INTRODUCTION - COVID-19 STRATEGIC RECOVERY PLAN                                                                            3

STRATEGIC COVID - 19 RECOVERY PLAN FOR BUSINESS RESILIENCE                                                                 5

STRATEGIC COVID - 19 RECOVERY PLAN FOR COUNCIL SUSTAINABILITY                                                             16

STRATEGIC COVID - 19 RECOVERY PLAN FOR DISASTER RECOVERY                                                                  17

STRATEGIC COVID - 19 RECOVERY PLAN FOR COMMUNITY RESILIENCE                                                               18

STRATEGIC COVID - 19 RECOVERY PLAN FOR STRATEGIC ADVOCACY                                                                 20

ISAAC.QLD.GOV.AU                       Covid-19 Strategic Recovery Plan – Endorsed 28/10/2020 - Resolution Number: 6945   02
Doc Number: CORP-PLN-063               Version 1 – ECM 4715650
INTRODUCTION - COVID-19 STRATEGIC RECOVERY PLAN
Following the declaration by the World Health Organisation of the COVID-19 pandemic on 11 March 2020, Council acted quickly to recognise that immediate
support and stimulus measures needed to be put in place to address both the pandemic and the anticipated recessionary effects that would quickly follow.
Council was also mindful that its actions needed to have a robust tactical and strategic framework underpinning them to ensure that resources would be used
wisely and effectively.
On 26 March 2020, Council adopted several measures including:
 A Tactical Response Plan,

 Three support and stimulus packages comprising a total of 58 separate measures under:

  – Business Support and Stimulus Package,
  – Community Support and Wellbeing Package; and
  – Community Compliance Response Package,
 The framework for establishing the Community Chest to support Small to Medium Businesses; and

 The framework for establishing the Special Community Grants Program to support not-for-profit community organisations

All these measures have been implemented to great effect and the three initial response support and stimulus packages were closed out at the same Council
Meeting which adopted this Strategic Recovery Plan.
During this period, the Council has continued to work on creating the strategies that would focus on Isaac’s longer-term recovery from the health crisis and the
recessionary impacts experienced particularly by small to medium businesses across the Region. The Council and the Executive Leadership Team have held
two strategic workshops with the most recent on 18 September 2020 to identify and craft the Strategies contained in this Strategic Recovery Plan.
Further, in order to maintain momentum, at the Ordinary Meeting on 23 September 2020, Council approved a few interim measures which could be readily
implemented pending the approval of this Strategic Recovery Plan.
Some important aspects of this Strategic Recovery Plan are that it contains 50 separate strategies in line with a strategic recovery framework responding to:
 Business Resilience,

 Council Sustainability,

 Disaster Recovery,

 Community Resilience; and

ISAAC.QLD.GOV.AU                                                                                           Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   03
Doc Number: CORP-PLN-063                                                                                   Version 1 – ECM 4715650
 Advocacy

Importantly it builds on Council’s existing five-year Economic Development Framework, and Tourism Strategy and Business Support Strategy and provides
resourcing and capacity to bring forward a substantial body of that work into the next 18 -24 months.
Council has also taken great care to make sure it integrates with other recovery plans that have been adopted for the broader Greater Whitsunday Region to
make sure that gaps are covered and there is not duplication. Readers are encouraged to visit the Queensland State Recovery Plan for the Mackay Isaac
Whitsunday Region at https://www.covid19.qld.gov.au/government-actions/our-economic-recovery-strategy/regional-economic-recovery/mackay-whitsunday-
regional-economic-plan and the Greater Whitsunday Alliance (GW3) Transformation Region COVID Recovery Plan which can be sourced at
https://www.greaterwhitsundayalliance.com.au/reports.
As recovery is expected to be long-term, it is intended review this plan with a view to updating late in FY2021 to ensure its continued relevance.
Critically, Council’s plan is fully funded, with budget and funding sources detailed throughout. Presently the plan commits $556,000 of the Pandemic and
Recession Recovery Reserve for expenditure in FY2021 (noting that the salary commitments are for just over half a year). Eight strategies are nominated as
being eligible for separate business cases to consider application of further reserve funds during FY2021. The reserve has capacity to fund all these if they
materialise.
It’s worth noting how the target timings work in the plan – where a quarter or financial year is nominated, it means by the end of that nominated period.
Council is confident that these measures will bring real value and support to the Communities of Isaac in both the short and longer-terms.

ISAAC.QLD.GOV.AU                                                                                            Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   04
Doc Number: CORP-PLN-063                                                                                    Version 1 – ECM 4715650
STRATEGIC COVID - 19 RECOVERY PLAN FOR BUSINESS RESILIENCE
                                                                                                                                                                    Budget and
                       Strategy                          Project, Task or Role (What?)                                Expected Outcome (Why?)                                                 Accountability           Timeframe
                                                                                                                                                                  Funding Source
 Small to Medium Enterprise (SME) -
 Business Recovery Strategies
                                        This is a ‘Concierge’ role - makes connections; is the empathic go-
                                        to person within Council for business (particularly at-risk
                                        businesses under stress). It will:

                                         Be a connector to Commonwealth, State and Regional
                                          programs for funding opportunities, business model advice,
                                          R&D, trade assistance, investment partnering, etc

                                         Undertake targeted research to find vulnerable industries and/or
                                          businesses and designing interventions within the scope of
                                          Council functions.

                                         Facilitate preparation of Community Chest applications for            Sustaining Regional business                      $95,000 -
                                                                                                                                                                  $110,000 salary
                                          bespoke eligible diversification/innovation proposals arising from                                                      and on costs pa
                                                                                                                Facilitating renewed business models
                                          the above                                                             throughout Region                                 $2,500 equipment
            Employ an Economic and                                                                                                                                in Y1 – all from           Manager
                                                                                                                                                                                                                      Recruit Q2
 BR1        Business Resilience          Engagement with ED networks to ensure gaps are covered and            Money circulation retained in local               reserve.                   Economy and
                                                                                                                                                                                                                      FY2021
            Coordinator for two years                                                                           economy                                                                      Prosperity
                                          to avoid duplicated effort.
                                                                                                                                                                  Office and vehicle
                                                                                                                Bring forward of Economic Development             not included –
                                         Development and delivery of (sustainable) mentoring programs.                                                           supply from
                                                                                                                Framework and Business Support
                                          Development of a business start-up program                            Strategy delivery                                 existing

                                         Investigate the use of vacant/low occupancy or utilisation
                                          Council facilities for pop up or cyclic short term creative or
                                          maker spaces or incubator/accelerator spaces for delivering the
                                          above

                                         Develop business resilience, capability and digital skills training
                                          as well as the broader re-training agenda through facilitation of
                                          connections with GW3, DESBT, DITD, DSDMIP, Split spaces
                                          etc

ISAAC.QLD.GOV.AU                                                                                                                               Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945     05
Doc Number: CORP-PLN-063                                                                                                                       Version 1 – ECM 4715650
Budget and
                       Strategy                            Project, Task or Role (What?)                             Expected Outcome (Why?)                                                   Accountability           Timeframe
                                                                                                                                                                   Funding Source
                                           Facilitate formation of Isaac Region Business Alliance

                                           Assist Manager Economy and Prosperity with the bring forward
                                            of Economic Development Framework and Business Support
                                            Strategy implementation and the delivery of this Strategic
                                            Recovery Plan

                                          The role will report to the Manager Economy and Prosperity and
                                          have a collaboration/dotted reporting line to the Director PECS.

                                                                                                               Curtail leakage of Council procurement
                                                                                                               spend from the Region, where:                       Cost of program to
                                                                                                                                                                   be monitored by
                                                                                                                                                                   monthly estimation
                                                                                                                the goods and services are available in
                                                                                                                                                                                              Manager
            Re-assess Local Preference    Ongoing re-examination of the effectiveness of the revised 12-         acceptable quantities and qualities in            No separate
 BR2                                                                                                                                                                                          Contracts and            FY2021
            Policy and weightings         month trial current local preference policy settings                                                                     budget – costs
                                                                                                                 the Region; and                                                              Procurement
                                                                                                                                                                   accrue to accounts
                                                                                                                                                                   where goods and
                                                                                                                Council can transparently demonstrate             services are
                                                                                                                 value for money                                   funded from

                                          Investment Attraction Framework has been developed in house                                                              Framework
                                          and reviewed by ELT – it is pending briefing to Council                                                                  developed inhouse
                                                                                                               Grow the Regional economic base
                                                                                                                                                                   from existing
                                          Develop prospectus of investment-ready opportunities in the           to support existing industry, and                 operational budget
                                          Region.                                                                                                                                             Manager
 BR3        Investment Attraction Plan                                                                                                                                                        Economy and              Q2 FY2021
                                                                                                                attract business activities that are              Prospectus
                                          Target key businesses/services that are absent from the Region,                                                          development                Prosperity
                                          for attraction                                                         needed now, or will support the (IR4)             requires modest
                                                                                                                                                                   supplementation
                                                                                                                 future of work
                                          Pursue grant funding opportunities for public infrastructure which                                                       from the reserve of
                                          supports existing and targeted business                                                                                  $10,000

                                          Gift card local buying program for the long haul.                    Increase turnover through Regional                  $20,000 required
                                                                                                               businesses                                          from reserve to for
                                          Enhance knowledge around the card either (1) by presentation                                                             Additional video
                                          wallet with a website where users can get up to date information     Creates direct consumer behaviour of                and other
                                          on participating businesses, how to re-charge credit balance and                                                                                    Manager
                                                                                                               buying locally                                      promotion/                                          Q1 FY2021
 BR4        Leverage Shop Isaac Program   other FAQs, or (2) adding a QR code to the cards                                                                                                    Economy and
                                                                                                                                                                   modifications to                                    and ongoing
                                                                                                                                                                                              Prosperity
                                                                                                                                                                   cards or wallets/
                                                                                                               Drive high-multiplier spending                      continued program
                                          Leverage to industry use of the cards to increase money circulated
                                          though the program                                                                                                       support
                                                                                                               Leverage Industry and Council spending.

ISAAC.QLD.GOV.AU                                                                                                                                Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   06
Doc Number: CORP-PLN-063                                                                                                                        Version 1 – ECM 4715650
Budget and
                       Strategy                                Project, Task or Role (What?)                            Expected Outcome (Why?)                                                 Accountability           Timeframe
                                                                                                                                                                    Funding Source
                                              Initial launch through Isaac Regional Council staff.                                                                  $46,000 for 2-
                                                                                                                                                                    stage IRC Staff
                                              Use shop Isaac Cards as an add-on to community events to be                                                           Launch funded
                                              used to support the supplies for the event and/or for prizes to                                                       from reserve
                                              attract event attendance
                                                                                                                                                                    NB cards for add-
                                                                                                                                                                    on to events is
                                                                                                                                                                    funded under CR2
                                              Continue to seek funding into the Community Chest and deliver
                                              grants to SMEs while resources allow, and need continues to be      Continued acute support for SMEs
                                              present                                                             experiencing hardship as a direct result of
                                                                                                                  COVID-19
                                                                                                                                                                                                                        Q2 FY2021
 BR5        Community Chest                   Investigate opportunities for the Community Chest to provide more                                                     Externally funded          Senior Advisor
                                                                                                                                                                                                                        and ongoing
                                              leverage for progressive and innovative changes to SME's            Opportunities to support SMEs adapt
                                              business models and address the 4IR and future of work              business models to the post -COVID and
                                              challenges, and reskilling, particularly through work done by the   4IR environment.
                                              Economic and Business Resilience Coordinator.
                                              Examine the value and potential effectiveness of e-B2B, B2C,
                                                                                                                  High exposure of Regional Business and
                                              B2IN (Industry Network) platform.
                                                                                                                  its capability within and beyond the Region
                                                                                                                                                                    Subject to ELT
                                              Showcase Regional Businesses.                                                                                         approval of an
                                                                                                                  Maximise Regional turnover
                                                                                                                                                                    appropriate
                                              Develop a Regional Capability Prospectus                                                                              business case,
                                                                                                                  Optimise the opportunities for local              funds of up to
                                                                                                                  businesses to support each other for their        $25,000 be
                                              Presence at Developing Northern Australia Conference                own business needs by ensuring the best           provided from the          Manager
            Existing Regional Businesses
 BR6                                                                                                              awareness of what is available within the         reserve for a B2B          Economy and              Q3 FY2021
            Connectivity and Promotion
                                              Presence in regional Provenance publication                         region                                            Platform                   Prosperity

                                              Promote connectivity methods and digital platforms to support       Similarly, to ensure that the community is        Other items from
                                              connectivity amongst business and community across the Region       aware of the full range of business               existing
                                              including:                                                          offerings and services within the region.         operational
                                              My community directory                                                                                                budgets
                                              Shop Isaac Facebook page                                            Support for the Isaac Region Business
                                                                                                                  Alliance
                                              Bang the Table.
                                              Measures proposed by LDAC to address the imbalance between                                                                                       Manager
                                              housing supply and demand, including:                                                                                 Housing forum              Liveability and
                                                                                                                                                                    $10,000 from               Sustainability
                                               Housing forum                                                                                                       existing
            Encourage Residential                                                                                                                                   operational budget
                                                                                                                  Moderate housing affordability in region
            Development to reduce
 BR7
            housing affordability issues in
                                               Reduction of minimum lot size from 450 to 400 m2                  throughout economic cycles to present the                                                             Q2 FY2021
                                                                                                                  region as more attractive and liveable            Other items to be
            an economic upswing
                                               investigation into Council controlled land available to provide                                                     funded from other
                                                                                                                                                                    sources yet to be
                                                affordable housing solutions                                                                                        identified

ISAAC.QLD.GOV.AU                                                                                                                                 Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   07
Doc Number: CORP-PLN-063                                                                                                                         Version 1 – ECM 4715650
Budget and
                       Strategy                              Project, Task or Role (What?)                           Expected Outcome (Why?)                                                  Accountability           Timeframe
                                                                                                                                                                  Funding Source
                                            Promote infill development as an efficient use of existing trunk                                                                                 Director
                                            infrastructure                                                                                                                                   Planning
                                                                                                                                                                                             Environment
                                                                                                                                                                                             and Community
                                            Consider incentives that could be realised from Infrastructure                                                                                   Services
                                            charges without impacting on Council’s future sustainability

                                            Develop a paper for Council’s consideration in October or
                                            November 2020 covering an incentive Memorandum of
                                            Understanding targeting a specific template Resources
                                            Industry/Developer incentives package with a 3-5-year outlook

                                            Investigate scope for Industrial development opportunities where
                                            industries can provide supply chain enhancements or export         Promotes greater economic diversity in             Up to $15,000 for
                                            replacements regionally. (From an overall resourcing perspective   Region                                                                        Manager
            Encourage targeted Industrial                                                                                                                         consultancy
 BR8                                        in-house resources will need some consultancy supplementation                                                                                    Economy and              Q3 FY2021
            Development                                                                                                                                           support from
                                            to complete this)                                                                                                                                Prosperity
                                                                                                               Grow the SME sector                                reserve

                                                                                                                                                                                             Manager                  Q1 FY2021
                                            12-month program for development application fees for SMEs -                                                          Anticipated                Liveability and
                                            75% discount for change to existing; and 50% discount for start-                                                      development                Sustainability/
                                            ups; and 100% for extensions to currency                                                                              application fee
                                                                                                               Encourage and attract business to the              discounts $40,000          Manager
            Reduction of costs and                                                                             region and make it easier for existing small       for FY2021.
                                            Improve early communication of requirements to prospective                                                                                       Economy and
 BR9        impacts of administrative and                                                                      to medium enterprises in the region to
                                            business and keep clear communication channel open through                                                                                       Prosperity
            compliance functions                                                                               expand, diversify, adopt new business
                                            process.                                                                                                              Other elements
                                                                                                               models to be prosperous
                                                                                                                                                                  being                      Manager                  Regulatory
                                            Continue with Council's Regulatory Reset project across all 5                                                         accommodated               Community                Reset
                                            areas of compliance/regulation overseen by Council.                                                                   inhouse.                   Education and            ongoing to
                                                                                                                                                                                             Compliance               Q2 FY2022
                                                                                                                                                                                                                      Q3 FY2021
                                                                                                                                                                  Seeding funding
                                                                                                               Creating a network of likeminded business                                                              dependent
                                            Leverage the COVID-19 and Shop Isaac program to create an                                                             for a standalone           Manager
            Develop an Isaac Region                                                                            interests to provide a platform for engaging                                                           on the
 BR10                                       Isaac Region Business Alliance (Chamber of Business) with a view                                                      alliance group             Economy and
            Business Alliance                                                                                  business needs, creating mutual aid,                                                                   progression
                                            to optimising digital/virtual meetings to provide                                                                     $5,000 from                Prosperity
                                                                                                               showcasing regional business capability.                                                               of the
                                                                                                                                                                  reserve
                                                                                                                                                                                                                      pandemic
                                                                                                                                                                  Event budget of
                                            Develop an annual Agricultural Sector Open day/s potentially                                                          $30,000 from
                                            focussed on Clermont and Nebo (either in conjunction with or at                                                       reserve
                                            another time of the year from the Beef Expo) to celebrate the      Creating a greater visibility and positive
                                            grazing and agricultural industries across the Region.             future for the grazing and agricultural            Also, drought              Manager
 BR11       Ag Sector/Saleyards Days                                                                           industries and the communities that                funding may                Economy and              Q2 FY2022
                                                                                                               support them as potential fire starters for        supplement, as             Prosperity
                                            This should also leverage the Drought Support Day elements that    diversification in the Region
                                            were deferred earlier.                                                                                                may a future
                                                                                                                                                                  engagement
                                                                                                                                                                  budget for the
                                                                                                                                                                  Community

ISAAC.QLD.GOV.AU                                                                                                                               Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   08
Doc Number: CORP-PLN-063                                                                                                                       Version 1 – ECM 4715650
Budget and
                       Strategy                            Project, Task or Role (What?)                            Expected Outcome (Why?)                                                  Accountability           Timeframe
                                                                                                                                                                 Funding Source
                                        Consideration should also be given to leverage that can be made                                                          /Corporate Plan
                                        from the Agri-futures work that CHDC has been doing, for the                                                             project
                                        Region’s benefit

                                        Also, event design should craft these events as key engagement
                                        opportunities with the rural/Ag/Beef sectors for Council’s upcoming
                                        Community Plan and Corporate Plan engagement

 Tourism Recovery Strategies

                                        Following the commencement and consolidation of the Tourism
                                        Role in Isaac that MTL has had funded through the Local Buying
                                        Foundation, confirm the resource shortfall, including tourism
                                        promotion and communications, within the Economy and
                                        Prosperity Department to deliver the Tourism Recovery Strategies                                                         $85 – 100K pa
                                        and recruit a fixed term resource to complete that work.                                                                 salary and oncosts
                                                                                                                                                                 plus $2,500
                                        Assist the Manger Economy and Prosperity with the bring forward       Accelerate development of Isaac tourism            equipment in Y1
                                        of the Tourism Strategy delivery                                      sector maturity                                    all funded from            Manager
            Employ a targeted Tourism                                                                                                                            reserve
 TR1                                                                                                                                                                                        Economy and              Q3 FY2021
            Development Resource
                                                                                                              Provide diversification to Regional                                           Prosperity
                                        The role will assist the Manager Economy and Prosperity to bring
                                        forward Tourism Strategy implementation and the delivery of this      economy                                            Office and vehicle
                                        Strategic Recovery Plan                                                                                                  from existing
                                                                                                                                                                 operational
                                                                                                                                                                 budgets

                                        The role will report to the Manager Economy and Prosperity and
                                        have a collaboration/dotted reporting line to the Director PECS.

                                                                                                                                                                 Nominal event
                                                                                                                                                                 development
                                                                                                                                                                 budget $15,000                                      Q3 FY2021
                                        1.     Prepare scope and project plan for the establishment of an                                                        from reserve               Manager                  for an event
                                               annual World Mud Crab Day (potentially building on the
                                                                                                                                                                                            Economy and              in early
                                               Clairview Easter Fishing Competition) based on the Isaac
                                                                                                                                                                 Event delivery             Prosperity               FY2022 if
                                               Coast for Council consideration
                                                                                                              Creating new reasons for people to visit           budget will need to                                 adopted
                                                                                                              the Region and for people within the               be provided if
                                                                                                              region to explore its own attractions with a       scope proves up
            Create additional iconic                                                                          view to keeping money circulating locally
 TR2                                    2.     Develop an Isaac Tourism Events Strategy:
            authentic Isaac events

                                         to include gap analysis and concept development                     Build tourism capability as a means of
                                                                                                              diversifying the regional economy
                                                                                                                                                                                            Manager
                                         consider possible new signature events e.g.                                                                            $30,000 from
                                                                                                                                                                                            Economy and              Q4 FY2021
                                                                                                                                                                 reserve
                                                                                                                                                                                            Prosperity
                                             – family-oriented Easter weekend festival at TCD,

                                             – Burning Man Mt Britton,

ISAAC.QLD.GOV.AU                                                                                                                              Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   09
Doc Number: CORP-PLN-063                                                                                                                      Version 1 – ECM 4715650
Budget and
                       Strategy                             Project, Task or Role (What?)                                  Expected Outcome (Why?)                                                 Accountability           Timeframe
                                                                                                                                                                       Funding Source
                                             – Indigenous cultural festival etc

                                            Consider events which would work at Lake Elphinstone, Dysart,
                                             Middlemount and Carmila

                                            World Mud Crab day potentially in association with the Clairview
                                             Fishing Competition

                                            Incorporate development pathways for the events in the interim
                                             Signature and Other Tourism Event Program (TR3) to integrate
                                             with the overarching strategies and reach their full potential.

 TR3                                       As an interim Priority Tourism Events List, undertake a structured
                                           workshop with Council to adopt a 2021 tourism signature event list
                                           from amongst: Nebo rodeo, Clermont show, 4U2 Concert, Twin
                                           Hills weekend, St Lawrence Wetlands Weekend, Race day circuit,
                                           CLM coal and gold, bush sports circuit and suitable others

                                           (Noting that Easter is the start of the Queensland, look to develop
                                                                                                                                                                       Initially within
                                           and publish a 2021 Isaac Tourism Calender)
                                                                                                                                                                       existing E&P
                                                                                                                     Leveraging existing events is often easier        budgets and
                                           In addition, undertake a range of partnering/facilitation activities as   and more productive than a start-up, with         Community Grants
                                           follows to confirm a Region-wide program of all tourism events (in        less overall risk and effort.                     where eligible                                      Council
                                           addition to the interim signature list prior to adoption of the Tourism                                                     organisations are                                   Workshop
            Build on existing events –     Events Strategy):                                                                                                           running the                Manager                  Q2 FY2021
                                                                                                                     Otherwise the 'why' for doing this is the         event/s
            Create interim Signature and                                                                             same as for creating new events as above                                     Economy and
            Other Event Program             Partner with adopted events and MTL to better promote, attract                                                                                       Prosperity               Balance
                                             sponsorship, event management training and opportunities                                                                  The additional                                      throughout
                                                                                                                                                                       costs of running                                    FY2021
                                                                                                                     Post-COVID it is also about getting               GOVID-Safe
                                            Promotion of integration opportunities to upscale existing events       communities back into al healthy season           events are eligible
                                             - fashions of the field and racing circuit - supporting local                                                             for support under
                                                                                                                                                                       CR2
                                             business

                                            Partner with Engaged Communities for development of arts and
                                             crafts, and food events - Eat street, food markets, Festival of
                                             small halls, pop up cinema and music festivals

ISAAC.QLD.GOV.AU                                                                                                                                    Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945     10
Doc Number: CORP-PLN-063                                                                                                                            Version 1 – ECM 4715650
Budget and
                       Strategy                                     Project, Task or Role (What?)                           Expected Outcome (Why?)                                                  Accountability           Timeframe
                                                                                                                                                                         Funding Source
                                              Partnering with existing sports-based events to determine
                                                  feasibility and facilitate leverage to another level - e.g. Local
                                                  state of origin

                                              Connect with and engage in attraction of regional events
                                                  external to Isaac - e.g. Off-road racing, mountain biking, 4WD,
                                                  Ute muster etc
 TR4                                                                                                                                                                     May require a
                                             1.     Continue to work with MTL as it reviews its business model                                                           higher level of
                                                    and seek the inclusion of the word Isaac in its trading name,                                                        annual                     Manager
                                                    with a view to positioning Isaac well both for COVID recovery                                                        contribution –             Economy and              FY2021
                                                    and to extract the greatest value from any potential future                                                          subject to                 Prosperity
                                                    consolidation of Regional Tourism Organisations                                                                      separate business
                                                                                                                                                                         case at the time
                                                                                                                      To achieve the appropriate balance of
                                                                                                                                                                         Position funded
                                                                                                                      destination marketing to attract visitors to
                                                                                                                                                                         through Local
                                                                                                                      the region by MTL as the Regional
                                                                                                                                                                         Buying Foundation
            Tourism attraction (to region)                                                                            Tourism Organisation; as distinct from the
                                                                                                                      attraction and promotion of local tourism
                                                                                                                      offerings to people already within the             IRC providing In-
                                             2.     Collaborate with MTL to ensure the appropriate level of on-       region                                             kind resources             Manager
                                                    ground resources in Isaac to support MTL's destination                                                               with office                Economy and              Q2 FY2021
                                                    marketing of Isaac                                                                                                   accommodation              Prosperity
                                                                                                                                                                         and $15,000
                                                                                                                                                                         towards
                                                                                                                                                                         vehicle/travel
                                                                                                                                                                         allowance from
                                                                                                                                                                         existing budget
 TR5
                                             1.     Develop video and supporting collateral for the 9 hero Isaac
                                                                                                                                                                                                    Manager
                                                    experiences - Indigenous culture, events, coastal region,                                                            $25,000 from
                                                                                                                                                                                                    Economy and              Q3 FY2021
                                                    Peak Ranges, unique wildlife, prospecting, mining tourism,                                                           reserve
                                                                                                                                                                                                    Prosperity
                                                    fishing and agritourism
                                                                                                                      To create awareness of and motivation to
                                                                                                                      visit key attractions within the Region by                                    Director
                                                                                                                      residents and visitors alike                                                  Planning
            Tourism attraction (within       2.     Scope and seek funding for a mining visitor interpretive centre                                                      Pursuing external          Environment
                                                                                                                                                                                                    and Community            Q2 FY2021
            region)                                 featuring Virtual Reality or other simulation technology          To progressively package attractions, trails       funding
                                                                                                                                                                                                    Services
                                                                                                                      and networks with a view to creating visitor
                                                                                                                      'dwell' (i.e. one or more overnight stays) to
                                                                                                                      increase visitor spend and multipliers             $30,000 from
                                             3.     Undertake domestic marketing campaigns - My Isaac                                                                    reserve for                Manager
                                                    photographic competition of residents/visitors sharing their                                                         additional                 Economy and              Q3 FY2021
                                                    favourite photo in Isaac                                                                                             campaign FY2021            Prosperity

ISAAC.QLD.GOV.AU                                                                                                                                      Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   11
Doc Number: CORP-PLN-063                                                                                                                              Version 1 – ECM 4715650
Budget and
                       Strategy                   Project, Task or Role (What?)                         Expected Outcome (Why?)                                          Accountability           Timeframe
                                                                                                                                             Funding Source
                                       Participate and fund the remaining Mackay Tourism FY2021                                              A similar
                                       campaigns for Visiting Friends and Relatives and Winter Long                                          commitment will
                                       Haul Drive Market (including Great Inland Way)                                                        likely apply in
                                                                                                                                             FY2022
                                       Also, over time, a range of "see the __________..”
                                       Campaigns.
                                  4.   Conduct influencer imagery famil and develop collateral from
                                       same.

                                   Peak Ranges                                                                                              $15,000 from
                                                                                                                                                                        Manager
                                                                                                                                                                        Economy and              Q3 FY2021
                                                                                                                                             reserve
                                   Isaac coastal region                                                                                                                Prosperity

                                   Great Inland Way
                                                                                                                                             Existing
                                                                                                                                                                                                 Scoping in
                                                                                                                                             operational budget
                                                                                                                                                                        Manager                  FY2021
                                  5.   Run a tourism ambassador campaign in line with golden                                                 FY2021
                                                                                                                                                                        Economy and
                                       ticket/best job on earth
                                                                                                                                                                        Prosperity               Delivery in
                                                                                                                                             Potential reserve
                                                                                                                                                                                                 FY2022
                                                                                                                                             funding in FY2022
                                                                                                                                             From an overall
                                                                                                                                             workload
                                                                                                                                             perspective, it is
                                  6.   Develop a range of collateral to guide visitors through the                                           proposed that the
                                       region, taking advantage of the digital opportunities of                                              existing
                                                                                                                                                                        Manager
                                       passport 'stamping' through visitor information centres both                                          operational budget
                                                                                                                                                                        Economy and              Q3 FY2021
                                       within and outside the region. Also, this should take up the                                          of $10,000 be
                                                                                                                                                                        Prosperity
                                       opportunities provided by geocaching and integration and                                              supplemented with
                                       updating of Isaac's online content. Signage will be                                                   $10,000 from the
                                                                                                                                             reserve to reflect
                                                                                                                                             the additional work
                                                                                                                                             to be consulted
                                                                                                                                             Successive
                                  7.   Implement major tourism signage strategic review within                                               budgets have
                                       region –                                                                                              struggled to fund
                                                                                                                                             place, directional                                  Q4 FY2021
                                       1)   Billboards Nebo, Waverley Ck, Clair view, 2x Bruce                                               and interpretive
                                            Highway, MBH Airport and PDH,                                                                    signage to a level
                                                                                                                                             consistent with the                                 Following
                                                                                                                                                                        Manager                  the delivery
                                       2)   Plus, tourism locations that require regional directional                                        intention set out in       Economy and              of the
                                            sign and local region story (e.g. Lake Elphinstone)                                              this Recovery              Prosperity               signage
                                                                                                                                             Plan. The
                                       3)   installation of Isaac Instagram frames at key tourist                                            Strategic review                                    funded in
                                            locations (e.g. Blue Mt) with appropriate #Isaac hashtag                                         should consider a                                   the FY2021
                                                                                                                                             business plan for a                                 budget
                                       4)   Replacement of deteriorated interpretive signage                                                 modest level of
                                                                                                                                             support from the
                                                                                                                                             reserve to help get

ISAAC.QLD.GOV.AU                                                                                                          Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945      12
Doc Number: CORP-PLN-063                                                                                                  Version 1 – ECM 4715650
Budget and
                       Strategy                                Project, Task or Role (What?)                                Expected Outcome (Why?)                                                 Accountability           Timeframe
                                                                                                                                                                        Funding Source
                                                   5)   Ensuring all new or repurposed attractions have                                                                 ahead of the
                                                        appropriate directional and interpretive signage                                                                signage backlog,
                                                        incorporate when they are inaugurated, and                                                                      for Council’s
                                                                                                                                                                        consideration
                                                   6)   undertake an overall signage audit with other asset
                                                        custodians across Council to support a strategic
                                                        positioning of signage in addition to the above

                                                                                                                                                                        Tourism resource
                                                                                                                                                                        and training
                                                                                                                                                                        delivered inhouse                                   Q2 and Q3
                                                                                                                                                                        from existing                                       FY2021
                                              8.   Develop an Isaac tourism resource and training program for
                                                   IRC's Community Hubs and Engagement Programs and                                                                     operational budget         Manager
                                                   Events staff. Establish tourism information availability at each                                                                                Economy and
                                                   of the 7 Community Hubs and seek funding for touch screen                                                            Develop scopes             Prosperity
                                                   kiosks for visitor information.                                                                                      for external
                                                                                                                                                                        funding for visitor                                 Q4 FY2021
                                                                                                                                                                        information kiosks
                                                                                                                                                                        across the region
                                              9.   Identify opportunities for development and promotion of all                                                                                     Manager
                                                                                                                                                                        $15,000 form
                                                   other camping sites (including private camping areas) across                                                                                    Economy and              Q3 FY2021
                                                                                                                                                                        reserve
                                                   the Region through Regional Camping Analysis and Strategy                                                                                       Prosperity
 TR6        Partner with First Peoples of     Develop a Region-wide planned network of indigenous tourism                                                                                          Manager
                                                                                                                      To reflect the richness and diversity of          Existing
            Isaac to identify and develop     experiences reflecting the significance of country and indigenous                                                         operational budget         Strategic and
                                                                                                                      First Nations cultural heritage across Isaac                                                          Q4 FY2021
            respectful Indigenous tourism     cultural heritage, as an adjunct to routine consultative processes                                                                                   Business
                                                                                                                      Region
            experiences                       and the development of Council's Reconciliation Action Plan                                                                                          Development

 TR7                                          Continued development of the Peak Ranges experience – initially                                                                                      Manager
                                                                                                                                                                        Existing
            Develop Isaac tourism             to develop concepts for infrastructure provision to enable improved                                                                                  Economy and              FY2021
                                                                                                                                                                        operational budget
            experiences (short term –         consumer experience and increased visitation                            To create market ready tourism attractions                                   Prosperity
            including future infrastructure   Development of the Isaac coastal experience (agritourism, fishing       and product                                                                  Manager
            needs)                                                                                                                                                      Existing
                                              dugongs) – develop concepts for shovel-ready infrastructure                                                                                          Economy and              Q1 FY2022
                                                                                                                                                                        operational budget
                                              projects for public and private investment opportunities                                                                                             Prosperity
 TR8        Develop Isaac tourism             Create longer term development plans for new or underdeveloped                                                                                       Manager
                                                                                                                      To create a continuous pipeline of                Existing
            experiences (medium to            experience opportunities and package together as a development                                                                                       Economy and              Q4 FY2022
                                                                                                                      attraction and product development                operational budget
            longer term)                      program                                                                                                                                              Prosperity
 TR9                                                                                                                                                                    Dependent on final
                                                                                                                                                                        designs any
                                                                                                                      To enable tourists to move and stay easily        shortfall from the
                                                                                                                      in and around the Region                          $80,000 provided           Capital and
            Develop enabling                                                                                                                                            in FY2021 Budget
                                              Deliver Middlemount and Moranbah dump points                                                                                                         Project Program          Q4 FY2021
            infrastructure                                                                                                                                              (CW212875),
                                                                                                                      To provide direction to future tourism                                       Manager
                                                                                                                                                                        should be funded
                                                                                                                      infrastructure development at key sites           from the reserve
                                                                                                                                                                        upon Council
                                                                                                                                                                        endorsement of a

ISAAC.QLD.GOV.AU                                                                                                                                     Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945    13
Doc Number: CORP-PLN-063                                                                                                                             Version 1 – ECM 4715650
Budget and
                       Strategy                              Project, Task or Role (What?)                               Expected Outcome (Why?)                                                   Accountability           Timeframe
                                                                                                                                                                       Funding Source
                                                                                                                                                                       suitable business
                                                                                                                                                                       case
                                                                                                                                                                       From an overall
                                                                                                                                                                       workload
                                                                                                                                                                       perspective, it is
                                                                                                                                                                       proposed that the
                                                                                                                                                                       existing
                                                                                                                                                                                                  Manager
                                                                                                                                                                       operational budget
                                           1.     Undertake Nebo Showgrounds master plan                                                                                                          Economy and              Q4 FY2021
                                                                                                                                                                       of $10,000 be
                                                                                                                                                                                                  Prosperity
                                                                                                                                                                       supplemented with
                                                                                                                                                                       $15,000 from the
                                                                                                                                                                       reserve to reflect
                                                                                                                                                                       the additional work
                                                                                                                                                                       to be consulted
                                                                                                                                                                       From an overall
                                                                                                                                                                       workload
                                                                                                                                                                       perspective, it is
                                                                                                                                                                       proposed that the
                                                                                                                                                                       existing
                                                                                                                                                                                                  Manager
                                                                                                                                                                       operational budget
                                           2.     Undertake TCD master plan                                                                                                                       Economy and              Q4 FY2021
                                                                                                                                                                       of $10,000 be
                                                                                                                                                                                                  Prosperity
                                                                                                                                                                       supplemented with
                                                                                                                                                                       $15,000 from the
                                                                                                                                                                       reserve to reflect
                                                                                                                                                                       the additional work
                                                                                                                                                                       to be consulted
                                           3.     Under banner of Isaac Trails, document strategy support and                                                          $150,000 -
                                                  a plan of development to bring delivery forward.                                                                     $200,000 per
                                                                                                                                                                       location potentially
                                                  Scope and document small scale visitor convenience and                                                               funded from the            Manager
                                                  camping/RV areas at key sites like Mt Britton, Blue Mt, Lord’s                                                       Resource                   Economy and              Q3 FY2021
                                                  Table, Russell Park Rd (Wolfang/Gemini) and potentially                                                              Communities                Prosperity
                                                  others as identified in the Isaac Trails documentation and                                                           Infrastructure
                                                  consistent with the Regional Open Space Strategy for                                                                 Fund
                                                  submission to the PAG process.

                                           Identify opportunities for tourism accommodation to be established
                                           in key areas (as distinct from Non-Resident Worker
                                           Accommodation). This could include:
                                                                                                                   To encourage drive visitors to stay in the
            Develop tourism
                                            Small scale Camping/RV parks close to towns like Moranbah,            region for longer (as a destination in itself)
                                                                                                                                                                       Existing                   Manager
 TR10                                                                                                                                                                  operational budget         Economy and              Q1 FY2022
            accommodation in key centres        Clermont, Nebo, Dysart, Middlemount and Glenden                    rather than just passing through on the
                                                                                                                                                                       for scoping                Prosperity
                                                                                                                   way to another destination
                                            homestay/farm stay opportunities near some towns - Initial
                                                scoping work to be done

ISAAC.QLD.GOV.AU                                                                                                                                    Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   14
Doc Number: CORP-PLN-063                                                                                                                            Version 1 – ECM 4715650
Budget and
                       Strategy                               Project, Task or Role (What?)                               Expected Outcome (Why?)                                                 Accountability           Timeframe
                                                                                                                                                                      Funding Source
                                                                                                                    To create Isaac narrative to support the          To be done in
                                                                                                                    development of tourism attractions and            conjunction with
                                                                                                                    product as articulated in the Tourism             CR4 with RADF              Manager
                                             Establish a capture and tell our stories portal to develop
                                                                                                                    Strategy                                          support and a              Economy and
            Collect and promote Isaac        online/video/written logs of each town/community (e.g. shearers
 TR11                                                                                                                                                                 further business           Prosperity               Q2 FY2022
            narratives                       strike, Coal Utah development, Chinese gold mining, town
                                                                                                                                                                      case to be
                                             heritage)                                                              To become more fluent about 'who Isaac                                       MEC
                                                                                                                                                                      considered for
                                                                                                                    is' as the communication foundation of            reserve funding if
                                                                                                                    building the Hero experiences                     necessary
                                             Conduct audit and assessment of visitor information provision                                                                                       Manager
            Overhaul visitor information                                                                            Improved service delivery and consumer            Operational
 TR12                                        throughout Isaac Region and actively implement the Visitor                                                                                          Economy and              FY2022
            portals                                                                                                 experience with intention to grow visitation      budget
                                             Information Network Model as proposed in the Tourism Strategy                                                                                       Prosperity
                                             Proactive pre-lodgement meetings with tourism development                                                                                           Manager
            Support and facilitate private                                                                          Increased tourism offerings and services          Existing                                            Throughout
 TR13                                        proponents, particularly in line with the opportunities presented in                                                                                Economy and
            tourism development efforts                                                                             delivered throughout the Region                   operational budget                                  FY2021
                                             the new Regional Planning Scheme                                                                                                                    Prosperity

ISAAC.QLD.GOV.AU                                                                                                                                   Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   15
Doc Number: CORP-PLN-063                                                                                                                           Version 1 – ECM 4715650
STRATEGIC COVID - 19 RECOVERY PLAN FOR COUNCIL SUSTAINABILITY
                                                                                                                                                                            Budget and
                      Strategy                                  Project, Task or Role (what?)                                Expected Outcome (why?)                                                  Accountability           Timeframe
                                                                                                                                                                          Funding Source
          Continue leadership focussed
          on innovative approaches to          Ongoing application of the leadership of the Emergency
          pandemic and recessionary            Management Committee (particularly through the business                                                                                               Executive
                                                                                                                                                                          Existing
          recovery and Council operations      continuity plans)                                                       Ongoing confidence by the community that                                      Leadership               Now and
 CS1                                                                                                                                                                      operational
          in line with the Isaac Vison and                                                                             Council delivers what it says it will.                                        Team and all             ongoing
                                                                                                                                                                          budgets
          in a sustainable manner                                                                                                                                                                    Isaac leaders
                                               Ongoing disaster management leadership through the LDMG

                                                                                                                                                                                                     Director
                                                                                                                                                                                                     Planning
          Continue cultural leadership                                                                                                                                                               Environment
          development to progressively         Roll out cultural leadership development program across all                                                                                           and Community
          create capability to achieve CS1                                                                             Continuous improvement of organisational                                      Services /
                                               Directorates                                                                                                               Existing
          above and resilience to adapt to                                                                             culture to create greater capacity to meet                                                             Q3 and 4
 CS2                                                                                                                                                                      operational                Manager People
          future community and                                                                                         future challenges – pandemic recovery                                                                  FY2021
                                                                                                                                                                          budgets                    and
          workplace change                                                                                             and otherwise
                                                                                                                                                                                                     Performance/
                                                                                                                                                                                                     Executive
                                                                                                                                                                                                     Leadership
                                                                                                                                                                                                     Team
                                               Consider the role particular infrastructure project proposals play in
                                               either assisting with recovery or the degree to which their absence
          Ensure the right infrastructure is   will be an impediment to recovery, through the PAG planning
          in place to support economic         process for FY2022                                                      Ensuring alignment and enablement of                                          Manager                  Q2 and 3
                                                                                                                                                                          Existing and future
 CS3      and community recovery                                                                                       recovery efforts through Council’s role as                                    Strategic Asset
                                                                                                                                                                          Capital Budgets                                     FY2021
                                                                                                                       an infrastructure provider                                                    Management
                                               Ensure the question about infrastructure enablement of recovery is
                                               specifically canvassed in the periodic reviews of the Recovery Plan

          Optimise Council assets and
          other decision making by
          applying the impact mitigation                                                                               Optimum use of scarce resources
          hierarchy which applies an           Progressive implementation of the impact mitigation hierarchy in                                                           Existing                   Executive
                                                                                                                                                                                                                              Now and
 CS4      avoid, reduce, reuse,                addressing infrastructure, service and operational needs as a                                                              operational                Leadership
                                                                                                                       Minimisation of overall, adverse and                                                                   ongoing
          repurpose, recycle, offset (or       foundational way of thinking towards corporate sustainability                                                              budgets                    Team
                                                                                                                       unintended impacts of decisions
          dispose) philosophy

                                               Develop a plan to address a contingent liability relating to a
                                               development matter in Clermont and seek Council’s endorsement
          Address contingent liabilities       of that plan.                                                           Resolution to a current contingent liability
                                                                                                                                                                          Not yet scoped or          Chief Executive          Initially
 CS5      and Legacies                                                                                                 to strengthen Council’s long-term financial
                                                                                                                                                                          source identified          Officer                  FY2021
                                               Monitor and plan resolution to any other contingent liabilities and     sustainability
                                               unsustainable legacy issues as they arise

          Finalise Strategic Asset             Imminent finalisation of the Strategic Asset Management Plan                                                               Existing                   Director
                                                                                                                       Improved reliability of Council’s Long-Term
 CS6      Management Plan to refine the        incorporating best asset condition and valuation information across                                                        operational                Corporate,               FY2021
                                                                                                                       Financial Forecast
          completeness and robustness          all asset categories                                                                                                       budgets                    Governance and

ISAAC.QLD.GOV.AU                                                                                                                                       Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945    16
Doc Number: CORP-PLN-063                                                                                                                               Version 1 – ECM 4715650
Budget and
                      Strategy                                Project, Task or Role (what?)                           Expected Outcome (why?)                                                  Accountability           Timeframe
                                                                                                                                                                   Funding Source
          of Council's Long-Term                                                                                                                                                              Financial
          Financial Forecast                                                                                                                                                                  Services

STRATEGIC COVID - 19 RECOVERY PLAN FOR DISASTER RECOVERY
                                                                                                                                                                     Budget and
                      Strategy                                Project, Task or Role (what?)                           Expected Outcome (why?)                                                  Accountability           Timeframe
                                                                                                                                                                   Funding Source
                                             Formal quarterly implementation reporting to Council to coincide
                                             with Annual Operational Plan reporting
          Provide governance oversight of                                                                                                                                                     Director
          the delivery of the Isaac                                                                                                                                                           Planning
          Recovery Plan including
                                             Agency reporting to LDMG in its meeting cycle supplemented by      Community confidence that Council’s
                                             IRC quarterly reports                                                                                                 Existing                   Environment
          transparency in regular                                                                               recovery planning and leadership is                                                                    Now and for
 DR1                                                                                                                                                               operational                and Community
          progress reporting to both                                                                            robust, and that Council does what it says                                                             life of plan
                                                                                                                                                                   budgets                    Services /
          LDMG and IRC.                      Reporting to Council’s Emergency Management Committee (EMC)        it will do
                                                                                                                                                                                              Recovery
                                             in relation to recovery aspects that either impact on or require                                                                                 Coordinator
                                             commitments by, support from or coordination with the EMC

                                                                                                                                                                                              Director
          Continue the regime of regular     Convening regular one to two monthly Recovery Sub-Group                                                                                          Planning
          meetings of the Isaac Recovery     meetings with Department of Communities, Treasury (State                                                                                         Environment
          Sub-Group (of the LDMG) on a       Development), Queensland Reconstruction Authority, IRC Disaster                                                       Existing
          frequency commensurate with                                                                           Ensuring fidelity to Council’s Disaster                                       and Community            Now and for
 DR2                                         coordination and recovery personnel                                                                                   operational                Services /
          recovery needs and measures                                                                           Management Plan                                                                                        life of plan
                                                                                                                                                                   budgets                    Recovery
          at the material time.
                                             Reporting the minutes of these meetings to LDMG                                                                                                  Coordinator

                                                                                                                                                                                              Manager
                                                                                                                Continued engagement about recovery
          Continue participation in the                                                                                                                                                       Engaged
                                                                                                                intelligence and practice by the State and
          State led (Greater Whitsunday)                                                                                                                           Existing                   Communities /
                                             Virtual or in-person attendance at and contributions to these      other Greater Whitsunday Councillors to                                                                Now and for
 DR3      Regional Human and Social                                                                                                                                operational                Deputy
                                             periodic meetings convened by State Department of Communities      support Isaac’s recovery planning and                                                                  life of plan
          Recovery Group meetings.                                                                                                                                 budgets                    Recovery
                                                                                                                implementation
                                                                                                                                                                                              Coordinator

                                                                                                                                                                                              Director
                                                                                                                Confidence to the Isaac community that                                        Corporate
          Engage further with the District   Engagement at scheduled DDMG meetings, planning workshop           the several aspects of the COVID                                              Governance and
          Disaster Management Group          and briefings, together with regular engagement directly with      pandemic and its recovery which                    Existing                   Financial                Now and for
 DR4      and District level agencies        District Disaster Coordinator and staff between formal scheduled   transcend regional boundaries are                  operational                Services /               life of plan
                                             meetings to support LDMG and local recovery needs as               managed in an integrated and holistic way          budgets                    Disaster
                                             appropriate                                                                                                                                      Coordinator

          Maintain a centralised contact     Establish Council’s Disaster Management Team as the single point   Reliable management of information                 Existing                   Director
                                                                                                                requests                                                                      Corporate                Now and for
 DR5      point for Disaster Management      of receiving and tracking information requests from emergency                                                         operational
                                                                                                                                                                                              Governance and           life of plan
          agency information requests        management and disaster management agencies                                                                           budgets
                                                                                                                                                                                              Financial

ISAAC.QLD.GOV.AU                                                                                                                                Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   17
Doc Number: CORP-PLN-063                                                                                                                        Version 1 – ECM 4715650
Budget and
                      Strategy                                 Project, Task or Role (what?)                               Expected Outcome (why?)                                                Accountability           Timeframe
                                                                                                                                                                      Funding Source
                                                                                                                     Confirmation that the correct source is                                     Services /
                                                                                                                     providing responses in a timely manner                                      Disaster
                                                                                                                                                                                                 Coordinator

STRATEGIC COVID - 19 RECOVERY PLAN FOR COMMUNITY RESILIENCE
                                                                                                                                                                        Budget and
                      Strategy                                 Project, Task or Role (what?)                               Expected Outcome (why?)                                                Accountability           Timeframe
                                                                                                                                                                      Funding Source
                                              Role focussed on reactivating community through events and
                                              celebrations in a new normal COVID Safe manner, and through                                                             $85 – 100K pa
                                              community development practice, both in the community and                                                               salary and oncosts
                                              across the Council organisation.                                                                                        plus $2,500
                                                                                                                                                                      equipment in Y1
                                                                                                                                                                      all funded from            Manager
          Employ a Community                  The position will identify and scope community resilience-building                                                      reserve                                             Recruit Q2
 CR1                                          activities and projects and maintain a high level of transparency on                                                                               Engaged
          Resilience Officer for two years                                                                                                                                                                                FY2021
                                              these functions.                                                                                                                                   Communities
                                                                                                                                                                      Office and vehicle
                                                                                                                                                                      from existing
                                              The role will report to the Manager Engaged Communities and                                                             operational
                                              have a collaboration dotted reporting line to the Director PECS.                                                        budgets

                                              An initial amount of $50,000 (from the reserve) to be ringfenced in
                                              the Special Community Grants specifically for applications             Growth in community and social capacity
                                                                                                                     and resilience through community                                                                     Commence
                                              sponsored by the Community Resilience Officer to the Special                                                                                                                upon
          Provide a dedicated funding         Community Grants Program on behalf of community organisations          resuming everyday community life
                                                                                                                     activities and events, and through targeted                                                          exhaustion
          allocation to support materials     for this purpose.
                                                                                                                     community development activities and                                                                 of existing
          and services for reactivation of                                                                                                                                                       Manager
                                                                                                                     projects                                         $50,000 from                                        Special
 CR2      community events (including                                                                                                                                                            Engaged
                                              Identified Tourism Events (under TR2 and TR3) are also eligible                                                         reserve                                             Emergency
          cleaning products and sanitisers                                                                                                                                                       Communities
                                              for support under this item.                                                                                                                                                Grants
          etc)                                                                                                       Events have the flow-on impact of further                                                            Program
                                                                                                                     stimulating business and growing                                                                     funds
                                              If these resources are exhausted, a further report will be provided    community self-belief
                                              to Council to consider supplementing this budget from the reserve

                                              In the pursuit of CR1 above, focus on quality events under these
                                              circumstances to make them memorable
          Don’t lose the year 2020 –
          reactivate COVID Safe               Apply a team effort comprising the Community Resilience Officer                                                         As per CR1 and
          Community functions, events         and the Community Relations Team to develop stronger                                                                    CR2 above to               Manager
          and celebrations and get people     community development and resilience capabilities in Council’s                                                                                                              Now and
 CR3                                                                                                                                                                  supplement                 Engaged
          moving with clubs and               Community Engagement, Programs and Events (CEPE) Team                                                                                                                       ongoing
                                                                                                                                                                      existing                   Communities
          organisations getting on with it.                                                                                                                           operational budget
                                              Within Council, apply focus on how Christmas Celebrations can be
                                              safely conducted in the various centres across the Region

ISAAC.QLD.GOV.AU                                                                                                                                   Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945     18
Doc Number: CORP-PLN-063                                                                                                                           Version 1 – ECM 4715650
Budget and
                      Strategy                              Project, Task or Role (what?)                             Expected Outcome (why?)                                                 Accountability           Timeframe
                                                                                                                                                                  Funding Source
                                           Celebrate narratives on how we overcame the adversity of the
                                           pandemic

                                            Collect the positive stories we tell ourselves                                                                       Pursue
                                                                                                                                                                  opportunities
                                            Celebrate community pride                                                                                            through the RADF
                                                                                                                                                                  program, and
                                            Engage the Arts community to help celebrate a strong sense of                                                        existing
          Enable a strong community                                                                                                                               operational
                                             community.                                                                                                                                      Manager
          belief in itself                                                                                                                                        budgets in the first                                Throughout
 CR4                                                                                                                                                                                         Engaged
                                                                                                                                                                  instance with the                                   FY2021
                                                                                                                                                                                             Communities
                                                                                                                                                                  opportunity to
                                           Develop a brief and separate business case for a public art                                                            present a business
                                           commission to create a lasting symbol of community spirit and grit
                                                                                                                                                                  case to Council for
                                           in the face of adversity                                                                                               future allocation of
                                                                                                                                                                  funds from the
                                           Where appropriate, use paid advertising to support this strategy
                                                                                                                                                                  reserve
                                           Ensure Council's maintenance programs are continued to keep a
                                           positive mindset in the community.

                                                                                                                                                                  Pursue
                                                                                                                                                                  opportunities
                                                                                                                                                                  within existing
                                                                                                                                                                  grants programs in
                                                                                                                To grow the base, coverage and                    the first instance
          Leverage relationship with                                                                                                                                                         Manager
                                           Explore assisting in expanding the reach of 4RFM throughout the      community ‘ownership’ of this valuable            with the                                            Throughout
 CR5      4RFM                                                                                                                                                                               Engaged
                                           Region                                                               social infrastructure, as Isaac’s own             opportunity to                                      FY2021
                                                                                                                                                                  present a business         Communities
                                                                                                                                                                  case for future
                                                                                                                                                                  budget or reserve
                                                                                                                                                                  funding

                                                                                                                Maintenance of meaningful engagement
          Ongoing targeted engagement
                                           Appropriately scaled and targeted engagement of community            with community to understand and                  Existing                   Manager
          of community organisations to                                                                                                                                                                               Now and
 CR6                                       organisations with meaningful reporting of intelligence              continue to plan for and respond to               operational                Engaged
          keep abreast of recovery needs                                                                                                                                                                              ongoing
                                           organisationally and to the Disaster Recovery Sub-Group              recovery needs                                    budgets                    Communities

                                                                                                                                                                  Consideration for
                                                                                                                                                                  Council to fund
                                           Through CR6 and Council’s business as usual community                                                                  identified
                                           engagements, remain vigilant to community resilience projects                                                          community
          Identify, scope and implement    arising from evidence-based needs or opportunities.                  Retaining an agile capacity to effectively                                   Manager
                                                                                                                                                                  resilience projects                                 Now and
 CR7      community resilience projects                                                                         respond to latent or emergent community                                      Engaged
                                                                                                                                                                  from the reserve                                    ongoing
                                                                                                                resilience needs                                  on the basis of a          Communities
                                           Scope and develop business cases for identified projects.
                                                                                                                                                                  compelling
                                                                                                                                                                  business case

ISAAC.QLD.GOV.AU                                                                                                                               Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   19
Doc Number: CORP-PLN-063                                                                                                                       Version 1 – ECM 4715650
Budget and
                      Strategy                                  Project, Task or Role (what?)                              Expected Outcome (why?)                                                 Accountability           Timeframe
                                                                                                                                                                       Funding Source
                                               Factor COVID Safe principles into all community projects
                                               including:

          Leverage other Community              Youth Unmet Needs Study
          focussed projects and strategies                                                                           Modelling and accepting a COVID-Safe
                                                                                                                                                                       Existing
                                                                                                                     way of life as basic community norms is                                      All Council              Now and
 CR8      to reinforce COVID Safe               Reconciliation Action Plan                                          important to the community’s long-term
                                                                                                                                                                       operational
                                                                                                                                                                                                  leaders                  ongoing
          community interactions                                                                                                                                       budgets
                                                                                                                     well-being
                                                Customer Service Strategy and Charter

                                                Community Plan and Corporate Plan engagement and the like
                                               Facilitate the reinstatement of the Glenden Bowls and Golf Clubs
          Where it is within Council’s         and Arts and Crafts Centre
          direct capacity, work to reinstate                                                                         Optimising utilisation of programs, projects                                 Manager
                                                                                                                                                                       Existing
 CR9      facilities and/or premises that                                                                            and facilities to support community                                          Community                Q2 FY2021
                                               Continued work through the Community Tenures and Facilities                                                             operational budget
          assist maintaining community                                                                               development and resilience                                                   Facilities
          resilience                           Advisory Committee

STRATEGIC COVID - 19 RECOVERY PLAN FOR STRATEGIC ADVOCACY
                                                                                                                                                                                                   Accountability
                                                                                                                                                                                                      (noting these
                                                                                                                                                                                                     strategies are
                                                                                                                                                                         Budget and                  developed and
                      Strategy                                  Project, Task or Role (what?)                              Expected Outcome (why?)                                                                          Timeframe
                                                                                                                                                                       Funding Source               implemented in
                                                                                                                                                                                                  close engagement
                                                                                                                                                                                                  with the Mayor and
                                                                                                                                                                                                       Councillors)
                                                                                                                     Credible and achievable diversification for
                                               Continued advocacy for and conceptual input into the scoping of a     Isaac to reduce reliance on the                                              Director
                                               diversification plan for Isaac Region in the context of the Greater   development and operation of                      To be funded               Planning
 SA1      Diversification plan for region      Whitsunday Region                                                     metallurgical coal mining in the Region           externally to              Environment              Ongoing
                                                                                                                     over time                                         Council                    and Community
                                                                                                                                                                                                  Services

                                                                                                                                                                                                  Chief Executive
                                               Continued advocacy to and support for business planning for                                                                                        Officer / Director
          Moranbah Hospital Upgrades
                                               upgrades to the Moranbah Hospital and its clinical delivery,                                                            To be funded               Planning                 Current and
          and other health service                                                                                   Improved Moranbah Hospital facilities and
 SA2                                           through the investment approval process used by Queensland                                                              externally to              Environment              throughout
          improvements                                                                                               services including resident medical staff
                                               Health                                                                                                                  Council                    and Community            FY2021
                                                                                                                                                                                                  Services

                                                                                                                                                                                                  Director                 Current and
 SA3      Future of Glenden                    Develop credible plans for a sustainable future for Glenden in the    To avoid the otherwise likely outcome of          Existing or
                                                                                                                                                                                                  Planning                 determined
                                               face of current mining developments and expected closure to           Glenden’s population falling below                amended
                                                                                                                                                                                                  Environment              by the

ISAAC.QLD.GOV.AU                                                                                                                                    Covid-19 Strategic Recovery Plan – Adopted 28/10/2020 - Resolution Number: 6945   20
Doc Number: CORP-PLN-063                                                                                                                            Version 1 – ECM 4715650
Accountability
                                                                                                                                                                                                     (noting these
                                                                                                                                                                                                    strategies are
                                                                                                                                                                        Budget and                  developed and
                      Strategy                               Project, Task or Role (what?)                               Expected Outcome (why?)                                                                           Timeframe
                                                                                                                                                                      Funding Source               implemented in
                                                                                                                                                                                                 close engagement
                                                                                                                                                                                                 with the Mayor and
                                                                                                                                                                                                      Councillors)
                                           provide a platform for facilitating better futures than are currently   sustainable thresholds contingent on the           operational                and Community            QCoal
                                           presenting without intervention                                         closure of Newlands Coal Mine                      budgets                    Services                 NRWA
                                                                                                                                                                                                                          Planning
                                                                                                                                                                                                                          Appeal

                                           Continued engagement with Queensland Resources Council in
                                           relation to the continued operation of Mining in a COVID Safe           Industry engagement and support for
          Continue QRC Engagement                                                                                                                                     Existing                   Chief Executive
 SA4                                       manner and for support for a range of resources communities             COVID Safe mining operations to protect                                                                Ongoing
                                           recovery measures                                                                                                          operational budget         Officer
                                                                                                                   Isaac Communities and optimise recovery

                                                                                                                                                                                                 Director
                                                                                                                   A campus focussed on social and
          Centre of Excellence for Mines                                                                                                                                                         Planning
                                           Developing a deliverable scope and business model and continued         environmental excellence, bringing                                                                     FY2022 for
          Safety and Rescue and Mines                                                                                                                                 Seeking external           Environment
 SA5                                       advocacy to industry, education and government to partner in its        together industry, tertiary education,                                                                 shovel-ready
          Visitor Interpretive Centre                                                                                                                                 funding                    and Community
                                           realisation                                                             community and visitors                                                                                 project
                                                                                                                                                                                                 Services

                                                                                                                                                                                                                          FY2021 for
          Support mining rehabilitation    Developing the concept for re-envisioning the opportunities                                                                                                                    initial
          opportunities as a mechanism                                                                             Sustainable futures for resources                                             Director                 prospectus
                                           presented by open-cut mining rehabilitation                             communities beyond operational mine                                           Planning
          to achieve sustainable futures                                                                                                                              Seeking external                                    of triple
 SA6      for the region and resources                                                                             lives created by ongoing centres of                                           Environment              bottom line
                                                                                                                                                                      funding
          towns in particular              Advocacy to industry, education and government to support and           enterprise based around mine                                                  and Community            feasible
                                           partner in the realisation of this concept                              rehabilitation opportunities                                                  Services                 options