LINTEC Concrete Technologies (LCT) would like to proudly                     Our customer initially highlighted that there were space
announce that we are the concrete batching plant supplier                    constraints that LCT had to work around, and at the
for the KL118 project in Kuala Lumpur, Malaysia. Upon                        same time our EUROTEC concrete batching plant had to
completion, the KL118 tower will be the tallest building in                  achieve an output capacity of 200cu.m. Despite the
Malaysia - surpassing the iconic Petronas Twin Towers,                       challenges, our in-house design team came up with a
second in Asia and on the list of mega-tall buildings                        customised engineering solution that met all of our
globally (Daily Express, 2016). The project has been                         customer’s requirements and needs. The size of the
undertaken by Permodalan Nasional Berhad on a 19-acre                        cement weighing hopper was increased to produce
land and is expected to be fully completed by 2019 (Daily                    quality grade concrete based on the customer’s mix
Express, 2016). The building will also be the first in                       recipe. Also, another highlight of this plant is the 4
Malaysia to satisfy the triple green building platinum index                 motors attached to its concrete mixer. These
accreditations locally and internationally – the Green                       customisations ultimately increases the efficiency,
Building Index, GreenRe and the Leadership and Energy                        improves the consistency and maintains the
and Environmental Design (KL118, 2016).                                      homogeneity of the concrete, and it has been proven to
                                                                             be able to produce top grade M105 concrete.
    Water Chiller and Flake Ice Machine                                            4 Motors Twin Shaft Mixer

                                           Daily Express, 2016. Home / National News. http://www.dailyexpress.com.my/news.cfm?NewsID=104734
                                           KL118, 2016. Malaysia to get new iconic landmark KL118. http://www.kl118.com.my/malaysia-to-get-new-iconic-landmark-kl118/
KL118 Project: Space Constraint Pose Installation Challenges
FIKIN Project: Targeted to Build First Modern City in Congo with ECO Plant

The FIKIN housing estate project is launched with the goal            of the plant are specifically designed make
of building a ‘cité modern’ (modern city) in Kinshasa                 transportation easier. JSL is notable for providing
Congo. This will improve the housing quality and condition            customised solution for its clients’ needs. Similarly, JSL
for the residents living in Kinshasa. The allocated project           included a customized weighing layer with an additional
area will comprise of 14 high-rise residential buildings with         platform on its plant to increase the ease of maintenance
630 apartments, 14 villas, a 5-star hotel, commercial                 for local operators. Since the commencement of its
buildings and recreational facilities. As one of the                  operation, the 4ECO90T plant has successfully
pioneering city projects in Congo, it provides a platform of          achieved the concrete production requirement of
growth for the city, creating jobs as well as providing quality       90m3/hr, therefore expediting the construction process.
accommodation for citizens and foreigners alike.

China First Highway Engineering Co. Ltd. (CFHE), a
subsidiary of China Communication Construction Co. Ltd.
(CCCC), is selected to spearhead the construction in this
project. In order to support the FIKIN project with a reliable
and durable supply of concrete, CFHE selected LINTEC
China as its concrete batching plant supplier.
Given the magnitude of this project, the Eurotec 4ECO90T
concrete batching plant was utilised as it provided cost
effective solution without compromising production
efficiency. Furthermore, the modular and portable features

                                               Concrete Mixer Tower
    FIKIN Project
KL118 Project: Space Constraint Pose Installation Challenges
Kurumoch International Project: LINTEC Plant Produced 120,000 cu.m Quality Concrete

LINTEC Type CC 3000 B Concrete Mixing Plant:                    promise of a reliable concrete supply through its mobile
Recognising its reliable and steady operation for the           and efficient containerized concrete batching plants.
Kurumoch Development Project, the modernization and
construction of Kurumoch International Airport in Samara,       As the project requires a high daily output of quality
Russia.                                                         concrete, the type CC 3000 B batching plant was used.
                                                                With an output capacity of 120m3/h, the plant is known
The Kurumoch International Airport is located 35km north of     to have served reliably in other runway construction
the city Samara in Russia. The airport serves the 3.2 million   projects located in Russia. But for the Kurumoch
citizens of the federal subject, Samara Oblast and is           development project, LINTEC engineered a special
recognized as the most important airport in Volga, a federal    aggregate feeding system to cater to the project’s
district in Russia. It ranks as one of the fifteen busiest      special needs.
airports in the Russia in 2015 with a passenger traffic of
over 2 million.                                                 By the end of June 2012, the LINTEC plant was setup
                                                                and commenced operations. Day and night shifts put in
On 17th January 2012, an investment agreement was               place to maintain the constant supply of concrete for the
signed to commence the Kurumoch development project             airport that covers a total area of more than 170,000 m².
which spearheads the construction and expansion of a new        Till today, the plant is operational without complications
and existing terminal respectively. Given the scale of the      on-site and has produced over 120,000m3 of high
project, there were special requirements for the                quality concrete. Once this project is completed, the
composition and quality of the concrete mix. The concrete       plant can be shifted relative ease and cost efficiency to
supplied for the construction of the airport’s runways and      another demanding project due to its mobile,
parking areas needed to withstand the demands of the            containerized system. LINTEC Germany Gmbh is truly
anticipated increase in passenger traffic. LINTEC Germany       honoured to serve this prestigious project in Kurumoch
Gmbh was selected as the concrete batching equipment            International Airport.
supplier in this prestigious project due the company’s
KL118 Project: Space Constraint Pose Installation Challenges
Aba-Mega Smart Mall Project: Delivered First SMART Plant with Free Standing Silo

Lafarge Nigeria appointed as concrete supplier for the                                                                         dation required, the silos manage to sustain the stability
biggest shopping center in Nigeria: Aba Mega Mall, devel-                                                                      throughout whole operation. The plant includes built-in
oping by Greenfield Assets Nigeria Limited (“GANL”) in                                                                         control room by default and second tier platform to form
partnership with Abia State government. The project costs                                                                      a compact design which suitable for limited space in the
approximately $300 million, expecting it will transform the                                                                    jobsite.
way in which African trades. This project will be a
purpose-built smart mall community with 100,000 sqm of
retail space, wholesale distributor, bank, multiplex movie
theater and transport system (Nsehe, 2015). It would be
managed and maintain by first class manager to enhance
the experience of activity and safety in leisure, shopping
and business. They hope this development will regenerate
sub-Saharan’s communities and empower lives, boost up
commerce and expanding economic activities in Nigeria
subsequently (Egbedi, 2015).

LINTEC Concrete Technologies supplied EUROTEC
SMART Concrete Batching Plant to this project with
45cum/hour. The highlight of the plant is the new design of
free standing 50Ton Silos. Despite no need civil work foun-

                                                                                      Free Standing Silos

          Aba Mega SMART Mall

Egbedi, H. (2015, February 20). N50BN ABA MEGA MALL: THE WORLD’S FIRST SMART MALL IS TAKING SHAPE IN EASTERN NIGERIA. Retrieved from Ventures:
http://venturesafrica.com/n50bn-aba-mega-mall-the-worlds-first-smart-mall-is-taking-shape-in-eastern-nigeria/
Nsehe, M. (2015, July 21). Nigeria Is Building A $300 Million Smart Mall In Aba City. Retrieved from Forbes: http://www.forbes.com/sites/mfonobongnsehe/2015/07/21/the-nigerian-building-a-300-million-smart-mall-in-aba-city/#32fc31c32bf3
KL118 Project: Space Constraint Pose Installation Challenges
New Members

We welcome Mr.Ricky and Mr. Barani to join LINTEC Concrete Technologies family. They are responsible in Mechanical
Design and Electrical Engineer respectively. We believe they can strengthen our team with their expertise. We wish them
all the best and hope they enjoy excellent time working with us.

                             RICKY                                                                                               BARANI
                             Mechanical Engineer                                                                                 Electrical and Electronic Engineer
                             DID: +65 66430866                                                                                   DID: +65 66430820
                             ricky@lintecconcrete.com                                                                            barani@lintecconcrete.com

      Exhibitions

    Bauma Munich, Germany                                                                        Bauma ShangHai, China

    Build Kenya, Kenya                                       Construction Sri Lanka, Sri Lanka                                 Philconstruct, Philippines

                                       Ethio-con, Ethiopia                                                           West African Building and
                                                                                                                     Construction,Ghana

LINTEC Concrete Technologies Pte Ltd
71 Tech Park Crescent, Tuas Tech Park, Singapore 638072 | Tel:+65 68618770 Fax: +65 68618768 | www.lintecconcrete.com | info@lintecconcrete.com
KL118 Project: Space Constraint Pose Installation Challenges KL118 Project: Space Constraint Pose Installation Challenges KL118 Project: Space Constraint Pose Installation Challenges KL118 Project: Space Constraint Pose Installation Challenges KL118 Project: Space Constraint Pose Installation Challenges