Future Projects Central Region District 3 2021 2024
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
2021-2024 Construction Projects Cass Lake 371 200 Walker 6 34 Remer 200 371 Longville Hill City Central Region 6 AITKIN District 3 Hackensack CASS 84 Backus 87 Ou"ng 87 84 Menahga Emily 169 Pine River 371 CROW WING 6 Sebeka 64 Jenkins Hassman Construct 210 Pequot 71 Lakes Aitkin 2021 Deerwood Wadena WADENA CASS Nisswa Crosby 47 2022 Ironton 210 2023 29 6 169 10 Staples Brainerd Glen 2024 Hewi! Baxter 18 Malmo 210 210 18 Motley Pillager 47 Bertha 371 Garrison Lake Mille Lacs AITKIN N TODD 10 18 Eagle Bend 25 Camp 71 Ripley Vineland 169 Isle Cushing 27 27 Woodland Browerville Randall Wahkon 115 27 Lastrup Onamia Li!le Falls Pierz MILLE LACS 65 Long Prairie 27 27 Genola KANABEC Osakis MORRISON Mora Brook 27 287 Swanville Park 28 10 169 Royalton 107 238 Li!le Rock Ogilvie Grey Eagle Upsala 70 Milaca Rice Bruns- 25 28 Sauk Centre Bock wick Westport STEARNS BENTON 23 47 Braham 94 71 Albany Sauk Foley 237 Pine Brook ISANTI Sartell Rapids Meire New Munich Avon Elrosa Grove Waite 95 Cambridge Collegeville Park Brooten 4 St. Cloud Hwy 23 North Gap: 25 Princeton Add lanes Cold 10 Spring 23 169 Isan" 2022-2023 St. Clear SHERBURNE Belgrade Lake Henry Augusta Lake 55 Richmond 23 Zimmerman 22 Clearwater Paynesville 15 Becker 24 94 Big Lake Redefine 169: Kimball South Elk River Convert to freeway 55 Haven 4 Mon"cello 2022-2024 Eden Valley MEEKER 101 Anoka Annandale Albertville Otsego ANOKA 25 WRIGHT St. Michael Rogers I-94 Maple Grove-Clearwater: 241 94 Add lanes, improve access Buffalo Maple Grove 2020-2021 Cokato Howard 25 55 Rockford 12 Lake Montrose 494 Waverly Delano 12 Minnesota Department of Transportation
2021 Construction Route County 2021 Work Detour Cost Reconstruct the road and improve pedestrian access from 2nd Ave 4 Stearns Yes $4.0 M S to 2nd Ave N in Meire Grove Resurface (mill and overlay) from Cass/Itasca county line to Hwy 2 6 Itasca Yes $5.9 M west of Cohasset; replace pipes (D1 funds, D3 construct) 10* Benton Install cable median barrier from CR 4 near Sauk Rapids to Rice No $1.7 M Reconstruct the road surface from Xenia Ave to Lowell Ave; 10 Sherburne update signals at Proctor Ave and Upland Ave; install pedestrian No $12.1 M trail in Elk River Resurface (mill and overlay) and improve pedestrian access in 55 Stearns Yes $2.9 M Brooten and Belgrade 71 Todd Replace bridge over Drayer Creek and Harris Creek in Browerville Yes $1.4 M 84 Cass Replace bridge over Norway Brook Dam in Pine River Yes $3.3 M Install 1/10th mile delineators from Indian Trail Lane in Pine River 84 Cass No $400,000 to Hwy 200 near Walker Resurface (reclaim) from CR 15 west of Pine Brook to Cambridge 95 Isanti Yes $8.8 M and construct a roundabout at Hwy 95/Hwy 47 Reconstruct, add lanes, improve access and replace/construct I-94 Wright bridges between Maple Grove and Clearwater (Corridors of No $345 M Commerce; Yr 3 of 3) Resurface (reclaim) and widen shoulders from south junction Hwy 200 Cass 371 near Walker to Hwy 84 near Longville (D3 funds, D2 No $11.6 M construct) Reconstruct from 2nd St SW to 3rd Ave NE in Crosby; resurface (mill 210 Crow Wing and overlay) from west of 7th Ave in Ironton to 2nd St SW in Yes $7.0 M Crosby, and upgrade pedestrian sidewalks and approaches Improve the road surface (smoothen, repair concrete) and replace 210 Crow Wing Yes $3.5 M two pipes between Deerwood and Aitkin MnDOT Central Region— District 3: 2021-2024 Future construction projects 1
2022 Construction Route County 2022 Work Detour Cost 2* Cass Resurface (mill & overlay) from end of the four-lane in Cass Lake to CR No $2.1 M 10 (D3 fund; D2 construct) 2* Cass Reconstruct through Bena (D3 fund; D2 construct) No $3.2 M 6 Cass Resurface from Cass CR 4 to Hwy 200 in Remer No $1.3 M 10 Benton Replace bridge (box culvert) northwest of CR 33 near Sauk Rapids No $1.4 M 12 Wright Resurface (mill and overlay) from 13th Ave Howard Lake to Montrose No $2.2 M 15 Stearns Reconstruct road and upgrade sidewalks from south of the railroad Yes $1.4 M crossing to Hwy 55 in Kimball 23 Benton Resurface and replace/repair pipes (mill and overlay) from Foley to Yes $14.7 M Mille Lacs Milaca; reconstruct and add roundabout in Foley 23 Stearns Expand to four lanes from Paynesville to Richmond (Corridors of Yes $47.9M Commerce funds; known as “North Gap” project; D8 fund/D3 construct; Yr 1 of 2) 25 Crow Wing Replace bridge over BNSF railway in Brainerd, includes Yes $4.0 M bike/pedestrian trail 27 Todd Resurface (mill and overlay) from I-94 to Osakis; reconstruct and Yes $20.5 M Douglas widen shoulders from Osakis to Hwy 71 south of Long Prairie; replace bridges/culverts, includes trail bridge over Hwy 27 55 Wright Resurface (mill and overlay) from Meeker/Stearns county line to No $5.1 M Brown Ave in Annandale 65 Kanabec Replace bridge over the Snake River in Mora Yes $5.1 M I-94 Stearns Rehab bridges over the BNSF railway west of the Hwy 23 interchange No $1.8 M in Waite Park 169 Aitkin Reconstruct 11 miles of road surface (unbond concrete overlay), Yes $15.0 M 210 widen shoulders and upgrade drainage from Aitkin to the Mississippi River bridge, north of Hassman (Yr 1 of 2) 169 Sherburne Convert three miles of Hwy 169 in Elk River to a freeway system from No $130.0 M Hwy 101/10 and 197th Ave includes four interchanges. (Corridors of Commerce; known as “Redefine 169” project; Yr 1 of 3) 238 Stearns Improve access at Hwy 238/Railroad Ave/1st St corner in Albany (City No $540,000 led) 371 Crow Wing Install Reduced Conflict Intersections to improve access between Gull No $7.0 M Lake Dam Rd and Green Gables Rd in Brainerd Lakes area 371B Crow Wing Resurface (mill and overlay) 70th Ave to Greenwood St; reconstruct Yes $6.5 M and improve Greenwood St to Joseph St in Brainerd MnDOT Central Region— District 3: 2021-2024 Future construction projects 2
2023 Construction Route County 2023 Work Detour Cost 10* Sherburne Install median cable barrier guardrail from St. Cloud to Clearlake No $1.6 M 10 Benton Reconstruct the Hwy 10/Hwy 23 interchange area and install No $35.5 M 23 pedestrian safety improvements in east St. Cloud. (Yr 1 of 2) 12 Wright Resurface (mill and overlay) from 13th Ave in Howard Lake to east No $4.7 M of Zephyr Ave in Montrose, update sidewalks (urban areas only) 18 Aitkin Reconstruct 13 miles of road surface (cold in-place recycle) from Yes $5.7 M east of Garrison at Hwy 169 to Hwy 47 in Malmo 23 Stearns Expand to four lanes between Paynesville and Richmond (Corridors Yes $47.9M of Commerce funds; known as “North Gap” project; D8 fund/design, D3 construct; Yr 2 of 2) 25 Wright Reconstruct road from south of 1st St to north of Settlers Parkway in Yes $6.2 M Buffalo, includes sidewalks 27 Morrison Replace bridge over stream three miles west of the Morrison/Mille Yes $1.0 M Lacs county line 47 Aitkin Resurface (mill & overlay) and improve Hwy 47 from west Hwy 27 in No $6.8 M Isle to 305th Lane north of Glen 55 Wright Resurface (mill and overlay) from Brown Ave to Poplar Ave in No $2.5 M Annandale; upgrade sidewalks and signals in Annandale 94 Stearns Repair and overlay CR 75 bridge deck northwest of St. Joseph No $1.2 M 169 Sherburne Convert three miles of Hwy 169 to a freeway system in Elk River No $130.0 M from Hwy 101/10 and 197th Ave includes four interchanges. (Corridors of Commerce; known as “Redefine 169” project; Yr 2 of 3) MnDOT Central Region— District 3: 2021-2024 Future construction projects 3
2024 Construction Route County 2024 work Detour Cost 10 Morrison Improve safety and access on Hwy 10 in Randall, includes reduced conflict No $2.2 M intersections at Morrison CR 14 and Hwy 115 23 Mille Lacs Resurface (mill and overlay) from east of CR 2/105th Ave east of Milaca to Yes $5.3 M the Groundhouse River bridge in east Ogilvie; replace the South Fork Groundhouse River bridge (box culvert) and ditch stream bridge (box culvert) west of Ogilvie 25 Wright Overlay the Mississippi River bridge deck in Monticello Yes $3.0 M 27 Mille Lacs Reconstruct road from west of 1st St to east of 3rd St in Wahkon, includes No $1.7 M sidewalks 95 Isanti Reconstruct road from Fern St to Davis St in Cambridge, includes sidewalks Yes $9.0 M 115 Morrison Resurface (mill and overlay) road from Hwy 10 in Randall to east of No $2.6 M Morrison CR 213, includes pedestrian crossing at Camp Ripley 169 Aitkin Resurface road from Mississippi River Bridge north of Hassman to Aitkin No $4.7 M CR 18 west of Palisade (14 miles) (D1 funds, D3 design/construct) 169 Mille Lacs Resurface (mill and overlay) road one mile north of Ojibwe Dr north of Yes $3.5 M Vineland to Crow Wing CR 26, south of Garrison, includes culverts 200 Cass Replace Willow River bridge (double-box) east of Hwy 6/200 east of Remer Yes $830,000 210 Crow Wing Resurface Timberwood Dr to Baxter Dr in Baxter No $2.5 M 238 Morrison Resurface (mill and overlay) road from Upsala to Hwy 27 west of Little Falls Yes $6.6 M and replace the Hay Creek bridge north of Bowlus 169 Sherburne Convert three miles of Hwy 169 to a freeway system in Elk River from Hwy No $130.0 M 101/10 and 197th Ave includes four interchanges. (Corridors of Commerce; known as “Redefine 169” project; Yr 3 of 3) Info is subject to change, includes construction year(s); Costs estimated; smaller projects may not be listed. *Project not highlighted on map. Updated January 15, 2021. Learn more: https://www.mndot.gov/d3/projects/ MnDOT Central Region— District 3: 2021-2024 Future construction projects 4
You can also read