                                             Economy Profile of Uzbekistan

                                             Doing Business 2019 Indicators
                                        (in order of appearance in the document)

Starting a business                    Procedures, time, cost and paid-in minimum capital to start a limited liability company

Dealing with construction permits      Procedures, time and cost to complete all formalities to build a warehouse and the quality
                                       control and safety mechanisms in the construction permitting system

Getting electricity                    Procedures, time and cost to get connected to the electrical grid, and the reliability of the
                                       electricity supply and the transparency of tariffs

Registering property                   Procedures, time and cost to transfer a property and the quality of the land administration
                                       system

Getting credit                         Movable collateral laws and credit information systems

Protecting minority investors          Minority shareholders’ rights in related-party transactions and in corporate governance

Paying taxes                           Payments, time, total tax and contribution rate for a firm to comply with all tax regulations as
                                       well as post-filing processes

Trading across borders                 Time and cost to export the product of comparative advantage and import auto parts

Enforcing contracts                    Time and cost to resolve a commercial dispute and the quality of judicial processes

Resolving insolvency                   Time, cost, outcome and recovery rate for a commercial insolvency and the strength of the
                                       legal framework for insolvency

Labor market regulation                Flexibility in employment regulation and aspects of job quality

                                                                                                                                          Page 2
Doing Business 2019           Uzbekistan

About Doing Business

The Doing Business project provides objective measures of business regulations and their enforcement across 190 economies and selected
cities at the subnational and regional level.

The Doing Business project, launched in 2002, looks at domestic small and medium-size companies and measures the regulations applying
to them through their life cycle.

Doing Business captures several important dimensions of the regulatory environment as it applies to local firms. It provides quantitative
indicators on regulation for starting a business, dealing with construction permits, getting electricity, registering property, getting credit,
protecting minority investors, paying taxes, trading across borders, enforcing contracts and resolving insolvency. Doing Business also
measures features of labor market regulation. Although Doing Business does not present rankings of economies on the labor market
regulation indicators or include the topic in the aggregate ease of doing business score or ranking on the ease of doing business, it does
present the data for these indicators.

By gathering and analyzing comprehensive quantitative data to compare business regulation environments across economies and over time,
Doing Business encourages economies to compete towards more efficient regulation; offers measurable benchmarks for reform; and serves
as a resource for academics, journalists, private sector researchers and others interested in the business climate of each economy.

In addition, Doing Business offers detailed subnational reports, which exhaustively cover business regulation and reform in different cities and
regions within a nation. These reports provide data on the ease of doing business, rank each location, and recommend reforms to improve
performance in each of the indicator areas. Selected cities can compare their business regulations with other cities in the economy or region
and with the 190 economies that Doing Business has ranked.

The first Doing Business report, published in 2003, covered 5 indicator sets and 133 economies. This year’s report covers 11 indicator sets
and 190 economies. Most indicator sets refer to a case scenario in the largest business city of each economy, except for 11 economies that
have a population of more than 100 million as of 2013 (Bangladesh, Brazil, China, India, Indonesia, Japan, Mexico, Nigeria, Pakistan, the
Russian Federation and the United States) where Doing Business also collected data for the second largest business city. The data for these
11 economies are a population-weighted average for the 2 largest business cities. The project has benefited from feedback from
governments, academics, practitioners and reviewers. The initial goal remains: to provide an objective basis for understanding and improving
the regulatory environment for business around the world.

More about Doing Business (PDF, 5MB)

                                                                                                                                                   Page 3
Doing Business 2019                Uzbekistan

         Ease of Doing Business in                                                                                              DB 2019 Rank
                                               Region                 Europe & Central Asia
                                                                                                                 190                                        1
              Uzbekistan
                                               Income Category        Lower middle income                                                 76
                                                                                                                          DB 2019 Ease of doing business score
                                               Population             32,387,200
                                                                                                                  0                                100

                                               City Covered           Tashkent                                                                 67.40

                                                            DB 2019 Ease of Doing Business Score

                       0                                                                                                                 100
                                                                                                               77.89: Kazakhstan (Rank: 28)

                                                                                                              77.37: Russian Federation (Rank: 31)

                                                                                                           73.54: Moldova (Rank: 47)

                                                                                                        72.34: Regional Average (Europe & Central Asia)

                                                                                                  68.33: Kyrgyz Republic (Rank: 70)

                                                                                                 67.40: Uzbekistan (Rank: 76)

Note: The ease of doing business score captures the gap of each economy from the best regulatory performance observed on each of the indicators across all economies
in the Doing Business sample since 2005. An economy’s ease of doing business score is reflected on a scale from 0 to 100, where 0 represents the lowest and 100
represents the best performance. The ease of doing business ranking ranges from 1 to 190.

Rankings on Doing Business topics - Uzbekistan

         1      12

         28                                    35
                                                                                                                                                  41

         55                                                                      60              64               64
                                                               71

         82                                                                                                                                                        91
 Rank

        109
                               134
        136

                                                                                                                                165
        163

        190

              Starting       Dealing         Getting        Registering      Getting          Protecting        Paying         Trading         Enforcing         Resolving
                 a            with          Electricity      Property        Credit            Minority         Taxes          across          Contracts        Insolvency
              Business     Construction                                                       Investors                        Borders
                             Permits

Ease of Doing Business Score on Doing Business topics - Uzbekistan

        100    95.79

                                             86.05

        80                                                                                                       76.92

                                                              66.60           65.00                                                              67.26
                              61.37                                                             60.00
Score

        60
                                                                                                                                49.79
                                                                                                                                                                  45.21

        40

        20

         0

              Starting       Dealing         Getting        Registering      Getting          Protecting         Paying        Trading          Enforcing        Resolving
                 a            with          Electricity      Property        Credit            Minority          Taxes         across           Contracts       Insolvency
              Business     Construction                                                       Investors                        Borders
                             Permits

                                                                                                                                                                             Page 4
Doing Business 2019           Uzbekistan

     Starting a Business

This topic measures the number of procedures, time, cost and paid-in minimum capital requirement for a small- to medium-sized limited
liability company to start up and formally operate in each economy’s largest business city.

To make the data comparable across 190 economies, Doing Business uses a standardized business that is 100% domestically owned, has
start-up capital equivalent to 10 times the income per capita, engages in general industrial or commercial activities and employs between 10
and 50 people one month after the commencement of operations, all of whom are domestic nationals. Starting a Business considers two
types of local limited liability companies that are identical in all aspects, except that one company is owned by 5 married women and the
other by 5 married men. The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a
business. These scores are the simple average of the scores for each of the component indicators.

The most recent round of data collection for the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                              Case study assumptions

Procedures to legally start and formally operate        To make the data comparable across economies, several assumptions about the
a company (number)                                      business and the procedures are used. It is assumed that any required information is
                                                        readily available and that the entrepreneur will pay no bribes.
• Preregistration (for example, name verification or
  reservation, notarization)
                                                        The business:
• Registration in the economy’s largest business        - Is a limited liability company (or its legal equivalent). If there is more than one type
  city
                                                        of limited liability company in the economy, the most common among domestic firms
• Postregistration (for example, social security        is chosen. Information on the most common form is obtained from incorporation
  registration, company seal)                           lawyers or the statistical office.
                                                        - Operates in the economy’s largest business city. For 11 economies the data are
• Obtaining approval from spouse to start a
  business or to leave the home to register the         also collected for the second largest business city.
  company                                               - The entire office space is approximately 929 square meters (10,000 square feet).
                                                        - Is 100% domestically owned and has five owners, none of whom is a legal entity;
• Obtaining any gender specific document for            has a start-up capital of 10 times income per capita and has a turnover of at least
  company registration and operation or national        100 times income per capita.
  identification card
                                                        - Performs general industrial or commercial activities, such as the production or sale
                                                        of goods or services to the public. The business does not perform foreign trade
Time required to complete each procedure
                                                        activities and does not handle products subject to a special tax regime, for example,
(calendar days)
                                                        liquor or tobacco. It does not use heavily polluting production processes.
• Does not include time spent gathering                 - Leases the commercial plant or offices and is not a proprietor of real estate and the
  information                                           amount of the annual lease for the office space is equivalent to the income per
                                                        capita.
• Each procedure starts on a separate day (2
  procedures cannot start on the same day)              - Does not qualify for investment incentives or any special benefits.
                                                        - Has at least 10 and up to 50 employees one month after the commencement of
• Procedures fully completed online are recorded        operations, all of whom are domestic nationals.
  as ½ day                                              - Has a company deed that is 10 pages long.
• Procedure is considered completed once final
  document is received                                  The owners:

• No prior contact with officials                       - Have reached the legal age of majority. If there is no legal age of majority, they are
                                                        assumed to be 30 years old.
Cost required to complete each procedure (% of          - Are sane, competent, in good health and have no criminal record.
income per capita)                                      - Are married and the marriage is monogamous and registered with the authorities.
                                                        - Where the answer differs according to the legal system applicable to the woman or
• Official costs only, no bribes                        man in question (as may be the case in economies where there is legal plurality), the
• No professional fees unless services required by      answer used will be the one that applies to the majority of the population.
  law or commonly used in practice

Paid-in minimum capital (% of income per
capita)

• Funds deposited in a bank or with third party
  before registration or up to 3 months after
  incorporation

                                                                                                                                                     Page 5
Doing Business 2019         Uzbekistan

Starting a Business - Uzbekistan

  Standardized Company

 Legal form                                                             Limited Liability Company

 Paid-in minimum capital requirement                                    UZS 0

 City Covered                                                           Tashkent

  Indicator                                             Uzbekistan         Europe &             OECD high            Best Regulatory
                                                                           Central Asia         income               Performance

 Procedure – Men (number)                              3                   5.2                 4.9                   1 (New Zealand)

 Time – Men (days)                                     4                   12.9                9.3                   0.5 (New Zealand)

 Cost – Men (% of income per capita)                   3.1                 4.6                 3.1                   0.0 (Slovenia)

 Procedure – Women (number)                            3                   5.2                 4.9                   1 (New Zealand)

 Time – Women (days)                                   4                   12.9                9.3                   0.5 (New Zealand)

 Cost – Women (% of income per capita)                 3.1                 4.6                 3.1                   0.0 (Slovenia)

 Paid-in min. capital (% of income per capita)         0.0                 2.3                 8.6                   0.0 (117 Economies)

 Figure – Starting a Business in Uzbekistan and comparator economies – Ranking and Score

                                                    DB 2019 Starting a Business Score

       0                                                                                         100

                                                                                          95.79: Uzbekistan (Rank: 12)

                                                                                        95.55: Moldova (Rank: 14)

                                                                                      93.04: Russian Federation (Rank: 32)

                                                                                      92.97: Kyrgyz Republic (Rank: 35)

                                                                                      92.96: Kazakhstan (Rank: 36)

                                                                                    90.02: Regional Average (Europe & Central Asia)

Note: The ranking of economies on the ease of starting a business is determined by sorting their scores for starting a business. These scores
are the simple average of the scores for each of the component indicators.

                                                                                                                                                Page 6
Doing Business 2019       Uzbekistan

  Figure – Starting a Business in Uzbekistan – Procedure, Time and Cost

                                                   Time (days)        Cost (% of income per capita)
                4                                                                                                                       2.5

               3.5

                                                                                                                                              Cost (% of income per capita)
                                                                                                                                        2
                3
 Time (days)

               2.5
                                                                                                                                        1.5

                2

                                                                                                                                        1
               1.5

                1
                                                                                                                                        0.5
               0.5

                0                                                                                                                       0
                               1                                      2                                          3
                                                              Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                              Page 7
Doing Business 2019         Uzbekistan

Details – Starting a Business in Uzbekistan – Procedure, Time and Cost

No.    Procedures                                                                            Time to Complete   Associated Costs

1     Register at the Single Window Center under the Ministry of Justice (one-               2 days             UZS 172,240 (equal
      stop shop) and obtain the Certificate of State Registration                                               to one minimum
      Agency : Public Service Center under the Ministry of Justice                                              wage salary)
      Starting from April 1, 2017, the new online platform for the companies registration
      was introduced: fo.birdarcha.uz

      The company can be registered online or in-person by visiting the Public Service
      Center of the relevant district. The following registration documents should be
      submitted:
      (1) application form;
      (2) constitutive documents: shareholders agreement and charter (for LLC);
      (3) confirmation of registration fee payment (if not done at the moment of
      registration).

      In case of online registration, each founder should electronically confirm that
      (s)he is becoming the founder of the company. Within 30 minutes after the
      documents are submitted and payment is made, the company is registered.

      Registration certificate and constitutional documents are sent electronically to the
      applicant.

      Registration fee is levied in the amount of 1 minimum wage in case of registration
      in person, or 0.5 minimum wage in case of registration online.

      After the LLC is registered, the local registering authority automatically provides
      the data on the registered LLC to the state statistics authorities, state tax
      authorities, and internal affairs agencies at place of location of the LLC.

2     Make a company seal                                                                    1 day              UZS 50,000 -
      Agency : Specialized seal-making company                                                                  100,000
      According to Article 5 of the Law "On limited liability company"
      (http://lex.uz/Pages/GetAct.aspx?lact_id=18793), small companies are not legally
      required to have a seal. However, most companies still prefer to do so in
      practice.

      Starting from April 1, 2017, small companies are no longer required to approve
      the seal design with the registration authorities. The company’s seal must be
      made by a specialized seal-making company. For ordering a seal, the company
      should provide the Registration Certificate.

3     Open a permanent bank account with a local bank                                        1 day              no charge
      Agency : Commercial Bank
      Companies open bank accounts in order to conduct official business, and
      because in practice Tax Authorities expect a notification regarding company’s
      corporate account number. In addition corporate bank account is required for
      notification of Xalq bank.

      To open a permanent bank account, it is required to submit the Decision of the
      newly registered company on nomination of the director of the company and the
      accountant.

      Requirement to submit originals and copies of the certificate of registration and
      constituent documents was abolished. When opening a bank account, banks
      independently gain access to information about the business entity (registration
      certificates and constituent documents).

      After opening a permanent bank account for the company, the bank notifies Tax
      Authorities and Khalk bank (People's bank) regarding the company's bank
      account.

Takes place simultaneously with previous procedure.

                                                                                                                                     Page 8
Doing Business 2019              Uzbekistan

     Dealing with Construction Permits

This topic tracks the procedures, time and cost to build a warehouse—including obtaining necessary the licenses and permits, submitting all
required notifications, requesting and receiving all necessary inspections and obtaining utility connections. In addition, the Dealing with
Construction Permits indicator measures the building quality control index, evaluating the quality of building regulations, the strength of
quality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. The most recent round of
data collection was completed in May 2018. See the methodology for more information

 What the indicators measure                              Case study assumptions

Procedures to legally build a warehouse                 To make the data comparable across economies, several assumptions about the
(number)                                                construction company, the warehouse project and the utility connections are used.

• Submitting all relevant documents and obtaining       The construction company (BuildCo):
  all necessary clearances, licenses, permits and
  certificates                                          - Is a limited liability company (or its legal equivalent) and operates in the economy’s
                                                        largest business city. For 11 economies the data are also collected for the second
• Submitting all required notifications and receiving   largest business city.
  all necessary inspections
                                                        - Is 100% domestically and privately owned; has five owners, none of whom is a
• Obtaining utility connections for water and           legal entity. Has a licensed architect and a licensed engineer, both registered with
  sewerage                                              the local association of architects or engineers. BuildCo is not assumed to have any
• Registering and selling the warehouse after its       other employees who are technical or licensed experts, such as geological or
  completion                                            topographical experts.
                                                        - Owns the land on which the warehouse will be built and will sell the warehouse
Time required to complete each procedure                upon its completion.
(calendar days)
                                                        The warehouse:
• Does not include time spent gathering
  information                                           - Will be used for general storage activities, such as storage of books or stationery.
                                                        - Will have two stories, both above ground, with a total constructed area of
• Each procedure starts on a separate day—              approximately 1,300.6 square meters (14,000 square feet). Each floor will be 3
  though procedures that can be fully completed
                                                        meters (9 feet, 10 inches) high and will be located on a land plot of approximately
  online are an exception to this rule
                                                        929 square meters (10,000 square feet) that is 100% owned by BuildCo, and the
• Procedure is considered completed once final          warehouse is valued at 50 times income per capita.
  document is received                                  - Will have complete architectural and technical plans prepared by a licensed
                                                        architect. If preparation of the plans requires such steps as obtaining further
• No prior contact with officials
                                                        documentation or getting prior approvals from external agencies, these are counted
Cost required to complete each procedure (% of          as procedures.
income per capita)                                      - Will take 30 weeks to construct (excluding all delays due to administrative and
                                                        regulatory requirements).
• Official costs only, no bribes
                                                        The water and sewerage connections:
Building quality control index (0-15)
                                                        - Will be 150 meters (492 feet) from the existing water source and sewer tap. If there
• Quality of building regulations (0-2)                 is no water delivery infrastructure in the economy, a borehole will be dug. If there is
• Quality control before construction (0-1)             no sewerage infrastructure, a septic tank in the smallest size available will be
                                                        installed or built.
• Quality control during construction (0-3)             - Will have an average water use of 662 liters (175 gallons) a day and an average
• Quality control after construction (0-3)              wastewater flow of 568 liters (150 gallons) a day. Will have a peak water use of
                                                        1,325 liters (350 gallons) a day and a peak wastewater flow of 1,136 liters (300
• Liability and insurance regimes (0-2)                 gallons) a day.
• Professional certifications (0-4)                     - Will have a constant level of water demand and wastewater flow throughout the
                                                        year; will be 1 inch in diameter for the water connection and 4 inches in diameter for
                                                        the sewerage connection.

                                                                                                                                                   Page 9
Doing Business 2019          Uzbekistan

Dealing with Construction Permits - Uzbekistan

       Standardized Warehouse

    Estimated value of warehouse                                               UZS 398,838,381.30

    City Covered                                                               Tashkent

       Indicator                                             Uzbekistan           Europe &              OECD high           Best Regulatory
                                                                                  Central Asia          income              Performance

    Procedures (number)                                     17                    16.0                  12.7               None in 2017/18

    Time (days)                                             246                   170.1                 153.1              None in 2017/18

    Cost (% of warehouse value)                             3.3                   4.0                   1.5                None in 2017/18

    Building quality control index (0-15)                   11.0                  12.0                  11.5               15.0 (3 Economies)

  Figure – Dealing with Construction Permits in Uzbekistan and comparator economies – Ranking and Score

                                                   DB 2019 Dealing with Construction Permits Score

                     0                                                                                   100

                                                                                 77.10: Kyrgyz Republic (Rank: 29)

                                                                               75.77: Kazakhstan (Rank: 35)

                                                                               74.61: Russian Federation (Rank: 48)

                                                                        69.02: Regional Average (Europe & Central Asia)

                                                                   61.37: Uzbekistan (Rank: 134)

                                                           52.19: Moldova (Rank: 172)

Note: The ranking of economies on the ease of dealing with construction permits is determined by sorting their scores for dealing with
construction permits. These scores are the simple average of the scores for each of the component indicators.

  Figure – Dealing with Construction Permits in Uzbekistan – Procedure, Time and Cost

                                                         Time (days)      Cost (% of warehouse value)
                                                                                                                                                3

                                                                                                                                                2.5
                                                                                                                                                      Cost (% of warehouse value)
               200

                                                                                                                                                2
 Time (days)

               150

                                                                                                                                                1.5

               100
                                                                                                                                                1

               50
                                                                                                                                                0.5

                0                                                                                                                               0
                         1   2   *3     4     5      6      7       8      9       * 10     11     12          13     14   15    16    17
                                                                   Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                                    Page 10
Doing Business 2019                   Uzbekistan

Figure – Dealing with Construction Permits in Uzbekistan and comparator economies – Measure of Quality

              15                                                                                                  14.0
                                                  13.0
                                                                                                12.0                                     12.0
                           11.0                                          11.0
Index score
              10

              5

              0

                        Uzbekistan             Kazakhstan           Kyrgyz Republic           Moldova       Russian Federation    Europe & Central Asia

Details – Dealing with Construction Permits in Uzbekistan – Procedure, Time and Cost

  No.              Procedures                                                                           Time to Complete         Associated Costs

1                  Request and obtain land clearance from Tashkent City Hokimiyat                       38 days                  no charge
                   (submission of an application for a land plot and of approved materials)
                   Agency : District Governor's Office
                   Starting on January 1, 2016, the government changed the way land plots of up to
                   1 hectare are allocated to legal entities and individuals. Land plots are now
                   assigned on the basis of a competitive selection process. Local authorities
                   (municipalities) select land plots that are available for allocation. Then, each
                   Municipality has the local Department of Architecture and Construction obtain all
                   preliminary approvals of land allocation (previously separate procedures) from
                   the relevant authorities, depending on the environmental, architectural and
                   zoning requirements of the individual plots. Once all approvals are obtained
                   internally by the Department of Architecture and Construction, a complete set of
                   documents is prepared for each land plot and submitted to the contest organizer
                   within the Municipality.

                   The time is 38 days (30 days after announcement is made to apply + 3 days for
                   the committee to evaluate the bids + 5 days to announce the decision).

                   Per the new process, an announcement is made in the mass media that there
                   are land plots allocated for a specific type of construction (e.g., kindergarten,
                   produce store, a warehouse etc.). Subsequently, these land plots, with all the
                   necessary characteristics, are made available on the website of the State
                   Committee of Uzbekistan on Architecture and Construction:
                   http://1kms.uz/kms/announcementnew/list/11.

                   There is only one committee that organizes the bid. The announcement about
                   the bid is made 1 month before the start of the bidding process, so bidders have
                   1 month to prepare the application and submit the bid. The committee takes 3
                   days to evaluate all the bids and then it has 5 days to announce the allotment
                   decision.

                   Once the decision is made, it is announced in mass media (in the same national
                   and local newspapers where the bid was announced in the first place). The
                   committee will inform the winners within 2 days after the official announcement.
                   Those who were not selected will find out in the papers and on the website. The
                   announcement is also sent by mail to all bidders.

                   The announcement of the auction / competition is made only 2 times a year (May
                   and November). This announcement is determined based on demand and supply
                   of available land plots.

                   The Hokimiyat signs a contract with the winner and the winner can go ahead and
                   sign a contract with the project design company.

2                  Obtain topographic survey of the land plot and the land plot's precise               21 days                  UZS 1,200,000
                   location (red lines) by "UzGAShKLITI”
                   Agency : State Design Research Institute of Engineering Studies in Construction,
                   Geoinformatics and Urban Cadastre - "UzGAShKLITI"
                   A specialized agency draws the precise location of the land plot on a map
                   (usually in red color, hence the name "red lines").

                                                                                                                                                          Page 11
Doing Business 2019           Uzbekistan

    3   Request and obtain technical conditions for the connection to water and               7 days    no charge
        sewerage
        Agency : Water and Sewerage Authority
        BuildCo must obtain technical terms for the connection to the water and
        sewerage systems. The terms are necessary for preparing project
        documentation.

        BuildCo must submit the following information to the local water and sewerage
        authority:
        • For water: the load of water demand, the calculation of water height, and the
        expected date of commencement of water consumption
        • For sewerage: the calculation of sewage volume, qualitative composition of the
        sewage, specification of whether the any plans for internal treatment, and the
        expected date the sewerage system is to be put into operation

        By law, this procedure should be completed in 3 business days. However, in
        practice, it takes longer.

4       Request and obtain architectural and technical objectives                             30 days   UZS 688,960
        Agency : Main Department of Architecture and Construction
        Based on the terms for designing the building in accordance with engineering
        supply norms and regulations, the technical conditions, and the decision of the
        Hokimat on the land plot (all provided by the department on architecture and
        construction of the city), the Main Department of Architecture and Construction
        develops the architectural planning terms (APZ, parts I and II).

        The fee is established by Government Resolution No. 150 (dated May 30, 2013)
        was set at 4 MMW.

5       Request ecological examination                                                        20 days   UZS 725,000
        Agency : Private Licensed Organization
        BuildCo should submit the project and pre-project documentation for ecological
        examination to a private expert firm. The expert firm will provide the examination
        and will also obtain the conclusion from The State Ecological Examination body
        of the Committee on the Protection of Nature of the city of Tashkent will issue the
        conclusion of the ecological examination. This document is necessary for
        subsequent submission to the territorial Inspection of State Architectural Building
        Supervision of the city of Tashkent and to the servicing bank (to allow financing).
        It is also necessary for obtaining the fire safety and earthquake stability
        compliance.

6       Request and obtain examination of project documents on their compliance               14 days   UZS 344,480
        with fire safety and seismic stability
        Agency : State Architectural and Construction Inspection (GASN)
        After obtaining an ecological evaluation, BuildCo can submit the construction
        plans for state examination on their compliance with fire safety and earthquake
        stability.

7       Request and obtain sanitation clearance for the project                               14 days   no charge
        Agency : State Sanitation and Epidemic Supervision Authority
        BuildCo must obtain project clearance from the state sanitation and epidemic
        supervision authority. This document can only be obtained after obtaining the fire
        safety and earthquake stability compliance.

8       Request and obtain project clearance from the local water and sewerage                7 days    no charge
        authority
        Agency : Water and Sewerage Authority
        BuildCo must obtain project clearance from the local water and sewerage
        authority. This authority checks whether the project and other relevant
        documentation conform to construction rules and technical terms. BuildCo enters
        into a contract with the local water and sewerage authority on technical
        supervision of the construction. This document can only be obtained after
        obtaining a sanitation clearance.

                                                                                                                      Page 12
Doing Business 2019         Uzbekistan

9    Request and obtain construction permit from State Architectural and                     10 days   UZS 119,652
     Construction Inspection (GASN)
     Agency : State Architectural and Construction Inspection (GASN)
     The permit for construction works is issued by the local branch of the architecture
     and construction authority. Although the permit should be issued within 5 days, in
     practice it takes longer.

     An inspector from the local branch of the architecture and construction authority
     undertakes oversight of the construction. There is no permit application fee.
     However, for the oversight/inspection phase, the company enters into a contract
     with the authority at a cost of 0.03% of the value of the warehouse.

     The company must submit the following documents:
     • Application form
     • Positive evaluation summary from the public examination bodies on the working
     project
     • Copy of the general plan and elevations of the building approved by the
     architectural bodies, or the protocol of the Town-Planning Council of the Main
     Department on Architecture and Construction of the city of Tashkent
     • Address list of construction sites

     The Inspectorate registers the construction project and issues the building
     permit. BuildCo starts construction of the warehouse and notifies the
     Inspectorate of the commencement of works within a month of receiving the
     building permit.

     Hire a technical supervision company for construction supervision                       1 day     UZS 9,970,960
10   Agency : Private construction supervision company
     There are three levels of construction supervision in Uzbekistan: (1) internal
     supervision or author's supervision, (2) technical supervision conducted by an
     external firm and (3) government supervision. The technical supervision
     companies usually charge around 2-3% of the construction costs.

11   Receive inspection from the State Architectural and Construction                        1 day     no charge
     Inspection (GASN)
     Agency : State Architectural and Construction Inspection (GASN)
     Inspection is carried out by State Architectural and Construction Inspection
     (GASN). GASN will assign one inspector for the specific construction who will be
     responsible for conducting the inspections throughout the construction period.

12   Connect to water and sewerage services                                                  5 days    no charge
     Agency : Water and Sewerage Authority

13   Obtain updated topographic map                                                          7 days    no charge
     Agency : State Design Research Institute of Engineering Studies in Construction,
     Geoinformatics and Urban Cadastre - "UzGAShKLITI"
     Once the construction works and complete and the water and sewage
     connection is obtained, the State Design Research Institute "UzGAShKLITI"
     conducts a survey of the land plot and of the building to develop a new
     topographic map of the area with the new construction on it. This is called
     executive mapping.

14   Call and establish Working Commission and submit documents to the                       14 days   no charge
     Commission
     Agency : Working Commission
     After completion of the construction works, BuildCo requests the creation of a
     Working Commission composed of the representatives of district architects, the
     sanitation supervision authority, the state fire supervision authority, the ministry
     on emergency situations, the city committee on nature protection, and others.

     The timeframe under the Construction rules, registered by Ministry of Justice
     No.545, for establishing Working Commission is 5 working days. However, in
     practice it takes 14 days, as the Commission only meets once every two weeks
     and in case the file doesn’t make it to the first meeting, it would almost certainly
     be reviewed at the second one.

     BuildCo must submit the following documents to the Working Commission:
     • The list of organizations that participated in the building and construction works,
     along with the type of work done by these organizations, the family names of the
     responsible engineers and technical employees
     • The full set of design drawings of the property developed by the project
     organizations
     • Certificates, technical passports, and other documents certifying the quality and
     safety of the materials, constructions, and details used in the building and
     construction works
     • Other relevant documents

                                                                                                                       Page 13
Doing Business 2019          Uzbekistan

15    Receive inspection and obtain certificate of completion from Working                  21 days   no charge
      Commission
      Agency : Working Commission
      After the inspection, an act of acceptance is drafted and endorsed by all
      members in no more than 5 working days.

      The Working Commission will inspect, among other things:
      • The compliance of the building and construction works with the requirements on
      labor protection, fire safety, environment protection, and its prevention of human-
      caused emergency situations, and so forth
      • The separate constructions and units of the warehouse

      If its findings are favorable, the commission then accepts the construction for
      subsequent presentation to the State Acceptance Board.

      The Working Commission issues the following:
      • The certificate of allowable concentration of radon in the completed
      constructions
      • The certificate of acceptance of the temporary buildings and constructions
      • The certificate of readiness of the construction for presentation to the State
      Acceptance Board

16    Request and obtain certificate of acceptance from the Tashkent City                   14 days   no charge
      Hokimat
      Agency : Hokimat
      The Hokim (the head of the city government) decides whether to approve the
      Working Commission’s act of acceptance within 2 days. However, in practice,
      this takes longer. There is no fee involved. The decision of Hokim is further
      needed for registering the building with the cadastre authorities.

      BuildCo should submit to the State Acceptance Board, among other documents,
      the following documents:
      • The certificate on elimination of defects brought to light by the Working
      Commission
      • The approved project and estimate documentation
      • The list of project and research organizations that participated in construction
      • Other relevant documents

17    Register the new construction with the cadastre                                       30 days   UZS 86,120
      Agency : Cadastre
      BuildCo must register the new construction with the real estate cadastre of the
      relevant district of the city of Tashkent. The registration takes around 2 weeks in
      Tashkent and costs 50% of MMW for legal entities.

Takes place simultaneously with previous procedure.

                                                                                                                   Page 14
Doing Business 2019         Uzbekistan

Details – Dealing with Construction Permits in Uzbekistan – Measure of Quality

                                                                                                      Answer               Score

Building quality control index (0-15)                                                                                      11.0

Quality of building regulations index (0-2)                                                                                2.0

  How accessible are building laws and regulations in your economy? (0-1)                             Available online;    1.0
                                                                                                      Free of charge.

  Which requirements for obtaining a building permit are clearly specified in the building            List of required     1.0
  regulations or on any accessible website, brochure or pamphlet? (0-1)                               documents; Fees
                                                                                                      to be paid;
                                                                                                      Required
                                                                                                      preapprovals.

Quality control before construction index (0-1)                                                                            1.0

  Which third-party entities are required by law to verify that the building plans are in             Licensed             1.0
  compliance with existing building regulations? (0-1)                                                architect;
                                                                                                      Licensed
                                                                                                      engineer.

Quality control during construction index (0-3)                                                                            2.0

  What types of inspections (if any) are required by law to be carried out during construction?       Inspections by in-   1.0
  (0-2)                                                                                               house engineer;
                                                                                                      Inspections by
                                                                                                      external engineer
                                                                                                      or firm;
                                                                                                      Unscheduled
                                                                                                      inspections;
                                                                                                      Inspections at
                                                                                                      various phases.

  Do legally mandated inspections occur in practice during construction? (0-1)                        Mandatory            1.0
                                                                                                      inspections are
                                                                                                      always done in
                                                                                                      practice.

Quality control after construction index (0-3)                                                                             3.0

  Is there a final inspection required by law to verify that the building was built in accordance     Yes, final           2.0
  with the approved plans and regulations? (0-2)                                                      inspection is
                                                                                                      done by
                                                                                                      government
                                                                                                      agency; Yes, in-
                                                                                                      house engineer
                                                                                                      submits report for
                                                                                                      final inspection;
                                                                                                      Yes, external
                                                                                                      engineer submits
                                                                                                      report for final
                                                                                                      inspection.

  Do legally mandated final inspections occur in practice? (0-1)                                      Final inspection     1.0
                                                                                                      always occurs in
                                                                                                      practice.

Liability and insurance regimes index (0-2)                                                                                1.0

  Which parties (if any) are held liable by law for structural flaws or problems in the building      Architect or         1.0
  once it is in use (Latent Defect Liability or Decennial Liability)? (0-1)                           engineer;
                                                                                                      Professional in
                                                                                                      charge of the
                                                                                                      supervision;
                                                                                                      Construction
                                                                                                      company.

  Which parties (if any) are required by law to obtain an insurance policy to cover possible          No party is          0.0
  structural flaws or problems in the building once it is in use (Latent Defect Liability Insurance   required by law
  or Decennial Insurance)? (0-1)                                                                      to obtain
                                                                                                      insurance .

Professional certifications index (0-4)                                                                                    2.0

                                                                                                                                   Page 15
Doing Business 2019         Uzbekistan

 What are the qualification requirements for the professional responsible for verifying that the   Minimum number       1.0
 architectural plans or drawings are in compliance with existing building regulations? (0-2)       of years of
                                                                                                   experience;
                                                                                                   University degree
                                                                                                   in architecture or
                                                                                                   engineering.

 What are the qualification requirements for the professional who supervises the construction      Minimum number       1.0
 on the ground? (0-2)                                                                              of years of
                                                                                                   experience;
                                                                                                   University degree
                                                                                                   in engineering,
                                                                                                   construction or
                                                                                                   construction
                                                                                                   management.

                                                                                                                              Page 16
Doing Business 2019              Uzbekistan

     Getting Electricity

This topic measures the procedures, time and cost required for a business to obtain a permanent electricity connection for a newly
constructed warehouse. Additionally, the reliability of supply and transparency of tariffs index measures reliability of supply, transparency of
tariffs and the price of electricity. The most recent round of data collection for the project was completed in May 2018. See the methodology
for more information.

 What the indicators measure                                Case study assumptions

Procedures to obtain an electricity connection             To make the data comparable across economies, several assumptions about the
(number)                                                   warehouse, the electricity connection and the monthly consumption are used.

• Submitting all relevant documents and obtaining          The warehouse:
  all necessary clearances and permits
                                                           - Is owned by a local entrepreneur and is used for storage of goods.
• Completing all required notifications and                - Is located in the economy’s largest business city. For 11 economies the data are
  receiving all necessary inspections
                                                           also collected for the second largest business city.
• Obtaining external installation works and possibly       - Is located in an area where similar warehouses are typically located and is in an
  purchasing material for these works                      area with no physical constraints. For example, the property is not near a railway.
                                                           - Is a new construction and is being connected to electricity for the first time.
• Concluding any necessary supply contract and
                                                           - Has two stories with a total surface area of approximately 1,300.6 square meters
  obtaining final supply
                                                           (14,000 square feet). The plot of land on which it is built is 929 square meters
Time required to complete each procedure                   (10,000 square feet).
(calendar days)
                                                           The electricity connection:
• Is at least 1 calendar day
                                                           - Is a permanent one with a three-phase, four-wire Y connection with a subscribed
• Each procedure starts on a separate day                  capacity of 140-kilo-volt-ampere (kVA) with a power factor of 1, when 1 kVA = 1
• Does not include time spent gathering                    kilowatt (kW).
  information                                              - Has a length of 150 meters. The connection is to either the low- or medium-voltage
                                                           distribution network and is either overhead or underground, whichever is more
• Reflects the time spent in practice, with little         common in the area where the warehouse is located and requires works that involve
  follow-up and no prior contact with officials
                                                           the crossing of a 10-meter road (such as by excavation or overhead lines) but are all
Cost required to complete each procedure (% of             carried out on public land. There is no crossing of other owners’ private property
                                                           because the warehouse has access to a road.
income per capita)
                                                           - Does not require work to install the internal wiring of the warehouse. This has
• Official costs only, no bribes                           already been completed up to and including the customer’s service panel or
• Value added tax excluded                                 switchboard and the meter base.

The reliability of supply and transparency of              The monthly consumption:
tariffs index (0-8)
                                                           - It is assumed that the warehouse operates 30 days a month from 9:00 a.m. to 5:00
• Duration and frequency of power outages (0–3)            p.m. (8 hours a day), with equipment utilized at 80% of capacity on average and that
• Tools to monitor power outages (0–1)                     there are no electricity cuts (assumed for simplicity reasons) and the monthly energy
                                                           consumption is 26,880 kilowatt-hours (kWh); hourly consumption is 112 kWh.
• Tools to restore power supply (0–1)                      - If multiple electricity suppliers exist, the warehouse is served by the cheapest
• Regulatory monitoring of utilities’ performance          supplier.
  (0–1)                                                    - Tariffs effective in January of the current year are used for calculation of the price of
                                                           electricity for the warehouse. Although January has 31 days, for calculation
• Financial deterrents limiting outages (0–1)              purposes only 30 days are used.
• Transparency and accessibility of tariffs (0–1)
Price of electricity (cents per kilowatt-hour)*

• Price based on monthly bill for commercial
  warehouse in case study

*Note: Doing Business measures the price of
electricity, but it is not included in the ease of doing
business score nor the ranking on the ease of
getting electricity.

                                                                                                                                                         Page 17
Doing Business 2019           Uzbekistan

Getting Electricity - Uzbekistan

  Standardized Connection

 Price of electricity (US cents per kWh)                                    5.7

 Name of utility                                                            Uzbekenergo

 City Covered                                                               Tashkent

  Indicator                                                Uzbekistan             Europe &           OECD high             Best Regulatory
                                                                                  Central Asia       income                Performance

 Procedures (number)                                      4                    5.3                  4.5                    3 (25 Economies)

 Time (days)                                              88                   110.3                77.2                   18 (3 Economies)

 Cost (% of income per capita)                            705.2                325.1                64.2                   0.0 (3 Economies)

 Reliability of supply and transparency of tariff         8                    5.5                  7.5                    8.0 (27 Economies)
 index (0-8)

 Figure – Getting Electricity in Uzbekistan and comparator economies – Ranking and Score

                                                         DB 2019 Getting Electricity Score

        0                                                                                               100

                                                                                             94.00: Russian Federation (Rank: 12)

                                                                                       86.05: Uzbekistan (Rank: 35)

                                                                             76.79: Kazakhstan (Rank: 76)

                                                                            74.88: Moldova (Rank: 81)

                                                                         71.66: Regional Average (Europe & Central Asia)

                                                    46.01: Kyrgyz Republic (Rank: 164)

Note: The ranking of economies on the ease of getting electricity is determined by sorting their scores for getting electricity. These scores are
the simple average of the scores for all the component indicators except the price of electricity.

                                                                                                                                                    Page 18
Doing Business 2019         Uzbekistan

  Figure – Getting Electricity in Uzbekistan – Procedure, Time and Cost

                                                     Time (days)        Cost (% of income per capita)
                                                                                                                                            800

                   80
                                                                                                                                            700

                                                                                                                                                  Cost (% of income per capita)
                   70
                                                                                                                                            600
                   60
 Time (days)

                                                                                                                                            500
                   50
                                                                                                                                            400
                   40
                                                                                                                                            300
                   30

                                                                                                                                            200
                   20

                   10                                                                                                                       100

                   0                                                                                                                        0
                                1                      2                                    3                            4
                                                                Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

  Figure – Getting Electricity in Uzbekistan and comparator economies – Measure of Quality

                           8                8                                                              8
                   8
                                                                                        7
                   7
                   6                                                                                                                 5.5
     Index score

                   5
                   4
                   3
                   2
                   1
                                                                 0
                   0

                        Uzbekistan      Kazakhstan         Kyrgyz Republic            Moldova       Russian Federation       Europe & Central Asia

                                                                                                                                                                                  Page 19
Doing Business 2019        Uzbekistan

Details – Getting Electricity in Uzbekistan – Procedure, Time and Cost

No.    Procedures                                                                         Time to Complete   Associated Costs

1     Submit application and await technical conditions and connection contract           14 calendar days   UZS 0
      with estimate
      Agency : Tashkent City Electric Network Enterprise OJSC
      The customer submits an application for the electrical connection to the Tashkent
      City Electric Network Enterprise and waits for them to issue technical conditions
      along with the connection contract that contains the time required for the
      connection works as well as the connection cost estimate.

2     Signing connection contract and make payment                                        3 calendar days    UZS 56,250,000
      Agency : Tashkent City Electric Network Enterprise OJSC
      Upon receiving the connection contract from the utility, customer has 3 business
      days to sign the contract and make the 100% prepayment for connection.

3     Implementation of connection works by utility and inspection                        70 calendar days   UZS 0
      Agency : Tashkent City Electric Network Enterprise OJSC
      During this procedure the Utility implements following works:
      - prepares the connection design, after the receipt of the advance payment under
      the contract on connection to electric networks "on a turn-key basis"(15-20
      business days),
      - receives preliminary approval by all stakeholder organizations (5 business
      days)
      - finalizes design based on received comments and gets final approval (3
      business days)
      - upon having the design approved, utility conducts the external connection
      works, carries out meter installation (15-30 business days)
      - after completion of external works, inspection by the State Energy Inspectorate
      "Uzgosenergonadzor" takes place (3 business days), wherein
      "Uzgosenergonadzor" inspects an external power supply system and issues:
      1) Certificate of technical inspection of electrical installations of consumers
      2) Permit for the commissioning of electrical installations

4     Sign supply contract and obtain final connection                                    1 calendar day     UZS 0
      Agency : Tashkent City Electric Network Enterprise OJSC
      The customer concludes a supply contract and obtains final electricity
      connection.

Takes place simultaneously with previous procedure.

                                                                                                                                Page 20
Doing Business 2019           Uzbekistan

 Details – Getting Electricity in Uzbekistan – Measure of Quality

                                                                                                                           Answer

 Reliability of supply and transparency of tariff index (0-8)                                                              8

 Total duration and frequency of outages per customer a year (0-3)                                                         3

    System average interruption duration index (SAIDI)                                                                     0.2

    System average interruption frequency index (SAIFI)                                                                    0.1

    What is the minimum outage time (in minutes) that the utility considers for the calculation of SAIDI/SAIFI             0.5

 Mechanisms for monitoring outages (0-1)                                                                                   1

    Does the distribution utility use automated tools to monitor outages?                                                  Yes

 Mechanisms for restoring service (0-1)                                                                                    1

    Does the distribution utility use automated tools to restore service?                                                  Yes

 Regulatory monitoring (0-1)                                                                                               1

    Does a regulator—that is, an entity separate from the utility—monitor the utility’s performance on reliability of      Yes
    supply?

 Financial deterrents aimed at limiting outages (0-1)                                                                      1

    Does the utility either pay compensation to customers or face fines by the regulator (or both) if outages              Yes
    exceed a certain cap?

 Communication of tariffs and tariff changes (0-1)                                                                         1

    Are effective tariffs available online?                                                                                Yes

    Link to the website, if available online                                                                               http://uzbekenergo.u
                                                                                                                           z./ru/activities/tariffs-
                                                                                                                           electric-power/

    Are customers notified of a change in tariff ahead of the billing cycle?                                               Yes

Note:

If the duration and frequency of outages is 100 or less, the economy is eligible to score on the Reliability of supply and transparency of tariff
index.

If the duration and frequency of outages is not available, or is over 100, the economy is not eligible to score on the index.

If the minimum outage time considered for SAIDI/SAIFI is over 5 minutes, the economy is not eligible to score on the index.

                                                                                                                                                       Page 21
Doing Business 2019           Uzbekistan

     Registering Property

This topic examines the steps, time and cost involved in registering property, assuming a standardized case of an entrepreneur who wants to
purchase land and a building that is already registered and free of title dispute. In addition, the topic also measures the quality of the land
administration system in each economy. The quality of land administration index has five dimensions: reliability of infrastructure, transparency
of information, geographic coverage, land dispute resolution, and equal access to property rights. The most recent round of data collection for
the project was completed in May 2018. See the methodology for more information.

 What the indicators measure                               Case study assumptions

Procedures to legally transfer title on                  To make the data comparable across economies, several assumptions about the
immovable property (number)                              parties to the transaction, the property and the procedures are used.

• Preregistration procedures (for example,               The parties (buyer and seller):
  checking for liens, notarizing sales agreement,
  paying property transfer taxes)                        - Are limited liability companies (or the legal equivalent).
                                                         - Are located in the periurban area of the economy’s largest business city. For 11
• Registration procedures in the economy's largest       economies the data are also collected for the second largest business city.
  business city.
                                                         - Are 100% domestically and privately owned.
• Postregistration procedures (for example, filling      - Have 50 employees each, all of whom are nationals.
  title with municipality)                               - Perform general commercial activities.

Time required to complete each procedure                 The property (fully owned by the seller):
(calendar days)
                                                         - Has a value of 50 times income per capita, which equals the sale price.
• Does not include time spent gathering                  - Is fully owned by the seller.
  information                                            - Has no mortgages attached and has been under the same ownership for the past
• Each procedure starts on a separate day -              10 years.
  though procedures that can be fully completed          - Is registered in the land registry or cadastre, or both, and is free of title disputes.
  online are an exception to this rule                   - Is located in a periurban commercial zone, and no rezoning is required.
                                                         - Consists of land and a building. The land area is 557.4 square meters (6,000
• Procedure is considered completed once final           square feet). A two-story warehouse of 929 square meters (10,000 square feet) is
  document is received
                                                         located on the land. The warehouse is 10 years old, is in good condition, has no
• No prior contact with officials                        heating system and complies with all safety standards, building codes and legal
                                                         requirements. The property, consisting of land and building, will be transferred in its
Cost required to complete each procedure (% of           entirety.
property value)                                          - Will not be subject to renovations or additional construction following the purchase.
                                                         - Has no trees, natural water sources, natural reserves or historical monuments of
• Official costs only (such as administrative fees,
  duties and taxes).                                     any kind.
                                                         - Will not be used for special purposes, and no special permits, such as for
• Value Added Tax, Capital Gains Tax and illicit         residential use, industrial plants, waste storage or certain types of agricultural
  payments are excluded                                  activities, are required.
                                                         - Has no occupants, and no other party holds a legal interest in it.
Quality of land administration index (0-30)

• Reliability of infrastructure index (0-8)
• Transparency of information index (0–6)
• Geographic coverage index (0–8)
• Land dispute resolution index (0–8)
• Equal access to property rights index (-2–0)

                                                                                                                                                     Page 22
Doing Business 2019       Uzbekistan

Registering Property - Uzbekistan

       Indicator                                         Uzbekistan            Europe &              OECD high               Best Regulatory
                                                                               Central Asia          income                  Performance

    Procedures (number)                                 9                     5.3                    4.7                  1 (4 Economies)

    Time (days)                                         46                    20.3                   20.1                 1 (New Zealand)

    Cost (% of property value)                          1.1                   2.6                    4.2                  0.0 (Saudi Arabia)

    Quality of the land administration index (0-30)     18.5                  19.6                   23.0                 None in 2017/18

  Figure – Registering Property in Uzbekistan and comparator economies – Ranking and Score

                                                      DB 2019 Registering Property Score

                    0                                                                                 100

                                                                                          90.27: Kyrgyz Republic (Rank: 8)

                                                                                         88.74: Russian Federation (Rank: 12)

                                                                                     84.62: Kazakhstan (Rank: 18)

                                                                                    82.62: Moldova (Rank: 22)

                                                                            75.57: Regional Average (Europe & Central Asia)

                                                                    66.60: Uzbekistan (Rank: 71)

Note: The ranking of economies on the ease of registering property is determined by sorting their scores for registering property. These
scores are the simple average of the scores for each of the component indicators.

  Figure – Registering Property in Uzbekistan – Procedure, Time and Cost

                                                      Time (days)       Cost (% of property value)
                                                                                                                                               0.5
               45

               40

                                                                                                                                                     Cost (% of property value)
                                                                                                                                               0.4
               35

               30
 Time (days)

                                                                                                                                               0.3
               25

               20
                                                                                                                                               0.2
               15

               10                                                                                                                              0.1

               5

               0                                                                                                                               0
                        1      2            *3          *4             *5               *6              7             8               9
                                                               Procedures (number)

* This symbol is shown beside procedure numbers that take place simultaneously with the previous procedure.

Note: Online procedures account for 0.5 days in the total time calculation. For economies that have a different procedure list for men and
women, the graph shows the time for women. For more information on methodology, see the Doing Business website
(http://doingbusiness.org/en/methodology ). For details on the procedures reflected here, see the summary below.

                                                                                                                                                                                  Page 23
Doing Business 2019                      Uzbekistan

Figure – Registering Property in Uzbekistan and comparator economies – Measure of Quality

              30
                                                                                                                        26.0
              25                                                             24.0
                                                                                                       22.0
Index score                                                                                                                                        19.6
              20              18.5
                                                      17.0
              15

              10

                  5

                  0

                            Uzbekistan            Kazakhstan            Kyrgyz Republic           Moldova         Russian Federation     Europe & Central Asia

Details – Registering Property in Uzbekistan – Procedure, Time and Cost

  No.                 Procedures                                                                              Time to Complete         Associated Costs

1                     Obtain the evaluation of the market value for the property                              10 days                  UZS 1,500,000; (1 to
                      Agency : Private evaluator                                                                                       2 million UZS)
                      Private evaluator will visit the land ad immovable property, take measurements,
                      etc. Usually, the visit is performed without presence of a client (seller).

2                     Request and obtain Cadastral Certificate                                                10 days                  no charge
                      Agency : Cadastral Service Office
                      The seller has to obtain the Cadastral Certificate. The certificate contains
                      technical parameters of premises (when built, height, deterioration level,
                      blueprint, etc.) as well as cadastral value (taxable value), which is used for
                      property tax calculation purposes.

              3       Inspection of a property to determine its status                                        1 day                    UZS 960,065.76; (1%
                      Agency : Cadastral Service Office                                                                                of the minimum
                      Pursuant to the Decree No.1 as of Jan 7, 2014 the state official will have to                                    monthly wage per
                      conduct the onsite inspection of the land and building. The inspection is
                                                                                                                                       square meter of land
                      performed to establish cadastral value of the property and to evaluate all possible
                                                                                                                                       plot area
                      changes in technical parameters, record new construction and reconstruction etc.
                                                                                                                                       As of December 1,
                                                                                                                                       2017, the minimum
                      Pursuant to the Order No. 186 from July 10, 2014 the fee for an inspection of the
                      property by experts from the State Committee on Land Resources, Geodesy,                                         wage is UZS
                      Cartography and State Cadastre is set as follow:                                                                 172,240)
                      1. Property with total size up to 100 sqr. m - 1 MMW (monthly minimum wage)
                      2. Property with total size from 100 sqr. m to 1000 sqr. m - 1% from MMW per
                      square meter of the property size
                      3. Property with total size from 1000 sqr. m to 5000 sqr. m - 15 from MMW
                      4. Property with total size from 5000 sqr. m to 15000 sqr. m - 30 from MMW
                      5. Property with total size from 15000 sqr. m to 50000 sqr. m - 50 from MMW
                      6. Property with total size more than 50000 sqr. m - 70 MMW

              4       Seller obtains the certificate stating that there are no outstanding payments           1 day                    no charge
                      due to the water and sewage service provider
                      Agency : Water service provider
                      Parties have to submit to the notary the certificates stating that there are no
                      outstanding payments due to the trash collection service use from trash
                      collection service provider. Parties have to request these certificates specifically
                      for the property transaction to demonstrate that there are no outstanding fees
                      that have to be paid before transfer of property takes place.

              5       Seller obtains the certificate stating that there are no outstanding electricity        1 day                    no charge
                      bills
                      Agency : Electricity service provider
                      Parties have to submit to the notary the certificates stating that there are no
                      outstanding payments due to the electricity service use from electricity service
                      provider. Parties have to request these certificates specifically for the property
                      transaction to demonstrate that there are no outstanding fees that have to be
                      paid before transfer of property takes place.

              6       Seller obtains the certificate stating that there are no outstanding trash              1 day                    no charge
                      collection bills
                      Agency : Trash collection service provider
                      Parties have to submit to the notary the certificates stating that there are no
                      outstanding payments due to the trash collection service use from trash
                      collection service provider. Parties have to request these certificates specifically
                      for the property transaction to demonstrate that there are no outstanding fees
                      that have to be paid before transfer of property takes place.