have expectations for infrastructure in the district, which is a challenge for Council’s Wharves Feasibility Study, financial capacity. Additionally, the planning framework (national, regional and local) significantly as well as public meetings changes Council’s ability to meet Levels of Service. and residents surveys. The feedback provided an analysis conducted as part Recognising the need and providing for resilience of the Activity Management Plans, which has helped to Kaipara’s infrastructural networks must be endowed with the capacity to endure and recover from shape the district’s key shocks, particularly from natural events (drought, flooding, etc.) brought on by climate change. infrastructure challenges into five categories. Balancing how to fund new infrastructure Kaipara will be faced with many competing funding priorities, and a careful balance must be struck to meet the expected level of growth in local communities over the short, medium and long-term. Uncertainty around waste minimisation Recycling rates in Kaipara are low; meanwhile, uncertainty remains as central government strategies for waste minimisation are still being finalised. 10 Re silio Stu d io | AR+Asso cia te s
Ka ip a ra District In fra stru ctu re Stra te gy 1.8 WHAT ARE OUR INFRASTRUCTURE CHALLENGES? BALANCING HOW TO FUND NEW INFRASTRUCTURE As identified in the Sub- Regional Spatial Plan, Kaipara will need to plan the provision of appropriate infrastructure for the various towns and villages in the district. Infrastructure investment will be particularly required in the Key Urban Centres, Service Towns and Local Villages. 11 Re silio Stu d io | AR+Asso cia te s
PART 2 - RESPONSES 12
Kaipara District Infrastructure Strategy 2.7 HOW WE PLAN TO Nga Pou E Wha - The Four Pillars TACKLE OUR CHALLENGES AND OPTIMISE OUR Customer -centric Te Aranga Design OPPORTUNITIES Circular Economy Managing Demand Design Principles This section looks at the In fra stru ctu re ca n e n a b le Th e wo rld ’s d o m in a n t Th e ke y o b je ctive o f th e Te We a im to m a ke th e b e st u se o f principles of how we approach a n d su p p o rt th e wid e r e co n o m ic m o d e l ca n b e Ara n ga Prin cip le s is to e n h a n ce th e in fra stru ctu re we h a ve b y our work (Nga Pou e Wha) and o u tco m e s o u r co m m u n ity ch a ra cte rise d a s ‘ta ke , th e p ro te ctio n , re in sta te m e n t, u sin g te ch n o lo gy a n d d a ta a s the strategies we engage with to a re lo o kin g to a ch ie ve . Th is m a ke a n d wa ste ’. In a d e ve lo p m e n t a n d a rticu la tio n th e b a sis fo r o u r re n e wa ls a n d assist us to achieve our goals. p rin cip le se e ks to b e circu la r e co n o m y, o f m a n a wh e n u a cu ltu ra l ca p ita l u p gra d e p ro gra m m e . in clu sive a n d in vo lve th e re so u rce s a re n e ve r la n d sca p e s, e n a b lin g a ll o f u s to Th e p ro ce ss o f d e m a n d Our response to these trends, co m m u n ity d u rin g th e a b a n d o n e d to b e co m e co n n e ct to a n d d e e p e n o u r m a n a ge m e n t p ro vid e s Co u n cil challenges and opportunities is d e sign p h a se o f p ro je cts, so wa ste . Ou r 2017 Wa ste ‘se n se o f p la ce ’. Th e se with a h igh le ve l to o l to id e n tify built around Nga Pou e Wha - th a t in te gra tio n o f Min im isa tio n Stra te gy p rin cip le s we re d e ve lo p e d in wh e re in fra stru ctu re gro wth is the four pillars. These four co m m u n ity, p a rtn e rs a n d sign a ls a ste p ch a n ge in Te Ara n ga m a ra e in Ha wke s Ba y like ly to o ccu r o ve r a p e rio d o f sta ke h o ld e rs a re re d u cin g o u r d isp o sa l to b y Mā o ri d e sign p ro fe ssio n a ls tim e . It e n a b le s a n a tu ra l, pillars have a basis in the four co n sid e re d a lo n gsid e o th e r la n d fills in Ka ip a ra . We will a s a fra m e wo rk fo r p e o p le n o t stru ctu re d gro wth o f th e p u b lic wellbeings - social, cultural, d rive rs in th e d e cisio n - lo o k fo r o p p o rtu n itie s to fa m ilia r with th e th e te a ro syste m to o ccu r. With o u t th is environmental and economic. In m a kin g p ro ce ss. We wo rk with in d ivid u a ls a n d Mā o ri - th e Mā o ri wo rld vie w - to typ e o f a sse ssm e n t, a d h o c this case, a “Kaipara-focused” re co gn ise th a t p ro je cts o rga n isa tio n s wh o e n ga ge a n d le a rn . We will se e k d e ve lo p m e n t o f lo ca lise d a sse ts lens has been applied. The sh o u ld n o t h a p p e n in re co gn ise th is p rin cip le . to e n ga ge e a rly, e sp e cia lly o n o ccu rs a n d ca n le a ve a relevance of these pillars to our iso la tio n , b u t sh o u ld b e Th is will h e lp u s to se e th e p ro je cts th a t a re se n sitive to b u rd e n so m e , so m e wh a t work is explained in the adjacent p a rt o f a wid e r p la ce -b a se d p o ssib ilitie s a ro u n d o u r m a n a wh e n u a a n d e sta b lish re d u n d a n t le ga cy fo r Co u n cil to table. a p p ro a ch (re fe r to Ka ip a ra wa ste a n d m a in te n a n ce h o w b e st we ca n e n su re th a t o p e ra te a n d m a in ta in . De m a n d Sp a tia l Pla n s). Th is m o re o p e ra tio n s so th a t we a re a d e q u a te tim e a n d re so u rce s m a n a ge m e n t stra te gie s p ro vid e The third and fourth pillars (Te co lla b o ra tive , p a rtn e rsh ip - re d u cin g th e im p a ct o n a re se t a sid e fo r m e a n in gfu l, a lte rn a tive s to th e cre a tio n o f Aranga Principles and Managing b a se d typ e o f a p p ro a ch will o u r e n viro n m e n t a n d fru itfu l d ia lo gu e a n d fo llo w-u p n e w a sse ts in o rd e r to m e e t b e ke y to p ro vid in g a m o re cre a tin g o u r o wn Ka ip a ra a ctio n s. d e m a n d a n d lo o k a t wa ys o f Demand) relate to how we seek in te gra te d in fra stru ctu re circu la r e co n o m y. m o d ifyin g cu sto m e r d e m a n d s to fulfil our Treaty partnership re sp o n se . so th a t th e u tilisa tio n o f e xistin g obligations and the mechanism a sse ts is m a xim ise d a n d th e by which we manage demand in n e e d fo r n e w a sse ts is d e fe rre d our activity programmes. o r re d u ce d . 13 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 2.1 OUR OPPORTUNITIES - INTRODUCING THE FOUR KEY PROGRAMMES In response to the infrastructure challenges and external trends affecting the Kaipara District, four strategic programmes have been developed to prioritise and coordinate significant infrastructure improvements. This approach will also inform who Council will collaborate with to achieve the programme goals. 1. Northland to 2. North Kaipara 3. Ancient Auckland Corridor Agricultural Delta Kauri Coast 4. Building Resilience 14
Ka ip a ra District In fra stru ctu re Stra te gy 2.2 KEY PROGRAMME 1: NORTHLAND TO AUCKLAND CORRIDOR PROGRAMME Th is m a p d e p icts th e a re a o f in flu e n ce th a t th is p ro gra m m e co u ld h a ve o ve r th e p la n n in g a n d in fra stru ctu re co o rd in a tio n fo r th is co rrid o r. 15 Re silio Stu d io | AR+Asso cia te s
Kaipara District Infrastructure Strategy 2.2 KEY PROGRAMME 1: NORTHLAND TO AUCKLAND CORRIDOR PROGRAMME SIGNIFICANT PROJECTS 1. Maungatūroto Growth (Spatial Plan) 2. Kaiwaka Growth (Spatial Plan) 3. Mangawhai Growth (Spatial Plan) 4. Increase in water storage capacity at Baldrock Dam to support Maungatūroto and Kaiwaka 5. Water reticulation in Kaiwaka 6. Water Supply for Mangawhai and possible reticulation 7. Wastewater treatment plant upgrades at Mangawhai 8. Tourism Infrastructure Projects for select communities ... Maungatūroto and Kaiwaka 9. Waste minimisation (washing, shredding, recycling) 16 Resilio Studio | AR+Associates
Ka Kaipipaara ra District DistrictInInfra frastru structu cture re Stra Stratetegy gy 2.3 KEY PROGRAMME 2: NORTH KAIPARA AGRICULTURAL DELTA PROGRAMME Th is m a p d e p icts th e e xte n t o f th e ... ltu ra l d e lta , wh e re th e a gricu p ro p o se d wa te r sto ra ge p ro je cts a n d p o te n tia l irriga tio n a re a co u ld d e ve lo p a n d to wn s it e n ca p tu re s. 17 Re silio Stu d io | AR+Asso cia te s
Kaipara District Infrastructure Strategy 2.3 KEY PROGRAMME 2: NORTH KAIPARA AGRICULTURAL DELTA PROGRAMME 1. Assessment of stopbanks and level of service and alignment with adaptation SIGNIFICANT PROJECTS decision -making, and ownership 2. North Kaipara Agricultural Delta[MS1] – Te Kopuru to Dargaville, Dargaville – Awakino Point East and Raupo Stopbanks PLACEHOLDER SLIDE 3. Upgrade and repair key transport structures to meet HPMV requirements eg. Demonstrate the projects on the map once agreed by Council. sthe Kaiwaka -Mangawhai bridge Pop outs if there is visuals. 4. Work with NZTA to upgrade detour routes alongside the SH1 corridor. [MS2] 5. Water Storage and security of water supply for communities as above. (ties into below point, Resilience and replacement of old infrastructure too) 6. Contribution towards the cost of investigating new water storage infrastructure in western Kaipara. 7. Contribution towards development of new water storage infrastructure in western Kaipara. 8. Sludge System Reuse 9. Dargaville Growth (Spatial Plan Projects) 10. Dargaville TIP, 11. Waste Minimisation (washing shredding recycling) 18 Resilio Studio | AR+Associates
Ka ip a ra District In fra stru ctu re Stra te gy 2.4 KEY PROGRAMME 3: ANCIENT KAURI COAST PROGRAMME Th is m a p d e p icts th e e xte n t o f th e An cie n t Ka u ri Co a st p ro gra m m e , su p p o rtin g th e e xistin g tra ve l ro u te fro m e a st co a st to we st co a st sh o wca sin g th e h isto ric a n d d istin ctive p la ce s o f in te re st. 19 Re silio Stu d io | AR+Asso cia te s
Kaipara District Infrastructure Strategy 2.4 KEY PROGRAMME 3: ANCIENT KAURI COAST PROGRAMME 1. North Kaipara - De ve lop a n d o p e n th e Ka ih u Va lle y Tra il a lo n gsid e a cco m m o d a tion a n d to u rism in itia tive s SIGNIFICANT PROJECTS - Pre m ie r Pa rk - Ta h o ro a Do m a in u p gra d e s a ro u n d Ka i Iwi La ke s ... 2. Central Kaipara - Im p le m e n t th e first p h a se o f th e Da rga ville To wn sh ip Im p ro ve m e n t Pla n , in clu d in g Ho kia n ga Ro a d , rive rsid e cycle p a th a n d in te rse ctio n im p ro ve m e n ts - Pre m ie r Pa rks - Po u tu te Ra n gi/Ha rd in g Pa rk d e ve lop m e n t p la n - Pa rks p ro je cts? To ile ts, ROSIF, Fre e d om Ca m p in g p ro je cts? Ne w sp o rts p a rk? - Da rga ville to Ma u n ga tū ro to He a rtla n d Tra il - Da rga ville Po n to o n 3. Poutō Peninsula - Ne w wh a rf a t Po u to Po in t - Se a lin g th e Po u to Ro a d 4. Kaipara Harbour - Re n e wa l o f th e Pa h i Wh a rf - Esta b lish m e n t o f a b e a ch la n d in g o p p o rtu n ity a t th e a n ce stra l m a ra e o f Ara p a o a a n d Oru a wh a ro 5. East Kaipara - De ve lop (in p a rtn e rsh ip with WDC) th e Bryn d e rwyn s Cycle Tra il a n d a sso cia te d Mo u n ta in Bike Pa rks - Co n tin u e to im p le m e n t th e Ma n ga wh a i Co m m u n ity Pla n in clu d in g th e sh a re d p a th n e two rk a n d Ma n ga wh a i Co m m u n ity Pa rk 20 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 2.6 BUILDING RESILIENCE Th is m a p d e p icts th e Ka ip a ra to wn s, villa ge s a n d se ttle m e n ts co n n e cte d th ro u gh in fra stru ctu re th a t fo rm th e e sse n tia l n e two rk wh ich th e co m m u n ity re lie s u p o n to live , wo rk a n d p la y. 21
Kaipara District Infrastructure Strategy 2.5 KEY PROGRAMME 4: BUILDING RESILIENCE INTO OUR ASSET NETWORK SIGNIFICANT PROJECTS Capital Projects Projects to be denoted on 1. Dargaville Water Storage map once agreed by Council. 1. Dargaville Water Security 1. Dargaville Growth – Spatial Plan 1. Water Treatment Upgrades Investigation 1. Maungatūroto Water Security 1. Maungatūroto Growth Projects 1. Kaiwaka Water Supply 1. Mangawhai Water supply 22 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 2.6 HOW THE PROGRAMMES COME TOGETHER Th is m a p s d e p icts h o w th e p ro gra m m e s co m e to ge th e r a n d in te rse ctio n with e a ch o th e r, a t ke y ju n ctio n p o in ts a n d th e in te rre la tio n sh ip with Ka ip a ra ’s n e igh b o u rin g d istricts. 23
Kaipara District Infrastructure Strategy 2.6 HOW WE PLAN TO TACKLE OUR CHALLENGES AND OPTIMISE OUR OPPORTUNITIES The Programme Management Office (PMO) aims to centralise all KDC projects by aligning them to the governance framework and being responsible for collecting and coordinating all related information to measure and define project delivery. We have focused on the standardisation of all project deliverables and the methodology of how projects should be approached and delivered using best practice principles and tools. The objectives of the PMO are; ● Implement a common methodology and governance ● Standardise terminology and deliverables ● Introduce effective repeatable project management processes ● Provide common supporting tools ● Improve levels of project success within the organisation Figure#. The PMO Framework - how we manage projects 24 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy Kaipara Procurement Objectives: ● Th e Pro cu re m e n t te a m will o ve rse e ● We will se e k to cre a te critica l 2.6 HOW WE PLAN TO p re -q u a lifica tio n re q u ire m e n ts, m a ss a n d th u s a ch ie ve gre a te r TACKLE OUR CHALLENGES AND ● De live r sa fe ly - a co m m itm e n t to wh ile a lso fo cu sin g o n re la tio n sh ip s e fficie n cy. Th is co u ld b e u tilisin g OPTIMISE OUR OPPORTUNITIES with a p p ro ve d su p p lie rs a n d re gio n a l b u yin g p o we r to re d u cin g h a rm to u s a n d th e p e o p le ve n d o rs. Th e le ve l o f p re - in cre a se wh a t we b u y in a sin gle in vo lve d in o u r su p p ly ch a in q u a lifica tio n re q u ire d will b e a ctivity, o r p a cka gin g wo rk in ● Cre a tin g a n d d e m o n stra tin g p u b lic PROCUREMENT STRATEGY va lu e th ro u gh o u r a ctivitie s with re la te d to th e le ve l o f risk o f th e o n e give n a re a give n a ctivity. ● We will ge n e ra te co lla b o ra tive p a rticu la r fo cu s o n : ● Pro cu re m e n t Pla n s will b e o p p o rtu n itie s b y im p ro vin g o u r Our Procurement Strategy 2019 ○ Go o d p rice ; d e ve lo p e d , a n d will in clu d e re la tio n sh ip s with o u r Re gio n a l details how Council seeks to ○ Go o d q u a lity a n d we igh tin gs to re fle ct Pro cu re m e n t Co u n cils, su p p lie rs a n d o th e r ○ Go o d o u tco m e s. conduct its procurement Ob je ctive s; co n sid e r o p p o rtu n itie s a ge n cie s. ● Im p ro ve th e e fficie n cy o f th e wa y we fo r p a cka gin g o f wo rk to p ro vid e activities. Procurement is one of p ro gre ss p ro je cts th ro u gh th e ir stro n ge r p ip e lin e s o f wo rk; a n d the most important aspects of life cycle to d e live r th e ca p ita l in co rp o ra te sa fe ty e xp e cta tio n s Council’s role in facilitating p ro gra m m e th ro u gh e a ch p ro je ct’s life cycle . delivery of infrastructure ● In cre a se th e a b ility o f o u r Iwi, services and activities that co m m u n itie s a n d b u sin e sse s’ in promote community wellbeing Ka ip a ra to p a rticip a te in Co u n cil in Kaipara. Council has sought a ctivitie s; PROCUREMENT STRATEGY- BROADER OUTCOMES to align its procurement ● In cre a se th e size a n d skill le ve l o f th e approach with good practice su p p ly ch a in d e live rin g wo rk in Ka ip a ra ; expectations set out by central ● Su p p o rt th e tra n sitio n to a ze ro n e t government. e m issio n s a n d p ro m o te e fficie n t u se o f re so u rce s. The way which Council conducts its procurement activities for infrastructure How will we implement our paves the way for broader Procurement Objectives? cultural, economic, environmental and social ● Th e Pro cu re m e n t te a m (with in outcomes in Kaipara. This is In fra stru ctu re Se rvice s) will b e encapsulated by our Broader re sp o n sib le fo r th e im p le m e n ta tio n o f Outcomes, shown in the th e Pro cu re m e n t Stra te gy a n d will adjacent figure. e n su re stro n g o ve rsigh t, go ve rn a n ce a n d d ire ctio n . 25 Resilio Studio | AR+Associates
PART 3 - ACTIVITY MANAGEMENT STRATEGY 26
Kaipara District Infrastructure Strategy 3.0 ACTIVITY MANAGEMENT STRATEGY This Strategy applies to the following activity groups : Kaipara’s infrastructure safeguards our environment TRANSPORT Safer roads, bridges, footpaths and cycleways and enables our communities to be functional and connected. The collection, treatment and disposal of quality potable drinking WATER SUPPLY water in a cost-effective, sustainable and environmentally-friendly THREE WATERS The Activity Management Strategy focuses on manner renewals programmes and renewals investment to get the best long term outcome WASTEWATER The management, treatment and disposal of sewage and reduce ongoing maintenance costs The management of discharges and collecting of contaminants in a STORMWATER Our Activity Management manner that protects the environment and public health Strategy is comprised of seven activity groups, each FLOOD PROTECTION administered through an Flood control schemes, river alignment control, and land drainage AND CONTROL Activity Management Plan (AMP). The Activity Management Plans are Reduce waste, increase recycling and resource recovery for the described in the adjacent SOLID WASTE protection of the environment and human health figure. Each AMP summarises RESERVES AND Maintain a diverse range of reserves and open spaces assets Council’s strategic and long- OPEN SPACES term management approach for provision and maintenance of the given asset. 27 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 3.1 ACTIVITY MANAGEMENT STRATEGY- TRANSPORT Direction Place based spatial plans discussion needed- Mangawhai ● Less focus on sealed roads Dargaville Kaiwaka Maungatūroto ● More focus on unsealed roads Network Operating Framework ● More focus on providing adequate drainage Business case implementation: Township improvement plans ● More focus on bridge renewals ● Continued focus on safety including speed management ● More focus on resilience improvements ● Continuation of the shared path programme ● Continuation of intersection improvements 28 Resilio Studio | AR+Associates
Ka ip a ra District In fra stru ctu re Stra te gy 3.1 ACTIVITY MANAGEMENT STRATEGY- TRANSPORT Major Capital Expenditure 2041/4 203 2021/ 2022/ 2023/2 2024/2 2025/ 2026/ 2027/ 2028/ 2029/ 2031/2032 2 to Description 0/20 22 23 4 025 26 27 28 2029 2030 to 2040 2050/2 31 051 Cycle wa ys - To u rism Cycle Tra ils (TCT) Cycle wa ys - Urb a n Active Tra n sp o rt Ne two rk (UATN) All cycle wa ys Un in fla te d 2.5 2.3 5.3 1.2 1.2 3.9 3.7 3.7 3.7 3.0 15.0 15.0 Co st ($m ) Major Capital Expenditure 2041/4 2030 2021/2 2022/2 2025/2 2026/ 2027/ 2028/ 2029/2 2031/2032 2 to Description 2023/24 /203 2 3 6 27 28 2029 030 to 2040 2050/2 1 051 Cycle wa ys - To u rism Cycle Tra ils (TCT) Un in fla te d Co st ($m ) 29 Re silio Stu d io | AR+Asso cia te s
Kaipara District Infrastructure Strategy 3.2 ACTIVITY MANAGEMENT Water Supply STRATEGY- WATER SUPPLY It is critica l fo r co n sta n t, a d e q u a te , a re p ro vid e d with wa te r so m e tim e s th e m with su sta in a b le d rin kin g wa te r su sta in a b le a n d h igh q u a lity wa te r to re d u cin g th e su p p ly fo r o th e r su p p ly. b e su p p lie d to Ka ip a ra d istrict’s in d u stria l p ro d u ctio n . Th e re a re a lso p re -e xistin g ra w wa te r re ticu la te d a re a s fo r d o m e stic Five co m m u n ity wa te r su p p ly su p p lie s fo r a gricu ltu ra l p u rp o se s in co n su m e rs, gro wth a n d lo ca l sch e m e s cu rre n tly ru n fo r Da rga ville th e Ka ih u (Da rga ville ) a n d Water Supply Overview e co n o m ic d e ve lo p m e n t. Te rrito ria l (in clu d in g Ba ylys Be a ch ), Glin ks Gu lly, Ma u n ga tū ro to b u lk wa te r m a in s th a t a u th o ritie s p la y a m a jo r ro le in th e Ru a wa i, Ma u n ga tū ro to a n d h a ve a h isto rica l o b liga tio n s b y su p p ly o f wa te r. Wa te r su p p ly Ma n ga wh a i (se e m a p ), p ro vid in g The main purpose of this Co u n cil fo r th e su p p ly o f n o n -p o ta b le a ctivitie s e n su re s th a t co m m u n itie s activity is the planning and wa te r. management of reliable supply of sufficient and safe drinking water. Water supply is critical to our economic and social well-being, and with external factors affecting our communities such as climate change, measures are required to be put in place to safeguard this precious resource. This activity management strategy relates to the storage, treatment and supply of quality potable drinking water. 30 Resilio Studio | AR+Associates Figure #. Lo ca tio n s o f Ka ip a ra ’s five co m m u n ity wa te r sch e m e s
Kaipara District Infrastructure Strategy 3.2 ACTIVITY MANAGEMENT STRATEGY- WATER SUPPLY Condition of Water Supply d e m o n stra te d in re ce n t n e two rk, u p gra d e s n e e d to b e Assets d ro u gh t co n d itio n s). m a d e b a se d o n a n e e d s/co n d ition -b a se d crite ria Th e Co u n cil fa ce s h isto ric Da ta a ro u n d a sse t co n d itio n s is first, ra th e r th a n o n th e b a sis o f issu e s a ro u n d a gin g a n d p o o r sp a rse in ce rta in a re a s, a n d a sse t d e sign life . co n d ition o f in fra stru ctu re . fu rth e r in ve stiga tio n is Condition of Water Supply re q u ire d to o p tim ise a sse t Assets Th is re su lts in a n in cre a se d risk m a n a ge m e n t p ra ctice s. o f fa ilu re a n d sign ifica n t re p a ir co sts. Wa te r su p p ly is A p ra gm a tic a p p ro a ch is Kaipara’s water supply b e co m in g m o re a n d m o re re q u ire d , with p a rticu la r fo cu s infrastructure is aged and in critica l with clim a te fo re ca stin g o n p o o r q u a lity a sse ts. Du e to largely poor condition. More b e in g in cre a sin gly e xtre m e (a s th e sh e e r vo lu m e o f th e a gin g accurate data is required to fully understand the true extent of all the water assets’ condition. Figure #. Co n d itio n o f Wa te r Su p p ly Asse ts 31 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 3.3 ACTIVITY MANAGEMENT Co u n cil o p e ra te s six co m m u n ity Th e p u rp o se o f th e se sch e m e s is STRATEGY- WASTEWATER wa ste wa te r sch e m e s (se e Figure to p ro te ct p u b lic h e a lth b y #) in Da rga ville , Glin ks Gu lly, p ro vid in g re lia b le wa ste wa te r Ka iwa ka , Ma u n ga tū ro to , se rvice th a t m in im ise s a d ve rse Te Ko p u ru a n d Ma n ga wh a i. e ffe cts o n th e e n viro n m e n t. Wastewater Overview The wastewater activity focuses on protecting public and environmental health by collecting and treating wastewater prior to its discharge into receiving environments. Continued growth, as well as the need to provide for visitors in peak periods (particularly in coastal communities), have resulted in Council’s ongoing commitment to significant wastewater infrastructure development. The Council undertakes asset management, planning, operation and maintenance of these wastewater schemes, including capital and refurbishment programmes, consent monitoring and continuous maintenance through its network contractors.. Figure # -Kaipara District Council’s Six Wastewater Schemes 32 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 3.4 ACTIVITY MANAGEMENT Locations of Council’s syste m s p re d o m in a n tly re gu la r a n d e xtre m e ra in fa ll STRATEGY- STORMWATER Stormwater Schemes in co rp ora te d in to th e ro a d e ve n ts, wh ilst co lle ctin g n e two rk a re p ro vid e d in Glin ks co n ta m in a n ts to p ro te ct th e Th e Ka ip a ra District Co u n cil Gu lly, Ke lly’s Ba y, Pa h i, e n viro n m e n t. o p e ra te s five co m m u n ity Wh a ka p ira u , Ma u n ga tū ro to , sto rm wa te r d ra in a ge sch e m e s Th e d ra in a ge sch e m e s a re a Tin o p a i, Pa p a ro a a n d Ma ta ko h e . fo r Da rga ville , Ba ylys Be a ch , Te m ixtu re o f o p e n d ra in s, p ip e s, Activity Overview Ko p u ru , Ka iwa ka a n d Th e se a ct to re m o ve a n d m a n h o le s a n d su m p s. In fo rm a tio n Ma n ga wh a i. Sto rm wa te r d isch a rge sto rm wa te r in su rro u n d in g th e se a sse ts is The purpose of the stormwater va ria b le . activity is to plan and manage for drainage of normal and extreme water storm events. The provision of sustainable stormwater systems is about finding a balance between maintaining and enhancing natural watercourses and providing piping to enable urbanisation to occur while collecting and treating stormwater runoff rom the effects of urbanisation prior to it entering the receiving environment water such that they are not detrimentally affected. Figure # - Lo ca tio n o f Sto rm wa te r Sch e m e s 33 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 3.6 ACTIVITY MANAGEMENT Solid Waste Overview a t Ha ka ru a n d Da rga ville ; a ctivitie s co m p ly with th e STRATEGY- SOLID WASTE re cyclin g d rop o ffs a t o u r two le gisla tio n . We a lso cle a r ille ga lly Th e Co u n cil p ro vid e s tra n sfe r sta tio n s a n d litte r b in s in d u m p e d ru b b ish a n d re m o ve two tra n sfe r sta tio n s fo r ke y a re a s th ro u gh o u t th e a b a n d o n e d ve h icle s. ge n e ra l wa ste a n d re cyclin g Ka ip a ra District. Le a ch a te d isp osa l; we e kly ke rb sid e p o llu tio n is m a n a ge d fro m re cyclin g in ke y u rb a n a re a s Activity Overview h isto ric la n d fills to p ro te ct fro m Ma n ga wh a i to e n viro n m e n ta l q u a lity; Da rga ville ; tra n sfe r sta tio n s a n d clo se d la n d fill Kaipara District aims to reduce waste and promote a circular economy. The solid waste activity purpose is to collect and distribute the communities disposal and recycling products to meet our statutory obligations and community needs. Thedecisions we make on managing solid waste directly affect our communities and our environment. We need to ensure that this service is affordable, hygienic and environmentally sustainable, which contributes to our well-being, by protecting and enhancing our natural assets and open spaces. 34 Resilio Studio | AR+Associates
PART 4 - NEXT STEPS 35
Ka ip a ra District In fra stru ctu re Stra te gy 4.0 SIGNIFICANT DECISIONS DISCUSSION POINTS - Initial Significant Decisions The following are a series of key We will protect Raupo, Dargaville and Te Kopuru decisions that are deemed significant and which underpin ● Climate change data indicates that we will see higher sea levels (see trends section ( Part 1.7 ), the strategic direction where coupled with more intense storm events; this requires conscious decisions to be made around Council is heading. which areas need to be protected and which areas will need to be a retreat. For the purpose of this Infrastructure Strategy, it has been agreed that: ○ Raupo to Ruawai, and Dargaville to Te Kopuru will be protected with the introduction of water storage/retention and raising of stopbanks (over time). ○ The first three years of the LTP will consider Adaptive Pathways planning and work with communities where adaptation and retreat options could be seriously considered. The strongest growth activity is likely to be in the east ● Future economic and growth data scenarios point towards the towns of Mangawhai, Maungatūroto a n d Ka iwa ka a s a n ticip a te d m a in gro wth a re a s, with la n d id e n tifie d fo r re zo n in g a s p a rt o f re ce n t sp a tia l p la n s. ● To su p p o rt th is a n ticip a te d d e m a n d , th e re will b e a fo cu s o n in ve stiga tin g, d e sign in g a n d co n se n tin g th e in fra stru ctu re n e e d e d to e n a b le su sta in a b le d e ve lo p m e n t, wh ile fu lfillin g cle a r e n viro n m e n ta l sta n d a rd s, with in th e first 3-6 ye a rs o f th e LTP. We will look to form partnerships to assist us deliver our infrastructure ● We h a ve a lre a d y fo rm e d a stro n g wo rkin g re la tio n sh ip with th e Min istry o f Bu sin e ss, In n o va tio n a n d Em p lo ym e n t in d e live rin g th e Ka ip a ra Kicksta rt p ro gra m m e a n d will co n tin u e to fo ste r th is p a rtn e rsh ip in th e p ro gra m m e ’s im p le m e n ta tio n . ● We h a ve fo rm e d a co lla b o ra tio n o f No rth la n d co u n cils to sh a re kn o wle d ge a n d h e lp e a ch o th e r in th e clim a te ch a n ge ch a lle n ge a n d d e ve lo p in g th e te ch n ica l skills n e e d e d to co m b a t it. ● We will se e k to fo rm a lise fu rth e r p a rtn e rsh ip s in th e d e ve lo p m e n t o f th e No rth la n d to Au ckla n d Co rrid o r p ro gra m m e , Ka ip a ra Ha rb o u r p ro je ct d e ve lo p m e n t, iwi le d p ro je cts a n d la rge d e ve lo p m e n t p ro p o sa ls. 36 Re silio Stu d io | AR+Asso cia te s
Kaipara District Infrastructure Strategy 4.0 SIGNIFICANT DECISIONS DISCUSSION POINTS - Revised Significant Decisions MANGAWHAI COMMUNITY WASTEWATER SCHEME Th e Ma n ga wh a i Co m m u n ity Wa ste wa te r Sch e m e wa s co n stru cte d in 2009, a n d wa s o rigin a lly size d fo r 20 ye a rs o f gro wth . In su b se q u e n t ye a rs, th e sch e m e h a s h a d se ve ra l sm a ll u p gra d e s a n d a d d ition a l la n d p u rch a se d fo r tre a te d e fflu e n t la n d d isp osa l (25h a to 65h a ). Th e d ra ft Ma n ga wh a i Sp a tia l Pla n p rop o se d la n d u se ch a n ge s to in cre a se th e ca p a city fo r se rvice d The Mangawhai Community wa ste wa te r fro m th e cu rre n t p o p u la tion o f 5,000 to 15,000-17,000 b y 2043 (u n d e r a m e d iu m Wastewater Scheme (MCWS) is gro wth sce n a rio ). Th e cu rre n t sch e m e is e xp e cte d to re a ch its irriga tion fie ld ca p a city b y 2032 reaching the end of is (a ve ra gin g 70 co n n e ctio n s p e r ye a r). Te ch n ica l re p o rts a lso p re d ict th a t Co u n cil co u ld e xce e d th e ir consentable limits, and is in co n se n tin g lim its fo r n itro ge n re m o va l a s e a rly a s th e su m m e r o f 2026. Th e re is th e re fo re a n e e d need of additional treated to in ve stiga te fu tu re d isp osa l so lu tio n o p tion s fo r a cco m m o d a tin g a n ticip a te d gro wth . effluent disposal solution to continue to receive future Th e th re e sh o rtlist o p tio n s fo r d isp osa l a re : connections post 2032. This significant decision relates to 1. Disch a rge to d isp osa l fie ld (va rie ty o f p o te n tia l o p tio n s) which option Council should 2. Se a Ou tfa ll - p ip e d to a d e e p ch a n n e l X km s o ff Ma n ga wh a i He a d s b e a ch continue to investigate. The 3. Disch a rge to Estu a ry - filte re d th ro u gh a ve ge ta te d b e d b e fo re re le a se d in to th e e stu a ry pros and cons, cost estimates and prefered option are included in this section. 37 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 4.0 SIGNIFICANT DECISIONS NGA MAHI A WAI Māori - WATER STORAGE AND USE PROJECT The Northland Regional Council and MBIE have partnered with Kaipara District Council to explore the potential for converting our high quality soils for higher value horticulture production. This water storage and use project seeks to hold water for irrigation purposes to enable a transition to growing crops like kumara and avocado. Additional employment opportunities could be created both on farms and in processing plants in the towns of Dargaville and Ruawai. Council would like to utilise this project to ensure water security for the towns of Dargaville and Te Kopuru, whose potable water supplies almost depleted due to the drought conditions in 2019. This is considered a significant decision as it is signals significant investment for both economic development and town water supply purposes. 38 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy 4.2 THE FUNDING STRATEGY Consistent with the Local Government Act 2002 (LGA), the Placeholder Table - to be filled in once funding situation is confirmed. Council budgeting process is iterative. Initial budgets are set Major Capital Expenditure with consultation between Uninflated senior management and Description 2020/25 2025/30 2030/35 2035/40 2040/45 2045/50 Key Driver Cost ($m) managers which then Tra n sp o rt workshoped with Council elected members. At the end of Wa te r Su p p ly the LTP workshops, the Council agrees the draft budget it feels Wa ste wa te r is in line with community Sto rm wa te r expectations and is prepared to send out for public Flo o d Pro te ctio n a n d Co n tro l consultation. Based on So lid Wa ste submissions received from members of the community, Re se rve s a n d Op e n Sp a ce s feedback is sent back to the Council for final ratification Co m m u n ity Fa cilitie s before being formally adopted . 39 Resilio Studio | AR+Associates
Kaipara District Infrastructure Strategy Placeholder IMPLEMENTATION 40 Resilio Studio | AR+Associates