INFORMATION AND CONSULTATION DOCUMENT FOR THE PROPOSED ANNUAL PLAN 2019 2020

Page created by Anna Frank
 
CONTINUE READING
INFORMATION AND CONSULTATION DOCUMENT FOR THE PROPOSED ANNUAL PLAN 2019 2020
INFORMATION AND CONSULTATION DOCUMENT FOR
THE PROPOSED ANNUAL PLAN 2019 – 2020
INFORMATION AND CONSULTATION DOCUMENT FOR THE PROPOSED ANNUAL PLAN 2019 2020
Our vision                                                            So what is an Annual Plan?
Our city is one of a kind. We are surrounded by outstanding natural   The Annual Plan is Council’s work programme for a given financial year (1 July – 30 June). This Annual Plan covers the
beauty and a wide range of leisure and recreational opportunities.    2019 – 2020 financial year.
We’re recognised as a great place for families and for people who
                                                                      Following community input on the Long Term Plan 2018 – 2028, the final document was adopted in June 2018.
enjoy the outdoors. We encapsulate this in our vision:
                                                                      The Long Term Plan covers ten years but is itself reviewed every three years. This Annual Plan represents year
Life. Leisure. Live it!
                                                                      two of the Long Term Plan 2018 – 2028.
In 2015, our vision was established after extensive community
                                                                      Within the Annual Plan you will find the agreed Long Term Plan work programme for year two, how much it will cost,
consultation. Since then, this vision has been supported by five
                                                                      and how it will be paid for. Overall, little has changed for year two, as described in the Long Term Plan, however there
strategic priority areas: Community, Environment, City centre,
                                                                      are some variances in the timing of some projects and their associated costs, all of which will be included in the Annual
Economy, and Infrastructure. These areas express our community
                                                                      Plan 2019 – 2020 document.
outcomes and guide what we deliver for our city.

                                                                                                2017   2018    2019 2020 2021   2022 2023 2024 2025 2026 2027 2028 2029 2030 2031

                                                                       Annual Plan 2017 – 2018

                                                                                                              Long Term Plan 2018 – 2028

                                                                                   Annual Plan 2019 – 2020

                                                                                         Annual Plan 2020 – 2021

                                                                                                                                Long Term Plan 2021 – 2031

                                                                                                       Annual Plan 2022 – 2023

                                                                      Information and consultation
                                                                      This document has two sections. In the first section, we are updating the basic financial changes and summaries for
                                                                      the upcoming financial year, along with Long Term Plan project updates. The second part is consultation, where we are
                                                                      seeking your feedback and input into our decision making for the upcoming financial year as well as the next Long Term
                                                                      Plan. We’ve made an effort to differentiate between the two sections with the following highlights.

                                                                                                          INFORMATION               HAVE YOUR SAY
INFORMATION AND CONSULTATION DOCUMENT FOR THE PROPOSED ANNUAL PLAN 2019 2020
INFORMATION                    Rate changes
                                  Y1               Y2                Y3               Y4                  Y5             Y6              Y7                Y8               Y9                  Y10
   AVERAGE NET                2018 – 2019      2019 – 2020       2020 – 2021      2021 – 2022         2022 – 2023    2023 – 2024     2024 – 2025       2025 – 2026      2026 – 2027         2027 – 2028
   RATES INCREASE
   (LONG TERM PLAN)             3.98%            5.51%                4.68%          5.44%              4.52%           4.74%           1.96%             1.79%            0.95%              1.23%

As outlined in the Long Term Plan, both Maidstone Max and H²O Xtream are due for a complete                                        We indicated in the Long Term Plan that (because of these projects)
                                                                                                            Average net
redevelopment. We received very positive support from the community last year when we                      rates increase          2019 – 2020 would be the year when the average net rates increase
consulted on these projects. Likewise, with its growing popularity, Expressions Whirinaki has               2019 – 2020            would be at its highest over the 10 years at 5.51%. We have managed

                                                                                                       4.87%
outgrown its current capacity and needs additional facilities to ensure it meets the growing                                       to reduce this figure to 4.87%.
needs of the community. Council considered all three projects were a high priority to meet the
needs of the city and scheduled them to begin in the 2019 – 2020 year.

How you’re affected                                                                                                                              RESIDENTIAL
                                                                                                                                                 CV $417,000
                                                                                                                                                                         RURAL
                                                                                                                                                                       CV $717,000
                                                                                                                                                                                               BUSINESS
                                                                                                                                                                                             CV $1,019,000
What does this rates increase mean? The table opposite indicates          General rates (includes the regional amenity fund rate)                    $1,270               $1,594               $9,002
how the average rates increase affects properties of average value.
                                                                          Targeted rates (water supply, wastewater, stormwater)                     $1,039           NOT APPLICABLE             $2,612
                                                                          Total UHCC rates (including GST)                                         $2,309                $1,594                $11,614
                                                                          Change per week (FROM 2018 – 2019)                                         $2.30                $2.60                 $15.79

Funding sources
Rates are not our only source of funding but do make                                             GENERAL RATES                                                                        28%
                                                                                                                                                                                                RATES 44%
up the largest portion at 44%. Council always considers                                      TARGETED RATES                                                                           16%
alternative options to minimise the rates impact where                                            BORROWINGS                                                                          22%       DEBT 22%
possible—this includes user fees and charges, external                                    FEES AND CHARGES                                                                            19%
funding, and debt (discussed on page 9 of the draft Annual                                           SUBSIDIES                                                                        8%
Plan document).                                                                                  RESERVE FUNDS                                                                        4%        OTHER 34%
                                                                  DEVELOPMENT AND FINANCIAL CONTRIBUTIONS                                                                             2%
                                                                                                       SUNDRY                                                                         1%
INFORMATION AND CONSULTATION DOCUMENT FOR THE PROPOSED ANNUAL PLAN 2019 2020
INFORMATION                        Annual Plan 2019 – 2020 budget at a glance

    Leadership              Land transport              Water supply                Wastewater                 Stormwater               Sustainability      Planning and      Community and         Economic
                                                                                                                                                             regulatory         recreation         development
                                                                                                            EXPENDITURE
                                                                                                                                                                                  $13.5 M
                                $10.4 M                                                                                                                                            CAPEX
                                  CAPEX                                                                           $7.2 M
                                                                                                                   CAPEX
                                                                                       $2.8 M
                                                             $1 M                       CAPEX
                                                             CAPEX

                                                                                                                                              OPEX
        OPEX                                                                                                       OPEX                     $0.6 M                                                      OPEX
        $3 M                                                  OPEX
                                                                                                                  $2.7 M                                                                              $3.2 M
                                   OPEX                                                 OPEX
                                                                                                                                                                OPEX
                                 $7.4 M                     $6.3 M                     $6.9 M                                                                 $7.8 M

                                                                                                                                                                                    OPEX
                                                                                                                                                                                  $17.4 M
                                                                                                         FUNDING SOURCES
  95% 0%       5%            32% 20% 48%                67% 3% 30%                 72% 10% 18%               29% 29% 42%                13% 0% 87%         37% 7% 56%          40% 36% 24%         68% 31%     1%

RATES DEBT OTHER*          RATES DEBT OTHER*          RATES DEBT OTHER*          RATES DEBT OTHER*          RATES DEBT OTHER*         RATES DEBT OTHER*   RATES DEBT OTHER*   RATES DEBT OTHER*   RATES DEBT OTHER*

                                                                                                    PORTION OF RATES SPEND

       7%                        16%                        12%                        17%                         7%                        0%                7%                 29%                  5%

* Includes fees and charges, subsidies and grants, development and financial contributions, and funding from other agencies (such as NZTA, GWRC, etc).
INFORMATION AND CONSULTATION DOCUMENT FOR THE PROPOSED ANNUAL PLAN 2019 2020
INFORMATION        Update on projects
Current projects                                                                    Projects set to commence in 2019 – 2020

       Upper Hutt Central Library seismic upgrade                                          Maidstone Max redevelopment
       Following the closure of the Library in February 2018, extensive                    Community engagement on the Maidstone Max redevelopment project
       earthquake strengthening has taken place with the work running to time              in January was a huge success. 199 people completed an online survey,
       and to budget. The upgraded building reopened on 11 March 2019.                     providing feedback on the existing facility and ideas for the redevelopment
                                                                                           and new design. This information, along with other feedback received on
                                                                                           Park Day, has been supplied as part of a design brief to the park designers.
       Walking and cycling network                                                         Concept designs are expected to be supplied to Council in June. The
       Council is preparing for land access negotiations, based on a feasibility           designs will be presented to the public for feedback later in 2019.
       study completed in 2017. This preliminary work will guide further planning
       for the capital works, currently scheduled to commence in 2019 – 2020.
                                                                                           H2O Xtream redevelopment
                                                                                           Once the budget becomes available in July 2019, the design process will
       Economic Development Stimulus Policy                                                begin. We expect to have a design for public consultation by early 2020.
       Half of the funding has been allocated so far this financial year through
       19 approved applications.
                                                                                           Expressions Whirinaki redevelopment
                                                                                           During the Long Term Plan 2015 – 2025 we consulted on the Expressions
       Residential Stimulus Policy                                                         Whirinaki redevelopment and a feasibility study was subsequently carried
       We have received ten applications. Nine have been approved,                         out. The study’s outcomes, and inflation since the original planning,
       and one application has been declined.                                              increased the projected cost to $7.25 million (from a previous budget of
                                                                                           $4.3 million in 2015). Council committed to funding $4.38 million as part
                                                                                           of the Long Term Plan 2018 – 2028, while the Expressions Whirinaki Trust
       Maidstone sports hub—stage 1: sports fields                                         is sourcing the remaining $2.87 million externally. The project is now in the
       Work began on 4 March. Once the work is complete and grass is                       detailed design phase which is expected to be complete by mid-July 2019.
       re-established, the fields should be available for use in winter 2020.
                                                                                           In conjunction with the redevelopment, an additional upgrade to the fire
                                                                                           suppression system is being carried out to enhance building compliance.
       Trentham Memorial Park                                                              This will be funded as asset renewal.

       We’re replacing the playground bark with matting to improve accessibility
       for all users, and constructing a new interactive water-play feature. Work
       should be complete by April/May 2019.
INFORMATION AND CONSULTATION DOCUMENT FOR THE PROPOSED ANNUAL PLAN 2019 2020
HAVE YOUR SAY
                                                                                                                     Sustainability Strategy
                                                                                                                     Adopted in 2012, the Upper Hutt Sustainability Strategy is due to be
                                                                                                                     reviewed this year. Before we begin, we would like to take the opportunity
                                                                                                                     to ask some questions that will help shape a full consultation process in
                                                                                                                     the coming months.

                                                                                                                     Sustainability has never been more defined or in the spotlight. The
                                                                                                                     United Nations defines sustainability with 17 key global goals including
                                                                                                                     responsible production and consumption, no poverty, gender equality,
                                                                                                                     education, clean energy, and climate action.

                                                                                                                     Closer to home, the New Zealand government is expecting to have the
                                                                                                                     Zero Carbon Bill enacted by the end of 2019, which will have an overriding
                                                                                                                     effect on the way we kiwis live.

                                                                                                                     What does all of this mean for Upper Hutt?
                                                                                                                     Our Sustainability Strategy will set out key principles to help shape Upper
                                                                                                                     Hutt through the next ten years as the world develops a more sustainable
                                                                                                                     future. As a resident of Upper Hutt, we want to know what you think the
                                                                                                                     Upper Hutt Sustainability Strategy should include, what our challenges
                                                                                                                     are, and what direction we should take.

  HAVE YOUR SAY
The future of kerbside recycling
For safety and environmental reasons, Upper Hutt City Council adopted a user-pays model for kerbside recycling       Or, Council could contract a single, city-wide recycling collection provider.
which began in February 2013. Any future city-wide recycling service will have to adopt a wheelie-bin and/or crate   The cost of this option is estimated to equate to a 3.6% increase in rates
system, similar to current providers. For the Long Term Plan 2021 – 2031 Council may consider alternative options.   on top of other rates increases ($80 – $96 per household).

Options include a model similar to Kāpiti Coast District Council. Under this user-pays model, waste collection       Tell us what you think—we’re preparing now for the next Long Term Plan
service providers are required (through a bylaw) to also provide recycling services for their customers.             and we’d like your input on the future of kerbside recycling in Upper Hutt.
HAVE YOUR SAY
Economic Development                                                             We recently asked 255 Upper Hutt businesses to share their thoughts about our Economic
                                                                                 Development Stimulus Policy. From a 12% response rate, we gained the following insights:

Stimulus Policy
Revising the policy
This initiative, first introduced in 2014 – 2015, has now been running
successfully for five years. The policy has contributed to increased
                                                                                       73%                                                                   58%
vitality within our city centre and provided investors with the confidence
that Upper Hutt is a great place to establish a business.

The incentives have encouraged businesses to invest over                      agree the city centre is vital to                                    were aware of EDSP grants, most
$20 million in building, expanding, and refurbishing industrial and          Upper Hutt’s economic prosperity                                      finding out through Council staff
commercial infrastructure in Upper Hutt. Over $6 million of this has
been invested directly in the city centre.

This year we are proposing to make a few changes to the criteria to
                                                                                                                        38%
ensure that the policy remains effective in activating the city centre,
and encouraging new business and industry across Upper Hutt.

We’re not proposing to make any changes to the $500,000 budget.                                                found the incentive grant to be
                                                                                                             vital to the success of their project
Proposed changes
1. Replace ‘CBD’ with ‘city centre’ to broaden the geographical
   area when considering applications.
2. Increased proportions and maximums for Council contributions to
   earthquake strengthening—according to NBS* levels achieved.
3. A scale for city centre commercial retrofits be introduced,
   starting from $5,000.
4. Relocations within Upper Hutt can be considered if relocation is
   necessary for business expansion or partnership development.
5. A condition of grant acceptance being that Council may request
   specific business information to help assess the impact of the policy.
                                                                             The fully revised Economic Development Stimulus Policy is available
                                                                              (with track-changes applied) at consultation.upperhuttcity.com
* New Building Standard for earthquake resilience
Ways to engage
     Make a submission online at consultation.upperhuttcity.com or download a submission                      Chat with the Mayor | Upper Hutt Central Library, Tuesday 2 April, 10.30 am
     form and email it to askus@uhcc.govt.nz with ‘Annual Plan submission’ as the subject
                                                                                                              Business workshop | Expressions Whirinaki, Wednesday 10 April, 7.30 – 9.00 am
     Join the discussion at facebook.com/UpperHuttCityCouncil                                                 If you’d like to attend this workshop, email askus@uhcc.govt.nz
     Complete the form in this document and freepost it or drop it in at:                                     We will be hearing oral submissions on this consultation document in late May.
         Council reception, 838 – 842 Fergusson Drive, Upper Hutt                                             To book a 10-minute oral submission slot call us on (04) 527 2169.
         Pinehaven Library, Corner Jocelyn Crescent and Pinehaven Road
         Upper Hutt Central Library, 844 Fergusson Drive, Upper Hutt

                                                                                                                          SEND US YOUR FEEDBACK BY 18 APRIL 2019

Consultation key dates
     14 MARCH                             2 APRIL                            18 APRIL                         20/21 MAY                            4 JUNE                              26 JUNE
       Thursday                            Tuesday                             Thursday                   Monday – Tuesday                          Tuesday                            Wednesday
     Consultation                      Chat with the                        Consultation                       Hearings                          Submissions                         Adoption of
        opens                             Mayor                                closes                                                             considered                         Annual Plan
                                          10.30 am                              5.00 pm                       Varying times                         9.00 am                             9.00 am
                                         Upper Hutt                           Upper Hutt                       Upper Hutt                          Upper Hutt                          Upper Hutt
                                        Central Library                       City Council                     City Council                        City Council                        City Council

Our elected members
  COUNCILLOR        COUNCILLOR         COUNCILLOR         DEPUTY MAYOR       COUNCILLOR          MAYOR           COUNCILLOR         COUNCILLOR        COUNCILLOR        COUNCILLOR          COUNCILLOR

CHRIS CARSON QSM   ROS CONNELLY      BLAIR GRIFFITHS      JOHN GWILLIAM     PAUL LAMBERT     WAYNE GUPPY JP    GLENN McARTHUR     ANGELA McLEOD      HELLEN SWALES     STEVE TAYLOR        DAVE WHEELER
   021 041 5969     027 733 5076       027 451 9561         027 527 9727     022 130 1697     027 277 1550       027 542 9308       027 497 2761      027 528 6799      027 337 8371        027 769 2390
You can also read