                                         One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)
Public Disclosure Authorized

                                                 Combined Project Information Documents /
Public Disclosure Authorized

                                                 Integrated Safeguards Datasheet (PID/ISDS)

                                                  Appraisal Stage | Date Prepared/Updated: 30-Apr-2019 | Report No: PIDISDSA25234
Public Disclosure Authorized

                               Jan 04, 2019                                                                                         Page 1 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

   BASIC INFORMATION

 OPS_TABLE_BASIC_DATA
  A. Basic Project Data

   Country                            Project ID                   Project Name              Parent Project ID (if any)
   Ethiopia                           P167794                      One WASH—Consolidated
                                                                   Water Supply, Sanitation,
                                                                   and Hygiene Account
                                                                   Project (One WASH—
                                                                   CWA)
   Region                             Estimated Appraisal Date     Estimated Board Date      Practice Area (Lead)
   AFRICA                             15-May-2019                  13-Jun-2019               Water

   Financing Instrument               Borrower(s)                  Implementing Agency
   Investment Project Financing       Ministry of Finance and      Ministry of Water,
                                      Economic Cooperation         Irrigation and Electricity,
                                                                   Ministry of Education,
                                                                   Ministry of Health

   Proposed Development Objective(s)

   To increase access to safely managed water supply, sanitation, and hygiene services and strengthen capacity for water
   resources management and service delivery.

   Components
   Rural and Pastoral Water Supply, Sanitation, and Hygiene (Rural WASH)
   Urban Water Supply, Sanitation, and Hygiene (Urban WASH)
   Institutional Water Supply, Sanitation, and Hygiene (Institutional WASH)
   Climate Resilient Water Supply, Sanitation, and Hygiene (Climate Resilient WASH)
   Institutional Strengthening and Project Management

   PROJECT FINANCING DATA (US$, Millions)

  SUMMARY      -NewFin1

   Total Project Cost                                                                                            350.00
   Total Financing                                                                                               350.00
               of which IBRD/IDA                                                                                 300.00
   Financing Gap                                                                                                   0.00

Jan 04, 2019                                                                                                   Page 2 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

  DETAILS      -NewFinEnh1

   World Bank Group Financing

      International Development Association (IDA)                                                                       300.00

         IDA Credit                                                                                                     300.00

   Non-World Bank Group Financing

      Counterpart Funding                                                                                                50.00
         Local Communities                                                                                               20.00
         Local Govts. (Prov., District, City) of Borrowing Country                                                       30.00

   Environmental Assessment Category
   B-Partial Assessment

   Decision
   The review did authorize the team to appraise and negotiate

   B. Introduction and Context

   Country Context

           1.      With over 100 million people Ethiopia is the second most populous country in Africa, after
           Nigeria. The country’s population is growing at an average rate of 2.6 percent per year, with projections
           that indicate that the population may exceed 130 million by 2030 (CSA, 2013) and 142 million by 2037.

           2.     Ethiopia has experienced rapid and stable economic growth over the past decade. From
           2005/06 to 2015/16, Ethiopia’s economy has been growing at an annual average rate of 10.3 percent
           compared to a regional average of 5.4%. The expansion of agriculture, construction and services
           accounted for most of this, with modest manufacturing growth.

           3.       There has been a significant reduction in poverty, but challenges remain. Over the past decade
           from 2004 to 2014, real GDP per capita increased on average 8 percent per year. Poverty declined
           substantially from 55.3 percent in 2000 to 33.5 percent in 2011, based on the international poverty line
           of US$1.90 per/day. There have also been significant improvements in nutrition, health, education, and
           access to basic services. While experiencing this rapid growth, Ethiopia remained one of the most equal
           countries in the world with a Gini coefficient of consumption of 0.33 in 2018. However, despite this
           progress, the country ranked only 173 out of 188 in the Human Development Index (HDI) of the United
           Nations Development Program (2018) and the poorest 15 percent of the population experienced a decline
           in well-being during 2011-2018, mainly because of high food prices. In recent years, the rural – urban gap

Jan 04, 2019                                                                                                       Page 3 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           has been increasing, driven primarily by lack of access to basic services. Access to Water Supply and
           Sanitation (WSS) services is estimated to be 55 and 68 percent in rural and urban areas respectively.

           4.        The Government’s Growth and Transformation Plan (GTP) has set an ambitious goal of becoming
           a middle-income country by 2025, with annual economic growth of 11.2 percent per year over the period
           and gross national income per capita reaching US$1,560 in 2025. A second phase of the GTP (GTP II -
           2015/16-2020/21) is currently under implementation. The Government has a powerful role in the
           economy, especially in priority sectors such as industry and agriculture, which are the key drivers of
           sustained economic growth and job creation. To achieve this plan, water features prominently and is a
           critical ingredient to sustain the ambitious agriculture, hydropower generation and industrialization
           agendas set forth in GTP II.

           5.        The temporal and spatial variability of water resources, exasperated by extreme climate shocks
           poses a continuous challenge for water service delivery for human consumption and productive use. At
           first glance, Ethiopia’s water resources endowment appears generous. The country has adequate average
           annual rainfall, several major rivers and lakes, and significant groundwater resources. One of the primary
           characteristics of Ethiopia’s water resources are extreme inter-annual and intra-annual rainfall variability,
           and the international nature of its most significant water resources. This variability is most obviously
           manifested in endemic, devastating droughts and floods. Less apparent is the broad range of impacts this
           variability has on the Ethiopian economy, even in good rainfall years. In recent years, inter-annual
           droughts have had devastating impacts leading to population displacement and requests for humanitarian
           help. Resource constraints due to hydrological variability and climate change are further exacerbated by
           mushrooming population demands and increasing competition for water resources between multiple
           productive sectors (agriculture, industry, hydropower, etc.).

           6.       Decentralization of service delivery to local levels is actively pursued. The current federal
           system of government was established in the early 1990s, and since 2003 the country has decentralized
           service delivery responsibilities to the regional and district (woreda) levels. Critical public functions such
           as water and sanitation, solid waste management, and public health services have been devolved.
           Underlying this decentralized system are formula-based fiscal transfers (block grants). Decentralization
           has yielded many positive results, but challenges related to regional disparities and rates of development
           are evident. Pace of development has varied greatly from region to region and smaller and predominantly
           pastoralist regions have achieved lower development outcomes. Regional variability in capacities and
           achievement of development outcomes have been exacerbated by civil unrest, influx of refugees (from
           neighboring countries) and internal displacement due to conflict and natural disasters. Though the
           country has been experiencing political instability over the last three years some signs of improved
           stability were evident following the election of the new prime minister in April 2018.

   Sectoral and Institutional Context (further details in Annex 3 of the Project Appraisal Document)

           7.       In 2015 Ethiopia met its Millennium Development Goals (MDGs) for water supply. This
           significant achievement was largely driven by the very rapid access increase in rural areas where 35 million
           people were provided access to piped and protected water sources between 1994 and 2015. In urban
           areas, an additional 10 million people gained access to piped water through household connections. The
           MDG for sanitation was not met but good progress was made in reducing open defecation in rural areas

Jan 04, 2019                                                                                                           Page 4 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           – over 40 million people built basic latrines – while in urban areas reduction of open defecation (OD)
           dramatically dropped from 40 to 6 percent. The drop in OD practices was accompanied by good progress
           with 8 million people moving up the sanitation ladder from basic to improved toilet facilities in urban
           areas. However, gains in urban sanitation coverage have been offset by increases in urban population,
           and lack of focus on the integrated sanitation service chain (containment, transport and safe treatment
           and/or disposal). The progress in improving access to Water, Sanitation and Hygiene (WaSH) services has
           been driven by a combination of decentralization and sector reforms.

           8.       The Government of Ethiopia’s (GoE) policies and strategies, are designed to respond to some of
           the economic, social, institutional, and operational challenges affecting the sustainable delivery of
           services. The major policy principles articulated in strategies such as the Integrated Urban Hygiene and
           Sanitation Strategy include: (i) recognizing water and sanitation as economic and social goods; (ii)
           devolving ownership and management autonomy to the lowest possible local level; (iii) moving towards
           full1 cost recovery for urban schemes and recovery of operation and maintenance cost for rural schemes;
           (iv) no direct subsidy for construction of household latrines; and (v) integrating sanitation and hygiene
           promotion with water supply.

           9.      Responsibility for development and provision of water supply and sanitation services is shared
           among four Federal Ministries; the Ministries of Education (MoE), Finance and Economic cooperation
           (MoF), Ministry of Health (MoH), and the Ministry of Water, Irrigation and Electricity (MoWIE), and
           their respective regional Bureaus. In addition, consistent with Ethiopia’s decentralization policy,
           woredas2, towns and communities are responsible for planning and managing their own water supply and
           sanitation services.

           10.      The One WaSH National Program (OWNP) is the Government’s main instrument for achieving
           the GTP’s goals of the WaSH sector in a more integrated manner. OWNP aims to coordinate WaSH
           activities and to improve efficient use of resource for service delivery with respect to water supply,
           sanitation, and hygiene in rural, urban, and pastoral communities, as well as schools and health posts and
           health centers. Currently the Bank is jointly financing the OWNP in roughly a third of rural woredas (382
           woredas out of 1000); a tenth of small towns (124 out of nearly 900 towns across the country); and 20
           medium towns in all regions, pooling its resources with DFID, AfDB, UNICEF and the Government of
           Finland in a Consolidated WaSH Account (CWA) that is managed by MoF. The World Bank manages the
           fiduciary, safeguards and monitoring and evaluation (M&E) aspects of this pooled account on behalf of
           CWA financing partners.

           11.     Access to improved water supply and Sanitation services in rural and urban areas in Ethiopia
           has improved at a steady pace but many challenges remain. High population growth, high non-
           functionality rate, frequent discontinuity of supply, water quality, reduced yields and drying wells during
           droughts and contamination of existing water sources are among the factors jeopardizing the expected
           health and economic benefits from improved infrastructure. Increases in rural sanitation coverage have

           1 The project policy design is fully cognizant of the need for gradual progress towards achievement of full cost recovery as a   longer-
           term objective in the Ethiopian context.
           2 Woredas or districts are the third-level administrative divisions. They are further subdivided into wards (kebeles) or

           neighborhood associations, which are the smallest unit of local government.

Jan 04, 2019                                                                                                                                    Page 5 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           resulted in increased convenience and improved safety and dignity, especially for women, but the poor
           quality of infrastructure has resulted in limited health benefits. High prevalence of open defecation and
           poor sanitation services, which contaminate local water supply sources, has been strongly linked to poor
           outcomes in child early years development and stunting as well as to high incidence of waterborne disease
           outbreaks. An assessment3 aimed at identifying underlying causes of stunting in Ethiopia found that poor
           sanitation contributes to 67 percent of observed cases of stunting in children under 5 years of age.

           12.     Regional variations in implementation capacity, particularly in developing regions, represent
           additional challenges. Service provision faces particular challenges in lowland, predominantly pastoralist
           regions, where water resources variability is more pronounced. In some of these areas also, the influx of
           refugees and internally displaced people complicates WSS service delivery and puts added strain on local
           water sources.

           13.     Many challenges and opportunities exist for the GoE to increase resilience and effective
           management of water resources to provide sustainable WSS services. If adequately addressed, the
           following challenges can present numerous opportunities for growth and sustainable management of
           water resources: (a) major gaps exist in access and coverage of different water services and other
           productive uses to achieve the GTP II and Sustainable Development Goals (SDGs) because of low level of
           water resources development; (b) water use conflicts are emerging in some parts of the country due to
           rapid urbanization, population growth and limited regulatory oversight; (c) institutions for water
           resources management require strengthening; (d) decision-making for water resources development is
           not conducted in an integrated manner; and (e) the socio-economic development is rather vulnerable to
           climate shocks due to inadequate investments in water infrastructure, particularly water storage facilities.
           The severe droughts in the past years in eastern and southeastern Ethiopia leading to devastating food
           shortage, health issues and even displacement, illustrate the urgent needs to develop more water
           (storage) infrastructure and improve climate resilience in the country. Related to this is the sub-optimal
           operation of the existing storage facilities due to soil erosion and environmental degradation in the
           catchment areas.

           14.      To build on the successes in WSS service provision and shift from project-based interventions
           to programmatic approach, the new operation seeks to enhance existing approaches, to achieve access
           scale-up and to address emerging challenges such as climate resilience. This new project seeks to
           broaden interventions for WSS service delivery to adequately address issues of sustainability related to
           availability of water resources, management of installed infrastructure and put in place measures to
           adequately address sanitation. The proposed operation builds on a solid foundation that is guided by the
           OWNP and a pooled financing mechanism (CWA), which supports sector implementing agencies to jointly
           plan, budget, implement and monitor WaSH activities. In addition to addressing elements of resilience,
           the proposed operation aims to address challenges in existing programmatic approach by addressing
           aspects of: (i) functionality and quality of rural WaSH services; (ii) adopting a comprehensive supply and
           demand-driven approach for sanitation in both rural and urban areas that includes linkages to local private
           sector and access to financing; (iii) stepped approach for urban WaSH to incentivize planning and improve
           readiness and dimensioning of WSS infrastructure; and (iv) promoting an integrated approach to address
           challenges in low access to improved sanitation.

           3   The World Bank. “All Hands on Deck – Reducing Stunting Through a Multi-Sectoral Approach in SSA and Ethiopia” March 2018.

Jan 04, 2019                                                                                                                          Page 6 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           15.      Ethiopia is an early adopter of the Human Capital Project, which aims to address three aspects
           of human capital: child survival, health (stunting and adult morbidity), and educational attainment.
           Through multi- sector work, the World Bank Ethiopia has engaged in Early Years Initiative, which is a joint
           initiative between health and nutrition, water, agriculture and social protection. The project aims to build
           on this momentum to scale up interventions in sanitation that directly link with this initiative. The program
           also aims to closely complement interventions of the National Nutrition Plan and strategically align with
           the Ministry of Health’s Woreda Transformation Plan in which improved hygiene and sanitation form an
           integral pillar.

           16.     The proposed Project address some of the key challenges highlighted in the above regional and
           country context section with a focus on increasing access for this first phase.

   C. Proposed Development Objective(s)

  Development Objective(s) (From PAD)
  Increase access to safely Managed water supply, sanitation and hygiene services and strengthen capacity for water
  resources management and service delivery

   Key Results
         PDO Level Indicators
                 i. Number of people provided with access to safely managed drinking water services4 under the
                    Project (rural/urban/female)
                ii. Number of people provided with access to safely managed sanitation services5 under the Project
                    (rural/urban/female)
               iii. Proportion of kebeles6 under the Project woredas declared and verified as open defecation free
               iv.  Proportion of water schemes that are functional and supply safe drinking water in areas under
                    the Project
                v.  Proportion of urban water service providers covering their operational costs under the Project
               vi.  Proportion of rural and urban water supply scheme designs using data from the water resources
                    management information system
   D. Project Description
          17.      This project is building on and adapts from successes and challenges in the implementation of
          the phase I of the OWNP and harmonization of the unified funding instrument, the CWA. This project,
          will focus on addressing gaps in the approach, design and implementation from previous interventions,
          while adopting directives and indicators from GTP II. Provision of water supply and sanitation service
          delivery will be better integrated with water resources management, health and nutrition outcomes,
          productive use of water, climate resilience and agile approaches to attend to WaSH in emergencies. The

           4 Safely managed drinking water services need to meet the conditions on quality (water supplied should be free from fecal and
           priority chemical contamination), accessibility (located on premises for urban households, and within a 30-minute round-trip of
           rural households), and availability (water should be available when needed), as detailed in the results framework.
           5 Safely managed sanitation services need to meet the specified conditions for accessibility (an improved facility that is not

           shared with other households) and service quality (excreta is safely disposed of in situ or emptied, transported, and treated
           offsite), as detailed in the results framework.
           6 Kebeles (wards) are fourth-level administrative divisions and constitute a subdivision of the woredas (districts).

Jan 04, 2019                                                                                                                            Page 7 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           project aims to increase and sustain access to improved WSS, using integrated approaches aimed at
           ensuring that investments in WSS service delivery are sustainable and resilient. This project will leverage
           additional financing from existing CWA partners and new development partners.

           18.      Component 1 – Rural and Pastoral Water Supply, Sanitation and Hygiene (US$ 110 million) –
           This component will support increasing access to water supply and sanitation services and promoting
           hygiene in selected rural areas. The component is structured into two sub-components: (i) increasing
           access to Water Supply and Sanitation Services and (ii) Enhancing Sustainable Service Delivery.
           Prioritization and selection criteria for selected rural woredas is in Annex 2 of the PAD.

               Subcomponent 1. A. Increasing Access to Water Supply and Sanitation Services (US$-96.60 million)

           19.      This subcomponent will finance: (i) development of Woreda Strategic WaSH Plans that outline
           approaches to development and rehabilitation water supply schemes, articulation of roles and
           responsibilities for O&M, and assessment of socio-economic viability to determine affordability; (ii)
           development and rehabilitation of community water supply schemes in participating woredas (including
           scoping and financing of alternative energy sources for O&M); (ii) capacity building to strengthen and
           sustain participating woredas’ capacity to plan, implement and manage WSS services jointly with OWNP
           core implementing sectors (water, education, health and finance) as well as coordinating sectors
           (agriculture, pastoralist affairs and disaster risk management commission). For woredas, where water
           resources are not sufficient or sustainable to meet current and future demands, considerations for multi-
           woreda schemes will be designed and developed in Component 4 and will have differentiated institutional
           and management structures commensurate with the complexity of proposed schemes. Further detail on
           component related activities are found in Annex 2 of the PAD.

           20.      For sanitation and hygiene, the project will support: (i) rolling out of new Behavior Change
           Campaigns (BCC) developed by the MoH; (ii) establishment of sanitation marketing centers; (iii)
           establishment of community saving structures such as “Eqob” and “idir”7 to ensure households have
           access to resources to invest in construction and upgrading of their sanitation facilities; and (iv) capacity
           building for supply side sanitation marketing to vocational training centers, micro-credit institutions,
           micro and small enterprises, local governments, etc. The BCCs are regionally tailored to ensure that
           messaging is effectively delivered to targeted communities. This activity will be implemented through
           Health Extension Workers and additional support from Woreda WaSH Teams (WWTs)/ Community
           Facilitators (CFs) to effectively mobilize communities to attain improved sanitation services. Sanitation
           activities will adopt a community-centered approach, whereby communities set their own targets,
           monitor their progress and encourage defaulters.

               Subcomponent 1.B Enhancing Service Delivery Management Capacity (US$13.40)

           21.     To address persistent challenges related to high non-functionality rates, and unsustainable service
           delivery, including aspects of water quality, this sub-component aims to strengthen post-construction and
           service delivery activities. The project will complement proposed water supply activities through the

           7Iqob and idir are community-based savings mechanisms whereby participating community members agree to contribute a
           specific amount on a monthly basis and a lottery system is devised to disburse monthly collection to one member at a time.

Jan 04, 2019                                                                                                                            Page 8 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           creation and strengthening of rural water supply management capacity, which include, inter alia: (i) scale
           up of pilot interventions for spare parts, supply chain and capacity building of the local private sector (to
           be operated by women and youth-led micro and small enterprises) to support O&M of water supply
           facilities; (ii) strengthening of community WaSH committees (WaSHCOMs) and establishing networks of
           support, where possible, through clustering of WaSHCOMs with urban water boards and utilities within
           their radius to provide technical assistance that is beyond the capacity of the community (e.g.
           procurement of equipment, engagement of specialist for complex repairs, etc.); (iii) strengthen capacity
           of respective water, health and education regional bureaus and woreda offices and WWTs to increase the
           number of trained and skilled facilitators that can support community mobilization activities, provide
           technical support during design and construction and post-construction of water supply systems; (iv)
           enhancing water quality monitoring; and (v) promoting and enhancing O&M training curricula under
           vocational skills programs (Technical and Vocational Training Colleges) to increase capacity of local private
           sector (technicians, artisans, construction, etc.). Through capacity building activities, WaSHCOMS will be
           given greater responsibility to monitor and report functionality of water supply systems as well as play an
           active role in promoting construction and upgrading of household sanitation facilities.

           22.     Component 2 – Urban Water Supply, Sanitation and Hygiene (US$ 105 million) – This component
           will improve access to WSS services in selected urban areas (small and medium towns8) and strengthen
           operational efficiency of urban water boards and utilities to effectively manage WSS service delivery.
           Regions will prioritize small and medium towns within their geographic areas to receive Technical
           Assistance (TA) and financial resources for investments. This component will finance: (i) preparation of
           Town WSS Business Plans (TWBPs) that lay out strategies for WSS service delivery for current and future
           demands for water supply and sanitation. These plans will also articulate prioritization and sequencing of
           investments in line with urban growth and demands; (ii) establishment and strengthening of urban water
           boards and utilities to efficiently provide services and manage WSS infrastructure and assets; (iii)
           construction, rehabilitation and optimization of urban water production, treatment and distribution
           systems; (iv) capacity building for participating water boards and utilities to establish and strengthen O&M
           of WSS services in line with GoE’s step approach sector policy for institutional development; and (vi)
           preparation of feasibility and design studies for priority water supply and sanitation investments.

           23.        For sanitation, the project will promote the City-Wide Inclusive Sanitation approach that has been
           adopted by Addis Ababa and secondary cities across the country. This approach aims to develop a
           complete sanitation service chain from household facility to safe transport, treatment/disposal of
           wastewater or fecal sludge. The project will finance: (i) construction, rehabilitation and management
           structures for public and communal sanitation facilities and on-site treatment or fecal sludge treatment
           sites; (ii) scoping and vetting of sanitation options within the TWBPs; and (iii) establishment of sanitation
           marketing centers. Awareness and communication campaigns will be carried out by local authorities
           (municipality, water Board or Utility, etc.) with the support of Town Support Groups (financed by the
           project). Linkages with micro-credit institutions will be established to avail affordable avenues for urban
           households to upgrade their sanitation facilities. Sanitation activities will be closely linked to provision of
           household water connections.

           8Small towns are defined as urban populations between 2,000-20,000 inhabitants; medium towns are between 20,000-100,000
           people

Jan 04, 2019                                                                                                                    Page 9 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           24.      This component will follow a two-pronged approach for urban WaSH. Step One will include
           capacity building support to all selected small and medium towns to develop adequate business plans,
           identify and study potential water supply and sanitation investments and strengthen institutional capacity
           of WSS service delivery operators. Upon meeting a set of readiness criteria that include institutional,
           technical and financial parameters, towns will be able to access Step Two, for the financing and
           implementation of infrastructure. The selection criteria to access TA support in Step One and the
           readiness criteria for financing in Step Two can be found in Annex 2 of the PAD. The cost recovery policy
           will be implemented gradually, based on the financial capacity of the town to repay. In cases where the
           recovery of capital cost is unaffordable by towns, part of the sub-project will be financed by a grant. For
           small towns9 financing will be provided through a combination of government grants and regional,
           municipal counterpart financing. For medium towns, more robust readiness criteria are in place and
           access to finance will come through on-lending from a GoE credit facility, the Water Resources
           Development Fund (WRDF). Medium towns will be rigorously appraised to access loans from WRDF. For
           small towns that were pre-identified during OWNP phase I (Water Supply, Sanitation and Hygiene Project
           WaSHP (P133591)) and faced a series of implementation challenges, financing for infrastructure
           development will be provided through this project, contingent on meeting readiness criteria. Medium
           towns identified during OWNP Phase I that have also faced similar delays, will be eligible on receiving on-
           lending support from this project, via the WRDF upon evaluation and must meet outlined readiness
           criteria (see Annex 2 of the PAD). For newly prioritized towns, consideration for financing will follow
           outlined two-pronged approach. See Annex 2 of the PAD for more detail on component activities.

           25.     This project will also provide technical capacity and support to the WRDF to improve its appraisal
           process for medium towns and to develop its capacity as a local lending institution. The project will
           provide targeted support for medium-sized towns to improve operational efficiency through activities
           such as: (i) reduction of non-revenue water; (ii) establishment and/or improvement of billing, collection
           and redress systems; (iii) adoption of adequate management information systems; (iv) improvement of
           customer relations; and (v) implementation of tariffs as per the approved Business Plans.

           26.      Component 3 – Institutional Water Supply, Sanitation and Hygiene (US$45 million) – This
           component will support: (i) increasing and improving access to WSS services in health facilities and
           schools; and (ii) hygiene promotion and behavior change activities (e.g. school WaSH clubs, promotion of
           menstrual hygiene management, etc.). The project will finance construction and rehabilitation of
           integrated WSS facilities in schools and health posts. Implementation of these activities will be
           incorporated into the Woreda Strategic WaSH Plans or TWBPs to ensure that institutions within the same
           geographic areas of targeted communities are provided with an integrated package of WSS services.
           Standards for sanitation services in schools will follow MoE guidelines, while standards in health facilities
           will follow MoH guidelines. Capacity building will be provided to bureaus of education and health to
           provide technical support in procurement and contract management of proposed infrastructure
           development to address weaknesses in sub-par construction quality.

           27.     Component 4 – Sustainable and Resilient Water Supply, Sanitation and Hygiene Services (US$65
           million) – This component aims to support the study, design and implementation of WSS services in areas
           that are prone to recurrent droughts and floods. This component is sub-divided into three pillars to

           9Small towns include towns with population of less than 20,000 people while medium towns comprise towns with population
           between 20,000 and 100,000 people (OWNP, 2013)

Jan 04, 2019                                                                                                                         Page 10 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           effectively address: (i) proactive planning and management; (ii) study, design and construction of resilient
           and sustainable infrastructure that cope with extreme climatic variability; and (iii) contingency response
           window to dimension support and mobilize resources in the event of emergencies.

           Sub-component 4.1 – Water resources monitoring and planning (US$5 million) –

           28.       This sub-component will support the consolidation and collation of water resources (both surface
           and groundwater) monitoring and planning to inform design and management of water supply service
           delivery. This component builds activities outlined as part of the Modernization of Hydrometeorological
           (hydromet) Services TA (P162600). This component will primarily support federal and basin level
           institutions mandated to monitor meteorological and hydrological services, namely the River Basin
           Development Authority within MoWIE (and its directorates: Directorates for Hydrology, Groundwater,
           Basin Administration, River Basin Bureaus (Abbay, Rift Valley and Awash) as well as the National
           Meteorological Agency. This component will enhance monitoring for surface and groundwater, that
           include: (i) strengthening of weather and climate information, surface and groundwater data collection,
           hydromet and early warning systems development; (ii) institutional capacity development of pertinent
           institutions; (iii) service delivery aspect of the system for end users and decision-making process; and (iv)
           water resources planning activities that include development of analyses and guidelines for catchment
           management interventions for water source protection. This sub-component would also support capacity
           building and coordination activities to link with existing spatial and early warning institutional mechanisms
           and approaches for dissemination of information to regional, Woreda and community levels. Further
           detail is in Annex 2 of the PAD.

               Sub-component 4.2 – Climate- Adaptive Service Delivery (US$60 million)

           29.      This sub-component will support targeted woredas and urban localities that are in identified
           drought and flood-prone areas. This sub-component will predominantly target areas that require water
           supply services that extend beyond local administrative boundaries and capacities, and that require
           special management mechanisms (geographic selection criteria can be found in Annex 2 of the PAD). This
           sub-component will be managed by MoWIE and will provide technical assistance for: (i) improved
           contingency and emergency planning; (ii) investment preparation (feasibility and engineering designs) for
           climate adaptive technologies; (iii) preparation of guidelines (menu of appropriate technologies, design
           considerations, etc.) and technical standards (for e.g. standard bidding documents) to facilitate scoping,
           design and construction of climate adaptive water supply service delivery. It will also finance investments
           that require scoping and design that expand beyond community and Woreda administrative boarders.
           These schemes will include inter alia, sustainable water source development and promotion of
           conjunctive use where possible using boreholes, spring development, water harvesting (haffirs, cisterns,
           etc.), groundwater recharge (e.g. sand dams) and storage (micro-dams, tanks, etc.). Further detail on sub-
           component activities and selection criteria of geographic areas to be targeted under this component are
           in Annex 2 of the PAD.

           Sub-component 4.3 – Contingency Emergency Response Component (US$0 million)

           30.   This sub-component will allow, if need be, to re-direct resources to woreda and regional level
           implementing agencies to address elements of emergency response for floods, droughts and outbreaks

Jan 04, 2019                                                                                                         Page 11 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           of water-borne diseases. The outline, the pre-defined framework of activities, and the associated triggers
           that will re-direct resources to support emergency efforts are incorporated into the Program Operations
           Manual.

           31.     Component 5 – Institutional Strengthening and Project Management (US$ 25 million)– This
           component will support the implementation of the project through two sub-components: (i)
           operationalization of sector-wide Monitoring Information System (MIS); and (ii) Institutional
           Strengthening and Project Management.

           32.      Given the importance of establishing an operational MIS, the project will finance activities related
           to implementation of MIS including: training, procurement and piloting of monitoring sensors and support
           to M&E staff at regional and local levels. The support will focus on: (i) institutionalization of this new WaSH
           M&E and MIS system; (ii) further improvement of the system to realize real-time monitoring; and (iii)
           introducing SIASAR (a successful information system for management of rural water supply systems) in
           Ethiopia.

           33.     Institutional strengthening and project management will be supported through: (i) capacity
           building, financing of additional implementation support and technical experts; (ii) project management
           and coordination between implementing agencies; (iii) procurement and contract management; (iv)
           financial management; and (v) application of environmental and social safeguards instruments and
           compliance; (vi) knowledge management and experience sharing. This component will also finance
           procurement of equipment and goods required by federal, regional and Woreda implementing agencies
           to effectively manage and implement proposed activities.

   E. Implementation

   Institutional and Implementation Arrangements

           34.     The project implementation and institutional arrangements will follow the existing structures
           that were used under the ongoing WASHP (P133591) whereby the WASH sector related Ministries:
           Water Irrigation & Electricity, Health, Education, and Finance at federal level and their respective
           bureaus and offices at regional and woreda levels will be the primary implementing agencies with
           oversight from their respective Steering Committees. These ministries and their respective regional
           bureaus have signed a Memorandum of Understanding (MoU) to support an integrated OWNP. The MoU
           describes the specific roles and responsibilities of the ministries and respective bureaus in implementing
           the OWNP. In addition, the MoU defines major areas of cooperation among the signatory parties’ joint
           planning, resource mobilization, creation of management and coordination structures, quality control,
           and monitoring. In addition, consistent with Ethiopia’s decentralization policy, woredas/towns and
           communities are responsible for planning and managing their own water supply and sanitation services.

           35.     WaSH implementation and Coordination Structure. To facilitate the implementation of the
           OWNP at different levels, GoE has established institutions to oversee WASH coordination,
           implementation, and monitoring at federal, regional, zonal, city and woreda levels. The highest governing
           body for program implementation is the National WASH Steering Committee (NWSC), whose members
           include MoF, MoWIE, MoH and MoE. The NWSC is chaired by the Minister of MoWIE. The technical arm

Jan 04, 2019                                                                                                           Page 12 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

           of the NWSC is the National WASH Technical Team (NWTT) consisting of Directors from the four WASH
           Ministries. A National WASH Coordination Office (NWCO) is responsible for coordinating, planning and
           overseeing Program implementation at federal level. The NWTT is replicated at regional level with
           dedicated coordinators in each of the WASH Bureaus in each region. At federal and regional levels Project
           Management Units will be responsible for day to day implementation of Project activities. At the woreda
           level, program planning and implementation will be coordinated by a dedicated WaSH Team consisting of
           members from the Water, Health, Education, and Finance desks. The Woreda WaSH Teams will report to
           a Woreda WaSH Steering Committee appointed by the Woreda Cabinet. The National and Regional WaSH
           Coordination Offices are responsible for preparing consolidated WaSH plans and budgets, leading
           biannual Joint Technical Reviews, and preparing and submitting biannual project performance (physical
           and financial) reports. MoF, Regional Bureaus of Finance, and Woreda Finance Offices will be responsible
           for managing funds, preparing quarterly Interim Financial Reports (IFRs) and facilitating annual audits. In
           addition, the Water Resources Development Fund will be responsible for appraisal and monitoring and
           evaluation of projects of the selected medium towns. The table below summarizes the arrangement and
           functions of One WaSH – CWA implementation structure:

               Level              Governance     and Oversight  and Program                          Program
                                  Guidance           Management     Implementation                   Coordination

               Federal            National  WaSH National     WaSH Federal   sector’s National WaSH
                                  Steering       Technical Team    WaSH       Project Coordination
                                  Committee                        Management Units: Office
                                                                   MoH, MoE, MoWIE,
                                                                   MoF

               Regional           Regional  WaSH Regional     WaSH Regional sector’s                 Regional
                                  Steering       Technical Team    WaSH        Project               WaSH
                                  Committee                        Management Units                  Coordination
                                                                   made up of Bureaus                Office
                                                                   of: water, health,
                                                                   education      and
                                                                   finance

               Zonal       (where Zonal WaSH Management Team                  Zonal WaSH Project Zonal WaSH
               applicable)                                                    Units:       water, Coordination
                                                                              health, education Office
                                                                              and Zonal Finance

               Woreda             Woreda WaSH Steering Committee Woreda WaSH Team – focal points
                                  (Woreda Cabinet)               from water, health, education and
                                                                 finance

Jan 04, 2019                                                                                                        Page 13 of 25
The World Bank
            One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

               Town/city            Town/City WaSH Steering Committee Water Resources Development Fund
                                    (Town Cabinet)                    in collaboration with Town/City
                                                                      WaSH Technical Team

                                                                                Municipality

                                                                                Town Water Board/ Utility

             36.       Operation of water supply systems. At the community level, WaSH WaSHCOMs consisting of
             elected community members (at least 50 percent women) will be formed to undertake planning,
             operation and maintenance and in some cases construction of improved water supply and sanitation
             facilities. In the case of towns, Water Boards or utilities will be responsible for planning, operation and
             maintenance of WSS services in urban areas.

             37.     For engagement related to climate resilient WASH, new stakeholders have been included:
             Ministry of Agriculture and Natural Resources, Ministry of Livestock and Fishery, Ministry of Environment,
             Forest and Climate Change, Ministry of Federal and Pastoralist Development Affairs; and National Disaster
             Risk Leadership Commission.
  .
      F. Project location and Salient physical characteristics relevant to the safeguard analysis (if known)

      Ethiopia is well endowed with water resources. Unfortunately, the spatial and geographic distribution of
      these resources varies. Large portions of the country experience recurrent droughts, while others are prone
      to floods. The availability of water resources to meet the demands of human consumption and other
      productive uses is challenging in arid and semi-arid areas of the country. Selection of technologies is highly
      dependent on water resources availability and will utilize groundwater, surface water, or a combination of
      both. The Project will support the GoE’s OWNP, which covers rural and urban beneficiaries across the
      country. Sites for rural and small-size town beneficiaries will be identified during implementation. The
      project will build upon and enhance existing safeguard instruments to ensure environmental and social
      impacts are adequately screened and mitigation measures are properly implemented. The environmental
      and social consequences of the project are expected to be minimal given the small scale of the schemes to
      be supported (rural areas and small and medium towns). However, to ensure that adverse impacts are
      adequately addressed, the existing Environmental and Social Management Framework and Resettlement
      Policy Framework have been revised to incorporate lessons learned from previous interventions. The
      revised documents have been cleared by the Bank and publicly disclosed. For subprojects identified during
      the course of preparation, individual Environmental Management Plans or Abbreviated Resettlement Action
      Plans will be developed as needed and disclosed accordingly.

      G. Environmental and Social Safeguards Specialists on the Team

      Yalemzewud Simachew Tiruneh, Social Specialist
      Tesfa Teferi Gebreegziabher, Social Specialist

Jan 04, 2019                                                                                                         Page 14 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

   Tesfaw Ashagrie Zegale, Environmental Specialist
   Tamru Demsis Temam, Environmental Specialist

   SAFEGUARD POLICIES THAT MIGHT APPLY

   Safeguard Policies                      Triggered?        Explanation (Optional)
                                                             This policy is triggered given that the construction
                                                             and rehabilitation of water supply and sanitation
                                                             schemes for rural and small towns might have
                                                             potential negative environmental and social impacts
                                                             unless properly identified and managed. These
                                                             impacts may arise largely related to the drilling of
                                                             wells and development and transmission of water.
                                                             To address these, the GoE has revised the ESMF
                                                             prepared for WASHP under implementation to
                                                             reflect additional activities, and changes have been
                                                             reviewed and approved by the Bank. The World
                                                             Bank Group Environmental, Health, and Safety
                                                             Guidelines (EHSG) for Water and Sanitation were
                                                             referred to while preparing the ESMF. The EHS
                                                             Guidelines for Water and Sanitation include
                                                             information relevant to the operation and
                                                             maintenance of (i) potable water treatment and
  Environmental Assessment OP/BP 4.01      Yes               distribution systems, and (ii) collection of sewage in
                                                             centralized systems (such as piped sewer collection
                                                             networks) or decentralized systems (such as septic
                                                             tanks subsequently serviced by pump trucks) and
                                                             treatment of collected sewage at centralized
                                                             facilities. The safeguard instruments such as the
                                                             ESM, RPF, and SA have been cleared by a regional
                                                             safeguards advisor and disclosed by the GoE (link:
                                                             http://www.mofed.gov.et/web/guest/-/esmf-of-
                                                             one-wash-cwa-phase-2-
                                                             ?redirect=http%3A%2F%2Fwww.mofed.gov.et%2Fw
                                                             eb%2Fguest%2Fwelcome%3Fp_p_id%3D101_INSTA
                                                             NCE_MbEiVwbCWckE%26p_p_lifecycle%3D0%26p_p
                                                             _state%3Dnormal%26p_p_mode%3Dview%26p_p_c
                                                             ol_id%3Dcolumn-6%26p_p_col_count%3D1). The
                                                             RPF, ESMF and SA are also disclosed on the Bank’s
                                                             external website. For subprojects identified during
                                                             Project preparation, individual Environmental

Jan 04, 2019                                                                                             Page 15 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

                                                             Management Plans or Abbreviated Resettlement
                                                             Action Plans will be developed as needed and
                                                             disclosed accordingly. In the case of potential use of
                                                             the Contingent Emergency Response Component
                                                             (CERC), safeguard concerns will be addressed
                                                             following the Guidance Note on Contingent
                                                             Emergency Response Components in Standard
                                                             Investment Projects and Rapid Response to Crises &
                                                             Emergencies: Procedural Guidelines. Specific CERC
                                                             guidelines will be attached as an annex to the
                                                             approved POM.
  Performance Standards for Private Sector
                                             No
  Activities OP/BP 4.03
                                                             The Project interventions will be predominantly in
                                                             human settlements, outside any natural habitats and
                                                             protected areas. If a water source for a particular
  Natural Habitats OP/BP 4.04                Yes             subproject is linked to an identified natural habitat,
                                                             as part of the ESMF screening, this issue will be
                                                             identified as will potential mitigation measures to
                                                             ensure sustainable use.
                                                             No subproject financed by this Project will intervene
  Forests OP/BP 4.36                         No              in forests. The Project activities do not involve any
                                                             elements of forestry.
                                                             The Project scope does not involve any pest
  Pest Management OP 4.09                    No
                                                             management measures.
                                                             This policy is triggered to avoid or mitigate any
                                                             adverse impacts of the Project activities on physical
                                                             cultural resources such as movable or immovable
                                                             objects, sites, structures, groups of structures,
                                                             natural features, and landscapes that have
                                                             archaeological, paleontological, historical,
                                                             architectural, religious, aesthetic, or other cultural
  Physical Cultural Resources OP/BP 4.11     Yes             significance. Physical cultural resources will be
                                                             addressed through the environmental and social
                                                             screening process outlined in the ESMF. In addition,
                                                             the Environmental Guidelines for Contractors
                                                             include a provision for handling chance finds. Any
                                                             subproject which the screening process
                                                             demonstrates may entail negative impacts on
                                                             cultural property will not be financed by the Project.
                                                             Based on the screening conducted by the World
                                                             Bank, the majority of people in the project area
  Indigenous Peoples OP/BP 4.10              Yes             meet the criteria defined under OP4.10, and the
                                                             project has triggered OP/BP 4.10. The SA was
                                                             updated to identify critical social issues and

Jan 04, 2019                                                                                              Page 16 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

                                                             complement with the updated RPF. Stakeholder
                                                             consultations at the regional, woreda, and
                                                             community levels were carried out and documented
                                                             as part of this assessment.
                                                             This policy is triggered to anticipate potential land-
                                                             related social issues. While site-specific locations of
                                                             subprojects are not identified at this juncture, the
                                                             planned construction and rehabilitation of water
                                                             supply and sanitation facilities might involve land-
                                                             related social issues such as right of way, etc. To
                                                             anticipate those situations, the existing
                                                             Resettlement Policy Framework (RPF) has been
                                                             updated and approved by the Bank. The final
  Involuntary Resettlement OP/BP 4.12      Yes
                                                             updated RPF has been disclosed locally and
                                                             internationally through the Project and the Bank’s
                                                             external websites on January 15 and 16, 2019,
                                                             respectively. During the course of implementation if
                                                             a particular subproject results in potential land
                                                             acquisition issues and or in restriction of access to
                                                             communal natural resources, a complete or
                                                             abbreviated Resettlement Action Plan (RAP) will be
                                                             prepared and disclosed accordingly.
                                                             This policy is triggered as the Project may finance
                                                             small water harvesting structures and small dams
                                                             that would require support to ensure the safety of
                                                             developed infrastructure. The guidelines for small
                                                             dam safety developed by the Ministry of Agriculture
  Safety of Dams OP/BP 4.37                Yes               and Natural Resources and the guidelines for small
                                                             dam safety developed by the MoWIE would be used
                                                             to guide activities related to these potential
                                                             structures. Both guidelines are in compliance with
                                                             the World Bank’s operational policy for the safety of
                                                             dams.
                                                             The specific sites for subprojects have not been
                                                             identified. However, it is likely that the water supply
                                                             for rural communities and small towns may be
                                                             abstracted from tributaries that contribute to
                                                             transboundary watercourses. Although 90 percent of
  Projects on International Waterways                        water supply is expected to be abstracted from
                                           Yes
  OP/BP 7.50                                                 groundwater aquifers, some are linked to surface
                                                             water recharge and others are transboundary
                                                             aquifers. Riparian countries have been notified
                                                             regarding potential extraction and impacts on
                                                             transboundary waters. Somalia responded
                                                             requesting additional time to review notification

Jan 04, 2019                                                                                              Page 17 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

                                                                      information, and an additional month was provided
                                                                      to facilitate its review. Egypt and Kenya responded
                                                                      positively, while no response was received from the
                                                                      remaining four riparian countries that were notified.
                                                                      This policy is not triggered because no water
  Projects in Disputed Areas OP/BP 7.60          No                   development subprojects will be implemented in
                                                                      disputed areas.

   KEY SAFEGUARD POLICY ISSUES AND THEIR MANAGEMENT

   A. Summary of Key Safeguard Issues

  1. Describe any safeguard issues and impacts associated with the proposed project. Identify and describe any potential
  large scale, significant and/or irreversible impacts:
  The Project will generate significant social and environmental benefits and will build on the lessons from the ongoing
  OWNP-CWA as the Project seeks to reduce premature death, water-borne diseases, and associated medical expenses
  by expanding access to improved WSS services. The Project is expected to facilitate time savings for women and girls,
  who bear the burden of fetching water, and thus improve girls’ academic outcomes. It will create permanent and
  temporary job opportunities during its construction and operational phases and will minimize the threat of sexual
  violence through improved, safe sanitation facilities. Any negative impacts would be related to the drilling of wells and
  development of surface water. Possible impacts include water-borne diseases (e.g., malaria, skin diseases) caused by
  lack of drainage in the immediate surroundings of the water systems; reduced water flow downstream, the potential
  of conflict between upstream and downstream users; groundwater contamination during a well’s construction or
  operation; potential for increased animal concentrations in the surroundings of the water point, with effects that
  include overgrazing, soil erosion, and ecosystem degradation; pollution from waste material extracted from the well
  or waste drilling cuttings and drilling mud (boreholes), if not disposed of or reclaimed properly; a temporary increase
  in the suspended solids content of water and effects on users downstream during construction; and, for springs in
  mountainous areas, the possibility of harm to fragile ecosystems and wetlands.
  The sanitation component could also have health hazards related to waste handling, odor, and smell. There is also the
  possibility of microbial water contamination. The inappropriate selection of sanitation systems’ location in relation to
  water supply systems could have a negative impact, and groundwater could be affected where the water table is
  shallow. Also, latrines and other stand-alone sanitation systems should be emptied on a regular basis to mitigate
  health hazards.
  In addition, in some cases there may be risks related to the physical or economic displacement of people, which will
  require careful planning and timely implementation of Resettlement Action Plans (RAPs) or Abbreviated Resettlement
  Action Plans (ARAPs). The likely adverse social impacts of the Project are associated with land acquisition related to
  physical works such as water source development and the construction of reservoirs, public and communal toilets,
  pipelines, and access roads. These might result in a temporary disturbance during construction activities. Other
  possible impacts include the loss of crops, the temporary loss of access to common property resources, the loss of
  physical structure on the land, and a decrease in livelihoods due to acquisition of private agricultural land. However,
  the Project is not expected to have large-scale, significant, or irreversible impacts. In addition, the mitigation measures
  will be implemented in accordance with the social and environmental safeguard instruments of the Project.
  Experiences from the ongoing WASHP (P133591) and fieldwork findings show that jobs created by the Project have
  been taken up by locals; physical infrastructure construction has not resulted in a labor influx in towns and woredas

Jan 04, 2019                                                                                                       Page 18 of 25
The World Bank
          One WaSH - Consolidated WaSH Account Project (One WaSH - CWA) (P167794)

  and hence, the associated risks of such a labor influx, including gender-based violence, are low. However, to preclude
  any gender-based violence (GBV) and sexual exploitation (SEA) risk during the construction period, the Project will
  ensure that a zero-tolerance policy on sexual harassment and abuse of female workers and community members is
  strictly enforced by contractors. Moreover, the Project will ensure that the assigned contractors prepare a code of
  conduct for workers and fully implement it during construction. Bidding documents will include an annex that outlines
  these points.

  2. Describe any potential indirect and/or long term impacts due to anticipated future activities in the project area:
  Possible impacts are site-specific, reversible, temporary in nature and scope; can be easily and cost-effectively
  mitigated; have a limited geographic footprint; and may be mitigated via known measures.

  3. Describe any project alternatives (if relevant) considered to help avoid or minimize adverse impacts.
  The anticipated adverse environmental effects of this Project are expected to be moderate. This is because: (i) the
  physical investments are small in scale; (ii) the effects of the proposed works are likely to be localized and small; (iii)
  mitigation measures are known and can be easily implemented with appropriate oversight at the construction and
  operation stages; iv) the client developed relatively strong capacity in the preparation and application of
  environmental and social safeguard instruments in the WASHS (P133591). The World Bank will also provide technical
  assistance in the form of capacity building activities to the Project team so that it can adequately manage the
  safeguard aspects of the Project during implementation. To address the environmental risks and impacts, the existing
  ESMF has been updated, cleared and disclosed in-country and on the World Bank’s external website. The required
  mitigation plans such as ESMPs will be prepared before commencement of any civil work.
  Regarding land and properties, the Resettlement Policy Framework (RPF) used under the current OWNP was updated
  to address any potential impacts, which are expected to be site specific and minor. The Bank’s OP 4.10 is triggered
  based on the screening conducted by the World Bank and reinforced by the constitution of Ethiopia, which indicates
  that most of the target population identify themselves as having the characteristics defined under OP/BP 4.10.

  4. Describe measures taken by the borrower to address safeguard policy issues. Provide an assessment of borrower
  capacity to plan and implement the measures described.
  The Borrower's capacity for safeguard compliance and oversight has steadily increased over the past few years
  through support from the WASHP (P133591). At the federal level, there is an Environment Social Management Unit
  (ESMU) consisting of four safeguard experts (two environmentalists and two social specialists) dedicated to the
  ongoing OWNP-CWA. There are also 19 safeguard experts working at the regional level. Furthermore, in some regions,
  woreda-level safeguard focal persons have been assigned. The ESMU has implemented several ESMFs and RPFs for
  various projects including the current WASHP (P133591) and the urban water supply projects (phase I and II).
  However, there is a need for strengthening safeguard capacity at both the regional and woreda level, including the
  provision of additional resources. Further training and capacity-building activities at all levels are required. The Project
  will ensure that all regions have assigned woreda-level focal persons responsible for all Project-related safeguard
  matters across sectors, including health and education, and that their capacity is strengthened. The Project will
  allocate adequate budgets for continuous training to further improve the quality of screening, reporting, monitoring,
  and documentation of safeguard activities.
  The updated ESMF and RPF clearly articulate the importance of building capacity for the Project’s safeguard matters at
  all levels. The RPF and ESMF instruments provide guidance for training and capacity-building plans, including the need
  to allocate an adequate budget for continuous training. Detailed requirements will be elaborated in the POM.
  Existing project coordination units have been duly incorporated into the structure of the MoWIE-WDC at the federal
  level and will continue to be responsible for the overall implementation of the ESMF and RPF, including the
  deployment of environmental and social safeguard specialists, and periodic compliance monitoring and reporting.