Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee BIM in Tunneling Webinar – March 18, 2021
Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee DAUB recommendation on “BIM in Tunnelling“ Heinz Ehrbar Head DAUB-steering committee BIM
Infrastructure projects are not an end in itself; they have to fulfil a large set of requirements in a complex environment stakeholder management social environment required factual quality risk management environment minimum on costs time background picture © keystone March 18, 2021 EUTF-Webinar 4
Underground construction requires ongoing decisions; Decisions have to be taken based on of information and knowhow • Die kognitive Wissenspyramide action decision, pragmatics knowhow context and experience, semantics information semantics data syntax characters based on: Institute of Software Science - University of Vienna © DB March 18, 2021 EUTF-Webinar 5
Our vision: Our digital tools provide us with the latest experience and Actual decision knowledge making anywhere andprocess at any time so that we can make our decisions. Source: Amberg Engineering March 18, 2021 EUTF-Webinar 6
Objectives when using digital methods Source: DB End Initiation Design Proc. Construction Use of life continuous, lossless, machine readable data flow March 18, 2021 EUTF-Webinar 7
Actual situation: Many parts of the puzzle are available with different degrees of maturity nd grou nd 3D – lling on a mode Integration of digital twin of all trades op erati sets GIS-systems sed f all as el ba o mod nitoring simu l mo tunn ation of el dr ive inte g delling over rated q 3D-mo round 4D - sta the u who ality co g tics under ctions le su nt constr u plly rol chai n simulation of l OHAS-aspects simulation and optimisation of ontro project c standards logistics 5D – tunnel drive control of tools g of existing with digit al 3D-modellin assets undergro d un ring owner partne element based tendering ctor contra err design March 18, 2021 EUTF-Webinar 8
Our Vision: By the year 2025, we own all puzzle pieces and we put them together in order to form a coherent overall picture 3D-modelling simulation 4D - statics of underground of tunnel 5D – project control constructions drive 3D – ground integrated quality control modelling over the whole suplly chain element based tendering digital twin of all trades simulation of OHAS-aspects 3D-modelling of existing underground assets IFC standards Tunnel Model based operation and monitoring of assets Integration of owner simulation and optimisation of control of tunnel drive partnering GIS-systems logistiscs with digital tools designer contractor March 18, 2021 EUTF-Webinar 9
Our Vision: reduction of number of data drops thanks to a new type of collaboration f from End o lif e f to End o life In In se se iti iti U U at at io io n n +2 n +2 n Co Desig Desig LPH 1 LPH 1 ns da tru ta en - dr c m ure H n op tio 4 da LP esig 3+ ta t s oc dro n ps D Pr 5 De H LP con sign LPH 6+ 7 str and u ct ion based on BMVI Procurement March 18, 2021 EUTF-Webinar 10
Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee Our challenges
Special features of underground construction The ground is our main construction material Generally high geometrical complexity with all its uncertainties Source: Nant de Drance Source: Golder Ass. / Tunneltalk March 18, 2021 EUTF-Webinar 12
Todays challenge: the data overload creation of useful information based on relevant data data volume relevant data time March 18, 2021 EUTF-Webinar 13
We need rules on many levels in order to avoid the data overload national rules - laws / regulations - standards - guidelines - recommendations - ..... March 18, 2021 EUTF-Webinar 14
Understanding of our role We take on a leading role to develop solutions for the There are many activities on BIM in parallel digitization of underground construction Need for coordination l _tunne ifc GEOL_BIM Number of actors / programs Bild: piabay.co,m March 18, 2021 EUTF-Webinar 15
Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee Our strategy
Our strategy: Implementation three major steps 2025 2020 2015 Development phases 1 Convergence 2 Digital Competence 3 Digital Transformation project-related model-based collaboration network - related integration of projects data-based holistic solution - Developing of processes and first - Integration of the entire supply chain - Assets are planned, designed, guidelines for BIM (Planning, design and construction are constructed and operated fully integrated in BIM) continuously with BIM – fully digital - Piloting BIM for design; - Major use cases for operations & and collaborative piloting of planning and construction for major use cases maintenance are developed, piloted - Digital Twin is embedded in a digital and implemented ecosystem, which enables exchanges with third parties (e.g. governmental authorities) digitization transformation March 18, 2021 EUTF-Webinar 17
Fields of action in our Strategy § clear definition of the ideal typical final state 1 Strategy § measurable milestones § team based collaboration – no silos anymore 2 People § Involve the team / reduce fear / training and education § Data architecture based on supplier independent interfaces 3 Information/Data § Standardized object and element libraries § define customized / new processes - get easier 4 Processes § clearly define new roles and responsibilities § Software/services follow the increasing requirements 5 Infrastructure IT § Common Data Environment on a safe cloud environment § Application in projects and in test use cases - do it! 6 Application § Integrate end-user requirements March 18, 2021 EUTF-Webinar 18
Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee The DAUB recommendation (May 2019)
DAUB recommendation on “BIM in Tunnelling“ (May 2019) Preamble The following fields of action should be given priority for a beneficial application of BIM in underground construction 1 General constraints § Standardisation of ground modelling 2 BIM basics § Standard catalogue of components for underground 3 Design preparation construction 4 Design § Soft- and hardware (modelling, project management (CDE) 5 Construction preparation § Conditions of contract (collaborative partnership) Digital Design, Building and Operation of 6 Construction Underground Structures § Contract award practice BIM in Tunnelling 7 Operation § Training for young professionals and users DAUB-Working Group 8 Outlook 9 Glossary available in - english 10 References - german Appendix 1 - spanish (near future) Deutscher Ausschuss für unterirdisches Bauen e. V. DAUB German Tunnelling Committee (ITA-AITES) Appendix 2 http://www.daub- ita.de/fileadmin/documents/daub/gtcrec4/gtcrec11_Recommendation_BIM_in_Tunnelling __05-2019_.pdf March 18, 2021 EUTF-Webinar 20
Additional document (October 2020): Model requirements - part 1; Object definition coding and properties available in english and german https://www.daub-ita.de/fileadmin/documents/daub/gtcrec4/2020- 11_DAUB_BIM_im_Untertagebau_Modellanforderungen_T1_en.pdf March 18, 2021 EUTF-Webinar 21
Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee Joint activities of DAUB, ITA-Austria, STS
Work in Progress: three additional recommendations application action decisions pragmatics know-how relations context and experiences semantics information meaning semantics data (un)structured syntax characters raw based on: Institute of Software Science - University of Vienna March 18, 2021 EUTF-Webinar 23
Work in Progress: Model Requirements – part 2 Structured handling of data and information Integration ABCDE vertical e n cim horizontal s pe Integration ß Integration Digital Design, Building and Operation of AB à CDE Underground Structures Model Requirements – part 2 Structured handling of data and information ß ß Standard Standard Standard à Standard C à A B D SIA 199 ÖGG-guidelines (zyclic drive) Standard E Digital Transformation in Tunnelling March 18, 2021 EUTF-Webinar 24
Work in Progress: Model Requirements – part 3 Recommendation on digital ground modelling from to e n e cim sp Digital Design, Building and Operation of Underground Structures Model Requirements – part 3 Recommendation on digital ground modelling source: Amberg Engineering March 18, 2021 EUTF-Webinar 25
Work in progress - Model Requirements – part 4 Recommendation on element based tendering e n e cim sp Digital Design, Building and Operation of Underground Structures Model Requirements – part 4 Recommendation on element based tendering March 18, 2021 EUTF-Webinar 26
Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee Outlook
Summary Digital Design, Building and Operation of Underground Structures BIM in Tunnelling DAUB-Working Group Deutscher Ausschuss für unterirdisches Bauen e. V. DAUB German Tunnelling Committee (ITA-AITES) .... published March 18, 2021 EUTF-Webinar 28
We work hard that the digital twin in tunnelling becomes soon reality real tunnel digital twin tunnel March 18, 2021 EUTF-Webinar 29
Next steps: the latest during the WTC 2022 Until then we expect challenging dialogues! We hope to meet you there! March 18, 2021 EUTF-Webinar 30
Deutscher Ausschuss für unterirdisches Bauen German Tunnelling Committee Thank you for your attention Webinar – March 18, 2021
Work in Progress: three additional recommendations .... Three linked recommendations. The overall document structure allows to expanded in order to meet future requirements March 18, 2021 EUTF-Webinar 32