February 10, 2022 MLK Day 2022 - City of Fort Collins

Page created by Gary Chang
 
CONTINUE READING
February 10, 2022 MLK Day 2022 - City of Fort Collins
MLK Day 2022

February 10, 2022
February 10, 2022 MLK Day 2022 - City of Fort Collins
FEBRUARY 10, 2022
Table of Contents
ISSUES BEFORE COUNCIL ................................................................................................................... 4
  FEBRUARY 15 SPECIAL MEETING ........................................................................................................................... 4
  FEBRUARY 15 REGULAR MEETING......................................................................................................................... 4
  FEBRUARY 22 WORK SESSION ............................................................................................................................... 4
  FEBRUARY 24 URBAN RENEWAL AUTHORITY BOARD ........................................................................................... 5
  MARCH 1 REGULAR MEETING ............................................................................................................................... 5
  MARCH 8 WORK SESSION ...................................................................................................................................... 5

PUBLIC ENGAGEMENT – UPCOMING EVENTS................................................................................... 6

SALES TAX - MONTHLY & YEAR TO DATE ......................................................................................... 6

CP - ENGINEERING................................................................................................................................. 7
 POWER TRAIL AND HARMONY RAOD GRADE SEPARATED CROSSING .................................................................. 7
 LINDEN STREET RENOVATION PROJECT ................................................................................................................ 7
 TIMBERLINE ROAD CORRIDOR PROJECT ............................................................................................................... 8
 LAPORTE AVENUE BRIDGE REPLACEMENTS .......................................................................................................... 9
 LAPORTE AVENUE ROADWAY AND MULTI-MODAL IMPROVEMENTS .................................................................. 9

CP - PARK PLANNING & DEVELOPMENT .......................................................................................... 10
 BUCKING HORSE PARK......................................................................................................................................... 10
 EAST PARK DISTRICT MAINTENANCE FACILITY .................................................................................................... 11
 MAIL CREEK TRAIL ............................................................................................................................................... 11
 POUDRE TRAIL AT I-25 ......................................................................................................................................... 11
 SPRING CANYON DOG PARK ................................................................................................................................ 12
 TRAVERSE PARK ................................................................................................................................................... 12
 EDORA DISC GOLF PARK UPDATES ...................................................................................................................... 13

CP - OPERATION SERVICES ............................................................................................................... 13
 BLOCK 32/42 – CIVIC MASTER PLAN REFRESH .................................................................................................... 13

CP - UTILITIES ....................................................................................................................................... 14
 JOINT TRAINING FIELD WITH POUDRE FIRE AUTHORITY .................................................................................... 14
 STONEHENGE CABLE REPLACEMENT-PRIORITY #4 ............................................................................................. 14
 OAK STREET STORMWATER IMPROVEMENTS PROJECT ..................................................................................... 15
 27” POUDRE CANYON RAW WATERLINE ............................................................................................................. 16

PUBLIC SAFETY ................................................................................................................................... 17
 POUDRE FIRE AUTHORITY.................................................................................................................................... 17
 POLICE SERVICES.................................................................................................................................................. 19

PLANNING, DEVELOPMENT &TRANSPORTATION........................................................................... 22
  BUILDING, PLANNING AND DEVELOPMENT REVIEW .......................................................................................... 22

GRAFFITI UPDATE................................................................................................................................ 22

SUSTAINABILITY SERVICES ............................................................................................................... 23
February 10, 2022 MLK Day 2022 - City of Fort Collins
ENVIRONMENTAL SERVICES ................................................................................................................................ 23
   SOCIAL SUSTAINABILITY ...................................................................................................................................... 23
   ECONOMIC HEALTH ............................................................................................................................................. 24

UTILITIES ............................................................................................................................................... 24
 CUSTOMER CONNECTIONS.................................................................................................................................. 24

COMMUNITY SERVICES....................................................................................................................... 25
 RECREATION ........................................................................................................................................................ 25
 PARKS................................................................................................................................................................... 26
 CULTURAL SERVICES ............................................................................................................................................ 26
 NATURAL AREAS .................................................................................................................................................. 27

PUBLIC ENGAGEMENT ........................................................................................................................ 29

BROADBAND – FORT COLLINS CONNEXION ................................................................................... 30

COMMUNITY DASHBOARD HIGHLIGHT............................................................................................. 31
February 10, 2022 MLK Day 2022 - City of Fort Collins
ISSUES BEFORE COUNCIL                                                          Please note that this list is subject to
                                                                               frequent change. Please call the City
                                                                               Clerk’s Office for up-to-date
                                                                               information. 970-416-2774.

FEBRUARY 15 SPECIAL MEETING
   Executive Session – 3:30 p.m. – 5:30 p.m.
    o Meet with recruiter to review semi-finalists and facilitate selection of finalists.
          High Performing Government 7.4 – Attract, retain, engage, develop and reward a
          diverse and competitive workforce to meet the needs of the community now and in
          the future.

FEBRUARY 15 REGULAR MEETING
   McDowell Property Metro District Pre-Application Meeting
    o Hold a pre-application meeting for a proposed Metro District on the McDowell property.
           Neighborhood Livability & Social Health 1.5 – Enhance the quality of life in
           neighborhoods, empower neighbors to solve problems, and foster respectful
           relations.
   Community Report: Representative Joe Neguse
    o To provide congressional updates from Washington DC.
   2021 Building Code Adoption
    o Adoption of the 2021 International Codes (I-Codes) and Local Code amendments that align
       with City plans and policies, including, City Plan, Our Climate Future, Housing Strategic Plan,
       and Electric Vehicle readiness.
           Neighborhood Livability & Social Health 1.6 – Align land use regulations and review
           procedures to guide development consistent with City Plan.
   Timber Lark Annexation (2nd reading – consent)
    o To adopt the Timber Lark Annexation on Second Reading.
           Neighborhood Livability & Social Health 1.7 – Provide a high-quality built
           environment, support quality, diverse neighborhoods and foster the social health of
           citizens.
   Temporary Housing Relief Ordinance
    o Establish a permit and process for households requesting additional occupancy to support
       residents impacted by the Marshall/Boulder County Fire.
           Neighborhood Livability & Social Health 1.1 – Improve and increase availability and
           choice of quality housing that is affordable to a broad range of income levels.
   Great Outdoors Colorado Visioning Grant
    o To consider a Resolution supporting an application for a Great Outdoors Colorado Visioning
       Grant relating to a portion of the Poudre River Corridor.
           Culture & Recreation 2.3 – Create enhanced arts and culture participation
           opportunities for all residents and visitors.

FEBRUARY 22 WORK SESSION
   2022 Strategic Plan Review and Update
    o Provide and review the draft 2022 Strategic Plan and ask Council inputs regarding the
       Strategic Objectives.
           High Performing Government 7.2 – Maintain the public trust through ahigh
           performing board, as well as organizational transparency, legal and ethical behavior
           and regulatory compliance.

CITY MANAGER’S UPDATE                                                                                        4
February 10, 2022 MLK Day 2022 - City of Fort Collins
   Air Quality Overview
    o Provide an overview of air quality levels and pollutions sources impacting Fort Collins, including
        strategic direction, opportunities, and challenges.
            Neighborhood Livability & Social Health 4.2 – Improve indoor and outdoor air quality.

FEBRUARY 24 URBAN RENEWAL AUTHORITY BOARD
   5:00 p.m. – Remote Meeting

MARCH 1 REGULAR MEETING
   City Recovery Plan (with Spanish Interpretation)
    o Consider an Ordinance adopting the City Recovery Plan.
             Economic Health 3.3 – Systematically Engage the business community with an
             emphasis on starting, sustaining and renewing businesses.
   Planned Unit Development Overlay
    o Consider Development agreement regarding Mulberry Planned Unit Development (PUD)
        Overlay to extend the term of vested rights from three years to fifteen year and to adopt certain
        terms regarding development within the Mulberry PUD Overlay.
             Neighborhood Livability & Social Health 1.6 – Align land use regulations and review
             procedures to guide development consistent with City Plan.
   Loan Agreement with U.S. Bank National Association (moved to regular meeting)
    o Renew a line of credit with U.S. Bank as a third-party source of capital for funding the Epic
        Loans Program, which offers low-interest on-bill financing to community members for
        residential energy efficiency upgrades.
             Environmental Health 4.1 – Intensify efforts to improve resilience and to meet 2030
             climate, energy and 100% renewable electricity goals.
   Staff Report: Equity Indicators Report and Dashboard Update
    o To provide a progress report to council and community members on the creation of the Equity
        Dashboard and how the data for the Equity Indicators Report is being utilized to advance our
        work.
            Neighborhood Livability & Social Health 1.4 – Advance equity for all, leading with
            race, so that a person’s identity or identities is not a predictor of outcomes.

MARCH 8 WORK SESSION
   East Mulberry Plan Update – Big Ideas and Policy Direction
    o Review policy and action items for the East Mulberry Plan and decision-making framework for
       potential Annexation phasing.
             Neighborhood Livability & Social Health 1.7 – Provide a high-quality built
             environment, support quality, diverse neighborhoods and foster the social health of
             citizens.
   Community Aquatics
    o To review and receive feedback on the consultant report related to Community Aquatics which
       will drive the next steps for the Mulberry Pool and aquatics in general.
             Culture & Recreation 2.21 – Develop recreation and cultural programs that are
             diverse, inclusive and accessible, and that also drive attendance.
   Stormwater Utility Capital Improvement Plan
    o Provide Council with an overview of the stormwater challenges the community faces as well as
       the proposed capital improvements needed. Staff will be looking for feedback from Council on
       the overall direction of the capital improvement plan.

CITY MANAGER’S UPDATE                                                                                   5
February 10, 2022 MLK Day 2022 - City of Fort Collins
Safe Community 5.5 – Address flooding risk for the protection of people, property
            and the environment.

PUBLIC ENGAGEMENT – UPCOMING EVENTS
1041 Regulations – Virtual Public Meetings: The City of Fort Collins is hosting virtual public
meetings to gather public input on 1041 regulations. There will be two virtual public meetings at noon
and 6:00 PM, both on February 23rd.

City Manager Recruitment: City Council received and reviewed 97 applications for the City Manager
position. After thoughtful evaluation and discussion by Council, Mark McDaniel, the executive recruiter
from SGR, has invited 19 semi-finalists to complete the next phase of candidate materials.

City Council will review these materials and discuss them Feb. 15 in an executive session, and
Council action to identify finalists is planned during February. Finalists' names will be posted on
OurCity, and additional information about the community forum open to all those interested and other
next steps in the process will also be provided as it becomes available.

SALES TAX - MONTHLY & YEAR TO DATE
This report reflects Sales and Use Tax collected in January for economic activity that occurred in
December. Please note the sales and use tax collected in January is predominately from December
sales but also includes delinquent collections from prior periods.

JANUARY SUMMARY OVER PRIOR YEAR
                                                           Month          Year to Date
Net Sales Tax Collected:                                   23.5%                 23.5%
Net Use Tax Collected:                                     62.9%                 62.9%
Net Sales and Use Tax Collected:                           27.5%                 27.5%

Year to date, sales and use tax collections excluding rebates are up 27.5% and total $16.3M.

JANUARY SUMMARY OVER BUDGET
                                                           Month          Year to Date
Net Sales Tax Collected:                                   17.6%                 17.6%
Net Use Tax Collected:                                     47.2%                 47.2%
Net Sales and Use Tax Collected:                           20.8%                 20.8%

Year to date, the City has collected 20.8% more sales and use tax revenue, totaling $3.2M over budget.

CITY MANAGER’S UPDATE                                                                                    6
February 10, 2022 MLK Day 2022 - City of Fort Collins
CP - ENGINEERING
POWER TRAIL AND HARMONY RAOD GRADE SEPARATED CROSSING
Funding Source: Federal Grant, Community Capital
Improvement Program (CCIP - Bike / Pedestrian Grade
Separated Crossings)
Estimated Project Budget: $7M - $10M
Estimated Completion Date: Pending funding
Phase: Preliminary Design
Project Details:
The Power Trail provides connectivity between the Spring
Creek Trail to the north and the Fossil Creek Trail to the
south. The Trail currently has a gap approximately three-
quarters of a mile long north and south of Harmony Road. The detour route requires users to cross
Harmony Road at grade at McMurry. This project will design, acquire property interests, and construct
a trail underpass at Harmony Road as well as the trail connections on either side.
Project Status:
 FOR Scope and Fee has been approved
 After the January 19th FIR restart meeting, advancement of design and utility coordination
   will continue throughout 2022.

More information is available at https://www.fcgov.com/engineering/powertrailcrossing

LINDEN STREET RENOVATION PROJECT

Overall Project Improvements

CITY MANAGER’S UPDATE                                                                                   7
February 10, 2022 MLK Day 2022 - City of Fort Collins
2022 Construction

Funding Source: Community Capital Improvement Program (CCIP)
Estimated Project Budget: $3.8M
Estimated Completion Date: 2022
Phase: Construction
Project Details:
The goals of this project are to renovate Linden Street between Walnut Street and Jefferson Street.
Initial concepts include converting this section of Linden Street to a “convertible” street; one that can
function primarily as a roadway but can also be closed to vehicles and converted to a pedestrian plaza
during specialty events.

Project Status:
 Continued outreach and engagement with business owners and stakeholders on Linden
   Street throughout the project.
 Construction Work Order finalized and awaiting signature and bonds from contractor
 Phase 2 construction to begin the week of February 7th, 2022
 Extended patio area barricades to be removed in coordination with mobilization and
   construction start.

More information is available at: https://www.fcgov.com/engineering/linden-street-renovation/

TIMBERLINE ROAD CORRIDOR PROJECT
Funding Source: Transportation Capital Expansion Fee
(TCEF), Developer Contribution, Federal Grant
Estimated Project Budget: $8M
Estimated Completion Date: 2022
Phase: Right-of-Way Acquisition and Construction

Project Details:
This project will reconstruct South Timberline Road from
Stetson Creek Drive to Zephyr Road to the City’s four lane
arterial roadway standards. Zephyr Road to Trilby Road will be
restriped to include two northbound lanes and one southbound
lane. Planned improvements include intersection
improvements at Kechter Road and Zephyr Road, multi-modal
accommodations, raised medians and center turn lanes,
access control, landscaping improvements, and roadway

CITY MANAGER’S UPDATE                                                                                   8
February 10, 2022 MLK Day 2022 - City of Fort Collins
improvements. A pedestrian underpass crossing Timberline Road will also be constructed near Bacon
Elementary School.

This project serves to build upon the development improvements that have been completed along the
corridor. This project will improve safety, reduce congestion, and provide improved accommodations
for alternate travel modes.

Project Status:
 Construction on the east half of the pedestrian underpass and irrigation ditch box culvert
   are about 25% complete.
 Traffic patterns will be shifted to the east side of Timberline Road in early March so that
   work on the west half of the two structures can be completed.
 The Timberline Corridor is pending CDOT authorization to advertise for construction.

More information is available at https://www.fcgov.com/engineering/timberlinewidening

LAPORTE AVENUE BRIDGE REPLACEMENTS
Funding Source: Capital Bridge Program
Estimated Project Budget: $4.2M
Estimated Completion Date: Spring 2023
Project Phase: Design 30% to 90%

Project Details:
This project will replace two bridges over the New Mercer
Canal just east of Taft Hill Road along Laporte Avenue
north of the cemetery. One bridge is structurally deficient
while the other is functionally obsolete. This project is
entirely locally funded and will employ the GM/GC
contract method.

Project Status:
 Design team kicked off
 Design team working on progressing 30% designs
 CM/GC RFP to advertise 1/31/22
 Putting together Public Involvement Plan

More information is available at https://www.fcgov.com/engineering/laporte-road-and-bridge-
improvements

LAPORTE AVENUE ROADWAY AND MULTI-MODAL IMPROVEMENTS
Funding Source: CCIP, Pedestrian Program, TAP grant, MMOF grant, Revitalizing Mainstreets grant,
TCEF
Estimated Project Budget: $4M
Estimated Completion Date: Spring 2024
Project Phase: Project Development

CITY MANAGER’S UPDATE                                                                                9
February 10, 2022 MLK Day 2022 - City of Fort Collins
Project Details:
This project will design and construct pedestrian, bicycle,
and other roadway improvements from Fishback to
Sunset to provide a safer connection to amenities
including Poudre High School and PSD offices. The
project is currently only funded to provide 30% design for
improvements along the entire corridor, however the final
design and construction of both bridges is fully funded
through the City’s Capital Bridge Program.

Project Status:
 CDOT IGA draft with City attorneys
 Resolution to Adopt IGA set for 1/15 council
   meeting
 Expected to advertise for design contract April
   2022

More information is available at https://www.fcgov.com/engineering/laporte-road-and-bridge-
improvements

CP - PARK PLANNING & DEVELOPMENT
BUCKING HORSE PARK
Funding Source: Neighborhood
Parkland Funds
Total Project Cost: $2.5 - $4.5 million
Phase: Design
Estimated Completion: 2023

Project Details:
Bucking Horse Park is a park planned
for the Bucking Horse neighborhood.

Project Status:
 Staff are reviewing cost
   estimates and completing 75%
   construction documents.
 Construction anticipated to begin in Spring.

More information available on project webpage.

CITY MANAGER’S UPDATE                                                                         10
EAST PARK DISTRICT MAINTENANCE FACILITY
Funding Source: Neighborhood Parkland &
Community Parkland Funds
Total Project Cost: $7 million
Phase: Design
Estimated Completion: Fall/Winter 2022
Project Details:
A maintenance facility to serve the East Park
District, which includes multiple neighborhood and
community parks, is proposed near the intersection
of Drake & Ziegler near the water treatment facility.
The maintenance facility will house Parks Department staff, equipment, and some minor material
storage.
Project Status:
 Construction began in December and is currently underway.
 Foundation recently poured.

MAIL CREEK TRAIL
Funding Source: Multiple Funding Sources including
Grants, TCEF, and Conservation Trust Funds
Total Project Cost: TBD
Phase: Pre-Design
Estimated Completion: TBD
Project Details:
When completed, the Mail Creek Trail will create a
trail connection from Kinard Middle School to the
Power Trail, providing much needed trail access for
southeast Fort Collins. Currently, design of the
Siphon overpass and Timberline trail
widening/underpass are in progress, in partnership
with the Engineering Department. In addition, Park Planning & Development is working to identify the
best location for the future Mail Creek Trail.
Project Status:
 Excavation for the underpass has begun.
 Trail design is underway.
 Stakeholder engagement continues for the alignment.

More information available on project webpage.

POUDRE TRAIL AT I-25
Funding Source: Conservation Trust Fund & GOCO Grant ($1M for Fort Collins)
Total Project Cost: $3 million
Phase: Design
Estimated Completion: 2023

CITY MANAGER’S UPDATE                                                                              11
Project Details:
Construction of this 2-mile section of the trail will complete the entire extent of the approximately 10-
mile Poudre Trail in the City of Fort Collins. Fort Collins partnered with Timnath, Windsor, and Larimer
County in 2019 to win a $2 million GOCO Connect Initiative Grant to complete all remaining segments
of the Poudre Trail. The GOCO project will complete approximately 4-miles of missing trail segments,
to complete the entre 40+ mile Poudre Trail from Bellvue to Greeley. The Fort Collins project will
connect the existing trail ending at the Colorado State Environmental Learning Center through the
future East Community Park to the proposed I-25 underpass to be constructed by the Colorado
Department of Transportation (CDOT) with the North I-25 project, and thereafter to the existing trail
segment in Timnath.
Project Status:
 Staff continuing to collaborate with developer, including significant coordination with
   Cottonwood Land and Farms regarding alignment.
More information available on project webpage

SPRING CANYON DOG PARK
Funding Source: Nature In the City Grant for $75,000
Total Project Cost: TBD
Phase: Design
Estimated Completion: Fall 2021
Project Details:
The water quality at Spring Canyon Community Park was adversely
affected by the drainage out of the dog park pond. Particularly,
issues like E. coli were difficult to manage and put the dog park
pond at risk of closure. Park Planning & Development worked with
Stormwater, Parks, and Environmental Regulator Affairs to seek
and receive a grant from Nature in the City. This grant will allow for much needed LID improvements
and restoration work on the dog park and SCCP water quality ponds.
Project Status:
 Construction will begin in the spring, expected opening by summer.

More information available on project webpage.

TRAVERSE PARK
Funding Source: Neighborhood Parkland Funds
Total Project Cost: $3.5- 4 million
Phase: Construction
Estimated Completion: December 2021
Project Details:
A new neighborhood park to be built in the Trail Head
neighborhood, located on East Vine Street. The park will
include typical neighborhood park features including a
shelter, playground, multi-purpose field, basketball court, and play area for teens.

CITY MANAGER’S UPDATE                                                                                   12
Project Status:
 Significant progress made toward securing easements for irrigation lines with adjacent
   landowners.

More information available on project webpage.

EDORA DISC GOLF PARK UPDATES
Funding Source: TBD
Total Project Cost: TBD
Phase: Planning
Estimated Completion: TBD
Project Details:
Staff are coordinating with two private disc golf
groups to significantly improve the course located
at Edora Park.
Project Status:
 Design of signage, tees and hole maps is
   near completion.
 Continuing work on funding solutions.
   Coordinating with local disc golf clubs on
   course updates.

CP - OPERATION SERVICES
BLOCK 32/42 – CIVIC MASTER PLAN REFRESH
Funding Source: Capital Project via BFO: $300,000
Estimated Project Cost: TBD
Phase: Conceptual Master Plan
Estimated Completion Date: June 2022

Project Details:
Space planning for Block 32 and 42 that was performed in 2013-2014 and
needs to be updated. The new planning effort will involve each affected
department to determine their space needs and anticipated growth over the
next 10-12 Years. With the completion of the refresh the City can decide
which departments to house in 215 N. Mason, 300 Laporte Ave - Building
A, and the new City Hall. The refresh will also help determine an
appropriate size of the new City Hall. Once this is determined and a
conceptual design is produced it will be submitted to Council for review, next recommended steps and
approval.

Project Status:
 The Master Plan has been adopted by City Council.
 Currently working with Clark & Enersen to determine the proper timing on proceeding with the next
   steps outlined in the Council Work Session presentation. Specifically, the traffic and parking
   studies and are likely to commence Spring 2022.

CITY MANAGER’S UPDATE                                                                                  13
CP - UTILITIES
JOINT TRAINING FIELD WITH POUDRE FIRE AUTHORITY
Funding Source: Offer # 11.21
Estimated Project Budget: $110,000 ($55,000 each in
2021 and 2022).
Phase: Design

Project Details:
 Poudre Fire Authority (PFA) and Utilities staff have
   been coordinating a plan to collaborate on training
   services that will benefit both agencies at the PFA
   Training Center on West Vine Drive. The development
   of these props will benefit the City’s Utilities Service
   Area by eliminating the need to purchase land on
   which to erect the props, and PFA benefits through
   the partnership by adding new dimensions to special
   rescue training, as well as partnering with Utilities to
   facilitate other site improvements. In this arrangement,
   PFA staff is working with Utilities staff to develop the
   construction drawings, surveys, and any excavation           Electric Field Service crew training
   and installation work that is necessary for the project.
   PFA’s cost is expected to be minimal, and Utilities has
   existing and future offers in the City’s budgeting
   process to cover their portion of the expenses.

Project Status:
 Initial poles for climbing and pole rescue training have been set. Remainder of poles are to
   be set early 2022.
 Access road improvements are expected to be constructed early 2022.
 Meeting scheduled for 2/18/22 on site with PFA/L&P for next steps.

STONEHENGE CABLE REPLACEMENT-PRIORITY #4
Funding Source: BFO # 8.9
Estimated Project Budget: $283,500
Phase: In Construction

Project Details:
 Electric primary cable has been evaluated through the
   City based on year of installation, style of cable and
   manufacturer to establish a prioritized failure risk. This
   area was calculated as Priority Area #4 citywide and
   involves the replacement of one (1) section of 3-phase
   power and 56 sections of single-phase power. The
   replacement primarily occurs within the Stonehenge
   Subdivision located east of S. Lemay Avenue along
   Stuart Street.
Project Status:
                                                                      Aerial View of Priority Area
CITY MANAGER’S UPDATE                                                                                  14
     Due to COVID 19 and with a lot of people working and learning from their homes, extra
      construction planning around outages is needed and may require outages to occur after hours or
      on weekends.
     Approximately 70% of all the single-phase cable sections have been replaced.
     Currently the 3-phase cable section is still in construction planning.
     Currently, 75% of the existing transformers designated for replacement have occurred with
      minimum outages.

OAK STREET STORMWATER IMPROVEMENTS PROJECT
Funding Source: Stormwater
Estimated Project Budget: $2.0M (Design), $23M (Construction), $25M Total
Status: In Design
Estimated Completion Date: Fall 2022 (Design), Early 2023 (Construction)

    Road Repair Project at the Trolley Tracks at Mack and Mountain,
    Summer 2012

Project Details:
This project is for the design and construction of stormwater infrastructure for the Oak Street Stormwater
Improvements Project (OSSP) that is part of the larger Downtown Stormwater Improvement Program
(DSIP). The project is located on Oak Street from Mason to Jackson and will include a few storm laterals
extending to the blocks both north and south of Oak Street. There will be approximately 8500 LF of new
storm pipe installed with this project, ranging in size from 78” to 48”.

This project will cross the Fort Collins Municipal Railway tracks (aka trolley tracks) in three locations on
Mountain Avenue. The design team has been investigating the requirements to repair the tracks after
construction. The photo above documents a repair project at Mack Street in 2012.

CITY MANAGER’S UPDATE                                                                                     15
Project Status:
 Permitting – Dewatering Permit through CDPHE; After groundwater investigation, this project will
   fall under the parameters of the general permit for dewatering.
 Permitting – Investigation into the permitting process with BNSF railroad has begun.
 Preliminary (60%) Design – Plans due February 4, 2022
 Cost Estimating – BT Construction and Connell Resources to produce a cost estimate based on
   the Preliminary Design Plans, due March 11, 2022
 Independent Cost Estimate – Capstone to conduct independent cost analysis based on the
   Preliminary Design Plans. Reconciliation of cost estimates due April 8, 2022

27” POUDRE CANYON RAW WATERLINE
Funding Source: Water - BFO#12.21 (2021)
Estimated Project Budget: $3,2000,000
Status: In Design
Estimated Completion Date:
 Final Design – March 2022
 Construction - August 2023

Project Details:
The goal of this project is to ensure the structural integrity and operational longevity of the City’s 27”
raw waterline in the Poudre Canyon. An existing, exposed section of the pipeline in the river near
Gateway Natural Area will be replaced to eliminate the risk of failure which ensures the continued
delivery and reliability of raw water from the Poudre River to the Water Treatment Facility. The design
will consider the existing geomorphology of the river to develop a long-term solution which may require
pipe alignment modifications and deeper burial depths of the pipeline. Final design and construction of
the selected alternative are included in this project.

                                       Horizontal Pipe Alignment
                                        (60% Design Drawings)

Project Status:
 Land acquisition process successfully completed with landowner.
 Ongoing team meetings with consultant and contractor on design and construction
   issues/decisions.
 Ongoing Stakeholder meetings.
 Risk Register updated and discussed with Project Team.
 Advancement of permitting documents and reviews taking place.
CITY MANAGER’S UPDATE                                                                                   16
   Coordination with Natural Areas and revegetation/restoration recommendations complete.

PUBLIC SAFETY
POUDRE FIRE AUTHORITY
Firefighter Recruitment Update
The first stage of the Poudre Fire Authority (PFA) hiring process closed on January 31 after two
months of active outreach and recruitment. The first step for applicants was to test through the
National Testing Network. A group of applicants was selected to move to the second round based on
their scores. PFA is expecting to welcome and train the largest group in its fire academy history this
fall.

Dog Rescued from Icy Pond | Feb. 7

Just after 5:30 p.m., the Tower 5 Crew rescued a golden retriever from an icy pond near Globe Ct. in
Southeast Fort Collins. The dog had been in the freezing waters for about 10 minutes according to
bystanders. The dog swam toward the PFA responder as he approached in a specialized ice rescue

CITY MANAGER’S UPDATE                                                                                    17
suit. The responder entered the water and safely hoisted the dog out. It walked to shore and gave
itself a good shake. The UCHealth medical unit assessed the dog and did not find any issues. After a
quick warmup in a blanket the golden retriever was returned to its owner. The people that called 911
did the right thing by calling for help rather than attempting to enter the water. PFA crews completed
ice training refreshers just a few weeks before the incident.

Mask Distribution Event | Feb. 5

PFA members of the Fire Prevention and Community Risk Reduction Division distributed free KN95
masks at drive thru event at the Northside Aztlan Community Center. The event was scheduled from
1:00 to 3:00 p.m. but staff decided to open the event about 20 minutes early because the line of cars
reached from the north end of the parking lot out onto Willow. St. The Colorado Division of Homeland
Security and Emergency Management delivered masks to libraries and fire departments across the
state so they could serve as local distribution sites.

CITY MANAGER’S UPDATE                                                                                    18
Two Chimney Fires in Two Weeks
PFA firefighters extinguished two chimney fires in the last two
weeks of January. They shared information about the
importance of chimney maintenance and the dangers of
creosote buildup. Creosote is a highly flammable residue that
builds up in chimneys. An unmaintained chimney could be lined
with what’s essentially an effective fire fuel. Here are three ways
to prevent the buildup of creosote in the first place but annual
chimney inspections and sweepings are still recommended.1)
Burn ONLY dry, properly seasoned firewood. Wet or green
wood is a major contributor to creosote production and buildup.
So, simply by burning dry, properly seasoned firewood (and
nothing else) in your fireplace, you’re greatly reducing your
chances of having a chimney fire. 2) Make sure your chimney is
properly lined and the liner is in good shape. A good,
appropriately sized, and properly installed chimney liner will
improve the performance and safety of your fireplace or
woodstove, which means less fire risk and less creosote
production. 3) Make sure your chimney gets adequate air. A chimney that’s getting adequate air will
burn at hotter temperatures and have better draft, which, again, means you’ll see less creosote
production.

POLICE SERVICES
Notable Cases

911 Dispatcher Delivers Baby - In early
January, a local mom went into labor with
her second child. She didn't think they'd
make it to the hospital in time before their
newest family member made an
appearance, so her husband called 911.
Dispatcher Megan Biberos took the call
and walked the family through the entire
process. This experience was a first for all
involved – the family never imagined their
birth plans would involve their home
bathroom, and Megan had never talked
someone through a full delivery. A week after this unforgettable birthday, the family came to FCPS to
put a face to the voice who helped them. And, for the very first time in her 10-year career, Megan got
to meet a caller she’d served. Denver7 covered the sweet reunion, which can be seen here:
https://www.thedenverchannel.com/news/local-news/ill-remember-her-forever-fort-collins-911-
dispatcher-helps-deliver-baby-girl

Weapons call ends in safe arrest - On a quiet early morning in January, FCPS received several
reports from community members about the sound of gunshots in South Fort Collins. As the calls were
coming in, area officers noticed a pickup truck driving erratically through town. They followed it, found
the truck stopped at an apartment complex on Landings Drive, and learned that the driver had already
CITY MANAGER’S UPDATE                                                                                    19
run away to a nearby apartment. They tried to contact him, but he refused to follow instructions.
Officers kept trying, and after about an hour, the man came outside. Through their investigation, police
determined that the man had been driving around the city and randomly firing shots out of his truck.
Fortunately, no injuries or damages have been reported. He was safely taken into custody and
arrested for Reckless Endangerment and Disorderly Conduct. Following the arrest, officers obtained a
search warrant and located the gun.

Agency News

30th Annual Award Ceremony – FCPS honored agency employees and community members at our
30th annual awards ceremony held in January. From lifesaving actions to compassionate service,
these people truly went above and beyond to help others in need, even at great personal risk in some
cases. This ceremony was a meaningful opportunity to reflect on the incredible ways that our agency
and residents invest in the wellbeing of our community.

2021 Annual Report - As we focus on the future and plan where we're going, FCPS continues to
reflect on where we've been. With that in mind, our 2021 annual snapshot report is now available
online. This report provides a brief overview of programs, priorities, partnerships, crime stats, and
more from the last year: https://www.fcgov.com/police/files/annual-report_final.pdf?1643843673

CITY MANAGER’S UPDATE                                                                                   20
Community Engagement

Police Department Tour - Spectrum Community Services is a service provider for people with
intellectual and developmental disabilities. A group from this organization visited the police station to
tour the building, check out the BearCat rescue vehicle, and connect with officers. The Neighborhood
Engagement Team and Mental Health Response Team had a great time meeting everyone!

Martin Luther King, Jr. Day - From walking alongside our community members to ensuring safety
along the route, FCPS was honored to march with our community and support the living legacy of Dr.
Martin Luther King Jr. The event’s theme was The March Is Far From Over. Chief Jeff Swoboda
shared a reflection about this on the agency’s Facebook page: “What does this mean in Fort
Collins in 2022? To me, it means that we still have segments of our community that need our support.
It means that we can continue to improve service access, to identify and remove barriers to inclusion,
and that we have opportunities to grow.”

CITY MANAGER’S UPDATE                                                                                       21
PLANNING, DEVELOPMENT &TRANSPORTATION
BUILDING, PLANNING AND DEVELOPMENT REVIEW
Monthly Reporting
Monthly construction reporting and mapping of development review proposals and construction can be
found by visiting:
http://citydocs.fcgov.com/?dt=MONTHLY+REPORT&dn=NEIGHBORHOOD+%26+BUILDING+SERVI
CES%2FZONING&vid=2&cmd=showdt

For a detailed listing of development Proposals under review, please visit:
https://www.fcgov.com/developmentreview/proposals/

YEAR TO DATE COMPARISON
                                                               2022           2021 YTD    % Change
Development Project Submittals Received                          41                  23     -43.90%
Conceptual/Preliminary Design/Staff Reviews                      23                  12     -47.83%
Building Permits Issued                                         723                 597     -17.43%
Building Permit Valuations ($M)                              $16.75              $27.91      66.62%
Building Inspections Performed                                2,514               2,606       3.66%
Zoning Inspections Performed                                     46                  15     -67.39%
Zoning Plan Reviews Performed                                   244                 194     -20.49%

Overall Development Review Center revenues are $232,414 under projection for 2022 as of January
31st, with Building Services under by $211,127, Neighborhood Services and Code Compliance under
by $1,521, Development Review under by $718 and Engineering Development Review under by
$19,048.

GRAFFITI UPDATE
During the month of January 2022, the Graffiti Abatement Team abated 55 issues consisting of 182
tags measuring 409 square feet of graffiti-covered surfaces.

    Month           Access FC         Hotline        Pro-Active           Total
 January                     4                  43                8               55

The issues were distributed throughout the City in the following Council Districts:

    Month          One        Two        Three       Four       Five          Six
 January                11        7             5        5            5           22

CITY MANAGER’S UPDATE                                                                              22
SUSTAINABILITY SERVICES
ENVIRONMENTAL SERVICES
Shift Your Water | Free Toilet!
                                                       Make a simple shift for water conservation! Sign
                                                       up for a free home efficiency assessment with
                                                       the experts at Larimer County Conservation
                                                       Corps today to get water-efficient products
                                                       installed in your home and see if you’re eligible
                                                       for a free new toilet.

                                                          What is a home efficiency assessment?
                                                          Assessments last 1-2 hours. During a Home
                                                          Efficiency Assessment, corps members educate
                                                          residents about water and energy efficiency
                                                          practices and services as well as retrofit water-
conserving showerheads and faucet aerators, smoke/carbon monoxide detectors, clotheslines, light
bulbs, furnace air filters, and high-efficiency toilets based on resident’s needs. All corps members are
trained and adhere to current COVID-19 protocols.

SOCIAL SUSTAINABILITY
City Deploys Land Bank Parcel for Affordable Home Ownership Development:
Last month, the City of Fort Collins sold a parcel of land, part of its “affordable housing land bank” to
be developed for affordable, for-sale housing. The land was sold to a development partnership led by
Indiana based TWG and includes Elevation Community Land Trust (ECLT) from Denver and Housing
Catalyst from Fort Collins.
The 5-acre parcel located at 3620 Kechter Road was purchased for the City’s land bank in 2002. TWG
will construct 54 townhomes on the land and sell them to ECLT who will retain ownership of the land
but sell the homes to qualified low wage-earning households. This will be the City’s first permanently
affordable, for-sale affordable housing development.

“The location of this property between two schools and two parks makes it ideal for this townhome
community. Generations of families will benefit from the housing built there,” said Sue Beck-Ferkiss,
who manages the Land Bank Program for the City.

The City of Fort Collins Land Bank Program buys and holds land for the future development of
affordable housing. The program is Fort Collins' only long-term affordable housing incentive. Between
escalating land prices and the realities of a fixed Growth Management Area (GMA), this program
ensures land will be available in the future to increase the stock of affordable housing homes.
A groundbreaking celebration for the Kechter project will be held in February 2022. Details will be
released soon.

CITY MANAGER’S UPDATE                                                                                     23
ECONOMIC HEALTH
Larimer County Mask Order Ends February 12

The Larimer County Department of Health & Environment (LCDHE) would like us to share with the
business community that due to improving COVID-19 conditions they have announced that the mask
order will expire on February 11, 2022 at 11:59 pm. Such a timeline allows for the Omicron wave to
further retreat and gives families, local businesses, and schools time to prepare for the transition. In
their press release, health officials are asking residents to be kind and patient in local businesses,
noting that some might choose to continue to require masks in their facilities.

As of February 12, 2022, businesses are no longer required to post signage requiring masks. The
Health Department has made signs available here for those who would like to encourage masks in
their facilities. The Health Department thanks the business community for their ongoing patience and
partnership. Questions and comments can be sent to LCDHE at CovidConcerns@larimer.org.

UTILITIES
CUSTOMER CONNECTIONS
   Xeriscape Incentive Program for HOAs and Commercial Customers: The application review
    committee met in late January and selected award recipients for twelve projects converting from
    high- to low-water use landscape. Landscapes are scheduled for installation in 2022 with a total
    project area over 170,000 square feet.

In the month of February, Utilities will offer the following engagement opportunities:

   February 3 - Fort Collins Floodplain Management Committee Annual Meeting – Each year
    Utilities engages a group of internal and external stakeholders to develop, guide and implement a
    public information plan for floodplain safety and education.

CITY MANAGER’S UPDATE                                                                                      24
   February 9th and 23rd – Sustainable Business Program - Utilities, in collaboration with
    Environmental Services Department and led by the Sustainable Living Association and Fort Collins
    businesses, is reimagining how sustainable business programing looks in Fort Collins. This month
    aspects of a future program are considered and prepared in advance of a summer pilot program.
    Learn more about this project https://sustainablelivingassociation.org/sustainable-business-
    program/.
   February 9 – CSU Housing Fair – Utilities joins property management companies, landlords,
    realtors, other community resources, and Colorado State University offices to inform the CSU
    community about housing options and resources.
   February 11 – Winter Bike to Work/Anywhere Day - Utilities once again has partnered
    with businesses and organizations to sponsor the Oak Street Plaza breakfast and bike
    repair station. Grab a bite to eat, bike adjustments and learn about Utilities resources.
   February 26 - Xeriscape Incentive Program Basics Training – Staff will present information and
    resources on how to participate in Utilities Xeriscape Incentive Program and be eligible to receive
    a 2022 rebate for transforming their high-water use areas into water-wise landscapes.

In 2022, Utilities Customer Connections has reached 24 participants through three outreach events in
January.

In the month of January, Utilities offered the following engagement opportunities:
 January 5 – CSU Housing and Dining Fair – Utilities shared affordability and
    conservation information and resources with CSU Housing and Dinning staff at this annual event.
 January 12 and 26- Sustainable Business Program - Utilities, in collaboration with Environmental
    Services Department and led by the Sustainable Living Association and Fort Collins businesses, is
    reimagining how sustainable business programing looks in Fort Collins. This month aspects of a
    future program are considered and prepared in advance of a summer pilot program. Learn more
    about this project https://sustainablelivingassociation.org/sustainable-business-program/.

COMMUNITY SERVICES
RECREATION
   Front Range Forum, a volunteer led group focused on lifelong learning at the Senior Center,
    started classes for their Winter term with 120 people registered. Classes cover topics like The
    American War in Afghanistan, Garbology, The Great American Famine, and Dimensions of
    Racism.
   Sports is creatively coordinating youth team schedules to ensure all groups have access to
    facilities for practice during the week. Due to Covid impacts and staffing shortages, there have
    been a reduced number of facilities within the community available for rental and practice space.
   The Farm passed a recent inspection for licensing with the USDA. This process ensures proper
    care and maintenance of both the facility and animals who live there.
   Recreation welcomed LeAnn Williams as the new Director of Recreation. Her first day of work was
    Monday, February 7.
   Due to staffing shortages, Mulberry Pool is currently operating with reduced hours. Staff are
    working hard to bring on new staff and restore levels of services as soon as possible.

CITY MANAGER’S UPDATE                                                                                25
PARKS
   Player Assistant Program changes for the Golf
    Division include a system that pays the assistants for
    their time bundled with golf privileges.
   Snow has returned to the Front Range after a dry Fall
    that required additional tree watering. Snow removal
    operations are in full swing.
   Seasonal purchasing of summer supplies includes
    ballfield supplies, fertilizer, plant material and safety
    supplies.
   The seasonal multi-cultural display at Library Park was
    removed for the season.
   Edora pond dredging project finalizing RFP
    paperwork.

CULTURAL SERVICES

                        Wynton Marsalis and the Jazz at Lincoln Center Orchestra

   The Lincoln Center will present New York City-based Jazz at Lincoln Center Orchestra with
    Wynton Marsalis on February 18th. Led by the nine-time Grammy-winning legend and trumpet
    virtuoso, Wynton Marsalis, the Orchestra features 15 of the finest jazz musicians today. The
    Orchestra performs a vast repertoire, from rare historic compositions to commissioned works,
    including compositions and arrangements by Duke Ellington, Count Basie, Fletcher Henderson,
    Thelonious Monk, Mary Lou Williams, and many others.
   The Fort Collins Museum of Discovery will present Music Industry Night on February 16th. Music
    Industry Night is an evening for the musician community of Northern Colorado to safely connect,
    find resources, and have fun! Attendees can get their instrument or pedalboard cleaned up at the
    refresh station, contribute to a community art project, or participate in a socially-distanced jam.
CITY MANAGER’S UPDATE                                                                                26
NATURAL AREAS
Five Land Acquisitions Conserved 207 Acres in 2021
Two Dry Creek Additions
Two parcels, one of nine acres and another of two acres were purchased along the Dry Creek
corridor, a conservation focus area. One parcel currently is the northern-most acquisition serving as
an important wildlife corridor and a potential north-south trail corridor connecting communities in the
area to the Poudre Trail. The second parcel connects existing conserved lands to Willox Lane. When
approached by staff, the landowners were intrigued in selling land that had been in the family for
almost a century, to preserve the current residence, a former one-room schoolhouse.

Crossline Canyons Addition
A 155-acre purchase extends the reaches of Crossline Canyons Natural Area, securing additional
wildlife habitat for the crossline skipper butterfly, black bears, mountain lions, and elk. The four
parcels making up the acquisition were used for livestock grazing and farming. The site encompasses
rock outcrops, steep foothills and small glades which give rise to distinct ecological communities like
montane-foothills shrubland and ponderosa pine woodland.

Cooper Slough
Twenty-four acres were purchased along the Cooper Slough, a conservation focus area designated in
the Land Conservation and Stewardship Master Plan, 2014. This area is deemed high priority
because of the unique warm water slough that does not freeze, which invites heavy wildlife use in the
winter and year-round. The property historically was used for agriculture but has stood vacant for
many years.

New Conservation Easement
A 17-acre residential and agricultural property directly along the Poudre River has been on the
potential conservation list for some time. After the property spent 80 years with the same family, they
decided to grant the City a conservation easement to preserve the relatively natural habitat and open
space. The property preserves an intact portion of the river amidst intense sand and gravel mining
activity. It is hoped that this conservation easement will jump start more conservation partnerships in
the vicinity.

CITY MANAGER’S UPDATE                                                                                 27
Acreag
 Land Conservation Summary To Date                                                                                 Cost
                                                                                                      e
 Acres of Land Purchased                                                                            39,543
 Acres of Land Leased                                                                                     87
 Acres of Land in Conservation Easements                                                            15,674
 Total Conserved - To Date                                                                          55,304     $ 153,051,675

                                                                                                   Acreag
 2021 Total Acquisitions                                                                                           Cost
                                                                                                     e
 Burrill Family                              Fee Acquisition             Dry Creek                     1.6     $     500,000
 Anderson Family                             Fee Acquisition             Cooper Slough                    24   $   1,245,000
 Leach Family                                Fee Acquisition             Dry Creek                        9    $     625,500
 Sharp Family                                Fee Acquisition             Crossline Canyons NA         155      $     750,000
 Brookman Family                             Conservation Easement       Poudre River Corridor            17   $     180,742
 Total Conserved - Year To Date                                                                       207      $   3,301,242

 Land Conservation Funds Budgeted for 2021                     $3,900,000 + Re-appropriation $4,313,875        $   8,213,875
 Land Conservation Funds Expended in 2021 to Date                                                              $   3,301,242
 Net Land Conservation Funds Remaining for 2021                                                                $   4,912,633

                                                                                                   Acreag
 Agreements / Under Contract                                             2022 Closings                             Cost
                                                                                                     e
 Northwest Fort Collins                                                  Fourth Quarter                   17   $   1,900,000
 Foothills                                                               Second Quarter               414      $   4,062,800
 West Fort Collins                                                       Second Quarter               168      $   2,000,000
 LCDNR Partnership                                                       Fourth Quarter               428      $     444,485
 Loveland Separator                                                      Fourth Quarter                   30   $     187,000
 Totals                                                                                              1057      $   8,594,285

                                                                                                   Acreag
 Agreements / Under Contract                                             2023 Closings                             Cost
                                                                                                     e

CITY MANAGER’S UPDATE                                                                                                          28
Foothills                                          First Quarter 2023    261   $   2,662,200
 Totals                                                                   261   $   2,662,200

Ranger Team Update
Rangers issued 83 summons, 56 warnings, and provided response to 38 dispatches for direct patrol
and emergency needs. In contrast, Rangers made 907 cordial contacts that including 373
informational/educational contacts and responding to 150 phone calls.

In 2021, Rangers issued 382 summons and 332 warnings and provided response to 135 dispatches
for patrol and emergency needs. In contrast, Rangers made 4,107 cordial contacts that included
providing 1,927 informational contacts and responding to 825 phone calls.

PUBLIC ENGAGEMENT
2022 State of the City: Mayor Jeni Arndt and Interim City Manager Kelly DiMartino hosted the State
of the City on Feb. 1, reflecting on 2021 and looking forward to the future of Fort Collins.
If you missed the live event, you can watch the replay on the City’s YouTube channel, or read the
report to the community at fcgov.com/stateofthecity.
As part of this year’s theme, pre-stamped postcards were made available at various City facilities for
the community to send a note to someone who makes Fort Collins better. The community is
encouraged to also share their notes of thanks online using #FoCoLoveLetter.

CITY MANAGER’S UPDATE                                                                                    29
BROADBAND – FORT COLLINS CONNEXION
Winter Weather and Connexion Installations

                                             Winter weather is upon us here in Fort Collins! With our
                                             network being 100% underground, including from the
                                             street to the side of your house, we do occasionally run
                                             into issues with frozen ground during the winter months.
                                             Cold temps and snow can sometimes prove challenging
                                             with construction and installation, but the good news is
                                             that fiber is naturally weatherproof and works up to -25
                                             degrees Fahrenheit!
                                             If frozen ground is an issue when conducting an install
                                             at your home, we can run a temporary drop above
                                             ground for your Connexion service. This temporary drop
                                             will be installed underground permanently once the
                                             ground has thawed. Our OnTrac, Inc. crews regularly
                                             monitor areas to determine if ground has thawed
enough to complete the installation and complete the direct-bury process.

New Website
Connexion has a new website! The new www.fcconnexion.com provides a stand-alone website
(separate from the City of Fort Collins) with resources and all the necessary information on service
availability, offerings, how to sign up for service and more, which will improve overall user experience.
The site also provides access to the new customer self-service portal which rolled out mid-December
along with the new Connexion billing system. We recently added a support hub with information and
support tools for customers including FAQ’s, how-to's, speed tests and other information as well as
access to all our news articles.

Address Look-up
We have enhanced our address
lookup tool! Now residents can
enter their address and get either a
month or season (Spring, Summer,
Fall) when they can anticipate
having Connexion Service available
for their property. Our address
look-up tool can be found on the
Connexion website at
www.fcconnexion.com.

CITY MANAGER’S UPDATE                                                                                   30
You can also read