KL118 Project: Space Constraint Pose Installation Challenges
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
KL118 Project: Space Constraint Pose Installation Challenges LINTEC Concrete Technologies (LCT) would like to proudly Our customer initially highlighted that there were space announce that we are the concrete batching plant supplier constraints that LCT had to work around, and at the for the KL118 project in Kuala Lumpur, Malaysia. Upon same time our EUROTEC concrete batching plant had to completion, the KL118 tower will be the tallest building in achieve an output capacity of 200cu.m. Despite the Malaysia - surpassing the iconic Petronas Twin Towers, challenges, our in-house design team came up with a second in Asia and on the list of mega-tall buildings customised engineering solution that met all of our globally (Daily Express, 2016). The project has been customer’s requirements and needs. The size of the undertaken by Permodalan Nasional Berhad on a 19-acre cement weighing hopper was increased to produce land and is expected to be fully completed by 2019 (Daily quality grade concrete based on the customer’s mix Express, 2016). The building will also be the first in recipe. Also, another highlight of this plant is the 4 Malaysia to satisfy the triple green building platinum index motors attached to its concrete mixer. These accreditations locally and internationally – the Green customisations ultimately increases the efficiency, Building Index, GreenRe and the Leadership and Energy improves the consistency and maintains the and Environmental Design (KL118, 2016). homogeneity of the concrete, and it has been proven to be able to produce top grade M105 concrete. Water Chiller and Flake Ice Machine 4 Motors Twin Shaft Mixer Daily Express, 2016. Home / National News. http://www.dailyexpress.com.my/news.cfm?NewsID=104734 KL118, 2016. Malaysia to get new iconic landmark KL118. http://www.kl118.com.my/malaysia-to-get-new-iconic-landmark-kl118/
FIKIN Project: Targeted to Build First Modern City in Congo with ECO Plant The FIKIN housing estate project is launched with the goal of the plant are specifically designed make of building a ‘cité modern’ (modern city) in Kinshasa transportation easier. JSL is notable for providing Congo. This will improve the housing quality and condition customised solution for its clients’ needs. Similarly, JSL for the residents living in Kinshasa. The allocated project included a customized weighing layer with an additional area will comprise of 14 high-rise residential buildings with platform on its plant to increase the ease of maintenance 630 apartments, 14 villas, a 5-star hotel, commercial for local operators. Since the commencement of its buildings and recreational facilities. As one of the operation, the 4ECO90T plant has successfully pioneering city projects in Congo, it provides a platform of achieved the concrete production requirement of growth for the city, creating jobs as well as providing quality 90m3/hr, therefore expediting the construction process. accommodation for citizens and foreigners alike. China First Highway Engineering Co. Ltd. (CFHE), a subsidiary of China Communication Construction Co. Ltd. (CCCC), is selected to spearhead the construction in this project. In order to support the FIKIN project with a reliable and durable supply of concrete, CFHE selected LINTEC China as its concrete batching plant supplier. Given the magnitude of this project, the Eurotec 4ECO90T concrete batching plant was utilised as it provided cost effective solution without compromising production efficiency. Furthermore, the modular and portable features Concrete Mixer Tower FIKIN Project
Kurumoch International Project: LINTEC Plant Produced 120,000 cu.m Quality Concrete LINTEC Type CC 3000 B Concrete Mixing Plant: promise of a reliable concrete supply through its mobile Recognising its reliable and steady operation for the and efficient containerized concrete batching plants. Kurumoch Development Project, the modernization and construction of Kurumoch International Airport in Samara, As the project requires a high daily output of quality Russia. concrete, the type CC 3000 B batching plant was used. With an output capacity of 120m3/h, the plant is known The Kurumoch International Airport is located 35km north of to have served reliably in other runway construction the city Samara in Russia. The airport serves the 3.2 million projects located in Russia. But for the Kurumoch citizens of the federal subject, Samara Oblast and is development project, LINTEC engineered a special recognized as the most important airport in Volga, a federal aggregate feeding system to cater to the project’s district in Russia. It ranks as one of the fifteen busiest special needs. airports in the Russia in 2015 with a passenger traffic of over 2 million. By the end of June 2012, the LINTEC plant was setup and commenced operations. Day and night shifts put in On 17th January 2012, an investment agreement was place to maintain the constant supply of concrete for the signed to commence the Kurumoch development project airport that covers a total area of more than 170,000 m². which spearheads the construction and expansion of a new Till today, the plant is operational without complications and existing terminal respectively. Given the scale of the on-site and has produced over 120,000m3 of high project, there were special requirements for the quality concrete. Once this project is completed, the composition and quality of the concrete mix. The concrete plant can be shifted relative ease and cost efficiency to supplied for the construction of the airport’s runways and another demanding project due to its mobile, parking areas needed to withstand the demands of the containerized system. LINTEC Germany Gmbh is truly anticipated increase in passenger traffic. LINTEC Germany honoured to serve this prestigious project in Kurumoch Gmbh was selected as the concrete batching equipment International Airport. supplier in this prestigious project due the company’s
Aba-Mega Smart Mall Project: Delivered First SMART Plant with Free Standing Silo Lafarge Nigeria appointed as concrete supplier for the dation required, the silos manage to sustain the stability biggest shopping center in Nigeria: Aba Mega Mall, devel- throughout whole operation. The plant includes built-in oping by Greenfield Assets Nigeria Limited (“GANL”) in control room by default and second tier platform to form partnership with Abia State government. The project costs a compact design which suitable for limited space in the approximately $300 million, expecting it will transform the jobsite. way in which African trades. This project will be a purpose-built smart mall community with 100,000 sqm of retail space, wholesale distributor, bank, multiplex movie theater and transport system (Nsehe, 2015). It would be managed and maintain by first class manager to enhance the experience of activity and safety in leisure, shopping and business. They hope this development will regenerate sub-Saharan’s communities and empower lives, boost up commerce and expanding economic activities in Nigeria subsequently (Egbedi, 2015). LINTEC Concrete Technologies supplied EUROTEC SMART Concrete Batching Plant to this project with 45cum/hour. The highlight of the plant is the new design of free standing 50Ton Silos. Despite no need civil work foun- Free Standing Silos Aba Mega SMART Mall Egbedi, H. (2015, February 20). N50BN ABA MEGA MALL: THE WORLD’S FIRST SMART MALL IS TAKING SHAPE IN EASTERN NIGERIA. Retrieved from Ventures: http://venturesafrica.com/n50bn-aba-mega-mall-the-worlds-first-smart-mall-is-taking-shape-in-eastern-nigeria/ Nsehe, M. (2015, July 21). Nigeria Is Building A $300 Million Smart Mall In Aba City. Retrieved from Forbes: http://www.forbes.com/sites/mfonobongnsehe/2015/07/21/the-nigerian-building-a-300-million-smart-mall-in-aba-city/#32fc31c32bf3
New Members We welcome Mr.Ricky and Mr. Barani to join LINTEC Concrete Technologies family. They are responsible in Mechanical Design and Electrical Engineer respectively. We believe they can strengthen our team with their expertise. We wish them all the best and hope they enjoy excellent time working with us. RICKY BARANI Mechanical Engineer Electrical and Electronic Engineer DID: +65 66430866 DID: +65 66430820 ricky@lintecconcrete.com barani@lintecconcrete.com Exhibitions Bauma Munich, Germany Bauma ShangHai, China Build Kenya, Kenya Construction Sri Lanka, Sri Lanka Philconstruct, Philippines Ethio-con, Ethiopia West African Building and Construction,Ghana LINTEC Concrete Technologies Pte Ltd 71 Tech Park Crescent, Tuas Tech Park, Singapore 638072 | Tel:+65 68618770 Fax: +65 68618768 | www.lintecconcrete.com | info@lintecconcrete.com
You can also read