Environmental Setting and Site Design Report

Page created by Peter Patton
 
CONTINUE READING
Environmental Setting and Site Design Report
Environmental Setting and
Site Design Report
Birtley Quarry
Environmental Permit Application

Ibstock Brick Limited

February 2018
Environmental Setting and Site Design Report
Environmental Setting and Site Design Report                                                 Project Reference: Birtley Quarry

Quality information
Prepared by                                    Checked by                           Approved by

Helen Woodmancy                                Angela Graham                        Angela Graham
Environmental and Planning                     Associate                            Associate
Consultant
                                               (Minerals and Waste)                 (Minerals and Waste)
(Minerals and Waste)

Revision History
Revision                Revision date          Details                Authorized   Name               Position

Distribution List
# Hard Copies           PDF Required           Association / Company Name

Prepared for: Ibstock Brick Limited                                                                                  AECOM
Environmental Setting and Site Design Report
Environmental Setting and Site Design Report                                 Project Reference: Birtley Quarry

Prepared for:
Ibstock Brick Limited

Prepared by:
AECOM Infrastructure & Environment UK Limited
Royal Court
Basil Close
Derbyshire
Chesterfield
S41 7SL
UK

T: +44 (1246) 209221
aecom.com

© 2018 AECOM Infrastructure & Environment UK Limited. All Rights Reserved.

Prepared for: Ibstock Brick Limited                                                                  AECOM
Environmental Setting and Site Design Report
Environmental Setting and Site Design Report   Project Reference: Birtley Quarry

Prepared for: Ibstock Brick Limited                                    AECOM
Environmental Setting and Site Design Report
Environmental Setting and Site Design Report                                                                                       Project Reference: Birtley Quarry

Table of Contents
1.       Introduction .................................................................................................................................................. 9
         1.1       Report Context ................................................................................................................................. 9
         1.1.1 The Operator .................................................................................................................................... 9
         1.1.2 The Agent ......................................................................................................................................... 9
         1.1.3 Site Description and Outline of the Proposed Activity ....................................................................... 9
         1.2       Site Details ..................................................................................................................................... 10
         1.2.1 Site Location and Access................................................................................................................ 10
         1.2.2 Site Classification ........................................................................................................................... 10
         1.2.3 Application Boundaries and Site Security ....................................................................................... 10
         1.2.4 Adjacent Former Waste Management Activity Boundaries ............................................................. 10
         1.3       Site Context .................................................................................................................................... 11
         1.3.1 Local Topography ........................................................................................................................... 11
         1.3.2 Environmental Receptors and Nature Protection Zones ................................................................. 11
         1.3.3 Residential Receptors..................................................................................................................... 12
         1.3.4 Recreational Areas ......................................................................................................................... 12
         1.3.5 Waterways ...................................................................................................................................... 12
         1.3.6 Water bodies................................................................................................................................... 13
         1.3.7 Agricultural or Urban Sites .............................................................................................................. 13
         1.3.8 Industrial and Commercial Sites ..................................................................................................... 13
         1.3.9 The Agency’s position statement on the location of Landfills .......................................................... 13
2.       Source ....................................................................................................................................................... 14
         2.1       Historical Site Development............................................................................................................ 14
         2.1.1 Historical Use of the Land............................................................................................................... 14
         2.1.2 Relevant Historical Areas of Waste Activity..................................................................................... 14
         2.1.3 Other Land Uses ............................................................................................................................ 14
         2.1.4 Incidents ......................................................................................................................................... 14
         2.2       Proposed Development .................................................................................................................. 15
         2.2.1 Proposed Waste Types ................................................................................................................... 15
         2.2.2 Quantity of Material Required ......................................................................................................... 16
         2.2.3 Phasing........................................................................................................................................... 16
         2.2.4 Hydrogeological Risk Screening ..................................................................................................... 16
         2.2.5 Final Landform and After-use ......................................................................................................... 16
3.       Pathway and Receptor............................................................................................................................... 17
         3.1       Published Geology ......................................................................................................................... 17
         3.1.1 Superficial Deposits ........................................................................................................................ 17
         3.1.2 Solid Geology ................................................................................................................................. 17
         3.1.3 Ground Investigations ..................................................................................................................... 17
         3.2       Hydrology ....................................................................................................................................... 17
         3.2.1 Water Courses ................................................................................................................................ 17
         3.2.2 Flood Risk....................................................................................................................................... 18
         3.2.3 Water Quality and Existing Contamination ..................................................................................... 18
         3.2.4 Surface Water Discharge Licences................................................................................................. 18
         3.3       Hydrogeology ................................................................................................................................. 18
         3.3.1 Aquifer Characteristics.................................................................................................................... 18
         3.3.2 Groundwater Flow .......................................................................................................................... 18
         3.3.3 Groundwater Monitoring ................................................................................................................. 19
         3.3.4 Groundwater Quality ....................................................................................................................... 19
         3.4       Man-made Subsurface Pathways ................................................................................................... 21

Prepared for: Ibstock Brick Limited                                                                                                                             AECOM
Environmental Setting and Site Design Report
Environmental Setting and Site Design Report                                                                                      Project Reference: Birtley Quarry

         3.5       Receptors and Compliance Points ................................................................................................. 22
         3.5.1 Hydrogeological Risk Assessment .................................................................................................. 22
         Groundwater .............................................................................................................................................. 22
         Surface Water ............................................................................................................................................ 22
         3.5.2 Amenity........................................................................................................................................... 22
4.       Pollution Control Measures ........................................................................................................................ 25
         4.1       Site Engineering ............................................................................................................................. 25
         4.1.1 Buttresses....................................................................................................................................... 25
         4.1.2 Materials and Materials Testing ...................................................................................................... 25
         4.1.3 CQA Requirements ......................................................................................................................... 26
         4.2       Restoration ..................................................................................................................................... 26
         4.3       Surface Water Management ........................................................................................................... 27
         4.3.1 Drainage ......................................................................................................................................... 27
         4.3.2 Existing Surface Water Monitoring Points ....................................................................................... 27
         4.4       Post Closure Controls (Aftercare) ................................................................................................... 28
5.       Monitoring .................................................................................................................................................. 29
         5.1       Weather .......................................................................................................................................... 29
         5.1.1 Obtaining meteorological information ............................................................................................. 29
         5.1.2 Prevailing wind direction and strength ............................................................................................ 29
         5.2       Site Survey ..................................................................................................................................... 29
         5.3       Waste Monitoring ............................................................................................................................ 29
         5.4       Groundwater and Surface Water Monitoring................................................................................... 29
         5.5       Gas Monitoring ............................................................................................................................... 30
6.       Site Condition Report ................................................................................................................................. 31
Appendix ESSD1 Hydrogeological Risk Assessment
Appendix ESSD2 Hydrogeological Interpretive Report
Appendix ESSD3 Surface Water Discharge Permit

Prepared for: Ibstock Brick Limited                                                                                                                            AECOM
Environmental Setting and Site Design Report                                                          Project Reference: Birtley Quarry

Figures
Table 1. List of Figures

Drawing          Scale                                               Title

D-ESSD1          50,000                                              Site Location

Detail           Site location in relation to surrounding features

D-ESSD2A         10,000                                              Environmental Site Setting
Detail           Site boundary
                 Residential areas
                 Schools, hospitals, care homes etc.
                 Recreational areas
                 Waterways
                 Water bodies
                 Agricultural areas
                 Urban sites
                 Roads, railways
                 Safeguarded aerodromes

D-ESSD2B         10,000                                              Flood Risk Zones
                 Flood risk map overlay
D-ESSD3          25,000                                              Cultural and Natural Heritage

Detail           Natural heritage
                 SSSIs, AONBs, National Parks
                 SACs, SPAs, Ramsar sites
                 Cultural heritage
                 Listed buildings
                 Scheduled ancient monuments

D-ESSD4          2,500                                               Site Layout and Waste

Detail           Deposition
                 Cell layout
                 Filled areas
                 Existing contours

D-ESSD5A         2,500                                               Restoration – Final Contours

Detail           Final contours

D-ESSD5B         2,500                                               Proposed Final Scheme Cross Sections

Detail           Final cross sections

D-ESSD5C         2,500                                               Conceptual Quarry Restoration Masterplan

Detail           Conceptual quarry restoration masterplan
                 Landscape planting proposals
                 Aftercare proposals

D-ESSD6A         2,500                                               Existing Topography and Geotech Assessment
Detail           Existing topography
                 Security infrastructure (gates and fencing)
                 Groundwater control
                 Surface water management features
                 Infrastructure

D-ESSD6B         2,500                                               Proposed Earthwork Solution and Cross Sections
                 Summary of engineering details on a cell by cell basis (possibly in a table on the drawing),
                 accompanied by schematic cross sections of the proposed layout.
                 Security infrastructure (gates and fencing)
                 Surface water management features

Prepared for: Ibstock Brick Limited                                                                                           AECOM
Environmental Setting and Site Design Report                                                         Project Reference: Birtley Quarry

Drawing          Scale                                           Title

D-ESSD7          2,500                                           Gas Monitoring
Detail           In waste monitoring points                     This plan is not required as no gas monitoring
                 Perimeter/ external monitoring points          currently takes place or is required to take place as
                                                                part of the recovery operation

D-ESSD8          50,000                                          Regional Geology
Detail           Regional geology (taken from BGS Geological Map)
D-ESSD9          12,500                                          Regional Hydrogeology
Detail           Aquifer classification
                 SPZs
                 Licensed and private abstractions from ground and surface water
                 Springs
                 Regional groundwater contours (for each ground water body)
                 Groundwater vulnerability
                 Off-site groundwater monitoring points (e.g. relevant EA Observation Wells etc)

D-ESSD10         2,500                                           Local Hydrogeology and Hydrology
Detail           Groundwater monitoring points
                 Local springs
                 Current surface water discharge points

D-ESSD11         2,500                                           Hydrogeological Cross Sections
Detail           Groundwater levels (for each groundwater body)
                 Groundwater flow to discharge points
                 Inter-relationship between; site (base and sides) and groundwater
                 Groundwater levels and relevant surface water features

D-ESSD12         2,500                                           Receptors and Pathways
Detail           Receptors
                 Surface water
                 Groundwater
                 People (amenity)
                 Pathways
                 Air (include wind rose)
                 Surface water
                 Groundwater
                 Drains, pipes etc
                 Surrounding strata

Appendices
Appendix A-ESSD1 Hydrogeological Risk Assessment
Appendix A-ESSD2 Hydrogeological Interpretive Report
Appendix A-ESSD3 Surface Water Discharge Permit

Tables
Table T-ESSD1 Active Waste Management Sites
Table T-ESSD2 Historic Waste Management Sites
Table T-ESSD3 Industrial Pollution
Table T-ESSD4 Waste Types to be use in Remedial Works
Table T-ESSD5 Summary of groundwater monitoring levels
Table T-ESSD6 Surrounding Land Uses within 500m
Table T-ESSD7 Surrounding Land Uses within 5km
Table T-ESSD8 Proposed Monitoring Parameters and Determinands

Prepared for: Ibstock Brick Limited                                                                                          AECOM
Environmental Setting and Site Design Report                                              Project Reference: Birtley Quarry

1.           Introduction
1.1          Report Context
AECOM has been commissioned by Ibstock Brick Limited (Ibstock) to prepare an application to obtain an
environmental permit for the importation of suitable inert waste materials for quarry stabilisation works located at
Birtley Quarry, Birtley, Chester-le-Street, Gateshead see Figure D-ESSD1.

This document details the environmental and site setting and site design (ESSD) report and supports the
Environmental Permit application. The report should be read in conjunction with other supporting application
information.

1.1.1        The Operator

Ibstock Brick Limited (Ibstock)
Leicester Road
Ibstock
Leicestershire
LE67 6HS

Ibstock Brick Limited is the owner and operator of Birtley Quarry which has operated for many years producing
clay for use at the adjoining Union Brickworks.

1.1.2        The Agent

AECOM Infrastructure and Environment UK Ltd
Royal Court
Basil Close
Chesterfield
S41 7SL

AECOM Infrastructure and Environment UK Ltd is the Agent acting on behalf of Ibstock Brick Ltd.

1.1.3        Site Description and Outline of the Proposed Activity

Birtley Quarry is an operational quarry used for the extraction of clay for brickmaking at the adjacent Birtley Union
Brickworks. Since the late 1990s the former (i.e. non-working) northern and southern quarry faces have suffered
progressive failure due to a combination of historic over-steepening (at a time when the quarry was under
different ownership) and poor drainage. These failures have been managed over the last decade by limited
buttressing and re-profiling of the slopes together with some face drainage. Despite this mitigation continued
movement is occurring.

Recent movements of the northern face could potentially lead to failure of the bank of the River Team, which runs
along the northern boundary of the site and lead to inundation of the site. Further movements of the southern
face could also cause failure of the bank of the Dilworth Beck, a tributary of the River Team, which runs along the
southern boundary of the site and again cause water inflow into the site.

A permanent solution to the stability problems at Birtley is required, which is stable both during on-going clay
extraction and following restoration.

The proposed operations are located within the footprint of the Birtley Quarry area (see Figure D-ESSD4). The
remedial works will include the construction of engineered buttresses on the northern and southern slopes of the
quarry using a total of 268,000 tonnes of imported inert materials and utilising conventional earthworking plant.
The buttresses would be constructed using imported suitable inert waste materials as there are no suitable
materials on-site which are available for this purpose.

It is proposed to undertake the engineered slope stability works over two years. The northern and southern
stability buttresses will be constructed sequentially, with works on the northern slope being undertaken during the
first year and the works on the southern slope undertaken during the second year.

Prepared for: Ibstock Brick Limited                                                                               AECOM
                                                                                                                      9
Environmental Setting and Site Design Report                                                   Project Reference: Birtley Quarry

The activities that will be carried out at the site as defined under Annex II of the Waste Framework Directive can
be summarised as follows:

   R11: use of wastes obtained from an operation numbers R1 to R10; and

   R13: Storage of waste pending an R11 operation.

1.2          Site Details

1.2.1        Site Location and Access

Birtley Quarry and the adjacent Union Brickworks are both on the outskirts of the community of Birtley - on the
southern fringe of the Tyneside conurbation, approximately half way between Gateshead to the north and
Chester-le-Street to the south (see Figure D-ESSD1).

The site access is from Station Lane, Birtley. This links to the A167 Durham Road to the east – which in turn joins
the A1(T) to the north at Low Eighton or the A693 Blind Lane and the A1(M) at Junction 63 to the south.

The centre of the site is located at National Grid Reference (NGR) NZ 26017 56209.

1.2.2        Site Classification

The site is currently an active quarry.

The proposed operation will involve the importation of suitable inert waste materials for quarry stabilisation works
which is classed as a recovery operation. The proposed development is fully detailed within the Waste Recovery
Plan (WRP) which is contained in Section 4 of the Application.

The proposed recovery activities at the site will be regulated under the Environmental Permitting (England and
Wales) Regulations 2016.

1.2.3        Application Boundaries and Site Security

The installation boundary is shown on Figure D-ESSD2 and is secured by lockable gates and perimeter fencing.
The area of the installation boundary is approximately 19.98ha, and the area where the remedial works will take
place is approximately 4.69ha.

1.2.4        Adjacent Former Waste Management Activity Boundaries

The Environment Agency “What’s in My Back Yard” website contains information regarding current and former
waste management facilities within 500m of the site.

Current waste management activities within 500m of the site are shown in Table T-ESSD1 below.

Table T-EDDS1. Active Waste Management Sites

Active Landfill Details                    Licence Type                     Environmental      Distance from the
                                                                            Permit Reference   site
                                                                            Number

Kibblesworth Quarry, Greenford Lane, A04: Household, Commercial &           EAEPR\EA/EPR/YP37 20m north west
Kibblesworth, Gateshead, Tyne and    Industrial Waste Landfill              97ZR/V007
Wyre, DH2 1BJ

St Bedes Brickworks                        A01: Co-Disposal Landfill Site   EAEPR\EA/EPR/AB32 350m south
                                                                            09XJ/T001

Prepared for: Ibstock Brick Limited                                                                                    AECOM
                                                                                                                           10
Environmental Setting and Site Design Report                                                        Project Reference: Birtley Quarry

Historic waste management activities within 500m of the site are shown in Table T-ESSD2 below.

Table T-ESSD2. Historic Waste Management Sites

Historic Landfill Details                First Waste         Last Waste           Type of Waste Received          Distance from the
                                         Received            Received                                             site

North Quarry, Station Lane, Birtley      25th January 1991   31st December 1991   Inert                           20m south
                                                                                  Industrial

North Quarry No. 1, Station Lane,        2nd August 1981     28th April 1994      Inert                           20m south
Birtley                                                                           Industrial
                                                                                  Commercial
                                                                                  Household
                                                                                  Special
                                                                                  Liquids/Sludges

Birtley Sewage Treatment Works           -                   -                    -                               50m north
                                             rd                  st
Durham Chemicals, Mary Avenue,           3 April 1978        31 December 1980     Inert                           50m east
Chester-le-Street, County Durham                                                  Industrial
                                                                                  Commercial
                                                                                  Household
                                                                                  Special

1.3          Site Context

1.3.1        Local Topography

The existing topography within the site is shown in Figure D-ESSD4.

The site is a current mineral working with mineral extraction being undertaken to the west of the site. Topography
in the vicinity of the site rises to the north at Halow Green, to the east within Birtley, and to the west towards
Kibblesworth Common.

1.3.2        Environmental Receptors and Nature Protection Zones

The Environmental site setting is shown on Figure D-ESSD2A and 2B. Environmental receptors within 2km of the
site are shown on Figure D-ESSD3.

Designated Sites

Information regarding designated sites was obtained from the Multi-Agency Geographic Information for the
Countryside (MAGIC) website, and a phase 1 habitat survey was completed as part of previous planning
applications. Information was obtained relating to:

     European Nature Conservation Sites;

     Special Protection Areas (SPAs);

     Special Areas of Conservation (SACs);

     RAMSAR sites; and

     Sites of Special Scientific Interest (SSSIs).

A search was completed for sites within at least 5km radius of the site. In summary:

     there are no SPAs, SACs or Ramsar Sites within 5km of the site;

     the closest SSSI to the site is Pockerley Farm Pond, located approximately 3.6km to the south west of the
      site; and
     the site is not subject of a landscape quality designation, however the site is located within the Great North
      Forest.

Prepared for: Ibstock Brick Limited                                                                                         AECOM
                                                                                                                                11
Environmental Setting and Site Design Report                                               Project Reference: Birtley Quarry

Other Sensitive Locations

In addition to the statutory designated sites, a further nine sites with non-statutory designations were identified as
being present within 2km of the Site:

     Birtley Union Brickworks Local Wildlife Site (LWS) – 7.5ha of land within the site boundary (east of Rowletch
      Burn) consisting of lowland mixed deciduous woodland, ponds and species rich grassland habitats and the
      presence of national/local BAP species including Hedge Sparrow, Song Thrush, Hedgehog, Great Crested
      Newt and Toad;

     the Bowes Valley Nature Reserve LWS - located 20m west of the site boundary and consisting of
      grassland, ponds and tree-planted areas on re-claimed clay pit, and supports NERC ACT S41 species,
      including dingy skipper as well as the Schedule 1 bird species little ringed plover;

     Lamesley Sewage Works Reedbed LWS - located 30m north of the site boundary and consisting of a large
      reedbed (the largest in Gateshead), pools and tree planted areas, and supports otter;

     River Team Woodlands LWS - located 30m southwest of the site boundary and consisting of ancient
      woodland (Urpeth Wood), with ornithological interest and a locally rare plant;

     Bowes Railway Line LWS - located 310m north of the site boundary and consisting of a recolonised railway
      line with heathland, acid grassland, woodland and a pond;

     Long Acre Dene LWS - located 670m northeast of the site boundary and consisting of ancient lowland
      mixed deciduous woodland;

     Long Acre Wood LWS - located 790m north of the site boundary and consisting of ancient lowland mixed
      deciduous woodland and ponds;

     Walters Wood, Ouston LWS – located 840m southwest of the site boundary and consisting of diverse
      habitats in a stream valley; and

     Urpeth Bottoms LWS - located 860m southwest of the site boundary and consisting of ancient lowland
      mixed deciduous woodland, grassland and riversides, and supports otter and great crested newt.

1.3.3        Residential Receptors

The closest residential receptors include:

     the White House, approximately 20m from the western site boundary;

     Berwicke Caravan Park at Urpeth Bridge, approximately 300m to the west of the Site;

     Low Urpeth, approximately 490m south west of the Site;

     Kibblesworth, approximately 880m north west of the Site; and

     Ouston, approximately 900m south of the Site.

1.3.4        Recreational Areas

The closest recreational area is a football ground and open green space approximately 450m to the east of the
site within Birtley.

1.3.5        Waterways

Birtley Quarry is surrounded by surface water courses on three sides of the quarry area:

     the River Team (a Major River) runs on a south-west – north-east alignment along the northern boundary of
      the site and flows north towards the River Tyne along the Team Valley;

     the Rowletch Burn runs on a south-north alignment through the site along the eastern boundary of the
      quarry void before joining the River Team on the northern boundary; and
     Urpeth Burn, a tributary of the Rowletch Burn, runs on a south-east – north-west alignment along the
      southern boundary.

Prepared for: Ibstock Brick Limited                                                                                AECOM
                                                                                                                       12
Environmental Setting and Site Design Report                                              Project Reference: Birtley Quarry

1.3.6        Water Bodies

The main hydrological feature on site is the flooded quarry sump, located within the quarry void. A further two
ponds are located to the east of the quarry along the eastern side of Rowletch Burn.

1.3.7        Agricultural or Urban Sites

The land to the west and south of the site is mainly in agricultural use.

The nearest settlement is Birtley, approximately 350m to the east of the site. Kibblesworth village is located
approximately 880m to the northwest.

1.3.8        Industrial and Commercial Sites

Industrial and Commercial receptors in the vicinity of the Site include:

     Birtley Water Pollution Works to the north of the River Team with Lamsley Combined Waste Water
      Treatment scheme beyond;

     the West Coast mainline railway line located adjacent to the eastern boundary of the Site; and

     Durham Road Trading Estate beyond the railway to the east.

1.3.9        The Agency’s position statement on the location of Landfills

The proposed development is a recovery operation and therefore the Environment Agency’s position statement
on the location of landfills does not apply in this case.

Prepared for: Ibstock Brick Limited                                                                               AECOM
                                                                                                                      13
Environmental Setting and Site Design Report                                                       Project Reference: Birtley Quarry

2.           Source
2.1          Historical Site Development

2.1.1        Historical Use of the Land

Historical ordnance survey maps and aerial photographs (supplied by Gateshead Council) were reviewed from
1884 to present day to identify the duration and extent of the clay extraction activities in the area of Birtley
Quarry.

Checks on the historical land use for the site confirm that the proposed remedial works are located within a site
with a history of quarrying operations. Clay extraction from land to the east of the Rowletch Burn began prior to
1898 with excavation to the west of the burn commencing before 1960. Brick manufacture began at Union
Brickworks prior to 1900 and at the neighbouring Team Valley brickworks by 1919.

The laminated clays worked at Birtley Quarry are superficial deposits (drift) of glacio-lacustrine origin and are
used in the manufacture of bricks and related products at the adjoining Union Brickworks.

Clay excavation typically takes place on an annual ‘campaign basis’ over an 8 to 12 week period each spring.
The excavated clay is stockpiled on land to the east of the Rowletch Burn – from which it is drawn in small
quantities on a regular basis to supply the brickworks. Relatively small quantities of reject bricks from the
brickworks manufacturing process are also stockpiled on the land to the east of the Rowletch Burn – prior to
being returned to the quarry void for use on haul roads.

2.1.2        Relevant Historical Areas of Waste Activity

There are no known relevant historical areas of waste activity within the site.

2.1.3        Other Land Uses

There are no known other land uses at the site which may give rise to potential sources of contamination within
the site.

2.1.4        Incidents

The Environment Agency record and classify any reported pollution incidents as major or significant. Based on
the results of the Environment Agency’s website search no reported pollution incidents have occurred within the
proposed installation boundary.

A number of historical incidents involving pollution of controlled waters was identified from the EA website and the
Envirocheck report and is summarised in Table T-ESSD3 below.

Table T-ESSD3 Industrial Pollution

Incident          Year     Type of Impact                            Incident Severity             Cause of Incident/
Number                                                                                             Pollutant

235/000347        1990     Pollution incident to controlled waters   Category 2 – Significant      Industrial General Spillage
                                                                     Incident

235/002510        1994     Pollution incident to controlled waters   Category 3 – Minor Incident   Sewage

235/002434        1994     Pollution incident to controlled waters   Category 3 – Minor Incident   Oil

235/002310        1994     Pollution incident to controlled waters   Category 3 – Minor Incident   Other Cause/not given

NT950223          1995     Pollution incident to controlled waters   Category 3 – Minor Incident   Miscellaneous – Inert
                                                                                                   Suspended Solids

26027             2001     Substantiated pollution incident to water Category 2 - Significant      Contaminated Water:
                                                                                                   Suspended Solids

626676            2008     Substantiated pollution incident to water Category 2 – Major Incident   Sewage Materials

Prepared for: Ibstock Brick Limited                                                                                        AECOM
                                                                                                                               14
Environmental Setting and Site Design Report                                                     Project Reference: Birtley Quarry

2.2          Proposed Development
The proposed development is considered in detail in the Waste Recovery Plan and shown on Figures D-
ESSD6B.

A permanent solution to the slope stability problems at Birtley is required, which is stable both during on-going
clay extraction and following restoration. A long term, practicable, cost effective and sustainable solution with
minimal maintenance requirements would be the construction of a retaining buttress on each slope. The
buttresses would be constructed using imported suitable inert waste materials as there are no suitable materials
on-site which are available for this purpose.

This would effectively reduce the slope angle and coupled with a simple water management system such as
interceptors and surface channels, would leave the slopes in a stable condition for the long-term.

The scheme description is described in full in the URS Remedial Works Report (Appendix D of the Waste
Recovery Plan (WRP)). Stabilisation of the northern face is considered to be the most urgently required, given
the proximity of the back scars to the River Team.

The stabilisation works will achieve the following:

       a margin between the adjacent watercourses and the top of the quarry slope is at least 10 metres in width in
        each case;

       a final engineered northern slope no steeper than 1 in 5.5; and

       a final engineered southern slope no steeper than 1 in 6.

2.2.1        Proposed Waste Types

The waste types to be used in the slope stabilisation works will be inert waste as defined in Article 2e of Council
Directive 1999/31/EC of 26 April 1999 on the landfill of waste (“the Landfill Directive”). That is:

“[…] waste that does not undergo any significant physical, chemical or biological transformations. Inert waste will
not dissolve burn or otherwise physically or chemically react, biodegrade or adversely affect other matter with
which it comes into contact in a way likely to give rise to environmental pollution or harm human health. The total
leachability and pollutant content of the waste and the ecotoxicity of the leachate must be insignificant, and in
particular not endanger the quality of surface water and/or groundwater.”

The inert wastes to be used are set out in Table T-ESSD4 together with their European Waste Catalogue codes
and which are considered suitable for use in waste recovery operations by the Environment Agency. Subject to
application of suitable waste acceptance procedures at the site these waste types will not pose an unacceptable
risk to the environment (including controlled waters) or human health.
                                                                1
T-ESSD4. Waste Types to be used in Remedial Works

EWC Code          Description

01 01             Wastes from Mineral Excavation

01 01 02          Wastes from Non-Metalliferous Excavation

01 04             Wastes from Physical And Chemical Processing of Non-Metalliferous Minerals

01 04 08          Waste Gravel And Crushed Rocks Other Than Those Containing Dangerous Substances

01 04 09          Waste Sand and Clays

10 12             Waste from Manufacture of Ceramic Goods, Bricks, Tiles and Construction Products

10 12 08          Waste Ceramics, Bricks, Tiles and Construction Products (After Thermal Processing)

17 01             Concrete, Bricks, Tiles and Ceramics

17 01 01          Concrete

17 01 02          Bricks

1
 Extract from Appendix 2 in Environment Agency Regulatory Guidance Series No EPR 13 Defining Waste Recovery:
Permanent Deposit of Waste on Land for typical use “B” Restoration of Mineral Workings

Prepared for: Ibstock Brick Limited                                                                                      AECOM
                                                                                                                             15
Environmental Setting and Site Design Report                                                    Project Reference: Birtley Quarry

EWC Code          Description

17 01 03          Tiles and Ceramics

17 01 07          Mixtures of Concrete, Bricks, Tiles and Ceramics

17 05             Soil Stones and Dredging Spoil

17 05 04          Other Soil and Stones

19 12             Wastes from the Mechanical Treatment of Waste Not Otherwise Specified
                                                        2
19 12 09          Minerals (for example Sand, Stones)

20 02             Garden and Park Wastes (Including Cemetery Waste)

20 02 02          Soil and Stones

2.2.2         Quantity of Material Required

The proposed remedial works at Birtley Quarry will involve the use of the minimum quantity of waste to achieve a
stable and acceptable landform. The methods used for calculating the quantity of material required is detailed in
the WRP.

The total volume of inert materials required to construct the stability buttresses has been calculated using LSS 3-
D terrain modelling software as the difference between the stability buttresses (Drawing 47066723/GEO/R01 in
Appendix D of the WRP) and the existing topography as surveyed in August 2013. The total volume of
engineered material required to construct both buttresses on the northern and southern faces has been
                                       3                                                           3
calculated as approximately 149,000m (or around 267,600 tonnes at a placed density of 1.8 t/m ).

2.2.3         Phasing

The location of the proposed development is shown on Figure D-ESSD4.

It is proposed to undertake the engineered slope stability works over two years. The northern and southern
stability buttresses will be constructed sequentially, with works on the northern slope being undertaken during the
first year and the works on the southern slope undertaken during the second year.

2.2.4         Hydrogeological Risk Screening

A hydrogeological risk assessment is required to demonstrate that the proposed development will be compliant
with the Environmental Permitting Regulations 2010 (as amended) and is included at Appendix A-ESSD1. These
Regulations require that certain substances (hazardous substances) are not discharged to groundwater such that
they are discernible, and that the discharge of other substances (non-hazardous pollutants) is limited so as to
prevent pollution.

There are no direct or indirect discharges to groundwater proposed as part of the activities.

Comprehensive details on the hydrogeological setting of the site has been considered in a number of technical
reports produced by URS/AECOM (see hydrogeological interpretive report at Appendix A-ESSD2).

2.2.5         Final Landform and After-use

The proposed final landform is shown on Figures D-ESSD5A and D-ESSD5B. On completion, the stabilised
slopes will be allowed to colonise naturally as this type of early successional habitat is of ecological value.

In the long-term, once mineral extraction at the quarry and associated dewatering ceases, the restoration scheme
for the quarry (as approved under planning permission DM/14/02371/VOCMW) will be implemented. The
stabilised slopes will form the sides of the flooded quarry and have been designed to be stable in this condition.

2
    Excluding residual "fines" from mechanical treatment of mixed wastes at transfer stations

Prepared for: Ibstock Brick Limited                                                                                     AECOM
                                                                                                                            16
Environmental Setting and Site Design Report                                               Project Reference: Birtley Quarry

3.           Pathway and Receptor
3.1          Published Geology
For geological information on the site, the British Geological Society (BGS) Drift Maps for Newcastle Upon Tyne,
(Sheet 20) 1:50,000 and the 1:10,560 scale BGS map NZ25NE were reviewed. The geology of Birtley Quarry is
superficial deposits (Glacial Lake Deposits locally overlain by alluvium) which in turn overlie Coal Measures
bedrock. The geology of the site and surroundings are shown on Figure D-ESSD8.

3.1.1        Superficial Deposits

The site is predominantly underlain by Glacial Lake Deposits (Glacio-lacustrine deposits– Clay and Silt of
Devensian age). This is locally overlain by Alluvium associated with the River Team in the north of the site. The
Alluvium consists of soft to firm, compressible silty clay which can contain layers of silt, sand, peat and basal
gravel. The Glacial Lake deposits predominantly consist of laminated clays and silts, which overlie fluvio-glacial
fine sands and gravels, with occasional pebbles beds recorded. The BGS borehole records show that the
superficial deposits in the vicinity of the site area approximately 40 m in thickness with the thickness increasing to
the east, infilling a pre-glacial valley running south to north along the axis of the Team Valley.

Within the former clay pit area historical borehole records identify grey/brown silty Clay (Glacial Lake Deposits)
containing thin bands of silt and fine sand underlying the Made Ground to depths of between 18.45m bgl to
30.2m bgl.

Underlying the Laminated Clay strata deposits of fluvio-glacial Sand, sandy Silt / silty Sand and banded Sands
have been encountered (occasionally containing fine coal fragments).

3.1.2        Solid Geology

The BGS Solid and Drift Map for Newcastle upon Tyne (Sheet 20) 1:50,000 indicates that the underlying solid
geology is the Pennine Middle Coal Measures Formation. This consists of inter-bedded grey mudstone, siltstone,
pale grey sandstone and coal seams. Two coal seams sub-crop within the site boundary with the discontinuities
in the sub-crops indicative of washout due to the presence of the buried valley.

No Geological Conservation Review Sites are identified within 1km of the Site.

3.1.3        Ground Investigations

Ground investigations have been undertaken between 2001 and 2015 and have informed the local geology at the
site and within the immediate vicinity from a number of exploratory boreholes. Local geology at the site is
considered in more detail in the Hydrogeological Interpretive Report included at Appendix A-ESSD2.

3.2          Hydrology

3.2.1        Water Courses

The River Team runs along the northern boundary of the site, merging with Rowletch Burn which runs from the
south eastern boundary across the site to the northern boundary. Dilworth Beck / Urpeth Burn is located along
the southern boundary of the clay extraction area as a tributary to Rowletch Burn. The River Team, once merged
with the Rowletch Burn, flows to the north towards the River Tyne along the Team Valley.

The main hydrological feature on site is the flooded quarry sump, located within the quarry void. Groundwater
and surface water within the quarry void is collected and periodically pumped to the east of Rowletch Burn to an
area of regenerated reed bed in the adjacent Local Wildlife Site before being discharged (Discharge Consent No.
235/1698), via infiltration, to Rowletch Burn (see Appendix A-ESSD3).

A further two ponds are located to the east of the quarry along the eastern side of Rowletch Burn.

Prepared for: Ibstock Brick Limited                                                                                AECOM
                                                                                                                       17
Environmental Setting and Site Design Report                                            Project Reference: Birtley Quarry

3.2.2        Flood Risk

The quarry void and land immediately adjacent to the River Team and Rowletch Burn lie within the Environment
Agency’s delineated Flood Zone 3 and are therefore deemed at high risk of flooding from fluvial sources.

The remaining site area, to the east and west of the quarry void, is located within the Environment Agency’s
delineated Flood Zone 1 and therefore deemed at low risk of flooding from fluvial sources.

3.2.3        Water Quality and Existing Contamination

The closest watercourse, which is monitored by the Environment Agency, is the River Team located adjacent to
the northern boundary of the site. The Environment Agency gives a Biology Grade C for this watercourse under
the General Quality Assessment (GQA) Scheme. According to the Environment Agency’s River Basin
Management Plan (RBMP), the whole stretch of the River Team has been classified as having a Good chemical
quality and a Moderate potential ecological quality.

3.2.4        Surface Water Discharge Licences

Ibstock operate a discharge licence located on-site which relates to trade discharge from mineral works to the
Rowletch Burn (see above) and Northumbrian Water Ltd operate a discharge license for storm sewage overflow
to the River Team associated with the sewage works located to the north of the site.

3.3          Hydrogeology
Hydrogeological investigations have been undertaken by AECOM most recently in 2015, see the Hydrogeological
Interpretive report in Appendix A-ESSD2. Regional hydrogeology is shown in Figure D-ESSD9.

3.3.1        Aquifer Characteristics

The superficial deposits of Glacial Lake Deposits across the majority of the site are classified by the Environment
Agency as Unproductive Strata. The superficial deposit of Alluvium located at the northern boundary of the site,
and the underlying bedrock of the Pennine Middle Coal Measures are classed as a Secondary A Aquifers.

The groundwater vulnerability for the whole quarry site is a minor aquifer overlain by soils of low leaching
potential.

There are no Source Protection Zones (Total Catchment – Zone 3) within 5km of the site. Therefore, it is
considered that SPZs will not be impacted by the proposed development as pathways are unlikely to be present.

The EA River Basin Management Plan (RBMP) Northumbria River Basin District currently classifies the
quantitative status of the district wide underlying groundwater as ‘good’ and the chemical status to be ‘poor’.
However, the groundwater chemical status underlying the site within the Pennine Middle Coal Measures
Formation will be poor due to underground coal workings.

There are no surface water or ground water abstractions within 1km of the site.

3.3.2        Groundwater Flow

Shallow groundwater flow within the alluvial deposits will be towards the surface watercourses. Groundwater flow
within the fluvio-glacial sands and gravels is likely to be limited be lateral persistency of the strata, and may
predominantly flow towards the north along the axis of the buried valley, except where influenced by groundwater
flow in the underlying Coal Measures. Groundwater flow in the Coal Measures is strongly influenced by the
presence of an extensive regional network of mined voids, and by the Coal Authority’s network of active, long-
term mine water pumping stations. Mine water is being pumped from the former Kibblesworth Colliery located
around 1.6km to the west of the site. Information obtained from the Coal Authority show that in 2013, mine water
was being abstracted at a rate of approximately 300 l/s and discharged at Lamesley Combined Water Treatment
Scheme to the north of the site. The groundwater level in June 2013 was at a level of 3.0m AOD. Coal Authority
records show that since 2004 the groundwater level has risen by approximately 30 m.

Groundwater levels within the Coal Measures are continuously recorded by the Environment Agency (EA) at a
borehole at Birtley around 500m to the north of the site. The EA state in a letter to Durham County Council dated
  th
24 June 2013 that the current groundwater level at the borehole was recorded at 4.2 m AOD in May 2013.

Prepared for: Ibstock Brick Limited                                                                             AECOM
                                                                                                                    18
Environmental Setting and Site Design Report                                              Project Reference: Birtley Quarry

Although, this may represent a confined (piezometric) groundwater level at a specific point rather than the
unconfined height of the water table across the area.

3.3.3        Groundwater Monitoring

Historic groundwater monitoring has been undertaken periodically at the site since 2001, and most recently in
2015 associated with two planning applications for the slope stabilisation works and quarry deepening (these
have since been decommissioned). The purpose of the ground investigation work was to evaluate the extent and
nature and thickness of the underlying superficial deposits, including the identification of any granular strata
below the Glacio-lacustrine Clays (laminated clays), the depth to rockhead (where possible) and the presence of
groundwater within permeable strata.

The investigation for the quarry consisted of:

     four cable percussion boreholes (GW01, GW02, GW03 and GW04),

     three standpipe installations to monitor groundwater (GW01, GW03 and GW04);

     geotechnical sampling and in-situ testing;

     groundwater monitoring (six rounds at weekly intervals);

     geotechnical laboratory analysis; and

     geo-environmental laboratory analysis of groundwater.

Environmental samples were taken during the course of the investigation for chemical testing.

The groundwater levels from 2015 is summarised in Table T-ESSD5 below and within Figure D-ESSD11.

Table T-EDDS5 Summary of Groundwater Monitoring Levels (in mAOD)

Location                                       Piezometric Level (mAOD)                 Stratum Screened

                                                    (Monitoring Round)

                  1              2              3            4            5      6

GW01              5.53           5.56           5.81         5.96         5.85   6.17   Fluvio-glacial (Sand)

GW02              (Artesian head in GW02 around 2.10mAOD)                               Fluvio-glacial (Gravel)

                  (Artesian head in GW02 around 4.60mAOD)                               Coal Measures

GW03              -0.23          -0.06          0.61         0.72         1.07   1.17   Fluvio-glacial
                                                                                        (Clay/Sand)

GW04              4.66           4.84           5.09         5.18         5.13   5.36   Fluvio-glacial
                                                                                        (Clay/Gravel)
Groundwater monitoring shows that groundwater heads in boreholes with response zones toward the base of the
fluvio-glacial deposits (i.e. GW01, GW04) (and also in GW02 where artesian water was struck near the base of
the superficial deposits) are between 4 and 6 m AOD. In contrast, groundwater heads recorded in GW03, where
the response zone was near the top of the fluvio-glacial deposits, are lower, around 0 – 1 m AOD. The elevated
groundwater heads deeper in the fluvio-glacial deposits are most likely to result from water at this depth being
confined by layers of low permeability clays within the sands and gravels.

3.3.4        Groundwater Quality

Groundwater samples were obtained from the fluvio-glacial deposits locations GW01 and GW04 during the
monitoring period. Location GW03 contained insufficient groundwater to enable sampling. In addition two “grab”
samples of groundwater were obtained from the groundwater strikes in the fluvio-glacial deposits and Coal
Measures at location GW02.

The samples were analysed primarily for a suite of metals and inorganic determinands to determine whether the
groundwater contained within the fluvio-glacial deposits exhibited a similar chemical profile to groundwater from
the Coal Measures strata which would indicate that they were in hydraulic continuity, and also to determine
whether there was any evidence to suggest that the groundwater had been impacted by underground
mineworkings. The results are shown below.

Prepared for: Ibstock Brick Limited                                                                               AECOM
                                                                                                                      19
Environmental Setting and Site Design Report   Project Reference: Birtley Quarry

Prepared for: Ibstock Brick Limited                                    AECOM
                                                                           20
Environmental Setting and Site Design Report                                            Project Reference: Birtley Quarry

Based upon the chemical analysis of groundwater sampled from both the granular fluvio-glacial deposits and the
underlying Coal Measures, the groundwater within the granular fluvio-glacial deposits is of acceptable quality and
is generally hydrogeologically isolated from the groundwater within the Coal Measures.

3.4          Man-made Subsurface Pathways
There are no known buried services within the quarry as the site is an area of ongoing mineral extraction. A
number of groundwater monitoring boreholes have historically been installed at the site associated with previous
ground investigations, but have been subsequently decommissioned.

A mine shaft associated with historical Coal Authority activities has been identified in previous geotechnical
studies, but there is no evidence of a shaft at the surface. It’s approximately location is shown on Figure D-
ESSD6A.

Prepared for: Ibstock Brick Limited                                                                             AECOM
                                                                                                                    21
Environmental Setting and Site Design Report                                                    Project Reference: Birtley Quarry

3.5          Receptors and Compliance Points

3.5.1        Hydrogeological Risk Assessment

A Hydrogeological Risk Assessment (HRA) has been prepared to assess the risks to groundwater quality
associated with the use of inert waste under the waste recovery permit at the site.

Groundwater

Receptors in relation to groundwater include:

     for hazardous substances, the potential receptor has been assumed to be the groundwater directly beneath
      the quarry site (prior to any dilution occurring);

     for non-hazardous substances, the potential receptor has been assumed to be the shallow groundwater in
      alluvium

There are no licenced abstractions within 1km and no water-dependant ecological sites within 2km of the site
which are in good hydraulic connection with the aquifer.

Surface Water

Receptors in relation to surface water include:

     the River Team along the northern boundary of the site, which flows north towards the River Tyne along the
      Team Valley;

     the Rowletch Burn along the eastern boundary of the quarry void before joining the River Team on the
      northern boundary;

     Urpeth Burn, which runs along the southern boundary;

     the flooded quarry sump located within the quarry void; and

     a further two surface water ponds located to the east of the quarry along the eastern side of Rowletch Burn.

Assessment

It is recognised that the hydrogeological risk assessment must assess compliance with the requirements of the
Environmental Permitting (England and Wales) Regulations, 2010 (as amended). An evaluation of the potential
risks associated with the site is presented in Table 2.5 of the HRA. It is concluded that the risk posed by
recovered material to shallow groundwater and deep groundwater is considered very low, while that to surface
runoff is considered low.

3.5.2        Amenity

A summary of the potential environmental receptors that are located within the vicinity of the site is presented
within Tables T-ESSD6 and T-ESSD7 and Figures D-ESSD2A and D-ESSD3. Identification of the potential
hazards and risks to these receptors is provided within the accompanying risk assessments.

Table T-ESSD6. Receptors within 500m

Receptor Name                         Receptor Type           Approximate Distance from Drawing Reference
                                                              EP boundary (at nearest
                                                              point)

Identified receptors within 500m of the installation boundary as shown on Figures D-ESSD2 Environmental
Site Setting

The River Team                        Surface Water           Adjoins northern boundary    R1

Rowletch Burn                         Surface Water           Within the site boundary     R2

Urpeth Burn                           Surface Water           Adjoins southern boundary    R3

Flooded Quarry Sump                   Surface Water           Within the site boundary     R4

Surface Water Ponds                   Surface Water           Within the site boundary     R5

Birtley Water Pollution Works         Industrial/Commercial   Adjacent northern boundary   R6

Prepared for: Ibstock Brick Limited                                                                                     AECOM
                                                                                                                            22
Environmental Setting and Site Design Report                                                   Project Reference: Birtley Quarry

Receptor Name                         Receptor Type           Approximate Distance from Drawing Reference
                                                              EP boundary (at nearest
                                                              point)

Lamsley Combined Waste Water          Ecological              50m north                  R7
Treatment Works. Lamesley
Sewage Works Reedbed LWS

Durham Road Trading Estate            Commercial/Industrial   20m east                   R8

West Coast Mainline Railway           Railway                 Adjoins eastern boundary   R9

Public Footpath 44 (an old            Public Right of Way     Adjoins south western      R10
mineral railway)                                              boundary

Bowes Valley Nature Reserve           Ecological              20m north west             R11
LWS

Birtley Union Brickworks Local        Ecological              Within the site boundary   R12
Wildlife Site LWS

Bowes Railway Line                    Ecological              310m north                 R13
LWS, Scheduled Monument and           Scheduled Monument
Public Right of Way                   Public Right of Way

River Team Woodlands LWS              Ecological              30m southwest              R14

Agricultural Land                     Agricultural            20m south west             R15

The White House                       Residential             20m west                   R16

Bewicke Caravan Park, Urpeth          Residential             300m west                  R17
Bridge

Low Urpeth                            Residential             490m south west            R18

Birtley                               Residential             350m east                  R19

Football ground and open green        Recreational            450m east                  R20
space

St Bedes Brickworks                   Active Waste            350m south                 R21
                                      Management site

N Quarry and N Quarry No. 1           Historic Waste          20m south                  R22
                                      Management Site

Durham Chemicals                      Historic Waste          50m east                   R23
                                      Management Site

Source: Magic Map accessed February 2018

Table T-ESSD7 Surrounding Land Uses within 5km

Receptor Name                          Receptor Type          Approximately Distance from EP Boundary (at
                                                              nearest point)

Nature Protection Areas and Scheduled Monuments within 5km of the installation boundary

Pockerley Farm Pond SSSI               Ecological             3.6km south west

Ridley Gill SSSI                       Ecological             3.7km west

Causey Bank Mires SSSI                 Ecological             2km west

Chester New Bridge                     Scheduled Monument 4.1km south

Concangium Roman Fort                  Scheduled Monument 4.7km south

Site of Ravensworth Coalmill,   Scheduled Monument 3.6km north west
600m east of Ravensworth Castle

Ravensworth Quadrangular               Scheduled Monument 3.8km north west
Castle

Colliery Engine House at               Scheduled Monument 4km north east
Washington F Pit, Albany

Source: Magic Map accessed February 2018

Prepared for: Ibstock Brick Limited                                                                                    AECOM
                                                                                                                           23
Environmental Setting and Site Design Report                                              Project Reference: Birtley Quarry

The location and distribution of sensitive features in relation to the site including habitats, and possible pathways
are considered in the Impact Assessment which accompanies the permit application (see Section 5 of the
Application). They are also shown on Figure D-ESSD12.

The assessment concludes that potential hazards from the proposed remedial works are not likely to be
significant and no further assessment is required.

Prepared for: Ibstock Brick Limited                                                                               AECOM
                                                                                                                      24