Interiors Fi+Out Industry Portfolio 2022 - Zyro

Page created by Shannon Bowen
 
CONTINUE READING
Interiors Fi+Out Industry Portfolio 2022 - Zyro
Interiors Fi+Out Industry Portfolio 2022

                                           1
Interiors Fi+Out Industry Portfolio 2022 - Zyro
About
Interiors Fi+Out Industry (IFI)
Interiors Fit-out industry (IFI) is a Malaysia- based interior design              Benjamin has a distinctive expertise working experienced in interior
Consultancy Interior Fit-out and Furniture online store Company founded in         Architecture, mega Additions and Alterations refurbishment Projects (A&A). He
April 2022.                                                                        has participated and delivered number of iconic sustainable projects with full
                                                                                   involvement in the built environment for the past 25 years.
IFI is currently operating it business in a home office and online store setting
with low operational cost by Mr. Benjamin Low and his collaborators and
partners with the aim to provide a full cycle of Interior design and fit-out       He has an abilities to forecast and troubleshoot design and construction
services, affordable custom and ready made furniture online store seller           technical issues in advance with solutions provided as well as resolving every
directly from a reliable and reputable furniture maker’s factories in Malaysia     construction matter on site with his knowledge and standby supports from an
without a middle man and without a conventional daily overhead operational         international recognized institution and council Project Management Institute
cost that usually goes back to end users.                                          (PMI) and Interior design confederation Singapore (IDCS). With Benjamin
                                                                                   active involvement in his institution, Association and council’s activities, he is
We are strongly engage with our partners who has a proven track record in          constantly updated with the latest technologies, application method and
producing high quality products with capability to cope for various size of        statutory compliance and requirements in all aspect for the benefits of time
projects and deliver them on time.                                                 and cost saving to clients to avoid an additional investment to fulfils various
                                                                                   requirement later.
With our broad knowledge and connection in bidding, obtaining and manage
various size of projects that comes with various requirements and criterial, we
worked very well with all our collaborators/partners who are mostly are a
skilled carpenters or detailed furniture maker who doesn’t know what is project
management, fit out contract, budget and project dateline are about that
commonly a root cause of delaying a project with tons of confusion and
misunderstanding generated. In short , it created an unhappy relationship with
the clients/Consultants and project stakeholder as a result.

With our present as a project leader with proven knowledge in project
management have drive every projects under our cares from inception until
the succeed completion to meet the satisfaction level of every clients.

                                                                                                                                                           2
Interiors Fi+Out Industry Portfolio 2022 - Zyro
About
Mr. Benjamin Low                                                                      Years of experience
B.Sc.. Degree (Hons) Construction Management, PMI, PMP, AIDC                          • 25 years.

                                                                                      A member of
                                                                                      • Project Management Institute – A Certified Member
                                                                                      • Interior Design Confederation Singapore – An Associate Member (AIDC)

Benjamin has a vast portfolio of expériences within the interior fit-out realm from   Qualification
luxury to boutique hospitality, F&B to large scale retail developments. Being the     • Bachelor Degree with Honours In construction Management Birmingham City
key project leader, Benjamin has been responsible for the successful                    University, BCU United Kingdom
implementation, management and roll-out of several notable projects especially        • Diploma in Interior design , Interior design Institute , IDI Australia
within Malaysia, Singapore, Thailand and Indonesia.                                   • Certification of Construction safety Course for Project Manager, WSH Singapore
                                                                                      • Certification of a Risk Management Implementation Plan developer, WSQ
With the hands-on experience in the day-to-day operations, he has developed a           Singapore
comprehensive methodology to ensure all deliverables are managed on                   • Project Management Professional (PMP-PMI)
schedule and within budget.                                                           • Six Sigma Yellow Belt Professional (SSYBP)
                                                                                      • Digital Marketing Fundamentals Professional (SCDM-F)
Being acquainted with the standards of international brands, Benjamin ensures
the team delivers on a high level of quality, workmanship through every step of
the process.
                                                                                      A member of
In addition, he is able to bring a strategic perspective when it comes to pre-        • Project Management Institute – A Certified Member (CM)
empting construction and operation issues, ensuring the team is able to plan          • Interior Design Confederation Singapore – An Associate Member (AIDC)
ahead and resolve challenges in a practical and proactive way.

                                                                                                                                                           3
Interiors Fi+Out Industry Portfolio 2022 - Zyro
Company
Registrations

                We are the Construction Industry Development Board
                (CIDB Malaysia) Grade 3 registered contractor allowing
                us to participate and carry out construction activities for
                public sector with RM 1,000,000.00 tendering limit.

                                                                  4
Interiors Fi+Out Industry Portfolio 2022 - Zyro
Qualifications

                 5
Interiors Fi+Out Industry Portfolio 2022 - Zyro
About
Mr. Benjamin Low
B.Sc.. Degree (Hons) Construction Management, PMI, PMP, AIDC

Distinctive Project Experienced

Malaysia                                                                             Singapore

• New World & Renaissance Hotel Jalan Ampang Kuala Lumpur - 1997                     •Level 4 Takashimaya Additions & Alterations works Orchard Road Singapore – 2013
• Mandarin Oriental Hotel Kuala Lumpur City Centre (KLCC) – 2000                     •Marina Square shopping complex Additions & Alterations and extension works
• Hilton & Le Meridian Hotel Kuala Lumpur Sentral – 2003                             Singapore – 2014
• Crown Princess Hotel Jalan Ampang Kuala Lumpur – 2003 (Now knows as The            •The Michael's residences development of Semi-detached house Chestnut Avenue
  Double Tree Hotel)                                                                 Singapore – 2015
• City Square shopping Centre Jalan Ampang Kuala Lumpur – 2004                       •Ritz Carlton Millenia Hotel – Summer Pavilion Chinese Restaurant Singapore – 2016
• Low Yat Plaza IT Mall refurbishment works Bukit Bintang Kuala Lumpur - 2004        •Yotel at 366 Orchard Road Singapore -2017
• River City Condominium Jalan Ipoh Kuala Lumpur – 2005                              •Paulaner Brauhaus German Bar and restaurant Millenia walk Singapore – 2017
• 1 Borneo Hyper Mall Kota Kinabalu Sabah – 2007                                     •Paya Lebar Quarter (PLQ) Singapore – 2019
• Beaufort-Labuan Swam pipeline project - 2010                                       •Outram Community Hospital Singapore – 2020
• 1st Avenue Concept store Berjaya Times Square Kuala Lumpur – 2011                  •Ritz Carlton Millenia Hotel – Level 2 Commonwealth meeting events – 2021
• Some of the famous services and Food Chain stores operating inside the 1 million   •ABI Plaza a Grade A 12 storey commercial office Additions & Alteration works at
   square feet Berjaya Times Square shopping mall such as U mobile Flagship          Keppel road Singapore (Project Planning works) – 2021
   store, 7-Eleven, Starbucks coffee, Krispy Kream, McDonald, Rasa Utara Malay       •HBD house owner projects – Ang Mo Kio, Chao Chu Kang, Sengkang, Bedok, Bidadari
   restaurants, England Optic, Cha time and many reputable commercial retail         Park, Bukit Merah, Amber Road and Bishan Road Singapore – 2020 to 2021
   stores - 2011 to 2012
• Lanson Place Service Apartments Bukit Ceylon Jalan Alor Kuala Lumpur - 2012
• Fly Project gymnasium Damansara City mall Kuala Lumpur - 2018
                                                                                     Indonesia
                                                                                     •Four season Hotel Jimbaran Bay Bali Indonesia – 2011

                                                                                     Thailand
                                                                                     •Hardrock Hotel Chon Buri Pattaya, Thailand - 2012

                                                                                                                                                          6
Interiors Fi+Out Industry Portfolio 2022 - Zyro
Procurement Networks & Collaborators

                                       7
Interiors Fi+Out Industry Portfolio 2022 - Zyro
Factory capacity
• We are carefully selected and partnering with several
  reliable and reputable furniture manufactures who has a
  capability to produce high quality custom made built-in and
  loose furniture from a huge, medium and small setting. We will
  conduct series of assessment on every projects we received
  depending on the project size, requirement criterial and
  budget and determine the suitable partner who deem fit to
  perform the job for our clients. With our close monitoring
  method.

• We do not own or operate any carpentry factory that putting
  us to service the fixed and high overhead operation and
  maintenance cost that the current market place is practicing
  which ultimately increase the project cost to the end users.

• All our collaborators/Partners are a skilled carpenters and they
  have been working with us for uncountable numbers of
  projects in the past for many years with our professional
  leadership in Project, Quality, budget and time management.

• Most of our projects are from the repeated clients who have a
  full confident with us without a needs to repeat their project
  requirement again and again to a fresh and new partner who
  have no guarantee on quality and on-time delivery. Our clients
  mostly comes in to take over the projects when it completed
  for their operations at the specific dateline.
                                                     8
Interiors Fi+Out Industry Portfolio 2022 - Zyro
Technology
• We only collaborate with our partner factories
  who have a basic wood working machineries
  for precision and quality control to meet the
  production timeline especially when comes to
  mask fabrication.

• We had a group of master carpenters who
  has an ability to produce carpentry works
  manually to satisfy our clients requirements
  on detail handcrafting’s product for their
  projects too.

                                                   9
Interiors Fi+Out Industry Portfolio 2022 - Zyro
How it works
• We practice transparency process from inception until the
  completion of the projects with no hidden cost

                                                 10
Pay                            Pay                               Pay                              Pay
                                                     30%                           30%                               30%                               10%

  Interior design       Talk to us      Get your                    Get your       Make          Get project                        Day to day      Handover of     Defect liability
                                                    Appoint                                                          Made
Consultancy process       your
                      requirement
                                         design
                                      consultancy
                                                      us        interior design
                                                                   proposal
                                                                                  progress
                                                                                  payment
                                                                                                   tender
                                                                                                documents,
                                                                                                                    progress
                                                                                                                    payment
                                                                                                                                      project
                                                                                                                                  management
                                                                                                                                                    your home/
                                                                                                                                                     Business
                                                                                                                                                                     management
                                                                                                                                                                      and project
                      and provide         fee                   presented and                     3D visual,                      work, series of   and pay the     documentation
                       necessary                                  have your                       material                         site Quality      balance          and record
                      information                                  feedback                     specification                      inspections                        assessment
                           and                                                                   sheets and                          with your                       submitted by
                       documents                                                                BOQ for your                           main                            your main
                                                                                                    main                            contractor                         contractor
                                                                                                 contractor
                                                                                                   costing

  Interior design &                                    Pay
                                                       10%
                                                                                      Pay
                                                                                     50%
                                                                                                                       Pay
                                                                                                                       35%
                                                                                                                                                         Pay
                                                                                                                                                         5%
    Build process
                         Talk to us     Get your    Book with     Finalize your    Confirmed       Get end to end      Made        Manufacture       Handover of        Enjoy your
                           your        Quotation       us            design,       and make           project        progress      and project       your home/         home and
                       requirement                                material and    payment for      Management        payment        execution        operate your      operate your
                            and                                    fit out cost     material         services         Before                           Business          business
                        estimated                                       and       procurement                       fabrication                      and pay the
                          budget                                   additional                                                                          balance
                                                                      works

                                                                                                                                                                      11
Pay                                Pay                               Pay                           Pay
                                                                40%                                 20%                              30%                            10%

Interior design Fi+Out     Talk to us        Get your                         Production of          Make         Get your day                       Final       Handover of     Move in and
                                                               Award                                                                   Pay
       process           and provide
                         us necessary
                                            Quotation            the
                                                              project to
                                                                             shop drawings
                                                                             for submission
                                                                                                   progress
                                                                                                  payment for
                                                                                                                 to day project
                                                                                                                  coordination
                                                                                                                                    progress
                                                                                                                                   payment
                                                                                                                                                  Installation   your project
                                                                                                                                                                 and pay the
                                                                                                                                                                                  enjoy you
                                                                                                                                                                                home/operate
                            project                               us          and approval            site             and          base on                        balance      your business
                          documents                                                               mobilization     installation      the the
                                                                                                    works             works        estimated
                                                                                                                                   work done

                                                                       Pay

  Online Furniture
  store purchase          Pick your favorite     Check out                       Get your 1- 28
                                                                  Make full                           Receive your           Have your          Enjoy your
                           items from our        your items     payment via      days delivery          delivery             products          comfirtable
                           online furniture        online        our secure        subject to          notification         delivered to         furniture
                          store or call us for                     online          individual                                your door
                              bulk order                          payment        product stock                                  step
                                                                platform and      availability
                                                                  get your
                                                                payment and
                                                                    order
                                                                confirmation

                                                                                                                                                                                 12
25 years Distinctive projects experienced
         • New Built development

         • Additions and Alterations works (A&A)

         • Architecture works

         • Structural works

         • Interior Fit-out works

         • Shopping mall operation & Maintenance works

         • Knowledge to work with an international Architects, Interior
           Designers, Civil & Structure Engineers, Landscape and Acoustic
           Specialists, Artists, Mechanical & Electrical Engineers, Branding
           Consultants, Real Estate experts, Lighting and sound system
           professionals etc.

         • Understanding the operational & Functional needs of Hotelier,
           F&B entrepreneurs, retailers, Home-owners and Public service
           and corporate offices.
                                                             13
2020 to 2021

               Ritz Carlton Millenia L2 Commonwealth
               Meeting event.
               Designer     : Tony Chi Studio New York
               Scope of work : Interior Fit out works

                                                         14
2019 to 2020

               Outram community Hospital Singapore
               Designer     : B+H Architect Singapore
               Scope of work : Interior Fit out works

                                                        15
Dec 2017 to Jan 2018

                       Fly Project Gymnasium Kuala Lumpur
                       Designer     : Blue design studio Malaysia
                       Scope of work : Interior Fit out works

                                                                    16
Feb 2017 to March 2017

                         Paulaner Brauhaus Millenia walk
                         Singapore
                         Designer     : Frank Architect Germany
                         Scope of work : Interior Fit out works

                                                                  17
Jan 2017 to July 2018

                        Yotel @ 366 Orchard road, Singapore
                        Designer     : DP Design Singapore
                        Scope of work : Interior Fit out works

                                                                 18
April 2015 to July 2016

                          Ritz Carlton Hotel Millenia Singapore
                          Summer Pavilion Chinese restaurant
                          Designer     : Tony Chi Studio New York
                          Scope of work : Interior Fit out project management work

                                                                           19
April 2015 to Jan 2016

                         The Michael’s residences , Singapore
                         Designer     : Ong & Ong Architects Singapore
                         Scope of work : Doors Fit out works

                                                                         20
2010 to 2011

               Four season Hotel Jimbaran bay , Bali
               Indonesia
               Designer     : Spins design studio Japan
               Scope of work : A&A and Interior Fit out works

                                                                21
2010 to 2012

               Hardrock Hotel Pattaya & Hardrock Café
               Bangkok, Thailand
               Designer       : HPL Singapore
               Scope of work : Interior Fit out works

                                                        22
2010 to 2011

               Lanson Place Bukit Ceylon , Kuala Lumpur
               Designer     : Atelier Ikebuchi Singapore
               Scope of work : Interior Fit out works

                                                           23
2011 to 2012

               Berjaya Group’s Flagship store in
               Berjaya Times Square, Kuala Lumpur
               Designer     : Various International brand designers
               Scope of work : Branding and store Fit out works

                                                                24
2006 to 2007

               One Borneo Hyper Mall , Sabah Malaysia
               Architect & Designer : YTS Architecture Sdn.Bhd Malaysia
               Scope of work : Architecture works

                                                                   25
2003 to 2005

Crown Princess hotel             My Habitat service Apartment   Low Yat Plaza IT Mall
Now Knows as Double Tree hotel

                                                                                              Low Yat Properties group, Malaysia
                                                                Empire Tower                  Architect & Designer : Low Yat group Malaysia
Federal Hotel                    Capitol Hotel                  Now knows as Landmark tower   Scope of work : Architecture & interior fit out works

                                                                                                                                                      26
2001 to 2003

               Hilton & Le Meridien Hotel KL Sentral
               Kuala Lumpur, Malaysia
               Architect & Designer : RSP Architects Planner Malaysia
               Scope of work : Interior Fit out out works

                                                                  27
1997 to 2000

               Mandarin Oriental KLCC Malaysia
               Architect & Designer : GDP Architects Malaysia & HBA Singapore
               Scope of work : Architecture & Interior Fit out works

                                                                28
1996 to 1999

               New World & Renaissance Hotel
               Kuala Lumpur ,Malaysia
               Architect & Designer : Bent Severin & Associates Singapore
               Scope of work : Architecture & Interior Fit out works

                                                                  29
Interior design portfolio 2021 – April 22
Conceptual drawings – Commercial & residential

                                                 30
The Toast , Johor Bahru Malaysia
         Interior design consultancy

                                       31
Kitchen                                The Toast , Taman Tun Aminah Johor Bahru Malaysia
                                       Open dining

Benjamin Low’s design portfolio 2021                                          32
The Toast , Taman Tun Aminah Johor Bahru Malaysia
Open dining

                                       33
The Toast , Taman Tun Aminah Johor Bahru Malaysia
POS & open dining

                                       34
The Toast , Taman Tun Aminah Johor Bahru Malaysia
                                       POS & open dining

Benjamin Low’s design portfolio 2022                                          35
Madam’s Chan Restaurant
Eco palladium Johor
Modern contemporary concept

                              36
Madam’s Chan restaurant Eco Palladium JB
                                           37
Façade Architecture
Madam’s Chan restaurant Eco Palladium JB
                                           38
Façade Architecture
Madam’s Chan restaurant Eco Palladium JB
                                           39
Open kitchen and Dining area
Madam’s Chan restaurant Eco Palladium JB
                                                              40
Dining area                                Benjamin Low’s design portfolio 2022
Terrace House at Valencia Sg.Buloh KL
Façade architecture * interior fit out

                                         41
The Valencia terrace Sungai Buloh Kuala Lumpur
                                                 42
Façade Architecture
The Valencia terrace Sungai Buloh Kuala Lumpur
                                                 43
Living room
The Valencia terrace Sungai Buloh Kuala Lumpur
                                                 44
Master Bathroom
5 Bedroom Condominium at Amber Road
     Modern classic Colonial concept

                                       45
The Esta Amber Condominium Singapore
                                       46
Open kitchen and Living room
The Esta Amber Condominium Singapore   47
Open Kitchen
The Esta Amber Condominium Singapore
Living room interconnected with open kitchen and Dining room   48
The Esta Amber Condominium Singapore
Dining room                            49
4 Bedroom HDB at Ang Mo Kio
      Modern simplicity contemporary concept

                                  50
HDB at Ang Mo Kio Singapore
Minimalists Living room concept   51
HDB at Ang Mo Kio Singapore
Minimalists Living room interconnected with dining room   52
HDB at Ang Mo Kio Singapore
Living room interconnected with dining   53
HDB at Ang Mo Kio Singapore
Living interconnected to Kitchen & dining   54
HDB at Ang Mo Kio Singapore
Kitchen                       55
For more information or clarification please contact Benjamin Low at +6017-878 2162 / +65 8433 0439
                                                    Or email Benjamin@interiorsfitoutindustry.com
                                                                      www.interiorsfitoutindustry.com

                                                         Interiors Fi+Out Industry Portfolio 2022
                                                               CR No: 202203108694 (IP0571105-U)

                                                                                                   56
You can also read