Technical Reviews and Database Adjustments Guideline Version 2.4 May 24, 2021 HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 1
Technical Reviews and Database Adjustments Multifamily property owners/agents (POAs) and Public Housing Agencies (PHAs) have the option to appeal a physical inspection score for reasons such as a belief that the inspection was not conducted in accordance with the Uniform Physical Condition Standards (UPCS) inspection protocol, that certain inspection data may have been recorded in error, or deficiencies are related to extraordinary events such as a natural disaster, that, if corrected/adjusted will result in an improvement in the property's overall score. There are two different processes available to appeal a physical inspection score: technical reviews and database adjustments. What is a Technical Review (TR)? A technical review may be requested if, during the physical inspection, an objectively verifiable and material error(s) occurred that, if corrected, would result in an improvement in the property's overall score. Material errors are those that exhibit specific characteristics and meet specific thresholds. The three types of material errors are: Building Data Errors - The inspection includes the wrong building or a building that is not owned by the property. Unit Count Errors - The total number of units considered in scoring is incorrect as reported at the time of the inspection. Non-Existent Deficiency Errors - The inspection cites a deficiency that did not exist at the time of the inspection. What Does NOT Qualify for a Technical Review? PIH-REAC will not consider the following for a technical review: disagreements over the severity of a defect, such as deficiencies rated Level 3 that the POA/PHA believe should be rated Level 1 or 2; deficiencies that were repaired or corrected during or after the inspection; deficiencies recorded with no associated point loss (for example, inoperable smoke detectors) or deficiencies for survey purposes only (for example, FHEO); deficiencies caused by residents. HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 2
What are the Steps for Submitting a Technical Review? A POA/PHA can initiate the technical review process by notifying PIH-REAC in writing within the appropriate time-period and supplying objective and verifiable documentation that a deficiency was recorded in error. Examples of objective and verifiable documentation are identifiable, dated pictures or video evidence; signed and dated written material from an objective source, such as a local fire marshal or building code official or a licensed or registered architect or professional engineer with the authority to sign and seal or ‘‘stamp’’ documents, thus taking the legal responsibility for them, or other similar evidence that is specific to the inspectable area and item being challenged. The evidence must be more than a disagreement with the inspector’s observations, or the inspector’s finding regarding the severity of the deficiency. As of October 31, 2007, appeals signed by the owner, his/her management agent and /or lawyers retained by the owners are the only acceptable appeals that will be processed. REAC is not required to review a request for appeal after the specified number of days has expired so it is important to note the time-period available for appeal. Public Housing: PHAs must submit a request for a technical review and must be received at REAC within 30 days from the physical inspection report release date. This change is effective for inspections released on or after March 25, 2011.The request must include an email address of the request originator. Multifamily: POAs must submit a request for a technical review and must be received at REAC within 30 days from the physical inspection report release date. The request must include an email address of the request originator. The information and proper documentation for a technical review must be mailed to the following address: U.S Housing and Urban Development/PIH/REAC Attn: Technical Assistance Center/TR/DBA 550 12th Street, S.W. Suite 100 Washington, DC 20410 What Can Be Expected in Response to a request for a Technical Review? If the PIH-REAC evaluation determines that an objectively verifiable and material error(s) has been reasonably documented by the POA/PHA and, if corrected, would result in a significant improvement in the property's overall score, the PIH-REAC will take one or a combination of the following actions: Schedule a new inspection; Correct the physical inspection report; Issue a corrected physical condition score; or Issue a corrected Public Housing Assessment System (PHAS) score. HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 3
An email will be sent to the originator of the request (a copy will be sent to the Primary Contact listed in the inspection report) explaining what action, if any, has occurred and why the technical review is accepted or denied. A technical review that changes a physical inspection score may change the PHAS score. The PHAS score is not considered final until all changes have been completed. What is a Database Adjustment (DBA)? A request for database adjustment initiates a review of the results of a physical inspection. A database adjustment may be requested for circumstances affecting the inspected property that are out of the ordinary, reflect an inconsistency with ownership, or are allowed by city/county/state codes. Circumstances that may be addressed by a database adjustment are as follows: Local Conditions and Exceptions - Circumstances include inconsistencies between local code requirements and the UPCS inspection protocol, such as conditions permitted by local variance or license (e.g., child guards allowed on sleeping room windows by local building codes) or preexisting physical features that do not conform to or are inconsistent with PIH-REAC's physical condition protocol. Ownership Issues - Items that were captured and scored during the inspection that are not owned or the responsibility of the PHA/POA. Examples include sidewalks, roads, fences, retaining walls, and mailboxes owned and maintained by adjoining properties or the city/county/state and resident-owned appliances that are not maintained by the PHA/POA. The PHA/POA must have notified the owner or proper authorities regarding the deficient item and any appliances provided to the tenant must be noted in the lease agreement. Adverse Conditions Beyond the Owner's Control - Deficiencies negatively affecting the score were caused by circumstances beyond the PHA’s/POA’s control, such as damage caused by a natural disaster; a third party, private or public entity working near the property or caused damage to the property. The responsibility to correct such conditions still belongs to the POA/PHA and must show evidence of work completed or work physically in progress to complete repair. Modernization Work in Progress – Properties and developments undergoing extensive modernization work in progress may qualify for a database adjustment for observed deficiencies actively being worked on at the time of the inspection. Routine and/or remedial maintenance before or during the inspection are not appealable. All elements of the unit/area that are not physically undergoing modernization at the time of the inspection (even if modernization is planned) will be subject to PIH-REAC's physical inspection protocol without adjustment. HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 4
What Does NOT Qualify for a Database Adjustment? PIH-REAC will not consider the following for a database adjustment: Requests submitted without appropriate documentation; Deficiencies noted during the inspection that were corrected during or after the inspection; Circumstances addressed in the technical review process. Requests for technical reviews must be submitted separately from requests for database adjustments. What are the Steps for Submitting a Database Adjustment? A POA/PHA can initiate the database adjustment process by notifying the correct office in writing within the appropriate time-period and submitting proper documentation (i.e., signed letter from local/ building/ fire code official for code variance; etc) to support the appeal. All requests for database adjustments can be made either prior to or after the physical inspection Public Housing: PHAs must send a request for a database adjustment and must be received within 45 days from the physical inspection report release date to the local PIH field office. The local PIH field office will then review the database adjustment request and forward their recommendation to PIH/REAC. This change is effective for inspections released on or after March 25, 2011. The request must include an email address of the request originator. Multifamily Housing: POAs must send a request for a database adjustment and must be received within 45 days from the physical inspection report release date to the following address. The request must include an email address of the request originator. U.S Housing and Urban Development/PIH/REAC Attn: Technical Assistance Center/TR/DBA 550 12th Street S.W. Suite 100 Washington, DC 20410 What Can Be Expected in Response to a request for Database Adjustment? If the PIH-REAC evaluation determines that the request is justified and, if corrected, would result in a significant improvement in the property's overall score, the PIH-REAC will take one or a combination of the following actions: Schedule a new inspection; Correct the physical inspection report; Issue a corrected physical condition score; or Issue a corrected Public Housing Assessment System (PHAS) score. An email will be sent to the originator of the request (a copy will be sent to the Primary Contact listed in the inspection report) explaining what action, if any, has occurred and HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 5
why the database adjustment request is accepted or denied. A database adjustment request that changes a physical inspection score may change the PHAS score. The PHAS score is not considered final until all changes have been completed. Examples of Appealed Items and Appropriate Documentation Shown below are examples of appealed items and supporting documentation that is and is not acceptable: Examples of Objective and Verifiable Documentation not considered observed deficiency Documentation objective and/or verifiable* Letter from the PHA or the MF A signed letter from a licensed Owner/Agent saying the wall is (TR) Building professional structural engineer sound and safe. Letter from a Exterior -Foundations with his/her seal stating that the general contractor/individual who Cracks/Gaps deficiency does not exist. is not licensed to give such opinion. A video or picture without a date/time stamp. A letter from the PHA/Property Owner/Agent A dated picture or video showing saying the vegetation is not (TR) Site Grounds - the whole site that overgrown overgrown. A time stamped Overgrown, vegetation does not exist video or picture showing Penetrating Vegetation immediately prior to or on the vegetation touching the building inspection date or growing over a walkway, etc. - the inspector's judgment will prevail. (TR) Any inspectable A pest control contract will not area – NA suffice to approve a TR. The Infestation/Presence of inspector’s judgment will prevail. Roaches A picture/video of the permanent A letter from the PHA/POA that art with a copy of the executed says it allows children to mark on contract between the PHA/POA the walls. Although a TR can be and the artist with a date prior to approved for chalk hopscotch the inspection or a newspaper marks on a driveway/walkway; article showing the artwork/mural (TR) Site - Graffiti crayon and other permanent done as a community project. A markings on a wall, building picture of temporary chalking surface, or fence cannot be such as hopscotch marks dated on approved unless they are part of a or within very few days after the permanent piece of artwork/art inspection clearly identifying the mural. area with the noted deficiency. HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 6
A manufacturer’s guide that states (TR) Common Area or seals/weather stripping was never A letter from the PHA/Property Dwelling Unit Doors - installed and a picture which Owner/Agent saying there were Deteriorated/Missing clearly identifies the inspected no seals on the door when it was Seals (Entry Only) door that matches the purchased. manufacturer’s guide. (TR) Building Signed letter from a licensed A letter from the PHA/POA Systems - Leaking professional mechanical engineer saying the leaking water was a Central Water Supply with his/her seal stating that the result of condensation rather than (Domestic Water) deficiency does not exist. a true leak. An inspection report from a fire sprinkler company or local code official, dated on or immediately (TR) Building A letter from the PHA/POA after the inspection, that clearly Systems - Missing saying they called the sprinkler states the specific painted Sprinkler (Sprinkler company and the vendor said it components (frame, thermal components painted was okay to paint the linkage, cap, deflector, or over) components. escutcheon) do not affect the effectiveness of the fire suppression system. An executed agreement dated prior to the date of the inspection and with appropriate contact information, between the city and the property owner stating the city owns and is responsible for the sidewalks or a letter from the city (DBA) Site - Tripping Letter from the PHA or the MF claiming ownership. Additionally, Hazard (Sidewalk- POA saying the city owns the there must be a letter from the ownership) sidewalks. PHA/POA dated prior to the inspection reflecting a request for the sidewalk to be repaired or a letter from the city with information regarding repair of the sidewalk with appropriate contact information. (DBA) Common Area (1) an executed contract with a Office - All copy of the scope of work, inspectable items including change orders if Letter from the PHA Mod (undergoing applicable; Coordinator or the MF Owner modernization work- (2) a Notice to Proceed with start saying the office is undergoing in-progress) and completion dates; modernization. (3) an affidavit from the Effective Date contractor’s authorized March 20, 2019 representative identifying: HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 7
a. the modernization work in progress that was being done at the time of the inspection; b. the identifiable location (e.g. inspectable area, Bldg. & unit number) of the work physically in progress; c. the work it has completed as of the date of the affidavit; d. the date on which the work was completed; and e. if the work is not completed as of the date of the affidavit, an explanation of why the work is still in progress and when it will be completed; and (4) photographic evidence sufficient to show that the observed deficiencies have been corrected or are in the process of being corrected. Documents submitted from the contractor(s) must be on the contractor’s letterhead and include the contractor’s licensing and contact information. Only the observed deficiencies that were physically in the process of being corrected by modernization work in progress at the time of inspection are eligible for consideration. Modernization work to be performed under an executed contract but was not physically in progress at the time of the inspection is not eligible for a database adjustment. Before processing a database HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 8
adjustment, REAC may contact the contractor for additional information or visit the property to verify the information submitted in the appeal. A letter from the local Fire Marshall or licensed or registered professional engineer with the authority to sign and seal or ‘‘stamp’’ documents (thus taking the legal responsibility for them, or other similar evidence that is specific to the inspectable area and item being challenged. The evidence must be more than a disagreement with the inspector’s A letter from the PHA/Property (DBA) Dwelling Unit observations, or the inspector’s Owner/Agent saying the local fire Emergency Fire Exits finding regarding the severity of code allows window air - Blocked/Unusable the deficiency) stating that conditioners. A letter from the (Air Conditioner/Bars window air conditioners/bars in PHA/POA or tenant saying the in the window) the window are allowed under the tenant requires the air local fire code or that he/she or conditioner. designee inspected the area in question and the cited deficiency does not pose any threat. Letter should include the reasoning for this decision such as the air conditioner is not bolted in and could be easily pushed through the window to provide emergency egress or the unit has a sprinkler system. A signed letter from an owner/company with a contact Letter from the PHA or the MF (DBA) Site - number validating ownership of Owner/Agent saying another Damaged/Leaning the cited fence or an approved person/company owns the fence. fence (ownership) building permit/plan reflecting A photograph of the fence. current ownership. HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 9
A letter from tenant's doctor stating the mechanical door closer required adjustment to slow the closing of the door, the door needed to be removed, the lock (DBA) Dwelling Unit needed to be removed, etc., to A letter from the PHA/POA or – Damaged accommodate tenant’s medical tenant saying the elderly/disabled Hardware/Locks/ necessity/disability. Letters must tenant needed the adjustment of Missing Door be on appropriate letterhead with door hardware or the door/door (database adjustment) contact information. The appeal hardware removed. should include the work order documenting request for adjustment/removal of the door/door hardware, dated prior to the inspection. A signed letter from a qualified local code official on an official letterhead noting the address of (DBA) Missing the property, the location of the Breakers/Fuses panel or item in question, a copy A letter from an electrician (Electrical System – of the photo taken by the REAC stating the repair is 'per the local Building Systems)- inspector at the time of code. ' Non-Industry inspection and stating that the Standard Repair panel or item in question has been inspected and meets local code. A signed letter from a qualified local code official on an official letterhead noting the address of (TR) Missing the property, the location of the Breakers/Fuses panel or item in question, a copy (Electrical System – A letter from an electrician of the photo taken by the REAC Building Systems)- stating the repair is 'per specs. ' inspector at the time of Non-Industry inspection and stating that the Standard Repair panel or item in question has been inspected and meets local code. Statements signed by residents or other personnel associated with the property are not HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 10
considered objective third-party sources Example of a technical review request Deficiency: BE - Roofs - Ponding** Documentation not considered objective and/or verifiable: Statement from the POA/PHA that it rained the day before the inspection Documentation considered objective and/or verifiable: Picture showing the roof is flat and weather report showing measurable precipitation (1/10 inch or more) during the previous 48 hours Example of a database adjustment request Adverse Conditions Beyond the Owner's Control (1) Deficiency: Missing Pieces/Holes/Spalling (Walls) Documentation not considered objective and/or verifiable: Statement from the POA/PHA that a car ran through the wall 2 days before the inspection Documentation considered objective and/or verifiable: Picture(s) and a police report HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 11
Pre-database adjustment When an appeal with corresponding proper documentation wherein the deficiency captured conforms to the local code or pertains to ownership matters, the property ID is added to our “pre-database” list. This means when the subsequent inspection noted deficiency that received points was granted on a previous appeal, that specific deficiency will be deleted prior to release of the new inspection report View the Applicable Federal Register Notices/Regulations PIH-REAC has provided the database adjustment guidelines in the Federal Register notices for 24 CFR Part 200.857 and 24 CFR Part 902.24. PIH-REAC has provided technical review guidelines in the Federal Register at 24 CFR Part 200.857 and 24 CFR Part 902.68. HUD – PIH / REAC – TR/DBA Version 2.4 – May 2021 Page 12