IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...

Page created by Nathaniel Mcguire
 
CONTINUE READING
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
IT’S IN OUR HANDS
Kai roto i ō tātou rikarika
#toitūWaitaha #ourCanterbury

Deciding what the future of Canterbury looks like:
Environment Canterbury’s 10-year plan
Te Pae Tawhiti 2021-31
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
Contents
    Ngā wāhanga o roto
                                                                Long-Term Plan 2021-31
    In this consultation document for the draft                 Te Pae Tawhiti 2021-31
    Long-Term Plan 2021-31 we want to step you
                                                                                        Tēnā koutou katoa                                       and it is not an insignificant amount of money. Council
    through council’s vision, the extent of what                                                                                                acknowledges that the price to pay is not just financial,
                                                                                        Waitaha/Canterbury is a magnificent                     and that there is also a need for increased action from
    we are trying to tackle, what we believe could                                      region in which to live, work and play,                 Environment Canterbury and from the people of the
    be a way to do this, and what it would require                                      and I’m sure I’m one of many who                        region. That needs to be balanced against the price we
    from ratepayers to help deliver that vision.                                        counts themselves very fortunate                        will pay as a community if we do not take that action.
                                                                                        to live here. But as magnificent as
    We invite your feedback.                                                                                                                    The total contribution from rates could be up to 24.5%
                                                                                        our region is, there are undoubtedly
                                                                                        things we need to fix.                                  more than for the current year, if we were to do everything
    Introduction......................................... 2                                                                                     we propose in Option 1 in this document. We have also
    The Council.......................................... 3     We all share a collective responsibility for the future                         outlined a second option that comes with a proposed
    The Power of Partnerships...................... 4           of our region, and the task ahead of us is not a small                          increase in total rates income of 18%. These percentages
                                                                one. The environment has become the issue of our age,                           represent average increases of $136.06 and $110.55
    Our Strategic Direction.......................... 6         and the human impact on our planet has never been                               respectively per ratable property.*
    Challenges and Opportunities................. 8             more at the forefront of local and global thinking. The
    Proposed Options for Feedback.............10                Canterbury Regional Council (Environment Canterbury)                            In this document you will hear our views - now we
                                                                acknowledged that concern by signing, in May 2019,                              need to hear yours.
    Portfolios............................................ 16
                                                                the Climate Emergency declaration. Others followed,
    Key Policies.........................................24                                                                                     Do you want to see the changes at the scale and
                                                                highlighting an increasing call for urgent action.
    Rates and Borrowing............................26                                                                                           timeframe we propose in the draft plan? And ultimately
                                                                Environment Canterbury is required – by our community                           are you able and willing to pay what is being asked for?
    Option 1 Financials...............................28
                                                                and by central government – to not just stop any decline
    Option 2 Financials...............................32                                                                                        These are big decisions, and Council is looking for your
                                                                in our environment, but to actively improve it for future
                                                                                                                                                feedback. It is important that we hear your views. I urge
    Rates Explained...................................36        generations. We know what needs to be done to deliver                           you to be informed, consider what is important, and to
    Auditor’s Report..................................37        what we are required to do by legislation, but now we                           tell us what you think. To find out how to have your say,
    How to Make a Submission....................38              are looking at how we must go beyond that if we are to                          please refer to the back of this document or speak to
                                                                see the gains we want to see in this beautiful part of the                      one of your elected councillors.
                                                                world before it is too late.
                                                                                                                                                Ngā mihi
                                                                This consultation document outlines what is in our draft
                                                                Long-Term Plan 2021-31. The ten-year plan outlines all
                                                                the activity that we propose to undertake over the next
                                                                decade. It also outlines how we propose to pay for the                          Jenny Hughey
                                                                activity – through grants, user-pays and rates income –                         Chair
                                                                *not all ratepayers would pay the same increase, as each property’s rates depends upon the mix of rating types and Capital Value.
                                                                Please have a look at page 13 for sample properties, and see our online rates calculator tool to see what it will mean for you.
2
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
Our vision and purpose                                 Ngāi Tahu
                                                      Tumu Taiao                                                                                       The region’s future
Mō tātou moemoeā me aronga                                                                                                                             is in our hands
                                                                                                                                                       Kai ō tātou rikarika te
Taking action together to shape a                    Yvette
                                                  Couch-Lewis
                                                                 Iaean
                                                                Cranwell
                                                                                                                                                       takiwā mō āpōpō
thriving and resilient Canterbury,
                                                                                                                                                       Collectively we have the ability to change
now and for future generations                                                                                                                         the world through our decisions and actions.
Toitū te marae o Tāne, toitū te
marae o Tangaroa, toitū te iwi.                                                                                                                        Environment Canterbury works with Ngāi Tahu
                                                                                                                                                       Papatipu Rūnanga, other councils in the region,
Before starting work on the draft                                                                                                                      stakeholders, central government and the wider
                                                                                                                                                       community to manage the use and quality of our
Long-Term Plan 2021-31, Council                                                                                                                        natural resources, including freshwater, coastal
developed our strategic direction,                                                                                                                     waters, air and biodiversity. Together we aim
working systematically through                                                                                                                         to enhance our quality of life, while improving
                                                                                                                                                       environmental sustainability, balancing the
all that needs to be done –                                                                                                                            cultural, social, economic and environmental
identifying enduring priorities                                                                                         Innes
                                                                                                                                                       wellbeings of the region.
we need to continue, and
                                                                                Harewood

                                                                                                              Papanui
                                                                                                                                      Coastal

                                                                                                                                 Burwood
                                                                                                                                                       We also have responsibilities for the protection
transformational opportunities                                                       Waimairi
                                                                                                       Fendalton                                       from floods, of people, homes and assets;
                                                                           Hornby                 Riccarton         Central
                                                                                                                                                       delivering the public transport network; civil
to accelerate environmental change                                                                        Spreydon
                                                                                                                                Linwood

                                                                                                                                                       defence; urban development; the Harbourmaster’s
                                                                                      Hallswell

and community wellbeing.
                                                                                                                                           Heathcote
                                                                                                                    Cashmere
                                                                                                                                                       functions, and more, as outlined in this document
                                                                                                                                                       and on ecan.govt.nz/your-council.
This work has been the foundation of
                                                                                                                                                       Our region covers an area of more than 45,000 km²
this draft Long-Term Plan for 2021 to 2031.                                                                                                            – from Kekerengu Point, north of the Clarence River,
                                                                                                                                                       south to the Waitaki River and west to the Southern
                                                                                                                                                       Alps. Canterbury is home to about 646,000 people,
                                                                                                                                                       and has 78,000 km of rivers and streams, 4,700
                                                                                                                                                       lakes and tarns, and around 800 km of coastline.
                                                                                                                                                       The Council monitors 24,000 resource consents
                                                                                                                                                       associated with the use of Canterbury’s natural
                                                                                                                                                       resources, ensuring agreed environmental limits
                                                                                                                                                       are met and improved over time through transition
                                                                                                                                                       to better practices than those of the past.

Consultation Document | Deciding our Long-Term Plan 2021-31                                                                                                                                           3
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
The power of partnerships
      Te mana o ngā hononga

We can’t – and don’t - do all the work we need to do         The Tuia Relationship Agreement underpins our                youth across Waitaha with their regional council.
by ourselves. Environment Canterbury works closely           partnership with the ten Papatipu Rūnanga of the region,     They run regular Youth Meet Ups and meetings with the
with Ngāi Tahu Papatipu Rūnanga, the ten territorial         working with them as they fulfil their role as mana whenua   Council’s elected member and staff. They provide input
authorities (local Councils) and other entities across the   and exercise kaitiakitanga. Our shared vision recognises     into organisational plans such as this Long-Term Plan,
region and outside it, as well as with our communities,      the relationship between Ngāi Tahu and their ancestral       and into regional resource management plans, and
and the outcomes are far better for it. Working together     land, and the fact it is inextricably affected by the work   campaigns such as our climate change work. They have
means we are able to share knowledge, compare data,          we do at Environment Canterbury. This partnership was        representation on some of the water zone committees
get a range of views, collaborate on design and delivery,    strengthened in 2020, with the appointment of two Tumu       and link up Environment Canterbury with other youth
and share resources.                                         Taiao (mana whenua experts) to Council.                      organisations through relationships and events.

Our Tuia relationship                                        Environment Canterbury Youth Rōpū                            Mayoral Forum
In 2012, Ngāi Tahu and Environment Canterbury signed         Our Youth Rōpū is a body of young people aged 14-24          The Canterbury Mayoral Forum is the primary
an agreement known as Tuia. Tuia means working               who are passionate about the environment, civics and         mechanism for local government communication,
together shoulder to shoulder. The agreement marked          empowering young people across Waitaha. Made up of           co-ordination and collaboration for the Canterbury
a new era of collaboration between the organisations         16 members, two from each voting constituency and two        region and its communities. Its members are the
and a new approach to the management of natural              mana whenua representatives, the Youth Rōpū has been         mayors of the ten territorial authorities in Canterbury
resources in the region, one which acknowledges and          formed to facilitate a two-way relationship between          and the Chair of Environment Canterbury. The Mayoral
brings together the tikanga responsibilities of Ngāi         young people and decision makers in the region.              Forum focuses on issues that affect the whole of the
Tahu and the statutory responsibilities of Environment                                                                    Canterbury region, such as freshwater management
Canterbury, creating better outcomes for everyone.           This group works to two clear priorities: to ensure the      (via the Canterbury Water Management Strategy), and
                                                             voices of young people are heard by decision makers          climate change-related work.
                                                             and staff at Environment Canterbury, and to engage

  4
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
The Forum works carefully to complement not compete                       Working with others
with the work of the member Councils, recognising
and respecting the statutory obligations of the                           As well as these key partnerships, we work with
different entities.                                                       landowners and homeowners, industry and individuals
                                                                          to undertake the considerable amount of work that is
                                                                          needed to make change in our region.
Greater Christchurch Partnership
                                                                          We work on the ground with community groups, and
Environment Canterbury is part of the Greater                             collaboratively with a range of government and non-
Christchurch Partnership – covering Christchurch                          government entities to advance key initiatives, such
City and the Selwyn and Waimakariri districts. The                        as the Mackenzie Basin alignment project and ongoing
partnership plays a key role in developing a clear, shared                work to restore our iconic braided rivers.
view of our future, and a plan for how we get there.
                                                                          Lastly – we need you, as Cantabrians, to participate
The partnership is vital, given 82% of Canterbury’s                       in our work, at the very least by telling us what you
population lives in the Greater Christchurch area.                        think of the options put forward in this consultation
Environment Canterbury’s Greater Christchurch                             document and the financial tools that support it.
partners are the Christchurch City Council, the Selwyn
and Waimakariri District Councils, Te Rūnanga o
Ngāi Tahu, the Canterbury District Health Board,
Waka Kotahi NZ Transport Agency and the
Department of the Prime Minister and Cabinet
(Greater Christchurch Group).

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                  5
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
Our Strategic Direction
      Ā mātou aronga rautaki

Turning vision and purpose                                 we reasonably ask of different parts of the community?      knowing that often the best solutions come from those
                                                           And of course, it comes down to money. While                being asked to invest the most in the outcomes. All
into outcomes                                              the council is able to use income from a variety of         this requires funding as well as a shift in thinking and
The Long-Term Plan for 2021 to 2031 outlines the actions   sources, the pot is finite. Rates make up around half of    the ability to evolve in response to opportunities and
that will be undertaken over the coming years to achieve   Environment Canterbury’s income. We have to ensure          challenges as they present themselves.
the outcomes we, the community, and central government     we are focusing on the right things at the right time –
want to achieve. In order to land a final plan, we are     knowing that it all needs attention to ensure the best
consulting on the draft seeking community feedback.        return for our ratepayers.                                     Consultation
When the elected members of Environment Canterbury         When forming our strategic direction, we looked at what        The detail in the draft Long-Term Plan 2021-31 – the
put together our strategic direction – see opposite –      we must continue to do: our enduring priorities. There         actions and funding required to deliver the strategic
and the draft Long-Term Plan, we did so with a range       are increased actions required within these ongoing            direction – is where we need your input. Consultation
of views being represented around the table. These         programmes of work now, for example responding to              is open from Monday 8 March until Sunday 11
differences in opinion and perspective were not about      central government’s call for fast implementation of           April. In this document we refer to ‘supplementary
the outcomes – there is agreement that we all want         the new freshwater standards. We also considered               information’ and our rates tool. These are both
good quality freshwater, we know we must respond           the ‘transformational opportunities’. What we could            located online and contain in depth information about
to climate change, we know the region’s biodiversity       accelerate, and where the opportunities to really bring        the financials and the measures and targets proposed.
needs urgent action, and we all want to see the            about change lie. Both the transformational and the            The Supplementary Information also includes all our
investment made in flood protection works and Civil        increased enduring work requires more money.                   supporting policies that outline how Environment
Defence, for example. The differences come in the                                                                         Canterbury will undertake our work. We recommend
actions required to get there.                             Council also considered how we will work: our operating        that you have a look at the Supplementary Information
                                                           principles. These include working with Ngāi Tahu, our          as a reference document.
There were many questions asked before there were          community, and partners to ensure we are working to
any answers. When everything needs some action,            best effect for the region. We looked at investigating         We need the community with us if we are to deliver
where should the emphasis be put? How much                 alternative sources of funding, using technology and data      on our stated purpose, and to realise our vision. We
is enough in one area of activity, so we can focus         to optimise efficiencies and decision-making. We looked        need your views on the draft Long-Term Plan 2021-31.
resources and energy into another? How much can            at increasing investment into community engagement,

  6
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
SFO          R M AT I O N A L O P P O R
                                                                                                  R A N                                                          TUN
                                                                                            RT                                                                           ITIE
                                                                                     OU                                    Build community
                                                                                                                                                                                S
                                                                                                                             engagement
                                                                                                                              and action
                                                                                    Facilitate                                                                        Champion safe,
                                                                                  diversification                                                                       multi-modal
                                                                                   of land use
                                                                                                                   DU           RING PRIOR                           transport choices
                                                                                                              R EN                                      ITIE
                                                                                                         OU                                                      S
                                                        Accelerate                                                  Fostering             Sustainable
                                                       regeneration                                             relationships to          and healthy                                          Lead climate
                                                                                                 Decisive      underpin regional           living and          Helping                           change
                                                       of the natural                           action for                                                     communities                      resilience
                                                                                                               leadership for our           working
                                                       environment                          healthy fresh                                                      be well prepared
                                                                                                                  communities            environments
                                                                                         water, land and                                                       for changes in the
                                                                                      coastal ecosystems                                                       natural environment

                 Our vision                                                    Taking action together to shape a thriving and
                                                                               resilient Canterbury, now and for future generations.
                 and purpose                                                   Toitū te marae o Tāne, toitū te marae o Tangaroa, toitū te iwi.

                OUR VALUES
                                                                                                         OUR OPERATING PRINCIPLES
                 Manaakitanga
                  people first                 We will make good decisions by                                We will efficiently deliver through                       We will support this by investing in
                Whanaungatanga                 • Listening to the people to serve communities                our portfolios of work                                    • An enduring partnership with Ngāi Tahu
                 collaboration                 • Displaying confident and caring democratic leadership       • Water and Land                                          • Community participation locally and regionally
                 Kaitiakitanga                 • Working collaboratively with partners                       • Biodiversity and Biosecurity                            • High-performing people for success
                  stewardship                  • Being guided by our values                                  • Climate Change and Community Resilience                 • Knowledge: science, data and mātauranga Māori
                    Pononga                    • Taking into account cultural, social, economic and          • Air Quality, Transport, and Urban Development           • Securing a diversity of funding sources
                                                 environmental wellbeing
                    integrity                                                                                • Regional and Strategic Leadership                       • Opportunities through technology and innovation
                                               • Being evidence-based and future-focused
                   Māiatanga                   • Enabling innovation                                         *2021 portfolios
                     can do                    • Ensuring change is both managed and manageable

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                                                                                                           7
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
Challenges and Opportunities
      Ngā wero me ngā kōwhiringa

These are unprecedented times. When the Council            particularly in freshwater, has become a model for          To this end, Council has built a draft plan of activity
started the development of the strategic direction in      others to follow and it has put Canterbury in a good        and an associated budget to present to you for
2019, there was no sign of COVID-19 in New Zealand;        position to meet the new challenges head on. The            feedback. To develop this draft plan Council members
there was an indication that the government would be       question is, as a community, should we and can we           brought a wide range of views to the table. All
releasing new, stricter legislation around freshwater      step up the pace?                                           aspects of current and future work were discussed to
and related activity but the detail was unknown; and we                                                                determine what should and could be done, when the
were one of the only councils to have declared a Climate   There is a pressing need to see further improvements        work could reasonably be carried out, how the work
Emergency. We now face these and other issues in the       in water quality, manage significant pests, restore         could be paid for, and whether it would be affordable.
immediate term, and the draft Long-Term Plan for           degraded habitats, respond to climate change, and
2021-31 reflects these.                                    deliver a sustainable public transport network. We
                                                           are also presented with the opportunity to continue to      Preferred option for consultation
The last ten-year plan was developed in very different     create jobs in the community and accelerate a number        The Council agreed to present to the community a
times, steadily progressing change for a healthier         of pest control and river projects by attracting external   package of work totalling $246.54 million (2021/22
environment at the pace Council felt the community         funding through central government’s COVID recovery         year) and seek feedback. This is referred to as Option 1.
could sustain, developing unique and Canterbury-           fund and Jobs for Nature programme.
focused ways of working. Initiatives such as auditable                                                                 The proposed package includes all the statutorily
Farm Environment Plans for farms to manage                 To address these specific challenges, take advantage of     required work as well as provision to accelerate key
their environmental impact, and using water zone           the opportunity to move some significant projects faster,   initiatives for Canterbury. What is included in
committees to bring the wide range of community            and continue to deliver on major commitments already        Option 1 is outlined in this document and in more
voices to the table when developing rules for              made, such as public transport service enhancements,        detail in the Supplementary Information pack on
freshwater management, took time and considerable          we need a Long-Term Plan that requires a greater            haveyoursay.ecan.govt.nz/LTP. See pages 10 and 11
community investment to establish. Much of that work,      investment from the community. This investment would        in this document.
                                                           be both financial and in terms of the action needed.

  8
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
Alternative option for consultation
Council has also developed an alternative option for consideration
by the community. Option 2 is a total package of work costing
$240.19 million. This option will deliver what we are statutorily
required to do – which is still a significant amount of work – but
without the provision to accelerate the same number of projects,
with some of those identified in Option 1 delayed/scaled back or
not proposed to be funded in Option 2. Information on Option 1 and
Option 2 can be found on pages 10 to 15. More detailed financial
information for both options is located on pages 28-35, on our rates
tool rates.ecan.govt.nz and in the Supplementary Information at
haveyoursay.ecan.govt.nz/LTP.

               Do you think we have prioritised the
               right issues and opportunities?
   What do you feel are the significant
   challenges and opportunities we face?

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                    9
IT'S IN OUR HANDS Kai roto i ō tātou rikarika - Deciding what the future of Canterbury looks like: Environment Canterbury's 10-year plan Te Pae ...
We now need your input
         Ka hiahia mātou ō whakauru
In order to give informed feedback, the community                •    ctive regeneration of the natural environment and
                                                                     A                                                         of the implementation of the Regional Public Transport

1
needs to know all that needs doing and how much                      tree planting programme (Me Uru Rākau)                    Plan – such as increasing the frequency on selected
it would cost.                                                   •   Building community engagement (including youth           routes, moving to low and zero-emission vehicles,
                                                                      engagement) and alignment with other agencies            delivering the national ticketing system in Canterbury
                                                                                                                               – require ongoing funding to deliver an attractive, well-
                            Option 1                             •    Data collecting, sharing information and knowledge
                                                                                                                               utilised public transport offering.
                                                                       for optimal decision-making.
         Council’s
         preferred option
                             Kōwhiringa 1
                                                                 There is proposed provision for activity across all           Investing in COVID-19 recovery projects attracts
         for consultation          Option 1 addresses what
                                                                 aspects of our work as well as significant investment in      significant government funding for key biosecurity pest
                                   we must do and how we
      The full package of                                        a number of key, increasingly pressing issues – such as       control, environmental restoration and river works
                                   need to do it to bring
      activity to bring
                                                                 implementing the Government’s ‘Essential Freshwater’          – enabling us to undertake more work in a shorter
      about change.               about change (our enduring
                                                                 package, which prescribes new limits for farming activities   timeframe through this co-funding arrangement that
                                 priorities) and what we could
                                                                 and for water quality, and the associated planning and        also supports job creation in the region.
                                do in response to what we
                                believe is the community’s       implementation work that must now be introduced to
                                                                                                                               There is also additional work to do to evolve our
                      call for faster, more urgent action        build on the work already undertaken in our communities.
                                                                                                                               Compliance, Monitoring and Enforcement function
(the transformational opportunities). This is Council’s          In particular, the resource management concept of             to ensure our region’s resources are being utilised
preferred option for consultation so that the                    Te Mana o te Wai – the mana of the water – must               according to plan limits. This includes working with,
community can see all that could be done and                     be worked through, relying on the strength of our             and providing advice to, landowners to understand
what it would cost ratepayers.                                   relationships within the region as well as the collective     how to give practical effect to our rules.
The big issues we would be tackling through Option 1 are:        willingness of our communities to step up again when
                                                                                                                               In Option 1 we have proposed sufficient funding for
                                                                 it comes to protecting the health of the waterways.
                                                                                                                               our regional Civil Defence activities as we face an
•    P rotecting and improving our freshwater, including
                                                                 It is up to communities and councils nationwide               increasingly uncertain future in the face of climate
      implementing central government’s new ‘Essential
                                                                 to consider and recognise Te Mana o te Wai. In                change, and progressing the previously deferred and
      Freshwater’ package
                                                                 Canterbury, this will involve considerable planning           increasingly urgent Coastal Plan review.
•     Reducing emissions via a well-utilised, low-
                                                                 and implementation work in partnership with Ngāi
       emission public transport network                                                                                       As the level of activity increases, so too does
                                                                 Tahu. Braided river revival and regeneration of our
•      COVID-19 economic recovery work, including                                                                             the supporting and enabling activity, including
                                                                 iconic braided river ecosystems are key elements
        pest control                                                                                                           enhancing our organisational collection and storage
                                                                 of this work in Canterbury.
•       Flood protection and infrastructure                                                                                    of mātauranga Māori and community data. Through
•       Enabling compliance with the rules we have              The evolution of our public transport network                 making that data more readily available for decision-
         worked hard with the community to develop               continues to gather momentum and the significant              making and community information, we aim to increase
                                                                 projects that have already been committed to as part          the community’s access to the council, and our access
•        Climate change and community resilience

    10
to the knowledge and input of the community,                              We propose to pay for it through a combination of            Around half of the $46 million increase would need
through enhanced engagement.                                              funding sources:                                             to come from rates, representing an increase in total
                                                                                                                                       rates revenue of 24.5% from the current (2020/21)
In Option 1 we have made provision for a contestable                      •   $ 43.6 million in Year 1 in Waka Kotahi NZ Transport    year. See below.
fund to support work by community groups for local                             Agency grants for Public Transport
environmental projects. We have also made provision                       •    $25.3 million in Year 1 in central government          Proposed Sources of Increased Funding: Option 1
to increase our capacity to deliver the Enviroschools                           support for the wilding pines and river engineering/   Grants                       User-Pays
programme to the 40+ schools on our waiting list, as                            flood control works in the Jobs for Nature and         46%
                                                                                                                                                                    and Other
well as enhance the wider environmental education                               COVID-19 recovery projects                                                          5%
programmes.                                                               •     $40 million in user-pays charges and other revenue
                                                                                 for such things as consent applications, swing
The bottom line is that Option 1 would require
                                                                                 moorings, bus fares and other activity.
around $246.54 million of activity in the first year
of the Long-Term Plan. This is $46 million more than                      This would leave a total of $143 million to be paid for                 $57.27 million*
the current 2020/21 expenditure.                                          by the ratepayers of the region. In this way, Canterbury                more in income            General Rates
                                                                                                                                                   than 2020/21             36%
                                                                          regional ratepayers can facilitate $246.54 million of
It is not possible for – and nor do we expect –
                                                                          work* for their rating contribution.
ratepayers to pay for all the work that is included
                                                                                                                                                                                *Total income would be
in Option 1.                                                              The detail of how we propose the rates revenue is paid                                                $251.87 million with
                                                                          is outlined in our draft Revenue and Finance Policy          Targeted                                 $5.33 million being used
                                                                                                                                       Rates                                    to replenish reserves, and
                                                                          (see page 25).                                               13%                                      $246.54 million being
                                                                                                                                                                                used for programme
                                                                                                                                                                                delivery – see page 28.

Option 1 proposes an increase in rates of 24.5%                          calculator that enables you to see what your rates would
compared to the current year. This is the percentage                     look like for both options.
                                                                                                                                           The average total rates a property would pay in
the total amount of money we receive from rates would
increase by. It isn’t the percentage that each ratepayer’s               The table below shows the percentage increase proposed            Year 1 would be $591.10, compared to $455.04
bill would go up by, as that depends on location and                     in Option 1 for subsequent years of the Long-Term Plan.           in the current year (2020/21). The average rates
value of the property (which impacts the amount of                                                                                         increase across the region would be $136.06.
targeted and general rates paid). Sample properties                                                                                        To see what the impact of Option 1 would be
are shown on page 13, and we have an online rates                                                                                          on your own rates, go to our rates calculator
                                                                                                                                           tool ratescalculator.ecan.govt.nz. Sample
 Year 1         Year 2        Year 3        Year 4         Year 5        Year 6      Year 7      Year 8       Year 9      Year 10
                                                                                                                                           properties are shown on page 13.
  24.5%         9%            3.7%           1.5%          2.2%          2.9%        2.2%         4.4%        3%          3.2%

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                                                                                    11
2
                       Option 2                                 Proposed Sources of Increased Funding: Option 2                       Option 2 would deliver the full extent of our statutory
                                                                                                                                      requirements and activity already committed to,
                        Kōwhiringa 2                            Grants                        User-Pays
                                                                                              and Other                               but not all that we believe could be done to bring
                                                                50%
         Statutory and           Option 2 is a balance of                                     9%                                      about meaningful environmental change in a shorter
         must do actions          increased demand for                                                                                timeframe.
        Addresses legislative
                                  action, enabling COVID-19
        requirements              recovery projects to take
        and existing
        commitments.
                                 place (which require funding                                                                                    Your views are sought on both
                                to attract the considerable                 $49.63 million*                                                      Option 1 and Option 2 and the
                                                                                                      General Rates
                              central government recovery                  more income than
                                                                               2020/21                                                           activity, expected outcomes and
                         funding), while focusing on working                                          31%
               within our statutory obligations. There are
                                                                                                                                         funding streams proposed for each.
                                                                                                      *Note the income required is
some new areas of expenditure that must be included
– public transport service improvements already
                                                                                                      $244.23 million, to fund           It is important that we hear what you would
                                                                                                      $240.19 million of activity
committed to, central government’s new Essential
                                                                Targeted
                                                                Rates                                 and put $4.04 million into
                                                                                                                                         like to keep in the plan, what you think
Freshwater and biodiversity packages requiring                  10%                                   reserves. See pages 32-35 for      could/should be removed, and anything
                                                                                                      Option 2 financials.
planning and policy work, as well as our contribution                                                                                    that you think we have missed.
to COVID-19 recovery projects.
                                                                Option 2 will progress key pieces of work over the time
In total, Option 2 represents $240.19 million of activity       of the Long-Term Plan and it still requires a significant
in Year 1 of the draft Long-Term Plan. This represents          investment from the community and other agencies –                                Your feedback is also invited on
an increase of $40 million, with around half coming             both in terms of money and in terms of activity required.
from rates. See Proposed Sources of Increased
                                                                                                                                                  the affordability of the proposed
Funding: Option 2 opposite. This increase in total rates        The total $244.23 million in revenue required for Year 1                          increase in total rates revenue
revenue is 18% more than the current (2020/21) year.            of Option 2 is proposed to be funded as follows:                         (under Option 1 or Option 2) against the
                                                                • $ 41.9 million in Waka Kotahi NZ Transport Agency
                                                                                                                                         total activity the rates income
The average total rates a property would pay in Year 1
would be $565.59, compared to $455.04 in the current               grants for Public Transport                                           would support. Noting that the increase
year (2020/21). The average rates increase across the           • $25.3 million in central government support for the                   will be different for different ratepayers
region would be $110.55. To see what the impact of                 wilding pines and river engineering/flood control                     (see sample properties opposite and in
Option 2 would be on your own rates, go to our rates               works in the Jobs for Nature and COVID-19                             the Supplementary Information online
calculator tool ratescalculator.ecan.govt.nz. Sample               recovery projects                                                     at haveyoursay.ecan.govt.nz/LTP).
properties are shown opposite.                                  • $41.7 million in user-pays charges and other revenue
                                                                   for such things as consent applications, swing
                                                                   moorings, bus fares and other activity.
                                                                This would leave a total of $135 million to be paid for
                                                                by the ratepayers of the region for Option 2. See the
                                                                breakdown of rates use by programme of work on page 17.

  12
Sample properties: impact on rates
What you would see on your July 2021-June 2022 rates bill for Environment Canterbury depends on the location and value of the property being rated. For the examples below,
you will see the flat fees (UAGC and Civil Defence) are the same for everyone. The general and targeted rates vary. An explanation of rate types is on page 36.
My house in Christchurch is worth $580,000                                        My rural property in Ashburton District is worth $4.96m               My house in Temuka is worth $285,000
Option 1                                                                          Option 1                                                              Option 1
                                        Public transport                                                                  Public transport                                                     Public transport
                                        $178.00                                                                           $0.85                                                                $11.98
                                                                                                                          Pest Management
                                                                                                                          $296.30
                                        Air Quality
                                        $6.99

          TOTAL RATES                   General                                             TOTAL RATES                   General                                TOTAL RATES                   General
            PAYABLE                                                                           PAYABLE                                                              PAYABLE
             $519.95                    $268.01                                               $4678.37                    $2283.93                                  $287.52                    $137.11

                                        UAGC                                                                              UAGC                                                                 UAGC
                                        $43.51                                                                            $43.51                                                               $43.51
                                                             Up                                                                                 Up                                                                  Up
                        Civil Defence                      $80.40                                         Civil Defence                       $735.85                          Civil Defence                      $67.62
     Catchment          $14.68                              from                       Catchment          $14.68                               from         Catchment          $14.68                              from
                                                           2020/21                                                                            2020/21                                                             2020/21
     $8.76                                                                             $2039.10                                                             $80.24

Option 2                                                                          Option 2                                                              Option 2
                                                                                                                           Public transport
                                        Catchment
                                                                                                                           $0.85
                                        $8.82                                                                                                                                                  Public transport
                                                                                                                          Pest Management                                                      $11.96
                                        Air Quality                                                                       $281.07
                                        $6.73

          TOTAL RATES                                                                       TOTAL RATES                   General                                TOTAL RATES
            PAYABLE                     General                                               PAYABLE                     $2168.81                                 PAYABLE                     General
            $492.21                                                                           $4548.83                                                              $277.91
                                        $254.50                                                                                                                                                $130.20
                                                                                                                          UAGC
                                        UAGC                                                                                                                                                   UAGC
                                                                                                                          $40.49
                                        $40.49                                                                                                                                                 $40.49
                                                                                                          Civil Defence
                        Civil Defence                        Up                                                                                 Up                             Civil Defence                        Up
                                                           $53.66                                         $14.80                              $606.31                                                             $58.01
     Public             $14.80                                                                                                                              Catchment          $14.80
     transport                                              from                         Catchment                                             from                                                                from
                                                           2020/21                                                                            2020/21       $80.46                                                2020/21
     $166.87                                                                             $2042.81

KEY: General rates –         Targeted rates –                 Civil defence uniform charge –         UAGC –

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                                                                                                            13
The difference between the options
       Ngā rerekētanga o ngā kōwhiri

The main difference between the two options is                In Option 2 there is less investment in the data             Your feedback is sought on Option 1 and Option 2. In
that Option 1 responds to increasing Government               programmes, which are proposed in Option 1 to continue       addition there are two particular projects that we are
and community expectation of action, including                to build on what data we collect and share for optimal       interested in your feedback on:
environmental initiatives we need to progress but are         decision-making.
not yet required by legislation. Option 2 accounts only                                                                    MyWay by Metro is the on-demand public transport
for initiatives we are required by legislation to undertake   In Option 2 there is a reduced level of support for          system being trialed in Timaru. In Option 1 there is
now and some we are already committed to, such as             landowners to assist with compliance and to support          provision to keep the system beyond the trial.
public transport improvements.                                implementation of the regulatory framework.                  In Option 2, there is no provision to keep it.

The portfolio information and table on pages 16 and 17        In Option 2 there is less provision for environmental                  S hould investment continue to be made in this
shows the proposed rates contribution for each of our         education and Enviroschools support. There is no provision              on-demand public transport option for Timaru
portfolios and their associated programmes of work.           for a contestable fund to support community projects.                   after the trial period has completed? Note it
Both Option 1 and 2 are shown in the table, to illustrate                                                                  will require a total of $1.18 million in Year 1 of the Long-
                                                              In both options we have allowed for the notification         Term Plan with continued investment in future years (see
where the differences are between the two options.            of the Regional Policy Statement, Regional Coastal           table opposite), and would be funded through a targeted
In Option 2 there are not the same opportunities to           Plan and the Freshwater planning to occur together in        rate for the Timaru community and from Waka Kotahi NZ
transform public transport through actions such               2024. By notifying these plans together we can save
as MyWay on-demand buses in Timaru. The new                   the community a significant amount of money. Provision
bus contract roll out, real-time information system           for community and partner engagement to develop
implementation, Total Mobility services and the               these plans is in both options and this work needs to
progression of the national ticketing system are all          commence in year one of the Long-Term Plan.
included in both Option 1 and Option 2.                       Both options include an average inflation increase
There will not be the same uplift in braided river revival    of 2.5%.
and tree planting programmes for regeneration of the
natural environment through Me uru Rākau with Option 2.

                                                                                                                                                                         Timaru MyWay

  14
Transport Agency grants. It would add about                               central government, the Councils and local land-owners     Hekeao Hinds Managed Aquifer Recharge
$14 inc GST per $100k of property value for                               has paid for the project. In order for this to continue,    Year             Provision           Additional         Total
Timaru District ratepayers in Year 1.                                     Environment Canterbury would need to introduce a                             already in
                                                                                                                                                       (Option 1 and 2)
                                                                                                                                                                           funding to
                                                                                                                                                                           continue
                                                                                                                                                                                              cost

                                                                          targeted rate for the local Ashburton community. This                                            enhancements
MyWay by Metro                                                            is not included in the figures for Option 1 or Option 2     1 – 2021/22       $1.39 million      -                  $1.39 million
 Year             Grants           Targeted         Total                 at this stage.
                                   rates            additional                                                                        2 – 2022/23       $0.5 million       $0.97 million      $1.48 million
                                                    cost
                                                                          The project’s business case has identified there are        3 – 2023/24       $0.43 million      $1.94 million      $2.37 million
  1 – 2021/22      $0.60 million    $0.58 million    $1.18 million        significant costs to the district should the project not
  2 – 2022/23      $0.62 million    $0.60 million    $1.22 million        be continued.                                                        Should investment be made to develop such
  3 – 2023/24      $0.64 million    $0.61 million    $1.25 million                  Do you want to see provision made to continue              systems to manage freshwater quality in
                                                                                    the MAR project after 2022? In Option 1                    other parts of the region in the future? This
                                                                                    and Option 2 there is provision in Year 1 of     would not materially impact rates proposed for the first
           ould you like to see this type of on-
          W                                                                                                                          few years of the Long-Term Plan as investigation and
          demand public transport as part of the wider                    $1.39 million ($1.09 million from targeted rates, and
                                                                          $300,000 from grants) to run the project. This is          feasibility work would need to be carried out first. We
          Canterbury public transport service in the                                                                                 are seeking community interest in principle at this time.
future, should the MyWay trial be successful? This                        included in the financial information for both options
would not materially impact rates proposed for the first                  in this document. There is also some allocation in
few years of the Long-Term Plan as investigation and                      Years 2 and 3, as shown in the table below. However,
feasibility work would need to be carried out first. We                   to continue to make enhancements to the project after
are seeking community interest in principle at this time.                 Year 1, additional funding would be needed – also
                                                                          through the targeted rate to the local Hinds Plains
The Hekeao Hinds Managed Aquifer Recharge (MAR)                           community between the Ashburton and Rangitata
is an environmental infrastructure project, proposed                      Rivers – as shown in the table.
by the Ashburton Zone Committee and supported
by the Ashburton District Council and Environment                         To give an indication of the rates required, the
Canterbury, to improve water quantity, quality and                        additional $0.97 million from rates in Year 2 equates to
ecosystem health on the Hinds plains, alongside                           an extra $76.36 inc GST per $100k of property value for
improved land-use practices required to meet                              Upper, and $14.99 inc GST per $100k of property value                                                            Hekeao Hinds MAR

environmental outcomes. To date, a mix of funding from                    for Lower A, and $49.95 for Lower B.                       For more information on Managed Aquifer Recharge visit ecan.govt.nz

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                                                                                           15
Portfolios
     Ngā Pūkete                                                                                             Option 1
     For ease of working and for          Regional and                                                  Total expenditure
     reporting purposes, we group         Strategic Leadership
     our activities into portfolios and   $45.08M/18%                                                      $246.54M
     related programmes.
     Our financial reporting is done      Includes partnerships,
     against the activities within        community engagement and
     the portfolios. You can view         data collection for optimal
                                          decision-making, running
     proposed expenditure by              of Council, environmental
     portfolio for each of the            education, sourcing diverse
     Options on pages 28-35               funding streams, planning,
                                          consents and compliance.
     and for Option 1 in more
     detail on our rates tool,
     rates.ecan.govt.nz.

     Figures shown here
     are for Option 1.
     Further information is on                                      Water and Land                     Biodiversity and Biosecurity
     the following pages.
                                                                    $36.39M/15%                        $37.36M/15%
     For detailed information on
                                                                    Includes the rules and plans for   Includes braided river revival,
     each portfolio please view the                                 freshwater management, zone        wetlands, a regionwide tree planting
     Supplementary Information at                                   committees and partnerships,       programme (Me uru Rākau), regional
     haveyoursay.ecan.govt.nz/LTP                                   environmental monitoring, and      parks, and meeting biosecurity
                                                                    rural and urban non-statutory      requirements including increased
                                                                    water initiatives.                 wallaby and wilding conifer control.
16
This table shows                                                                  Option 1   Option 2   Difference
                                                                  Total Rates Proposed by Portfolio for Year 1
                                           the proposed total                                                                  ($M)       ($M)       ($M)
                                          rates contribution      Air Quality, Transport and Urban Development
                                               by portfolio (by   Clean Air                                                    2.1        2.0        $0.1 less
                                              comparison, the     Integrating Urban Land Use, and Regional Transport           0.9        0.9        -
                                                                  Transforming Public Transport                                32.7       30.0       $2.7 less
                                         figures shown to the                                                                  35.7       32.9       $2.8 less
                                        left for the portfolios   Biodiversity and Biosecurity
Air Quality,                                      are for total   Braided River Revival                                        3.8        2.9        $0.9 less
Transport and                                                     Leading and Partnering for Biodiversity Outcomes             1.6        1.6        -
                                          expenditure made
Urban Development                                                 Me Uru Rākau (planting for regeneration programme)           1.0        0.1        $0.9 less
                                            up of income from
$93.48M/38%                                  rates, grants and
                                                                  Priority Habitats Wetland Protection
                                                                  Regional Pest Management
                                                                                                                               4.8
                                                                                                                               7.1
                                                                                                                                          4.5
                                                                                                                                          6.8
                                                                                                                                                     $0.3 less
                                                                                                                                                     $0.3 less

Includes clean air initiatives, urban
                                          user-pays revenue).                                                                  18.3       15.9       $2.4 less
                                                                  Climate Change and Community Resilience
and regional land use and transport,                              Climate Change Resilience                                    1.0        1.0        -
and our public transport services.
                                                                  Leading Community Resilience                                 5.4        5.4        -
                                                                  Leading Flood and River Resilience                           12.2       12.2       -
                                                                  Managing Contaminated Land, Hazardous Substances and Waste   1.7        1.6        $0.1 less
                                                                  Managing the Coastal Environment                             3.7        3.5        $0.2 less
                                                                                                                               24.0       23.7       $0.3 less
                                                                  Regional and Strategic Leadership
                                                                  Data for Decision Making                                     3.1        2.6        $0.5 less
                                                                  Engagement and Influence                                     8.6        8.2        $0.4 less
                                                                  Governance and Advisory Services                             4.6        4.7        $0.1 more
                                                                  Investing for the Future                                     2.4        1.9        $0.5 less
                                                                  Leading Regional Planning, Consenting and Compliance         9.0        9.0        -
                                                                  Tuia Partnership                                             1.6        1.6        -
Climate Change and                                                                                                             29.3       28         $1.3 less
Community Resilience                                              Water and Land
$34.23M/14%                                                       Freshwater Regulatory Framework                              6.2        6.3        $0.1 more
                                                                  Freshwater Resilience                                        7.7        7.4        $0.3 less
Includes flood control works,                                     Healthy Waterway Actions                                     5.9        5.9        -
Civil Defence, the Harbourmaster’s                                Monitoring and Understanding our Environment                 11.6       11.6       -
functions, natural hazards and                                    Stewardship of Land and Water                                0.4        0.3        $0.1 less
hazardous substances, the coastal                                 Working Together for Healthy Land and Water                  4.0        3.5        $0.5 less
environment, contaminated land                                                                                                 35.8       35         $0.8 less
and waste, and our response to                                                                                                 143.1      135.5      $7.6 less
climate change.
                                                                                                                                                                 17
Understanding our work
       Te māramatanga i ā mātou mahi

We group our activities into portfolios and related work     government influence and regional relationships,            Investing for the future
programmes. Our financial reporting is done against          collaboration and hearing the community voice through       Recognising the burden on ratepayers, Council is
the activities within the portfolios.                        provision of information and collection of feedback.        working to identify and establish new and sustained
The proposed groupings for the Long-Term Plan 2021-31                                                                    income sources to deliver community aspirations and
                                                             Tuia partnership
are a little different to the 2020/21 portfolios, and they                                                               address environmental legacy issues.
                                                             Our relationship with Ngāi Tahu is key to ensuring we
are summarised below with the proposed programmes            reach the right outcomes for our region. We call this       Data for decision making
of work for Option 1 noted.                                  relationship ‘Tuia’ – standing shoulder to shoulder with    The value of data for supporting informed communities
Further information on the Option 1 programmes               mana whenua. The programme of work recognises the           and better decision making is a priority for the Council.
is provided in the Supplementary Information on              rights of Ngāi Tahu and enables them to fulfil their role   This programme of work will build on the foundation
haveyoursay.ecan.govt.nz/LTP                                 as mana whenua and exercise kaitiakitanga alongside         of improving access to data, science and mātauranga
                                                             the Council’s statutory role.                               Māori for the benefit of the community, from individual
                                                                                                                         Cantabrians to policy and law makers.
Regional and Strategic Leadership                            Engagement and influence
           Te Hautūtanga ā-Rohe,                             Broadening collaborative community engagement to            Governance and advisory services
           ā-Rautaki hoki                                    enrich participation in regional decision-making and        Delivering efficient and effective governance and
                                                             working to help guide and influence central government      advisory services to support all Council business.
               Ki te kāhore te whakakitenga                  action for the best outcome for Canterbury.
               Ka ngaro te iwi
               Without foresight and vision the              Leading regional planning, consenting
               people will be lost                           and compliance
               This portfolio addresses key cross-           Delivering regulatory services (planning, consents
               cutting themes of importance for              and compliance) that build confidence and trust in
all Council portfolios, such as strategic planning,          Environment Canterbury, and enable the outcomes
guiding the organisation in our work with Ngāi Tahu,         desired by the community and required under legislation.

  18
Water and Land                                      collaborative arrangements with Papatipu Rūnanga,          to prosecuting, to achieve Te Mana o te Wai and make
                      Te Wai me Te Whenua                                 zone committees, community and key organisations           ongoing improvements to our freshwater.
                                                                          including through joint work programmes.
                      Ka hāhā te tuna ki te roto                                                                                     Stewardship of water and land
                      Ka hāhā te reo ki te kāinga                         Monitoring and understanding our environment               Stewardship of our water and land is a collective
                      Ka hāhā te tangata ki te whenua                     Collecting and managing good quality trusted data that     responsibility. Our role must include strategically
                      If the lake is full of eels                         can be accessed and used by the community and key          investing in supporting stewardship initiatives, sharing
                      If the home resounds with language                  organisations ensures we have a shared understanding       information and actions that work, building awareness
                      The land will be inhabited with people              of the trends and actions needed to report on and meet     and implementing opportunities to deliver on future
                                                                          statutory requirements and environmental outcomes.         stewardship of land and water, using the regulatory
At the centre of this portfolio is the Canterbury Water                                                                              and non-regulatory functions.
Management Strategy (CWMS) and the associated                             Freshwater regulatory framework
collaborative framework to managing our freshwater                        Freshwater is managed not just locally but through         Freshwater resilience
in the region. The new Essential Freshwater package                       national direction. Implementing this direction through    Freshwater resilience is about supporting
from central government – and resulting planning                          the regulatory framework is done by the regional council   intergenerational, multi-stakeholder, catchment-based
and implementation activity required – will influence                     and others. Creating the plan rules is not enough          projects that restore freshwater environments enabling
the direction. Science-informed decision-making                           though and this programme also covers improving plan       those environments to withstand natural impacts. This
will be key, as will ongoing projects that gain strong                    implementation through plan effectiveness reviews and      requires collaboration, building community support and
partnership support and a shared funding approach,                        ongoing evaluation of environmental outcomes.              ultimately enables implementation of Te Mana o Te Wai.
and empowering and engaging with communities.
                                                                          Healthy waterways actions
Working together for healthy water and land
                                                                          To reach our goal of healthy waterways we need to
The community has committed to working together                           take deliberate actions not just to implement our
to drive regional priorities and share resources to                       planning framework and the national direction, but
strengthen the Canterbury Water Management Strategy                       also through using a consistent and focused approach
delivery. This requires resources to support the                          across a range of actions from community education

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                                                                         19
Biodiversity and Biosecurity                Leading and partnering for biodiversity outcomes          Braided river revival | Whakahaumanu
               Te Rerenga Rauropi me Te                    Creating a shared regional approach to biodiversity is    Ngā Awa ā Pākihi
               Whakahaumaru Rauropi                        key to achieving the outcomes of restored and protected   Canterbury’s braided rivers are iconic, running from the
                                                           indigenous biodiversity. This shared understanding        mountains to the sea as critical ecological corridors.
               Manaaki whenua                              and collective buy-in to the actions required by many     Creating landscape-scale alignments with agencies and
               Manaaki tangata                             agencies can be achieved by supporting effective          communities to revive these rivers is key to their future
               Haere whakamua                              partnerships, leading activity and sharing information.   and the life and activities they sustain.
               Care for the land
               Care for people                             Regional pest management                                  Me Uru Rākau
               Go forward!                                 By intervening early and working collaboratively with     Me Uru Rākau is a regionwide protection, planting
                                                           all those involved in biosecurity, we can protect our     and restoration programme to enhance regional
Enabling the natural environment to support our
                                                           biodiversity, economic production and mahinga kai         biodiversity. Although reported through this portfolio,
cultural, physical and economic wellbeing requires us
                                                           from harmful organisms.                                   Me Uru Rākau is a programme that impacts, and
to first support the natural environment. By sharing our
understanding of the pressures on the environment,                                                                   is impacted by, activity in all other portfolios with
                                                           Priority habitats and wetland protection                  benefits for water quality, erosion control, mahinga kai,
and the action needed to relieve those pressures, we
                                                           The number of wetlands in the region has fallen           community engagement and climate change responses.
can restore our biodiversity and support ecosystems
                                                           considerably and this programme aims to
to thrive and in turn support the life that depends
                                                           regenerate priority habitats and wetlands,
on them. Our biodiversity work is closely related to
                                                           protecting and enhancing these areas in
much of our other work, and in particular is impacted
                                                           collaboration with the community.
by biosecurity threats, and relies heavily on the
investment and action of the community.

 20
Climate Change and                                  risk of soil erosion, sea-level rise and coastal erosion,   risks in Canterbury can be achieved by ensuring we are
                      Community Resilience                                increased flooding in some areas, potential for faster      aligned with partners such as Papatipu Rūnanga and
                                                                          spread of pests and weeds. These have the potential         territorial authorities, and carry a shared understanding
                      Te Whakamahanatanga o                               to increase our community risk of impact in flood and       and responsibility for the regional response.
                      Te Ao me Te Aumangea                                bushfire-prone areas, and coastal communities, and
                      o te Hapori                                         will impact how we use our water resources.                 Managing contaminated land,
                                                                                                                                      hazardous substances and waste
                      Arohanui ki te tangata,                             Leading community resilience
                      tētahi ki tētahi                                                                                                Past and sometimes present land practices
                                                                          Community resilience to natural and human-induced           and industrial activity can mean we must deal with
                      Caring for the people                               hazards is key as prevention of those hazards is not        legacy land issues and the risks associated with
                      with respect and good faith                         always possible. Through risk reduction, and the            managing contaminated land, hazardous substances and
                                                                          collecting, providing, and communicating of natural         waste. This programme ensures such risks are managed
The Climate Change and Community Resilience                               hazards information, we can help build community            to protect the environment and human wellbeing.
portfolio includes a range of activities with the common                  resilience through enhancing our collective capacity to
thread of the protection of people, assets (both natural                  adapt, respond and recover when emergencies occur.          Leading flood and river resilience
and built), and the economy. Work programmes are                                                                                      As we face a future with the potential for increased
aimed at supporting the Canterbury region to minimise                     Managing the coastal environment                            extreme weather events, increasing community
and adapt to the negative impacts of climate change,                      By working with, and alongside, our partners we can         resilience to flood risks posed to people and property
reduce and manage risks from flooding, natural                            manage the regeneration of Canterbury’s coastal             can be achieved through building and maintaining high
hazards, contaminated land, hazardous substances,                         environment through effective and integrated coastal        quality flood protection, land drainage and erosion
and waste, ensure commercial and recreational                             management.                                                 control infrastructure. See page 24 for information
boating safety, monitor coastal water quality, and                                                                                    on our 30-year Infrastructure Strategy. Our flood and
ensure communities are prepared for and resilient                         Climate change resilience                                   river works are often associated with land and forestry
to natural hazard risk.                                                   Climate change has become a household concern and,          management activity and this programme is proposed
Climate change is already affecting Canterbury                            as a region, we need to be able to adapt and respond        to cover the integration of that activity.
and future impacts are likely to include, higher                          to it as well as continue to do what we can to mitigate
temperatures, less rainfall, more frequent and more                       the impact of our actions on the climate. Building
extreme droughts, strong winds, low humidity, increased                   community knowledge and resilience to climate change

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                                                                           21
Air Quality, Transport,                 Clean air                                                   Transforming public transport
                   and Urban Development                   Air quality management has previously required a            The public transport network is Environment
                   Te Pai o Te Hau Takiwā,                 portfolio of work, however in this draft Long-Term Plan     Canterbury’s single largest area of expenditure.
                   Ngā Momo Waka, me Te                    we are proposing that the regulating and supporting         It is supported by central government grants, targeted
                                                           of initiatives to ensure air quality improves and does      rates in some locations and user-pays (fares) revenue,
                   Whanaketanga o Ngā Tāone                not impact on the wellbeing of our communities, is          and guided by the Regional Public Transport Plan.
                   Ko ngā pae tawhiti whāia kia tata       included in a wider Air Quality, Transport and Urban        Operating, managing, and delivering innovative and
                   Ko ngā pae tata whakamaua kia tina      Development portfolio.                                      continuous improvements to public transport
                   The potential for tomorrow depends                                                                  services in Canterbury is key to establishing a
                                                           This is in part due to the successful action of the         sustainable service.
                   on what we do today
                                                           community over recent years, converting to cleaner
The Air Quality, Transport and Urban Development           forms of home heating and burning wood more
portfolio influences how the people of Canterbury          efficiently, thereby reducing the particulate emissions
live, work and travel now and into the future through      and improving the ambient air quality in our urban areas.   More information on the work within each portfolio,
planning and delivering public transport activities in                                                                 and the associated targets and measures, can be found
Greater Christchurch and Timaru, enabling vibrant          Integrating urban land use                                  in the Supplementary Information for this consultation
and connected communities, coordinating future             and regional transport                                      on haveyoursay.ecan.govt.nz/LTP and on our website
urban development within Greater Christchurch and          The integration of our urban land use, regional             ecan.govt.nz.
the wider Canterbury region, developing regional land      transport and hazards planning is necessary to ensure
transport plans and supporting the regional transport      sustainable development within our region. This
committee, and reducing air pollution where people live.   work includes facilitating prioritised and integrated
                                                           investment in Canterbury’s regional transport network,
                                                           and regional/sub-regional planning.

  22
The following pages outline key policies and how
                                                                                    the Long-Term Plan is proposed to be funded.

Consultation Document | Deciding what the future of Canterbury looks like 2021-31
                                                                                                                                       23
What are your thoughts on the way

    How could this be paid for?                                                                                                     we have proposed rates are charged,
                                                                                                                                    as outlined in the draft Revenue and

    Me pēhea te whakautu?                                                                                                   Financing Policy ie the proposed use of Uniform
                                                                                                                            Annual Charges, targeted rates, general rates,
                                                                                                                            and user-pays?

The draft Long-Term Plan 2021-31 outlines the activity       Financial Strategy                                          30-year Infrastructure
proposed for each year and how it could be paid for.
Ratepayers will want to consider what the community          Environment Canterbury’s draft Financial Strategy           Strategy 2021-51
would need to pay in general rates, targeted rates,          2021-31 can be found in full in the Supplementary           Council has a 30-year strategy to manage
user-pays and other fees and charges in the proposed         Information located on haveyoursay.ecan.govt.nz/LTP         infrastructure. Most of our infrastructure is for flood
plan. Council has a number of policies guiding how we        The Financial Strategy outlines how we intend to            protection and control, and the strategy identifies
determine how different activities should be funded,         manage the money we receive from ratepayers and             potential issues within the 30-year timeframe that may
and on page 36 we describe what the different rating         other sources. The strategy sets guidelines and limits      impact the infrastructure and outlines the mechanisms
types are.                                                   on our use of that money and outlines that our aim is       for managing associated decisions. The value of the
                                                             to take an approach that maximises the return on the        infrastructure can be measured in billions of dollars –
Pages 24 and 25 of this consultation document outline in                                                                 not its replacement value (estimated at $673 million
particular four key documents, the Financial Strategy and    investments we have and minimises risk. It also outlines
                                                             how we will manage any funds in reserves and the            in 2020) but the value to the community of having this
the 30-year Infrastructure Strategy, and the Revenue and                                                                 protective infrastructure in place.
Financing Policy and the Fees and Charges Policy. Your       Council’s self-imposed desired limits on rates increases.
feedback is invited on these as part of this consultation.   Both Option 1 and Option 2 in this consultation             Environment Canterbury manages 59 river control and
                                                             document result in proposed rates increases beyond          land drainage schemes that collectively cover over
As required under section 82A of the Local Government                                                                    1,000 km of rivers, many smaller streams and over
Act, the pages of this consultation document                 the current self-imposed limits. These limits are the
                                                             same each year and have been set at 5% for rate             760 km of rural open drains.
constitute the ‘statement of proposal’ for the Revenue
and Financing Policy and the Fees and Charges Policy.        increases, and debt to be no more than 280% of total        Our largest flood protection scheme, the Waimakariri–
Submitters on these policies are encouraged to               rates revenue. Council acknowledges that the rates          Eyre–Cust scheme, provides flood protection from
view the full draft documents in the Supplementary           increase limits in the policy are no longer realistic in    the Waimakariri River to the Greater Christchurch
Information on haveyoursay.ecan.govt.nz/LTP                  the current climate of central government legislation       area. The scheme protects thousands of people, jobs,
                                                             and community expectation, and proposes an increase         homes and other assets – around $118 billion worth -
                                                             in excess of the limits in full knowledge of that.          with the potential cost of community damages from a
         Do you support the rationale and the
                                                                                                                         catastrophic failure of the scheme estimated to be as
         proposed changes in the draft Fees and
                                                                                                                         much as $12 billion.
         Charges Policy. See the full draft policy
online at haveyoursay.ecan.govt.nz/LTP

  24
You can also read