ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021

Page created by Peter Peters
 
CONTINUE READING
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
ENERGY ABSOLUTE PCL.
OPPORTUNITY DAY for Q2/2021
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
At a Glance
Market Capitalization (as of 23.08.21)
Approximately THB 220.1 bil. (US$ 6.6 bil.)
                                                          Others,
Credit Rating                                             24.60%
Corporate rating : A                                                                                    Somphote
                                                                                                      Ahunai (CEO),
CG Rating                                                                                                46.22%
Excellent                                                                Shareholder
                                                                          Structure
                                                     Foreign
                                                     Juristic,
                                                     16.51%

                 A                                                  Domestic Fund, 12.68%
                                                 Somphote Ahunai (CEO)     Domestic Fund   Foreign Juristic   Others

                                                                 Total Board Members = 11

                                                      Independent          Executive            Other
                                                        Directors          Directors       Non - Executive
                                                        = 6 (55%)          = 2 (18%)         = 3 (27%)

                                                                                                                       2
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Our Business

                                                                             Electric Vehicle and
       Biodiesel               Renewable Power        Energy Storage
                                                                           Charging Station Platform
 (1) B100 & Glycerin           (1) COD               (1) Amita Taiwan        (1) EV (MINE SPA1)
     800,000 liters/day           •   Solar 278 MW       400 MWh             (2) MINE Smart Ferry
 (2) Bio-PCM & Green Diesel       •   Wind 386 MW    (2) Amita Thailand      (3) E-Bus and E-Truck
     130 tons/day (2 Phases)   (2) New projects          1 GWh (by 2021)     (4) Charging Station and
 (3) Other related                                                               EA Anywhere application

                                                                                                           3
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Agenda

• Financial Performance

• Progress in Ongoing and Future business
   •   Palm Oil-based Business
   •   Renewable Power Business
   •   Energy Storage Business
   •   Electric Vehicle Business
   •   EV Charging Platform

• 2021 Investment Plan

                                            4
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Financial Performance

                        5
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Revenue Up Amid Pandemic Situation
Mil.Baht             Biodiesel      Power       Other Businesses    Other Revenues
 12,000
                                                                                                    • Revenue rose by 18% YoY mainly from the fully revenue
                                                                                  +8% YoY
                                                                                                      recognition from Crude Palm Oil (CPO) sales by Larp
                                                                                                      Pakdee Palm (since 2Q20) and Karnjanadit Palm (since
                                                                                     9,642
 10,000                                                                                               3Q20) which lead to an increase of 468 Mil Baht.
                                                                                              15
                                                                   8,937                      120
                                                                             77                     • B100’s revenue rose 277 Mil Baht after CPO Stock
                                                                            123
                                                                                                      decreased.
  8,000

                                                                                                    • For the power business, overall revenue contributed
                                                                                     5,367
                                                                                                      similar to the same period last year.
                             +18% YoY
  6,000                                                             5,376

                                 4,935     12                                                               Others                          Others
           4,175      47                   84
                                                                                                             1%                              2%
  4,000
                      17                                                                                                Biodiesel                    Biodiesel
                                  2,593                                                                                   38%                          45%
            2,611
                                                                                                            6M/20                           6M/21
  2,000                                                                              4,139
                                                                    3,361                                                           Power
                                  2,246                                                             Power                            53%
            1,500                                                                                    61%
      -
           Q2/2020               Q2/2021                           6M2020            6M2021

                                                                                                                                                                 6
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Maintain Gross Profit
Mil.Baht
                                                                                                                    During Covid Situation
                                Biodiesel BU.        Power BU.         Other Businesses

  5,700                                                                                                         • Gross Profit recorded the same level in 2Q and
                                                                                                                  the second half of 2021.
  4,700
                                                                           3,948              3,968     +1%
                                                                                                        YoY

  3,700

                                                                                                                      Gross Profit Margin
                                                                                                                                                  Q2/20        Q2/21
                                                                                                                         by Business
  2,700
                           -3% YoY
                 1,885              1,823
                                                                                                                 Biodiesel Business                 6%             4%
                                                                             3,936              3,960

  1,700                                                                                                          Power Business
                                                                                                                 Solar                             81%             82%
                  1,861               1,864                                                                      Wind                              52%             57%
    700

                    89                 85                                     180                174
                   (65)              (126)                                   (168)              (167)
   (300)
                 Q2/20              Q2/21                                  6M/20               6M/21

 Note: Total Revenue and Net Profit are excluded Accounting Gain, Other Income, Gain/Loss from exchange rate.

                                                                                                                                                                         7
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Maintain Net Profit During Covid Situation
  YoY
                       +1%           Solar
(Mil.THB)                            Gross
                                            (38)             (640)                                    39
                                     Profit                                      (33)                        (769)
                                   Increase                                                                                 (50)
             3,948             3,968
                                                                                                                                      2,603               2,601

        Gross Profit 6M20               Selling Expense                Share of Loss in investment         Financial Cost          Net Profit 6M21

  YoY
                         -3%
(Mil.THB)                                   (20)             (292)                                    13
                                                                                  (8)                        (379)
                                                                                                                                                        +4%
                                                                                                                            (12)
             1,885             1,823
                                                                                                                                       1,191              1,149

        Gross Profit Q2/2020            Selling Expense              Share of loss from investments        Financial Cost          Net Profit Q2/2021

                                                           21% YoY                                           7% YoY
                                                          Improving                                        Repaying
                                                           Efficency                                         Loan
                                                                                                                                                                  8
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Controllable Leverage Ratio and Diversified Payment Schedule

       Total Interest Bearing Debt
                                               Mil.Bt.
                             Current                                                                               Bond      LT-Loan
                            portion of
                           Debentures &                             7,299     7,135
                                                  6,337    6,390                                 6,030
                             ST-Debt
                               15%
                                                  2,337                                                                       4,000
                                                                               5,635
                                                                                       3,466      3,030
                                                            4,390    6,299                                                       -

             43,835                               4,000                                 2,766
                                                                                                  3,000
                                                                                                           642         212     4,000
  LT-Debt
   57%
                Mil.Bt.           Debentures
                                     28%
                                                            2,000
                                                                     1,000     1,500
                                                                                         700                642
                                                                                                             -         212
                                                                                                                        -
                                                  2021     2022     2023      2024     2025      2026     2027      2028      2029

                                               On 11th February 2021, EA signed THB 1.5 billion 3-year loan to ADB and was certified
                                               by CBI to be green loan.

               Interest Rate
       Short Term Debt:   1.20 – 1.50%         On 10th July 2020, EA issued bond worth THB 2.2 billion
                                               - Tranche 1 : 2-year bond worth THB 500 million with 2.62% interest
                   P/N:   1.20 – 1.50%         - Tranche 2 : 3-year bond worth THB 1,000 million with 2.94% interest
        Long Term Debt:   2.30 – 3.80%         - Tranche 3 : 5-year bond worth THB 700 million with 3.30% interest

                 Bond:    2.37 – 3.30%
                   D/E    1.56
                Net D/E   1.43

 Net IBD/equity ratio not exceeding 3.5:1

                                                                                                                                       9
ENERGY ABSOLUTE PCL. OPPORTUNITY DAY for Q2/2021
Palm Oil-based
Business

                 10
                 1
                 0
B100’s Revenue Up Driven by CPO Stock
                                                                                                                         Market situation in Thailand
                                                                                                                          Unit : Ton
  Mil.liters                                                                                         Baht/liter         600,000

                                                                                                                        500,000
300
                                                                                                                        400,000
                             188                                   193         188
200             175                            174                                                                      300,000
                                      152                158
      134
                                                                                                                        200,000
100
                                       35.07                                                  48.2           41 33.78   100,000
       25.00         28.60    30.99              24.18    20.17      17.69      28.79                23.33

 0                                                                                                                             -
                                                                                                                                    Apr 20 May 20 Jun 20 Jul 20 Aug 20 Sep 20 Oct 20 Nov 20 Dec 20 Jan 21 Feb 21 Mar 21 Apr 21 May 21 Jun 21
      2013          2014     2015     2016      2017     2018       2019       2020           Q2/20          Q2/21

                                               Sales Volume    Avg Price                     1,124.77     1,401.40      +25%                                                  CPO Stock
                                                                                             mil.THB       mil.THB
                                                                                                                         YoY         Unit : Ton

                                                                                                                                   340,000                                                              Q2/20   Q2/21
            Location         Kabin Buri Industrial Estate, Prachinburi under BOI promotion & privileges
                                                                                                                                   320,000
                             • Biodiesel 800,000 Liters per day
            Plant                                                                                                                  300,000
                             • Production of green diesel/PCM 65 Ton per day
            Capacity                                                                                                               280,000
                             • Refined Glycerin 80 Tons per day (by product)
                                                                                                                                                                           B100 Demand

                                                  B100 selling price increased 44.8% YoY after CPO Stock decreased
                                                despite its volume decreased 14% YoY following the Covid-19 outbreak.

         Source: Company data, Ministry of Commerce (https://bit.ly/3xEhcPg)
                                                                                                                                                                                                                                               11
Fully Integrating Palm Oil Value Chain
       New Era                                                   Existing and Beyond

        Palm Oil Plant in Suratthani
        capacity 0.5 ton per day
                                                           Bio PCM Plant in Rayong
                                                           capacity 130 tons per day
                                Shore Tank                 (2 phases)

                         Palm Oil

                                                                                                     Diesel equivalent,
                             Stabilize CPO Prices
                                                                                                     sell to oil companies

Palm                                                                                            >>
                                                         Biodiesel Plant in Prachinburi
                                                         capacity 800,000 Liters per      day
         Palm Oil Plant in Krabi
         capacity 1.2 tons per     day

                                                                                                                             12
Opportunities
of Green Diesel and Bio PCM               Bio-PCM absorbs heat above targeted range

                                                     Bio - PCM
                                                                   18-22 ℃
            Green Diesel                                  Bio-PCM releases heat if temperature is lower
                                                                      than targeted range

 ü Characteristics equivalent to Euro 5   ü Construction Industry
                                                                                   ü Textile and
 ü Jet Fuel
                                                                                   Garment Industry
                                                               Block heat
 ü Purity

                                                              Release heat
 ü X2 engine performance            X2

                                                                                                          13
Renewable Power
Business

                  14
Steady Performance of Renewable Power 664 MW
                                 Solar,
                                278MW                                                            • Maintain the performance the same level from
                        Wind,                                                                      last year during Covid Situation
                       386MW
                                                                                                        Mil. kWh                  Solar     Wind
                                                                                         1600
                                          EA Solar Phitsanulok
                                          90 MW                                          1400
 EA Solar Lampang
            90 MW                              EA Wind Hanuman (Chaiyaphum)              1200
                                               260 MW
                                                                                         1000

                                                                                          800

                                                                                          600                                                                   674       691

                                                                                                    321                   373         361                      330345       365
                                                                                          400                    306                               330                   326
                                                                                                                            231       202
                                                                                                 175146         149157   142       159         167163
                                                                                          200

                                                                                             0
EA Solar Nakornsawan                                                                               Q2/20         Q3/20    Q4/20      Q1/21         Q2/21         6M/20    6M/21
              90 MW
                                                                              EA Wind Hadkanghan                                                           Output Production
                                                                              (Songkla & Nakorn si thammarat)
              EA Solar Lopburi                                                126 MW
                        8 MW

                                                                                                                                                                                  15
Improving Efficiency &Renewable Power Opportunities
 Current Advanced to Improve Solar Efficiency

ü Re-install New Solar Panel          ü Sun Tracker                      ü Robot Cleaning

 Current Advanced to Improve Solar Efficiency
                                                             Feasibility
  ü Waste Energy                                             ü Hydro Power Up to 2,880MW

  •   Koh Sichang, Koh Chang and Ranong                       •   Saravan and Phamong
                                                                                            16
Driving Business
to New Era

                   17
Potential Growth for EV Market: Thailand ZEV Plan
THAILAND EV MARKETS                                                                 PRIVATE CHARGING FOR ELECTRIC LIGHT-DUTY VEHICLES
                                                                                          WILL DOMINATE IN NUMBER AND CAPACITY

             Forecasting number of EV Passenger Car (Accum.)            6,400,000
                                                                                             Forecasting number of charger
                                                                                                       (Accum.)

                                                 2,050,000
                               402,000                                                                                 40,500

2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035                          13,450
          Forecasting number of EV Truck & EV Bus (Accum.)                430,000          2,460

                                                                                            2025          2030         2035
                                                  160,000
                                  31,000

 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035

 Source: State policies EV Committee
                                                                                                                                        18
Potential Growth for Thailand Battery

                                              120          BATTERY DEMAND

                                        Gwh
                                              100
                                               80
                                               60
                                                                              100
                                               40
                                               20                  38
                                                0    20

                                                    2025          2030       2035

                                Thailand EV production target keep surging demand of battery
                                            more than 100 Gwh per year in 2035

 Source: Thailand EV Board Resolution
                                                                                               19
EV Business Structure

                                                                EA Mobility Holding

          55%                  100%                  100%                        40%                    75%                100%         71.2%
   Absolute           Mine Mobility       E Smart Transport                                                      Mine Mobility       Amita Taiwan
                                                                             NEX                 EV Now *
Assembly (AAB)        Corp. (MMC)               (EST)                                                             Research
                                          EV Ferry – Own and           Capital 1,674.45
     Produce,        EV Car – Produce,                                                       Capital 50M.THB     R&D all electric    Energy Storage
                                              operate mass                 M.THB
assemble all buses   assemble, sell all                                                                            vehicles            Business
                                            transport service         • Rent
 and vans and sell    passenger EV                                                           Distribute EV Bus
                                               and tourism            • Domestic&Overse
   to distributor                                                                            and hire AAB to                            100%
                                                                        as sale
                                                                                             produce and                               Amita TH
                                                                      • After sale service
                                                                                             assemble
                        PRODUCER                                      • Autopart                                 R&D SUPPORT
           45%                                                        • Service for all                                              Energy Storage
                                                      100%              buses                                                          Business

                                            Chao Phraya
                                                                                                                                    PRODUCER &
                                           River Line(CRL)
                                                                                    DISTRIBUTOR                                     DISTRIBUTOR
                                             Transportation
                                           service and tourism
                                                 operator                                                                                         20
Energy storage
Business

                 21
Amita’s Reputable and Experienced in Energy Storage
ü Proven and strong experience over 20 years

ü Produce lithium-ion power battery with strong material science research and long test data
  accumulation supported by ITRI.*

ü Turnkeys of high technology battery factory for EV in Beijing

ü Various patents

ü Awarded submarine in Taiwan

ü Bringing Amita to manufacture in Thailand for BOI, Free Zone, Competiveness & Sustainability

ü World class machine and facilities
                                                     * ITRI, a nonprofit R&D organization of Taiwan, who played a vital role in Taiwan's economic growth,
                                                     strengthen capabilities of innovation and cooperation with international partners all over the world.
                                                                                                                                                     22
One-stop Service for Customers

In Free zone                             Accept for All types of Cooperations
• Efficient and convenient for Import-   (JV, exclusive production line, etc)
   Export
• Tax Benefits lead to competitiveness   • Supply all types of products (cells, modules, packs)

                                         • Quickly scale up and running

                                                              Cell         Module       Pack
                                                                                                  23
Energy Storage System : Core Technology for New Businesses

                                EV       Electric        Electric    Electric
                             Charging    Vehicle           Ferry       Bus
                              Station      (EV)          (E-Ferry)   (E-Bus)

Phase I   Final Target
                                               Energy
                               Energy
1 GWh     50 GWh               Trading
                                               Storage
                                               System
                               System
                                                (ESS)

                                                                                24
Amita’s Competitive Battery Features

 Ultra Fast Charge                                   Solid State
  ü Fast charging 4C (15 Mins Charge)
  ü Long cycle life over 3,000 (>8 Yrs)

 Durable Charge
                                                     ü Higher energy density
  ü Charging 1C (1-Hour Charge)
                                                     ü Ultra safety
  ü Long cycle life over 8,000
                                                     ü Good conductivity and stability

       NOW                       All in-house development                NEXT
                                                                                         25
AMITA Li-ion is the Key for Commercial EV

         EV Car                                    E-Truck

EV Bus                          AMITA Li-ion           E-Ferry
                                  Battery

                  EV Mini Bus
                                                                            26
ESS The Game Changer

    Renewable Energy Hybrid                     Potential Location of Energy Storage System
                                                                in Power Gid

Renewable         ESS            Household/EV

                                                  •   Support the use of electricity in remoting area
   Support the use of electricity in
                                                             • Support energy trading
           remoting area
                                                       • Shift growth when EV demand comes
                                                                                                        27
Progress of Battery Factory Project

                                          EV Ecosytem Integration
                      Installation                               Ready to Commence
                      & Test Run Full System                    the Production by 2021

Total space is approximately 75,000 m2

* Capacity in Phase I (1Gwh) can reserve to 2 – 4 GWh
                                                                                              28
Electric Vehicle
Business

                   29
EA - EV Ecosystem

                                Leading Thailand’s EV to Support EA’s Sustainable Growth

             Battery                 EV Vehicle Factory           EV Vehicle                   EV Charger              After service

   High quality of battery          World Class Factory       Various type of EV vehicle   Fast charge technology     High standard of
 supported by in-house strong      designed by Professional    offering commercial fleet     will accerelate the     After sales service
  R&D with countless patents           with international     business come up with fast    electrifying source of   is one stop service
                                           standard                charge technology          energy usage in        for all model of our
                                                                                              commercial fleet            EV vehicle
                                                                                                   business

                                                                                                                                            30
EV Business Structure

                                                       EA Mobility Holding

          55%                  100%                  100%                      40%                      75%               100%

   Absolute           Mine Mobility       E Smart Transport                                                      Mine Mobility
                                                                             NEX                 EV Now *
Assembly (AAB)        Corp. (MMC)               (EST)                                                             Research
                                          EV Ferry – Own and         Capital 1,674.45
     Produce,        EV Car – Produce,                                                       Capital 50M.THB     R&D all electric
                                              operate mass               M.THB
assemble all buses   assemble, sell all                                                                            vehicles
                                            transport service       • Rent
 and vans and sell    passenger EV                                                           Distribute EV Bus
                                               and tourism          • Domestic&Overse
   to distributor                                                                            and hire AAB to
                                                                      as sale
                                                                                             produce and
                                                                    • After sale service
                                                                                             assemble
                        PRODUCER                                    • Autopart                                   R&D SUPPORT
           45%                                                      • Service for all
                                                      100%            buses
                                            Chao Phraya
                                           River Line(CRL)
                                                                                      DISTRIBUTOR
                                             Transportation
                                           service and tourism
                                                 operator                                                                           31
EV’s Eco-system: All modes of EV Applications

                          eBus, eFerry and
                          other commercial vehicles

                                                                                                              MINE Truck
                                                                                                              Ready Next Year

                                                         MINE BUS

                                                         Battery size:   250-350 kWh   Max Speed:   80 km/h
                                                         Rang/Charge:    250 km        Max passenger: 80
MINE Smart Ferry

Battery size:   800 kWh           Max Speed:   18 knot
Rang/Charge:    100 km            Max passenger: 250
                                                                         MISSION NO EMISSION
                                                                                                                                32
The largest Integrated E-Bus Plant in Southeast Asia

                                                               BUILD TO HIGHEST QUALITY
                                                              1.The plant designed by professional team who had
                                                                designed international automotive manufacturing

                                                              2.Machine Sourcing / Installation / Commissioning by
                                                                expertise in the automotive industry

                                                              3.Monitoring production process by professional partners to
                                                                meet global standards and high quality of electric vehicles

 •   Company:            Absolute Assembly Co.,Ltd.
 •   Location:           Chachoengsao
 •   Capacity:           Up to 3,000 units per year
 •   Standard Granted:   ISO:9001
 •   Area:               Over 65,000 sq.m3
                                                      AAB – Global Standard E-Vehicles Plant
                                                                                                                         33
Electric Bus with Time Saving for All                                                                                                   4 Times
                                                                                                                                        Faster
                                                                                   300

           VinBus                                                                  250                                                                                      480          480
                                                                                                                                                                                                     560    700

                                                                                                                                                                400                                         500
                                                                                   200                                                              320
                                 Vinfast’s VinBus                                                                           240         240
                                                                                   150                        160                                                                                           300

                                  § Company – Vinfast (Vietnam)                                 80
                                                                                   100                                                                                                                      100
                                  § Range per charge – 220 to 260 km
                                                                                         40     40     40     40     40      40                40    40    40    40    40    40                 40    40
                                                                                   50                                                                                                                       -100
                                  § Charging Time – 2 hours (150 kW fast charge)
                                                                                    0                                                                                                                       -300
                                                                                         5.00   6.00   7.00   8.00   9.00   10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00

                                                                                                                          Running Distance (km)           Accumulated Distance (km)

                                                                                   300                                                                                                                      900
                                                                                                                                                                                                     700
                                 MINE Mobility’s MINE Bus                          250
                                                                                                                                                                                         620                700
                                                                                                                                                                            540
                                  § Company – MINE Mobility (Thailand)                                                                                          470
                                                                                   200                                                              390                                                     500
                                                                                                                                        310
                                  § Range per charge – 220 to 280 km                                                        240
                                                                                   150                        160                                                                                           300
                                  § Charging Time – 15 to 20 minutes (900 kW DC                 80
                                    super fast charge) >   4 time faster !!        100                                                                                                                      100
                                                                                         40     40     40     40     40      40          40    40    40    40    40          40    40    40     40    40
                                                                                   50                                              30                                  30                                   -100

                                                                                    0                                                                                                                       -300
                                                                                         5.00   6.00   7.00   8.00   9.00   10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00

Fast charge model suits with commercial vehicle segment as it requires
                                                                                                                          Running Distance (km)           Accumulated Distance (km)
     less charging time, thus more asset utilization during the day
Electric bus fleet
Green Fleet for a Sustainable Transportation

   Over 100 Completed Production               48 Derivering
                                                               35
The First Thai Electric Ferry for Transportation and Tourism
                                                                          Battery capacity:

                                                                        800 kWh
      Max Passenger                 250
      Range                80 – 100 km.
                           per single charge

Ultra Fast Charge within 15 Mins with 2 stations in North & South

    5 May 2021                         17 May 2021                         Within 3Q2021

  Commenced               Fully operate from Nonthaburi Pier to   27 electric ferries to be ready
   operation               Phra Nang Klao Pier – Sathorn Pier
 www.minesmartferry.com                                                                             36
The First Thai Electric Ferry with Cost Saving for All

                                                      77% Cheaper in the Same Destination
          Electric Train

                           86 Baht
                                                          86 Baht
             Sathorn                 Phra Nang Klao

           MINE Smart Ferry

                        20 Baht
                                                          20 Baht
              Sathorn                Phra Nang Klao

                                                                                       37
GHG Emission Reduction
                                                                      Saving Diesel Fuel

                                                              4,029,260 Liters/yr
 10,879 tCO2e/yr
          Based on 6 trips/day (365 days) service and 1 diesel boat uses 80 liters of diesel fuel
   Greenhouse Gas Emissions 0.2159 tCO2e/yr per trip when serving 23 boats (Excluding 4 cruise ships)   38
EV Charging
Platform

              39
Urbanization and Sustainablity Creates
Demand Supporting by Commercial EV

                                     40
Department Stores

   ~ 440                 1,100                                                      600
                         Ahead of Charging Station                         Ahead of Charging Station

 No. of Locations
                     ~                                                        ~
                         AC (Normal Charge)                                     DC (Super Fast Charge)                     Retails & Mix Use

                     EA Anywhere Charging Station Platform
                         • DC Ultra-Fast Charger 300 kW/ 14 charging stalls / 28 chargers
                          • Equipped with control systems, command and status monitoring that Oil Stations
                           is convenient and safe following on the charging standards
                            • 80% within 15-20 minutes with Ultra fast charging (Depend on
                           battery size)                                                      Offices & Property

                                                     ~1,700
                                                                                                             Over 70%
                                                      Total Ahead of Charging Station

No.1 in the Country                                                                                         Market Share
 DC (Ultra Fast Charge 300 kW)                        Source: Electric Vehicle Association of Thailand (EVAT)              Modern trade
                                                      As of 7 May 2021

                                                     EA ANYWHERE Application
                                                                      Available now
                                                                                                Hit ~ 20,00 downloads                          41
EV Charging’s Competitive Advantages

ü Integrated EV charging to various business models

ü Industry leading charging design and maintenance

ü Fast charging technology with parallel charging

ü Leading R&D to support future technology

ü Secure prime location in urban areas

ü Business proven and first mover in Thailand

                                                          42
EV Charging’s Various Business Models and Opportunities
                                                                                                       Future Growth
                            Only                                       Residential Usage
    SELLING CHARGER   Selling Charger                                  Slow and medium Charge
                                                                     maximum 40 kWh suitable for
                                                                     residential and working place
                      Selling Charger

                        Maintenance                                   Commercial Usage
                         package                                   Fast Charge) Maximum 300kWh
                                                                  suitable for commercial EV vehicle
                         Monitoring
                         Application

                                               Located in prime area
                                            including Community mall
                      Urban Charging       parking, Gas station, Office
                                           building serving daily use for
                                              passenger car and taxi

     OPERATE                                 Develop charging station
                      Interstate / Stand   along the interstate road to                                E xp an d t h e c o v e r a g e
                       alone Charging      facilitate all commercial EV                                charging area to all
                           Station         vehicles and passenger car                                  potential public and
                                             for long-length journey
                                                                                                       private location
                                                                                                       including interstate
                                                                                                       charging station at all
                                                                                                       interstate road.

                                                                                                                                         43
Ultra Fast Charge Solution

                                               Battery 250-350   kWh

                                               for 250 km

1-1.4 MW

                                                    Battery   800 kWh
           3.2 MW                                   for 100 km
 MINE Smart Ferry Charging Station

                                                                        44
2021 Investment Plan

                   45
Investment Plan in 2021

Investment Plan                     Progress / Target                        Capital Investment in 2021
                     32 mil.THB to invest in small machinery and                                   New Power
Bio Diesel & PCM                                                                                    Projects
                     equipment
                                                                                                      126
                                                                                                     2.1%
                                                                                                                Battery Business
Battery Plant
                     1,223 mil.THB. To start production in 2021                                                       1,223
(Thailand)                                                                                                           20.0%

                     1,506 mil.THB. Comprise of EV Bus and E Ferry.
EV Business

                     426 mil. THB. Currently, achieve around 500            Power         6,100 mil.
EV Charging          stations in 53 provinces with more than 2,000         Business,
                     outlets installed and expanding to nationwide
                                                                         2,787 , 45.7%       THB
                     2,787 mil. THB. Mainly, to improve performance of
Power Business
                     solar plants and investing in new project
New Power Projects   126 mil.THB. Under studying                                                                EV Business,
                                                                                                                1,506 , 24.7%
                                                                                    Bio Diesel &     Charging
                                                                                        PCM          Stations
                                                                                          32            426
                                                                                        0.5%           7.0%

                                                                                                                                   46
Leading Thailand’s EV to Boost EA’s Sustainable Growth
Disclaimer

This presentation contains summary information about Energy Absolute Public Company Limited (“EA” or “the Company”) and its subsidiaries as of 25
May 2021 and, unless stated otherwise. The information does not purport to be complete or comprehensive.
This presentation contains forward looking statements that may be identified by use of words such as “anticipates,” “hopes,” “expects,” “estimates,”
“intends,” “projects,”“plans”, “predicts,” “projects”, “aims” or other similar expressions that are used to identify such statements. Forward looking
statements are based on certain assumptions and expectations of future events. No guarantee nor assurance is made that these assumptions and
expectations are accurate or will be realized. Such forward looking statements should be considered with caution, since actual results may differ
materially from those expressed or implied by such statements.
The information in this presentation were obtained from various external sources which has not verified through any independent source. No
representation or warranty, either express or implied, is made regarding the accuracy, completeness, correctness, reliability, or scope of the
information and disclaim all responsibility and liability for the information (including, without limitation, liability for negligence).
This presentation is provided for the sole purpose of enhancing understanding of the Company and should not be construed as a legal, tax or
investment recommendation or any other type of advice.
The Company does not provide any representation, warranty, endorsement, or acceptance, about opinion or statement of any analyst s or other third
parties; or the use of any such opinion, or statement of any analysts or other third parties.
This document is strictly confidential and being given solely for your information and may not be shared, copied, reproduced or redistributed to any
other person in any manner.
IR Contact
IR@energyabsolute.co.th
(+66) 02 248 2488 ext. 19531
www.EnergyAbsolute.co.th
You can also read