Program
  #1 Clean Power for Transport : roll-out charging stations
  • A Flemish initiative to stimulate electrical mobility
  • The tender
  • The project approach
  • Success story?

  #2 Impact of electrical mobility on the grid

  #3 Smart use of the available grid capacity
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
Clean power for Transport
A Flemish initiative to stimulate
electrical mobility
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
Need for clean mobility!
Initiatives in Flemish Region                                    Clean Power for Transport

20 hydrogen filling stations          CNG: 300 fuel stations   Electricity: 7 400 charging points

                                                               Support by DSO
                                                               via CPT-team
                               Fiscal stimuli
                                                                                      March 2019    4
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
Clean Power for Transport

• Decree “Public Charging Infrastructure” (spring/2016)
  CPT Roll-out 2016-2020

• Public Service Obligation for the DSO

                         Design of implantation plan

                           Facilitation roll-out charging infrastructure

                         Contact point ‘Charging station on demand’

                                                                           March 2019   5
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
Design of implantation plan

Objective:
• 2 500 charging stations in Flanders towards 2020

• Optimal implantation in the Flemish region (300 municipalities)
  (At least one public charging station in each village/city)

Taking into account …
• Objective study

• Cooperation with experienced Research Company EIFER ( f.i. Amsterdam, Nice, Stuttgart, …)

• Flemish DATA

• Taking into account non-public initiatives

                                                                                              March 2019   6
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
Charging behaviour (in Flanders)

  At home                 At work   On the way

70%                       20%          10%

                                             March 2019   7
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
Implantation plan: Objective 2020
At least 1 charging station in each city / village

                  More than 100   41 to 100   21 to 40   11 to 20   6 to 10   1 to 5

                                                                                       March 2019   8
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
‘Charging station on demand’
Not able to charge your EV at home? Apply
for a charging station near your home!
=> Apply via www.fluvius.be

Conditions                                        Results :
                                                                                    141 requests
• You don’t dispose of a garage nor driveway
  at home                                         Period: 30 months
                                                  (2016-2017-2018)
                                                                                   21 realisations
• You own a full-electric car (no hybrid car)

• No public charging infrastructure in the
  neighborhood (< 500m)                         Today most of the EV’s are not depending on
                                                public charging infrastructure.
                                                They charge at home or at work, mostly on
                                                private property.
                                                                                          March 2019   9
E-Mobility Kurt Vanderhispallie Customer Service Fluvius 18/3/2019
Clean power for Transport
Finding the right partners for the
roll out
Tender – Conditions Flemish Decree

• Stimulate the free market of charging providers
• Charging provider = investor, and pays for:
        -The charging station infrastructure
        -The connection to the electricity grid
        - Exploitation and maintenance

• The charging provider is responsible for the exploitation of the
  charging station during (at least) 10 years
• No impact on the grid tariffs
• Maximal interoperability
• Possibility for ad hoc payments (without subscriptions)

                                                                     March 2019   11
Tender – Survey local authorities and EV drivers

• Concerns of the local authorities:     • Concerns of the EV drivers
  •   No extra cabinets on the streets     •   Interoperability of different charging passes
  •   Easy to use                          •   Correct tariffs
  •   Compact dimensions                   •   Overview via web and app
  •   Use of green energy                  •   EHBO
  •   Uniformity in look & feel
  •   Safety of the users

                                                                                   March 2019   12
Tender – Technical specifications
                           • Compact meter compartment

                           • Digital meter ready

                           • Employability of existing charging stations

                           • Connection power 2x11kW 400V 32A

                           • 2 power plugs – each 11 kW (Type 2 connectors)

                           • RFID card reader

                           • Anti graffiti

                           • LED status indications

                           • No Smart Charging

                           • Easy software and hardware upgrade in the future

                           • …

                                                                                March 2019   13
Interoperability                                         CPO

                                                            Allego
                                                                                 EV Box
                                                            ….
                                                                         Blue Corner
                                                                                                            VISA
                                                                         ….

                                                                                           PlugSurfing

                                                                                          ….

                                                                                                             MSP

            The interoperability relies on Open Charge Point Protocol (OCPP)
            • Applied in > 50 countries
            • www.openchargealliance.org
                                                                                               March 2019          14
Tender criteria

• Maximal deployment of existing technology
      lower cost for the investor
      Fast roll-out

• Importance of the qualifications:
          • Charging price: 50%
          • EV services: 25%
          • Project approach: 25%

                                              March 2019   15
Timing roll-out charging infrastructure
     Decree

          2016                    2017                     2018                   2019                   2020

                                                                       REALIZED
                                         750 charging
LOT2016-2017 Realized by Allego            stations

                                                                                         IN PROGRESS (almost realized)
                                                                                         Local Authority: Take care of adapting the
                                                              500 charging               parking lots + police regulations
                        LOT2018 Realized (90%) by Allego        stations

                                                                                                                IN PROGRESS
                                                                                                                Local Authority:
                                                                                   500 charging                 Determination location
                                                LOT2019 IN PROGRESS by Allego        stations
                                                                                                                charging station

                                                                                                           750 charging   TENDER 2019
                                                                                  LOT2020                    stations

                                                                                                                          March 2019   16
Clean power for Transport
Project Approach
From implantation plan to installation
• Coordination: Fluvius(*)

• Determination of the charging locations taking into account:                                   Important parameters:
   Needs of the EV drivers                                                                         • Electricity grid 3x400V
   Vision local authorities                                                                        • Longterm parking
   Technical requirements Fluvius & CPO                                                            • 70% 20% 10% behavior
                                                                                                   • Public parkings 24/7

(*)Remark:

  • Each local authority had the choice either to organise the roll out on itself, or to let the roll out be
    organised via Fluvius

  • Result: Almost all installations are organised via Fluvius, except for
        Basic Infrastructure: Antwerp en St-Truiden
        Charging station on demand: Antwerp, St-Truiden and Leuven

                                                                                                           March 2019   18
Project Approach

Coordination and connection of the     Installation of the charging         Adaptation of parking spot
charging stations to the electricity   station                              Adaptation of police
grid                                   Maintenance and exploitation         regulations
Contact point ‘Charging station        Supporting EV drivers                Installation of traffic sign
follows car’                           vb SMOOV app
Coordination future charging
locations
Notification document                                      Mobility Service Provider (MSP)
Notification requirement / Databank                        Providing charging passes
                                                           Invoicing

                                                                                                  March 2019   19
Clean power for Transport
Success story?
Actual status: +/- 1000 CPT Charging Stations operational

                                                               Gent

                www.milieuvriendelijkevoertuigen.be
                                                        March 2019    21
26/02/2019 15h18

Charging capacity => EV Ready!
                                 March 2019   22
Actual status
Roll-out on target
EV’s lower than expected

Support of local authorities decreases

                                         March 2019   23
Lessons Learned

                  • Coordination at a higher level is a must

                  • Cooperation local authority is very important (support roll-
                    out and police regulations)

                  • Roll-out aligned with # EV’s

                  • Overhead costs vs. energy costs

                  • What should we do differently?
                    •   Integration adaptation of parking lot

                    •   On the countryside more focus on ‘Charging station on demand’ and less
                        basic roll-out infrastructure

                                                                              March 2019   24
E-Mobility: a threat or an
opportunity for the grid?

Some facts
Electricity demand increases

                                             Electricity consumption + 30%
TWh
                                             (incl. energy-efficiency) because of:
                                             • Economical growth
                                             • Population growth
                                             • More electrical appliances:
                                                  • Heat
                                                  • Mobility
                                                  • Industry
                                                  • ..

                      (Cijfers planbureau)
                                                                      March 2019   26
Evolution of batteries

                                       In 2022 it will be possible
                                       to build an EV with a
                         Volume /4     range of 500 km for the
                                       same price of a
                                       combustion engine car. In
                                       2025 an EV will be the
                                       cheapest alternative!
                         Price   /10

                                                          March 2019   27
Impact of E-Mobility on our grids

• Simulation: 1 million EV’s (in 2030)

Average use EV: 50 km / day       => 10 kWh / day per EV      (@ 20 kWh / 100 km)
                                  => 10 GWh / day per EV      (@ 1.000.000 EV’s)
                                  => 3,6 TWh / year
                                  = 3% of total annual        (total annual electricity
                                  electricity consumption     consumption = 100 TWh *)

           Increase of EV fleet is no problem for the electricity transport grid
           Take care for local problems on the distribution grid

                                                            (*) Federaal Planbureau Energiebehoefte 2050
                                                                                            March 2019     28
E-Mobility can contribute in balancing supply and demand
     7 GW     Production DEFECITS to be balanced in Flanders
     6
     5
     4
                                                                      The expected defecits
     3                                                                remain stable
     2
     1
     0
    -1      2015        2020         2030         2040         2050

     7 GW   Production SURPLUSSES to be balanced in Flanders
     6
     5
                                                                      The production surplusses
     4                                                                will be a bigger challenge in
     3                                                                the future
     2
     1
     0
    -1      2015        2020         2030        2040          2050

                               (Cijfers planbureau)
                                                                                                  March 2019   29
Smart use of the available
grid capacity
Moment of charging is important

                                 Sun hours

                                             March 2019   32
                      Saturday    Friday
A smart approach makes our grid EV-ready towards 2030

 • Charging infrastructure
  •   Roll-out aligned to the growth of EV fleet
  •   After 2025 “smart charging” will be necessary

 • Slow charging when possible – Fast charging when needed
  •   Encourage to charge at home and at work

 • Need for dynamic tariffs that influence behavior
  •   Taking into account the availability of green energy
  •   Taking into account the situation of, and the effect on the grid

                                                                         March 2019   34
Thanks!

Questions/comments?

          Kurt Vanderhispallie
          Kurt.vanderhispallie@fluvius.be
          T +32 292 63 21 64 M +32 473 69 33 55