KM 450.0 - 451.4 SLIDE STABILIZATION AND SAFETY IMPROVEMENTS
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Public Services and Services Publics et Procurement Approvisionnement Canada Canada Pacific Region région du Pacifique KM 450.0 - 451.4 SLIDE STABILIZATION AND SAFETY IMPROVEMENTS ALASKA HIGHWAY, BC ALASKA HIGHWAY BRITISH COLUMBIA ISSUED FOR TENDER PROJECT No. R.115165.001 MAY 11, 2021
PROJECT LOCATION PLAN DRAWING LOCATION PLAN Public Services and Procurement Canada Services publics et Approvisionnement Canada REAL PROPERTY SERVICES Pacific Region SERVICES IMMOBILIERS FORT NELSON AIRPORT Région du Pacifique MON4521 ISSUED FOR TENDER MUSKWA RIVER BRIDGE GENERAL NOTES: 05 FORT NELSON 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN 1 AL C METERS UNLESS NOTED OTHERWISE AS KA 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE HI GH V ER LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION W RI 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN C104 AY A W AND SLOT DRAINS MAY BE DIRECTED BY THE K US DEPARTMENTAL REPRESENTATIVE DURING WORK M PROPOSED ATV TRAILS 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED PE 0 6 PI PE BB LEC RE C1 LI NE EK M AI R NL 3 IVE IN C10 E AR D SIKANNI ROA SKW MU 2 PROJECT SITE C10 1 C10 D SPIKE 1106 SIKANNI ROA AGE CL ONT AR KE OAD LA Y 8 FR KE A RO HW AH R AD E 29 HIG AY-Y MIL SKA R Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C000-001 COVER & KEY PLAN.dwg [C001] June 13, 2021 - 9:01:16 pm (BY: HORWOOD, ANDREW) E AY KENN RIV ALA HW T G HE HI OP KA PR AS AL SCALE: 1:50,000 SCALE: 1:7,500 DRAWING INDEX LEGEND LINETYPE (EXISTING) LINETYPE (PROPOSED) LINETYPE (EXISTING) LINETYPE (PROPOSED) Revision/ DRAWING DESCRIPTION Revision Description/Description Date/Date Client/client C000 COVER PAGE EDGE OF ACP C001 PROJECT LOCATION PLAN, KEY PLAN, DRAWING INDEX, LEGEND & CONTROL MONUMENTS C101 - C105 ATV TRAIL PLAN - PROFILE 5+100 Public Services and CENTERLINE CENTERLINE OF ATV TRAIL ATV TRAIL DECOMMISSIONED ATV TRAIL C106 ATV TRAIL CONNECTOR PLAN - PROFILE Procurement Canada C107 ATV TRAIL HORIZONTAL ALIGNMENT GEOMETRY & DITCH LAYOUT DETAILS RIGHT OF WAY CONSTRUCTION EASEMENT CONCRETE BARRIERS CONCRETE BARRIERS C201 INTERCEPTOR AND SLOT DRAINS SITE PLAN C202 INTERCEPTOR DRAIN PROFILE WHITE LINE FENCE WELDED GALVANIZED FENCE C203 INTERCEPTOR AND SLOT DRAIN SECTIONS SLOPE FAILURE SHOULDER C204 INTERCEPTOR DRAIN DETAILS C301 ATV TRAIL TYPICAL SECTIONS TOP OF BANK TEMPORARY EXCAVATION - TOP OF CUT W-BEAM BARRIER Project title/Titre du projet C302 - C303 RIPRAP DITCH DETAILS C/F CUT / FILL LINE WATERLINE C304 ATV TRAIL & CONCRETE BLOCK WALL DETAILS 350 5m CONTOUR C305 CONCRETE BLOCK WALL ELEVATION VIEW SWAMP KM 450.0 - 451.4 SLIDE LOCK BLOCK WALL C306 CULVERT TYPICAL SECTIONS & DETAILS STABILIZATION AND SAFETY C307 LOCKABLE REMOVABLE BARRIER AND SIGNAGE DETAILS GABION BASKETS C308 WELDED GALVANIZED FENCE DETAILS OVERHEAD POWERLINE IMPROVEMENTS BRIDGE DECK C309 PRECAST CONCRETE BARRIER DETAILS FIBER OPTIC CABLE ALASKA HIGHWAY, BC C310 WELDED GALVANIZED RAILING DETAILS CONTROL MONUMENT Approved by/Approuve par C311 ATV TRAIL DITCH CROSSING DETAILS GAS LINE G. WILKINS C312 ATV TRAIL DECOMMISSIONING TYPICAL SECTIONS WATER MAIN OIP IRON PIN Designed by/Concept par XSEC-01 - 06 ATV TRAIL CROSS SECTIONS A. HORWOOD / E. YANG XSEC-07 ATV CONNECTOR TRAIL CROSS SECTIONS TREELINE POWER POLE Drawn by/Dessine par XSEC-08 CULVERT CROSS SECTIONS DITCH DITCH A. DEEPWELL LS LUMINARIES PWGSC Project Manager/Administrateur de Projets TPSGC PROJECT CONTROL MONUMENTS CULVERT CULVERT SIGN RELOCATED SIGN A. TAHERI PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC INTERCEPTOR & SLOT DRAIN DP DELINEATOR POST POINT EASTING NORTHING ELEVATION DESCRIPTION Client/client SPIKE 1106 519,482.793 6,515,110.738 369.735 SPIKE FH FIRE HYDRANT Public Services and Procurement Canada MON 4521 519,524.324 6,516,552.515 306.586 CONTROL MONUMENT 3 HORIZONTAL ALIGNMENT CURVE NUMBER Drawing title/Titre du dessin NOTES: BP BEGIN ALIGNMENT PROJECT LOCATION PLAN, KEY 1. ELEVATIONS ARE GEODETIC AND DERIVED FROM DUAL FREQUENCY CARRIER PHASE GPS. OBSERVATIONS PROCESSED USING PWGSC CONTROL MONUMENTS AND POST PROCESSED POSITIONING BC BEGIN OF CURVE PLAN, DRAWING INDEX, LEGEND & 2. CONTROL POINT DATUM: NAD83 EC END OF CURVE CONTROL MONUMENTS CONTROL POINT VERTICAL DATUM: CGVD 28 CONTROL POINT PROJECTION: UTM ZONE 10 3. BASE MAPPING SURVEY FROM APEX SURVEY SOLUTIONS LTD. PERFORMED OCTOBER 2017 AND JUNE 2018 4. CONTROL MONUMENTS NOT LISTED IN THE ABOVE TABLE SHALL NOT BE USED Project No./No. du Sheet/Feuille Revision no./ projet La Révision 5. THE CONTRACTOR SHALL PROTECT EXISTING INFRASTRUCTURE FOR THE DURATION OF CONSTRUCTION. ANY no. DAMAGE OCCURRING DURING CONSTRUCTION TO BE REPAIRED / REPLACED TO EQUAL OR BETTER CONDITION BY THE CONTRACTOR AT NO COST TO THE CONTRACT R.115165.001 C001 0
REALIGN EXISTING ATV TRAIL PERPENDICULAR TO HIGHWAY. LIMIT OF EXISTING NOTES: Public Services and Services publics et N ATV TRAIL DECOMMISSIONING TO BE CONFIRMED IN FIELD. SEE DETAIL ON C311 40 EXISTING ATV TRAIL TO BE DECOMMISSIONED. Procurement Canada Approvisionnement Canada ,4 1. ELECTRICAL CONDUIT AND CABLES BETWEEN LUMINAIRES NOT 519 SEE C312 FOR DETAILS 1.0 Ø BOULDERS. SEE DETAIL ON C311 SHOWN FOR CLARITY. CONTRACTOR TO VERIFY LOCATION 6,5 E REAL PROPERTY SERVICES INSTALL WOOD POST & PRIOR TO CONSTRUCTION. 15, CHECKERBOARD SIGN (W14 - 75x75) 2. SEE C107 FOR ATV TRAIL ALIGNMENT CURVE LAYOUT Pacific Region 200 N GEOMETRY AND RIPRAP DITCH LAYOUT GEOMETRY. ,520 SERVICES IMMOBILIERS INSTALL LOCKABLE REMOVABLE 519 Région du Pacifique BOLLARDS. SEE DETAIL ON C307 6,5 E 35 349 15, 0 348 347 347 348 348 360 ISSUED FOR TENDER 362 361 360 9 N 35 8 35 357 35 35 0 35 48 35 35 35 19, 2 1 6 5 RIPRAP TRAIL AT EXISTING DITCH 4 3 5 CROSSING. SEE C311 FOR DETAILS 6,5 E 15, LS 240 GENERAL NOTES: STA. 5+056.000 START RIPRAP SEE DETAIL 1 O 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE STA. 5+051 13.8m LONG - 600mm Ø CSP CULVERT EX. HWY CL LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION INLET ELEV: 367.199 ALASKA HIGHWAY 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN N 6,515,109.110 DITCH N C302 START OF WELDED GALVANIZED AND SLOT DRAINS MAY BE DIRECTED BY THE E 519,472.944 FENCE STA. 5+055.000 DEPARTMENTAL REPRESENTATIVE DURING WORK OUTLET ELEV: 364.956 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED N 6,515,119.893 D) YE E 519,464.628 VE UR LS SHEET C102) LS NS LS CUT / FILL LINE (U LS AN PROPOSED GALVANIZED WELDED FENCE LS PL LS LS SE LS BA F/C D MATCH LINE STA 5+355 (NEXT F F TE 5+100 FH F MA DP 1 TI 2 ES F/C 5+200 5+300 LS 3 F 4 C C INSTALL LOCKABLE SEE C304 FOR LAYOUT DETAILS REMOVABLE BOLLARDS. OIP SEE C307. EDGE OF ATV TRAIL N 519,469.999 E 6,515,116.354 START LOCK BLOCK WALL HIGHWAY RIGHT-OF-WAY N 519,472.960 E 6,515,115.355 STA. 5+086.336 O/S 1.5 BC HYDRO RIGHT-OF-WAY 368 367 366 36 36 36 36 360 359 358 357 N 5 36 353 3 2 1 354 LIMIT OF ATV T 35 35 20 4 6 5 9,5 TREE CLEARING. SEE C301 FOR DETAILS 51 6,5 E 15, START TREE CLEARING 160 TEMPORARY EXCAVATION CUT LIMITS FOR LOCK BLOCK WALL CONSTRUCTION. AIL CONSTRUC R SEE C304 FOR DETAILS STA. 5+333 MATCH TO EX N 0 ,56 STA 5+045.925 519 SIK N 6,5 E N 6,515,107.25 0 ,60 519 15, E 519,468.579 ISTING ACP AN 200 6,5 E TION 15, NI 280 RO 5 AD 370 370 360 360 18. LIMIT OF CONSTRUCTION STA 5+045.925 EL 367.160 MATCH TO EXISTING ACP Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C101] May 18, 2021 - 11:13:22 am (BY: DEEPWELL, ANDREW) STA 5+050.652 0 5 H 1:500 25m PIVC 368.016 0 0.5 V 1:50 2.5m 368 368 358 358 % 091 Revision/ Description/Description Date/Date Revision Client/client EVC 367.779 BVC 367.588 BVC 365.086 -1 Public Services and 0.0 STA 5+269.908 00 13 VC -6.0 Procurement Canada PIVC 354.442 % 366 K3 366 356 22% 356 EVC 364.097 EXISTING GROUND @ EVC 356.412 HWY 97 CONTROL LINE 5 VC KK0.2 0 EXISTING GROUND @ BVC 355.489 Project title/Titre du projet HWY 97 CONTROL LINE EXISTING GROUND @ ATV TRAIL CONTROL LINE 364 -4.8 364 354 354 KM 450.0 - 451.4 SLIDE 23% EXISTING GROUND @ STABILIZATION AND SAFETY STA 5+086.622 PIVC 364.419 ATV TRAIL CONTROL LINE FINISHED GRADE @ ATV TRAIL CONTROL LINE IMPROVEMENTS FINISHED GRADE @ ATV ALASKA HIGHWAY, BC TRAIL CONTROL LINE 35 VC K 33 EVC 353.212 Approved by/Approuve par BVC 363.143 G. WILKINS STA 5+175.139 362 362 352 352 PIVC 360.149 Designed by/Concept par A. HORWOOD / E. YANG -7. 080 Drawn by/Dessine par % A. DEEPWELL BVC 349.438 PWGSC Project Manager/Administrateur de Projets TPSGC A. TAHERI 19 VC PWGSC, Architectural and Engineering Resources Manager/ K9 Ressources Architectural et de Directeur d'Ingénierie, TPSGC 360 360 350 350 Client/client EXISTING GROUND ELEVATION Public Services and Procurement Canada @ ATV CONTROL LINE (TYP.) Drawing title/Titre du dessin FINISHED GROUND ELEVATION ATV TRAIL @ ATV CONTROL LINE (TYP.) PLAN - PROFILE 124 VC K 104 STA. 5+040 TO STA. 5+355 PIVC 348.763 STA 5+350.128 5+040 5+100 5+200 5+300 5+355 367.081 365.081 355.031 357.434 353.720 352.312 349.480 363.773 362.806 361.809 360.773 359.699 358.585 356.243 350.896 348.536 362.51 350.01 359.84 355.44 354.02 366.28 364.57 363.75 363.13 361.47 359.08 357.77 356.55 352.88 350.88 348.98 367.160 367.160 Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C101 0
NOTES: N 0 Public Services and Services publics et 1. ELECTRICAL CONDUIT AND CABLES BETWEEN LUMINAIRES NOT ,60 519 Procurement Canada Approvisionnement Canada SHOWN FOR CLARITY. CONTRACTOR TO VERIFY LOCATION REMOVE & DISPOSE OF 4.0 LENGTH 6 ,5 E PRIOR TO CONSTRUCTION. OF CULVERT AND BACKFILL WITH REAL PROPERTY SERVICES 15, 327 328 330 329 EXISTING ATV TRAIL TO BE DECOMMISSIONED. 33 33 33 2. SEE C107 FOR ATV TRAIL ALIGNMENT CURVE LAYOUT 1 5 33 2 CRUSHED BASE GRAVEL Pacific Region 340 3 60 341 335 4 342 GEOMETRY AND RIPRAP DITCH LAYOUT GEOMETRY. SEE C312 FOR DETAILS SERVICES IMMOBILIERS 343 6 33 344 337 REMOVE & DISPOSE OF 7.0 LENGTH 345 Région du Pacifique 338 339 346 OF CULVERT AND BACKFILL WITH CRUSHED BASE GRAVEL ISSUED FOR TENDER N 0 ,64 STA. 5+500.000 START IMPERVIOUS SEE DETAIL 2 ON C3 519 END RIPRAP DITCH SEE DETAIL 1 ON C3 PROPOSED SHOULDER 6 ,5 E RECONSTRUCTION. SEE C302 15, SEE TYP VIOUS FILL DIT END IM 600 SEE DET ERCEPTOR DRA S T A RT STA. 5+6 GENERAL NOTES: P N 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN ICAL IN E 0 ,60 AIL 3 ON R 31.200 T 519 METERS UNLESS NOTED OTHERWISE 02 FILL DITCH 02 S 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE 6 ,5 E E C LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION 15, PROPOSED GALVANIZED WELDED FENCE T C3 0 2 IO 480 DAYLIGHT OF CUT/FILL LS LS 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN N A ON LS AND SLOT DRAINS MAY BE DIRECTED BY THE LS DEPARTMENTAL REPRESENTATIVE DURING WORK CH IN C203 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED LS LS LS (NEXT SHEET C103) XT SHEET C101) 5+500 7 5+600 C/F F 8 F F F F 5+400 6 MATCH LINE STA 5+355 (NE 9 SEE C304 FOR LAYO 5 680 C F/C F/ F/C MATCH LINE STA 5+ C/F END LOCK BLOCK STA. 5+498.465 O/S SEE C301 FOR DETAILS C C SEE C304 TREE CLEARING. 33 TEMPORARY EXCAVATION 2 333 C C SEE C304 FOR LAYO INTERCEPTOR & SLOT DRAIN START LO - TOP OF CUT HIGHWAY RIGHT-OF-WAY (TYP.) SEE C203 FOR DETAILS 334 OIP UT DETAILS MH 335 STA. 5+396 FOR LAYO BC HYDRO RIGHT-OF-WAY Tel 33 SEE C304 FO END LOCK BLOCK 6 STA. 5+360.355 O/S 33 WALL 7 CK BLOCK 33 1.5 8 START LOCK 33 9 .671 O/S 1.5 UT DETAIL STA. 5+660.14 34 UT DETAILS R LAYOUT D 0 WALL 34 1 WALL BLOCK WALL S 1.5 34 350 349 2 3 O/S 1.5 347 34 34 34 34 ETAILS 6 5 4 8 34 N 3 0 ,64 519 N 0 ,68 6,5 E 519 N 1 5,4 0 ,72 6,5 E 519 STA. 5+659 9.0m LONG - 600mm Ø CSP CULVERT 0 N 1 0 5,4 INLET ELEV: 328.553 0 ,76 6,5 E 519 8 STA. 5+381 15.2 LONG - 800mm Ø CSP CULVERT N 6,515,663.673 15, 0 6,5 INLET ELEV: 345.575 E 560 E 519,719.675 15, N 6,515,407.129 OUTLET ELEV: 327.749 640 E 519,608.370 N 6,515,670.371 OUTLET ELEV: 345.390 E 519,713.698 N 6,515,418.847 E 519,598.691 Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C102] May 18, 2021 - 11:13:33 am (BY: DEEPWELL, ANDREW) 0 5 H 1:500 25m 0 0.5 V 1:50 2.5m EXISTING GROUND @ EVC 348.294 350 350 342 HWY 97 CONTROL LINE 342 336 336 STA 5+377.362 Revision/ Description/Description Date/Date PIVC 347.425 Revision Client/client FINISHED GRADE @ ATV EXISTING GROUND @ Public Services and -4.9 15 VC 11% TRAIL CONTROL LINE HWY 97 CONTROL LINE Procurement Canada BVC 346.449 EVC 332.439 K4 348 348 340 340 334 334 EXISTING GROUND @ HWY 97 CONTROL LINE FINISHED GRADE @ ATV TRAIL CONTROL LINE BVC 347.840 EVC 345.246 BVC 331.173 -9 .85 Project title/Titre du projet 3% EXISTING GROUND @ 16 VC EVC 339.154 EXISTING GROUND @ ATV TRAIL CONTROL LINE K6 EVC 330.439 STA 5+644.494 ATV TRAIL CONTROL LINE -6. KM 450.0 - 451.4 SLIDE PIVC 330.224 346 346 338 338 332 126 332 -6. EVC 346.593 57 % STABILIZATION AND SAFETY BVC 335.885 -6. 5% 1 89% FINISHED GRADE @ ATV IMPROVEMENTS TRAIL CONTROL LINE ALASKA HIGHWAY, BC PIVC 345.710 STA 5+394.768 17 VC EXISTING GROUND @ K3 -3.30 5% ATV TRAIL CONTROL LINE Approved by/Approuve par BVC 345.162 G. WILKINS STA 5+450.697 PIVC 342.249 344 344 336 336 330 330 STA 5+630.212 PIVC 330.696 Designed by/Concept par A. HORWOOD / E. YANG BVC 330.435 Drawn by/Dessine par 54 VC A. DEEPWELL EVC 329.786 K 121 PWGSC Project Manager/Administrateur de Projets TPSGC A. TAHERI 13 VC PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC K4 -6. 342 342 334 334 328 86328 Client/client 3% Public Services and Procurement Canada Drawing title/Titre du dessin PIVC 334.101 STA 5+574.630 ATV TRAIL PLAN - PROFILE 94 VC K 244 STA. 5+355 TO STA. 5+680 5+355 5+400 5+460 5+500 5+580 5+600 5+680 333.792 331.322 348.536 348.278 347.116 345.393 344.143 342.884 341.608 340.316 339.008 337.693 336.378 335.070 332.547 330.368 329.160 327.787 337.01 336.21 348.98 348.19 345.34 345.92 344.76 343.60 342.44 340.36 334.80 333.58 332.28 330.94 329.40 328.90 328.49 338.35 Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C102 0
314 NOTES: N 0 Public Services and Services publics et 6 9,7 1. ELECTRICAL CONDUIT AND CABLES BETWEEN LUMINAIRES NOT 303 Procurement Canada Approvisionnement Canada 51 N 315 2 0 SHOWN FOR CLARITY. CONTRACTOR TO VERIFY LOCATION 304 9,7 6,5 51 E 30 305 REAL PROPERTY SERVICES PRIOR TO CONSTRUCTION. N 15 80 6 ,6 307ATV TRAIL ALIGNMENT CURVE LAYOUT 6 ,5 Pacific Region ,8 8 519 316 E 2.30 SEE C107 FOR 309 8 15 0 310 GEOMETRY AND RIPRAP DITCH LAYOUT GEOMETRY. SERVICES IMMOBILIERS 6 ,5 ,80 E 317 311 312 15 0 Région du Pacifique ,72 318 0 N 319 00 9,8 51 ISSUED FOR TENDER N F 320 60 EXISTING ATV TRAIL TO BE DECOMMISSIONED. 9,7 6,5 51 E SEE C312 FOR DETAILS 321 15 C312 6,5 ,92 322 E 15 0 323 ,84 0 324 GENERAL NOTES: T C104) 325 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN 326 02 17- 01 METERS UNLESS NOTED OTHERWISE 03 BH 17- EXT SHEE 7- BH BH1 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION SEE TY END IN IL 1 ON C302 SEE DE RAP DITCH START 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN STA. 5 (N IL AND SLOT DRAINS MAY BE DIRECTED BY THE PROPOSED SHOULDER RA 0 = PICAL T T DEPARTMENTAL REPRESENTATIVE DURING WORK 0 IL .390 OR + TA E RIP 0 786.390 RECONSTRUCTION. SEE C302 R A + END OF WELDED FENCE STA. 5+897.000 EX. HIGHWAY CENTERLINE 3 T 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED TR 1 C C 6 V 6+0 NNE 000 EPTOR E STA S T A A. O 00. EC ST V C 0+0 .593 T 4 AT A. ,973 IO MATCH LIN 7-0 LS 1 DRAIN BH ST 515 N A ON MATCH LINE STA 5+680 (NEXT SHEET C102) PROPOSED PRECAST 6, N 05 LS ALASKA HIGHWAY 17- CONCRETE BARRIER - 810 mm BH C20 LS 3 F F LS LS /F 326 5+700 LS C 6+000C 327 F/C 5+900 LS 10 17 328 15 16 329 F F C C/F 14 330 5+800 331 C/F 11 C C 332 REMOVE & DISPOSE OF 12 13 1 OIP SEE C3 TREE CLEARING. SEE EXISTING PIEZOMETER C306 C301 FOR DETAILS 333 F/C C/F HIGHWAY RIGHT-OF-WAY 04 F N 334 PROPOSED GALVANIZED WELDED FENCE 80 EN BC HYDRO RIGHT-OF-WAY 9,8 STA. 5+ 51 O D R 335 305 L 6,5 O L E 306 A C 15 YOUT D K BLOC 336 STA. 5+885 8.1m LONG - 1400mm Ø CSP CULVERT 784.342 307 ,92 N WITH INLET & OUTLET CONCRETE HEADWALLS 308 0 60 SEE C304 FOR LAYOUT DETAILS SEE C304 FOR LAYOUT DETAILS 9,7 INLET ELEV: 312.606 309 51 ETAILS K WALL O/S 1.5 337 N 6,515,856.294 310 6,5 START LOCK BLOCK WALL E E 519,828.542 15 END LOCK BLOCK WALL STA. 5+873.167 O/S 1.5 ,68 STA. 5+856.677 O/S 1.5 338 OUTLET ELEV: 311.577 31 0 1 END TREE CLEARING N 6,515,862.388 E 519,833.786 N 40 9,8 SEE C306 FOR DETAILS 31 51 2 STA. 5+821.5 6,5 E 31 15 PROPOSED DITCH. SEE C302 FOR DETAILS 3 ,80 0 TEMPORARY TOP OF CUT FOR LOCK BLOCK WALL CONSTRUCTION N 40 9,8 51 6,5 E 15 ,7 60 Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C103] May 18, 2021 - 11:13:43 am (BY: DEEPWELL, ANDREW) 330 330 0 5 H 1:500 25m STA 5+803.512 0 0.5 V 1:50 2.5m BVC 313.267 PIVC 319.112 EXISTING GROUND @ 20 VC 328 328 320 HWY 97 CONTROL LINE 320 314 K7 314 FINISHED GRADE @ ATV TRAIL CONTROL LINE Revision/ EVC 311.601 Description/Description Date/Date Revision Client/client 15 VC BVC 317.027 Public Services and STA 5+724.019 EXISTING GROUND @ PIVC 324.766 K4 HWY 97 CONTROL LINE Procurement Canada 326 EXISTING GROUND @ 326 318 318 312 312 FINISHED GRADE @ ATV HWY 97 CONTROL LINE EVC 315.998 EXISTING GROUND @ TRAIL CONTROL LINE -9. PIVC 312.286 STA 5+910.255 BVC 315.772 39 VC ATV TRAIL CONTROL LINE 01 STA 5+953.290 K 21 3% PIVC 309.340 BVC 325.882 EXISTING GROUND @ 27 VC -6. ATV TRAIL CONTROL LINE K9 84 Project title/Titre du projet 5% EVC 317.342 EVC 314.837 STA 5+887.317 BVC 308.714 PIVC 314.537 FINISHED GRADE @ ATV TRAIL CONTROL LINE -4.9 KM 450.0 - 451.4 SLIDE 324 324 316 17% 316 310 310 STABILIZATION AND SAFETY PIVC 316.361 STA 5+834.036 IMPROVEMENTS 33 VC -7. -2.067% 11 7% EXISTING GROUND @ ALASKA HIGHWAY, BC BVC 309.682 EVC 323.610 K 130 ATV TRAIL CONTROL LINE Approved by/Approuve par -7. STA 5+859.402 PIVC 315.114 G. WILKINS 11 EVC 308.984 3% -9314 308 322 322 314 .81 308 Designed by/Concept par BVC 314.644 A. HORWOOD / E. YANG 3% 10 VC Drawn by/Dessine par K 37 A. DEEPWELL EVC 314.028 PWGSC Project Manager/Administrateur de Projets TPSGC A. TAHERI PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC 320 320 312 312 306 306 Client/client Public Services and Procurement Canada BVC 320.510 10 VC Drawing title/Titre du dessin K1 ATV TRAIL PLAN - PROFILE STA. 5+680 TO STA. 6+000 5+680 5+700 5+800 5+900 6+000 316.071 317.624 313.292 307.524 327.787 326.415 325.037 323.630 322.207 320.785 319.299 315.189 314.688 311.619 310.250 308.863 306.396 318.91 312.81 309.71 307.31 328.49 326.89 325.06 323.88 322.48 320.75 317.34 315.50 315.45 312.35 311.30 308.53 306.26 Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C103 0
R SS S C CE ETAIL A D NG FOR STI EXI C312 NOTES: SEE Public Services and Services publics et N 1. ELECTRICAL CONDUIT AND CABLES BETWEEN LUMINAIRES NOT Procurement Canada Approvisionnement Canada SHOWN FOR CLARITY. CONTRACTOR TO VERIFY LOCATION E 519,8 00 3 PRIOR TO CONSTRUCTION. REAL PROPERTY SERVICES 30 6,516 2. SEE C107 FOR ATV TRAIL ALIGNMENT CURVE LAYOUT EX EXACT LOCATION TO BE ADJUSTED TO SUIT EXISTING Pacific Region .H UTILITIES & TREELINE BY THE DEPARTMENTAL GEOMETRY AND RIPRAP DITCH LAYOUT GEOMETRY. IG ,120 HW REPRESENTATIVE ON SITE. SEE DETAIL 4 ON C312 SERVICES IMMOBILIERS AY N CE Région du Pacifique N E 302 TE 519,8 R LIN 4 0 6,516 ISSUED FOR TENDER E N E ,000 N 519,8 E 00 6,516 519,8 3) 40 10 R 30 6,516 RIE TC , 2 200 B A R EE LS ED GENERAL NOTES: ,040 OS SH P ATV TRAIL RO 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN XT O FP METERS & )UNLESS NOTED OTHERWISE NE STA. 6+013.390 = D EN E (2 S. ( ATV CONNECTOR TRAIL 04 TO 2. THEO SCONTRACTOR IS RESPONSIBLE FOR VERIFYING THE N TAIL 00 303 3 4 IGN LLLOCATION +0 C STA. 0+000.000 S U B OR D E OF ALL UTILITIES PRIOR TO CONSTRUCTION G 6 6+ TIN ETE3. 09 FTHE TA N 6,515,973.593 C312 I S R LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN 00 EX NC E C3 ES 0 C/F E 519,881.104 304 T A 30 E 5 C O E AND SLOT DRAINS MAY BE DIRECTED BY THE LOC AST (2). S LIN E E C DEPARTMENTAL REPRESENTATIVE DURING WORK C F R PR RRIER H F D TC EXISTING ATV TRAIL TO BE DECOMMISSIONED. E A 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED OS ON B OP MA 3 N 30 I SEE C312 FOR DETAILS PR NSIT 30 0 E 5 A 0+00 R C/F 519,8 T 105) OIP LS 40 6 30 6,516 304 ET C 18 ,160 HE LS 306 XT S 5 MAT 305 CH L 304 22 NE INE C312 PROPOSED PRECAST CONCRETE BULL NOSE (2) & OIP S TA 0 305 F F 303 260 ( +010 TRANSITION BARRIER (2). SEE C309 FOR DETAILS. (SEE 305 302 SHE A 6+ ET C 301 106) LS GE 300 E ST 305 D ED 304 LS E 2 C/F OS RAIL 31 OP IN 304 PR ATV T CH L C306 R 19 OF RIE 6+100 LS 303 B AR ILS. MA T E 303 LS 6+22100 302 O SID AD OR D ETA F/C 301 R 9F TE 0 RE O C3 END STA. 6 START 20 300 N C T 302 299 F CO FER F AST D. RE RIP +040 301 C 298 RE LE START P DAYLIGHT OF CUT/FILL WELD 300 m P STAL R RELOCATE EXISTING SIGN TO A 0 m N 299 81 BE IN P D .000 SEE DETAIL 4 END OF PROPOSED BARRIER E TO ED ITC 519,9 ON C309 RECAST 20 GALVA H 6,516 OIP N STA. 6+2 ETE BARRIER E STA. 6 AILING ,000 N 519,8 CONCR IZED R 80 6,516 +220.8 01.000 O ,200 N 80 E 519,8 /S 2.6 m 80 6,516 32 ,240 -WAY RIGHT-OF HIGHWAY N -WAY ATV TRAIL THROUGH WETLAND UNSURVEYED. H Y D R O RIGHT-OF E B C 519,9 20 LIMITS SHOWN ARE APPROXIMATE. 6,516 ,120 N F/C E 519,9 20 6,516 N CTIO ,160 U S TR 1.701 N 1 I L CO A 0+1 Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C104] May 18, 2021 - 11:13:54 am (BY: DEEPWELL, ANDREW) 0 5 H 1:500 25m A ST TR A TV 0 0.5 V 1:50 2.5m IT OF LIM 310 310 Revision/ Description/Description Date/Date Revision Client/client Public Services and Procurement Canada 308 308 Project title/Titre du projet EXISTING GROUND @ EVC 304.591 HWY 97 CONTROL LINE 306 306 KM 450.0 - 451.4 SLIDE 135 VC FINISHED GRADE @ ATV 50 VC STABILIZATION AND SAFETY BVC 303.935 EVC 303.929 K 19 TRAIL CONTROL LINE K 19 % IMPROVEMENTS EXISTING GROUND @ 2.620 ATV TRAIL CONTROL LINE ALASKA HIGHWAY, BC BVC 305.478 Approved by/Approuve par G. WILKINS 304 0.007% 304 Designed by/Concept par A. HORWOOD / E. YANG Drawn by/Dessine par A. DEEPWELL STA 6+196.471 PIVC 303.936 STA 6+029.375 PIVC 303.925 PWGSC Project Manager/Administrateur de Projets TPSGC A. TAHERI PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC 302 302 Client/client Public Services and Procurement Canada Drawing title/Titre du dessin ATV TRAIL PLAN - PROFILE STA. 6+000 TO STA. 6+260 6+000 6+020 6+040 6+060 6+080 6+100 6+120 6+140 6+160 6+180 6+200 6+220 6+240 6+260 303.931 306.396 305.480 304.283 304.002 303.930 303.932 303.934 303.954 304.149 304.553 305.077 305.598 304.775 303.61 306.26 305.42 304.27 303.93 303.83 303.90 304.70 305.18 304.75 303.65 303.65 304.15 304.45 Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C104 0
NOTES: Public Services and Services publics et 1. ELECTRICAL CONDUIT AND CABLES BETWEEN LUMINAIRES NOT Procurement Canada Approvisionnement Canada SHOWN FOR CLARITY. CONTRACTOR TO VERIFY LOCATION PRIOR TO CONSTRUCTION. G REAL PROPERTY SERVICES 2. SEE C107 FOR ATV TRAIL ALIGNMENT CURVE LAYOUT C31 Pacific Region GEOMETRY AND RIPRAP DITCH LAYOUT GEOMETRY. 2 SERVICES IMMOBILIERS 304 Région du Pacifique 303 EXISTING ACCESS ROAD TO BE DECOMMISSIONED. SEE C312 FOR DETAILS E ISSUED FOR TENDER N 51 9, 72 6, 5 0 16 ,2 GENERAL NOTES: 80 E EXISTING W-BEAM BARRIER TO REMAIN 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN 305 N DECOMMISSION ATV TRAIL TO WITHIN METERS UNLESS NOTED OTHERWISE 51 9, 3m OF EXISTING GRAVEL ROAD 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE 6, 80 H 51 0 LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION 6 C312 ,2 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN 00 E AND SLOT DRAINS MAY BE DIRECTED BY THE N DEPARTMENTAL REPRESENTATIVE DURING WORK 51 9, 68 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED 6, 5 0 16, 104) 304 36 0 E SHEET C N 51 RELOCATE EXISTING SIGN TO END OF PROPOSED BARRIER 9, 6, 76 305 5 0 306 1 T 6, 260 (NEX 28 0 307 PROPOSED PRECAST CONCRETE BULL NOSE (2) & 6+ TRANSITION BARRIER (2). SEE C309 FOR DETAILS. INE STA 306 F F LS MATCH L 22 306 6+300 LS LS 6+F400 23 L 26 25 S 3.0 305 307 304 24 24 306 303 E 305 N PROPOSED EDGE 302 W IDE 304 OF ATV TRAIL 301 51 M 3.0m APPROX. EX. BRIDGE 9, 80 IO N FRO EXISTING 303 W 6, 300 S IT (NOT SURVEYED) TRAN MATCH TO V 51 0 RELOCATE EXISTING SIGN TO END OF PROPOSED BARRIER 13.3m WAY 302 AIL TO IDGE WALK 6 299 ,2 V T R F 8 A T OF BR 301 0 298 WIDTH MUSKWA F F 300 RIVER CUSTOM 810 mm PRECAST CONCRETE MEDIAN BARRIER. SEE C309 FOR DETAILS. MATCH TO EXISTING BRIDGE PEDESTRIAN RAILING LIMIT O 810mm PRECAST CONCRETE ROADSIDE BARRIER END BA TO BE INSTALLED. REFER TO C309 FOR DETAILS. EXISTING ATV TRAIL TO BE DECOMMISSIONED. OI P SEE SECTION H ON C312 FOR DETAILS FA TOE OF FILL RRIER & MATCH TV TRA E T WELDE N O EXISTIN ENSURE POSITIVE DRAINAGE FROM BRIDGE / HIGHWAY IL CONS +400.097 51 E 9, 6, 84 SURFACE TO EXISTING CSP CULVERT FLUME D GALV N 51 0 ,2 6 STA 6 G BRIDG 6,318.535 51 80 9, 88 6, E ANIZED 5 TRUCTI 0 N 16 N 24 , 6 E 519,7 51 E WALK ,51 0 9, 72 6, RAILING 51 0 6, ON 54.953 44 WAY 0 , Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C105] May 18, 2021 - 11:14:03 am (BY: DEEPWELL, ANDREW) 0 5 H 1:500 25m 0 0.5 V 1:50 2.5m LIMIT OF ATV TRAIL CONSTRUCTION STA 6+400.097 MATCH TO EXISTING BRIDGE WALKWAY 312 312 Revision/ Description/Description Date/Date Revision Client/client Public Services and Procurement Canada 310 310 EXISTING GROUND @ FINISHED GRADE @ ATV ATV TRAIL CONTROL LINE ESTIMATED EXISTING BRIDGE DECK TRAIL CONTROL LINE Project title/Titre du projet EXISTING GROUND @ STA 6+283.702 HWY 97 CONTROL LINE KM 450.0 - 451.4 SLIDE PIVC 306.221 308 308 STABILIZATION AND SAFETY IMPROVEMENTS 1.117% ALASKA HIGHWAY, BC Approved by/Approuve par G. WILKINS Designed by/Concept par 306 306 A. HORWOOD / E. YANG EVC 306.539 Drawn by/Dessine par A. DEEPWELL PWGSC Project Manager/Administrateur de Projets TPSGC A. TAHERI 57 VC PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC K 38 Client/client 304 304 Public Services and Procurement Canada Drawing title/Titre du dessin ATV TRAIL PLAN - PROFILE STA. 6+260 TO STA. 6+460 6+260 6+280 6+300 6+320 6+340 6+360 6+380 6+400 6+420 6+440 6+460 307.521 306.044 306.384 306.850 307.074 305.598 306.627 307.297 305.62 305.18 305.75 306.40 306.68 306.48 306.89 306.96 Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C105 0
NOTES: Public Services and Services publics et 1. SEE C107 FOR ATV TRAIL ALIGNMENT CURVE LAYOUT Procurement Canada Approvisionnement Canada GEOMETRY AND RIPRAP DITCH LAYOUT GEOMETRY. REAL PROPERTY SERVICES Pacific Region SERVICES IMMOBILIERS Région du Pacifique ISSUED FOR TENDER GENERAL NOTES: 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN AND SLOT DRAINS MAY BE DIRECTED BY THE DEPARTMENTAL REPRESENTATIVE DURING WORK TRUCTION 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED 1.701 TING 2.511 N 6,516,02 .387 AY O F-W - AY 6 STA 0+11IS HT E 519,97 I G F -W TIE TO EX YR T-O H WA R IGH HIG RO S LS YD N H BC IL C O STA. 0+100 10.0m LONG - 600mm Ø CSP CULVERT MA (SE 18 A TC E S INLET ELEV: 302.970 TV TR H HE N 6,516,013.803 LIN E 2 E TC E 519,970.825 06 20 ST 10 N C3 OUTLET ELEV: 301.362 9,9 A 4) 0+ 6+ LIMIT OF A 00 51 N 6,516,018.751 02 0 6,5 R3 0 EN 16 E 519,962.283 R3 D STA ,00 0 F RI . 6 E C/ PR +0 C/F 00 AP 40 DI .00 00 0 6+ TC 0 N 0,0 F F H 52 F IP 6,5 F C O 0+100 1 6,0 31 40 IL MA E RA TC 0 RT TO = 32 C HL N 90 IP F/C ST V C +01 L A. ON 3.3 AT A. 6 RAI INE 19 5,97 00 EC O F/C 1.1 593 00 ST V T ST ,88 3. 0. AT A6 E 5 6,51 0+ EXISTING ATV TRAIL (TYP.) +0 04 00 (SE N ES 305 HE ET 306 C1 307 03 308 ) STA. 0+020 9.8m LONG - 1400mm Ø CSP ATV CONNECTOR TRAIL 0 309 0 N 0,0 CULVERT WITH INLET CONCRETE HEADWALL 52 310 INLET ELEV: 302.667 6,5 E 16 AT N 6,515,968.990 ,00 IM 0 E 519,907.329 E OX 311 PR OUTLET ELEV: 301.885 60 AP N 6,515,978.767 N 9,9 E 519,901.320 51 6,5 312 SEE C306 FOR DETAILS 15 ,96 0 E 313 Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C106] May 18, 2021 - 11:14:14 am (BY: DEEPWELL, ANDREW) 0 5 H 1:500 25m 0 0.5 V 1:50 2.5m STA 0+111.701 LIMIT OF CONSTRUCTION TIE TO EXISTING Revision/ 10 VC Revision Description/Description Date/Date Client/client K0 BVC 304.822 8 VC Public Services and STA 0+020.515 PIVC 304.557 K1 Procurement Canada EVC 304.360 306 -3.76 306 STA 0+061.854 9% PIVC 303.969 BVC 303.875 -14 FINISHED GRADE @ EVC 303.670 .77 CONTROL LINE 7% EXISTING GROUND % Project title/Titre du projet 5. 512 -6. 63 6% 304 1.275% -0.588% 304 KM 450.0 - 451.4 SLIDE BVC 304.378 EVC 304.341 STABILIZATION AND SAFETY STA 0+011.971 PIVC 304.086 IMPROVEMENTS EVC 303.945 BVC 303.917 PIVC 303.622 STA 0+034.605 ALASKA HIGHWAY, BC Approved by/Approuve par G. WILKINS 302 302 Designed by/Concept par A. HORWOOD / E. YANG 6 VC K1 8 VC Drawn by/Dessine par A. DEEPWELL K4 PWGSC Project Manager/Administrateur de Projets TPSGC A. TAHERI PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC 0+000 0+100 0+120 Client/client Public Services and Procurement Canada 302.371 303.690 303.940 303.862 304.458 303.745 303.362 303.258 303.418 302.628 Drawing title/Titre du dessin ATV TRAIL CONNECTOR PLAN - PROFILE 0+100 STA. 0+000 TO STA. 0+111 Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C106 0
Public Services and Services publics et Procurement Canada Approvisionnement Canada REAL PROPERTY SERVICES Pacific Region SERVICES IMMOBILIERS Région du Pacifique ISSUED FOR TENDER ATV TRAIL CURVE LAYOUT GEOMETRY ATV CONNECTOR TRAIL CURVE LAYOUT GEOMETRY GENERAL NOTES: 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE CHORD CHORD 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE CURVE # RADIUS DELTA LENGTH BC STATION EC STATION PI COORD. CURVE # RADIUS DELTA LENGTH BC STATION EC STATION PI COORD. LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION BEARING BEARING 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN 5+071.245 5+076.912 0+016.288 0+028.385 AND SLOT DRAINS MAY BE DIRECTED BY THE N 6,515,133.934 N 6,515,971.264 DEPARTMENTAL REPRESENTATIVE DURING WORK 1 50 6° 29' 38" 5.667 N21° 53' 27"E N 6,515,131.247 N 6,515,131.247 31 20 34° 39' 16" 12.097 N78° 36' 26"E N 6,515,971.909 N 6,515,971.909 E 519477.580 E 519,903.511 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED E 519,476.673 E 519,476.673 E 519,897.305 E 519,897.305 5+106.318 5+115.859 0+059.399 0+070.036 N 6,515,167.443 N 6,515,991.731 2 200 2° 44' 00" 9.541 N26° 30' 16"E N 6,515,163.123 N 6,515,163.123 32 50 12° 11' 19" 10.637 N55° 11' 09"E N 6,515,989.165 N 6,515,989.165 E 519493.303 E 519,940.864 E 519,491.276 E 519,491.276 E 519,936.182 E 519,936.182 5+161.731 5+172.140 N 6,515,216.813 3 200 2° 58' 55" 10.409 N26° 22' 48"E N 6,515,212.211 N 6,515,212.211 E 519519.411 E 519,516.978 E 519,516.978 5+261.883 5+274.385 N 6,515,308.616 4 200 3° 34' 54" 12.502 N23° 05' 54"E N 6,515,302.943 N 6,515,302.943 E 519562.003 E 519,559.372 E 519,559.372 RIPRAP DITCH LAYOUT GEOMETRY 5+372.877 5+386.907 TOP OF RIPRAP N 6,515,412.739 * ATV TRAIL CONTROL LINE TO CENTERLINE OF RIPRAP 5 200 4° 01' 10" 14.030 N19° 17' 52"E N 6,515,406.201 N 6,515,406.201 E 519,600.065 E 519,600.065 E 519602.615 STATION OFFSET DISTANCE (m)* ELEVATION AT DITCH AND INTERCEPTOR DRAIN. LEFT SIDE IS NEGATIVE DITCH CENTERLINE 5+415.350 5+426.582 N 6,515,451.962 5+060.000 -8.43 364.60 6 200 3° 13' 03" 11.232 N18° 53' 49"E N 6,515,446.598 N 6,515,446.598 E 519614.823 E 519,613.153 E 519,613.153 5+080.000 -5.95 363.62 5+509.125 5+531.767 5+100.000 -5.16 362.59 N 6,515,545.151 7 200 6° 29' 11" 22.642 N23° 44' 56"E N 6,515,534.536 N 6,515,534.536 E 519649.675 E 519,645.705 E 519,645.705 5+120.000 -4.73 361.68 5+599.461 5+627.318 5+140.000 -4.81 360.67 N 6,515,628.001 8 200 7° 58' 49" 27.856 N30° 58' 56"E N 6,515,615.570 N 6,515,615.570 E 519,685.543 E 519,685.543 E 519691.875 5+160.000 -4.89 359.49 5+180.000 -4.80 358.61 5+629.724 5+690.893 N 6,515,666.515 9 400 8° 45' 42" 61.169 N30° 35' 29"E N 6,515,641.405 N 6,515,641.405 E 519718.815 5+200.000 -4.83 357.55 E 519,701.251 E 519,701.251 5+220.000 -4.85 356.34 5+719.101 5+762.268 10 200 12° 21' 59" 43.167 N32° 23' 38"E N 6,515,719.316 N 6,515,719.316 N 6,515,738.756 5+240.000 -4.87 355.16 E 519754.379 E 519,744.809 E 519,744.809 5+260.000 -4.90 353.91 5+798.408 5+824.053 5+280.000 -5.23 352.73 N 6,515,793.986 11 200 7° 20' 49" 25.645 N34° 54' 13"E N 6,515,783.948 N 6,515,783.948 E 519798.432 E 519,790.425 E 519,790.425 5+300.000 -5.16 351.29 5+854.940 5+863.311 5+320.000 -5.09 349.83 N 6,515,834.956 12 200 2° 23' 52" 8.370 N30° 01' 52"E N 6,515,831.377 N 6,515,831.377 E 519,821.104 E 519,821.104 E 519823.274 5+340.000 -5.02 348.43 5+360.000 -5.09 346.94 5+874.673 5+885.762 Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C107] May 18, 2021 - 11:14:23 am (BY: DEEPWELL, ANDREW) N 6,515,854.002 13 10 63° 32' 12" 11.089 N2° 56' 10"W N 6,515,848.577 N 6,515,848.577 E 519833.758 5+380.000 -5.84 345.63 E 519,830.772 E 519,830.772 5+400.000 -5.45 344.15 5+886.127 5+896.294 14 10 58° 15' 24" 10.168 N5° 34' 34"W N 6,515,859.393 N 6,515,859.393 N 6,515,863.974 5+420.000 -4.98 342.97 E 519826.852 E 519,830.025 E 519,830.025 5+440.000 -4.90 341.82 5+899.772 5+919.813 5+460.000 -4.90 340.67 N 6,515,881.486 15 100 11° 28' 58" 20.041 N29° 17' 37"E N 6,515,872.269 N 6,515,872.269 E 519834.486 E 519,830.468 E 519,830.468 5+480.000 -4.90 339.26 5+925.328 5+938.739 5+500.000 -4.90 337.87 N 6,515,899.733 Revision/ 16 100 7° 41' 02" 13.411 N31° 11' 35"E N 6,515,894.234 N 6,515,894.234 Description/Description Date/Date E 519,843.424 E 519,843.424 E 519847.279 5+520.000 -4.90 336.63 Revision Client/client 5+540.000 -4.90 335.29 5+970.636 5+992.129 17 200 6° 09' 26" 21.493 N24° 16' 21"E N 6,515,934.029 N 6,515,934.029 N 6,515,943.584 333.97 Public Services and E 519869.961 5+560.000 -4.90 E 519,865.019 E 519,865.019 Procurement Canada 5+580.000 -4.90 332.60 5+999.822 6+056.761 18 200 16° 18' 42" 56.938 N13° 02' 16"E N 6,515,960.786 N 6,515,960.786 N 6,515,987.510 5+600.000 -4.90 331.48 E 519886.994 E 519,876.631 E 519,876.631 5+620.000 -4.90 330.18 6+072.335 6+105.242 5+640.000 -4.92 328.91 N 6,516,048.018 19 200 9° 25' 38" 32.907 N0° 10' 06"E N 6,516,031.587 N 6,516,031.587 E 519892.162 Project title/Titre du projet E 519,890.759 E 519,890.759 5+660.000 -4.93 327.86 6+119.838 6+164.710 5+680.000 -4.92 326.43 N 6,516,101.466 20 200 12° 51' 18" 44.872 N10° 58' 22"W N 6,516,079.006 E 519,889.699 N 6,516,079.006 E 519,889.699 E 519887.913 5+700.000 -4.90 325.07 KM 450.0 - 451.4 SLIDE 5+720.000 -4.90 323.84 STABILIZATION AND SAFETY 6+184.172 6+215.180 21 200 8° 53' 00" 31.009 N21° 50' 31"W N 6,516,141.537 N 6,516,141.537 N 6,516,156.362 5+740.000 -4.90 322.62 IMPROVEMENTS E 519870.710 E 519,875.356 E 519,875.356 5+760.000 -4.90 321.11 ALASKA HIGHWAY, BC 6+232.083 6+305.003 22 330 12° 39' 38" 72.920 N32° 36' 50"W N 6,516,185.447 N 6,516,185.447 N 6,516,218.271 5+780.000 -4.90 319.36 Approved by/Approuve par E 519840.135 G. WILKINS E 519,856.346 E 519,856.346 5+800.000 -4.91 317.94 Designed by/Concept par 6+306.467 6+311.495 5+820.000 -4.91 316.47 A. HORWOOD / E. YANG N 6,516,249.838 23 300 0° 57' 37" 5.027 N39° 25' 27"W N 6,516,247.882 N 6,516,247.882 E 519814.623 Drawn by/Dessine par E 519,816.203 E 519,816.203 5+840.000 -4.90 314.95 A. DEEPWELL 6+343.381 6+345.579 5+860.000 -4.94 314.04 PWGSC Project Manager/Administrateur de Projets TPSGC N 6,516,277.070 24 50 2° 31' 10" 2.199 N38° 38' 40"W N 6,516,276.226 N 6,516,276.226 A. TAHERI E 519,792.556 E 519,792.556 E 519791.850 5+880.000 -5.76 312.80 PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC 5+900.000 7.86 310.60 6+365.327 6+369.765 N 6,516,295.399 25 50 5° 05' 07" 4.438 N39° 55' 39"W N 6,516,293.634 N 6,516,293.634 E 519777.844 5+920.000 9.48 307.77 Client/client E 519,779.193 E 519,779.193 Public Services and Procurement Canada 5+940.000 9.68 306.71 Drawing title/Titre du dessin 6+388.920 6+391.467 26 20 7° 17' 51" 2.547 N46° 07' 08"W N 6,516,311.166 N 6,516,311.166 N 6,516,312.107 5+960.000 7.66 306.13 E 519,763.412 E 519,763.412 E 519762.550 ATV TRAIL HORIZONTAL 5+980.000 14.51 304.98 ALIGNMENT GEOMETRY & DITCH 6+000.000 19.32 303.56 LAYOUT DETAILS 6+020.000 19.40 N/A 6+040.000 18.23 300.28 Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C107 0
Public Services and Services publics et INTERCEPTOR & SLOT DRAIN LAYOUT POINTS Procurement Canada Approvisionnement Canada REAL PROPERTY SERVICES POINT # NORTHING EASTING EX. GROUND ELEV. DESIGN ELEVATION (DESCRIPTION) Pacific Region SERVICES IMMOBILIERS 1.1 6,515,643.956 519,713.786 330.867 MATCH EXISTING (LIMIT OF EXCVATION) Région du Pacifique 1.2 6,515,648.702 519,710.333 329.337 324.997 (START OF PIPE) 1.3 2.1 6,515,655.439 6,515,664.189 519,705.429 519,726.944 328.827 330.560 323.764 (PIPE BEND) MATCH EXISTING (LIMIT OF EXCVATION) ISSUED FOR TENDER 2.2 6,515,667.850 519,723.575 330.414 325.585 (START OF PIPE) GENERAL NOTES: 2.3 6,515,674.641 519,717.324 327.601 322.649 (PIPE BEND) 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN 6,515,684.253 519,737.253 MATCH EXISTING (LIMIT OF EXCVATION) METERS UNLESS NOTED OTHERWISE 3.1 332.104 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE 3.2 6,515,687.900 519,733.869 328.977 327.129 (START OF PIPE) LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN 3.3 6,515,694.663 519,727.593 326.096 322.408 (PIPE BEND) AND SLOT DRAINS MAY BE DIRECTED BY THE DEPARTMENTAL REPRESENTATIVE DURING WORK 4.1 6,515,704.275 519,747.517 329.959 MATCH EXISTING (LIMIT OF EXCVATION) 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED 4.2 6,515,707.953 519,744.104 327.863 324.976 (START OF PIPE) 314 N 0 4.3 6,515,714.686 519,737.857 324.681 320.972 (PIPE BEND) 9,72 51 6,5 5.1 6,515,645.604 519,697.902 329.463 322.475 (INTERCEPTOR DRAIN INVERT) 315 E 15 ,80 0 5.2 6,515,656.085 519,704.960 328.646 322.190 (INTERCEPTOR DRAIN INVERT) 5.3 6,515,675.226 519,716.786 327.395 321.684 (INTERCEPTOR DRAIN INVERT) 6 31 N 0 5.4 6,515,695.248 519,727.050 325.801 321.178 (INTERCEPTOR DRAIN INVERT) ,68 519 6,5 5.5 6,515,715.271 519,737.314 324.328 320.672 (INTERCEPTOR DRAIN INVERT) E 317 15 ,72 6,515,735.753 519,748.011 320.152 (INTERCEPTOR DRAIN INVERT) 0 5.6 323.108 318 327 328 5.7 6,515,740.904 519,751.093 322.757 320.039 (INTERCEPTOR DRAIN INVERT) 6,515,747.384 519,755.397 319.859 (INTERCEPTOR DRAIN INVERT) 319 5.8 322.192 FIBRE OPTIC CONTINUES BEYOND 5.9 6,515,752.335 519,759.006 321.672 319.705 (INTERCEPTOR DRAIN INVERT) SHOWN. LOCATION UNKNOWN 320 6.0 6,515,766.794 519,769.993 320.107 319.296 (INTERCEPTOR DRAIN INVERT) 321 6.1 6,515,777.959 519,778.476 318.978 318.978 (INTERCEPTOR DRAIN INVERT) 322 FIBRE OPTIC CONTINUES BEYOND SHOWN. LOCATION UNKNOWN 323 324 325 326 EDGE OF PAVEMENT GEOTECHNICAL Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C201] May 18, 2021 - 11:14:32 am (BY: DEEPWELL, ANDREW) 0 2 H 1:250 10m INSTALL 3.6m LONG CLEAN OUT PIPE. SEE C203 FOR DETAILS 0 0.5 V 1:50 2m PROPOSED INTERCEPTOR DRAIN SEE END INTER STA. 5+786 SEE DETAIL 3 ON C302 START INTERCEPTOR DRAIN STA. 5+631.200 T Y EDGE OF PAVEMENT LS P LS LS IC LS A CEPTOR DR .390 L .) SECTION A YP ,T Revision/ Description/Description ON Revision Date/Date 5.7 .6 .7 TI #5 #5 Client/client .7 EC # #5 AIN NN .5 .8 ON C20 Public Services and #5 CO #5 .9 T #5 .4 IN Procurement Canada #5 .1 JO 3 #5 ( #4 .2 .3 #5 #5 .3 326 P.) #3 N (TY .3 #1 327 5+700 #2 .3 .3 DRAI (P 5+800 IP 328 E YP.) SLOT BE Project title/Titre du projet ND IN (T 329 #4 ,T .2 OSED YP ATV TRAIL CONTROL LINE DRA SEE DETAIL 1 - C204 .) (SHOWN FOR REFERENCE) 330 FOR INTERCEPTOR KM 450.0 - 451.4 SLIDE #3 PROP T #1 .2 SLO DRAIN OUTLET DETAIL STABILIZATION AND SAFETY .2 #2 331 .2 15.0 #4 IMPROVEMENTS (S .1 TA #3 RT 332 #1 .1 ALASKA HIGHWAY, BC OF .1 332 PI #2 P .1 -OF-WAY E, HIGHWAY RIGHT Approved by/Approuve par (T 333 TY 333 OP G. WILKINS WILKINS / C. CHENG T-OF-WAY P. BC HYDRO RIGH OF ) CU 334 Designed by/Concept par INSTALL 7.0 LONG CLEAN OUT T, A. HORWOOD / E. YANG TY PIPE. SEE C202 FOR DETAILS 334 P. 335 ) Drawn by/Dessine par 336 A. DEEPWELL PWGSC Project Manager/Administrateur de Projets TPSGC 337 335 A. TAHERI PWGSC, Architectural and Engineering Resources Manager/ 338 Ressources Architectural et de Directeur d'Ingénierie, TPSGC 336 339 Client/client Public Services and Procurement Canada 34 0 Drawing title/Titre du dessin N 60 9,7 51 INTERCEPTOR AND SLOT 34 337 6,5 1 E DRAINS SITE PLAN 15 ,68 0 34 2 338 NOTES: 1. STAGED CONSTRUCTION / SEQUENCING OF INTERCEPTOR Project No./No. du Sheet/Feuille Revision no./ VE NO.2 INDIAN RESER DRAIN AND SLOT DRAINS IS REQUIRED - SEE SECTION 31 23 34 projet La Révision 3 FORT NELSON AY no. 757 RIGHT-OF-W 33 - EXCAVATION AND BACKFILL OF THE CONTRACT PLAN CLSR 52 SPECIFICATIONS FOR DETAILS R.115165.001 C201 0
Public Services and Services publics et Procurement Canada Approvisionnement Canada REAL PROPERTY SERVICES Pacific Region SERVICES IMMOBILIERS Région du Pacifique 330 NOTES: 330 ISSUED FOR TENDER 1. STAGED CONSTRUCTION / SEQUENCING OF INTERCEPTOR DRAIN AND SLOT DRAINS IS REQUIRED - SEE SECTION 31 23 GENERAL NOTES: 33 - EXCAVATION AND BACKFILL OF THE CONTRACT 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN SPECIFICATIONS FOR DETAILS METERS UNLESS NOTED OTHERWISE 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN AND SLOT DRAINS MAY BE DIRECTED BY THE DEPARTMENTAL REPRESENTATIVE DURING WORK 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED 328 328 EXISTING GROUND @ INTERCEPTOR DRAIN INTERCEPTOR DRAIN CLEANOUT - 200mm Ø HDPE NON-PERFORATED DRAINAGE TUBING SLOT DRAIN BEND POINT # 1.3 TRENCH DEPTH = 7m INVERT ELEV. = 323.764 326 326 STA. = 10+012.429 EXISTING GROUND @ HIGHWAY CONTROL LINE SLOT DRAIN BEND POINT # 2.3 SLOT DRAIN BEND POINT # 3.3 INVERT ELEV. = 322.648 INVERT ELEV. = 322.408 STA. = 10+034.948 STA. = 10+057.446 START INTERCEPTOR DRAIN STA 5+631.200 GEOTECHNICAL 324 324 Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C101-109 PLAN PROFILES.dwg [C202] May 18, 2021 - 11:14:39 am (BY: DEEPWELL, ANDREW) 0 2 H 1:250 10m 0 0.5 V 1:50 2m SLOT DRAIN BEND POINT # 4.3 INTERCEPTOR DRAIN CLEANOUT - 200mm Ø HDPE NON-PERFORATED DRAINAGE TUBING INVERT ELEV. = 320.972 STA. = 10+079.947 Revision/ Description/Description .1 Revision Date/Date #5 0.35 THK. CLASS 10kg RIPRAP Client/client GEOSYNTHETIC CLAY LINER ENCASED IN Public Services and .2 #5 NONWOVEN GEOTEXTILE (ABOVE AND BELOW) IMPERVIOUS FILL Procurement Canada 322 200mm Ø HDPE 322 .3 DRAINAGE TUBING (TYP.) NONWOVEN GEOTEXTILE #5 200mm Ø PERFORATED HDPE DRAINAGE TUBING Project title/Titre du projet .4 #5 END INTERCEPTOR DRAIN STA 5+786.390 KM 450.0 - 451.4 SLIDE STABILIZATION AND SAFETY .5 #5 IMPROVEMENTS ALASKA HIGHWAY, BC .6 #5 Approved by/Approuve par .7 G. WILKINS WILKINS / C. CHENG #5 320 320 .8 Designed by/Concept par #5 A. HORWOOD / E. YANG .9 #5 Drawn by/Dessine par A. DEEPWELL NONWOVEN GEOTEXTILE PWGSC Project Manager/Administrateur de Projets TPSGC .0 #6 A. TAHERI PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC .1 #6 Client/client Public Services and Procurement Canada Drawing title/Titre du dessin SEE INTERCEPTOR DRAIN OUTLET INTERCEPTOR DRAIN PROFILE DETAIL 1 - C204 5+620 5+640 5+660 5+680 5+700 5+720 5+740 5+760 5+780 5+790 INTERCEPTOR DRAIN PROFILE Project No./No. du Sheet/Feuille Revision no./ STA. 5+631.200 TO 5+786.390 (PROJECTED FROM ATV TRAIL CONTROL LINE) projet La Révision no. SCALE H 1:250 V 1:50 R.115165.001 C202 0
Public Services and Services publics et Procurement Canada Approvisionnement Canada NOTES: 1. STAGED CONSTRUCTION / SEQUENCING OF INTERCEPTOR DRAIN AND SLOT DRAINS IS REQUIRED - SEE SECTION 31 23 REAL PROPERTY SERVICES OFFSET DISTANCE TO ATV TRAIL CONTROL LINE - SEE TABLE C107 33 - EXCAVATION AND BACKFILL OF THE CONTRACT Pacific Region SPECIFICATIONS FOR DETAILS SERVICES IMMOBILIERS 2. ATV TRAIL DETAILS SHOWN IN GREY FOR REFERENCE - SEE Région du Pacifique C301 FOR TYPICAL SECTIONS AND C304 FOR DETAILS. PURPOSE BUILT GALVANIZED 3. CONCRETE BLOCK WALL DETAILS SHOWN IN GREY FOR ISSUED FOR TENDER STEEL CAP - TOP OF CAP SET REFERENCE - SEE C304 FOR DETAILS. FLUSH WITH TOP OF RIPRAP GENERAL NOTES: 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE EXISTING GROUND 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN AND SLOT DRAINS MAY BE DIRECTED BY THE 4 3 DEPARTMENTAL REPRESENTATIVE DURING WORK 1 1 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED FILTER GRAVEL INTERCEPTOR DRAIN CLEANOUT - 200mm Ø HDPE DRAINAGE TUBING (LOCATIONS SHOWN ON C202) EXCAVATION IN ACCORDANCE WITH SECTION 31 23 33 - EXCAVATION AND BACKFILL OF THE CONTRACT SPECIFICATIONS VARIES 10 NONWOVEN GEOTEXTILE EXISTING TREELINE 1 200 mm Ø HDPE PERFORATED HDPE DRAINAGE TUBING (PERFORATIONS DOWN) TYPICAL LAYOUT POINT (EXAMPLE #5.4). 10 SEE C201 FOR LOCATION AND ELEVATION 1 0.75 0.75 TYPICAL SECTION A INTERCEPTOR DRAIN TYPICAL FROM STA. 5+631.200 TO 5+786.390 - 1:25 GEOTECHNICAL Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C301-C311 TYPICAL DETAILS.dwg [C203] May 18, 2021 - 11:49:52 am (BY: DEEPWELL, ANDREW) 0 0.5 1:50 2.5m TYPICAL LAYOUT POINT (EXAMPLE #3.1). SEE C201 FOR LOCATION AND ELEVATION CL OFFSET DISTANCE TO ATV TRAIL CONTROL LINE - SEE TABLE C107 1 1 Revision/ Description/Description Date/Date Revision Client/client Public Services and Procurement Canada NONWOVEN GEOTEXTILE FILTER GRAVEL MIN. 1.5 WIDE AT BOTTOM OF EXCAVATION Project title/Titre du projet AND WRAPPED ON ALL SIDES WITH NONWOVEN GEOTEXTILE 3 1 KM 450.0 - 451.4 SLIDE STABILIZATION AND SAFETY IMPROVEMENTS ALASKA HIGHWAY, BC Approved by/Approuve par G. WILKINS WILKINS / C. CHENG Designed by/Concept par TYPICAL LAYOUT POINT (EXAMPLE #3.2). A. HORWOOD / E. YANG VARIES SEE C201 FOR LOCATION AND ELEVATION Drawn by/Dessine par A. DEEPWELL PWGSC Project Manager/Administrateur de Projets TPSGC A. TAHERI PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC INTERCEPTOR DRAIN, NONWOVEN GEOTEXTILE SEE TYPICAL SECTION A Client/client 200mm Ø PERFORATED HDPE DRAINAGE TUBING Public Services and Procurement Canada Drawing title/Titre du dessin 0.75 0.75 TYPICAL LAYOUT POINT (EXAMPLE #3.3). INTERCEPTOR AND SLOT DRAIN SEE C201 FOR LOCATION AND ELEVATION SECTIONS 200mm Ø PERFORATED HDPE DRAINAGE TUBING TYPICAL LAYOUT POINT (EXAMPLE #5.4). SEE C201 FOR LOCATION AND ELEVATION TYPICAL SECTION B INTERCEPTOR DRAIN Project No./No. du projet Sheet/Feuille Revision no./ La Révision no. TYPICAL AT SLOT DRAINS - STA. 5+644.035, STA. 5+666.823, 1:50 - STA. 5+689.613, STA. 5+712.127 R.115165.001 C203 0
Public Services and Services publics et NOTES: Procurement Canada Approvisionnement Canada 1. STAGED CONSTRUCTION / SEQUENCING OF INTERCEPTOR DRAIN AND SLOT DRAINS IS REQUIRED - SEE SECTION 31 23 REAL PROPERTY SERVICES 33 - EXCAVATION AND BACKFILL OF THE CONTRACT Pacific Region SPECIFICATIONS FOR DETAILS 2. ATV TRAIL DETAILS SHOWN IN GREY FOR REFERENCE - SEE SERVICES IMMOBILIERS C301 FOR TYPICAL SECTIONS AND C304 FOR DETAILS. Région du Pacifique 3. CONCRETE BLOCK WALL DETAILS SHOWN IN GREY FOR REFERENCE - SEE C304 FOR DETAILS. ISSUED FOR TENDER PLAN GENERAL NOTES: DETAIL A TYPICAL INTERCEPTOR DRAIN 1. DIMENSIONS, COORDINATES, ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE OUTLET PROTECTION 1:50 C107 2. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE 0.35 THK CLASS 10kg RIPRAP (SEE RIPRAP LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION DITCH DETAILS C302 AND C303) 3. THE LOCATIONS AND EXTENT OF INTERCEPTOR DRAIN AND SLOT DRAINS MAY BE DIRECTED BY THE GEOSYNTHETIC CLAY LINER ENCASED IN NONWOVEN GEOTEXTILE DEPARTMENTAL REPRESENTATIVE DURING WORK (ABOVE AND BELOW) (SEE RIPRAP DITCH DETAILS C302 AND C303) 4. ALL DISTURBED AREAS TO BE HYDRAULIC SEEDED IMPERVIOUS FILL (SEE RIPRAP DITCH DETAILS C302 AND C303) END INTERCEPTOR DRAIN SEE DETAIL 1 C302 START RIPRAP DITCH STA. 5+786.390 NONWOVEN GEOTEXTILE (SEE RIPRAP 0.65 THK CLASS 10kg RIPRAP DITCH DETAILS C302 AND C303) 1.0 INSTALL PURPOSE BUILT GALVANIZED STEEL "ANIMAL GUARD" COMPLETE WITH DRAINAGE MESH AND SECURED TO END OF PERFORATED HDPE DRAINAGE TUBING 0.1 EXISTING GROUND 2.0 FILTER GRAVEL 200mm Ø PERFORATED HDPE DRAINAGE TUBING NONWOVEN GEOTEXTILE GEOSYNTHETIC CLAY LINER ENCASED IN NONWOVEN GEOTEXTILE (ABOVE AND BELOW), WHERE NEEDED, OVERLAP GEOSYNTHETIC CLAY LINER MIN. 600 mm IN DIRECTION OF POSITIVE DRAINAGE (TYP.) DETAIL 1 INTERCEPTOR DRAIN OUTLET 1:50 C201 GEOTECHNICAL Q:\Vancouver\Transportation\TRN.VHWY\Projects\TRN.VHWY03091 Alaska Highway Km 450.6 Slide\400 - Drawings\C301-C311 TYPICAL DETAILS.dwg [C204] May 18, 2021 - 11:50:00 am (BY: DEEPWELL, ANDREW) 0 0.5 1:50 2.5m MIN 200mm 250 mm Ø CSP PIPE INSERTION OVERLAP 200 mm Ø PERFORATED HDPE DRAINAGE TUBING (TYP) Revision/ Description/Description Date/Date Revision Client/client 200 mm Ø PERFORATED HDPE DRAINAGE TUBING (TYP) Public Services and MIN 200mm INSERTION OVERLAP Procurement Canada 90° THREE-WAY CONNECTION PIPE (250 Ø CSP) 45° BEND (THREE UNITS) DRAIN PIPE (TYP.) DETAIL 2 HDPE DRAINAGE TUBING DETAIL 3 HDPE DRAINAGE TUBING THREE-WAY CONNECTION 45° BEND Project title/Titre du projet - - NTS NTS KM 450.0 - 451.4 SLIDE STABILIZATION AND SAFETY INTERCEPTOR DRAIN CLEANOUT - R 1.0 IMPROVEMENTS 200mm Ø HDPE DRAINAGE TUBING ALASKA HIGHWAY, BC Approved by/Approuve par G. WILKINS WILKINS / C. CHENG Designed by/Concept par A. HORWOOD / E. YANG 200 mm Ø PERFORATED HDPE Drawn by/Dessine par DRAINAGE TUBING (TYP) A. DEEPWELL PWGSC Project Manager/Administrateur de Projets TPSGC DETAIL 4 HDPE DRAINAGE TUBING A. TAHERI WYE CONNECTION TO CLEANOUT - NTS PWGSC, Architectural and Engineering Resources Manager/ Ressources Architectural et de Directeur d'Ingénierie, TPSGC Client/client Public Services and Procurement Canada Drawing title/Titre du dessin INTERCEPTOR DRAIN DETAILS Project No./No. du Sheet/Feuille Revision no./ projet La Révision no. R.115165.001 C204 0
You can also read