For the next 10 years - CONSULTATION DOCUMENT for the Long-term Plan - Taupo District Council

Page created by Marion Sparks
 
CONTINUE READING
For the next 10 years - CONSULTATION DOCUMENT for the Long-term Plan - Taupo District Council
for the next 10 years

CONSULTATION DOCUMENT
for the Long-term Plan
2018-28
For the next 10 years - CONSULTATION DOCUMENT for the Long-term Plan - Taupo District Council
Contents
Why we want you to have your say!                       3
What happens with my feedback?                          3
Consultation events                                     3
Our Long-term District Strategy for 2018-2028           4
Our services and activities                             6
Our Financial Strategy                                  7
Keeping rates affordable and sustainable                7
Looking after the assets we have                        8
while maintaining levels of service
Prudent management of our investments                   8
and borrowings
What’s happening in your area                           10
Rates for different property types                      12
Our Infrastructure Strategy                             13
Population and demographic change                       13
Protecting the health of our communities                14
and the environment
Maintaining and renewing our infrastructure             15
Resilient infrastructure                                15
Knowledge gaps                                          15
Planned infrastructure spending 2018-28 (in millions)   16
Tell us what you think                                  17
Improving traffic flow through Taupō’s CBD              17
Upgrading Acacia Bay’s water supply                     19
Working to reduce wastewater spills                     21
Submission form                                         25
For the next 10 years - CONSULTATION DOCUMENT for the Long-term Plan - Taupo District Council
2018-28 LONG TERM PLAN
Why we want you                                                       What happens with my
to have your say!                                                     feedback?
Every three years we seek feedback on our draft 10-Year               When you make a submission you will be given the option
Plan that outlines the services, key projects and initiatives         on whether you want to present your view to the Council
we plan on delivering for our community. This document                in person. If you do we will book a time for you to attend a
outlines some of the key issues we want your feedback on.             public meeting during the week of April 30- May 6. You will
It’s just as important to let us know the things you support          be given up to 10 minutes to present your submission and
as well as the things you don’t as what you tell us will guide        answer any questions. Hearings in Turangi and Mangakino
our future decision making.                                           will be arranged if there are sufficient numbers. Alternatively,
                                                                      you may wish to present your view to the Council
You can have your say in the following ways:
                                                                      electronically e.g. conference call. Please let us know if you
- taupo.govt.nz                                                       wish to present in this way.
- 10yearplan@taupo.govt.nz                                            All submissions will be considered by the Council regardless
                                                                      of whether you want to be heard or not. Final decisions will
- Call into your nearest council office
                                                                      be made in May. All submissions will be made available to the
- Drop into one of these sessions below.                              public via the Council website, including your personal details.

This time we are seeking your feedback on three issues:
Improving traffic flow through Taupō’s CBD (pages 17-18), Upgrading Acacia Bay’s water supply (pages 19-20) and working to
reduce wastewater spills (page 21).

Consultation events
We are planning a number of opportunities for you to come and chat with us about our proposed plans. To find out more visit
our website taupo.govt.nz, call into one of our customer service centres, email 10yearplan@taupo.govt.nz or give us a call
on 0800 ASK TDC (0800 275 832). We’d love to see you there!

    Taupō                                                        Day                      Date                       Time
 Acacia Bay Community Hall                                       Tuesday                  20 March                   5 - 7pm
 Kinloch Community Hall                                          Thursday                 22 March                   4 - 6pm
 Our Customer Service Centre 46 Horomatangi St                   Saturday                 24 March                  12 - 2pm
 Our Customer Service Centre 46 Horomatangi St                   Thursday                 29 March                  12 - 2pm
 Taupō Library                                                   Thursday                 29 March                  10 - 11am
 Waitahanui Community Hall                                       Thursday                 15 March                     5pm
    Turangi                                                      Day                      Date                       Time
 Turangi Library                                                 Monday                   26 March                   4 - 5pm
    Mangakino                                                    Day                      Date                       Time
 Mangakino Service Centre                                        Wednesday                21 March                   4 - 5pm
 Tirohanga Settlers Hall                                         Monday                   12 March                   7:30pm
    Southern end of Lake                                         Day                      Date                       Time
 Omori & Kuratau Community Centre                                Wednesday                14 March                 5:30 - 7pm

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                                3
Our Long-term
District Strategy                                               Our district's reputation will be built on the attractiveness

for 2018-2028                                                   of our towns, the diversity of the experiences we offer, and
                                                                the friendliness of our people.

Taupō District Council’s vision is ‘To be the most
prosperous and liveable district in the North Island by
2022’.
As your Mayor and Councillors, we want the Taupō District
to be the ‘Heartbeat of the North Island’ not only by its       The vibrancy of our district will be created by well-
geographical position but by creating world class, authentic    connected communities who work together to create a
and resilient communities that people want to be a part         positive, fun environment people want to call home.
of. We want our district to be known for its charm, to be
vibrant, and to also offer a quality experience for both
residents and visitors, while creating real value in what we
offer and by the way we do things. We will work closely and
collaboratively with our partners to ensure the best possible
outcomes are achieved for our community, including iwi,
and to maximise any opportunities.                              We enable people to prosper by working to keep
                                                                unemployment low, housing affordable and ensuring
To help guide our strategy we have used a core set of values
                                                                whatever we do is the best it can be.
to underpin our decision making when it comes to the
services and activities we carry out as a council. These are:

The work we do will maintain – and build on – our               We will retain and attract residents and businesses by
international reputation as a destination of choice. We will    ensuring the district remains affordable and ensuring
promote an excellent quality of life for our residents while    the work we do creates a better life for people and their
protecting the natural environment that makes our district      families.
so special.

                                                                This Long-term strategy continues to align with the goals we
                                                                set ourselves in the last Long-term Plan of:
                                                                • Ensuring that the Taupō District remains a great place
                                                                  to live
We will be open and transparent in the way we carry out
our business and offer an experience that is genuine and        • Promoting economic development
real.                                                           • Protecting our water resources and using them wisely
                                                                • Maintaining the quality infrastructure that we have and;
                                                                • Keeping rates and debt affordable.
                                                                We want to build on the strong foundation we have built
                                                                over the past three years.
Our plans, infrastructure and work programmes will be
designed to ensure we are prepared to withstand or recover
quickly from, disasters and/or difficult situations. We will
be flexible and respond quickly to change.

4                                                                     Looking after the place we love for the next 10 years.
Our services and activities

6                      Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
Our Financial Strategy
The strategy continues the focus Council set in the Long-term Plan 2012-22 and 2015-25 on prudently managing our
investments and borrowings, keeping rates affordable and sustainable and looking after the assets we have while maintaining
levels of service.

Keeping rates affordable and sustainable
It is always a balancing act between meeting the wants and        In our last Long-term Plan, we had set the limit on rates
needs of our communities whilst keeping rates affordable          increases at LGCI +1%. We have increased this by 0.5%
and sustainable. This strategy has been prepared with this        as we are proposing a significant capital infrastructure
at the forefront of our thinking.                                 programme.
Rates                                                             Local government infrastructure costs, as measured by the
                                                                  Local Government Cost Index (LGCI) increase at a higher
To help achieve what we think is a good balance we have
                                                                  rate than the Consumer Price Index (CPI). We believe that
set the following limits on rates:
                                                                  the limits that we have set for rates still allow us to provide
• Total rates revenue must not exceed 80% of operating            for and maintain existing levels of service and to meet any
  revenues                                                        additional demand for services.
• Rate increases may not exceed the forecast Local
  Government Cost Index (LGCI) +1.5%

Rates percentage increase

   %
                                                                                                           4.10%        4.20%
  4.5                                                                           3.90%        4.00%
                  3.70%       3.70%        3.70%       3.80%       3.80%
  4.0
        3.50%
  3.5

  3.0
        3.40%
  2.5
                  2.65%       2.57%
  2.0
                                           2.44%       2.46%
                                                                   2.27%        2.17%                                   2.12%
                                                                                              2.12%       2.09%
  1.5

  1.0

  0.5

    0
        2018/19    2019/20      2020/21      2021/22    2022/23     2023/24      2024/25      2025/26      2026/27      2027/28

            Financial Strategy Limit (LGCI + 1.5%)        Prospective average rates % increase

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                                7
The strategy outlines the Council’s financial vision for the
next 10 years and the impacts on rates, debt, levels of
                                                                  Prudent management
service and investments. It will guide the Council’s future
funding decisions and, along with the Infrastructure
                                                                  of our investments and
Strategy, informs the capital and operational spending for        borrowings
the Long-term Plan 2018-28. It identifies the challenges that
we want to respond to with our financial goals.                   The strategy maintains Councils current prudent and
                                                                  conservative approach to the management of its
Over the past five years we have been successful in
                                                                  investments and borrowings to ensure that todays and
implementing the planned financial strategy. Rates have
                                                                  future generations of ratepayers share both the benefits
been within the limits set in the financial strategies of
                                                                  and the costs of Council services.
2012 and 2015. Debt has reduced from a peak of $168m
in 2014 to $144m by 2018 and we have maintained our               Council has maintained its borrowing limit at 200% of
levels of service. We have continued with our strategy of         operating revenue.
selling surplus non-strategic land both as bare land parcels
                                                                  To read our full Financial Strategy visit taupo.govt.nz.
for private sector development and we have successfully
completed a staged subdivision at Botanical Heights with all
39 sections sold.
Council has maintained its AA credit rating from Standard         Capital expenditure by activity
& Poors (S&P). This is reflective of Council’s strong financial
management and budgetary performance. Council’s
strategy is to retain its AA credit rating by ensuring that it    $ Millions
operates in a financially prudent manner and stays within
the limits imposed within this financial strategy.                40
                                                                  40

Looking after the                                                 35
                                                                  35

assets we have while                                              30
                                                                  30

maintaining levels of                                             25
                                                                  25

                                                                  20
service                                                           20

                                                                  15
                                                                  15
The Council is tasked with providing good quality local
infrastructure, local public services, and cost effective         10
                                                                  10

regulatory functions. This strategy is designed to maintain
                                                                   55
the level of services, facilities and regulatory functions
provided by the Council.                                           00
                                                                        2018/19

                                                                                  2019/20

                                                                                            2020/21

                                                                                                      2021/22

                                                                                                                2022/23

                                                                                                                           2023/24

                                                                                                                                     2024/25

                                                                                                                                               2025/26

                                                                                                                                                         2026/27

                                                                                                                                                                    2027/28

There are several projects in this Long-term Plan which will
increase the level of service provided to the community
such as the transportation projects relating to improving
traffic flow through Taupō’s CBD.
This Long-term Plan provides for upgrades to the remaining        Transport                  Wastewater                   Community facilities
water schemes required to meet the New Zealand Drinking
Water Standards which will increase the levels of service to        Water                   Solid waste                     Stormwater                             Other
those communities.

8                                                                           Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
Gross Debt, Investments and Net Debt

200   $ Millions

150

100

50

 0
      2008/09

                2009/10

                            2010/11

                                      2011/12

                                                2012/13

                                                          2013/14

                                                                    2014/15

                                                                              2015/16

                                                                                        2016/17

                                                                                                  2017/18

                                                                                                             2018/19

                                                                                                                        2019/20

                                                                                                                                    2020/21

                                                                                                                                              2021/22

                                                                                                                                                        2022/23

                                                                                                                                                                  2023/24

                                                                                                                                                                            2024/25

                                                                                                                                                                                      2025/26

                                                                                                                                                                                                2026/27

                                                                                                                                                                                                          2027/28
                Actual gross debt                                                                                      Actual and forecast net debt *
                LTP 2018-28 forecast gross debt                                                                        Actual and forecast investments
      * Net debt equals gross external borrowings, less investments (cash, fixed term investments, equities).

Differences between CPI and LGCI

The Consumer Price Index (CPI) is a measure of how much                                                     Council spends a large proportion of its total expenditure
household costs change over time. It is determined by                                                       on areas of infrastructure, for example on materials that
measuring changes in a “basket” of goods and services that                                                  are used to create roads and pipes. These areas use a lot of
a typical household will use- for example, food, furnishings                                                petroleum based products, as well as construction materials
and health services.                                                                                        – all of which are very different to the items used in the
                                                                                                            “basket” for the CPI. Therefore, council uses a more relevant
The costs faced by council differ significantly from those
                                                                                                            measure – the Local Government Cost Index (LGCI), which is
covered within the CPI “basket”.
                                                                                                            made up of items council spends its money on.

                                      CPI                                                                                                               LGCI
                                er Price In                                                                                                 rnment Cos
                            nsum           de                                                                                           Gove          t In
                          Co                 x
                                                                                                                                    cal                   de
                                                                                                                                  Lo                        x

  food...furnishings... clothing and footwear...                                                             roading...pipes...petroleum based products...
communication...recreation and culture...health...                                                                       construction materials

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                                                                                                                9
What’s happening
in your area

                         Streets upgrade               Lakefront and
                           programme                 public convenience
                       Years 2018/19 - 2024/25         development
                              $187,000                       Year 2021-22
                                                               $372,000

          Whakamaru
                                Mangakino
             drinking                                                 Open spaces
              water standards                                          upgrade
                improvements                                            Year 2018/19
                                                                          $100,000
                       2021/22 and 2022/23
                              $302,000

                              Creating new
                              playgrounds
                              Year 2018/19 and
                             2019/20- $ 474,000
                                                  Turangi-Tongariro
Kuratau erosion                                     National Park
    control                                           Gateway
  Year 2018/19 -
2027/28 $1.3 million       Turangi                      Year 2019/20
                                                          $102,000

          Wastewater                             Open spaces
           upgrades                               upgrades
         Years 2018/19 - 2019/20        Years 2018/19 - 2021/22
          and 2022/23 - 2023/24                $737,000
                $4million

10                                                Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
                                                          Drinking
       Wastewater                                      water standards
        upgrades                                       improvements
 Years 2018/19 - 2019/20                                  Years 2018/19 - 2022/23
and 2022/23 - 2023/34                                            $7.8million
     $7.1million
                               Kinloch

                   Footpath construction
              Years 2018/19 - 2019/20 $352,000

                                       Northern access             Erosion control
                                          upgrades                   Years 2018/19 - 2027/28
                                         Years 2018/19 -             $2.9 million
                                      2024/25 $2.15 million

                                                                                       ?
                        Acacia Bay
                      water upgrades                    Taupō                       Civic
                                                                                Administration
                                                                                  Building
                    Years 2018/19 - 2020/21
                           $4.7 million                                     Years 2018-19 - 2021-22
                                                                                  $15.7 million
                                                       Destination
                                                       Playground
                                                Years 2019/20 - 2020/21
                                                       $484,000

Taupō District Council | LONG TERM PLAN CONSULTATION                                      11
To
                                                                                                                        see what
Rates for different property types                                                                                   this means for
The table below shows examples of the rates for a range of rating valuations for residential                       your property visit
properties in Taupō, Turangi, Mangakino, and Kinloch industrial and commercial properties and                      our rates calculator
rural properties based on what we have planned.                                                                     at taupo.govt.nz
Examples of rates per type of property
Residential properties - Taupō
                           2017/18    2018/19     2017/18      2018/19      2017/18      2018/19      2017/18       2018/19
       Rating valuation   $284,000   $284,000   $453,000     $453,000     $565,000     $565,000     $810,000       810,000
                             CV$        CV$        CV$          CV$          CV$          CV$          CV$            CV$
Targeted rates               1,175      1,233       1,175        1,233        1,175        1,233        1,175         1,233
General rates                 962       1,001       1,418        1,448        1,706        1,744        2,338         2,391
Total rates                  2,157      2,234       2,592        2,680        2,881        2,976        3,513         3,624
$ change per week                       1.48                    1.69                      1.84                        2.15
% change                                4%                       3%                        3%                         3%
Residential properties - Turangi
                           2017/18    2018/19     2017/18      2018/19      2017/18      2018/19      2017/18       2018/19
       Rating valuation   $162,000   $162,000   $186,000     $186,000     $208,000     $208,000     $466,000       $466,000
                             CV$        CV$        CV$          CV$          CV$          CV$          CV$            CV$
Targeted rates               1,040      1,121       1,040        1,121        1,040        1,121        1,040         1,121
General rates                 668        678         729          742          786          800         1,451         1,482
Total rates                  1,708      1,799       1,770        1,863        1,827        1,921        2,492         2,603
$ change per week                       1.75                    1.78                      1.81                        2.14
% change                                5%          4%           5%                        5%                         4%
Residential properties - Mangakino
                           2017/18    2018/19     2017/18      2018/19      2017/18      2018/19      2017/18       2018/19
       Rating valuation   $111,000   $111,000   $157,000     $157,000     $218,000     $218,000     $320,000       $320,000
                             CV$        CV$        CV$          CV$          CV$          CV$          CV$            CV$
Fixed Targeted rates         1,189      1,234       1,189        1,234        1,189        1,234        1,189         1,234
General rates                 536        543         655          665          812          826         1,075         1,096
Total rates                  1,726      1,777       1,844        1,899        2,001        2,060        2,264         2,330
$ change per week                       0.99                    1.05                      1.13                        1.26
% change                                3%          4%           3%                        3%                         3%
Residential properties - Kinloch
                           2017/18    2018/19     2017/18      2018/19      2017/18      2018/19      2017/18       2018/19
       Rating valuation   $111,000   $111,000   $157,000     $157,000     $218,000     $218,000     $320,000       $320,000
                             CV$        CV$        CV$          CV$          CV$          CV$          CV$            CV$
Fixed Targeted rates         1,127      1,223       1,127        1,223        1,127        1,223        1,127         1,223
General rates                 987       1,006       1,410        1,440        1,706        1,744        2,312         2,365
Total rates                  2,114      2,229       2,537        2,663        2,833        2,967        3,439         3,588
$ change per week                      2.2299                   2.43                      2.58                        2.88
% change                                5%          4%           5%                        5%                         4%
Industrial Commercial properties
                           2017/18    2018/19     2017/18      2018/19      2017/18      2018/19      2017/18       2018/19
       Rating valuation   $485,000   $485,000   $800,000     $800,000     $1,100,00    $1,100,00    $2,800,00     $2,800,00
                             CV$        CV$        CV$          CV$           CV$          CV$          CV$           CV$
Fixed Targeted rates         1,220      1,286       1,574        1,641        2,596        2,722        2,085         2,182
General rates                2,500      2,558       3,962        4,057        6,073        6,222       13,241        13,575
Total rates                  3,720      3,844       5,535        5,698        8,669        8,945       15,326        15,756
$ change per week                       2.38                    3.13                       5.3                        8.27
% change                                3%          4%           3%                        3%                         3%
Rural properties
                           2017/18    2018/19     2017/18      2018/19      2017/18      2018/19      2017/18       2018/19
       Rating valuation   $615,000   $615,000   $1,050,000   $1,050,000   $6,115,000   $6,115,000   $10,072,000   $10,072,000
                             CV$        CV$         CV$          CV$          CV$          CV$          CV$           CV$
Fixed Targeted rates           45         53          45           53           45           53           91           107
General rates                1,835      1,876       2,956        3,026       16,012       16,417       26,462        27,128
Total rates                  1,881      1,929       3,002        3,079       16,057       16,470       26,552        27,235
$ change per week                       0.94                     1.49                     7.94                       13.13
% change                                3%          4%           3%                        3%                         3%

12                                                                          Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
Our Infrastructure Strategy
Our Infrastructure Strategy outlines the main themes and        Issue 3 – An ageing population on fixed incomes facing
issues that arise from these over the next 30 years, but also   increasing infrastructure costs may result in rates that are
how we plan to respond to those. These are:                     unaffordable for our ratepayers.
                                                                We will respond by: Where possible, maintaining current
Population and                                                  levels of service by looking at innovative solutions
demographic
change                                                                                  In 2016, 42 per cent of our property
                                                                                        owners did not live in the district
The district’s population will continue to                                              and in 2013, 32 per cent of houses

                                                         1
grow to 2038 and will then decline. The                                                 were unoccupied. This indicates
urban areas of Taupō town and                                                            that about 30 per cent of our
Kinloch will continue to grow                                                                housing stock in our district are
until 2038 and then start to                                        Deliver                     used as holiday homes.
decline. The population                                            services                         There are large
of Taupō town will                    Infrastructure                                                 variations in the
increase from 24,190               in place for                   to meet                             percentage of
in 2013 until it
                                the future                            changing                          holiday homes
peaks at 27,260                                                                                          in our different
in 2038 before                                                          demands                           settlements.
slowly starting to
decline. In Kinloch
the population                                                                         2                   For example,
                                                                                                           in Taupō about
                                                                                                           30 per cent

                           4
is projected to                                                                                            of the houses
increase from 520                                                                                          are holiday
in 2013 to 780                                                              Innovative                     homes, whereas
in 2028 and then                                                                                          in Kuratau,
remain stable. The                                                         solutions
                              Infrastructure                                                             Whareroa, and
towns of Turangi and                                                     to maintain 		                Omori, about 90
Mangakino have been                for projected 		                                                   per cent are holiday

                                                                3
experiencing population
                                                                          current
                                      number of 		                                                   homes.
decline for some time                                                     services
and it is projected that this
                              		           house-                                                 Issue 4 – It is projected
                              			             holds                                            that our population will
decline will continue.
                                                                                            decline but there is uncertainty
Issue 1 – New infrastructure is                                                         about what the impact will be on
required to cater for growth, primarily in                                        the number of dwellings that need to
Taupō town and Kinloch.                                                    be serviced by infrastructure.
We will respond by: Working alongside developers to             We will respond by: Providing infrastructure and long term
ensure the infrastructure is in place as required in time for   capacity for the projected number of households.
development.

The district’s population aged over 65 years is expected to
nearly double from 5,800 in 2013 (17% of the population)
to 11,100 in the next 25 years (28% of the population).
Issue 2 – An ageing population may drive a change in
demand for the services that we provide.
We will respond by: Delivering services and levels to meet
changing demands.

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                       13
Over the next 10 years we plan to spend $20.4
Protecting the health of                                         million on upgrading the districts water supplies (in
our communities and the                                          addition to what we are spending on Acacia Bay).

environment                                                       Issue 6 – The availability and supply of raw water will
                                                                    come under increased pressure.
An important part of providing infrastructure is
                                                                       We will respond by: Taking a more proactive approach
protecting the health of our communities and
                                                                        to water demand management, by undertaking
ensuring that our use of natural resources
                                                                          a project in the next six years to evaluate the
and discharges do not adversely affect our
                                                                            different options and implement the preferred
environment and therefore our attractiveness
                                                                               option to reduce urban daily household water
as a visitor destination and future economic
                                                                                 consumption. This work will be considered
development.
                                                                                   during the development of a water
Issue 5 – Some of our communities                                                   strategy.
may face a health risk without safe
and clean drinking water supplies.
                                                                                          We aim to reduce the impacts our
We will respond by: Ensuring we
                                                                                           infrastructure on the environment
upgrade our water supplies in
                                                                                             wherever possible. However,
line with the timeframes set
                                                                                               environmental requirements
out in water safety plans.
These timeframes are
                                                                       Safe                     are increasing and will
                                                                                                  continue to become more
                                                                       drinking

                                                    8
developed and prioritised
                                                                                                   stringent in the future.
based on risk.                Prevent                                  water
                                                                                                      Issue 7 – Protection
The contamination of            overflows                                                              of the environment
the Havelock North              to lake                                                                 will drive increased
water supply in

                                                                                5
                                                                                                         costs for council’s
September 2016
                                                                                                          wastewater and
highlighted the
                                                                                                          stormwater

                                         7
importance of
                                                                                                           discharges.
ensuring that we
provide a safe                                                                                            We will respond
drinking water                                                                                           by: Ensuring we
supply to our                                                                                            are improving our
communities. This is                                                                                    discharges to protect

                                                                 6
why we a upgrading                  Improve                              Reduce water                  the environment and
our drinking water                  discharges                           consumption                  comply with consent
supplies over the course                                                                            requirements.
of this plan to prevent this
happening in our district.

                                                                                      Issue 8 – Every year we have
                                                                                 a number of wastewater overflows
Much of our raw water comes from Lake Taupō                               with many of these entering the lake. This is
where all of the available water has already been                        unacceptable to the Council and community.
                                                                 We
allocated. While we have consent to take more                want your        We will respond by: Increasing our annual
water than we currently distribute we need to             feedback. Refer       operational budgets to undertake more
ensure we have access to sufficient raw water           to page 21 for more      preventative work. We have increased our
to provide for population, economic growth                  information.         budget by $2.33 million over the 10 years of
and seasonal variations. This means it will                                      the Long-term Plan for the work to take place.
be increasingly difficult to not only retain our                                This would be in addition to the $700,000
existing consent volumes but also get consents                                we currently spend on renewing and repairing
for increased water takes in the future to meet                            wastewater and sewerage pipes, and the $150,000
this increasing demand. It is likely that any increased                we spend on inspecting and cleaning. It would also
demand for water will have to be catered for within our             mean we would expect to have less spills to the lake and
existing allocation.                                                we have reflected this in our performance measures.

14                                                                       Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
Maintaining and                                             Knowledge gaps
renewing our                                                There are some limitations in the information we hold on
                                                            our facilities, and our parks and reserves. We lack condition
infrastructure                                              information and are still to develop a strategic direction for
                                                                        these areas.
The majority of our infrastructure is in good
condition. It is important renewals                                        Issue 11 – We have knowledge
are done at the appropriate time.                                              gaps across facilities, parks and

                                                       9
This allows us to get value for                                                   reserves which mean we
our money and avoid our                                                              are not strategic in our
infrastructure failing,
                                                                     Planning          provision of parks and
                                   Condition                         for natural         reserves and facilities.
resulting in expensive
repairs. It will also              assessments                       hazards                        We will respond
ensure that there                  & renewal                                                         by: Developing
is no unexpected
interruption
                                   planned                                                            separate strategies
                                                                                                       for parks and
in service to                                                                                           reserves and
communities.                                                                                            facilities and
Issue 9 – Some                                                                                           improve our
of our assets                                                                                            knowledge and
may be nearing                                                                                          condition of

                                                                              10
the end - or are                                                                                       facilities.

                                  11
already at the end
- of their useful life
                                                                                                     To read our full
and need renewal.                             Improved                                             Infrastructure Strategy
However, we do not
know how many assets                          strategies for                                     visit
are potentially affected.                     parks, reserves                                  taupo.govt.nz
We will respond by: Ensuring                  and facilities
condition assessments are
programmed for all infrastructure
assets and infrastructure renewal is
planned.

Resilient infrastructure
We need to ensure our communities are resilient should
there be disruption to our infrastructure networks. These
can be from failures in the network, such as a water main
bursting, or from natural hazards such as
flooding and earthquakes.
Issue 10 – The district is vulnerable to a wide
range of events, including natural hazards,
that could cause significant damage and
disruption to council’s services at any time.
We will respond by: Planning for natural
hazards and network failures and build in
feasible contingencies.

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                    15
Planned infrastructure spending
2018-28 (in millions)

                            $
                      Millions

     Transport           Wastewater                             Community facilities
     $207.9              $195.8                                      $284.8
   CAPEX $59.3          CAPEX $42.6                                 CAPEX $58
 Operational $148.6   Operational $153.2                         Operational $226.8

       Water             Solid Waste                                  Stormwater
     $193.2               $57.7                                        $29.6
   CAPEX $72.7          CAPEX $3.5                                  CAPEX $7.8
 Operational $120.5   Operational $54.2                           Operational $21.8

16                                     Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
               Norman Smith
               St / Wairakei Dr
              ‘merge like a zip’
                     signs

                                                 Tongariro St
                                                   & Spa Rd
                                                 roundabout
                                                lane changes

                                                                                                Variable signage at
                                                                                              certain times on SH 1 to
                                                                                               direct traffic to other
                                                                                               entrances into Taupō
                                                       ALREADY DONE
                    Tongariro
                   St left-hand
                    only turn
                                                                                  Have
                                                                               your say,
                                                                             these are the
                                                                          matters that we want
                                                                           your feedback on.

Tell us what you think
                                                              some short, medium and long term solutions we have
Improving traffic flow                                        included in the draft Long-term Plan.
through Taupō’s CBD                                           Already, we have changed the lane marking at the
                                                              merge of Norman Smith Street/Wairakei Drive and have
                                                              installed new, improved, 'merge like a zip' signs. We have
And easing congestion at Norman Smith                         also changed the lanes at the Tongariro Street/Spa Road
Street/Wairakei Drive                                         roundabout approach, by Countdown, to left and right only
Ongoing community frustrations with congestion at             to improve traffic flow.
Norman Smith Street last year saw us include $100,000 in      The entry into Redoubt Street will be left-hand turn only
the 2017/18 Annual Plan to fast track an investigation into   and the exit onto Tongariro Street will be left-hand turn only
traffic movements through the northern part of Taupō’s        as well. Variable signage will also be in place at certain times
Central Business District. We also took the opportunity to    on State Highway 1 to direct traffic to other entrances into
include roading improvements identified through structure     Taupō, to take pressure off Wairakei Drive at peak times.
planning in 2011.
                                                              The package of proposed solutions takes into account that
We engaged specialist consultants, Traffic Design Group, to   our northern entrance operates as part of our transport
identify options and look into traffic movement as well as    network, so doing any one change on its own could cause
factoring in projected population and visitor growth. They    issues elsewhere.
also met with a number of community groups, residents
associations and other key stakeholders to gain a better      The majority of the proposed projects are to be funded
understanding of the issues.                                  through loans and a subsidy from the New Zealand
                                                              Transport Agency.
The outcome was an extensive report on the options
available and suggested timeframes. The report outlines

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                       17
The proposed solutions are:

 Short-term:                                          1 2                                         Medium-term:

                                                                                                                                                              6
                                                                                                                                5

                                                                                                                                                          7

                      3                                                                                                                               8
                             4

           1  Change the speed limit to 50kph just north of Huka
              Falls Road including painted islands and shoulders.
           We will be consulting on this as part of our Speed Bylaw
           Review in April/May this year.
                                                                                                             5       Close the Countdown access to Tongariro Street,
                                                                                                                     timing and cost to be determined.
           2   Design and install threshold treatment at the start
               of the 50kph to form a gateway into Taupō from the
           north. Year 2018/19. Total cost $127,000. This would be                                           6       Install traffic lights at the Titiraupenga Street and
                                                                                                                     Spa Road intersection. Year 2020/2021. Total cost
           funded through our minor improvements programme.                                                      $649,000.

           3  Install traffic lights at the Norman Smith Street/
              Wairakei Drive intersection. Year 2018/19. Total cost                                          7       Install traffic lights at Titiraupenga and Tamamutu
                                                                                                                     Streets. Year 2021/22. Total cost $502,000.
           $479,000.
                                                                                                             8        Install traffic lights at the Titiraupenga Street and

           4    Install traffic lights at the Spa Road/Ruapehu Street                                                 Heuheu Street intersection. Year 2022/2023. Total
                intersection. Year 2019/2020. Total cost $422,000.                                               cost $493,000.

 Long-term:
                                                                                 9      It has been recommended a new bridge be built downstream from
                                                                                        the Control Gates Bridge. This is seen as a long-term option and
                                                                                   we have included $100,000 in the 2018/19 year to undertake some
                                                                                   investigation work.
                  9
                                                                                  10              Install traffic lights at the intersection of Paora Hapi and
                                                                                                  Gascoigne Streets. Year 2023/2024. Total cost $424,000.

                                                                                  11      Install traffic lights at the intersection of Paora Hapi and Ruapehu
                                                                                          Streets. Year 2024/2025. Total cost $526,000.
                   1210                                                                                                                                                 We
                        11                                                        12      Investigation into removing the Spa Road
                                                                                          Roundabout and realign Tongariro Street.
                                                                                   Year 2024/25. Total cost $172,000.
                                                                                                                                                                     would like
                                                                                                                                                                   your feedback
                                                                                                                                                                  on the following
                                                                                   *Please note figures quoted include inflation.
                                                                                                                                                                      options.
 Option 1                                                                                          Option 2
 Preferred: Complete the programme as described above. This                                        Do nothing, status quo remains. This would
 option would result in improved traffic flow at the northern                                      mean there would continue to be traffic flow
 entry to Taupō. The impact of rates on this option is shown in                                    issues at the northern entry to Taupō during peak
 the table below. The average rate impact is $7 per annum.                                         times and would not result in an additional rate increase.
                                 2018/19

                                            2019/20

                                                       2020/21

                                                                  2021/22

                                                                             2022/23

                                                                                        2032/24

                                                                                                       2024/25

                                                                                                                      2025/26

                                                                                                                                 2026/27

                                                                                                                                            2027/28

     Average rate impact $   $4.08         $4.80      $4.80      $4.80      $7.47      $7.47         $9.19          $9.19       $9.19      $9.19

18                                                                                                               Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
Upgrading Acacia Bay’s water supply
                                                               Option 1: Build a new water treatment
                                                               plant in Acacia Bay.
                                                               Estimated total cost: $6.2 million. We will raise a
                                                               loan to fund this project.
                                                               Estimated annual operating cost: $185,000
                                                               (excludes interest and depreciation).
                                                               For this option, we would need to buy land for a new
                                                               water treatment plant and ensure it had the capacity for
                                                               growth. We would continue to take water from Lake Taupō
                                                               and would treat it to the same standard of drinking water
                                                               quality as the Taupō water treatment plant.
                                                               Risks
                                                               • Potential for higher than planned costs or difficulty in
 Meeting the drinking water                                      acquiring a suitable site to locate a new water treatment
 standards                                                       plant.
                                                               • Difficulty and additional costs in obtaining the required
 Providing safe, clean drinking water to our communities         consents to construct the new plant.
 connected to a council supply is one of our key goals.
                                                               • Potential for the visual amenity of the residential area to
 We have 19 water schemes around the district and are            be lowered; it is proposed that a buffer zone is created
 required under legislation to take all practicable steps to     around the proposed treatment plant with landscaping
 ensure we supply drinking-water that complies with the          planting to provide visual screening
 Drinking-water Standards for New Zealand. We have
 a programme of water treatment upgrades planned               • The proposed site and may require additional
 over the next 10 years to ensure we can meet this               construction works than expected.
 requirement.                                                  This option would mean that the Acacia Bay and Mapara
 So far, we have upgraded the Taupō, Turangi and               water schemes would continue to operate and be funded
 Mangakino water treatment plants. The next major              separately to the Taupō town water scheme.
 upgrade is for the Acacia Bay supply.
                                                               Option 2 – Connect Acacia Bay and
                                                               Mapara Road to the Taupō water
  hen we consulted on our last Long-term
 W
 Plan we signalled there would need to be a
                                                               treatment plant
 conversation with our communities regarding the               Estimated total cost: $4.5 million. We will raise a
 funding of all or our water supplies in the future.           loan to fund this project.
 We are still working on the options however                   Estimated annual operating cost: $159,000
 there is a need to upgrade the Acacia Bay supply              (excludes interest and depreciation).
 before that conversation is had. This is now likely           A new pipeline would be laid from Jarden Mile to the
 to form part of the next Long-term Plan.                      existing reservoir at Reeves Road to supply water to Acacia
                                                               Bay from the Taupō water treatment plant. The current
Key issue                                                      water intake at Acacia Bay would no longer be required.
Upgrading Acacia Bay’s water supply                            The existing Taupō water treatment plant can produce 25
Our Acacia Bay water treatment plant supplies water to 742     mega litres per day. Over summer, increased water demand
Acacia Bay / 387 Mapara properties, including those in the     sees the plant running at capacity so an upgrade to 30 mega
Mapara Road rural water supply zone. We commissioned           litres per day will be required in 2018/19, regardless of
engineering consultants Mott McDonald to assess the            whether Acacia Bay and Mapara Road properties connect.
options for meeting the drinking water standards and we        The cost to increase the capacity of the Taupō water
are now seeking feedback on the two practicable options        treatment plant to 30 mega litres per day is approximately
that were identified.                                          $1.75 million. We will raise a loan to fund this project.

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                         19
Connecting the Acacia Bay and Mapara Road properties
to the Taupō plant, would result in a total peak demand of
at least 26.5 mega litres per day. The additional capacity                                 Fluoridation
provided by this upgrade will also cater for the continued                            The debate on whether or not
growth of the Taupō community.                                                     fluoride should be added to water
The plant was designed to allow for an increase capacity                          supplies is a long-standing one and it
to 35 mega litres per day in two separate stages. Based on                    is an issue that has been recommended to
current growth forecasts, an upgrade to 35 mega litres per                   be handed to District Health Boards to make a
day if Acacia Bay is connected is not expected to be needed                             decision on in the future.
until about 2040.                                                   A key difference between the current Acacia Bay water
This option would mean that the Acacia Bay and Mapara              supply and Taupō’s is that the Taupō supply is fluoridated.
water schemes would become part of the Taupō water                    If Acacia Bay were to join the Taupō scheme those
scheme. All users within the scheme would fund the                      properties would also receive fluoridated water.
operational and capital costs associated with this scheme          As the responsibility for making the decision on fluoridation
from 1 July 2018.                                                 is likely to be no longer under our control, we cannot predict
Risks                                                                   whether a new water treatment plant for Acacia Bay
                                                                              would be required to include fluoridation.
• Connection of Acacia Bay and Mapara Road to the
  Taupō water supply via a single, lengthy pipeline poses                   We, like other local authorities, are awaiting the
  a risk to water security at Acacia Bay. The reservoir has                 outcome of the Health (Fluoridation of Drinking
  storage capacity of about 24-hours.                                           Water) Amendment Bill introduced by
                                                                                   the Government. This is expected
• If growth in Taupō, Nukuhau, Acacia Bay and Mapara
                                                                                            in the near future.
  Road meant a water demand over the 35 mega litre
  per day capacity of the Taupō water treatment plant,
  there would be a need to consider further supply and
  reticulation infrastructure. This risk is mitigated by
  Council’s intention to reduce consumption rates over
                                                                                 2017-18

                                                                                            2018-19

                                                                                                      2019-20

                                                                                                                 2020-21

                                                                                                                            2021-22
                                                                   Scheme

  time.

What does it mean for rates?
                                                                   Taupō NA                 $458.21   $461.71    $482.73    $508.64
Option 1: Construct a new water                                    combined
treatment plant in Acacia Bay.                                    The annual change on Taupō, Acacia Bay and Mapara
The rating impact of constructing a new water treatment           ratepayers for option 2 (the preferred option) on combining
plant in Acacia Bay to be funded solely by residents in the       Acacia Bay and Mapara schemes with the Taupō scheme is
Acacia Bay and Mapara Road schemes is as follows:                 as follows:

                                                                   Increase/(-)Decrease in Targeted income
             2017-18

                       2018-19

                                 2019-20

                                           2020-21

                                                     2021-22
Scheme

                                                                    Taupō                   $1.26     $7.41      $21.10     $30.04

Taupō        $447.45   $456.95   $454.30   $461.63    $478.60       Acacia Bay              -$9.88    -$104.20   -$323.93   -$479.09

Acacia Bay   $545.30   $468.10   $565.91   $806.66    $987.71       Mapara*                 -$48.47   -$139.15   -$358.28   -$515.32

Mapara*      $309.80   $506.68   $600.87   $841.01    $1,023.96
                                                                  The calculations include allowances for asset depreciation,
*average rate as existing scheme is land value based.             interest and operating costs.

                                                                  Preferred option
Option 2 – Connect Acacia Bay and
                                                                  The preferred option is to connect the Acacia Bay and
Mapara Road schemes to the existing                               Mapara Road communities to the Taupō water supply.
Taupō water treatment plant                                       This option has the lowest construction cost and lower
                                                                  ongoing operational costs. There is also a lower impact on
The rating impact of combining the Acacia Bay and Mapara          ratepayers in the Acacia Bay and Mapara Road areas. The
Road schemes with the Taupō scheme is as follows:                 standalone option is considered too great an increase for
                                                                  these ratepayers.

20                                                                           Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
                                                                                                                    We
                                                                                                                 want your
                                                                                                                 feedback.

                                                                   Option 1: Undertake
                                                                   additional work to prevent
                                                                   wastewater spills from our
                                                                   network
                                                                   Our preferred option is to increase our annual operational
                                                                   budgets to undertake more preventative work. We have
                                                                   increased our budget by $2.33 million over the 10 years of
                                                                   the Long-term draft Plan for the work to take place. This
                                                                   would be in addition to the $700,000 we currently spend
                                                                   on renewing and repairing wastewater each year, and the
                                                                   $150,000 we spend on inspecting and cleaning each year.
                                                                   It would also mean we would expect to have less spills
                                                                   to the lake and we would reflect this in our performance
                                                                   targets. This option would mean that in 2018/19 year, the
                                                                   wastewater targeted rate would increase from $701.71 to
                                                                   $721.06.

Working to reduce                                                  Option 2: Continue with the current
wastewater spills                                                  programme
                                                                   We continue our current programme of spending about
Every year, we spend about $700,000 on renewing and                $700,000 each year on renewing and repairing wastewater
repairing wastewater pipes, and another $150,000 on                pipes, and another $150,000 each year on inspecting and
inspecting and cleaning them in an effort to avoid any             cleaning. This option would mean that the wastewater
overflows.                                                         targeted rate would be $701.71. Our levels of service under
                                                                   this option would remain the same.
Despite this, there are still a number of overflows
that happen every year and many of the incidents see               Economic development                              FYI
wastewater enter the lake. We want this to stop.
There is an ongoing issue with people flushing or putting          Tourism New Zealand funding –
things down the drains that shouldn’t be there, with, cooking      Winter Campaign
fat, wet wipes and tree roots causing the biggest issues.
                                                                   Last February Ruapehu Alpine Lifts unveiled a plan to
In areas where tree roots have entered the pipes, these            transform the Taupō District into New Zealand’s premier ski
items build up quite quickly and cause blockages. Larger           destination.
objects our team have found in the system include building
materials, rubbish, clothes, and even curtains!                    At that time, we approved $100,000 of funding each year
                                                                   for the next two years to support a Tourism New Zealand
While we are developing a public education programme to            campaign that aimed to help the Ruapehu Alpine Lifts gain a
encourage people to do the right thing, we want to invest          strong foothold in the Australian tourism market.
more heavily in a preventative maintenance programme
that will allow us to proactively identify any potential trouble   The campaign also gained funding support from Ruapehu
areas in a timely way.                                             District Council and Auckland International Airport.

This financial year we will spend an extra $395,000 to             In our draft Long-term Plan, we have included $100,000 per
increase the amount of camera surveillance, and we will use        annum for another three years to continue supporting the
blockage detection technology to ensure any potential issues       partnership as the district’s activities and attractions will
are known of and dealt to early. This is targeting the areas       form the key basis of the campaign.
most likely to cause spills to the lake.                           In the 2018/19 year it will be accompanied by a matching
Next year we want to spend an extra $350,000 to continue           contribution of $100,000 from Ruapehu Alpine Lifts,
the work and we have budgeted an additional $220,000               $300,000 from Auckland International Airport, $250,000
a year each year thereafter for an increased ongoing               from Tourism New Zealand and $50,000 from Ruapehu
maintenance programme.                                             District Council.

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                            21
Building a new future - where we are
                                                               with our Civic Administration Building

                                                               early     Friable asbestos detected
                                                                17
                                                                         Decision to relocate employees
                                                                Apr      New building is the preferred
                                                                 17      option

                                                                May      Community consultation to
                                                                 17      determine preferred options

                                                                         Decision from community
                                                                Jun
                                                                         feedback to build at yet-to-be
                                                                 17      determined site

                                                                Jul      EOI’s sought for leasing a building,
                                                                17       site or both

                                                                Sep      Employees relocated to
                                                                         alternative premises
                                                                 17

                                                                Oct      Area fronting Story Place chosen
                                                                 17      5 EOIs discounted

Taupō Airport upgrade                                           Nov      Masterplan to be developed
Increasing passenger numbers, aging infrastructure, health       17      Initial planning begins
and safety issues and projected tourism growth prompted
us to take a good look at our airport facilities and the
experience we offer to air travellers.
                                                                Dec      Decision to demolish Lake Terrace
Towards the end of 2017 we prepared a business case to           17      site
the Minister of Transport outlining the need to upgrade
both the terminal building, carpark and entranceways as
Taupō Airport is 50 per cent owned by the Crown.
                                                                Jan      Demolition starts on Lake Terrace
Since then we have engaged with the Ministry of Business,        18      building
Innovation and Employment and provided a business
plan to the Regional Economic Development Fund
seeking assistance with funding the upgrade. We have                     Project manager appointed
an opportunity to enhance the visitor experience and            Feb      Masterplanning new options for
provide a fitting ‘gateway’ to the Central North Island. We      18      cultural, arts and heritage
hope to attract some Government funding to upgrade the
facilities and have allowed $2.5 million in the plan as our
contribution.                                                   mid      Feedback from community sought
If we are unable to secure external funding, we will need to    18       on options
re-evaluate how we deliver this project.

22                                                                 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN
Civic Administration Building

Last year we were required to vacate our                                    in time to ask the community for feedback on
former administration building at 72                                                options as part of this Long-term Plan
Lake Terrace due to a number                                                             process. However, late last year
of health and safety issues                                                                  we recognised an opportunity
including the detection of                                                                       to take a good look at the
friable asbestos and the                                                                            wider picture and to

                                                    uild
need to undertake                                                                                     ‘do it once and do it
earthquake
strengthening.
During the
                                     i           c B                                                    right’.
                                                                                                             In February, we
                                                                                                              approved the

                                                                         in
development                                                                                                    development of
                                  Civ
of the 2017/18                                              We’ll                                               a masterplan
Annual Plan,                                             be seeking                                              for the area

                                                                           g
                                                           ?
we consulted                                           your feedback                                             by the Great
with the                                                                                                         Lake Centre
                                                      on new building
community                                                                                                        to see what
on a number
                                                      options later this                                         efficiencies
of different                                                year                                                 can be
options, from                                                                                                   made, what
refurbishment                                                                                                  opportunities
to a new build,                                                                                               can be
with the preferred                                                                                          capitalised
option being to                                                                                            on, and to
build a new building                                                                                     futureproof any
at the Lake Terrace                                                                                   development going
site. However, following                                                                           forward. We think
feedback the decision was                                                                      there is a real opportunity
made to build a new building, on                                                           to develop a ‘civic heart’ for
a site to be determined. It was also                                                   Taupō by including new cultural,
decided to investigate lease options as an                                      arts and heritage facilities to replace the
alternative to self-funding a new building.                      existing Taupō Museum, but we want to gain a better
                                                                 understanding of the details, including costs, before we
The majority of staff relocated to five sites in the Taupō
                                                                 make the decision to seek your feedback. We also want
CBD during the year, and investigations continued into
                                                                 to further investigate the potential to attract funding
potential sites and funding options. Calls for expressions
                                                                 from outside sources as has been done in other centres.
of interest from parties who may have been interested
in leasing a building, site or both were made, and there         Our aim now is to have the preliminary investigations
were five responses, but all were discounted during the          completed by the middle of the year and then come
site selection process in October for various reasons.           back to you with the information you need to give
                                                                 informed feedback to help guide our decision making.
Instead, the council decided to investigate the
                                                                 This will include options on what is or isn’t included in a
development of the area fronting on to Story Place
                                                                 new building, costs and timelines. In the meantime, we
near the Great Lake Centre and the library for the new
                                                                 have included funding of $15.7 million in the plan for a
building as its preferred option. The other two options,
                                                                 new building as a placeholder.
in order of preference, were to build on the Tuwharetoa
Street carpark or on the former site at 72 Lake Terrace.
It was hoped that the investigations would be complete

Taupō District Council | LONG TERM PLAN CONSULTATION                                                                      23
Changes to policies:                                             Revenue and Financing Policy
Development Contributions Policy 2018                            This policy sets out who pays for the activities that
                                                                 Council undertakes on behalf of the community and
The effects of growth, particularly the cumulative effects of    how these activities will be funded. Our funding policies
development, require Council to incur capital expenditure,       are determined having consideration of who benefits,
on behalf of incoming communities, to provide new or             intergenerational equity, who contributes to the need
additional services. Funding tools such as development           for the activity, distinct funding and the overall impact
contributions, along with others, are essential in meeting       of the method of funding. The Revenue and Financing
these needs. Development contributions assist Council to         Policy should be read in conjunction with the s101(3)
assign the costs of growth to the time frame in which that       considerations report available at taupo.govt.nz.
demand is generated. A Development Contributions Policy
aims to recover infrastructure costs arising from growth         The key changes to our existing policy are:
from developers who create the infrastructure need.              • We have moved from set percentages for funding
The draft Development Contributions Policy 2018 has been           sources to a range of percentages.
reviewed and some changes have been proposed from the            • Consolidation of two activities within the economic
policy adopted in 2015. These include:                             development group.
• Changing funding of reserves from district-wide to             • Removed rural fire within the community services group
  catchment based (Taupō and Kinloch only).                        as it is no longer a council function.
• The definitions of ‘growth’ and ‘reserve land’ have been
  clarified
                                                                 Fees and charges
                                                                 We are required to consult on fees and charges for
• Clarifying when reserves development contributions
                                                                 regulatory services (animal control, building services,
  apply for infill development and;
                                                                 planning services, and inspection services), water supply,
• The introduction of water contributions in Kuratau,            parks and reserves, trade waste and solid waste. These
  Omori, and Pukawa.                                             can be found on the council’s website. All fees and charges
                                                                 include GST. The key changes from 2017/18 to 2018/19 are
Rates Remissions and Postponement                                summarised below:
Policies                                                         Animal management
Council is required to have rates remissions and                 • Removal of the ‘rural dog other’ category so that all
postponement policies. Each policy outlines the objectives,        dogs, other than working dogs, are classified the same.
conditions and criteria specific to that policy including the
information that must be provided when an application is         Community Services:
made. The draft policy contains nine policies.                   • The AC Baths entry fees to increase: from $8 to $10 for
This includes a new rates remission policy for Crown owned         an adult, $5 to $6 for a senior/student, child or under 5s
Hydro lakes (with easements to carry out the electricity           including non-paying adult for supervision to increase
generation business) that has been added to the current            from $4 to $5.
Rates Remission for Lake Taupō Lakebed, Crown owned              • There is also an increase to the AC Baths aqua fitness
Hydro Lakes lakebeds (with easements to carry out the              class fees and membership fees.
electricity generation business) and Lakeshore Reserve.
The new Hydro Lakes lakebeds (with easements to carry out        • Turangi Aquatic Centre entry fees for an adult to
the electricity generation business) rates remission policy        increase from $4 to $5.
recognises the significance of public access to the lakes for    • The Mangakino Pool entry fees to increase from $3.50
enjoyment and recreational activities.                             to $4.50 for an adult.

24                                                              Taupō District Council | LONG-TERM PLAN CONSULTATION
Submission form
How to make a submission
                                                                                                                         submit
                                                                                                                         submit
You can make an online submission by going to www.taupo.govt.nz or you may complete the form below.                       online
                                                                                                                         online
Submissions open on Monday 12 March and close on 16 April, 2018, 5pm
Please note that your submission (including any personal information supplied) will be made available to the Councillors
and the public.
                                                                  Hearings have been set down for the week April 30 - May 3
Written submissions to be posted to:                              2018. Hearings in Turangi and Mangakino will be arranged if
The Chief Executive Officer                                       there are sufficient numbers.
Taupō District Council                                            If you have indicated that you wish to present your comments
Private Bag 2005                                                  in person, you will be contacted after the submission period
Taupō 3352                                                        has closed to arrange a date/time. You will be given up to
Freepost No. 112497                                               10 minutes in which to present your submission and answer
Fax 07 378 0118                                                   questions. Please make your written comments as complete
Submissions can also be emailed: 10yearplan@taupo.govt.nz          as possible and use the hearing time to highlight the most
                                                                   important aspects of your submission.

Your details:                                                      Submission
Mr                 Mrs                   Ms                 Miss   Please provide your feedback on the Consultation Document for
                                                                   the Long-term Plan 2018 – 28. Tell us the things you support, or
                                                                   what you don’t, to help guide our future decision making.
                                                                   Please attach additional pages if required
Name
                                                                   Improving traffic flow through Taupō’s CBD – what is your
                                                                   preferred option?
                                                                          ption 1: Complete the programme as described on
                                                                         O
Contact details                                                          pages 17-18
Postal address                                                           Option 2: Do nothing, the status quo remains
Email                                                              Comments:

Best daytime contact number
Mobile

If your contact details are provided you will receive an           Upgrading Acacia Bay’s water supply – what is your preferred
acknowledgement of your submission                                 option?

Organisation                                                              ption 1: Build a new water treatment plant in Acacia
                                                                         O
                                                                         Bay
If you are completing this submission on behalf of others
please name the organisation                                              ption 2: Connect Acacia Bay and Mapara Road to the
                                                                         O
                                                                         Taupō water treatment plant
Organisation                                                       Comments:

Presentation
Do you wish to present your submission to the Council in           Working to reduce wastewater spills – what is your preferred
person at a hearing?                                               option?
Yes             No                                                        ption 1: Undertake additional work to prevent
                                                                         O
                                                                         wastewater spills from our network
                                                                         Option 2: Continue with the current programme
If ‘Yes’ where would you prefer to be heard?                       Comments:
Taupō        Turangi       Mangakino
Independent auditor’s report on Taupo District Council’s
                           Consultation Document for its proposed 2018-28 Long-Term Plan

I am the Auditor-General’s appointed auditor for Taupo District Council (the Council). Section 93C of the Local Government Act 2002
(the Act) requires an audit report on the Council’s consultation document. We have done the work for this report using the staff and
resources of Audit New Zealand. We completed our report on 1 March 2018.
Opinion
In my opinion:
•         the consultation document provides an effective basis for public participation in the Council’s decisions about the
          proposed content of its 2018-28 long-term plan, because it:
          ¡          fairly represents the matters proposed for inclusion in the long-term plan; and
          ¡          identifies and explains the main issues and choices facing the Council and district, and the consequences of
                     those choices; and
•         the information and assumptions underlying the information in the consultation document are reasonable.
Basis of opinion
We carried out our work in accordance with the International Standard on Assurance Engagements (New Zealand) 3000 (Revised):
Assurance Engagements Other Than Audits or Reviews of Historical Financial Information. In meeting the requirements of this
standard, we took into account particular elements of the Auditor-General’s Auditing Standards and the International Standard on
Assurance Engagements 3400: The Examination of Prospective Financial Information that were consistent with those requirements.
We assessed the evidence the Council has to support the information and disclosures in the consultation document. To select
appropriate procedures, we assessed the risk of material misstatement and the Council’s systems and processes applying to the
preparation of the consultation document.
We did not evaluate the security and controls over the publication of the consultation document.
Responsibilities of the Council and auditor
The Council is responsible for:
•         meeting all legal requirements relating to its procedures, decisions, consultation, disclosures, and other actions
          associated with preparing and publishing the consultation document and long-term plan, whether in printed or electronic
          form;
•         having systems and processes in place to provide the supporting information and analysis the Council needs to be able to
          prepare a consultation document and long-term plan that meet the purposes set out in the Act; and
•         ensuring that any forecast financial information being presented has been prepared in accordance with generally
          accepted accounting practice in New Zealand.
I am responsible for reporting on the consultation document, as required by section 93C of the Act. I do not express an opinion on
the merits of any policy content of the consultation document.
Independence
In carrying out our work, we complied with the Auditor-General’s:
•         independence and other ethical requirements, which incorporate the independence and ethical requirements of
          Professional and Ethical Standard 1 (Revised); and
•          quality control requirements, which incorporate the quality control requirements of Professional and Ethical Standard 3
           (Amended).
In addition to this report on the Council’s consultation document and all legally required external audits, we have provided
assurance reports on certain matters in respect of the Council’s Debenture Trust Deed and the Planning and Procurement Processes
for a new Headquarters Building. These assignments are compatible with those independence requirements. Other than these
assignments, we have no relationship with or interests in the Council or any of its subsidiaries.

Clarence Susan
Audit New Zealand
On behalf of the Auditor-General, Tauranga, New Zealand