Contents Why we want you to have your say! 3 What happens with my feedback? 3 Consultation events 3 Our Long-term District Strategy for 2018-2028 4 Our services and activities 6 Our Financial Strategy 7 Keeping rates affordable and sustainable 7 Looking after the assets we have 8 while maintaining levels of service Prudent management of our investments 8 and borrowings What’s happening in your area 10 Rates for different property types 12 Our Infrastructure Strategy 13 Population and demographic change 13 Protecting the health of our communities 14 and the environment Maintaining and renewing our infrastructure 15 Resilient infrastructure 15 Knowledge gaps 15 Planned infrastructure spending 2018-28 (in millions) 16 Tell us what you think 17 Improving traffic flow through Taupō’s CBD 17 Upgrading Acacia Bay’s water supply 19 Working to reduce wastewater spills 21 Submission form 25
2018-28 LONG TERM PLAN Why we want you What happens with my to have your say! feedback? Every three years we seek feedback on our draft 10-Year When you make a submission you will be given the option Plan that outlines the services, key projects and initiatives on whether you want to present your view to the Council we plan on delivering for our community. This document in person. If you do we will book a time for you to attend a outlines some of the key issues we want your feedback on. public meeting during the week of April 30- May 6. You will It’s just as important to let us know the things you support be given up to 10 minutes to present your submission and as well as the things you don’t as what you tell us will guide answer any questions. Hearings in Turangi and Mangakino our future decision making. will be arranged if there are sufficient numbers. Alternatively, you may wish to present your view to the Council You can have your say in the following ways: electronically e.g. conference call. Please let us know if you - taupo.govt.nz wish to present in this way. - 10yearplan@taupo.govt.nz All submissions will be considered by the Council regardless of whether you want to be heard or not. Final decisions will - Call into your nearest council office be made in May. All submissions will be made available to the - Drop into one of these sessions below. public via the Council website, including your personal details. This time we are seeking your feedback on three issues: Improving traffic flow through Taupō’s CBD (pages 17-18), Upgrading Acacia Bay’s water supply (pages 19-20) and working to reduce wastewater spills (page 21). Consultation events We are planning a number of opportunities for you to come and chat with us about our proposed plans. To find out more visit our website taupo.govt.nz, call into one of our customer service centres, email 10yearplan@taupo.govt.nz or give us a call on 0800 ASK TDC (0800 275 832). We’d love to see you there! Taupō Day Date Time Acacia Bay Community Hall Tuesday 20 March 5 - 7pm Kinloch Community Hall Thursday 22 March 4 - 6pm Our Customer Service Centre 46 Horomatangi St Saturday 24 March 12 - 2pm Our Customer Service Centre 46 Horomatangi St Thursday 29 March 12 - 2pm Taupō Library Thursday 29 March 10 - 11am Waitahanui Community Hall Thursday 15 March 5pm Turangi Day Date Time Turangi Library Monday 26 March 4 - 5pm Mangakino Day Date Time Mangakino Service Centre Wednesday 21 March 4 - 5pm Tirohanga Settlers Hall Monday 12 March 7:30pm Southern end of Lake Day Date Time Omori & Kuratau Community Centre Wednesday 14 March 5:30 - 7pm Taupō District Council | LONG TERM PLAN CONSULTATION 3
Our Long-term District Strategy Our district's reputation will be built on the attractiveness for 2018-2028 of our towns, the diversity of the experiences we offer, and the friendliness of our people. Taupō District Council’s vision is ‘To be the most prosperous and liveable district in the North Island by 2022’. As your Mayor and Councillors, we want the Taupō District to be the ‘Heartbeat of the North Island’ not only by its The vibrancy of our district will be created by well- geographical position but by creating world class, authentic connected communities who work together to create a and resilient communities that people want to be a part positive, fun environment people want to call home. of. We want our district to be known for its charm, to be vibrant, and to also offer a quality experience for both residents and visitors, while creating real value in what we offer and by the way we do things. We will work closely and collaboratively with our partners to ensure the best possible outcomes are achieved for our community, including iwi, and to maximise any opportunities. We enable people to prosper by working to keep unemployment low, housing affordable and ensuring To help guide our strategy we have used a core set of values whatever we do is the best it can be. to underpin our decision making when it comes to the services and activities we carry out as a council. These are: The work we do will maintain – and build on – our We will retain and attract residents and businesses by international reputation as a destination of choice. We will ensuring the district remains affordable and ensuring promote an excellent quality of life for our residents while the work we do creates a better life for people and their protecting the natural environment that makes our district families. so special. This Long-term strategy continues to align with the goals we set ourselves in the last Long-term Plan of: • Ensuring that the Taupō District remains a great place to live We will be open and transparent in the way we carry out our business and offer an experience that is genuine and • Promoting economic development real. • Protecting our water resources and using them wisely • Maintaining the quality infrastructure that we have and; • Keeping rates and debt affordable. We want to build on the strong foundation we have built over the past three years. Our plans, infrastructure and work programmes will be designed to ensure we are prepared to withstand or recover quickly from, disasters and/or difficult situations. We will be flexible and respond quickly to change. 4 Looking after the place we love for the next 10 years.
Our services and activities 6 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Our Financial Strategy The strategy continues the focus Council set in the Long-term Plan 2012-22 and 2015-25 on prudently managing our investments and borrowings, keeping rates affordable and sustainable and looking after the assets we have while maintaining levels of service. Keeping rates affordable and sustainable It is always a balancing act between meeting the wants and In our last Long-term Plan, we had set the limit on rates needs of our communities whilst keeping rates affordable increases at LGCI +1%. We have increased this by 0.5% and sustainable. This strategy has been prepared with this as we are proposing a significant capital infrastructure at the forefront of our thinking. programme. Rates Local government infrastructure costs, as measured by the Local Government Cost Index (LGCI) increase at a higher To help achieve what we think is a good balance we have rate than the Consumer Price Index (CPI). We believe that set the following limits on rates: the limits that we have set for rates still allow us to provide • Total rates revenue must not exceed 80% of operating for and maintain existing levels of service and to meet any revenues additional demand for services. • Rate increases may not exceed the forecast Local Government Cost Index (LGCI) +1.5% Rates percentage increase % 4.10% 4.20% 4.5 3.90% 4.00% 3.70% 3.70% 3.70% 3.80% 3.80% 4.0 3.50% 3.5 3.0 3.40% 2.5 2.65% 2.57% 2.0 2.44% 2.46% 2.27% 2.17% 2.12% 2.12% 2.09% 1.5 1.0 0.5 0 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 Financial Strategy Limit (LGCI + 1.5%) Prospective average rates % increase Taupō District Council | LONG TERM PLAN CONSULTATION 7
The strategy outlines the Council’s financial vision for the next 10 years and the impacts on rates, debt, levels of Prudent management service and investments. It will guide the Council’s future funding decisions and, along with the Infrastructure of our investments and Strategy, informs the capital and operational spending for borrowings the Long-term Plan 2018-28. It identifies the challenges that we want to respond to with our financial goals. The strategy maintains Councils current prudent and conservative approach to the management of its Over the past five years we have been successful in investments and borrowings to ensure that todays and implementing the planned financial strategy. Rates have future generations of ratepayers share both the benefits been within the limits set in the financial strategies of and the costs of Council services. 2012 and 2015. Debt has reduced from a peak of $168m in 2014 to $144m by 2018 and we have maintained our Council has maintained its borrowing limit at 200% of levels of service. We have continued with our strategy of operating revenue. selling surplus non-strategic land both as bare land parcels To read our full Financial Strategy visit taupo.govt.nz. for private sector development and we have successfully completed a staged subdivision at Botanical Heights with all 39 sections sold. Council has maintained its AA credit rating from Standard Capital expenditure by activity & Poors (S&P). This is reflective of Council’s strong financial management and budgetary performance. Council’s strategy is to retain its AA credit rating by ensuring that it $ Millions operates in a financially prudent manner and stays within the limits imposed within this financial strategy. 40 40 Looking after the 35 35 assets we have while 30 30 maintaining levels of 25 25 20 service 20 15 15 The Council is tasked with providing good quality local infrastructure, local public services, and cost effective 10 10 regulatory functions. This strategy is designed to maintain 55 the level of services, facilities and regulatory functions provided by the Council. 00 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 There are several projects in this Long-term Plan which will increase the level of service provided to the community such as the transportation projects relating to improving traffic flow through Taupō’s CBD. This Long-term Plan provides for upgrades to the remaining Transport Wastewater Community facilities water schemes required to meet the New Zealand Drinking Water Standards which will increase the levels of service to Water Solid waste Stormwater Other those communities. 8 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Gross Debt, Investments and Net Debt 200 $ Millions 150 100 50 0 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 Actual gross debt Actual and forecast net debt * LTP 2018-28 forecast gross debt Actual and forecast investments * Net debt equals gross external borrowings, less investments (cash, fixed term investments, equities). Differences between CPI and LGCI The Consumer Price Index (CPI) is a measure of how much Council spends a large proportion of its total expenditure household costs change over time. It is determined by on areas of infrastructure, for example on materials that measuring changes in a “basket” of goods and services that are used to create roads and pipes. These areas use a lot of a typical household will use- for example, food, furnishings petroleum based products, as well as construction materials and health services. – all of which are very different to the items used in the “basket” for the CPI. Therefore, council uses a more relevant The costs faced by council differ significantly from those measure – the Local Government Cost Index (LGCI), which is covered within the CPI “basket”. made up of items council spends its money on. CPI LGCI er Price In rnment Cos nsum de Gove t In Co x cal de Lo x food...furnishings... clothing and footwear... roading...pipes...petroleum based products... communication...recreation and culture...health... construction materials Taupō District Council | LONG TERM PLAN CONSULTATION 9
What’s happening in your area Streets upgrade Lakefront and programme public convenience Years 2018/19 - 2024/25 development $187,000 Year 2021-22 $372,000 Whakamaru Mangakino drinking Open spaces water standards upgrade improvements Year 2018/19 $100,000 2021/22 and 2022/23 $302,000 Creating new playgrounds Year 2018/19 and 2019/20- $ 474,000 Turangi-Tongariro Kuratau erosion National Park control Gateway Year 2018/19 - 2027/28 $1.3 million Turangi Year 2019/20 $102,000 Wastewater Open spaces upgrades upgrades Years 2018/19 - 2019/20 Years 2018/19 - 2021/22 and 2022/23 - 2023/24 $737,000 $4million 10 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Drinking Wastewater water standards upgrades improvements Years 2018/19 - 2019/20 Years 2018/19 - 2022/23 and 2022/23 - 2023/34 $7.8million $7.1million Kinloch Footpath construction Years 2018/19 - 2019/20 $352,000 Northern access Erosion control upgrades Years 2018/19 - 2027/28 Years 2018/19 - $2.9 million 2024/25 $2.15 million ? Acacia Bay water upgrades Taupō Civic Administration Building Years 2018/19 - 2020/21 $4.7 million Years 2018-19 - 2021-22 $15.7 million Destination Playground Years 2019/20 - 2020/21 $484,000 Taupō District Council | LONG TERM PLAN CONSULTATION 11
To see what Rates for different property types this means for The table below shows examples of the rates for a range of rating valuations for residential your property visit properties in Taupō, Turangi, Mangakino, and Kinloch industrial and commercial properties and our rates calculator rural properties based on what we have planned. at taupo.govt.nz Examples of rates per type of property Residential properties - Taupō 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 Rating valuation $284,000 $284,000 $453,000 $453,000 $565,000 $565,000 $810,000 810,000 CV$ CV$ CV$ CV$ CV$ CV$ CV$ CV$ Targeted rates 1,175 1,233 1,175 1,233 1,175 1,233 1,175 1,233 General rates 962 1,001 1,418 1,448 1,706 1,744 2,338 2,391 Total rates 2,157 2,234 2,592 2,680 2,881 2,976 3,513 3,624 $ change per week 1.48 1.69 1.84 2.15 % change 4% 3% 3% 3% Residential properties - Turangi 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 Rating valuation $162,000 $162,000 $186,000 $186,000 $208,000 $208,000 $466,000 $466,000 CV$ CV$ CV$ CV$ CV$ CV$ CV$ CV$ Targeted rates 1,040 1,121 1,040 1,121 1,040 1,121 1,040 1,121 General rates 668 678 729 742 786 800 1,451 1,482 Total rates 1,708 1,799 1,770 1,863 1,827 1,921 2,492 2,603 $ change per week 1.75 1.78 1.81 2.14 % change 5% 4% 5% 5% 4% Residential properties - Mangakino 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 Rating valuation $111,000 $111,000 $157,000 $157,000 $218,000 $218,000 $320,000 $320,000 CV$ CV$ CV$ CV$ CV$ CV$ CV$ CV$ Fixed Targeted rates 1,189 1,234 1,189 1,234 1,189 1,234 1,189 1,234 General rates 536 543 655 665 812 826 1,075 1,096 Total rates 1,726 1,777 1,844 1,899 2,001 2,060 2,264 2,330 $ change per week 0.99 1.05 1.13 1.26 % change 3% 4% 3% 3% 3% Residential properties - Kinloch 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 Rating valuation $111,000 $111,000 $157,000 $157,000 $218,000 $218,000 $320,000 $320,000 CV$ CV$ CV$ CV$ CV$ CV$ CV$ CV$ Fixed Targeted rates 1,127 1,223 1,127 1,223 1,127 1,223 1,127 1,223 General rates 987 1,006 1,410 1,440 1,706 1,744 2,312 2,365 Total rates 2,114 2,229 2,537 2,663 2,833 2,967 3,439 3,588 $ change per week 2.2299 2.43 2.58 2.88 % change 5% 4% 5% 5% 4% Industrial Commercial properties 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 Rating valuation $485,000 $485,000 $800,000 $800,000 $1,100,00 $1,100,00 $2,800,00 $2,800,00 CV$ CV$ CV$ CV$ CV$ CV$ CV$ CV$ Fixed Targeted rates 1,220 1,286 1,574 1,641 2,596 2,722 2,085 2,182 General rates 2,500 2,558 3,962 4,057 6,073 6,222 13,241 13,575 Total rates 3,720 3,844 5,535 5,698 8,669 8,945 15,326 15,756 $ change per week 2.38 3.13 5.3 8.27 % change 3% 4% 3% 3% 3% Rural properties 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 2017/18 2018/19 Rating valuation $615,000 $615,000 $1,050,000 $1,050,000 $6,115,000 $6,115,000 $10,072,000 $10,072,000 CV$ CV$ CV$ CV$ CV$ CV$ CV$ CV$ Fixed Targeted rates 45 53 45 53 45 53 91 107 General rates 1,835 1,876 2,956 3,026 16,012 16,417 26,462 27,128 Total rates 1,881 1,929 3,002 3,079 16,057 16,470 26,552 27,235 $ change per week 0.94 1.49 7.94 13.13 % change 3% 4% 3% 3% 3% 12 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Our Infrastructure Strategy Our Infrastructure Strategy outlines the main themes and Issue 3 – An ageing population on fixed incomes facing issues that arise from these over the next 30 years, but also increasing infrastructure costs may result in rates that are how we plan to respond to those. These are: unaffordable for our ratepayers. We will respond by: Where possible, maintaining current Population and levels of service by looking at innovative solutions demographic change In 2016, 42 per cent of our property owners did not live in the district The district’s population will continue to and in 2013, 32 per cent of houses 1 grow to 2038 and will then decline. The were unoccupied. This indicates urban areas of Taupō town and that about 30 per cent of our Kinloch will continue to grow housing stock in our district are until 2038 and then start to Deliver used as holiday homes. decline. The population services There are large of Taupō town will Infrastructure variations in the increase from 24,190 in place for to meet percentage of in 2013 until it the future changing holiday homes peaks at 27,260 in our different in 2038 before demands settlements. slowly starting to decline. In Kinloch the population 2 For example, in Taupō about 30 per cent 4 is projected to of the houses increase from 520 are holiday in 2013 to 780 Innovative homes, whereas in 2028 and then in Kuratau, remain stable. The solutions Infrastructure Whareroa, and towns of Turangi and to maintain Omori, about 90 Mangakino have been for projected per cent are holiday 3 experiencing population current number of homes. decline for some time services and it is projected that this house- Issue 4 – It is projected holds that our population will decline will continue. decline but there is uncertainty Issue 1 – New infrastructure is about what the impact will be on required to cater for growth, primarily in the number of dwellings that need to Taupō town and Kinloch. be serviced by infrastructure. We will respond by: Working alongside developers to We will respond by: Providing infrastructure and long term ensure the infrastructure is in place as required in time for capacity for the projected number of households. development. The district’s population aged over 65 years is expected to nearly double from 5,800 in 2013 (17% of the population) to 11,100 in the next 25 years (28% of the population). Issue 2 – An ageing population may drive a change in demand for the services that we provide. We will respond by: Delivering services and levels to meet changing demands. Taupō District Council | LONG TERM PLAN CONSULTATION 13
Over the next 10 years we plan to spend $20.4 Protecting the health of million on upgrading the districts water supplies (in our communities and the addition to what we are spending on Acacia Bay). environment Issue 6 – The availability and supply of raw water will come under increased pressure. An important part of providing infrastructure is We will respond by: Taking a more proactive approach protecting the health of our communities and to water demand management, by undertaking ensuring that our use of natural resources a project in the next six years to evaluate the and discharges do not adversely affect our different options and implement the preferred environment and therefore our attractiveness option to reduce urban daily household water as a visitor destination and future economic consumption. This work will be considered development. during the development of a water Issue 5 – Some of our communities strategy. may face a health risk without safe and clean drinking water supplies. We aim to reduce the impacts our We will respond by: Ensuring we infrastructure on the environment upgrade our water supplies in wherever possible. However, line with the timeframes set environmental requirements out in water safety plans. These timeframes are Safe are increasing and will continue to become more drinking 8 developed and prioritised stringent in the future. based on risk. Prevent water Issue 7 – Protection The contamination of overflows of the environment the Havelock North to lake will drive increased water supply in 5 costs for council’s September 2016 wastewater and highlighted the stormwater 7 importance of discharges. ensuring that we provide a safe We will respond drinking water by: Ensuring we supply to our are improving our communities. This is discharges to protect 6 why we a upgrading Improve Reduce water the environment and our drinking water discharges consumption comply with consent supplies over the course requirements. of this plan to prevent this happening in our district. Issue 8 – Every year we have a number of wastewater overflows Much of our raw water comes from Lake Taupō with many of these entering the lake. This is where all of the available water has already been unacceptable to the Council and community. We allocated. While we have consent to take more want your We will respond by: Increasing our annual water than we currently distribute we need to feedback. Refer operational budgets to undertake more ensure we have access to sufficient raw water to page 21 for more preventative work. We have increased our to provide for population, economic growth information. budget by $2.33 million over the 10 years of and seasonal variations. This means it will the Long-term Plan for the work to take place. be increasingly difficult to not only retain our This would be in addition to the $700,000 existing consent volumes but also get consents we currently spend on renewing and repairing for increased water takes in the future to meet wastewater and sewerage pipes, and the $150,000 this increasing demand. It is likely that any increased we spend on inspecting and cleaning. It would also demand for water will have to be catered for within our mean we would expect to have less spills to the lake and existing allocation. we have reflected this in our performance measures. 14 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Maintaining and Knowledge gaps renewing our There are some limitations in the information we hold on our facilities, and our parks and reserves. We lack condition infrastructure information and are still to develop a strategic direction for these areas. The majority of our infrastructure is in good condition. It is important renewals Issue 11 – We have knowledge are done at the appropriate time. gaps across facilities, parks and 9 This allows us to get value for reserves which mean we our money and avoid our are not strategic in our infrastructure failing, Planning provision of parks and Condition for natural reserves and facilities. resulting in expensive repairs. It will also assessments hazards We will respond ensure that there & renewal by: Developing is no unexpected interruption planned separate strategies for parks and in service to reserves and communities. facilities and Issue 9 – Some improve our of our assets knowledge and may be nearing condition of 10 the end - or are facilities. 11 already at the end - of their useful life To read our full and need renewal. Improved Infrastructure Strategy However, we do not know how many assets strategies for visit are potentially affected. parks, reserves taupo.govt.nz We will respond by: Ensuring and facilities condition assessments are programmed for all infrastructure assets and infrastructure renewal is planned. Resilient infrastructure We need to ensure our communities are resilient should there be disruption to our infrastructure networks. These can be from failures in the network, such as a water main bursting, or from natural hazards such as flooding and earthquakes. Issue 10 – The district is vulnerable to a wide range of events, including natural hazards, that could cause significant damage and disruption to council’s services at any time. We will respond by: Planning for natural hazards and network failures and build in feasible contingencies. Taupō District Council | LONG TERM PLAN CONSULTATION 15
Planned infrastructure spending 2018-28 (in millions) $ Millions Transport Wastewater Community facilities $207.9 $195.8 $284.8 CAPEX $59.3 CAPEX $42.6 CAPEX $58 Operational $148.6 Operational $153.2 Operational $226.8 Water Solid Waste Stormwater $193.2 $57.7 $29.6 CAPEX $72.7 CAPEX $3.5 CAPEX $7.8 Operational $120.5 Operational $54.2 Operational $21.8 16 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Norman Smith St / Wairakei Dr ‘merge like a zip’ signs Tongariro St & Spa Rd roundabout lane changes Variable signage at certain times on SH 1 to direct traffic to other entrances into Taupō ALREADY DONE Tongariro St left-hand only turn Have your say, these are the matters that we want your feedback on. Tell us what you think some short, medium and long term solutions we have Improving traffic flow included in the draft Long-term Plan. through Taupō’s CBD Already, we have changed the lane marking at the merge of Norman Smith Street/Wairakei Drive and have installed new, improved, 'merge like a zip' signs. We have And easing congestion at Norman Smith also changed the lanes at the Tongariro Street/Spa Road Street/Wairakei Drive roundabout approach, by Countdown, to left and right only Ongoing community frustrations with congestion at to improve traffic flow. Norman Smith Street last year saw us include $100,000 in The entry into Redoubt Street will be left-hand turn only the 2017/18 Annual Plan to fast track an investigation into and the exit onto Tongariro Street will be left-hand turn only traffic movements through the northern part of Taupō’s as well. Variable signage will also be in place at certain times Central Business District. We also took the opportunity to on State Highway 1 to direct traffic to other entrances into include roading improvements identified through structure Taupō, to take pressure off Wairakei Drive at peak times. planning in 2011. The package of proposed solutions takes into account that We engaged specialist consultants, Traffic Design Group, to our northern entrance operates as part of our transport identify options and look into traffic movement as well as network, so doing any one change on its own could cause factoring in projected population and visitor growth. They issues elsewhere. also met with a number of community groups, residents associations and other key stakeholders to gain a better The majority of the proposed projects are to be funded understanding of the issues. through loans and a subsidy from the New Zealand Transport Agency. The outcome was an extensive report on the options available and suggested timeframes. The report outlines Taupō District Council | LONG TERM PLAN CONSULTATION 17
The proposed solutions are: Short-term: 1 2 Medium-term: 6 5 7 3 8 4 1 Change the speed limit to 50kph just north of Huka Falls Road including painted islands and shoulders. We will be consulting on this as part of our Speed Bylaw Review in April/May this year. 5 Close the Countdown access to Tongariro Street, timing and cost to be determined. 2 Design and install threshold treatment at the start of the 50kph to form a gateway into Taupō from the north. Year 2018/19. Total cost $127,000. This would be 6 Install traffic lights at the Titiraupenga Street and Spa Road intersection. Year 2020/2021. Total cost funded through our minor improvements programme. $649,000. 3 Install traffic lights at the Norman Smith Street/ Wairakei Drive intersection. Year 2018/19. Total cost 7 Install traffic lights at Titiraupenga and Tamamutu Streets. Year 2021/22. Total cost $502,000. $479,000. 8 Install traffic lights at the Titiraupenga Street and 4 Install traffic lights at the Spa Road/Ruapehu Street Heuheu Street intersection. Year 2022/2023. Total intersection. Year 2019/2020. Total cost $422,000. cost $493,000. Long-term: 9 It has been recommended a new bridge be built downstream from the Control Gates Bridge. This is seen as a long-term option and we have included $100,000 in the 2018/19 year to undertake some investigation work. 9 10 Install traffic lights at the intersection of Paora Hapi and Gascoigne Streets. Year 2023/2024. Total cost $424,000. 11 Install traffic lights at the intersection of Paora Hapi and Ruapehu Streets. Year 2024/2025. Total cost $526,000. 1210 We 11 12 Investigation into removing the Spa Road Roundabout and realign Tongariro Street. Year 2024/25. Total cost $172,000. would like your feedback on the following *Please note figures quoted include inflation. options. Option 1 Option 2 Preferred: Complete the programme as described above. This Do nothing, status quo remains. This would option would result in improved traffic flow at the northern mean there would continue to be traffic flow entry to Taupō. The impact of rates on this option is shown in issues at the northern entry to Taupō during peak the table below. The average rate impact is $7 per annum. times and would not result in an additional rate increase. 2018/19 2019/20 2020/21 2021/22 2022/23 2032/24 2024/25 2025/26 2026/27 2027/28 Average rate impact $ $4.08 $4.80 $4.80 $4.80 $7.47 $7.47 $9.19 $9.19 $9.19 $9.19 18 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Upgrading Acacia Bay’s water supply Option 1: Build a new water treatment plant in Acacia Bay. Estimated total cost: $6.2 million. We will raise a loan to fund this project. Estimated annual operating cost: $185,000 (excludes interest and depreciation). For this option, we would need to buy land for a new water treatment plant and ensure it had the capacity for growth. We would continue to take water from Lake Taupō and would treat it to the same standard of drinking water quality as the Taupō water treatment plant. Risks • Potential for higher than planned costs or difficulty in Meeting the drinking water acquiring a suitable site to locate a new water treatment standards plant. • Difficulty and additional costs in obtaining the required Providing safe, clean drinking water to our communities consents to construct the new plant. connected to a council supply is one of our key goals. • Potential for the visual amenity of the residential area to We have 19 water schemes around the district and are be lowered; it is proposed that a buffer zone is created required under legislation to take all practicable steps to around the proposed treatment plant with landscaping ensure we supply drinking-water that complies with the planting to provide visual screening Drinking-water Standards for New Zealand. We have a programme of water treatment upgrades planned • The proposed site and may require additional over the next 10 years to ensure we can meet this construction works than expected. requirement. This option would mean that the Acacia Bay and Mapara So far, we have upgraded the Taupō, Turangi and water schemes would continue to operate and be funded Mangakino water treatment plants. The next major separately to the Taupō town water scheme. upgrade is for the Acacia Bay supply. Option 2 – Connect Acacia Bay and Mapara Road to the Taupō water hen we consulted on our last Long-term W Plan we signalled there would need to be a treatment plant conversation with our communities regarding the Estimated total cost: $4.5 million. We will raise a funding of all or our water supplies in the future. loan to fund this project. We are still working on the options however Estimated annual operating cost: $159,000 there is a need to upgrade the Acacia Bay supply (excludes interest and depreciation). before that conversation is had. This is now likely A new pipeline would be laid from Jarden Mile to the to form part of the next Long-term Plan. existing reservoir at Reeves Road to supply water to Acacia Bay from the Taupō water treatment plant. The current Key issue water intake at Acacia Bay would no longer be required. Upgrading Acacia Bay’s water supply The existing Taupō water treatment plant can produce 25 Our Acacia Bay water treatment plant supplies water to 742 mega litres per day. Over summer, increased water demand Acacia Bay / 387 Mapara properties, including those in the sees the plant running at capacity so an upgrade to 30 mega Mapara Road rural water supply zone. We commissioned litres per day will be required in 2018/19, regardless of engineering consultants Mott McDonald to assess the whether Acacia Bay and Mapara Road properties connect. options for meeting the drinking water standards and we The cost to increase the capacity of the Taupō water are now seeking feedback on the two practicable options treatment plant to 30 mega litres per day is approximately that were identified. $1.75 million. We will raise a loan to fund this project. Taupō District Council | LONG TERM PLAN CONSULTATION 19
Connecting the Acacia Bay and Mapara Road properties to the Taupō plant, would result in a total peak demand of at least 26.5 mega litres per day. The additional capacity Fluoridation provided by this upgrade will also cater for the continued The debate on whether or not growth of the Taupō community. fluoride should be added to water The plant was designed to allow for an increase capacity supplies is a long-standing one and it to 35 mega litres per day in two separate stages. Based on is an issue that has been recommended to current growth forecasts, an upgrade to 35 mega litres per be handed to District Health Boards to make a day if Acacia Bay is connected is not expected to be needed decision on in the future. until about 2040. A key difference between the current Acacia Bay water This option would mean that the Acacia Bay and Mapara supply and Taupō’s is that the Taupō supply is fluoridated. water schemes would become part of the Taupō water If Acacia Bay were to join the Taupō scheme those scheme. All users within the scheme would fund the properties would also receive fluoridated water. operational and capital costs associated with this scheme As the responsibility for making the decision on fluoridation from 1 July 2018. is likely to be no longer under our control, we cannot predict Risks whether a new water treatment plant for Acacia Bay would be required to include fluoridation. • Connection of Acacia Bay and Mapara Road to the Taupō water supply via a single, lengthy pipeline poses We, like other local authorities, are awaiting the a risk to water security at Acacia Bay. The reservoir has outcome of the Health (Fluoridation of Drinking storage capacity of about 24-hours. Water) Amendment Bill introduced by the Government. This is expected • If growth in Taupō, Nukuhau, Acacia Bay and Mapara in the near future. Road meant a water demand over the 35 mega litre per day capacity of the Taupō water treatment plant, there would be a need to consider further supply and reticulation infrastructure. This risk is mitigated by Council’s intention to reduce consumption rates over 2017-18 2018-19 2019-20 2020-21 2021-22 Scheme time. What does it mean for rates? Taupō NA $458.21 $461.71 $482.73 $508.64 Option 1: Construct a new water combined treatment plant in Acacia Bay. The annual change on Taupō, Acacia Bay and Mapara The rating impact of constructing a new water treatment ratepayers for option 2 (the preferred option) on combining plant in Acacia Bay to be funded solely by residents in the Acacia Bay and Mapara schemes with the Taupō scheme is Acacia Bay and Mapara Road schemes is as follows: as follows: Increase/(-)Decrease in Targeted income 2017-18 2018-19 2019-20 2020-21 2021-22 Scheme Taupō $1.26 $7.41 $21.10 $30.04 Taupō $447.45 $456.95 $454.30 $461.63 $478.60 Acacia Bay -$9.88 -$104.20 -$323.93 -$479.09 Acacia Bay $545.30 $468.10 $565.91 $806.66 $987.71 Mapara* -$48.47 -$139.15 -$358.28 -$515.32 Mapara* $309.80 $506.68 $600.87 $841.01 $1,023.96 The calculations include allowances for asset depreciation, *average rate as existing scheme is land value based. interest and operating costs. Preferred option Option 2 – Connect Acacia Bay and The preferred option is to connect the Acacia Bay and Mapara Road schemes to the existing Mapara Road communities to the Taupō water supply. Taupō water treatment plant This option has the lowest construction cost and lower ongoing operational costs. There is also a lower impact on The rating impact of combining the Acacia Bay and Mapara ratepayers in the Acacia Bay and Mapara Road areas. The Road schemes with the Taupō scheme is as follows: standalone option is considered too great an increase for these ratepayers. 20 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN We want your feedback. Option 1: Undertake additional work to prevent wastewater spills from our network Our preferred option is to increase our annual operational budgets to undertake more preventative work. We have increased our budget by $2.33 million over the 10 years of the Long-term draft Plan for the work to take place. This would be in addition to the $700,000 we currently spend on renewing and repairing wastewater each year, and the $150,000 we spend on inspecting and cleaning each year. It would also mean we would expect to have less spills to the lake and we would reflect this in our performance targets. This option would mean that in 2018/19 year, the wastewater targeted rate would increase from $701.71 to $721.06. Working to reduce Option 2: Continue with the current wastewater spills programme We continue our current programme of spending about Every year, we spend about $700,000 on renewing and $700,000 each year on renewing and repairing wastewater repairing wastewater pipes, and another $150,000 on pipes, and another $150,000 each year on inspecting and inspecting and cleaning them in an effort to avoid any cleaning. This option would mean that the wastewater overflows. targeted rate would be $701.71. Our levels of service under this option would remain the same. Despite this, there are still a number of overflows that happen every year and many of the incidents see Economic development FYI wastewater enter the lake. We want this to stop. There is an ongoing issue with people flushing or putting Tourism New Zealand funding – things down the drains that shouldn’t be there, with, cooking Winter Campaign fat, wet wipes and tree roots causing the biggest issues. Last February Ruapehu Alpine Lifts unveiled a plan to In areas where tree roots have entered the pipes, these transform the Taupō District into New Zealand’s premier ski items build up quite quickly and cause blockages. Larger destination. objects our team have found in the system include building materials, rubbish, clothes, and even curtains! At that time, we approved $100,000 of funding each year for the next two years to support a Tourism New Zealand While we are developing a public education programme to campaign that aimed to help the Ruapehu Alpine Lifts gain a encourage people to do the right thing, we want to invest strong foothold in the Australian tourism market. more heavily in a preventative maintenance programme that will allow us to proactively identify any potential trouble The campaign also gained funding support from Ruapehu areas in a timely way. District Council and Auckland International Airport. This financial year we will spend an extra $395,000 to In our draft Long-term Plan, we have included $100,000 per increase the amount of camera surveillance, and we will use annum for another three years to continue supporting the blockage detection technology to ensure any potential issues partnership as the district’s activities and attractions will are known of and dealt to early. This is targeting the areas form the key basis of the campaign. most likely to cause spills to the lake. In the 2018/19 year it will be accompanied by a matching Next year we want to spend an extra $350,000 to continue contribution of $100,000 from Ruapehu Alpine Lifts, the work and we have budgeted an additional $220,000 $300,000 from Auckland International Airport, $250,000 a year each year thereafter for an increased ongoing from Tourism New Zealand and $50,000 from Ruapehu maintenance programme. District Council. Taupō District Council | LONG TERM PLAN CONSULTATION 21
Building a new future - where we are with our Civic Administration Building early Friable asbestos detected 17 Decision to relocate employees Apr New building is the preferred 17 option May Community consultation to 17 determine preferred options Decision from community Jun feedback to build at yet-to-be 17 determined site Jul EOI’s sought for leasing a building, 17 site or both Sep Employees relocated to alternative premises 17 Oct Area fronting Story Place chosen 17 5 EOIs discounted Taupō Airport upgrade Nov Masterplan to be developed Increasing passenger numbers, aging infrastructure, health 17 Initial planning begins and safety issues and projected tourism growth prompted us to take a good look at our airport facilities and the experience we offer to air travellers. Dec Decision to demolish Lake Terrace Towards the end of 2017 we prepared a business case to 17 site the Minister of Transport outlining the need to upgrade both the terminal building, carpark and entranceways as Taupō Airport is 50 per cent owned by the Crown. Jan Demolition starts on Lake Terrace Since then we have engaged with the Ministry of Business, 18 building Innovation and Employment and provided a business plan to the Regional Economic Development Fund seeking assistance with funding the upgrade. We have Project manager appointed an opportunity to enhance the visitor experience and Feb Masterplanning new options for provide a fitting ‘gateway’ to the Central North Island. We 18 cultural, arts and heritage hope to attract some Government funding to upgrade the facilities and have allowed $2.5 million in the plan as our contribution. mid Feedback from community sought If we are unable to secure external funding, we will need to 18 on options re-evaluate how we deliver this project. 22 Looking after the place we love for the next 10 years.
2018-28 LONG TERM PLAN Civic Administration Building Last year we were required to vacate our in time to ask the community for feedback on former administration building at 72 options as part of this Long-term Plan Lake Terrace due to a number process. However, late last year of health and safety issues we recognised an opportunity including the detection of to take a good look at the friable asbestos and the wider picture and to uild need to undertake ‘do it once and do it earthquake strengthening. During the i c B right’. In February, we approved the in development development of Civ of the 2017/18 We’ll a masterplan Annual Plan, be seeking for the area g ? we consulted your feedback by the Great with the Lake Centre on new building community to see what on a number options later this efficiencies of different year can be options, from made, what refurbishment opportunities to a new build, can be with the preferred capitalised option being to on, and to build a new building futureproof any at the Lake Terrace development going site. However, following forward. We think feedback the decision was there is a real opportunity made to build a new building, on to develop a ‘civic heart’ for a site to be determined. It was also Taupō by including new cultural, decided to investigate lease options as an arts and heritage facilities to replace the alternative to self-funding a new building. existing Taupō Museum, but we want to gain a better understanding of the details, including costs, before we The majority of staff relocated to five sites in the Taupō make the decision to seek your feedback. We also want CBD during the year, and investigations continued into to further investigate the potential to attract funding potential sites and funding options. Calls for expressions from outside sources as has been done in other centres. of interest from parties who may have been interested in leasing a building, site or both were made, and there Our aim now is to have the preliminary investigations were five responses, but all were discounted during the completed by the middle of the year and then come site selection process in October for various reasons. back to you with the information you need to give informed feedback to help guide our decision making. Instead, the council decided to investigate the This will include options on what is or isn’t included in a development of the area fronting on to Story Place new building, costs and timelines. In the meantime, we near the Great Lake Centre and the library for the new have included funding of $15.7 million in the plan for a building as its preferred option. The other two options, new building as a placeholder. in order of preference, were to build on the Tuwharetoa Street carpark or on the former site at 72 Lake Terrace. It was hoped that the investigations would be complete Taupō District Council | LONG TERM PLAN CONSULTATION 23
Changes to policies: Revenue and Financing Policy Development Contributions Policy 2018 This policy sets out who pays for the activities that Council undertakes on behalf of the community and The effects of growth, particularly the cumulative effects of how these activities will be funded. Our funding policies development, require Council to incur capital expenditure, are determined having consideration of who benefits, on behalf of incoming communities, to provide new or intergenerational equity, who contributes to the need additional services. Funding tools such as development for the activity, distinct funding and the overall impact contributions, along with others, are essential in meeting of the method of funding. The Revenue and Financing these needs. Development contributions assist Council to Policy should be read in conjunction with the s101(3) assign the costs of growth to the time frame in which that considerations report available at taupo.govt.nz. demand is generated. A Development Contributions Policy aims to recover infrastructure costs arising from growth The key changes to our existing policy are: from developers who create the infrastructure need. • We have moved from set percentages for funding The draft Development Contributions Policy 2018 has been sources to a range of percentages. reviewed and some changes have been proposed from the • Consolidation of two activities within the economic policy adopted in 2015. These include: development group. • Changing funding of reserves from district-wide to • Removed rural fire within the community services group catchment based (Taupō and Kinloch only). as it is no longer a council function. • The definitions of ‘growth’ and ‘reserve land’ have been clarified Fees and charges We are required to consult on fees and charges for • Clarifying when reserves development contributions regulatory services (animal control, building services, apply for infill development and; planning services, and inspection services), water supply, • The introduction of water contributions in Kuratau, parks and reserves, trade waste and solid waste. These Omori, and Pukawa. can be found on the council’s website. All fees and charges include GST. The key changes from 2017/18 to 2018/19 are Rates Remissions and Postponement summarised below: Policies Animal management Council is required to have rates remissions and • Removal of the ‘rural dog other’ category so that all postponement policies. Each policy outlines the objectives, dogs, other than working dogs, are classified the same. conditions and criteria specific to that policy including the information that must be provided when an application is Community Services: made. The draft policy contains nine policies. • The AC Baths entry fees to increase: from $8 to $10 for This includes a new rates remission policy for Crown owned an adult, $5 to $6 for a senior/student, child or under 5s Hydro lakes (with easements to carry out the electricity including non-paying adult for supervision to increase generation business) that has been added to the current from $4 to $5. Rates Remission for Lake Taupō Lakebed, Crown owned • There is also an increase to the AC Baths aqua fitness Hydro Lakes lakebeds (with easements to carry out the class fees and membership fees. electricity generation business) and Lakeshore Reserve. The new Hydro Lakes lakebeds (with easements to carry out • Turangi Aquatic Centre entry fees for an adult to the electricity generation business) rates remission policy increase from $4 to $5. recognises the significance of public access to the lakes for • The Mangakino Pool entry fees to increase from $3.50 enjoyment and recreational activities. to $4.50 for an adult. 24 Taupō District Council | LONG-TERM PLAN CONSULTATION
Submission form How to make a submission submit submit You can make an online submission by going to www.taupo.govt.nz or you may complete the form below. online online Submissions open on Monday 12 March and close on 16 April, 2018, 5pm Please note that your submission (including any personal information supplied) will be made available to the Councillors and the public. Hearings have been set down for the week April 30 - May 3 Written submissions to be posted to: 2018. Hearings in Turangi and Mangakino will be arranged if The Chief Executive Officer there are sufficient numbers. Taupō District Council If you have indicated that you wish to present your comments Private Bag 2005 in person, you will be contacted after the submission period Taupō 3352 has closed to arrange a date/time. You will be given up to Freepost No. 112497 10 minutes in which to present your submission and answer Fax 07 378 0118 questions. Please make your written comments as complete Submissions can also be emailed: 10yearplan@taupo.govt.nz as possible and use the hearing time to highlight the most important aspects of your submission. Your details: Submission Mr Mrs Ms Miss Please provide your feedback on the Consultation Document for the Long-term Plan 2018 – 28. Tell us the things you support, or what you don’t, to help guide our future decision making. Please attach additional pages if required Name Improving traffic flow through Taupō’s CBD – what is your preferred option? ption 1: Complete the programme as described on O Contact details pages 17-18 Postal address Option 2: Do nothing, the status quo remains Email Comments: Best daytime contact number Mobile If your contact details are provided you will receive an Upgrading Acacia Bay’s water supply – what is your preferred acknowledgement of your submission option? Organisation ption 1: Build a new water treatment plant in Acacia O Bay If you are completing this submission on behalf of others please name the organisation ption 2: Connect Acacia Bay and Mapara Road to the O Taupō water treatment plant Organisation Comments: Presentation Do you wish to present your submission to the Council in Working to reduce wastewater spills – what is your preferred person at a hearing? option? Yes No ption 1: Undertake additional work to prevent O wastewater spills from our network Option 2: Continue with the current programme If ‘Yes’ where would you prefer to be heard? Comments: Taupō Turangi Mangakino
Independent auditor’s report on Taupo District Council’s Consultation Document for its proposed 2018-28 Long-Term Plan I am the Auditor-General’s appointed auditor for Taupo District Council (the Council). Section 93C of the Local Government Act 2002 (the Act) requires an audit report on the Council’s consultation document. We have done the work for this report using the staff and resources of Audit New Zealand. We completed our report on 1 March 2018. Opinion In my opinion: • the consultation document provides an effective basis for public participation in the Council’s decisions about the proposed content of its 2018-28 long-term plan, because it: ¡ fairly represents the matters proposed for inclusion in the long-term plan; and ¡ identifies and explains the main issues and choices facing the Council and district, and the consequences of those choices; and • the information and assumptions underlying the information in the consultation document are reasonable. Basis of opinion We carried out our work in accordance with the International Standard on Assurance Engagements (New Zealand) 3000 (Revised): Assurance Engagements Other Than Audits or Reviews of Historical Financial Information. In meeting the requirements of this standard, we took into account particular elements of the Auditor-General’s Auditing Standards and the International Standard on Assurance Engagements 3400: The Examination of Prospective Financial Information that were consistent with those requirements. We assessed the evidence the Council has to support the information and disclosures in the consultation document. To select appropriate procedures, we assessed the risk of material misstatement and the Council’s systems and processes applying to the preparation of the consultation document. We did not evaluate the security and controls over the publication of the consultation document. Responsibilities of the Council and auditor The Council is responsible for: • meeting all legal requirements relating to its procedures, decisions, consultation, disclosures, and other actions associated with preparing and publishing the consultation document and long-term plan, whether in printed or electronic form; • having systems and processes in place to provide the supporting information and analysis the Council needs to be able to prepare a consultation document and long-term plan that meet the purposes set out in the Act; and • ensuring that any forecast financial information being presented has been prepared in accordance with generally accepted accounting practice in New Zealand. I am responsible for reporting on the consultation document, as required by section 93C of the Act. I do not express an opinion on the merits of any policy content of the consultation document. Independence In carrying out our work, we complied with the Auditor-General’s: • independence and other ethical requirements, which incorporate the independence and ethical requirements of Professional and Ethical Standard 1 (Revised); and • quality control requirements, which incorporate the quality control requirements of Professional and Ethical Standard 3 (Amended). In addition to this report on the Council’s consultation document and all legally required external audits, we have provided assurance reports on certain matters in respect of the Council’s Debenture Trust Deed and the Planning and Procurement Processes for a new Headquarters Building. These assignments are compatible with those independence requirements. Other than these assignments, we have no relationship with or interests in the Council or any of its subsidiaries. Clarence Susan Audit New Zealand On behalf of the Auditor-General, Tauranga, New Zealand
You can also read