Document Quality Assurance Bibliographic reference for citation: Boffa Miskell Limited 2020. First Avenue Commercial Building: Application for Resource Consent and Assessment of Environmental Effects. Report prepared by Boffa Miskell Limited for FDL First Ave Limited. Prepared by: Matt Allott Planner / Principal Boffa Miskell Limited Reviewed by: Sean Grace Planner / Principal Boffa Miskell Limited PM Approved for Matt Allott release: Planner / Principal Boffa Miskell Limited Status: FINAL Revision / version: 2 Issue date: 10 January 2020 Use and Reliance This report has been prepared by Boffa Miskell Limited on the specific instructions of our Client. It is solely for our Client’s use for the purpose for which it is intended in accordance with the agreed scope of work. Boffa Miskell does not accept any liability or responsibility in relation to the use of this report contrary to the above, or to any person other than the Client. Any use or reliance by a third party is at that party's own risk. Where information has been supplied by the Client or obtained from other external sources, it has been assumed that it is accurate, without independent verification, unless otherwise indicated. No liability or responsibility is accepted by Boffa Miskell Limited for any errors or omissions to the extent that they arise from inaccurate information provided by the Client or any external source. Template revision: 20190509 0000 File ref: BM19129_RC_Application_20200110_Rev_2.docx
CONTENTS 1.0 Introduction 1 2.0 Applicant and Property Details 2 3.0 Site and Locality Description 3 4.0 Proposal 4 5.0 Tauranga City Plan 6 5.1 Planning Maps – Zoning and Notations 6 5.2 Activity Status 11 6.0 Assessment of Environmental Effects 12 6.1 Positive Effects 12 6.2 Permitted Baseline / Existing Environment 13 6.3 Landscape and Visual Effects 13 6.4 Character and Amenity Effects 14 6.5 Transportation Effects 14 6.6 Flooding / Inundation Effects 15 6.7 Cultural Heritage Effects 17 6.8 Infrastructure and Servicing Effects 19 6.9 Contaminated Soil Effects 20 6.10 Construction Effects 21 6.11 Cumulative Effects 22 6.12 Conclusion of Assessment of Environmental Effects 23 7.0 Statutory Assessment 24 7.1 Part II of the Resource Management Act 1991 (RMA) 24 7.2 Section 104B 25 7.3 National Policy Statements 25 7.4 Bay of Plenty Regional Policy Statement 25 7.5 Tauranga City Plan 26 7.6 Conclusion on Statutory Considerations 30 8.0 Consultation 31 9.0 Notification 32 9.1 Public Notification 32 9.2 Limited Notification 34 U:\2019\BM19129_MAl_First_Avenue_Mixed_Use_Development\Documents\BM19129_RC_Application_202 00110_Rev_2.docx
9.3 Protected Customary Rights Group 35 9.4 Customary Marine Title Group 36 9.5 Conclusion of Notification Assessment 36 10.0 Other Matters 37 10.1 City Centre Strategy 37 10.2 City Centre Spatial Framework 37 11.0 Conclusion 38 Appendices Appendix 1: Application Form Appendix 2: Certificates of Title Appendix 3: Site Survey Appendix 4: Architectural Plans/Design Statement Appendix 5: Assessment of Landscape and Visual Effects Appendix 6: Civil Engineering Design Features Report Appendix 7: Geotechnical Investigation Report Appendix 8: Transportation Assessment Appendix 9: NESCS Assessment Appendix 10: Archaeological Assessment Appendix 11: Cultural Values Assessment Appendix 12: Written Approvals U:\2019\BM19129_MAl_First_Avenue_Mixed_Use_Development\Documents\BM19129_RC_Application_202 00110_Rev_2.docx
1.0 Introduction FDL First Ave Limited (FDL) propose to redevelop the site at 152 – 154 First Avenue, Tauranga. The proposed development will include the demolition of existing built form within the site and the subsequent construction of a new commercial building in general accordance with the proposed plans 1. The proposed new commercial building will comprise a total gross floor area (GFA) of 3,438m 2 (excluding outdoor and parking areas but including 157m2 associated with stairwells, lifts and voids). In relation to Tauranga City Plan (City Plan) performance standards; elements of non- compliance that require resource consent include: A protrusion through the maximum permitted building height of 12m (Discretionary; Rule 17A.11.1.1); A minor shortfall in the number of on-site parking spaces (Restricted Discretionary Activity, Rule 4B.2.3); The inability for the site to accommodate a 90 percentile two axle truck in strict accordance with prescribed tracking curves (Restricted Discretionary Activity; Rules 4B.2.5 & 4B.2.6); and The requirement for the building to be designed accordingly given the presence of a flood hazard plan area overlay affecting a small portion of the north-western corner of the site (Restricted Discretionary Activity, Rule 8C.3) There are no resource consent requirements under Bay of Plenty Regional Council (BOPRC) planning documents. Overall, adopting the bundling principle, resource consent is required for a discretionary activity. This application for resource consent is made pursuant to Section 88 of the Resource Management Act 1991 ("RMA") and has been prepared in accordance with the Fourth Schedule of the RMA (reprint as at 19 April 2017) in such detail to satisfy the purpose for which it is required. 1 See Appendix 4, Architectural Plans/Design Statement First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 1
2.0 Applicant and Property Details A completed application form is enclosed 2. The summary details relating to the applicant and subject site are as follows: To: Tauranga City Council Applicant’s Name: FDL First Ave Limited Boffa Miskell Ltd PO Box 13373, Tauranga 3141 Address for Service: Attn: Matt Allott Phone: 0274233604 Email: matt.allott@boffamiskell.co.nz FDL First Ave Limited PO Box 10063 Address for Fees: Hamilton 3241 Email: leonardg@fosters.co.nz Site Address: 152 – 154 First Avenue, Tauranga Allotment 747 Section 2 Town of Tauranga; Lot 2 DPS Legal Description: 34465 Owner/Occupier Name and FDL First Ave Limited Address: Site Area: 1,402m² District Plan Zoning: Commercial Flood Hazard Plan Area Overlay 3; Viewshaft Protection Designations / Limitations: Area Overlay 4 Pre-application meetings have been held with Tauranga Pre-Application Meetings City Council staff 2 See Appendix 1, Application Form 3 See Tauranga City Plan, Part B – Plan Maps, L105 4 See Tauranga City Plan, Part B – Plan Maps, Section 7: Viewshaft Protection Areas 2 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
3.0 Site and Locality Description The site is located at 152 – 154 First Avenue, Tauranga. The site is currently occupied by two-storey building at 154 First Avenue, which accommodates a the Health and Wellness Services run by the Western Bay of Plenty Primary Health Organisation; this includes a walk-in clinic; and a martial arts training facility, which offers classes between 3pm and 8.30pm Monday to Friday plus Saturday mornings; and offers 24- hour access for other training activity. On-site parking comprising approximately 23 spaces is located on the site; with the majority (19 spaces) being located behind the two-storey building at 152 First Avenue The topography of the site is flat with the exception of eastern boundary, which is located alongside a steep escarpment that rises approximately 8m 5. This escarpment is covered in a mixture of predominately exotic trees (Blue Cedar) and weed vegetation with some native species, including Pohutukawa in the south-eastern corner of the site. Surrounding land uses predominately comprise a mix of commercial and light industrial. Directly opposite the site is a recently extended multi-storey car park building. The car parking building offers public parking and leased parking, which ha access and egress to both upper and lower First Avenue. Certificates of title are included 6. The site is legally described as Allotment 747 Section 2 Town of Tauranga and Lot 2 DPS 34465; and comprises an area of approximately 1402m 2. Figure 1: Aerial photograph of site; view from First Avenue towards site. 5 See Appendix 3, Site Survey 6 See Appendix 2, Certificates of Title First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 3
4.0 Proposal Resource consent is sought to establish and operate a new commercial building at 152 – 154 First Avenue, Tauranga. The proposed development will include the demolition of existing built form within the site and the subsequent construction of a new commercial building in general accordance with the proposed plans 7. By way of summary, the architectural design statement 8 specifies the following in terms of built form and design response … “The site context and location respond to two main aspects of the city centre, on one side the industrial side of First Avenue and on the other side the CBD grid of the city. The proposed development is situated central to various amenities and is appropriately positioned for the proposed office and hospitality use. The site is well connected to transport networks, primary movement corridors, recreation and amenities … … The design character addresses the two different context conditions by proposing a different building use and materials on each part of the building; like two buildings on top of each other, separated by a void space that creates pedestrian and visual connectivity at ground level (upper First Avenue) … … The lower side of First Avenue – the industrial side – has been thought of as a heavy concrete box or plinth that will support a lightweight building on top. Its use is cohesive with its context and function … car parking and secondary pedestrian entry of lower First Avenue … … The void in the middle of these two volumes is fundamental to create a break between two different forms and also create a pedestrian and visual connection with the transparent layer from one side of First Avenue through to the harbourside as well as a welcoming ‘front door’ to the building … the development aims to introduce pedestrian corridors, which will enhance interaction through the city and improve access within the city grid, especially given the adjacent segregation of upper and lower First Avenue … … The upper side of First Avenue forms part of the CBD … so the design response is intentionally lightweight to provide dynamic visual amenity. The elevated office space will be more sophisticated and material selection will endeavour to stand out from the crowd … … The main three layers … the main structural grid for the upper ‘box’ … FDL interested in using timber for the primary structure … the combination of vertical and horizontal elements, together with diagonal members for seismic bracing will be exposed and expressed architecturally … … The second layer will provide for the weathertightness barrier … lightweight … proposed glazed curtain wall to achieve this function in combination with some vertical cladding … … The third layer – the ‘screen’ – will provide sun and heat gain control … will also create an imaginative layer …” 7 See Appendix 4, Architectural Plans/Design Statement 8 See Appendix 4, Architectural Plans/Design Statement 4 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
An overarching objective for the proposal is to set an appropriate architectural benchmark for the city fringe area surrounding the Tauranga City Centre, and for the project to act as a catalyst for other city centre/city fringe development. Careful consideration has been given to ensure the proposed development integrates well with surrounding land use activities both now and into the future. By way of summary, the proposed new commercial building will comprise … A total GFA of 3,438m2 (excluding outdoor and parking areas but including 157m2 associated with stairwells, lifts and voids); Level 1, which will provide a total of 33 parking spaces (inclusive of two disabled parking spaces); vehicle access and egress to lower First Avenue; motorcycle and bicycle parking spaces, storage and refuse areas, a drop off/loading bay, pump area and a lobby/central lift/stair core, the latter of which will ‘run’ up through the five levels; Level 2, which will provide an internal vehicle ramp from level 1 to a total of 38 parking spaces and motorcycle parking spaces; Level 3, which will provide for pedestrian connectivity from upper First Avenue; a café with outdoor deck/seating area, office space and two core areas, both of which will ‘run’ up from level 3 to level 5; Level 4, which will provide for office space and two core areas; and Level 5, which will provide for office space and two core areas. The maximum height of the proposed building will be 22.62m at the apex; 21.63m on the western façade and between 14.61m and 16.08m along the eastern façade 9. As proposed, a portion of the new building in the north-eastern corner of the site will encroach into an area of existing public road 10. This area of public road will need to be stopped under the Local Government Act and incorporated into the site. Given the existing environment, inclusive of the area of public road in question, FDL is of the view that the proposal represents a sustainable use of the land resource. In addition to the road stopping process; FDL propose to work collaboratively with TCC and other key stakeholders in relation to an upgrade of pedestrian connectivity and landscape planting within the adjacent road reserve 11. Earthworks associated with the proposed development will be minimal; essentially restricted to site works incidental to pile, foundation and retaining wall establishment. 9 See Appendix 4, Architectural Plans/Design Statement 10 See Appendix 4, Architectural Plans/Design Statement 11 See Appendix 4, Architectural Plans/Design Statement First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 5
5.0 Tauranga City Plan 5.1 Planning Maps – Zoning and Notations The site is located within the Commercial Zone of the City Plan 12. Figure 2: Tauranga City Plan, Part B – Plan Maps, L105 The purpose of the Commercial Zone is … “… the purpose of the Commercial Zone is to provide key focal points for commercial developments that are efficiently located throughout the transport network … … to provide a broad spectrum of uses in consolidated locations. The Commercial Zone provides a variety of environments for commercial development, recognising the need to provide flexibility within the zone for the marketplace … … the distribution of the Commercial Zone and the extent of each zoned area specifically provides for a strong network of town, neighbourhood and local centres. IN addition, the zone provides opportunities for larger, dedicated sub-regional shopping centres …” 12 See Tauranga City Plan, Part B – Plan Maps, L105 6 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
The only notations on the City Plan Maps that affect the site are the presence of a Flood Hazard Plan Area, which affects a small portion of north-western corner of the site 13; and the viewshaft protection area overlay 14. There are no other notations, natural hazards or significant features that affect the site. In terms of City Plan zoning applicable to the surrounding environment: To the east the properties fronting Cameron Road are zoned City Centre with a maximum permitted building height of 19m 15; and adjacent to the east the property is zoned Commercial with a maximum permitted building height of 12m; Adjacent to the south and west and on the opposite side of lower First Avenue the properties are zoned Commercial with a maximum permitted building height of 12m. 5.1.1 Permitted Activity Rule Compliance Assessment The relevant planning framework anticipates and expects business activities in the Commercial Zone subject to an assessment against a range of ‘checks and balances’. The table below provides an assessment of the proposal against the relevant performance standards contained in the City Plan; and highlights elements of non-compliance and subsequent consent requirements. 5.1.1.1 Section 4B - Transportation Provisions Rule Assessment Activity Status 4B.2.3 – On-Site Does not comply Restricted Discretionary Car Parking 71 on-site parking spaces are (Rule 4B.4(a)) Requirements proposed, which as assessed is two (Note: Due to the requirement (2) spaces short of the reduced to provide more than 25 on-site requirement of 73 spaces as provided parking spaces as calculated for in the City Plan. under City Plan provisions, resource consent is required for a Restricted Discretionary Activity pursuant to Rule 4B.4(b) also) 4B.2.4 On-Site Complies Permitted Parking Design The design of on-site car parking has (Rule 4B.2.4) been assessed and it is determined that compliance with the relevant performance standards will be achieved. 4B.2.5 On-Site Does not comply Restricted Discretionary Manoeuvring Provision for on-site manoeuvring has (Rule 4B.4(a)) been assessed and it is determined 13 See Tauranga City Plan, Part B – Plan Maps, L105 14 See Tauranga City Plan, Part B – Section 7 – Viewshaft Protection Areas, Map 28 15 See Tauranga City Plan, Chapter 17 – Appendix 17A: City Centre Building Heights First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 7
Rule Assessment Activity Status that compliance with relevant performance standards will be generally be achieved; except for sub- clause (c), which states that for every activity in the Commercial Zone on- site manoeuvring shall be provided for (i) 1 90 percentile two-axle truck in accordance with Appendix 4E: 90 Percentile Tracking Curve for an 8 metre Rigid Two Axle Truck; (ii) Articulated trucks and trailers or buses where they are likely to visit the site in accordance with Appendix 4F: 90 Percentile Tracking Curve for a 19 metre Truck; in such a way that all vehicles can enter and exit the site without reversing. Such manoeuvring shall be able to be executed in no more than a three-point turn. As assessed, a low height small truck could negotiate the site; furthermore, there is provision within the street entranceway to accommodate loading and unloading with only minor inconvenience to others. 4B.2.6 Vehicle Does not comply Restricted Discretionary Loading As above. (Rule 4B.4(a)) Requirements 4B.2.7 Site Complies Permitted Access and Provision for site access and vehicle (Rule 4B.2.7) Vehicle Crossings crossings has been assessed and it is determined that compliance with the relevant performance standards will be achieved. 5.1.1.2 Section 4C - Earthworks 4C.2.3.2 All Complies Permitted Zones Business activity is listed as a (Rule 4D.4.3.2) permitted activity in the Commercial Zone; earthworks activity will be incidental to the development of the proposed new commercial building. 8 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
5.1.1.3 Section 4D – Signs 4D.2.3.4 Complies Permitted Commercial … As assessed the proposal will comply (Rule 4D.2.3.4) with the permitted sign standards for the Commercial Zone. 5.1.1.4 Section 4E – Noise 4E.2.3 Complies Permitted Commercial As assessed the proposal will comply (Rule 4E.2.3) …Zones with the permitted noise standards for the Commercial Zone. 4E.2.14 Complies Permitted Construction Construction noise will be managed in (Rule 4E.2.14(a)) Noise accordance with NZS 6803:1999 Acoustics Construction Noise. 5.1.1.5 Section 4G - Lighting 4G.2.2 Complies Permitted Commercial … As assessed the proposal will comply (Rule 4G.2.2) Zones with the permitted lighting standards for the Commercial Zone. 5.1.1.6 Section 4H – Permitted Intrusion Rules 4H.2.3(a) For effects-based assessment Permitted Height purposes the 3m permitted maximum Intrusions height intrusion for a design feature or building component needs to be considered when assessing the proposal. 5.1.1.7 Section 8C – Flood Hazard Plan Area 8C.3 Activities Does not comply Restricted Discretionary within the Flood A small portion of the north-western (Rule 8C.3) Hazard Plan Area corner of the site is affected by the Flood Hazard Plan Area. 5.1.1.8 Section 17 – Commercial Zones 17A.11.1.1 Does not comply Discretionary Activity Building Height in The permitted building height for the (Rule 17A.15.1(a)) the Commercial Commercial Zone is 12m above Zone ground level. The proposed building protrudes through the permitted building height by a varying degree due to the underlying topography. First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 9
The maximum building height protrusion occurs at the roof apex (see Figure 3 below). This maximum building height protrusion of between approximately 10.6m and 11m equates to two levels. This maximum building height protrusion excludes the 5.8m x 4.05m lift shaft. The extent of building height protrusion across the balance of the site is less. Modelling of the ‘non-compliant’ proposed building height in comparison to the compliant building height is illustrated in: Cross-sections, complaint envelope and elevation plans prepared by First Principles Architects 16; GIS mapping of building height regime 17. Figure 3: Building Height Protrusion Analysis 16 See Appendix 4, Architectural Plans/Design Statement 17 See Appendix 5, Assessment of Landscape and Visual Effects 10 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
5.2 Activity Status The proposal will include land use activities that fall under the ambit of ‘business activity’ as defined in the City Plan. For completeness, the City Plan definition of ‘business activity’ is … “land, buildings and structures used for: a) Retail activities b) Professional and service activities c) Social and administrative activities d) Educational activities e) Technological activities f) Tourism service activities g) Services, storage, distribution or manufacturing activities carried out on a site principally for commercial gain For the purpose of this definition, business activity does not include visitor accommodation or homestays”. Table 17A.1: Commercial Zones Activity Status; confirms that business activity is classified as a permitted activity in the Commercial Zone subject to compliance with relevant Permitted Activity Rules. The compliance assessment in Section 5.1.1 highlights that the proposal requires resource consent for the following aspects of non-compliance: A restricted discretionary activity due to a minor shortfall in the provision of on-site parking and a technical non-compliance with respect to on-site manoeuvring and loading; A restricted discretionary activity due to a small portion of the north-western corner of the site being affected by the Flood Hazard Plan Area; and A discretionary activity due to the proposed building protruding through the maximum permitted height plane. In terms of ‘other’ statutory plan provisions; as assessed; the proposal requires no resource consents under any Bay of Plenty Regional Council (BOPRC) planning document. Under the National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health (NESCS) the site is classified as a piece of land 18; given that no DSI has been undertake for the site to date resource consent is required for a discretionary activity pursuant to regulation 11 under the NESCS. Overall, adopting the bundling principle, resource consent is required for a discretionary activity. 18 See Appendix 9, NESCS Assessment First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 11
6.0 Assessment of Environmental Effects Having regard to the nature and scale of the proposal, the existing environment and the discretion available to TCC in assessing the application for resource consent, the following effects have been considered: Positive Effects Permitted Baseline / Existing Environment Landscape and Visual Effects Transportation Effects Flooding / Inundation Effects Cultural Heritage Effects Infrastructure and Servicing Effects Contaminated Soil Effects Construction Effects Cumulative Effects 6.1 Positive Effects Section 3 of the Resource Management Act 1991 (RMA) specifies that the term ‘effect’ means the following: (a) Any positive or adverse effect; and (b) Any temporary or permanent effect; and (c) Any past, present or future effect; and (d) Any cumulative effect which arises over time or in combination with other effects … regardless of the scale, intensity, duration or frequency of the effect, and also includes – (e) Any potential effect of high probability; and (f) Any potential effect of low probability, which has high potential impact. The establishment and operation of the proposed new commercial building will align directly with the overarching objective of revitalising the Tauranga city centre/city fringe. The proposal will set a benchmark – in particular from an architectural and streetscape perspective – for new development in the city centre/city fringe. The occupation of new grade A office space will contribute to additional ‘foot fall’ within the city centre/city fringe area and as a consequence an increase in discretionary retail spend will result. Overall, the proposal will align with strategic planning objectives for the city centre/city fringe area and generate a number of positive socio-economic effects. 12 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
6.2 Permitted Baseline / Existing Environment Section 104(2) of the RMA states that when forming an opinion for the purposes of Section 104(1)(a), a consent authority may disregard an adverse effect of the activity on the environment if the plan permits an activity with that effect. The permitted baseline enables an assessment of any actual and potential effects of a proposed activity on the environment in comparison with the effects of activities permitted by the relevant plan. Associated with this concept, but mandatory, is the analysis of the existing environment which extends to activities authorised by implemented resource consents and unimplemented resource consents that are likely to be exercised. In this case the existing building, the surrounding environment and the building height regime for both the site and the surrounding environment 19 are relevant considerations when undertaking an effects-based assessment. 6.3 Landscape and Visual Effects An assessment of landscape and visual effects is included 20. The focus of this assessment of landscape and visual effects relates to the protrusion of a portion of the proposed building through the permitted 12m building height. As noted earlier, the proposed building protrudes through the permitted building height by a varying degree due to the underlying topography. The maximum building height protrusion occurs at the roof apex. This maximum building height protrusion of between approximately 10.6m and 11m equates to two levels. This maximum building height protrusion excludes the 5.8m x 4.05m lift shaft. The extent of building height protrusion across the balance of the site is less. Modelling of the ‘non-compliant’ proposed building height in comparison to the compliant building height is illustrated in Cross-sections, complaint envelope and elevation plans prepared by First Principles Architects 21; and GIS mapping of building height regime 22. Establishing a benchmark height to control building height is common practice in statutory urban planning to ensure a homogenous height over large areas of urban fabric. Its disadvantages are lack of flexibility and lack of adaption to changing economic circumstances and requirements over time. Building height is only one variable in place making, derived from a vision of the kind of place which is envisioned. It is imperative that any objective analysis of tall buildings must, therefore, be considered in relation to their local context, as the assessment of landscape and visual effects sets out to achieve. Equally the appropriateness of the building design is also set in the context of its local 19 Inclusive of the permitted building height and viewshaft protection area intrusions; See Tauranga City Plan, Rule 4H.2.3 20 See Appendix 5, Assessment of Landscape and Visual Effects 21 See Appendix 4, Architectural Plans/Design Statement 22 See Appendix 5, Assessment of Landscape and Visual Effects First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 13
interface within the immediate environment. This is achieved through design measures that simplify its interface with the surrounding environment with a high regard for visual amenity. The assessment of landscape and visual effects concludes as follows: “… the additional height relates to the rolling height plane, resulting in two floors on the western façade extending above the permitted 12m height plane. While this is an extension in height the potential adverse effects on the urban form and character of the area will be low to moderate with the potential adverse visual effects ranging from low to moderate to low … … Interpreting the scale of effect with regard to RMA terms this equates to a minor landscape and visual effect”. Overall, the resultant effects on the townscape and visual amenity attributable to the additional height are considered to be low. In urban landscape and visual amenity terms the proposed new commercial building will become a recognised and valued townscape resource with enhanced visual amenity. 6.4 Character and Amenity Effects The overall scale of the proposed new commercial building will not create a dominant building within the future built fabric of the city centre/city fringe environment. The height regime attributable to the city centre/city fringe is influencing the shape and form of the area. The additional two floors plus lift tower, will create a building that will individually have a limited visual appearance; the extension above the permitted height will continue to respond appropriately to the immediate and wider city form and will not detract from evolving architectural form/context. The ‘non-compliant’ height of the proposed building will not affect amenity values as identified in the Tauranga City Landscape Study 23. Overall, character and amenity values associated with both the site and surrounding environment will be maintained. 6.5 Transportation Effects A transportation assessment is included 24. The transportation assessment describes the surrounding transportation environment and provides a summary of sustainable travel options, traffic patterns and road safety. In relation to the proposal; an analysis of trip generation (existing v proposed) and traffic effects (access, network effects, parking, loading/servicing) is provided; as is a summary of how the proposal ‘fits’ with the relevant City Plan policy framework insofar as transportation matters are concerned. The transportation assessment summarises and concludes as follows … 23 Boffa Miskell Ltd, 26 March 2011, Tauranga City Landscape Study – A Review of the Landscape Study for the City of Tauranga 24 See Appendix 8, Transportation Assessment 14 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
“… Assessment of both existing and proposed uses of the site have demonstrated that the expected trip generation of the activity will be of similar magnitude to the existing activities on site and no more than the anticipated baseline activity for the site. Accordingly, the proposal is unlikely to noticeably increase traffic volumes on the surrounding road network in these peak periods … … It is acknowledged that there are existing congestion issues, which affect access to the commercial area bounded by Glasgow Street and Third Avenue. This has been recognised by Council, as evidenced by previous investigations at the Cameron/Third and Elizabeth/Glasgow intersections. However, as described above, the proposed change in activity at the subject site is not expected to significantly increase traffic in the peak commuter hour at these intersections … … The proposed parking supply falls two spaces short of the City Plan reduced requirement. Notwithstanding that the parking supply is very close to the assessed reduced requirements, consideration has been given to the effects of any potential for parking spill over. Int his respect it is acknowledged that some trips associated with the site will make use of the First Avenue intersection with Cameron Road. This more than likely will relate to visitors to the building and particularly café customers (should the café become a destination in its own right). As there is existing on-street parking on First Avenue as well as off-street pay parking (public and leased) on the adjacent site, there is adequate parking within the network for visitors approaching the site from First Avenue …” Overall, it is concluded that the proposed development can be established with a no more than minor effect on the safety and efficiency of the surrounding transportation network. 6.6 Flooding / Inundation Effects TCC GIS maps indicate a possible flood risk in a 100-year storm event at the site based on current levels. An estimated flood depth ranging from 0.1m to 0.5m occurs within the site. Although no overland flow path is shown for the specific flooding at the site, the contour of First Avenue indicates that overland flow paths direct flood waters west along First Avenue to Glasgow Street. The finished floor level (FFL) of the existing building at 154 First Avenue is RL 2.66m and the FFL of the ground floor of the recently developed car park on the opposite side of the street at 155 First Avenue is RL 2.31m. All site levels should be above the level of the road (First Avenue). A FFL of RL 3.0 for the ground floor of the new commercial building is proposed. Limited flooding of the ground floor car park would be permissible subject to the provision of tanking walls and the power points above floodable water level. First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 15
Figure 4: TCC GIS Map – Potential Flood Risk Chapter 8 of the City Plan relates to natural hazards and sets out in Appendix 8B the information requirements in relation to the risks of flooding on the site. The table in Figure 5 below provides a summary of these information requirements and an analysis of how the proposal complies (or otherwise) with each of the criteria. 16 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
Figure 5: Flood Hazard Assessment Overall, subject to the adoption of a FFL of RL 3.0m for the ground level car park and an appropriate design response; there will be no adverse flooding/inundation effects on either the proposed building or surrounding environment. 6.7 Cultural Heritage Effects Preliminary consultation has been undertaken by the applicant with Ngai Tamarawaho 25. The concept design phase for the proposed new commercial building has been informed by this preliminary consultation and the cultural values assessment, which has been prepared by Ngai Tamarawaho 26. Consultation by the applicant with Ngai Tamarawaho in relation to the proposal will continue throughout the resource consent process. An archaeological assessment is included 27. The archaeological assessment states that there are no known archaeological sites within the two land parcels affected by the proposed development. Early aerial photographs indicate that the properties remained in scrub and appear to have been poorly drained as late as the 1940’s. 25 Meeting held between Matt Allot, Graham Price and Buddy Mikaere on 6 September 2019; subsequent email and phone correspondence between Matt Allott and Buddy Mikaere 26 See Appendix 11, Cultural Values Assessment 27 See Appendix 10, Archaeological Assessment First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 17
Such a landscape would probably have been unsuitable for pre-European Maori settlement but may have been a landscape rich in natural resources used by surrounding populations. Midden deposits extending along the western escarpment indicate occupation occurred above property and the low coastal bench may have been used by these populations as a platform for canoe launching and accessing harbour resources. A recorded midden site (U14/2725) is located on the escarpment above the properties and within the First Avenue road reserve (see Figure 6 below). This area will be affected up the proposed landscape treatment to First Avenue. The archaeological integrity and significance of the midden remains unclear; however, it is likely to have been disturbed by previous landscaping of the escarpment. It represents food waste deposited over the escarpment from a settlement located on level ground directly above. Evidence of occupation above the midden has likely been damaged by 20th century commercial development. Figure 6: Plan showing recorded archaeological sites in the immediate vicinity of the site (NZAA Archsite Data) As there remains a possibility that unrecorded archaeological sites may be present within the two affected properties and that the proposed landscaping of First Avenue escarpment may affect intact archaeological deposits associated with U14/2725 a program for the mitigation of effects on possible intact archaeological features exposed during demolition and redevelopment 18 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
should be established before the commencement of ground disturbance. This mitigation program will require an authority from Heritage New Zealand to damage or destroy part of archaeological site/s U14/2725 and possible unrecorded archaeological sites. Overall, subject to the adherence of recommendations made in the archaeological assessment, there will be no adverse cultural heritage effects that cannot be adequately avoided, remedied or mitigated. 6.8 Infrastructure and Servicing Effects A civil engineering design features report is included 28. The site is serviced by existing reticulated water supply, wastewater and stormwater connections. Pre-application discussion with TCC staff indicates that there is adequate capacity within the reticulated system to accommodate the proposed new commercial building. 6.8.1 Water Supply Council reticulation will be used for water supply to the proposed new commercial building. Approximately 3000m2 of commercial space is proposed and assuming a peak minimum hourly flow rate of 0.75 litres/second/hectare a design peak hourly flow rate of 0.23 L/s results. A 50mm diameter service connection with a backflow preventer is expected to meet the proposed design requirements. This will have to connect from the 100mm water main located to the east of the site on the southern side of First Avenue. In relation to firefighting; the existing hydrants located on the water supply lines along First Avenue will be used to provide for firefighting means, as this provides for firefighting to the existing site. Two existing fire hydrants are located adjacent to the site on First Avenue. 6.8.2 Wastewater Management Wastewater will be gravity discharged to the existing reticulated system on First Avenue. The existing connection will be upgraded to service the proposed new commercial building. With approximately 3000m2 of commercial floorspace being proposed; and with the minimum peak hourly flow rate for commercial space being 0.7 litres/second/hectare; this results in a design peak hourly flow rate of 0.21 L/s. A single 150mm uPVC connection will be suitable for the proposed development. 6.8.3 Stormwater Management Stormwater will be collected through the roof downpipes and the pavement catch pits and discharged without attenuation to Council reticulation. The existing site has an impermeable area of 1304m2, and the proposed development will increase the impermeable area to approximately 1650m2. The loss of permeable area is predominantly from the scrub covered bank. Additionally, there will be a loss of impermeable area due to the encroachment of the 28 See Appendix 6, Civil Engineering Design Features Report First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 19
proposed walkway/deck area outside the property boundary. The slope of the bank ranges between 28o and 50o. The proposed new commercial building is located close to the terminus of the Council’s reticulated stormwater system, which is an outfall structure discharging into the Waikareao Estuary. Any attenuation flows, with the intention of avoiding peak flows from the larger catchment, will more likely increase the risk of greater peak flow into the system. To reduce the risk of increasing the peak flows within the system as a whole, it is recommended that run-off from the site be discharge without attenuation. Stormwater quality will be managed through the use of sumps collecting the paved stormwater run-off to allow silts and gross pollutants to be removed. Stormwater from the roof is considered to be of sufficient quality for direct discharge into Council’s reticulation system. 6.9 Contaminated Soil Effects The National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health (NESCS) is a nationally consistent set of planning controls and soil contaminant values. It ensures that land affected by contaminants in soil is appropriately identified and assessed before it is developed - and if necessary, the land is remediated, or the contaminants contained to make the land safe for human use. Research of the most up to date information held by TCC and BOPRC identifies that past (and likely) use of a HAIL activity has occurred on the site. On this basis the site is classified as a ‘piece of land’ 29. Given that no detailed site investigation (DSI) has been undertake for the site to date, resource consent is required for a discretionary activity pursuant to regulation 11 under the NES. In relation to potential contaminated soil effects; the following consent conditions are recommended: xx Within three weeks of the demolition of the existing building on site, the consent holder shall provide to Council’s Team Leader: Environmental Monitoring or their delegate a Detailed Site Investigation (DSI) for certification. The DSI is to be undertaken by a suitably qualified and experienced practitioner. The DSI shall: (a) Be undertaken in accordance with the current edition of Contaminated Land Management Guidelines No.5 – Site Investigation and Analysis of Soils, Wellington, Ministry for the Environment; and meets the following requirements; (b) Be reported on in accordance with the current edition of Contaminated Land Management Guidelines No.1 – Reporting on Contaminated Sites in New Zealand, Wellington, Ministry for the Environment; (c) Result in a report that is certified by the practitioner; (d) Include the sampling results, and a statement on whether the contaminants in soil exceed the relevant National Environmental Standard figure/s provided by the Ministry for the Environment; and 29 See Appendix 9, NESCS Assessment 20 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
(e) Include controls (such as a remediation action plan – RAP) that are considered necessary to manage the risks to human health from any contamination on the site. xx If the DSI prepared in accordance with Condition xx of this Consent confirms that any contaminants present within the soil on site are at or below background levels, no further reports are required and compliance with Conditions xx and xx of the Consent is not required. xx Where a RAP is required by a DSI, then a Site Validation Report (SVR) shall be prepared and submitted to Council’s Team Leader: Environmental Monitoring or their delegate to demonstrate the actions in the RAP were carried out and confirm that the site contamination is removed or managed so as to present no further risk to human health once the remediation works are finished. xx Where the DSI recommends a site-specific Contaminated Site Management Plan (CSMP), the consent holder shall prepare and submit a CSMP to Council’s Team Leader: Environmental Monitoring or their delegate prior to any works (other than the removal of the existing building) commencing on site. The CSMP shall be prepared by a suitably qualified and experienced practitioner (SQEP) and shall contain, but is not limited to the following: (a) Methodology to mitigate and manage risk to human health and environmental receptors during the course of the proposed earthworks; (b) Methodology for containment, management, sampling and removal of excavated site material for off-site disposal; (c) Methodology in the event that previously unidentified contamination sources or suspected contaminated material is discovered on site; (d) Methodology for ensuring that the future use of the site is appropriate and does not result in an increase in the risk to human health; (e) Demonstration of on-going compliance with NESCS regulations; (f) Methodology to address decommissioning of existing buildings on the site; and (g) Contingency plans to address contamination should there be no suitable area to contain/store contaminated soil/materials on site. 6.10 Construction Effects The construction effects associated with the proposal will be acceptable. Construction activities will comply with the construction noise limits 30 and relevant vibration standards. It is recommended that a construction noise and vibration management plan (CNVMP) be prepared and implemented throughout the construction phase to ensure that any potential construction effects are adequately avoided, remedied or mitigated. For the same reason, it is also recommended that a traffic management plan (TMP) be prepared and implemented throughout the construction phase. 30 See Tauranga City Plan, Rule 4E.2.14(a) and NZS 6803:1999 Acoustics Construction Noise First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 21
In relation to potential construction effects; the following consent conditions are recommended: xx Construction noise shall not exceed the limits in NZS 6803:1999 Acoustics Construction Noise. Construction noise shall also be measured and assessed in accordance with this standard. xx A construction noise and vibration management plan (CNVMP) shall be prepared by a suitably qualified person and submitted to Council’s Team Leader: Environmental Monitoring or their delegate for certification prior to commencement of the works. At a minimum, the CNMP shall include: (a) The noise limits that must, where practicable, be complied with; (b) Identification of potentially affected receivers; (c) Predicted noise levels for relevant equipment and activities; (d) Details of the best practicable options with respect to noise mitigation measures and implementation of these measures; (e) Noise monitoring requirements with triggers and feedback mechanisms; (f) Communications and complaints response protocols; (g) The relevant measures set out in German Industrial Standard DIN 4150-3 (1999): Structural vibration - Part 3 Effects of vibration on structures. xx Prior to any works authorised by this consent commencing on the site the Consent Holder shall submit, to Council’s Team Leader: Environmental Monitoring or their delegate for certification, a Traffic Management Plan (TMP). This TMP and the certification thereof shall include details about any obstruction to access to roads, footpaths and berms. xx Traffic management during the construction of the building authorised by this consent, shall be undertaken in accordance with the Certified TMP to the satisfaction of Council’s Team Leader: Environmental Monitoring or their delegate. 6.11 Cumulative Effects Section 3 of the RMA defines effect to include any ‘cumulative effect, which arises over time or in combination with other effects’. It is considered that the correct approach to a consideration of an application seeking departure from particular performance standards is a consideration of the effects of the departure consistent with the matters to which the consent authority has discretion. In other words, the performance standards relating to building height, flood hazard and transportation provisions are methods TCC has chosen to control effects. The City Plan states that a departure from these standards is permissible provided the relevant effects assessment determines that a departure from these standards will not result in adverse effects that are more than minor. The Environment Court decision of Beca v Auckland City Council (A102/99; Judge Whiting; 22 September 1999) addresses precisely this issue. That case concerned a breach of the relevant density provisions of the Auckland District Plan and was classified a non-complying activity. In relation to the departure from the minimum residential density standard, Judge Whiting said: “Density is one of a number of combined rules designed to protect the amenity values and character elements of this special character zone. The other rules include 22 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
coverage, front yard controls and height controls. These controls are tools used by the plan to assist in maintaining amenity values. The purpose of this parcel of rules is to minimise effects. However, the rules themselves are not absolute in that a breach means there will be adverse effects. They indirectly relate to effects and should not be used as a substitute for an assessment of effects of a proposal. There will be situations where a development of a particular site could be acceptable even though it does not comply with the rules”. This application for land use consent is one such case. The effects of the proposal, including the cumulative effects, on the surrounding environment will be no more than minor. 6.12 Conclusion of Assessment of Environmental Effects The assessment of environmental effects determines that any actual or potential effects on the environment as a result of the proposal will be no more than minor. First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 23
7.0 Statutory Assessment 7.1 Part II of the Resource Management Act 1991 (RMA) Of the provisions contained in the Resource Management Act (RMA) Part II is the most significant. In this respect it defines the purpose and principles around which the RMA is centred. Section 5, which documents the RMA’s purpose, promotes the sustainable management of natural and physical resources. In defining the phrase ‘natural and physical’, Section 5 states that resources may be used in a manner that enables people and communities to provide for their social, economic and cultural well-being, and for their health and safety while: (a) Sustaining the potential of natural and physical resources (excluding minerals) to meet the reasonably foreseeable needs of future generations; and (b) Safeguarding the life-supporting capacity of air, water, soil and ecosystems; and (c) Avoiding, remedying or mitigating any adverse effects of activities on the environment. The proposal promotes the concept of sustainable management, providing for the social, economic and cultural well-being of the community, without giving rise to any adverse environmental effects that cannot be avoided, remedied or mitigated. Section 6 relates to matters of national importance. In achieving the purpose of the RMA all persons exercising functions and powers under it, in relation to managing the use, development, and protection of natural and physical resources, shall recognise and provide for the matters listed. Of the matters listed the following are relevant to a consideration of this application: (e) the relationship of Maori and their culture and traditions with their ancestral lands, water, sites, waahi tapu, and other taonga; (f) the protection of historic heritage from inappropriate subdivision, use and development. Cultural heritage values will be maintained and protected as a consequence of the proposal. Section 7 lists other matters to which consent authorities shall have ‘particular regard to’ when considering resource consent applications. Of those matters listed the following are relevant to a consideration of this application: (a) Kaitiakitanga; (b) The efficient use and development of natural and physical resources; (c) The maintenance and enhancement of amenity values; (f) Maintenance and enhancement of the quality of the environment. The proposal is an example of an efficient use and development of the land resource. The character and amenity values associated with the site and the surrounding environment will be maintained as will the quality of the environment. Section 8 of the RMA states: “In achieving the purpose of the Act, all persons exercising functions and powers under it, in relation to managing the use, development, and protection of natural and physical 24 First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects
resources, shall take into account the principles of the Treaty of Waitangi (Te Tiriti o Waitangi)”. The proposal is not contrary to the principles of the Treaty of Waitangi. 7.2 Section 104B Section 104B states that when considering an application for a resource consent for a discretionary or non-complying activity a consent authority may grant or refuse the application, and if it grants the application may impose conditions under Section 108. 7.3 National Policy Statements The National Policy Statement on Urban Development Capacity 2016 came into effect in December 2016 31. The purpose of the National Policy Statement on Urban Development Capacity is to ensure regional and district plans provide adequately for the development of business and housing. This is to enable urban areas to grow and change in response to the needs of their communities. In the case of this proposal; there is a demonstrable demand for new office space in the Tauranga city centre/city fringe area; and subject to appropriate ‘checks and balances’; it has been determined that the proposal will have not result in any adverse effects that cannot be adequately avoided, remedied or mitigated. 7.4 Bay of Plenty Regional Policy Statement The Bay of Plenty Regional Policy Statement (RPS) establishes Bay of Plenty Regional Council’s overall strategy for achieving sustainable management of natural and physical resources. Chapter 2.8 of the RPS relates to urban and rural growth issues; with the following objectives and supporting policies relevant to a consideration of this application: A compact, well designed and sustainable urban form that effectively and efficiently accommodates the regions urban growth 32; Implementing high quality urban design and live-work-play principles 33; An efficient, sustainable, safe and affordable transport network, integrated with the region’s land use patterns 34; and Promoting the integration of land use and transportation 35. As assessed, the proposal will align with the purpose and intent of this RPS policy framework. The proposed new commercial building will provide for business growth in the city centre/city fringe area; and the building been carefully designed with consideration afforded to best practice urban design principles. Given the site location the proposal will contribute positively 31 http://www.mfe.govt.nz/publications/towns-and-cities/national-policy-statement-urban-development-capacity-2016 32 See Bay of Plenty Regional Policy Statement, Objective 23 33 See Bay of Plenty Regional Policy Statement, Policy UG 8B 34 See Bay of Plenty Regional Policy Statement, Objective 24 35 See Bay of Plenty Regional Policy Statement, Policy UG 13B First Avenue Commercial Building | Application for Resource Consent and Assessment of Environmental Effects 25