Contents Introduction Heritage Page 4 Page 14 Site Context Green Belt Review Page 5 Page 15 The Vision Landscape Page 6 Page 18 Planning Policy Context Transport Page 8 Page 20 SHELAA 2018 Developing the Masterplan Page 9 Page 22 Site Specific Technical Assessments Forecast Delivery Page 10 Page 23 Drainage Summary and Conclusions Page 13 Page 24 Developing the West Midlands Socio-Economic Footprint in 2019 Page 25
Introduction This vision document has been This Vision Statement outlines the prepared by Savills on behalf of Barratt development potential of Land at West Midlands in respect of their Dunsley Road, Kinver. It explains land interests to the north and south why the two sites are a suitable and of Dunsley Road, Kinver (hereafter sustainable location for a residential led referred to as ‘Parcel A’ northen site scheme for approximately 255 dwellings and ‘Parcel B’ southern site). and should be a preferred location for a residential allocation to help meet Barratt Developments PLC are the the growth requirements of South nation’s largest housebuilder, having Staffordshire District and the Greater 255 DUNSLEY ROAD built almost 500,000 dwellings in its 60 year history. Barratt Developments PLC is proud of its industry-leading Birmingham Housing Market Area (‘GBHMA’) in the South Staffordshire Local Plan Review. PROPOSED reputation for quality, innovation and great customer service. Its commitment The two sites are both adjacent to the DWELLINGS to the highest standards of design, construction and customer service has existing settlement boundary of Kinver and are currently within the Green Belt. enabled it to achieve HBF 5 star status The two sites can deliver housing and for 10 consecutive years. supporting infrastructure including This development would be a significant amounts of open space and dual brand Barratt and David Wilson a community facility in a sustainable Homes scheme, which will provide a location with good access to a range varied housing product from starter to of services and facilities offered within family homes. Kinver and Stourbridge. High quality landscaping can be delivered as This document has been produced part of the development to help blend to support the promotion of two separate sites for residential the site into the surrounding area and development through the South limit its impact on the landscape and Staffordshire Local Plan Review process. adjacent heritage assets. 4
Site Context The sites comprise approximately The village of Kinver provides a range 17.8ha (41 acres) and are located in of services and facilities required in the settlement of Kinver, an area to the order to support significant residential east of the centre of Kinver. The sites growth which includes a wide variety currently comprise agricultural fields. of shops and services (at least 43 non-convenience shops), two primary The sites are comprised of two parcels schools, a high school and sixth form, of land; a day nursery, two GP surgeries, 5 Parcel A, of c.13ha, (32 acres) occupies public houses, a library, a post office land north of Dunsley Road between and various community centres. Grade II Listed Dunsley Hall to the A path running along the northern east, residential dwellings at Brindley boundary of Dunsley Road provides Brae to the west and the Staffordshire direct pedestrian access from the sites and Worcestershire Canal to the north. to Kinver village centre. Additionally, The net development area of Parcel there is a bus stop located 10m from A is considerered to be approximately the sites on Dunsley Road which 7ha/17acres. serves a bus services that operates Parcel B, of c.3.5ha (9 acres), lies between Kinver, Sourbridge (service to the south of Dunsley Road, south 228) and Kidderminster (service 580). of Dunsley Manor and Dunsley Manor Barns. Parcel B is bounded by agricultural fields to the south and east, and the Staffordshire and Worcestershire Canal, in part, to the west. The net developable area of Parcel B is considered to be approximately 0.4ha/0.9 acres 5
The Vision The vision is to create an attractive, The three key aspirations welcoming, high quality housing for the site are to: development that will be a desirable place to live that responds to the site’s distinct qualities and environmental setting. 1) Create a sustainable development that The proposed development, of land benefits from the desirable and highly located at Dunsley Road, Kinver accessible location of the site, being in will form a natural extension to the close proximity to shops, services and settlement of Kinver. local facilities. It will provide much needed market and affordable housing and new areas of public open 2) Develop a distinctive place, building space in a highly sustainable on positive elements of the existing location. It will incorporate retained built environment, both existing and and additional tree planting to evolving in order to create a site specific help blend the scheme into the identity and character that is attractive surrounding environment. to new residents. 3) Create a walkable neighbourhood, incorporating areas of new public open space and landscaping, helping to integrate and assimilate the development into the existing landscape. 6
Parcel A Dunsley A449 Dunsley Road Parcel B Kinver
Planning Policy Context Adopted Development Plan A consultation on the Strategic Local Plan Review Timescale Spatial Strategy & Infrastructure South Staffordshire Council’s adopted Delivery Consultation is being The April 2019 Local Development Development Plan comprises the Scheme for South Staffordshire sets undertaken between 21st October – Core Strategy (adopted 2012) and the out the following timetable: 16th December 2019. Site Allocations Document (adopted September 2018). The consultation document sets out 7 The sites are located within the Green Spatial Housing Strategies (A-G) and • Strategic Spatial Strategy & Belt (Policy GB1) and is immediately it states that the Council’s preferred Infrastructure Delivery Consultation adjacent to the development strategy is ‘Option G - Infrastructure- – 21st October – 16th December 2019 boundary of Kinver. Parcel A is led development with a garden village located to the south of the ‘Canal area of search beyond the plan period’. This option will direct 60% of • Preferred Spatial Strategy and Sites Conservation Area’ (Policy E3) and Document – Spring 2020. Parcel B is located to the east of it. growth to Tier 1 – 4 settlements and In the adopted Core Strategy and 40% of growth to urban extensions. Site Allocations Document, Kinver is Although there are no figures • Publication Document identified as a ‘Main Service Village’ provided in the document stating the - Winter 2020/21 which are the main focus for housing amount of growth that will be directed growth and service provision. to each settlement, from the Option G key diagram, approximately 1/8 of Local Plan Review the growth proposed in Kinver will be • Submission of Local Plan – Autumn 2021. The Council is currently reviewing met by additional housing than those their Development Plan and is already identified in the adopted Site undertaking a Local Plan Review Allocations Document. • Local Plan Examination which will include additional housing – Winter 2021/2022 allocations to meet the District and Housing Market Area’s needs up to 2037. The two sites were submitted • Adoption of Local Plan to the Council for consideration for – Summer 2022 residential development during the Issues and Options consultation in November 2018. 8
SHELAA 2018 DUNSLEY ROAD NORTH The latest Strategic Housing Parcel B - Land south of Dunsley and Economic Land Availability Road (Site 550) Assessment (SHELAA) was updated Parcel B is assessed using a site 249 in October 2018. In the 2018 SHELAA, area of 8.67Ha which is greater than both Parcels A and B have been the circa 0.94Ha and 6 dwellings assessed are located within which is now being proposed. The 17.12Ha ‘Locality 5’. It should be noted the SHELAA assessed the site’s capacity SHELAA assessment is based on a for 166 dwellings and concludes larger site area for both parcels which that the site is ‘not suitable - the has now been reduced. 14.5 site is disassociated from any village Parcel A - Land north of Dunsley development boundary’. The site Road (Site 549) assessment for Parcel B states that PER HECTARES ‘The site is not directly adjacent to Parcel A described in the SHELAA as the development boundary of Kinver, having a gross area of 19.45Ha with and can only access the village via a DUNSLEY ROAD SOUTH a capacity of 373 dwellings using narrow lane and a road with no formal 6 SHELAA assumptions. With regards footway (Dunsley Road). Site modelled to deliverability, the site is assessed at 32 dwellings per hectare.’. as being ‘potentially suitable but subject to policy constraints – Green It is considered that the site is not Belt’. The site assessment for disassociated from the settlement Parcel A reads: ‘Site is directly as it is immediately adjacent to adjacent to the Kinver development existing properties on Dunsley Road. 0.94Ha boundary and borders a Canal It is acknowledged that a limited Conservation Area to the north. number of dwellings can be served Village edge site modelled at 32 off the existing access. Therefore dwellings per hectare’. the proposed housing yield has been 6.38 PER HECTARES The only major constraint identified for this site is the Green Belt. The Green Belt is currently under review amended as part of the Submission. The revised site area and proposed yield is considered to be more suitable for the site. Therefore, the and consider that Parcel A is a site is a suitable option for release suitable location for release from from the Green Belt and allocation for 9 the Green Belt and allocation for residential development. residential development.
Site Specific Technical Assessments Preliminary Ecological Assessment An Ecological Assessment of the two sites was undertaken to identify potential ecology constraints to development and to inform recommendations to the masterplan design. Protected Sites Protected Habitats There is a single European designated Parcel A supports the following habitats: site within 10km of the sites (Fens Pool Special Area of Conservation (SAC)) • Buildings; and a single nationally designated • Boundary fences; site within 2km of the sites (Kinver Edge Site of Special Scientific Interest • Hedgerows; (SSSI)). It is considered unlikely • Species-poor semi-improved that development of the two sites grassland; for housing would affect the Fens Pool SAC or the Kinver Edge SSSI. • Scattered broadleaved trees; Increased visitor pressure on the SSSI will be assessed and mitigated against • Standing water. at planning application stage. Parcel B supports scattered broad There are also five Sites of Biological leared trees along the boundary and Interest (SBIs) within 1km of the two species-poor semi-improved grassland sites (Staffordshire and Worcestershire Habitats directly adjacent to the Canal, Hyde Lock, The Hyde, south sites include: west of The Hyde and Potters Cross). • Arable fields; It is envisaged that the potentially adverse impacts could be mitigated by • Plantation woodland. providing suitable recreational open It is proposed that the boundary trees space and creation/enhancement of and hedgerows across the sites are multi-functional green infrastructure retained, where possible, within the within the Site. green infrastructure enhancements 10 proposed as part of the comprehensive development proposals.
Preliminary Ecological Assessment Protected Species Recommendations Although no protected species surveys It is considered that through have been undertaken, the Preliminary appropriate and sensitive Appraisal identified that there is masterplanning that the development potential for the presence of several could be designed to be in conformity protected and priority species within with local and national planning policy the sites and their vicinity including: and legislation afforded to wildlife. The following main principles have • Great Crested Newts; been adopted: • Badgers; • Focused built development in the areas of lowest ecological importance • Bats; (grassland fields); • Breading Birds; • Retain the existing hedgerows and scattered trees, as far as is practical, • Doormouse; within multifunctional • Hedgehogs; green infrastructure; • Invertebrates. • Creation of new areas of native species-rich grassland, hedgerows, waterbodies, and scrub, which would benefit local biodiversity by providing nesting, foraging, and shelter for a range of species and species groups including birds, mammals, and invertebrates; and • In the future, a management strategy could be developed for public access to and maintenance of the green infrastructure, to provide interpretation and education materials for new residents to promote ownership and encourage the conservation and protection of 11 these features.
Preliminary Arboricultural Assessment A high level arboricultural appraisal The following recommendations has been undertaken on the sites to were made by the Tree Consultant provide a preliminary review of the and have been incorporated into the current context and condition of trees illustrative masterplan for the site on and within influence of the sites. where possible: The majority of the trees on the • Individual mature trees are areas sites are in a typical condition for of tree belt and woodland which its context, age and species and should be retained and protected are largely influenced by farming from development activities where practices and adjoining highway. practicable. Some of the internal hedgerows, • There should be an allowance for suffer from poor management development offsets from retained and have notable gaps in places. trees to accommodate the Root Individual mature trees are notable Protection Areas and canopy features of the site of moderate to shading. high value and quality. The Parcel A boundary trees adjacent to Dunsley • Boundary tree and hedgerow Road form a cohesive tree belt, enhancement adjacent to Dunsley providing a degree of visual screening Road should be sought to maintain into Parcel A from Dunsley Road. a visual screen and noise barrier The majority of trees adjacent to into Parcel A. the proposed access route to the land south of Dunsley Road are of • Explore options for strengthening low arboricultural value. However, a tree and hedgerow cover moderate value group of ash trees along existing roadsides and and a mature lime tree of high field boundaries to enhance arboricultural value were identified. the containment and habitat connectivity across the periphery of the sites. 12
Drainage A desktop study into the possible Where standard density residential sources of flood risk and a preliminary development is proposed, a 60% surface water drainage assessment impermeability has been assumed. was undertaken for the site. Where higher density residential development is proposed, a 65% The sites are in Flood Zone 1 and are impermeability has been assumed. at low risk of flooding from all flood To provide a conservative approach, risk sources. a 10% allowance for urban creep has The existing sites are wholly greenfield been made for the entire development in nature, with no formal drainage as the specific density is unknown. As infrastructure evident. Given the the development proposals progress, geology of the sites it is expected that the urban creep allowance may be surface water runoff largely infiltrates able to be reduced in line with the into the ground. When the infiltration above table. ▶ potential of the ground is exceeded, A conceptual drainage strategy runoff would flow overland towards the has been prepared which low points of the site. demonstrates that a suitable solution Given the current drainage regime can potentially be achieved for and the geological characteristics, surface water drainage at the sites. it is likely that the sites will prove The primary option, in line with the conducive for the use of soakaways. drainage hierarchy, is infiltration. 13
Heritage A Heritage Appraisal was undertaken The Staffordshire Historic Environment to outline the significance of the Record (HER) details several features designated and non-designated and structures which may be heritage assets and their settings considered non-designated heritage within the sites and in the vicinity of assets or of note within the historic the sites which may be sensitive to the environment at Kinver and Dunsley. proposals, and consider the potential The HER identifies the site of a impacts of the proposed development windmill (also known as Dunsley Mill) of the sites on the heritage assets within Parcel A. therein and in the vicinity of the Site. In order to limit the impact of the The sites does not contain any proposed development on the adjacent designated heritage assets. The heritage assets, Dunsley Hall and Staffordshire and Worcestershire the Staffordshire and Worcestershire Canal Conservation Area runs to the Canal Conservation Area, and their North of Parcel A and West of Parcel settings buffer zones are proposed B. Parcel B is also adjacent to the in order to restrict built development Kinver Conservation Area. The Grade adjacent to these assets. Additionally II Listed Dunsley Hall is located to the the design of the development will east of the Parcel A. Further Listed incorporate an appropriate scale, Buildings are located to the north and density and use of materials to further south of Parcel A and North and West limit the developments impact on of Parcel B, including the Grade II* adjacent heritage assets and no built Whittington Inn and Grade II Listed development is proposed on the site of Dovecote at Hyde Farm. However, the former Dunsley Mill in Parcel A. these are not considered sensitive to the proposed residential development at the sites due to the intervening distance, topography and landscape. 14
Green Belt Review South Staffordshire has published a Green Belt Study (2019) with the Local Plan Review consultation. Parcels A and B are located within Parcel S81A. Part of Parcel A is identified as forming part of parcel S81As1 which has a ‘High’ Green Belt rating. However the western part of Parcel A and the whole of Parcel B is located within parcel S81As3 which has a ‘Moderate’ rating. We have assessed the sites’ against the five purposes of the Green Belt and set out responses on each of the purposed below: Checking Unrestricted Sprawl enclosure to development that restricts any physical or perceived • There is the potential for merging of Kinver with the development to contribute towards settlement of Stourton. sprawl if ribbon development extends along Dunsley Road Safeguarding the Countryside adjacent to Parcel A. It is proposed from Encroachment that development should be set back • The Council’s evidence identifies from the road and soft landscaping a ‘Strong’ contribution to this should be utilised to provide a robust purpose with little explanation. The and permanent offset. Development Green Belt Study states, ‘…Land of Parcel B will sit adjacent to contains the characteristics of open existing properties off Dunsley Road countryside and does not have a so it is not considered to make a stronger relationship with the urban contribution to this purpose. area than with the countryside’. However, as previously described, Preventing Neighbouring Parcels A and B are located adjacent Towns Merging to the existing settlement of Kinver, • Parcels A and B are not considered and whilst development of both to play a major role in maintaining parcels would constitute a loss of grassland fields, avoiding sensitive separation between settlements and areas could allow for a suitable therefore do not contribute towards improved development edge without this purpose. The incorporation impacting on the wider landscape. of development offsets from the Avoiding development on the high eastern boundary of Parcel A can ground of Parcel A will limit visual 15 ensure a robust and permanent impact from distant views.
Green Belt Review Continued Preserve the Setting and Special Opportunities for the Release of Character of Historic Towns Green Belt • The sites do not form part of the In summary, both Parcels A and setting of a historic town and B make a limited contribution to therefore they do not contribute the wider landscape when careful towards this purpose. mitigation is incorporated. Whilst the development of Parcel A and B To assist in Urban Regeneration by would lead to a loss of grassland Encouraging the Recycling of Urban/ fields, the function of the wider Green Derelict Land Belt in checking unrestricted sprawl, • All parcels in the District are preventing coalescence of settlements considered to make an equal would be retained. Any loss of land contribution to this purpose. to development would be limited and localised. The release of both sites for development also offers opportunities for enhancements through the provision of accessible open space. Both Parcels A and B contain physical boundaries which are recognisable and defensible in the form of hedgerows and hedgerow trees. 16
Green Belt Review Continued Opportunities for Release of Green In addition to requiring the release Belt Land of Green Belt land to be clearly As considered above, the sites make defined by robust new Green Belt a limited contribution within the boundaries, the NPPF also considers wider Green Belt and landscape when at paragraph 138 that plans should, careful mitigation is incorporated. ‘…set out ways in which the impact The northern sites are contained by of removing land from the Green Belt existing recognisable and permanent can be offset through compensatory boundaries formed by Dunsley Road improvements to the environmental to the south, existing development quality and accessibility of remaining to the east (Dunsley Hall and farm), Green Belt land.’ woodland and a residential dwelling Although the sites do not offer the to the north. Whilst development of the opportunity for enhancement of land site would lead to a loss of 4 grassland retained in the Green Belt (in line fields, the function of the wider Green with the 2019 NPPF), They do offer Belt in checking unrestricted sprawl, the opportunities for enhancements preventing coalescence of settlements through the provision of accessible would be retained. Any loss of land to open space especially within the development would be limited northern parcel on the higher land and localised. absent of development. As illustrated As set out at paragraph 139 of the on the Opportunities and Constrains 2019 NPPF, when defining Green Belt Plan, there are further opportunities boundaries, plans should, ‘define for this space to be enhanced with boundaries clearly using physical characteristic new structural planting features that are readily recognisable to assist with filtering views of the and likely to be permanent.’ As stated proposed development, as well above, the sites contain physical as being managed for wildlife and boundaries which are recognisable biodiversity benefits. Currently, review and defensible in the form of of the sites are publically accessible woodland, Dunsley Road, Dunsley but if developed, public open space Hall and a sloping topography to the will be provided as part of the east. This provides the opportunity to development proposals which will reinforce and enhance these hedgerow benefit the local community. 17 boundaries with additional planting to further filter views.
Landscape South Staffordshire’s Landscape contained both physically and visually, Assessment 2019 has been reviewed in with existing properties to the south of regards to the Parcels A and B. Dunsley Road screening views from the north, existing properties off Dunsley Landscape Sensitivity Drive to the west and mature tree belt to Both Parcels A and B are located within the south. parcel ‘SL2’ within the Landscape Landscape Recommendations Assessment 2019 which scored a ‘moderate-high’ sensitivity rating. This A series of recommendations were made rating is in relation to a considerably by Barratt West Midlands’ landscape larger area than the sites. The consultant which have been incorporated assessment commentary for this option into the Concept Masterplan. The states that ‘gently undulating areas recommendations for Parcel A include; with a good level of containment (due the retention of the existing mature to topography or vegetation) and that trees along Dunsley Road, restricting relate well to the existing settlement development on the higher ground in edge of Dunsley north and south of the south eastern part of the site and a Dunsley Road, have moderate sensitivity landscape buffer towards the northern to development’. This directly relates to part of the site. Recommendations for both Parcels A and B, where the reduced Parcel B include; retaining existing judgement of ‘Moderate’ sensitivity is vegetation where possible between the appropriate; both sites relate well to the site and existing dwellings and providing existing residential edge of Kinver and a robust landscape buffer at the eastern development considerations avoiding the edge of the site to provide a new upper contours will reduce the overall defensible and permanent edge to the impact on the local landscape. proposed built development. Visual Context It is considered that the actual area of land being promoted for Visually, Parcel A is well enclosed to the built development within both sites north by existing boundary vegetation along with the significant green with the area of land and woodland infrastructure proposed will result in corridor adjacent to the River Stour and less impact on the wider landscape Staffordshire and Worcestershire Canal, 18 in addition to the existing residential than has been assessed as part of the wider parcel SL2. edge to the west. Parcel B is well-
N A 60m A C IR E 65m H IR A development offset is recommended from the eastern part E Site Boundary S H Filter Distant Views of the northernsite to address the more rural character in 70m R S this area as well as the open nature of the higher ground. The E D Development Frontage Considerations Potential Site Access 75m approach to the village of Kinver from the east can be respected S OR Potential Development Parcels and enhanced by retaining this development offset so that the Former Dunsley Mill C FF 80m T character of the street-scene on the approach is retained. Potential Development Parcels with a higher R A Opportunity to Reinstate Historic Field E density consideration T Boundaries S Potential Public Open Space and Development PotentialA rea for SuDS / Landscaping DUNSLEY O Planting W 85m HALL 19 Existing Public Rights of Way U R R T VE I O R DUNSLEY S H A L L FA R M 90m 94m Development should be restricted Sort out layout on the higher ground in this location to avoid new built form being overly prominent in the surrounding Development of the sites will represent an extension of the landscape and when the settlement settlement eastwards and the creation of a new settlement edge is viewed from the public approach. In order to ensure the existing character of the village footpaths to the south. AD approach is retained and where possible, enhanced, it will be Y RO important to consider the incorporation of a landscape buffer/ N SLE development offset, and the appearance of the new dwellings on DU the eastern and southern edges of the development. Outwards The existing mature trees along the facing properties, with scattered tree planting and an area of roadside should be retained and open space at the outer edge of the development would be protected, with development set- consistent with the existing edge of the village and characteristic MANOR DUNSLEY back from the road to ensure their features can be incorporated. The gentle rise in ground levels in1 FA R M MANOR protection, as well as to provide a this location can be utilised to define the development edge and visually filtered view of new built form landscape buffer width. and the new settlement edge. A robust landscape buffer should be provided at the eastern edge of the southern site to provide a new defensible and permanent edge to the proposed 6 dwellings to secure the remaining green belt land beyond, as well as to ensure the open aspect of this part of the site is respected.
Transport Existing Highways Network Proposed Development Impact on Highways The site are situated on land adjacent to the north and south of Dunsley Road, For the purposes of calculating the approximately 950m northeast of Kinver traffic generation for these assessments Village centre. To the east Dunsley Road it has been assumed that maximum connects to the A449 which provides total of 450 dwellings could be provided. links to Stourbridge and Kidderminster. The potential impact of the vehicle trip Dunsley Road ranges in width between generation on the local highway network 5.3m at its narrowest to 6.75m. Along the would be minimal with a 10% impact site frontage Dunsley Road is subject to daily predicted on the A449 to the east of a 60mph speed limit. The limit reduces the sites. to 30mph at the junction with Hampton Grove to the west of the site. The existing footway on Dunsley Road will be required to be improved to provide Automatic Traffic Count (ATC) surveys pedestrian facilities between the site were undertaken to record traffic volume and the village to the west. Appropriate and speeds on Dunsley Road. The result footways and crossing facilities will also of the ATCs show that the average daily be required to ensure that the southern traffic flow was recorded as 4,708 two- site is accessible for pedestrians. way vehicles with an 85th percentile speed of circa 38mph in both directions. The results of the ATC speed surveys Peak hour movements were recorded as indicated that the 85th percentile speeds 240 two-way vehicles in the morning peak of vehicles using Dunsley Road is 38mph hour and 368 in the evening peak hour. compared to the posted 60mph speed limit. The access junctions have therefore The nearest public transport been designed with 120m visibility splays. infrastructure to the sites are bus stops located on Dunsley Road on both sides of To enhance the future more residential the carriageway these stops are served nature of Dunsley Road, a case could be by bus routes 227 and 228 operated made to reduce the road speed to 40mph by Diamond Buses which provide in line with the recorded speeds. connections to Stourbridge centre, with a bus serving the road every 60 minutes in 20 both directions on weekdays.
Transport Continued Access The ATC survey identified that the background traffic flows on Dunsley The northern site is currently accessed Road are relatively low. Hence, the via a track that serves an existing capacity of the site access junctions building and varies from 2.31m to would not be a constraint to the 2.58m in width, the southern site is number of dwellings on the site. currently accessed via a track that Instead the number of accesses ranges from 2m to 2.4m. in width. will be a determining factor. Therefore, It is recommended that two it is anticipated that the sites could be access points are provided into the accessed via simple priority-controlled northern plot, as either two formal T-junctions. access points or one access and an The illustrative masterplan set out in emergency access. A single access this document demonstrates suitable point would be sufficient for the potential access point locations. southern site which could serve 6 properties. 21
Developing the Masterplan Both sites are capable of delivering a high quality, residential-led environment with associated open space and potential community use which will blend in with the existing settlement. An indicative masterplan has been prepared by Barratt to illustrate how a scheme here could be developed. Through its development, the constraints and opportunities identified, both on and off site, have been considered, which will incorporate landscape and historical influences. It is anticipated further engagement with the Local Authority will be undertaken through the Local Plan and ultimately the pre-application process, along with a public consultation, to ensure views are taken into account to prepare the final masterplan for the sites. 22
Forecast Delivery As a national housebuilder, Barratt have the ability to deliver housing on the site swiftly and to assist in meeting the Housing Requirements of the District in the short term. In this instance, this will be a joint development between Barratt and David Wilson Homes. As such there will be two outlets which would deliver circa 70 dwellings per annum. 2022/2023 2023/2024 2024/2025 2025/2026 Private Units 27 42 42 42 Completed Affordable Units 18 28 28 28 Completed Total 45 70 70 70 *The above figures are based upon Barratt’s financial years which end on the 30th June. 23
Summary and Conclusions The Vision Statement demonstrates how Barratt Homes can create a high quality residential development to include a community use and public open space on land off Dunsley Road, Kinver making a valuable contribution to the District and GBHMA’s housing requirement as well as providing public benefits. South Staffordshire Council is part of the Local Plan Review. currently reviewing their Local Plan. It is not considered that the site It is considered that Parcels A and performs well against the purposes of B are suitable and sustainable sites the Green Belt and should therefore for residential development which be considered for release. should be considered for allocation in The Masterplan for the sites has the Local Plan Review document. The been landscape and heritage led and Sites are immediately adjacent to the it is therefore considered that the settlement of Kinver and are within development proposals will have a walking distance of the village centre limited impact on adjacent landscape which offers a range of services and and heritage assets. The development facilities. The Sites are also within will provide significant areas of open 10m of a bus stop on Dunsley Road space and potential community uses which provides frequent services to the benefit of both existing and between Kinver and Stourbridge. future residents. Barratt are keen No significant environmental or to engage with both the Council and heritage constraints have been local residents and will undertake identified through the technical work public consultation with regard to that has been undertaken by various matters such as the design of the consultants. The only constraint development, public open space identified is a policy constraint as the and the type and scale of potential site is located within the Green Belt community uses that the community which is currently under review as may require. 24
INVESTING IN NEW HOMES EMPLOYMENT AND SKILLS DEVELOPMENT Developing the West Midlands 592 44% 1,261 jobs £80m 27 new homes (including of homes built on Socio-Economic Direct, indirect and of Gross Value graduates, apprentices joint ventures) of which previously developed land induced employment 127 are affordable Added (GVA), and trainees on through direct employees, contribution to UK programme Footprint in 2019 sub-contractors and economic output suppliers equivalent to 2 jobs per dwelling SUPPLY CHAIN NETWORKS SUPPORTING PUBLIC SERVICES The infographic provides an illustration of our socio-economic footprint for the financial year 2019. The assessment was carried out by 90% 380 460 £3.7m £23m independent consultants Lichfields, of components sub-contractor companies supplier companies New Homes Bonus tax generated manufactured supported (including supported (including payments by Government Corporation Tax, NI, PAYE, SDLT and who analysed socio-economic in the UK through joint ventures) through joint ventures) over 4 y of components local Council Tax generated (p.a.) impacts through the delivery manufactured in the UK by our activities chain for new housing based upon Barratt Developments PLC datasets, BUILDING STRONGER COMMUNITIES published research and national statistics. All figures are based on the financial year ending 30th June 2019. £1.6m £17m 57 £9.9m local contributions expenditure on physical works benefiting school places provided spending in shops and services by including s106 and local communities (including highway residents of new homes (p.a.) supporting equivalent contributions and environmental improvements and 100 retail and service-related jobs (p.a.) community facilities) SAFEGUARDING THE ENVIRONMENT 2,882 26.2ha 82% 2.57 7.88 97% trees or shrubs of green space of developments tonnes of CO2e tonnes of waste of construction waste planted or created through using above ground emissions per 100m.sq. diverted from 25 retained on developments public open space and private gardens landscape-led Sustainable Urban per 100m.sq. completed build completed build area landfill Drainage Systems area (scope 1, 2 and limited scope 3)